安全控制措施-(中英文)

安全控制措施-(中英文)
安全控制措施-(中英文)

7. Quality Control Measures

7.1 The people who are engaged in doing test must have enterprise, consciousness of responsibility and relevant work certificates, and perform their position duties with due diligence. It is necessary for them to study and digest drawings and relevant documents as soon as possible. If any problem is found, it is necessary to raise it in time. Further, being explicit with the work scope and test items is indispensable.

7.2 Testing personnel must comply with all valid regulations, specifications, provisions, standards, and methods issued by nation and accepted by industry.

7.3 Testing personnel must be familiar with the operation and performance of testing equipment, instrument and apparatus. And guarantee they are in good working conditions.

7.4 Testing personnel must make original records with discreetness and secure the authenticity and reliability of test data without leave-out and mistake, so that the data can serve as proof for investigation. The electronic version of test reports must be preserved properly to protect them from being damage and tampered.

7.5 When the quality is in conflict with the project period, insist on the quality first thought.The unqualified products are reported to the factory or replaced.

7.6 Any accident due to poor quality, regardless of its seriousness, occurring or not cannot be hidden, indulged, and compromised.

8. Safety, civilized construction and environmental management.

8.1 General provisions

8.1.1 All workers who are engaged in construction must pass safety examination and health examination, understand safe operation regulations of different types of work. Before work can start, technicians must give safety instructions and safety instructions to workers and specify working method, procedure, precautions and personal duties to workers. After this, the workers are required to sign off the instruction records for confirmation and registration before they are allowed to start working. Any worker who does not undergo instructions is not allowed to work on the site.

8.1.2 It is not allowed to drink alcohol during the work time. No one is allowed to enter the site intoxicated. It is forbidden to work when a worker is ill.

8.1.3 People who enter the site must wear PPE correctly. It is forbidden to wear slippers, high

heels or shoes with nails; all special type of workers such as person who is engaged in high voltage test must have certificates and be familiar with their own work.

8.1.4 Test equipment must be stacked in order tidily based on the regulations set up and comply with transportation and firefighting requirements.

8.1.5 Set up sufficient illumination for night shift.

8.1.6 Workers who need to work at height must wear harness and hook it to the safety rope to avoid falling down from the height.

8.2 Test in a safe manner

8.2.1 Only electrician is allowed to dismantle and assemble construction power consumption facilities.

8.2.2 Electric equipment must be operated based on tag instructions. It is forbidden to use one switch for several power connections.

8.2.3 It is not allowed to hook the wire directly to the switch blade or directly plug wire into power socket. The switch of test devices should adopt double-pole switch with obvious break point and reliable overload protection device.

8.2.4 When works in the site, based on the voltage class of the electrified body the testing personnel must keep a safe distance away from electrified body, which should not be less than the distance regulated in the ‘safety regulations’ .

8.2.5 The metal shell of the test tools must have proper grounding. Wiring between test instruction and equipment must be firm and reliable. After insulation resistance measuring and DC test is finished, it is necessary discharge the tested objects thoroughly.

8.2.6 The test should be conducted under the circumstance when the weather is good. If strong wind and thunderstorm take place, it is necessary to stop the test.

8.2.7 After the test is complete, testing personnel must dismantle temporary grounding wire and inspect the tested equipment and clean the testing spot.

8.3 Housekeeping Measures

8.3.1 After the test is completed, the principal ‘finish the work, clean the site and take away the material’ should be abided by.

8.3.2 The wall and barricading established on the site must be stable, tidy and nice.

8.3.3 Testing personnel must establish awareness to protect finished products. It is forbidden

to dismantle, take away and paint the finished products arbitrarily without permission.

8.3.4 It is not allowed to work after drinking.

8.3.5 No smoking is allowed within the testing spot. No open fire is allowed for keeping warm within testing spot.

8.3.6 When leave the working area, it is necessary to shut down the power supply and lock the window to protect the working area from theft.

8.4 Environment Protection Measures

8.4.1 The tags and labels on the construction site must be tidy, aesthetic with eye-catching slogans.

8.4.2 Temporary work on the site must be standardized and proceed in good order. Keep circumstance inside and outside the tools storage room clean and sanitary.

8.4.3 Test equipment and test devices must be stack tidily in good order in the designated area. It is necessary to abide by the principal ‘finish the work, clean the site and take away all materials’

8.4.4 Test equipment must be clean and tidy. Power supply panels must be standardized with complete locks. Safety protection measures are completed and reliable.

8.4.5 Strictly comply with public moralities, professional ethics, professional disciplines. Dispose of the neighbor relationship with other companies in the site properly. And try best to get the support and understanding from the relevant companies.

8.4.6 The cable rack of temporary construction power supply must meet safety requirements, power panels must be standardized and the illumination must be arranged properly.

8.4.7 In order to prevent the trash from spreading to public area, roads, and it is necessary to stop the slag and residue from spilling.

8.5 Emergency Plan

8.5.1 The manager of HSE department is responsible for initiating to organizing emergency respond group and set up clinics both on the site and nearby office area. Designate constructors emergency muster point on the site.

8.5.2 First aid for electric shock: cut off the power supply immediately, pull down the switch, turn off the power supply switch and unplug the plug. Make sure that the victim hurt by electric shock is disconnected from the power supply and send him/her to the site clinic for treatment.

8.5.3 Once emergency accident take place in the site, the relevant personnel must report it to the emergency command group immediately. Meanwhile, it is necessary for him to inform HSE emergency treatment personnel on duty. Project department HSE needs to mark out the caution area based on the site actual situation. And make sure the access for salvage is accessible and unimpeded. Gather the unauthorized personnel to the emergency muster point. After counting up the head of the personnel, evacuate them based on the preassigned evacuation routes.

8.5.4 Medical staff in the clinic must rescue the injured person or give the injured person first aid based on the injured person status. If the injured person needs to be sent to hospital for salvage, it is necessary to dial 120 immediately for the ambulance service.

9. Construction Risk and Housekeeping Forecast Control Plan Table

9.1 Construction Risk Control Plan Table

Construction Risk Control Plan Table

9.2 Housekeeping Forecast Control Plan Table

Housekeeping Forecast Control Plan Table

欢迎您的下载,

资料仅供参考!

