计算机监控系统业绩表2009

计算机监控系统业绩表2009
计算机监控系统业绩表2009

Reference: h9000_proj_ref.doc

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

北京中水科水电科技开发有限公司

Beijing IWHR Technology Co., Ltd.

中国水利水电科学研究院自动化所

Department of Automation, China Institute of Water Resources and Hydropower Research

地址(Add.):北京市复兴路甲一号(A1, Fuxing Road, Beijing)邮编(ZIP):100038

电话(Tel.):(010) 68589177传真(Fax):(010)68515653

(010) 68515653 电子邮件(email):aec_mk@https://www.360docs.net/doc/4d2778114.html, bitc@https://www.360docs.net/doc/4d2778114.html,

H9000 System Reference (Domestic)

BITC Reference Abroad

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC 1 浙江富春江水电厂(I)

Zhejiang Fuchunjiang HPP (I) 5x60=300MW 轴流 Kaplan

多微机系统 Intel

S 1984.10. Oct. 1984

RH

我国第一套水电厂计算机监控系统—富春江水电厂计算机监控系统(1984年) The 1st Computerized Control System in China (Fuchunjiang Hydropower Plant, 1984)

2 陕西石泉水电厂

Shanxi Shiquan HPP. 3x45=135MW 混流 Francis 分层分布 Distributed HN3000,April SMC600 PLC S,C,R 1991.6. June 1991 NC 3

浙江富春江水电厂(II) Zhejiang Fuchunjiang HHP.(II)

5x60=300MW

轴流 Kaplan 分层分布 Distributed Intel, April SMC600 PLC

S,C,P,A

1990.7. July 1990 RH

4

浙江紧水滩水电厂 Zhejiang Jingshuitan HPP.

6x60+3x20 =420MW

混流 Francis

集中监控 Centralized HN3000 S,C,R 1991.6. June 1991 NC

5

青海龙羊峡水电厂 Qinghai Longyangxia HPP.

4x320=1280MW 混流

Francis 分层分布 Distributed Micro VAX II, CRTP I/O S,C 1993.5. May 1993 NC

6

陕西安康水电厂

Shanxi Ankang HPP.

4x200=800MW

混流 Francis

分层分布 Distributed

HN3000, April SMC600 PLC S,C,P 1993

NC

2

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC 7 广西昭平水电厂 Guangxi Zhaoping HPP. 3x21=63MW 轴流

Kaplan 分层分布 Distributed Intel, STD I/O S,C 1994 NC

现代化的湖南五强溪水电厂中央控制室

Central control room of Wuqiangxi Hydropower Station

8 湖南五强溪水电厂

Hunan Wuqiangxi HPP. 5x250=1250MW 混流 Francis TG8500 Alpha 3000/300, TeleGyr 5700 S,C,R,A 1994.12.

Dec.1994

NC 9 广东宝安水厂 Guangdong Baoan WTP.

TG8500

Alpha 3000/300, Motorola RTU

S,C 1994.8.

Aug.1994 NC

10 湖南凤滩水电厂 Hunan Fengtan HPP. 4x100=400MW 混流

Francis H9000 1.0 Alpha 200 4/100, Alpha 255/233, DEC HUB90 Ethernet, GE90/70 PLC

S,C,P,A

1994.12. Oct.1994

RH 11 四川宝珠寺水电厂 Sichuan Baozhusi HPP. 4x175=700MW 混流 Francis H9000 1.0 Alpha 3000/600S,Alpha 3000/ 300X, DEC HUB90 Ethernet, RTP I/O, Omron CH200 PLC S,C,R,P,A 1996.12. Dec.1996 NC 12 重庆大河口水电厂

Chongqing Dahekou HPP.

3x23=69MW

混流 Francis

H9000S 2.0 IPC 586, GE90/30 PLC

S,C,P

1996.12.

Dec. 1996

NC

3

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC 13 湖南双牌水电厂 Hunan Shuangpai HPP. 3x45=135MW 混流

Francis H9000S 2.0 DEC DWP266I, GE90/30 PLC S,C,P 1995.12. Dec. 1995

RH

14 浙江乌溪江水电厂 Zhejiang Wuxijiang HPP. 1x100=100MW 混流

Francis H9000 1.0 Alpha 200 4/100, GE90/70,

GE90/30, DEC HUB90 Ethernet S,C,P,A 1996.8. Aug. 1996

NC

15 浙江紧水滩水电厂 Zhejiang Jinshuitan HPP. 6x50=300MW 混流

Francis H9000 2.0 Alpha 255/233, dual GE90/30, DEC HUB90 Ethernet

S,C,R,P,A 1997.4. Apr. 1997 RH 16 新疆阿克苏水电厂 Xinjiang Akesu Xidajiao HPP.

4x6.5=26MW 混流

Francis H9000XS

IPC 586 (dual CPU), STD I/O

S,C,P 1996.11. Nov. 1996 RH

17 重庆磨刀溪梯级水电厂调度中心 Chongqing Modaoxi CHPP.

2x8.5=17MW 混流 Francis

H9000S DEC DWP266I

S,C,R

1997.10. Oct. 1997

NC

18 重庆鱼背山水电站 Chongqing Yubeishan HPP.

2x8.5=17MW 混流

Francis H9000S DEC DWP266I, GE90/30 S,C,P

1997.10. Oct. 1997 NC

19 重庆双河水电站 Chongqing Shuanghe HPP.

2x5.5+2x8 =27MW 混流

Francis

H9000XS IPC 586, GE90/30 S,C,P 1997.10. Oct. 1997 NC

20 重庆赶场水电站 Chongqing Ganchang HPP.

3x12.5=37.5MW 混流

Francis H9000XS IPC 586, GE90/30 S,C,P 1997.10. Oct. 1997 NC

21 西北电网水库调度自动化系统

China North West WMS

H9000FDS

Alpha Server 2000/100, Alpha Server 1000, Alpha 3000/300X, HP 586, DEC HUB90 Ethernet

S 1997.9. Aug. 1997

NC

4

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type

配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC

青海龙羊峡水电厂计算机监控系统

The Computerized Control System for Longyangxia Hydropower Plant

22 青海龙羊峡水电厂

Qinghai Longyangxia HPP.

4x320=1280MW 混流

Francis H9000 2.0

Alpha 255/300, DEC HUB90 Ethernet, CRTP I/O

S,C,A

1996.12. Dec. 1996 RH

23 湖南大东江水电厂

Hunan Dadongjiang HPP.

4x125=500MW

混流 Francis H9000 2.0 Alpha 255/300, DEC HUB90 Ethernet, SG-8 PLC, SU-5 PLC S,C,P,A 1997.6. June 1997 RH

24 湖南小东江水电厂

Hunan Xiaodongjiang HPP.

4x25=100MW 混流 Francis H9000S Alpha 255/300, DEC HUB90 Ethernet, SG-8 PLC

S,C,P,A 1997.12. Dec. 1997

RH

25 河北桃林口水电厂

Hebei Taolinkou HPP. 2x13=26MW 混流 Francis H9000S IPC 586, DEC HUB90 Ethernet, GE90/30 PLC

S,C

1997.6. June 1997

NC 26 吉林白山水电厂 Baishan CHPP.

桦甸梯级调度中心 Jilin Huadian CDC.

H9000 2.0

Alpha 255/300, DEC HUB900 100MB Ethernet

S,C,R,A 1997.9.

Sept. 1997

RH

27 白山水电厂

5x300=1500MW 混流 H9000 2.0 Alpha 255/300,Alpha 433au, DEC S,C,P,R,1997.9. RH

5

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item

用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC Jilin Baishan HPP.

Francis HUB 900 100MB Ethernet, Dual

CPU GE90/70

A Sept. 1997 28 红石水电厂

Jilin Hongshi HPP. 4x50=200MW 轴流

Kaplan

H9000 2.0 Alpha 255/300, DEC HUB90 Ethernet, GE90/70 PLC S,C,P,R,A

1997.11. Nov. 1997 RH 29 广西西津水电厂

Guangxi Xijin HPP 4x60=240MW 轴流

Kaplan

H9000 2.0 Alpha 255/233, DEC HUB90 Ethernet, GE90/70 PLC S,C,P,R,A

1997.11. Nov. 1997 RH 30 福建尤溪雍口水电厂

Fujian Youxi Yongkou HPP

2x35=70MW 混流

Francis H9000S IPC 586, DEC HUB90 Ethernet, GE90/30 PLC S,C,P,A

1998.8. Aug. 1998 NC

31 四川洪雅城东水电厂

Sichuan Hongya Chengdong HPP 3x30=90MW

混流

Francis H9000S

IPC 586,GE90/30

S,C,P 1999.12. Dec. 1999

NC

32 海南牛路岭水电厂

Hainan Niululing HPP 4x20=80MW 混流 Francis

H9000S

HP X1100, CISCO 100MB Ethernet, GE90/30 PLC S,C,P 1997.12. Dec. 1997

RH

埃塞俄比亚Tis Abay 二级水电厂的运行人员在操作H9000计算机监控系统

Operator manipulating H9000 control system in Tis Abay II (Ethiopia) hydropower station

33 Tis Abay 二级水电厂

(埃塞俄比亚)

2x36=72MW

混流 Francis

H9000 2.0

Alpha 255/300, DEC HUB90 Ethernet, GE90/70 PLC

S,C,P 1999.12. NC

6

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC Tis Abay II HPP (Ethiopia)

34 福建涌溪三级电站 Fujian Yongxi III HPP. 2x20=40MW 混流 Francis H9000 2.0 Alpha 255/300, DEC HUB90 Ethernet, GE90/30 S,C,P,A,R 1998.12. NC 35 四川汶川中坝水电厂 Sichuan Zhongba HPP. 3x8=24MW 轴流 Kaplan H9000S IPC 586,GE90/30 S,C,P 1998.12. NC 36 四川马边波罗水电厂 Sichuan Boluo HPP. 2x25=50MW 混流 Francis H9000S IPC 586,GE90/30 S,C,P 1998.11. NC 37 广东大河水电厂

Guangdong Dahe HPP. 3x12.5 =37.5MW 轴流 Kaplan H9000S IPC 586,GE90/30 S,C,P,A

1998.10.

