试产总结报告(模板)

试产总结报告(模板)

1Number of times

√=passed

x=failed Documents

BOM 物料清单CCCF PMP Drawing 工程图纸Equipment 设备Fixture 治具

WI\Flowch art 作业指Sample 样品Comments

Project Manager:

Engineer:PO NO.

ITEM NO.

Pilot Run Description:

Pilot Run summary:Pilot Run Result:Pilot run result need to confirm after review

meeting (需总结会议后确认)

Remark/备注

Pilot Run Date:

Order Quantity:Pilot Run Classification:

Total Input Quantity:Qualified Product Ratio:

(Qualified rate >95%

Total Output Quantity :Balance Efficiency>85%: Pilot Run Results Summary Item :

Total Qty: ( ) PCS Accepted Goods:( ) PCS

Rejects ( ) PCS

Yield : %

FPY : %

Balance Efficiency: %

Quality Manager:Quality Engineer:Henson Conclusion Pre-Pilot Checklist

Note: This is used to determine the production of the required documents, samples, fixtures, equipment, etc already be prepared. 这个是用于确定产品的文件、样品、治具、设备等已经被准备好了。相关人员讨论后对现场发现的问题点改善批复后一起总结的结论

FPY:(FPY)>90%

Defect Quantity:

相关文档
最新文档