致力为企业和个人提供合同协议,策划案计划书,学习资料等等

打造全网一站式需求

高空作业人员安全管理措施

高空作业人员安全管理措施 根据被服务方的面积、工程的难度及被要求工程时间来确定需要几个人来清洁。有两种方式,一种是高空吊篮,另一种为高空吊绳,专业讲叫"上几根绳,下几回板"。 高空作业难度大,危险性高,特此施工人员是经过专业培训后,有多次高空作业的经验。安全操作规程 l、上班前必须认真检查机械设备、用具、绳子、坐板、安全带有无损坏,确保机械性能良好及各种用具无异常现象方能上岗操作。 2、操作绳、安全绳必须分开生根并扎紧系死,靠沿口处要加垫软物,防止因磨损而断绳,绳子下端一定要接触地面,放绳人同时也要系临时安全绳。 3、施工员上岗前要穿好工作服,戴好安全帽,上岗时要先系安全带,再系保险锁(安全绳上),尔后再系好卸扣(操作绳上),同时坐板扣子要打紧,固死。 4、下绳时,施工负责人和楼上监护人员要给予指挥和帮助。 5、操作时辅助用具要扎紧扎牢.以防坠伤人,同时严禁嘻笑打闹和携带其它无关物品; 6、楼上、地面监护人员要坚守在施工现场.切实履行职责.随时观察操作绳、安全绳的松紧及绞绳、串绳等现象,发现问题及时报告,及时排除。 7、楼上监护人员不得随意在楼顶边沿上来回走动。需要时,必须先系

好自身安全绳,尔后再进行辅助工作。地面监护人员不得在施工现场看书看报,更不得随意观赏其它场景。并要随时制止行人进入危险地段及拉绳、甩绳现象发生。 8、操作绳、安全绳需移位、上下时,监护人员及辅助工人要一同协调安置好,不用时需把绳子打好捆紧。 9、施工员要落地时,要先察看一下地面、墙壁的设施,操作绳、安全绳的定位及行人流量的多少情况,待地面监护人员处理、调整,同意后方可缓慢下降,直至地面。 10、要坚持安全第一、文明施工,确保工程服务质量。 11、不准乱拿甲方或客户的物品,不得损坏甲方或客户的各种设施。 12、高空作业人员和现场监护人员必须服从施工负责人的统一指挥和统一管理。

工程项目安全生产管理措施(正式)

编订:__________________ 单位:__________________ 时间:__________________ 工程项目安全生产管理措 施(正式) Deploy The Objectives, Requirements And Methods To Make The Personnel In The Organization Operate According To The Established Standards And Reach The Expected Level. Word格式 / 完整 / 可编辑

文件编号:KG-AO-8521-62 工程项目安全生产管理措施(正式) 使用备注:本文档可用在日常工作场景,通过对目的、要求、方式、方法、进度等进行具体、周密的部署,从而使得组织内人员按照既定标准、规范的要求进行操作,使日常工作或活动达到预期的水平。下载后就可自由编辑。 (一)安全管理方针: 安全管理方针是"安全第一,预防为主"。 (二)安全组织保证体系 以项目经理为首,由项目副经理、安全负责人、各专业分公司等各方面的管理人员组成安全保证体系安全组织保证体系 (三)安全管理制度 1、安全技术交底制:根据安全措施要求和现场实际情况,各级管理人员需亲自逐级进行书面交底; 2、班前检查制:责任工程师必须督促与检查施工方、专业分公司对安全防护措施是否进行了检查; 3、大中型机械设备实行验收制,凡不经验收的一律不得投入使用; 4、周一安全活动制,经理部每周一要组织全体工

人进行安全教育,对上一周安全方面存在的问题进行总结,对本周的安全重点和注意事项作必要的交底,使广大工人能心中有数,从意识上时刻绷紧安全这根弦。 5、定期检查与隐患整改制:经理部每周要组织一次安全生产检查,对查出的安全隐患必须定措施、定时间、定人员整改,并作好安全隐患整改消项记录; 6、管理人员和特种作业人员实行年审制,每年由公司统一组织进行,加强施工管理人员的安全考核,增强安全意识,避免违章指挥; 7、实行安全生产奖罚制与事故报告制; 8、危急情况停工制:一旦出现危及职工生命财产安全险情,要立即停工,同时即刻报告公司,及时采取措施排除险情; 9、持证上岗制:特殊工种必需持有上岗操作证,严禁无证操作。 (四)安全管理工作 1、项目经理部负责整个现场的安全生产工作,严

高空作业的基本安全技术措施详细版

文件编号:GD/FS-6232 (解决方案范本系列) 高空作业的基本安全技术 措施详细版 A Specific Measure To Solve A Certain Problem, The Process Includes Determining The Problem Object And Influence Scope, Analyzing The Problem, Cost Planning, And Finally Implementing. 编辑:_________________ 单位:_________________ 日期:_________________

高空作业的基本安全技术措施详细 版 提示语:本解决方案文件适合使用于对某一问题,或行业提出的一个解决问题的具体措施,过程包含确定问题对象和影响范围,分析问题,提出解决问题的办法和建议,成本规划和可行性分析,最后执行。,文档所展示内容即为所得,可在下载完成后直接进行编辑。 1、凡是临边作业,都要在临边处设置防护栏杆,一般上杆离地面高度一般为1.0-1.2m,下杆离地面高度为0.5-0.6m;防护栏杆必须自而下用安全网封闭,或在栏杆下边设置严密固定的高度不低于18cm 的挡脚板或40cm的挡脚笆。 2、对于洞口作业,可根据具体情况采取设防护栏杆、加盖板、张挂安全网与装栅门等措施。 3、进行攀登作业时,作业人员要从规定的通道上下,不能在阳台之间等非规定通道进行攀登,也不

得任意利用吊车车臂架等施工设备进行攀登。 4、进行悬空作业时,要设有牢靠的作业立足处,并视具体情况设防护栏杆,搭设架手架、操作平台,使用马凳,张挂安全网或其他安全措施;作业所用索具、脚手板、吊篮、吊笼、平台等设备,均需经技术鉴定方能使用。 5、进行交叉作业时,注意不得在上下同一垂直方向上操作,下层作业的位置必须处于依上层高度确定的可能坠落范围之外。不符合以上条件时,必须设置安全防护层。 6、结构施工自二层起,凡人员进出的通道口(包括井架、施工电梯的进出口),均应搭设安全防