NC 38 华能云南徐村水电厂 Yunnan Xucun HPP

3x26=78MW

混流 Francis

H9000 2.0

Alpha 500a, DEC HUB90 Ethernet, GE90/30

S,C,P,R,A

1999.8. NC

乌溪江梯级水电厂远方集中控制中心

Remote control center of Wuxijiang cascaded hydropower plants

39 浙江乌溪江水电厂

Wuxijiang CHPP. 梯级调度中心

Huangtankou CDC

4x24.5+1x100 =198MW 4x7.5+ 2x26 =82MW

H9000 2.0

Alpha 500au, DEC HUB900 100MB Ethernet

S,C,R,A 1998.9.

Sept. 1998

RH

7

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC 40 浙江湖南镇水电厂 Zhejiang Hunanzheng HPP

4x24.5+1x100 =198MW 混流

Francis H9000 2.0 Alpha 500au, DEC HUB900

100MB Ethernet, GE90/30 S,C,P,R,A

1998.9. Sept. 1998

RH 41 浙江黄坛口水电厂 Zhejiang Huangtankou HPP

4x7.5+ 2x26 =82MW 混流

Francis H9000 2.0

Alpha 500au, DEC HUB900 100MB Ethernet, GE90/30 S,C,P,R,A 1998.9. Sept. 1998 RH

42 滦南电网调度自动化系统

Hebei Luannan DMS 11个站

H9000S IPC586, STD

S,C,R

1998.3.

Mar. 1998

43 陕西安康水调自动化系统

Shanxi Ankang HPP WMS

H9000FDS HP586 S 1999.4. April 1999

NC

44 陕西石泉水电厂 Shanxi Shiquan HPP 3x45=135MW 混流

Francis H9000S DEC DWP266I, DEC HUB90 Ethernet, GE90/30 PLC S,C,P,A 1999.4. April 1999 RH 45 福建沙县水电厂 Fujian Shaxian HPP 3x16=48MW 贯流

Bulb H9000S Alpha 500a, DEC HUB90 Ethernet, GE90/30 PLC

S,C,P,A 1999.7. July 1000 NC 46 陕西安康水电厂 Shanxi Ankang HPP 4x200=800MW 混流

Francis H9000 2.0 Alpha 600au,Dual CISCO 100MB Ethernet, Dual CPU Quantum PLC S,C,P,A 1999.4. April 1999 RH 47 湖南蟒塘溪水电厂 Hunan Mangtangxi HPP

3x20=60MW 贯流

Bulb H9000S

Alpha 500a, 10MB Ethernet, GE90-30 PLC

S,C,P

2000.3. Mar. 2000 NC

48 河北大黑汀水电厂 Hebei Daheiting HPP 4x3+2x8 =28MW 混流

Francis

H9000S HP XW4100, CISCO 100MB Ethernet, GE90/30 PLC S,C,P 1999.8. Aug. 1999 RH 49 广东北江及飞来峡防洪调度自动化系统

Guangdong Beijiang &

H9000FDS

HP Server, CISCO 100MB Ethernet, Motorola RTU

S,P

1999.9. Sept. 1999

NC

8

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item

用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC Feilaixia WMS 50 广东坝头水电厂

Guangdong Batou HPP 3x8=24MW 混流 Francis H9000S DEC DWP300i, GE90/30 PLC S,C,P 1999.10. Oct. 1999 NC 51 贵州白水河梯级水电厂

Guizhou Baishuihe CHPP

2x17=34MW

冲击 Pelton H9000S

DEC DWP300i, GE90/30 PLC

S,C,P,A

2000.4. April 2000 NC

52 陕西石泉水电厂二期

Shanxi Shiquan HPP II 2x45=90MW 混流 Francis

H9000 2.0

Alpha 600au, DEC HUB90 Ethernet, GE90/30 PLC

S,C,P,A 2000.3. Mar. 2000

NC

我国第一座大型水电厂新安江水电厂自动化改造后面貌焕然一新的中央控制室

View of central control room of Xinanjiang Hydropower Station, the 1st large hydropower station in China, after rehabilitation

53 浙江新安江水电厂

Zhejiang Xinanjiang HPP

9x90=810MW

混流 Francis

H9000 2.0

Alpha 500au, Dual CISCO 100MB Ethernet, ABB AC70, Dual CPU AC160

S,C,P,A

1999.11. Nov. 1999

RH

9

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type

配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC

贵州东风电厂自动化改造后整洁的发电机厂房

Power house view of Dongfeng Hydropower Station after rehabilitation

54 贵州东风水电厂

Guizhou Dongfeng HPP

3x170=510MW

混流 Francis H9000 2.0

Alpha 500au, Dual CISCO 100MB Ethernet, Quantum PLC

S,C,P,R,A 1999.11. Nov. 1999 RH

55 贵州东风水电厂清镇远

方控制中心

Guizhou Dongfeng HPP CDC

3x170=510MW 混流 Francis

H9000 2.0 Alpha 500au, Dual CISCO 100MB Ethernet

S,C,R,A 2000.5.

May 2000

NC

56 黑龙江西沟水电厂

Heilongjiang Xigou HPP

2x18=36MW

混流 Francis H9000S

IPC 586/200, CISCO 100MB Ethernet, GE90/30 PLC

S,C,P,A

2000.3. Mar. 2000 RH

57 安徽磨子潭水电厂

Anhui Mozitan HPP 1x10=10MW 混流 Francis H9000S AP400/350, AB ControlLogix PLC S,C,P 2000.3. Mar. 2000 RH 58 湖南青山水电厂

Hunan Qingshan HPP 2x18=36MW 混流 Francis H9000S IPC 586/200, CISCO 100MB Ethernet, GE90/30 PLC

S,C,P 2000.5. May 2000 NC 59 福建贡川水电厂

Fujian Gongchuan HPP

2x21.5=43MW

贯流 Bulb

H9000S

Alpha 500a, GE90-30 PLC

S,C,P,A

2000.7. July 2000

NC

10

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type

配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC

马其顿总统参加科佳电站发电剪彩仪式。

President of Macedonia participating

commercial operation ceremony of 1st unit of Kozjak in 7 July, 2004.

60 科佳水电厂(马其顿) Kozjak HPP (Macedonia) 2x50=100MW

混流 Francis H9000S HP LC3, Siemens S7 400 PLC

S,C,P 2000.3. Mar. 2000

NC 61 湖北隔河岩水电厂 Hubei Geheyan HPP

4x300

=1200MW 混流 Francis H9000 3.0 Alpha 600au, Dual CISCO 100MB Ethernet, dual CPU Quantum PLC S,C,P,R,A 2000.8. Aug. 2000 RH 62 百丈际梯级水电厂调度中心

Zhejiang Baizhanji CHPP CDC

H9000S

AP400/350 S,R 2001.1.

Jan. 2001

RH

63 百丈际一级电站 Zhejiang Baizhanji I HPP

2x13.5=27MW

冲击 Pelton H9000S AP400/350, GE90-30 PLC S,C,P

2001.1. Jan. 2001 RH

64 百丈际二级电站 Zhejiang Baizhanji II HPP

2x6.5=13MW

冲击 Pelton H9000S AP400/350, GE90-30 PLC S,C,P 2001.1. Jan. 2001

RH

65 青海龙羊峡水电厂 Qinghai Longyangxia

HPP.

4x320=1280M

W 混流 Francis

H9000 2.0

Alpha 600au, Alpha 255/300, Dual CISCO 100MB Ethernet, Quantum Dual CPU PLC

S,C,P,R,A 2000.5. May 2000 RH

11

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC 66 浙江上标水电厂

Zhejiang Shangbiao HPP

2x8=16MW 冲击

Pelton H9000S IPC 586/200, GE90/30 PLC S,C,P 2000.5. May 2000 RH

67 北京密云水电厂(蓄能)

Miyun Miyun Pump Storage HPP 2x10=20MW

混流 Francis H9000S

Contec PII/333, GE90/30 PLC

S,C,P

2000.6. June 2000 RH

68 浙江北溪水电厂

Zhejiang Beixi HPP 2x34=68MW 混流 Francis H9000 2.0 Alpha 500au, CISCO 100MB Ethernet, GE90/30 PLC S,C,P 2001.12 Dec. 2001 NC 69 贵州乌江渡水电厂

Guizhou Wujiangdu HPP.

3x210=630MW

混流 Francis H9000 2.0

Alpha XP1000, Dual CISCO 100MB Ethernet, Dual CPU GE90-70 PLC

S,C,P,A

2000.11 Nov. 2000 RH

70 新疆铁门关水电厂

Xinjiang Tiemenguan HPP.

5x8.75 =43.75MW 混流 Francis H9000 2.0

Alpha 600au, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P 2001.1 Jan. 2001 NC

71 新疆大山口水电厂

Xinjiang Dashankou HPP.

4x26=104MW

混流 Francis H9000 2.0

Alpha 600au, CISCO 100MB Ethernet, GE90-30 PLC S,C,P 2001.2 Feb. 2001

NC

72 福建东固水电站

Fujian Donggu HPP 1x11.5 =11.5MW 混流 Francis H9000 2.0 GE90/30

S,C,P,R 2001.5.

May 2001

NC 73 北京密云水电厂

Beijing Miyun HPP

4x10=40MW

混流 Francis

H9000S

AP500, CISCO 100MB Ethernet, GE90/30 PLC S,C,P 2001.8. Aug. 2001

RH

12

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type

配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC

引滦入津工程天津大张庄泵站H9000计算机监控系统

H9000 Computerized control system for Dazhangzhuang Pump station of water diversion project for Tianjin city

74 天津大张庄泵站

Tianjin Dazhangzhuang Pump Station

5x900=4500kW

混流 Francis H9000 3.0

AP200, CISCO 100MB Ethernet, Premium PLC

S,C,P

2001.4. Apr. 2001

NC

75 广东贺江梯级调度中心

Guangdong Hejiang CDC

2x20+2x30+2 x 40 =180MW 贯流 Bulb H9000S

AP200, CISCO 100MB

S,C,P,R 2002.3.

Mar. 2002 RH

76 广东江口电站

Guangdong Jiangkou HPP

2x20=40MW

贯流 Bulb H9000S AP200, GE90-30 PLC S,C,P,R 2002.3.

Mar. 2002 RH

77 广东白垢电站

Guangdong Baigou HPP

2x10=20MW 贯流 Bulb H9000S AP200, GE90-30 PLC S,C,P,R 2002.3.

Mar. 2002 RH

78 广东都平电站

Guangdong Duping HPP

2x15=30MW 贯流 Bulb H9000S AP200, GE90-30 PLC S,C,P,R 2002.3.

Mar. 2002 RH

79 福建高砂水电站

Fujian Gaosha HPP

4x12.5=50MW 贯流 Bulb

H9000 3.0 Alpha XP1000, GE90-30 PLC S,C,P

2002.1. Jan. 2001

RH

13

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration 功 能 Functions 投运日期 Operational RH/NC 80 黑龙江黑河水电调度自

动化系统

Heilongjiang Heihe HPDC 混流

Francis

H9000S AP 500,CISCO 100MB Ethernet S,C,P 2001.5. May 2001

NC

三峡梯级调度中心计算机监控系统 Computerized control system of Three Gorges Cascade Dispatching Center

81 三峡梯级调度中心

Hubei Three Gorges CDC

14x700 =9800MW

混流 Francis

ABB Spider

Alpha DS10, DS20,

CISCO Ethernet

S,C,P,R

2003.4. Apr. 2003

NC

14

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type

配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC

宏伟壮观的三峡左岸电站中央控制室

View of central control room of right bank power station of Three Gorges

82 三峡左岸水电站

Hubei Three Gorges Left Bank HPP

14x700 =9800MW 混流 Francis ABB HPC

HP 64位工作站, Hirschmann 10MB Ring Ethernet, Dual CPU AC450 S,C,P 2003.4. Apr. 2003 NC

83 四川马边波罗水电厂

Sichuan Buolo HPP 2x25=50MW 混流 Francis H9000S AP150, GE90/30

S,C,P 2002.1. Jan. 2001 NC 84 贵州长田水电厂

Guizhou Changtian HPP

2x4=8MW

混流 Francis H9000S

AP250, GE90/30 PLC, Protection

S,C,P

2002.5. May 2002 NC

85 陕西蔺河口水电厂

Shanxi Linhekou HPP 3x24=72MW 混流 Francis H9000 3.0 Alpha 600au, CISCO 100MB Ethernet, Dual CPU Quantum PLC S,C,P 2002.10. Oct. 2002 RH 86 重庆江口水电厂

Chongqing Jiangkou HPP

3x100=300MW

混流 Francis

H9000 3.0

Alpha XP1000, CISCO 100MB Ethernet, Quantum PLC

S,C,P 2002.12. Dec. 2002 NC

87 湖南耒中水电厂

Hunan Leizhong HPP

3x13.5=40.5MW 贯流

Bulb

H9000 3.0 HP E800, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P 2002.10. Oct. 2002

NC

15

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name 装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type 配 置 Configuration 功 能 Functions 投运日期 Operational RH/

NC 88 湖南洪江水电厂 Hunan Hongjiang HPP 6x45=270MW 贯流

Bulb ABB HPC HP 64位工作站, Hirschmann Ring Ethernet, ABB AC400 PLC+S800

S,C,P

2002.12. Dec. 2002 NC 89 新疆石灰窑水电厂 Xinjiang Shihuiyao HPP

4x30=120MW 混流

Francis H9000 3.0 Alpha 600au, COMPAQ DW300, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P 2002.11. Nov. 2002 NC

90 云南文山落水洞水电厂 Yunnan Luoshuidong HPP

2x10=20MW 混流

Francis H9000 3.0 HP, GE90/30 PLC, CISCO 100MB Ethernet S,C,P 2003.5. May 2003 NC

91 福建涌溪梯级控制中心 Fujian Yongxi CHPP 2x20+1x11.5 =51.5MW 混流

Francis

H9000 2.0 Alpha 255/300, CISCO 100MB Ethernet

S,C,R

2002.11. Nov. 2002

NC 92 福建古田溪一级水电站 Fujian Gutianxi I HPP 2x8+4x12.5 =66MW 混流

Francis

H9000 3.0 HP E800, GE90-30 PLC, CISCO 100MB Ethernet

S,C,P 2002.10.

Oct. 2002

RH 93 湖南大东江水电厂 Hunan Dadongjiang HPP.

4x125=500MW 混流

Francis H9000 2.0

Alpha 255/300, SU-6 PLC, CISCO 100MB Ethernet

S,C,P,R,A 2002.11. Nov. 2002

RH

94 广西合面狮水电厂 Guangxi Hemianshi HPP.

4x20=80MW 轴流

Kaplan H9000 3.0

HP DS10, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P 2002.12.

Dec. 2002 RH

95 浙江上标水电厂 Zhejiang Shangbiao HPP.

2x8=16MW 冲击

Pelton H9000 3.0 HP EVO W6000, CISCO 100MB Ethernet, GE90-30 PLC S,C,P

2003.1. Jan. 2003 RH

96 湖南蟒塘溪水电厂扩机 Hunan Mangtangxi HPP. II

1x10=10MW 混流

Francis H9000 2.0 GE90-30 PLC

S,C,P 2003.4. Apr. 2003 NC

97 浙江仙居水电厂 Zhejiang Xianju HPP. 2x12.5=25MW 混流

Francis H9000 3.0 ICS C4, CISCO 100MB Ethernet, Premium PLC

S,C,P 2004.6. June 2004 NC 98 江西抱子石水电厂 2x20=40MW 贯流

H9000 3.0 Sun Blade 2000, CISCO 100MB

S,C,P

2003.10.

NC

16

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type

系统型号 System Type 配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC

Jiangxi Baozishi HPP. Bulb

Ethernet, Premium PLC

Oct. 2003

99 湖南碗米坡水电厂

Hunan Wanmipo HPP. 3x80=240MW 混流

Francis

H9000 3.0 Sun Blade 2000, CISCO 100MB Ethernet, Dual CPU Quantum PLC S,C,P 2003.9. Sept. 2003

NC

100 湖北陡岭子二级水电厂 Hubei Doulingzi II HPP. 3x5=15MW 混流

Francis

H9000 3.0 HP EVO W4000, CISCO 100MB Ethernet, Siemens S7 300 PLC S,C,P 2003.7. July 2003

NC

101

贵州乌江水电厂扩机 Guizhou Wujiangdu HPP. II

2x250=500MW 混流

Francis H9000 3.0

Sun Blade 2000, CISCO 100MB Ethernet, Dual CPU Quantum PLC S,C,P 2003.6. June 2003 NC

102 云南曼棍水电厂

Yunnan Mangun HPP. 2x8=16MW 混流 Francis H9000 3.0 HP EVO W4000, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P 2003.12. Dec. 2003 NC 103 湖南潇湘水电厂

Hunan Xiaoxiang HPP. 4x13=52MW 贯流 Bulb H9000 3.0 HP EVO W4000, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P 2003.6. June 2003 NC 104

重庆梯子洞水电厂 Chongqing Tizidong HPP.

3x12=36MW

轴流转浆

Kaplan H9000 3.0

HP EVO W4000, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P

2003.11. Nov. 2003 NC

105 湖南凤滩水电厂扩机 Hunan Fentan HPP.II 4x100+2x200 =800MW 混流 Francis H9000 3.0 Sun Blade 2000, CISCO 100MB Ethernet, Dual CPU Quantum PLC S,C,P 2003.12. Dec. 2003 NC 106 广西桂平水电厂

Guangxi Guiping HPP. 3x15=45MW 贯流 Bulb H9000 3.0 HP XW5000, FastEthernet, Quantum PLC

S,C,P 2004.5. May 2004 RH 107

湖南株州航运水电厂 Hunan Zhuzhou Navigation HPP.