安全风险管控措施

安全风险分级管控措施 为了使我场安全管理更加规范化、标准化、深入贯彻执行“安全第一、预防为主”的方针。在安全管理上形成完善的安全管理体系,以安全管理理念指导和实施安全生产管理工作争创安全文明的林场。 一、安全体系建设: 1.安全管理方针、安全第一、预防为主、综合治理。 2.安全管理目标 A.杜绝重大伤亡事故 B.创建安全标准的单位和文明单位 二、安全生产部署: 1.建立健全安全应急救援保证体系 2.结合我场特点,性质,制定相关的安全生产有关规定及实施细则 (1)营林、扑火、管护安全防护措施 (2)各类机具安全操作规定 (3)特殊工种安全操作规定 三、安全保证措施: 1.安全管理组织机构 (1)负责贯彻执行安全管理有关法规、规定,制度安全管理制度,安全责任层层分解,落实到人,林场场长为安全生产第一负责人(2)各单位、作业组成立安全管理小组,负责执行上级有关安全

管理制度。监督本单位职工严格按操作规程操作,落实安全措施。(3)配备专职安全员,负责日常安全工作的督促和检查。 2.安全保证措施: 安全操作是我场各项生产任务的主要保证,因此,在抓好营林生产质量进度的同时,必须做好安全工作。 (1)建立安全生产制度,所有管理人员和职工都必须认真执行和遵守安全制度的规定和要求。 (2)树立“安全第一、预防为主、综合治理”的指导思想。做好对职工的安全培训教育,认真学习安全操作规程,增强安全意识和法制观念。 (3)建立健全安全生产责任制度,层层签订安全生产管理责任状,坚持执行“谁主管生产。谁负责安全”的原则。 (4)工作过程中安全控制 A.职工熟悉操作区域的周围环境,设备的分布情况,并有专人负责安排指导。 B.进入营林生产作业场地,作业人员必须载带好安全帽和个人劳动保护用品。 C.林场各单位用电要由专人看护,不准随意乱按电线。 (5)安全生产列会制度: 林场每月召开最少一次“安全列会”分析总结当月安全生产情况,部署下一步安全生产措施。 (6)安全生产教育培训措施:

工程施工安全生产管理措施示范文本

工程施工安全生产管理措 施示范文本 In The Actual Work Production Management, In Order To Ensure The Smooth Progress Of The Process, And Consider The Relationship Between Each Link, The Specific Requirements Of Each Link To Achieve Risk Control And Planning 某某管理中心 XX年XX月

工程施工安全生产管理措施示范文本使用指引:此解决方案资料应用在实际工作生产管理中为了保障过程顺利推进,同时考虑各个环节之间的关系,每个环节实现的具体要求而进行的风险控制与规划,并将危害降低到最小,文档经过下载可进行自定义修改,请根据实际需求进行调整与使用。 为加强安全生产监督管理,保障国家和人民生命财产 安全,促进经济持续健康发展,维护社会稳定,实现安全 生产,更好的提高我处经济效益,共同至力于公司发展, 为此,安全措施必须进一步规范管理。工程建设的关键: “生产必须安全,安全为了生产”,“安全第一”与“质 量第一”是并存的,安全是为了质量服务,质量亦需以安 全做保证,安全也是质量的特点之一,抓住质量与安全这 两个环节,工程施工就能顺利进行,就能获得良好的社会 效益、经济效益和环境效益。 一、施工中的安全技术措施

1、安全组织和管理 1.1安全生产目标 贯彻“安全第一、预防为主”的方针,安全、高效、优质的建成本处工程项目。其安全目标为:无人身重伤及其以上事故;无等级火警事故及压力容器爆炸事故;无汽车行驶责任重大事故;无施工安全事故。 1.2安全生产责任制 处长对本处工程项目安全负责。在其领导下,工程技术人员、班组长、操作工人,逐级建立安全管理责任制度。管理人员坚持安全生产“五到位”原则,即:健全机构到位、批阅文件到位、深入现场到位、检查到位、处理问题到位;并实施“四全”管理制度,即:全员、全过程、全方位、全天候的安全管理。 1.3安全生产检查制度 为确保各项施工安全技术措施的顺利实施,由处长领

高空作业安全控制措施与应急预案正式版

In the schedule of the activity, the time and the progress of the completion of the project content are described in detail to make the progress consistent with the plan.高空作业安全控制措施与应急预案正式版

高空作业安全控制措施与应急预案正 式版 下载提示:此解决方案资料适用于工作或活动的进度安排中,详细说明各阶段的时间和项目内容完成的进度,而完成上述需要实施方案的人员对整体有全方位的认识和评估能力,尽力让实施的时间进度与方案所计划的时间吻合。文档可以直接使用,也可根据实际需要修订后使用。 1.控制措施 ⑴、高处作业必须逐级进行安全技术教育及交底,对各种用于高处作业的设施和设备,在投入使用前,必须经检查确定完好后才能使用。⑵、高处作业人员必须着装整齐,严禁穿硬塑料底等易滑鞋、高跟鞋,工具应随手放入工具袋,按要求系好安全带。⑶、高处作业人员严禁相互打闹,以免失足发生坠落危险。⑷、在进行攀登作业时,攀登用具结构必须牢固可靠,使用必须准确。⑸、各类手持机具使用前应检查,确保安全牢靠。洞口临边作

业应防止物体坠落。⑹、施工人员应从规定的通道上下,不得攀爬脚手架、边坡,在非规定通道进行攀登、行走 2.监控措施 ⑴施工过程中要经常对高处作业的安全设施进行检查,若发现安全设施有缺陷或隐患,必须及时解决,危机人身安全时,必须停止作业。⑵实行自控、互控、他控等安全监控机制,消除安全隐患。 3.应急方案 必须事先备有人员急救器材,制定应急计划,确定责任到人(现场负责人为既定应急救援负责人),熟悉伤员急救方法;事故发生时,应立即上报,拨打急救电话;现场负责人或发现者应立即组织人员采取

高处作业安全保证措施标准范本

解决方案编号:LX-FS-A59097 高处作业安全保证措施标准范本 In the daily work environment, plan the important work to be done in the future, and require the personnel to jointly abide by the corresponding procedures and code of conduct, so that the overall behavior or activity reaches the specified standard 编写:_________________________ 审批:_________________________ 时间:________年_____月_____日 A4打印/ 新修订/ 完整/ 内容可编辑