5x28=140MW

贯流 Bulb

H9000 3.0

Sun Blade 2000, CISCO 100MB Ethernet, Dual CPU Quantum PLC

S,C,P

2004.5. May 2004

NC

17

北京中水科水电科技开发有限公司 / 中国水利水电科学研究院自动化所

By Beijing IWHR Technology Co., Ltd. / Department of Automation, China Institute of Water Resources and Hydropower Research

计算机监控系统业绩表

Reference of Computerized Supervision and Control System

序号 Item 用 户 名 称 User Name

装机容量 Installed Capacity 机组类型 Unit Type 系统型号 System Type

配 置 Configuration

功 能 Functions 投运日期 Operational RH/NC

公伯峡水电站已于2006年5月全部机组发电

All five units of Gongboxia Power Station become operational with H9000 system by May 2006.

108 青海公伯峡水电厂

Qinghai Gongboxia HPP.

5x300=1500MW 混流

Francis H9000 3.0

Sun Blade 2000, CISCO 100MB Ethernet, Quantum Dual CPU PLC, BARCO

S,C,P 2004.5. May 2004 NC

109 云南茄子山水电厂

Yunnan Qiezishan HPP.

2x8=16MW

混流 Francis H9000 3.0

Compaq ML350G3, CISCO 100MB Ethernet, GE90-30 PLC S,C,P 2003.7. July 2003 NC

110 甘肃汉平嘴水电厂

Gansu Hanpingzui HPP.

3x24=72MW 贯流 Bulb H9000 3.0 Sun Blade 150, CISCO 100MB Ethernet, Quantum PLC

S,C,P

2004.5. May 2004 NC

111 福建涌溪四级水电厂

Fujian Yongxi IV HPP. 3x12=36MW 混流 Francis H9000 2.0 Alpha 433, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P 2003.12 Dec. 2003 NC 112 四川天龙湖水电厂

Sichuan Tianlonghu HPP.

3x60=180MW

混流 Francis H9000 3.0

Sun Blade 2000, CISCO 100MB Ethernet, Dual CPU Quantum PLC S,C,P 2003.9. Sept. 2003 NC

113 浙江分水江水电厂

Zhejiang Fenshuijiang

2x15=30MW 贯流 Bulb

H9000 3.0 Nematron IPC, CISCO 100MB Ethernet, GE90-30 PLC

S,C,P

2004.9. Sept. 2004

NC

2009年考研计算机统考408真题

2009年考研计算机统考408真题 一、单项选择题 1.为解决计算机主机与打印机之间速度不匹配问题,通常设置一个打印数据缓冲区, 主机将要输出的数据依次写入该缓冲区,而打印机则依次从该缓冲区中取出数据。 该缓冲区的逻辑结构应该是 1 。 A.栈 B.队列 C.树 D.图 2.设栈S和队列Q的初始状态均为空,元素a,b,c,d,e,f,g依次进入栈S。若每个元素出 栈后立即进入队列Q,且7个元素出队的顺序是b,d,c,f,e,a,g,则栈S的容量至少是 2 。 A. 1 B. 2 C. 3 D. 4 3.给定二叉树如图A-1所示。设N代表二叉树的根,L代表根结点的左子树,R代表 根结点的右子树。若遍历后的结点序列是3,1,7,5,6,2,4,则其遍历方式是 3 。 图A-1 A.LRN B.NRL C.RLN D.RNL 4.下列二叉排序树,满足平衡二叉树定义的是 4 。 A. B.

C. D. 5.已知一棵完全二叉树的第6层(设根为第1层)有8个叶结点,则该完全二叉树的 结点个数最多是 5 。 A.39 B.52 C.111 D.119 6.将森林转换为对应的二叉树,若在二叉树中,结点u是结点v的父结点的父结点, 则在原来的森林中,u和v可能具有的关系是 6 。 I.父子关系 II.兄弟关系 III.u的父结点与v的父结点是兄弟关系 A.只有II B.I和II C.I和III D.I、II和III 7.下列关于无向连通图特性的叙述中,正确的是7 。 I.所有顶点的度之和为偶数 II.边数大于顶点个数减1 III.至少有一个顶点的度为1 A.只有I B.只有II C.I和II D.I和III 8.下列叙述中,不符合m阶B树定义要求的是8 。 A.根结点最多有m棵子树 B.所有叶结点都在同一层上 C.各结点内关键字均升序或降序排列 D.叶结点之间通过指针链接 9.已知关键字序列5,8,12,19,28,20,15,22是小根堆(最小堆),插入关键字 3,调整后得到的小根堆是8 。 A.3,5,12,8,28,20,15,22,19 B.3,5,12,19,20,15,22,8,28 C.3,8,12,5,20,15,22,28,19 D.3,12,5,8,28,20,15,22,19

船闸计算机监控系统

船闸计算机监控系统 摘要:现如今,我国的国民经济在快速的发展,社会在不断的进步,随着自动 化技术和信息化技术不断发展,以及运行管理体制的改革,对水利水电工程的自 动化技术提出了更高的要求。计算机技术、信息技术和现场总线技术的飞速发展 给水利水电工程自动化系统无论在结构上还是功能上,都提供了一个广阔的发展 空间。水利水电工程自动化系统应该成为一个集计算机、远程控制、网络以及多 媒体为一体的综合系统。 关键词:船闸;计算机;监控系统 引言 船闸计算机监控系统是航运行业管理自动化信息化的重要组成部分,涉及计 算机控制、分布式数据管理、上下位软件编程、传感器技术、通信技术等。随着 船闸布点的迅速发展,建立一套船闸计算机监控系统迫在眉睫,以实现船闸管理“无人值班、少人值守”的目标。 1系统配置与结构 某船闸上、下闸首均采用人字门启闭,卧式液压启闭机提供动力,闸首左、 右闸室均配置一套现地动力控制柜和一套现地左、右现地动力控制柜主要控制液 压油泵、人字门、泄水阀门及交通灯,左侧现地配置一套施耐德右侧现地配置一 套施耐德远程扩展机架,左、右侧采用扩展电缆连接,实现闸首左、右侧同步控制。上位机配置台操作员站、台历史数据库服务器和台调度服务器。监控软件采 用监控软件,台操作员站互为冗余,充分保证系统旳可靠性;历史数据库服务器 负责历史数据存储,能够实现报表分类查询,操作査询,事件査询、曲线査询等;调度服务器主要功能为船闸优化调度和船闸收费,船闸调度系统软件可以模拟闸 室尺寸与船闸尺寸,合理安排上行、下行船只数量,高效、快捷地实现船只上行 与下行。船闸收费系统配置了上闸首收费刷卡机、下闸首收费刷卡机及网络设备,采用收费系统软件,实现上行、下行船只收费工作。 2船闸计算机监控系统 2.1架构设计 枢纽船闸计算机监控系统采用分层分布式结构,采用开放式、全分布设计, 由集中控制单元和现地控制单元两部分组成。船闸计算机监控系统还包括广播、 收费、通航信号灯等设备,与西溪船闸工业电视图像视频系统构成一个完整的、 独立的船闸控制监视综合系统。船闸监控系统的网络拓朴结构分为以下三层,最 上层是监控管理层,包括2台互为热备用的操作员工作站(监控主机)、1台数 据服务器、1台调度工作站、2台收费工作站以及视频监视主机。中间层是现地LCU控制层,现地LCU向上通过以太网通信模块与监控管理层实现通讯,通讯介 质为光纤,上下闸首的两台收费工作站通过光纤以太网和监控管理层相连。现地LCU分布在上闸首、下闸首的左右机房和闸坝配电房内。底层是设备与器件层, 各种设备与器件通过硬线电缆与LCU及继电器、接触器相连接。各PLC与上位机 之间的通讯采用光纤以太网。现地控制单元PLC之间通过PROFIBUSDP现场总线 实现连接,总线安装方便简单,各PLC之间实现监测数据共享,LCU主要完成被 监控设备的就地数据的采集及监控功能。船闸收费系统作为计算机监控系统中一 个重要的子系统,完成对过往船只的注册登记、收费管理的采集船只信息与完成 缴交过闸费用的任务。船闸收费调度系统船闸收费调度由收费工作站、读卡器、 调度工作站和数据库服务器等组成。收费工作站一般放置于上游(下游)收费亭

计算机监控系统管理制度

中国大唐集团新能源股份有限公司 计算机监控系统管理制度 部门:万宝沟电站 年度:2016年度

计算机监控系统管理制度 第一章总则 第一条为加强万宝沟电站计算机监控系统的管理,确保计算机监控系统正常运行,特制定本制度。 第二条本制度包括:运行管理、维护管理、技术管理、安全管理。 第三条适用范围:电站计算机监控系统的管理。 第二章运行管理 第四条电站是计算机监控系统的运行维护管理部门,贯彻执行计算机监控系统各项技术标准、规程规范和管理制度;负责保障电站计算机监控系统相关设备正常工作所需条件,保障系统的安全、稳定运行,对系统运行率指标负责;负责电站计算机监控相关设备的日常巡视;负责自动化数据可靠上传、缺陷处理等维护、定检工作。 第五条计算机监控系统的安全是电站安全生产的重要环节,集中中心负责计算机监控系统软硬件的管理和维护,运行值班人员负责在操作员站上监视和控制。 第六条运行值班人员对计算机监控系统各设备进行定时巡检,及时发现计算机监控系统异常情况,并及时汇报处理。巡检内容应包括电站计算机监控系统各主机是否运行正常,各设备运行指示灯指示应正常,监控程序数据正常刷新,和各监控装置、智能设备通讯正常,监控功能正常。 第七条运行人员可按照现场运行规程的规定,对监控装置进行断电复位等简单缺陷处理工作。 第八条监控主机经验收合格投入运行后,如无特殊情况不得退出监控程序。 第九条运行人员严禁修改监控系统数据、配置,严禁在监控画面私自添加用户帐号和更改监控画面。 第十条运行人员如果发现监控装置设备紧急故障,如设备电源起火、有冒烟现象等,应立即断开监控装置电源,缓解故障情况后,及时通知相关人员进行处理。 第三章维护管理 第十一条电站维护专责对电站所有监控计算机及信息进行统筹管理,对电站所有监控计算机、设备进行登记、造册备案和维修;对软件系统进行维护和改造。 第十二条计算机监控系统的维护包括:系统故障后的系统软硬件、应用软件重新安装、根据运行需要对原有系统的功能完善,数据及系统备份,以及版本的升级等。 第十三条凡在电站计算机监控系统设备上的检修、试验、故障处理等工作,包括软件的修改、测试、对网络及硬件的维护等,必须办理工作票。 第十四条计算机监控系统的验收应按设备检修的验收规范进行。 第十五条应用软件(逻辑控制程序、数据库、画面及配置文件等)和硬件的更改必须经电站批准,重大技术更改须经总工程师批准。修改工作完成后需填写《计算机监控系统软硬件修改记录表》,集控中心定期进行检查。 第十六条电站根据定期工作计划,每月对计算机监控系统进行一次检测维护,并填写《计算机监控系统日常维护检测表》,班组审查、存档。 第十七条在对软件、监控程序、数据库、通讯规约、配置文件等进行修改之前及修改完成后均需对系统进行备份,以备意外情况下的及时恢复。 第十八条未经电站负责人批准,不允许任何人改变计算机监控系统网络拓扑结构。禁止计算机监控系统与Internet及其他系统连接。 第十九条计算机监控系统必须使用专用磁盘。 第二十条维护人员应定期对监控程序、数据库、通讯规约、配置文件、历史记录进行备份,应有不少于两份的可用备份,并存放于不同介质与不同地点。 第二十一条新增监控设备需经相应的验收程序后,方可投运。 第二十二条电站的计算机监控系统各装置由运行人员负责清洁。 第二十三条电站应建立计算机监控系统的定期巡检、定期校验、轮换规定,建立巡检记录簿、检验记录簿、缺陷处理记录簿,上述各项工作均应详细记录在相应的记录簿上。

全国2009年10月自学考试计算机网络管理试题

全国2009年10月自学考试计算机网络管理试题 课程代码:02379 一、单项选择题(本大题共20小题,每小题2分,共40分) 在每小题列出的四个备选项中只有一个是符合题目要求的,请将其代码填写在题后的括号内。错选、多选或未选均无分。 1.在控制台产生报警事件时,是由于网络设备中超过RMON警报组定义的一组网络性能的 ( ) A.最小值 B.最大值 C.门限值 D.默认值 2.下面属于端系统之间的协议是( ) A.TCP B.IP C.ARP D.PPP 3.为了提高效率,希望监视器每次只返回的那些自上次查询以来改变了的值,RMON2在MIB的定义中, 使用( ) A.时间过滤器索引 B.外部对象索引 C.协议目录表 D.监视器的标准配置法 4.若“2007年8月15日,当地时间21点57分43.5秒”用GeneralizedTime类型可表示为 ( ) A.070815215743.5 B.070815215743.5Z C.20070815215743.5 D.20070815215743.5Z 5.在不修改、不违反 .......SNMPv1管理框架的前提下,RMON规范提供了( ) A.检索未知对象的操作 B.检索表对象操作 C.行增加和行删除的操作 D.设置或更新变量值的操作 6.在Windows Server 2003环境中,仅用于分发电子邮件且没有 ..启用安全性的组类型是 ( ) A.安全组 B.全局组 C.通信组 D.本地组 7.为了以最小的交换次数检索最大的管理信息,或者说管理站要求最可能大的响应报文,SNMPv2增加的PDU是( ) A.GetrequestPDU https://www.360docs.net/doc/4d2778114.html,rmRequestPDU C.GetBulkRequestPDU D.SetRequestPDU 8.RFC1155中所定义的未知 ..数据类型是( ) A.Counter B.TimeTicks 1

监控系统技术要求规范书

实用文档 变电站综合自动化系统 技术要求 XXXX公司 O—四年十月

文案大全

招标项目技术要求 说明:对于招标文件中标有“ * ”下画线的条款,投标人必须满足;对这些条款的偏 离可能会导致废标。 1适用范围及工程概况 1.1适用范围 本项目要求书适用于 10kV & 0.4 kV 变电站综合自动化系统项目 所用的变电站自动化系统,满 足实现高、中、低压设备智能化监控的集成。 1.2 工程概况 本项目变电所为10kV 变电站和0.4 kV 变电所,工程内容为 10kV 变电站增加一台高压配电设 备,0.4kV 变 电所增加相应的一套低压配电设备。 投标单位需将0.4 kV 变电所按照综合自动化系统的要求进行系统集成,具体要求如下: 1.2.1按要求提供系统后台硬 件及软件,软件必须有免于买方第三方侵权起诉的完整知识产权。 1.2.2设计并实施系统综合布线,该布线内容除网络布线外尚需包含低压柜等智能设备的通讯网络系 统的二次接线设计、端子排布置设计和供货及现场接线等。 1.2.3*提供智能仪表 YYEL2000系列硬件和配套的通讯接口软件,并接入监控系统,要求监控系统完 整采集中标设备可提供的有关参数如:电流、电压、功率、功率因数、有功电度、无功电度等。 1.2.4提供系统所需的操作台、椅、控制柜等。 2供货范围及工程要求 *投标方必须是施耐德公司电力配电监控系统的系统集成商,并且须具有相关的授权书资质; 近三年内具有两个以上的电力监控系统的系统集成业绩。 2.1 *低压开关柜上的多功能智能型电力参数测量仪必须为 液晶显示屏、 10 模块、通讯接口等。 2.2设备的生产制造应按照设计图纸进行。 卖方责任范围 负责提供所供系统(设备)与其它系统(设备)的接口要求,配合相关的接口设计。 提供所供系统(设备)的技术文件、拓扑图、技术资料及与其它(系统)设备的接口设计。 YYEL2000系列,每台仪表应配置大屏幕 2.3 设备的包装及运输应符合相关标准要求。 2.4 设备的交货地点:XXXXX 工地。 2.5 设备的交货日期:合同签订生效后 1个月内。 2.6 设备的现场安装、调试:现场条件具备后进场。 3.1 负责监控系统的设计、生产、安装调试。 3.2 3.3 3.4 负责对买方技术人员的培训。

计算机监控系统管理制度

精心打造 计算机监控系统管理制度 部门:万宝沟电站 年度:2016年度

计算机监控系统管理制度 第一章总则 第一条为加强万宝沟电站计算机监控系统的管理,确保计算机监控系统正常运行,特制定本制度。 第二条本制度包括:运行管理、维护管理、技术管理、安全管理。 第三条适用范围:电站计算机监控系统的管理。 第二章运行管理 第四条电站是计算机监控系统的运行维护管理部门,贯彻执行计算机监控系统各项技术标准、规程规范和管理制度;负责保障电站计算机监控系统相关设备正常工作所需条件,保障系统的安全、稳定运行,对系统运行率指标负责;负责电站计算机监控相关设备的日常巡视;负责自动化数据可靠上传、缺陷处理等维护、定检工作。 第五条计算机监控系统的安全是电站安全生产的重要环节,集中中心负责计算机监控系统软硬件的管理和维护,运行值班人员负责在操作员站上监视和控制。 第六条运行值班人员对计算机监控系统各设备进行定时巡检,及时发现计算机监控系统异常情况,并及时汇报处理。巡检内容应包括电站计算机监控系统各主机是否运行正常,各设备运行指示灯指示应正常,监控程序数据正常刷新,和各监控装置、智能设备通讯正常,监控功能正常。 第七条运行人员可按照现场运行规程的规定,对监控装置进行断电复位等简单缺陷处理工作。 第八条监控主机经验收合格投入运行后,如无特殊情况不得退出监控程序。 第九条运行人员严禁修改监控系统数据、配置,严禁在监控画面私自添加用户帐号和更改监控画面。 第十条运行人员如果发现监控装置设备紧急故障,如设备电源起火、有冒烟现象等,应立即断开监控装置电源,缓解故障情况后,及时通知相关人员进行处理。 第三章维护管理 第十一条电站维护专责对电站所有监控计算机及信息进行统筹管理,对电站所有监控计算机、设备进行登记、造册备案和维修;对软件系统进行维护和改造。 第十二条计算机监控系统的维护包括:系统故障后的系统软硬件、应用软件重新安装、根据运行需要对原有系统的功能完善,数据及系统备份,以及版本的升级等。 第十三条凡在电站计算机监控系统设备上的检修、试验、故障处理等工作,包括软件的修改、测试、对网络及硬件的维护等,必须办理工作票。 第十四条计算机监控系统的验收应按设备检修的验收规范进行。 第十五条应用软件(逻辑控制程序、数据库、画面及配置文件等)和硬件的更改必须经电站批准,重大技术更改须经总工程师批准。修改工作完成后需填写《计算机监控系统软硬件修改记录表》,集控中心定期进行检查。 第十六条电站根据定期工作计划,每月对计算机监控系统进行一次检测维护,并填写《计算机监控系统日常维护检测表》,班组审查、存档。 第十七条在对软件、监控程序、数据库、通讯规约、配置文件等进行修改之前及修改完成后均需对系统进行备份,以备意外情况下的及时恢复。 第十八条未经电站负责人批准,不允许任何人改变计算机监控系统网络拓扑结构。禁止计算机监控系统与Internet及其他系统连接。 第十九条计算机监控系统必须使用专用磁盘。 第二十条维护人员应定期对监控程序、数据库、通讯规约、配置文件、历史记录进行备份,应有不少于两份的可用备份,并存放于不同介质与不同地点。 第二十一条新增监控设备需经相应的验收程序后,方可投运。 第二十二条电站的计算机监控系统各装置由运行人员负责清洁。 第二十三条电站应建立计算机监控系统的定期巡检、定期校验、轮换规定,建立巡检记录簿、检验记录簿、缺陷处理记录簿,上述各项工作均应详细记录在相应的记录簿上。