高处作业安全保证措施标准范本 使用说明:本解决方案资料适用于日常工作环境中对未来要做的重要工作进行具有统筹性,导向性的规划,并要求相关人员共同遵守对应的办事规程与行动准则,使整体行为或活动达到或超越规定的标准。资料内容可按真实状况进行条款调整,套用时请仔细阅读。 在干燥的冬春季节,人们常有被莫明其妙“电”一下的感觉。早晨起床,头发越梳越乱甚至会立起来……其实,这都是静电的作怪。 冬春季节,当你脱下毛衣、涤纶、化纤衣服或从床上拉起的确良床单时,会听到“噼噼啪啪”的响声。此时如是夜晚,你还会看到闪烁的火花。不仅如此,当人们在手指触及水龙头门把手等金属物或两人握手、接触时都可能有电击感。这些都是日常生活中的静电现象。

工程施工安全生产管理措施简易版

A Specific Measure To Solve A Certain Problem, The Process Includes Determining The Problem Object And Influence Scope, Analyzing The Problem, Cost Planning, And Finally Implementing. 编订:XXXXXXXX 20XX年XX月XX日 工程施工安全生产管理措 施简易版

工程施工安全生产管理措施简易版 温馨提示:本解决方案文件应用在对某一问题,或行业提出的一个解决问题的具体措施,过程包含确定问题对象和影响范围,分析问题,提出解决问题的办法和建议,成本规划和可行性分析,最后执行。文档下载完成后可以直接编辑,请根据自己的需求进行套用。 为加强安全生产监督管理,保障国家和人民生命财产安全,促进经济持续健康发展,维护社会稳定,实现安全生产,更好的提高我处经济效益,共同至力于公司发展,为此,安全措施必须进一步规范管理。工程建设的关键:“生产必须安全,安全为了生产”,“安全第一”与“质量第一”是并存的,安全是为了质量服务,质量亦需以安全做保证,安全也是质量的特点之一,抓住质量与安全这两个环节,工程施工就能顺利进行,就能获得良好的社会效益、经济效益和环境效益。

一、施工中的安全技术措施 1、安全组织和管理 1.1安全生产目标 贯彻“安全第一、预防为主”的方针,安全、高效、优质的建成本处工程项目。其安全目标为:无人身重伤及其以上事故;无等级火警事故及压力容器爆炸事故;无汽车行驶责任重大事故;无施工安全事故。 1.2安全生产责任制 处长对本处工程项目安全负责。在其领导下,工程技术人员、班组长、操作工人,逐级建立安全管理责任制度。管理人员坚持安全生产“五到位”原则,即:健全机构到位、批阅文件到位、深入现场到位、检查到位、处理问

高空作业安全控制措施(2021新版)

( 安全技术 ) 单位:_________________________ 姓名:_________________________ 日期:_________________________ 精品文档 / Word文档 / 文字可改 高空作业安全控制措施(2021新 版) Technical safety means that the pursuit of technology should also include ensuring that people make mistakes

高空作业安全控制措施(2021新版) 为规范高处作业安全管理,减少高处坠落事故的发生,确保员工生命安全,特制定本措施。 本制度适用于本厂及相关方的高处作业安全管理。 1、高处作业的定义与分类 本制度所指高处作业是在坠落高度基准面2m以上(含2m)位置有可能坠落的作业。高处作业分为一般高处作业和特殊高处作业两类。 (一)在作业基准面2米(含2米)以上30米以下(不含30米)的,称为一般高处作业; (二)符合以下情况的高处作业为特殊高处作业; 在作业基准面30米(含30米)以上的高处作业、高温或低温、雨雪天气、夜间、接近或接触带电体、无立足点或无牢靠立足点、

突发灾害抢救、有限空间内等环境进行的高空作业及在排放有毒、有害气体和粉尘超出允许浓度的场所进行的高处作业。 2、高处作业的安全控制措施 2.1凡是坠落高度在2米以上(含2米)的作业,均称为高处作业,高度虽不足2米,但作业地段的下面是坡度大于45°的斜坡,附近有坑、井、有转动设备或堆放容易伤人的物品,工作条件特殊(风雪天气),有机械震动的地方,在有毒气体存在的房内工作时,均应按高处作业的规定执行。 2.2在进行高处作业时,作业人员必须系好安全带、戴好安全帽,作业现场必须设置安全护梯或安全网(强度合格)等防护设施,遇有六级以上大风、暴雨或雷电天气时,应停止高处作业。 2.3高处作业的人员必须经安全教育合格,并熟悉现场环境和施工安全要求,对患有职业禁忌证和年老体弱、疲劳过度、视力不准及酒后等人员不准进行高处作业。 2.4进行高处作业的人员一般不应交叉作业,凡因工作需要,必须交叉作业时,要设安全网、防护碰等安全设施,否则不准作业。

一般风险控制措施

一般风险控制措施 为了避免本项目各类事故的发生,必须采取行之有效的控制措施。针对本工程项目的一般风险因素,制定以下控制措施。措施制定坚持“安全第一,预防为主”的安全管理方针,从安全管理制度、具体施工措施两个方面严格加以控制,已达到最大下限度的降低风险和财产损失。 一、安全管理制度 1.1组织保证体系 建立安全保证体系,切实落实安全生产责任制,项目部设置安全生产领导小组,项目经理为安全第一责任人;管生产的施工负责人必须管安全;项目部设安质部,并设专职安全检查员,做到分工明确,责任到人。 1.2资金和信息保证体系 ①保证足够的安全生产资金投入和物资投入。 ②建有完整、可靠的安全生产信息系统,保证及时、准确地传递、处理和反馈各类有关安全生产的信息。 1.3制度保证体系: 安全生产必须制定齐全的安全保证制度,并严格执行。 ①安全生产管理制度; ②安全生产检查制度; ③安全生产验收制度; ④安全生产教育培训制度;