水电站计算机监控系统的基本技术

,第二篇水电站计算机监控系统的基本技术 任务一、水电站计算机监控系统的工作原理 子任务一、电站主控层的计算机监控原理 电站主控层(主要由上位机组成),介于电网层与现地控制层之间,是操作员监控运行过程的主要窗口,负责对控制过程的“控、监、传”。其“控”,就是将“人”的操作信息送入控制系统,实现运行状态的转换,其“监”,就是对系统的数据库进行管理,进而实现信息处理和送达,其“传”,就是在电网层与现地控制层之间实现信息的传递。在水电站主控层安装有水电站计算机监控系统的历史数据库、实时数据库、历史数据库管理系统、实时数据库管理系统、上位机软件系统和人机接口界面等。现地控制单元层的数据首先采集进入实时数据库,一方面,上位机软件根据设定的时间,通过实时数据库管理系统定时访问实时数据库的数据,并定时刷新人机接口界面,这样便于操作运行人员了解整个电站的运行情况;另一方面,实时数据库的数据定时存储入历史数据库,历史数据库可以由历史数据库管理系统进行管理,操作运行人员可以一次通过人机接口界面、上位机软件和历史数据库管理平台对历史数据进行管理、修改和查询等操作。此外,实时数据库可以通过上位机中的远程通讯软件与电网层进行数据交换。主控层原理见(图2-1)。 图2-1 电站主控层的工作原理简图

子任务二、现地控制单元层计算机监控原理 水电站计算机监控系统的现地控制单元主要包括机组现地控制单元和开关站及公用设备现地控制单元。其中,机组现地控制单元主要在现场对机组运行实现监视和控制。它需要直接与水电站的生产过程接口,对发电机生产过程进行监控,运行中要实现数据采集、处理和设备运行监视,同时通过局域网与监控系统其他设备进行通信,以及完成自诊断等。同时,它要协调功能层设备如调速器、励磁装置、同期装置、备自投装置等与现地控制单元的的联动以完成调速、调压、调频以及事故处理等快速控制的任务。在上位机系统出现故障或退出运行时,现地LCU应能够正常运行和实现对水轮发电机组发电的基本控制。而开关站及公用设备现地控制单元主要完成对开关站以及公用设备的计算机监控。现地LCU主要技术有: 1.水轮发电机组的测量 水轮发电机组的测量主要包括电量和非电量的测量。电量包括交流电参数和直流电参数。非电量包括水位、油位、压力、温度等。 2.水轮发电机组的顺序控制 水轮发电机组的顺序操作功能是机组现地控制单元中自动控制的组成部分,是实现水电厂计算机监控的基础,其任务是按照给定的运行命令自动地按规定的顺序控制机组的调速器、励磁设备、同步装置和机组的自动化原件,实现机组各种工况的转换。常规机组通常有停机、发电和调相三种运行状态。机组的顺序操作主要是机组三种运行状态的转换,实际运行中,也包括发电、并网、空载、空转等运行状态的转换。 1)水轮发电机组的PLC控制系统设计 目前在水电站中广泛应用的计算机监控系统现地控制单元是以可编程序控制器(PLC)和人机接口界面(触摸屏)为控制核心的。PLC的输入输出原理如图所示:

计算机统考考研试题及参考答案

2009年计算机统考考研试题及参考答案 2009年计算机统考考研试题及参考答案1 2009年计算机统考考研试题1 2009年计算机统考试题参考答案9 2009年计算机统考考研试题及参考答案2009年计算机统考考研试题 一.单项选择题,每小题2分,共80分。 1.为解决计算机与打印机之间速度不匹配的问题,通常设置一个打印数据缓冲区,主机将要输出的数据依次写入该缓冲区,而打印机则依次从该缓冲区中取出数据。该缓冲区的逻辑结构应该是 A.栈 B.队列 C.树 D.图 2.设栈S和队列Q的初始状态均为空,元素abcdefg依次进入栈S。若每个元素出栈后立即进入队列Q,且7个元素出队的顺序是bdcfeag,则栈S的容量至少是 A.1 B.2 C.3 D.4 3.给定二叉树图所示。设N代表二叉树的根,L代表根结点的左子树,R代表根结点的右子树。若遍历后的结点序列为3,1,7,5,6,2,4,则其遍历方式是 A.LRN B.NRL C.RLN D.RNL 4.下列二叉排序树中,满足平衡二叉树定义的是

A. B. C. D. 5.已知一棵完全二叉树的第6层(设根为第1层)有8个叶结点,则完全二叉树的结点个数最多是 A.39 B.52 C.111 D.119 6.将森林转换为对应的二叉树,若在二叉树中,结点u是结点v的父结点的父结点,则在原来的森林中,u和v可能具有的关系是 I.父子关系 II.兄弟关系 III. u的父结点与v的父结点是兄弟关系 A.只有II B.I和II C.I和III D.I、II和III 7.下列关于无向连通图特性的叙述中,正确的是 I.所有顶点的度之和为偶数 II.边数大于顶点个数减1 III.至少有一个顶点的度为1 A.只有I B. 只有II C.I和II D.I和III 8.下列叙述中,不符合m阶B树定义要求的是 A.根节点最多有m棵子树 B.所有叶结点都在同一层上 C.各结点内关键字均升序或降序排列 D.叶结点之间通过指针链接 9.已知关键序列5,8,12,19,28,20,15,22是小根堆(最小堆),插入关键字3,调整后得到的小根堆是 A.3,5,12,8,28,20,15,22,19 B. 3,5,12,19,20,15,22,8,28 C.3,8,12,5,20,15,22,28,19 D. 3,12,5,8,28,20,15,22,19 10.若数据元素序列11,12,13,7,8,9,23,4,5是采用下列排序方法之一得到的第二趟排序后的结果,则该排序算法只能是 A.起泡排序 B.插入排序 C.选择排序 D.二路归并排序 11.冯·诺依曼计算机中指令和数据均以二进制形式存放在存储器中,CPU区分它们的依据是 A.指令操作码的译码结果 B.指令和数据的寻址方式 C.指令周期的不同阶段 D.指令和数据所在的存储单元 12.一个C语言程序在一台32位机器上运行。程序中定义了三个变量xyz,其中x和z是int型,

计算机后台监控系统报告

检测试验报告 客户名称:淮安供电公司 工程名称:淮安黄岗220KV变电站庆鼎110KV出 线间隔扩建工程 项目名称:计算机监控系统调试报告 检验时间: 报告编号:JNDL-调试-XLBH-004 报告编写/日期: 报告审核/日期: 报告批准/日期: (检测报告章) 江南电力有限公司

第一部分整体说明及功能、性能报告 一、整体说明 本调试报告内容主要分分以下二个部分: 第一部分为概述及功能、性能试验; 第二部分为站内测控装置系统调试报告; 1、调试、检验依据 1.1调试依据 1.1.1GB 50150-2006《电气装置安装工程电气设备交接试验标准》 1.1.2DL/T 《电力建设安全工作规程(变电所部分)》 1.1.3DL/T995-2006《继电保护和电网安全自动装置检验规程》 1.1.4DL/T630-1997 《交流采样远动终端技术条件》 1.1.5DL/ 《远动设备及系统第5部分传输规约第101 篇基本远动任务配套标准》1.1.6DL/T667-1999 《远动设备及系统第5部分传输规约第103 篇继电保护设备信 息接口配套标准》 1.1.7DL/T719-2000 《远动设备及系统第5部分传输规约第102 篇电力系统电能累 计量传输配套标准》 1.1.8DL5002-2005《地区电网调度自动化设计技术规程》 1.1.9DL5003-2005《电力系统调度自动化设计技术规程》 1.1.10DL/T5136-2001《火力发电厂、变电所二次线设计技术规定》 1.1.11DL/T5149-2001 《220kV~500kV变电所计算机监控系统设计技术规程》 1.1.12Q/GDW 140-2006 《交流采样测量装置运行检验管理规程》 1.1.13国家电网安监[2005]83号《国家电网公司电力安全工作规程(变电站和发电厂电气 部分)》 1.1.14《华东电网500kV计算机监控系统技术规范和验收标准》 1.1.15《江苏电网时间同步系统技术规范》 1.1.16设计院、制造厂有关的图纸、技术资料、相关技术规范 1.1.17监控系统的功能技术规范书、工厂验收报告、入网检测报告 二、后台应用及功能、性能试验