⑤安全生产技术管理制度; ⑥安全生产奖罚制度; ⑦工人职员因工伤亡事故报告制度; ⑧重要劳动防护用品定点使用管理制度; ⑨特种作业及外协力量安全管理制度。 1.4安全生产教育 安全教育内容分别为安全生产思想教育、安全知识教育、安全技能教育。我单位的安全教育分三个层次进行,一是对各级领导和管理人员的安全教育。每次生产会、调度会、协调会布置生产任务先强调安全生产,对本工程易发生事故的地方和行为尽量做到事先提醒,要求各级管理人员高度警觉,防止不安全因素滋长,做到警钟长鸣。二是对基层单位领导、工地施工负责人、安全员开展的安全业务培训。在安全专业技术培训方面,进一步学习《建筑法》有关建筑安全生产管理的条例,使管理人员提高认识,转变单纯追求经济效益的观念,把“安全第一”变成依法办事的自觉行动,并不断介绍安全管理的新知识新技术、新经验,提高管理队伍整体业务水平和安全管理效能。三是对工地施工人员的入场教育,每一批工人进场,由项目部组织进行岗前安全培训,由安全部门统一命题考试,合格者才能上岗,并在分项工程施工前由施工负责人进行安全技术交底。抓好岗位培训,特别是安全管理人员和特殊工种操作人员的岗位培训,坚持持证上岗,以有效地提高职工和各级管理人员和职工的安全意识和业务素质,加强防范各种隐患的能力,提高安全生产的管理水平。

施工安全管理措施模板

宝颖安全管理措施 安全生产保证体系 一、建立安全生产管理机构 1、建立以公司总经理挂帅, 管生产的副总经理和各职能部门负责人组成的公司安全领导小组, 协调部门与项目间的关系, 监督施工中安全防范措施的实施。 组长: 公司总经理 副组长: 公司管生产的副经理 组员: 公司质安部部长、工程部部长、机械设备租赁公司经理、材料公司经理 2、项目经理是第一安全负责人, 下设一名专职安全员和班组兼职安全员( 班部长) 参加的安全施工管理小组, 形成现场管理网络, 坚持安全管理制度, 严格执行安全技术”十二条”的规定。 安全施工管理小组 组长: 项目经理 副组长: 项目生产副经理、技术负责人、安全工程师 组员: 安全员、工长、机械员、材料员、各班组长

安全生产领导小组 项目经理安全员机电员施工员材料员施工班组工地保卫公司领导治安科 治安组 机具租赁 项目部 施工技术 材料 供应科 工会保卫科 全面安全 生产管理 安全教育 规章制度 安全检查 机电设备 用电安全 技术措施 安全管理 安全措施 劳护用品 劳动保护 职工权益 消防保卫 防火防盗 安全管理实施流程图 项目施工安全保证体系图

项目经理 技术部工 程 部 设 备 部 材 料 部 安 保 部 其 他 科 室 制定安全方案 及技 术措施,检查措施 落实情况,解决有关技术问 题 监督全过程的安全生产,纠正违 章行为,开展全员安全教育,调查处理安全 事故 机械设备安 全措施的制定和技术改造,监督机操工按安全要求作业 负责安 全设施 的采购 和管理, 发放。 检查安 全设施 的使用 情况 监督现 场安全 保卫, 消防, 防盗等 方面的 工作, 查处违 章行为 。管理 工地报 委员 组织工 人的进 场安全 教育, 作好人 员统计, 协助处 理安全 事故。 提供安 全技措 经费, 加强行 政管理 确保安 全,保 卫,消 防的正 常运行 贯彻落实到 质安员各工种现场 二、项目各级安全生产责任制 1、项目经理安全生产责任制

E级风险控制措施

E级风险为发生频率高、后果严重的风险,因此必须采取行之有效的控制措施,避免事故的发生。针对本工程项目的风险因素(详见E级风险一览表),制定以下控制措施。措施制定坚持“安全第一,预防为主”的安全管理方针,从安全管理制度、具体施工措施两个方面严格加以控制,以达到最大下限度的降低风险和财产损失。 一、安全管理制度 1.1组织保证体系 建立安全保证体系,切实落实安全生产责任制,项目部设置安全生产领导小组,项目经理为安全第一责任人;管生产的施工负责人必须管安全;项目部设安质部,并设专职安全检查员,做到分工明确,责任到人。 1.2资金和信息保证体系 ①保证足够的安全生产资金投入和物资投入。 ②建有完整、可靠的安全生产信息系统,保证及时、准确地传 递、处理和反馈各类有关安全生产的信息。 1.3制度保证体系: 安全生产必须制定齐全的安全保证制度,并严格执行。 ①安全生产管理制度; ②安全生产检查制度; ③安全生产验收制度; ④安全生产教育培训制度;

⑤安全生产技术管理制度; ⑥安全生产奖罚制度; ⑦工人职员因工伤亡事故报告制度; ⑧重要劳动防护用品定点使用管理制度; ⑨特种作业及外协力量安全管理制度。 1.4安全生产教育 安全教育内容分别为安全生产思想教育、安全知识教育、安全技能教育。我单位的安全教育分三个层次进行,一是对各级领导和管理人员的安全教育。每次生产会、调度会、协调会布置生产任务先强调安全生产,对本工程易发生事故的地方和行为尽量做到事先提醒,要求各级管理人员高度警觉,防止不安全因素滋长,做到警钟长鸣。二是对基层单位领导、工地施工负责人、安全员开展的安全业务培训。在安全专业技术培训方面,进一步学习《建筑法》有关建筑安全生产管理的条例,使管理人员提高认识,转变单纯追求经济效益的观念,把“安全第一” 变成依法办事的自觉行动,并不断介绍安全管理的新知识新技术、新经验,提高管理队伍整体业务水平和安全管理效能。三是对工地施工人员的入场教育,每一批工人进场,由项目部组织进行岗前安全培训,由安全部门统一命题考试,合格者才能上岗,并在分项工程施工前由施工负责人进行安全技术交底。 抓好岗位培训,特别是安全管理人员和特殊工种操作人员的岗位培训,坚持持证上岗,以有效地提高职工和各级管理人员和

高空作业安全控制措施与应急预案

编号:SM-ZD-29890 高空作业安全控制措施与 应急预案 Through the process agreement to achieve a unified action policy for different people, so as to coordinate action, reduce blindness, and make the work orderly. 编制:____________________ 审核:____________________ 批准:____________________ 本文档下载后可任意修改

高空作业安全控制措施与应急预案 简介:该方案资料适用于公司或组织通过合理化地制定计划,达成上下级或不同的人员之间形成统一的行动方针,明确执行目标,工作内容,执行方式,执行进度,从而使整体计划目标统一,行动协调,过程有条不紊。文档可直接下载或修改,使用时请详细阅读内容。 1.控制措施 ⑴、高处作业必须逐级进行安全技术教育及交底,对各种用于高处作业的设施和设备,在投入使用前,必须经检查确定完好后才能使用。⑵、高处作业人员必须着装整齐,严禁穿硬塑料底等易滑鞋、高跟鞋,工具应随手放入工具袋,按要求系好安全带。⑶、高处作业人员严禁相互打闹,以免失足发生坠落危险。⑷、在进行攀登作业时,攀登用具结构必须牢固可靠,使用必须准确。⑸、各类手持机具使用前应检查,确保安全牢靠。洞口临边作业应防止物体坠落。⑹、施工人员应从规定的通道上下,不得攀爬脚手架、边坡,在非规定通道进行攀登、行走 2.监控措施 ⑴施工过程中要经常对高处作业的安全设施进行检查,若发现安全设施有缺陷或隐患,必须及时解决,危机人身安

冬季施工安全生产管理措施

冬季施工安全生产管理 措施 集团公司文件内部编码:(TTT-UUTT-MMYB-URTTY-ITTLTY-

冬季施工安全生产管理措施时值隆冬,安全生产中的不安全因素增多,薄弱环节也增加,我们必须有足够的认识,并采取有针对性的措施,避免安全事故的发生。为进一步加强冬季施工安全,强化冬季安全措施的落实,根据首钢京唐钢铁公司安全环境保卫部文件的要求,特制定六冶京唐项目部《冬季安全生产管理措施》,各项目部要结合《冬季防火安全要点》组织施工单位制定冬季防火安全措施,于10月20日前组织对本作业部所属施工单位的施工,生活办公区域冬季安全施工,冬季防火进行一次全面检查,对检查发现的问题要立即整改。隐患和整改情况于10月28号前报项目部安全环境部。 1.要注意防煤气中毒。冬季天气寒冷,在取暖时应遵守防火管理规定,绝不能用明火炉取暖,人走炉灭,同时还要注意防煤气中毒。 2.要注意防滑。生产岗位上的脚手架各种楼梯和踏步处遇到雨水或积雪易结冰,职工上下梯子或步踏时容易滑到摔伤,因此,应注意及时清扫脚手架或步踏处的雨水或积雪,不让脚手架或步踏结冰。同时还要在梯子上绑上草绳、在步踏处铺上草袋,把防滑措施落到实处。 3.要注意防火。冬季风干物燥,易发生火灾,动火作业时一定要注意周围的环境,确认安全,切实做好防火工作,杜绝火灾事故的发生。

4.要注意防冻。当气温在摄氏零度以下时,就要做好设备的防冻,如给裸露在室外的水管、闸门等设备缠上草袋或草绳,防止设备冻坏影响生产,另外还要防止岗位职工冻伤。 5.要注意防雾。冬季易出现大雾天气,而且持续时间也较长,这就给施工区内交通安全带来威胁,运输车辆要注意减速行驶,确保交通运输万无一失。 6.要注意防坠。冬季雨雪过后往往天气放晴,化雪后建筑物会结成冰坠。因此要注意及时清理,防止冰坠掉下伤害过往的行人。 7.要注意防黑暗。冬季昼短夜长,照明设备使用时间长,要注意对职工上下班的道路、作业区的照明设施及时检查维修,确保照明设施完好无损,防止因照明不好而发生安全事故。 8.要注意防触电。生活区宿舍内严禁使用电褥子、电炉等电热设备取暖、做饭。严禁乱拉电线,接装电源插头等,室内照明灯具不超过100W/只。 9.要注意防爆。冬季使用的取暖锅炉,在使用前必须先办理相关手续,并按标准逐项进行检查,符合条件后方可使用。

高空作业专项安全措施方案.doc

宁夏工人文化宫综合楼项目工程泛光照明设计及施工高空作业安全措施方案 编制人: 审核人: 审批人: 编制单位: 编制日期:年月日

方案审批 总包单位: 安全员: 审批人: 日期:年月日

高空作业安全专项施工方案 一、工程概况 本工程为宁夏工人文化宫室外泛光照明工程,在施工过程中,高处作业的主要项目有:楼体墙面灯具的安装及管线的敷设等,为预防高处作业事故的发生,根据《建筑施工高处作业安全技术规范》 (J GJ80-91),结合我司历年来高处作业施工经验,特制定本安全 措施方案。 工程地址:银川市金凤区上海路北正源街东 建筑高度: 112M 基本风速:≤ 3 级 二、高空作业基本规定 1、按规范实施高处作业的安全技术措施。所需料具必须按国标要求 进场。 2、单位工程施工负责人应负责工程的高处作业安全技术。 3、施工前,应逐级进行安全技术教育及交底,落实所有安全技术措 施和人身防护用品,未经落实时不得进行施工。 4、高处作业中的安全标志、工具、仪表、电气设施和各种设备,必 须在施工前加以检查,确认其完好,方能投入使用。 5、攀登和悬空高处作业人员及搭设高处作业安全设施的人员,必须 经过专业技术培训及专业考试合格,持证上岗。 6、施工中对高处作业的安全技术设施,发现有缺陷和隐患时,必须 及时解决;危及人身安全时,必须停止作业。

7、施工作业现场有可能坠落的物件,应一律先行撤除或加以固定。 高处作业中所用的物料,均应堆放平稳,不妨碍通行和装卸。工具应 随手放入工具袋;作业中的走道、通道板和登高用具,应随时清扫干净;拆卸下的物件及余料和废料均应及时清理运走,不得任意乱置或向下丢弃。传递物件禁止抛掷。 三、施工吊板安全技术规范 本工程全部临空工作面均采用吊板施工。 1.吊板作业为年满 18 周岁的男性公民。且经过身体检查及安全技术 培训,考试合格后方可上岗作业。 2.作业者在作业前及午饭休息时严禁喝酒,严禁在高空及吊板上打闹,开玩笑或投掷物品。 3.吊板作业者在使用吊板前,须着装规范,将安全带、完全锁好挂好,否则不得上吊板工作。 4.使用吊板前,必须选择安全可靠的铆点(具体位置现场确定),将大绳固定好,并且由专人验收,符合要求后方可使用。操作时,铆点处必须设专人看管。 5.大绳与建筑物棱角接触部位必须加安全垫,以防摩擦,保护绳索。 6.使用频繁的大绳、吊板、安全锁,必须进行作业前的检查,发现 异常(如断丝超过 3 根或离股)应立即停止使用。 7.吊板及安全带、安全锁上的各部件,不得随意拆卸,以防不必要 的事故发生。 8.吊板作业者不准穿戴棉大衣和手套,风力超过四级不准上吊板作