计算机控制系统习题集

计算机控制系统习题集计算机控制系统课程课题组编 青岛科技大学信 息科学技术学院 2008.10

目录 一各章习题.........................................................1二填空题练习......................................................6三简答题练习......................................................8四综合题练习 (11)

一各章习题 1.1 第1章绪论 1.计算机控制系统的硬件主要包括哪几个部分? 2.什么是过程控制通道,过程控制通道主要有哪几种? 3.根据计算机控制系统的发展历史和在实际应用中的状态,计算机控制系统可分为哪6类,各有何特点? 4.计算机控制系统从深度和广度两方面各有何发展趋势。 1.2 第2章计算机控制系统中的检测设备和执行机构 1.什么叫传感器及变送器? 2.简述压力检测的主要方法和分类。 3.简述温度检测的主要方法和分类。 4.简述热电偶测温的原理。 2. 物位仪表分为哪几类? 6.简述电容式差压变送器的工作原理。 7.简述常用执行机构和执行器的工作原理。 8.简述TT302温度变送器的结构和工作原理。 9.简述交流、直流伺服电机的工作原理。 6.简述步进电机的工作原理。 1.3 第3章计算机总线技术 1.什么叫总线?为什么要制定计算机总线标准? 2.计算机总线可以分为哪些类型? 3.评价总线的性能指标有哪些? 4.STD 总线有哪些特点? 5.常用的PC总线有哪些?各有什么特点? 6.简述PCI总线的性能特点。

2005年---2015年_江苏专转本计算机--真题及答案

2005-2015年 江苏专转本计算机历年真题 目录 2005年“专转本”计算机应用基础统一考试试题 (2) 2006年“专转本”计算机应用基础统一考试试题 (9) 2007年“专转本”计算机应用基础统一考试试题 (15) 2008年“专转本”计算机应用基础统一考试试题 (23) 2009年“专转本”计算机应用基础统一考试试题 (32) 2010年“专转本”计算机应用基础统一考试试题 (40) 2011年“专转本”计算机应用基础统一考试试题 (49) 2012年江苏省普通高校专转本选拔考试计算机基础试题57 2013年江苏省普通高校专转本选拔考试计算机基础试题 (64) 2014年江苏省普通高校专转本选拔考试计算机基础试题 (73) 2015年江苏省普通高校专转本选拔考试计算机基础试题 (80)

2005年“专转本”计算机应用基础统一考试试题 (考试时间90分钟,满分100分) 一、单项选择题 1.基于冯·诺依曼提出的存储程序控制原理的计算机系统,其硬件基本结构包括:、控制器、存储器、输入设备和输出设备。 A. 显示器 B. 运算器 C. 磁盘驱动器 D. 键盘 2.在下列字符中,其ASCⅡ码值最大的一个是。 A. 5 B. 6 C. X D. Y 3. 能将高级语言源程序转换成目标程序。 A.解释程序 B. 编辑程序 C. 编译程序 D. 调试程序 4. 用浮点数表示任意一个数据时,可通过改变浮点数的部分的大小,能使小数位置产生移动。 A. 基数 B. 阶码 C. 尾数 D. 有效数字 5. 二进制数01011010扩大成2倍是。 A. 10110100 B. 10101100 C. 10011100 D. 10011010 6. 微型计算机系统的CPU、存储器和外部设备之间采用总线连接。总线通常由三部分组成。 A. 地址总线、数据总线和系统总线 B. 系统总线、数据总线和控制总线 C. 地址总线、数据总线和控制总线 D. 地址总线、系统总线和控制总线 7. 在下列一组数中,其最大的一个数是。 A. (10101000)B B. (A9)H C. (78)O D. (75)D 8. 3.5英寸的软盘的总容量为。 A. 80磁道ⅹ9扇区ⅹ1024字节/扇区ⅹ2 B. 40磁道ⅹ18扇区ⅹ1024字节/扇区ⅹ2 C. 40磁道ⅹ18扇区ⅹ512字节/扇区ⅹ2 D. 80磁道ⅹ18扇区ⅹ512字节/扇区ⅹ2 9. 用8位补码表示整数—126的机器码,算术右移一位后的结果是。 A. 10000001 B. 01000001 C. 11000001 D. 11000010 10. 计算机系统配置高速缓冲存储器(Cache)是为了解决。 A. 内存与辅助存储器之间速度不匹配问题 B. CPU与辅助存储器之间速度不匹配问题 C. CPU与内存储器之间速度不匹配问题 D. 主机与外设之间速度不匹配问题 11. 在Windows操作系统下创建的某文件,其长文件名为“ABCD20050521.doc”,则在DOS 环境下,该文件的文件名为。 A. ABCD20~1.doc B. ABCD20~A.doc C. ABCD2005.DOC D. ABCD2005.052 12. 在Windows操作系统中,为结束陷入无响应的程序,应首先按的键是。 A. Alt+Del B. Ctrl+Del C. Ctrl+Alt+Del D. Ctrl+Alt 13. 下列不属于多用户多任务操作系统的软件。 A. Linux B. UNIX C. Windows XP D. DOS 14. 在Windows的“资源管理器”窗口中,用鼠标选定连续文件的操作是。

技术名称H计算机监控系统

1、技术名称:H9000计算机监控系统 2、申报单位:中国水利水电科学研究院 3、技术简介(技术原理,技术特点,应用范围,解决的具体问题等) H9000计算机监控系统是面向水利水电工程监控与自动化应用而研制开发的全新的具有国际先进水平的分层分布式计算机监控系统,总体结构一般分两层:全厂控制层(PCL)和现地控制层(LCL),两层之间采用冗余的高速网络连接。它结合了当代国内外最新计算机硬件产品、软件产品、网络技术、实时工业控制产品,集中体现了中国水利水电科学院自动化所(北京中水科水电科技开发有限公司)在水利水电自动化领域20多年的研制开发经验,系统配置灵活具有良好的可靠性、可变性、可扩充性和可移植性。不仅适用于水电站、蓄能电站、抽水泵站、水电站群、梯级水电站的集中监控,也适用于变电站、泵站及其它领域集中控制的计算机监控系统。 系统主要功能:数据采集处理,综合参数统计计算与分析,实时运行与安全监视,实时数据库管理,画面显示与人机联系,电站设备操作控制,自动发电控制(AGC),自动电压控制(AVC),经济运行(EDC)(包括梯级经济运行),语音报警、电话短信报警及查询,生产统计与管理,系统授权管理,时钟管理,故障检测与自恢复,报表查询,运行指导,培训仿真,WEB服务等。 目前,针对巨型机组特大型电站对控制系统性能及功能要求,H9000系列产品已经开发升级到V4.0版。进一步完善和优化了数据采集与处理、图形界面、报警处理、人机联系、报表管理、信息发布、历史数据管理等功能,不仅具有卓越的系统可靠性和可维护性,而且使系统更加开放、友好。 H9000系统具有完全兼容的在UNIX和WINDOWS两个操作系统平台运行的版本,不仅用户界面完全相同,具有相同的性能与功能,而且软件代码也兼容,进一步提高了系统的兼容性和可维护性。 H9000系统已被广泛地应用于180多个各类大中小型水利水电自动化工程,受到广大水电用户的欢迎和好评,如黄河上游梯级集控、东北白山梯级及白山蓄能、青海龙羊峡、公伯峡、湖南五强溪、东江梯级、凤滩及扩机等大型水电站,特别是通过三峡工程的国际合作和成功应用于三峡右岸电站监控系统,使我们及时跟踪国际最新的技术发展,进一步丰富和完善了H9000系统的功能和设计,保持了自主研发的H9000系统在国内的领先地位。 4、技术指标(经过具有资质的检测部门认可的性能指标) 系统主要技术性能指标: 1.系统容量:开关量:200000点(可扩)、模拟量:80000点(可扩) 2.数据采集周期:小于1秒 3.实时数据库更新时间:1秒 4.事件分辨率:1ms 5.画面的响应时间:0.5~1秒 6.操作员命令发出到现地控制单元接受命令的时间:小于1秒 7.AGC任务执行周期:1秒~5分钟(可在画面上设置)

GER6000型计算机监控系统

GER-6000水电厂计算机监控系统 技术说明书 上海申瑞电力自动化科技有限公司 南京申瑞电气系统控制有限公司 二零零四年四月

目录 1 概述 (1) 2 系统结构 (1) 3 上位机系统及通讯网络 (2) 3.1 体系结构 (2) 3.2 数据库系统 (3) 3.3 系统安全 (4) 3.4 人机界面 (4) 3.5 事故追忆 (5) 3.6 语音报警 (6) 3.7 公式编译 (6) 3.8 AGC/A VC (6) 3.9 对外通讯 (6) 3.10 网络互联和Web浏览 (6) 4 现地控制单元 (7) 4.1 装置特点 (7) 4.1.1 结构配置灵活 (7) 4.1.2 功能齐全强大 (7) 4.1.3 高可靠性和抗干扰能力 (7) 4.1.4 多样化的通讯接口 (7) 4.1.5 信息丰富的人机界面 (8) 4.1.6 强大的组态和调试软件 (8) 4.1.7 易于维护 (8) 4.2 装置结构 (8) 4.2.1 装置基本结构 (8) 4.2.2 装置的冗余 (8) 4.2.3 双LCU冗余 (8) 4.2.4 电源冗余 (9) 4.2.5 CPU模件冗余 (9) 4.2.6 通讯通道的冗余 (9) 4.2.7 盘柜结构 (9) 4.3 装置功能 (10) 4.3.1 数据采集和处理 (10) 4.3.2 顺序控制操作 (10) 4.3.3 机组转速测量功能 (10) 4.3.4 自动准同期功能 (10) 4.3.5 功率调节功能 (10) 4.3.6 通迅功能 (11) 4.3.7 当地人机界面 (11) 4.3.8 自诊断 (11) 4.3.9 时钟同步 (11) 4.4 主要技术指标 (11) 4.4.1 开关量输入 (11) 4.4.2 开关量输出 (11)