安全生产风险分级管控制度

安全生产风险分级管控制度 第一章总则 第一条为了准确把握安全生产的特点和规律,坚持风险预控、关口前移,实现把风险控制在隐患形成之前,预防和减少生产安全事故,确保企业的生产安全,落实安全生产主体责任,根据有关法律、法规和国务院安委会办公室《关于实施遏制重特大事故工作指南构建双重预防机制的意见》(安委办〔2016〕11号)要求,全面推行企业安全生产风险分级管控,制定本制度。 第二条本制度所称安全生产风险是指生产安全事故或职业健康损害事件发生的可能性和后果的组合,安全生产风险分级管控是指按照风险不同级别、所需管控资源、管控能力、管控措施复杂及难易程度等因素而确定不同管控层级的风险管控方式。 第三条本制度对安全生产风险分级管控提出了要求,适用于集团公司总部、各直属单位。全资及控股权属企业,应根据本制度和国务院安委办《标本兼治遏制重特大事故工作指南》等文件精神,结合各自实际,实现本制度的转化、对接和落实。 第二章安全生产风险分级 第四条各单位应当依据《生产过程危险和有害因素分类与代码》(GB/T13861)的规定,充分考虑危害的根源和性质,对本单位潜在的人的因素、物的因素、环境因素、管理因素等安全生产危害因素进行辨识。 第五条各单位应当结合实际,选择有效、可行的安全风险评估方法进行危害因素辨识和风险评估。可使用工作危害分析法(JHA)和安全检查表分析法(SCL),有条件的企业可以选用危险与可操作性分析法(HAZOP)进行安全风险评估。

第六条各单位应当组织专家和全体员工,采取安全绩效奖惩等有效措施,全方位、全过程辨识生产工艺、设备设施、人员行为和管理体系等方面存在的安全风险,做到系统、全面、无遗漏,并持续更新完善,安全生产风险评估过程要突出遏制重特大事故,高度关注暴露人群,聚焦重大危险源、劳动密集型场所、高危作业工序和受影响的人群规模。 (一)生产工艺固有风险重点评估内容。 1.设计施工情况、边坡高度、边坡角、水文地质条件、工程地质条件、封闭圈以下深度、排土场情况和周边环境等。 2.设计施工情况、库容、坝高、汇水面积、筑坝方式、浸润线控制情况、库址地质条件和周边环境等。 (二)设备设施重点评估内容。 1.生产设备设施系统的机械化程度和自动化水平。 2.生产、调度、管理、监控信息化和智能化水平。 3.设备设施的技术水平,先进适用技术和装备的应用情况。 4.设备设施取得矿用产品安全标志情况。 5.设备设施定期检测检验执行情况。来安全生产监管指令落实情况。 第七条各单位应当对辨识出的安全生产风险进行分类梳理,参照《企业职工伤亡事故分类》(GB6441—1986),综合考虑起因物、引起事故的诱导性原因、致害物、伤害方式等,确定安全风险类别,对不同类别的安全风险,采用相应的风险评估方法确定安全风险等级。 第八条各单位应当将安全生产风险等级从高到低划分为D级\1级(重大风险)、C级\2级(较大风险)、B级\3级(一般风险)和A级\4级(低风险),分别用红、

2020年(安全生产)安全生产管理体系及保证措施

(安全生产)安全生产管理体系及保证措施

安全生产管理体系及保证措施 (壹)、安全生产管理体系 根据项目部安全生产责任制的规定,成立以项目经理为第壹责任人、项目副经理为分项安全责任人的安全保证体系,监督和指导各职能部室的安全生产行为。安全生产管理体系实行项目经理负责制,设置专管安全的项目副经理,领导各级生产指挥人员贯彻、落实安全生产方面的各项规章制度和保证措施,确保安全生产。安全生产的日常工作由安全副经理、安全员负责。在安全副经理、安全员的指导下,组织全体上岗人员进行岗前安全教育,特种作业人员必须经过培训合格后,持有效证件上岗,杜绝盲目指挥冒险作业。 安全生产管理体系图: 安全生产管理体系人员和各部门职责: 项目经理: (1).认真贯彻执行国家有关法律、法规和规范,对本工程安全生产工作负全面责任。 (2).定期主持召开安全生产会议,研究解决安全生产中的重大问题,注意改善劳动条件,关心职工的安全和健康,保证安全生产管理体系正常运行。 (3).检查且考核项目部各部门安全生产责任制落实情况。 项目副经理(安全副经理): (1).在项目经理领导下,负责本工程的安全生产工作,确保安全生产管理体系正常运行。 (2).协助项目经理组织贯彻国家劳动保护方针、政策、法令和上级有关安全生产方面的指示。

(3).贯彻安全生产“五同时”的原则,即在计划、布置、检查、总结、评比生产的同时,同样要计划、布置、检查、总结、评比安全工作。 (4).领导编制和组织实现安技措施计划,监督劳动保护费用的使用,不断改善职工的劳动条件。 (5).对各级干部、工程技术人员、工人经常进行安全生产教育。 (6).组织安全大检查,定期召开安全专会。 (7).组织均衡生产,注意工人的劳逸结合,对因加班加点致使工人过度疲劳造成事故负领导责任;对经理责成解决的安全工作或已决定急需解决的安全隐患,未及时采取措施解决而酿成的事故负直接责任;对虽采取措施,但由于下属人员执行不力造成的事故负领导责任。 项目总工程师: (1).在项目经理领导下,对本工程安全技术工作负责。 (2).审批各工种安全技术操作规程,主管安全技术教育工作。 (3).在审批技术文件和处理技术问题时,认真贯彻落实国家的安全标准。 (4).在审批采用新技术、新工艺、新材料、新设备和革新项目时,符合安全技术规定。 (5).对已提出的技术方面的安全隐患,未能及时采取措施解决而酿成的事故负直接责任,对虽采取措施,但由于下属人员执行不力造成的事故负领导责任。 技术质量部: (1).在项目经理的领导下,协助主管领导贯彻落实安全技术工作。 (2).在进行技术方案设计及工艺方案选择时,优先考虑安全设施的设计(如:脚手架、护栏、支撑、模板等),减少对施工人员的危害,以保证施工人员的安