计算机监控系统研究论文

计算机监控系统研究论文 计算机监控系统研究全文如下: 【摘要】随着我国社会经济的发展,科学技术取得了巨大的进步,与此同时,计算机监控系统也在我国各个领域中得到了广泛的应用,极大的促进了我国社会经济的发展进步。 【关键词】计算机;监控系统;应用;研究 一、计算机监控系统介绍 (一)计算机监控系统的重要性 近年来,计算机网络技术的发展进步对整个人类社会产生了极大的影响,目前,计算机网络已经深入到了我国各个领域行业中去,对社会发展起到了巨大的作用。但是需要注意的是,虽然计算机及网络技术的发展带来了很多的方便,但是仍然存在很多问题。在公司、企业、学校等事业单位和职能部门当中都普遍出现了这样一类现象:上班时间上网聊天、玩游戏,滥用电脑等,对人们的工作学习产生了一定的负面影响。根据相关部门的统计调查发现,在很多互联网办公的企事业单位中,员工每天一半的工作时间都耗费在了上网聊天当中,更有甚至,公然浏览国家所明令禁止的网站、打游戏、恶意攻击等,不仅极大的降低了工作效率,而且使企事业单位受到了严重的安全威胁。特别是当前很多企事业单位都简称了电子政务互联,在内联网当中存在着多个部门及网络系统,由于不同部门的保密要求不尽相同,但是由于其互联性很容易导致重要信息的泄露和窃取现象,为不法分子打开了通道。不仅如此,在保密专用网络系统当中,不同等级的用户与信息如果没能采取有效的措施加以防范,就很容易导致信息数据的失窃与破坏,给信息数据的安全带来了极大的安全威胁。 正因如此,企事业单位需要一种能够监控员工对计算机使用情况和信息的工具,并在不良或破坏问题出现时能够及时的加以保护和

控制,确保信息数据安全,在这一大环境下计算机监控系统呼之欲出。鉴于很多单位中电脑数量众多,管理人员每天都需要耗费大量 的精力做好维护管理工作,但是仍然无法取得良好的成效,因此将 计算机监控系统应用在具体的工作当中非常必要,这对于提高工作 效率、提高安全性具有重要的作用。 (二)计算机监控系统特点分析 1、实时性。众所周知,计算机监控系统实际上就是一个较为特 殊的计算机系统,他其它普通计算机系统最大的区别就在于具有实 时性的特点,不仅如此,实时性也是计算机系统的一个重要的性能 指标。实时性从某种程度上来说主要指的是计算机监控系统对外界 事件作出反应的能力,通俗来讲就是看计算机系统响应所耗时间, 这一层次上主要是通过系统响应时间来加以反应。由于计算机监控 系统在具体的工作当中需要对现场各类数据信号加以收集并响应, 因此实时性是计算机监控系统一个最为基本的特性。其次需要注意 的是,监控系统的实时性也要求系统能够在规定的时间内完成任务,因此实时性实际上确保了计算机监控系统的高效率与高准确性。另外,考虑到计算机监控系统的实时性是与分时相对应的,因此在监 控系统当中各项操作已经按照所分好的时间来处理的,在这些操作 中往往有不同的优先级。比如计算机监控系统在正常的工作运行过 程中,如果其高优先级的操作得到满足,监控系统便会立即终端正 在运行的操作区执行高优先级的任务。 2、交互性。通常情况下,计算机监控系统同普通操作系统一样 具有丰富的人机交互方式,尤其是对于某些大型、复杂、连续的监 控过程当中,交互性体现的更为明显。因为在这一过程当中,监控 系统的操作人员往往需要在较短的时间内接受大量的信息数据、分 析并完成操作,所以只有较高的交互性才能确保操作人员工作的效 率与质量。比如键盘鼠标、显示器等常规的交互工具外,计算机监 控系统往往还配备了语音功能、触摸大屏等设备。 3、可靠性与可维护性。计算机监控系统的可靠性主要是指计算 机无故障运行的能力,及时计算机在具体的工作运行过程中受到各 种因素的影响而导致的故障,但是基于这一特性能够保证计算机及

计算机监控系统系统功能和分层

计算机监控系统系统功能和分层 3.2.1概述 电站计算机监控系统无论网络结构采用何种方式,整个系统的设备可分为厂站控制级及现地控制级两层, 厂站层系统设备包括:监控系统主机、操作员站、工程师站、培训工作站、通讯工作站、报表及电话语音工作站、外设服务器及外设、生产信息查询服务器、模拟屏驱动器及模拟屏及相关网络设备等; 现地控制级设备包括:机组现地控制单元、全厂公用现地控制单元、开关站现地控制单元、泄水闸集中控制单元。 上述设备依据电站规模不同对设备配置有所不同,电站计算机监控系统功能由厂站层及现地控制级共同完成。 计算机监控系统控制调节方式分为控制方式和调节方式二类。控制方式包括现地控制方式、厂站控制方式和远方控制方式;调节方式包括厂站调节方式和远方调节方式。 现地控制单元设有“现地/远方”切换开关。 在现地控制方式下,现地控制单元只接受通过现地级人机界面、现地操作开关、按钮等发布的控制及调节命令。厂站级及远方级只能采集、监视来自电站的运行信息和数据,而不能直接对电厂的控制对象进行远方控制与操作。 在厂站级设有“电站控制/远方控制”软切换开关和“电站调节/远方调节”软切换开关。当监控系统处于“电站控制”和“电站调节”方式且现地控制单元处于“远方控制”方式时,厂站级可对电站主辅设备发布控制和调节命令,远方级则只能用于监视;当监控系统处于“电站控制”和“远方调节”方式且有现地控制单元处于“远方控制”方式时,厂站级只能对电站主、辅设备发布控制命令,远方级则只能发布调节命令;当监控系统处于“远方控制”和“电站调节”方式且现地控制单元也处于“远方控制”方式时,远方只能对电站主、辅设备发布控制命令,厂站级则只能发布调节命令;当监控系统处于“远方控制”和“远方调节”方式且现地控制单元也处于“远方控制”方式时,远方可对电站主、辅设备发布控制和调节命令,厂站级则只能用于监视。 控制调节方式的优先级依次为现地控制级、厂站控制级和远方控制级。 3.2.2电站层功能 (1)数据采集 0)自动采集各现地控制单元的各类实时数据; 0)自动采集来自远方调度的数据;

2009年全国计算机等级考试二级C++笔试试题

一、名词解释题(每小题5分,共20分) 1、超越器械:在投掷器械最后用力前,人体支撑点以最快的速度赶超到器械的前面,使器械远远地落在身体重心后面的身体动作姿势。 2、腾起角:腾起初速度方向与水平方向之间形成的夹角。 3、跨栏步:是指从起跨脚踏上起跨点到过栏后摆动腿着地的过程(分为起跨攻栏,腾空过栏,下栏着地三个阶段)。 4、内力和外力:内力和外力:内力是指肌肉收缩时产生的力、它是人体运动的动力来源。外力是指人体与外界物体相互作用时所产生的力。 5、径赛:径赛:以时间计算成绩的和跑的项目叫径赛。 6、腾起初速度:是助跑、起跳所产生的水平速度与垂直速度的合速度。 7、步长与步频:步长是指两脚着地点之间的距离,步频是指单位时间内的步数。 8、田径运动定义:径赛和田赛运动,或由跑、竞走和越野跑运动。 二、单选题 1、决定跑速的主要因素是___C__。 A、速度 B、爆发力 C、步频和步长 2、计时小组三块表计取的成绩各不相同时,应以____C___成绩为准。 A、平均 B、较差 C、中间 3、女子100米栏,栏间跑三步,其三步的比例为___C____。 A、中、小、大 B、小、中、大 C、小、大、中 4、蹲踞式跳远腾空后容易产生前旋,其主要原因是____B___。 A、摆动腿的大腿抬的不高 B、下肢靠近身体重心,旋转半径较短 C、摆动动作没有做“突停” 5、背向滑步推铅球比侧向滑步推铅球在技术上的优越性是___A____。 A、提高了预先速度,便于发挥力量 B、提高了出手速度 C、加长了球在出手前的运行距离 6、田径运动定义是根据____C___田联章程而定。 A、中国田联章程 B、亚洲田联章程 C、国际田联章程 7、跳高落地区宽是多少米?____C___ A、5米 B、8米 C、3米 D、6米 8、加速跑的距离一般为多少米?___D____ A、10-20米 B、30-40米 C、40-50米 D、20-30米 9、运动员通过助跑起跳,身体按一定方向腾起时,____C___越大,跳跃的运动成绩越好。 A、助跑速度 B、起跳高度 C、腾起的初速度 D、腾起高度 10、终点跑包括终点跑技术和____A___。 A、撞线技术 B、伸头技术 C、摆臂技术 D、最后用力技术 11、跳远教学的核心部分是____A___。 A、助跑 B、起跳 C、腾空 D、落地

相关文档
最新文档