高空作业安全保证措施教学提纲

高空作业安全保证措 施

高空作业安全保证措施 一、概述 大广北路基施工第三合同段起点(K23+920)位于麻城市顺河镇安畈村朝阳寺东侧,与第02合同段终点相接,终点(K38+702.112)位于麻城市黄金桥开发区鼎长岗村本合同段终点,路线全长14.781112公里。本合同段共有大桥、立交桥19座,天桥7座,桥梁大多采用柱式墩台柱结构。 本合同施工特点具有点多面广,安全因素多的特点,随着桥梁工程逐步由桩基逐步转向墩、台柱、梁板安装施工,高空作业安全为本项目施工重点。为保障本工程施工的正常运行,确保员工生命安全,结合本项目施工特点,特制定防高处坠落安全措施。 二、安全管理措施 2.1 完善安全管理机构。项目部成立施工安全管理组织机构,即施工安全管理委员会。它是本工程施工安全最具权威的管理机构,由项目经理、项目副经理、各部门主管、专(兼)职安全员和作业队队长组成。在项目部设安全部,配备3名专职安全员,兼职安全员由各施工队具体负责安全工作的人员担任。项目经理为施工安全管理委员会主任,是施工安全第一责任人。办事机构设在安全部,由专职安全员负责处理日常事务。 2.2 实行安全生产三级管理,即:一级管理由安全副经理领导下的质量安全部负责,二级管理为施工作业厂队负责,三级管理由班组负责。 2.3 根据高空作业施工特点制定《安全生产责任制》、并按照颁布的《安全生产责任制》的要求,落实各级管理人员和操作人员的安全生产责任制,人人做好本岗位的安全工作。 2.4 实行逐级安全技术交底制,由项目经理部组织有关人员进行详细的安全技术交底,参加安全技术交底的人员要履行签字手续,并保存资料,质量安全部专职安全员对安全技术措施的执行情况进行监督检查,并作好记录。 三、现场安全管理措施

工程施工安全生产管理措施

工程施工安全生产管理措施

工程施工安全生产管理措施 为加强安全生产监督管理,保障国家和人民生命财产安全,促进经济持续健康发展,维护社会稳定,实现安全生产,更好的提高我处经济效益,共同至力于公司发展,为此,安全措施必须进一步规范管理。工程建设的关键:“生产必须安全,安全为了生产”,“安全第一”与“质量第一”是并存的,安全是为了质量服务,质量亦需以安全做保证,安全也是质量的特点之一,抓住质量与安全这两个环节,工程施工就能顺利进行,就能获得良好的社会效益、经济效益和环境效益。 一、施工中的安全技术措施 1、安全组织和管理 1.1安全生产目标 贯彻“安全第一、预防为主”的方针,安全、高效、优质的建成本处工程项目。其安全目标为:无人身重伤及其以上事故;无等级火警事故及压力容器爆炸事故;无汽车行驶责任重大事故;无施工安全事故。 1.2安全生产责任制 处长对本处工程项目安全负责。在其领导

下,工程技术人员、班组长、操作工人,逐级建立安全管理责任制度。管理人员坚持安全生产“五到位”原则,即:健全机构到位、批阅文件到位、深入现场到位、检查到位、处理问题到位;并实施“四全”管理制度,即:全员、全过程、全方位、全天候的安全管理。 1.3安全生产检查制度 为确保各项施工安全技术措施的顺利实施,由处长领导各项目处的安全工作。加强对起重机械、施工塔吊、上下升降电梯、悬臂施工挂篮等的安全检查,消除一切安全隐患,施工现场设安全标志,危险作业区要悬挂“危险”或者“禁止通行”、“严禁烟火”等标志,夜间设红灯示警。工地布置符合防洪、防火、防雷击等有关安全规则及环卫要求。火工房、仓库、油库的设置遵守国家有关规定。安全技术措施保证制度:制定各项安全规章制度,投入必须的安全设施,为参加施工人员、机械设备、车辆以及进入现场的其他人员创造一个安全可靠的施工环境。施工技术难点工序、新技术、新工艺和高空、起

高处作业安全措施

吊篮高处作业安全措施 一、施工高处作业安全控制: 1、高处作业的安全技术措施其所需料具,必须齐备。 2、工程施工负责人应对工程的高处作业安全技术负责,并建立相应的责任制。施工前应逐级进行安全教育及交底并落实,落实所有安全技术措施和人身防护用品,未经落实时不得进行施工。 3、高处作业中的设施、设备、必须在施工前进行检查,确认其完好,方能投入使用。 4、攀登和悬空作业人员,必须经过专业培训及专业考试合格,持证上岗,并必须定期进行体格检查。 5、施工中高处作业的安全技术设施,发现有缺陷和隐患时,必须及时解决。危及人身安全时,必须停止作业。 6、施工作业场所有坠落可能的物件,应一律先进行撤除或加以固定。高处作业中所用的物件,均应堆放平稳,不妨碍通行和装卸。随手用工具应放在工具袋内。作业中的走道内余料应及时清理干净,不得任意乱掷或向下丢弃。传递物件禁止抛掷。 7、雨天和雪天进行高处作业时,必须采取可靠的防滑防寒和防冻措施。水、冰、霜、雪均应及时清除。遇有6级以上强风,浓雾等恶劣气候,不得进行露天攀登与悬空高空作业。暴风雪及台风暴雨后,应对高处安全作业设施逐一加以检查,发现问题,立即修理完善。 8、钢结构吊装前,应进行安全防护设施的逐项检查和验收,验收合格后,方能进行高处作业。 二、攀登作业安全控制: 1、现场登高应借助建筑结构或脚手架上的登高设施,可用载人的垂直运输设备,进行攀登作业时,也可使用梯子或采用其它攀登设施。 2、构件吊装所需的直爬梯及其它登高用的拉攀件,应在构件施工图或说明内做出规定,攀登的用具在结构构造上,必须牢固可靠。 3、梯脚底部应垫实,不得垫高使用,梯子上端应有固定措施。 4、安装拱肋时,应搭设脚手架,在节段连接处架设操作平台,幷设好防护栏杆。 三、悬空作业的安全控制: 1、悬空作业处应有牢固的立足处,并必须视具体情况,配置防护栏网,栏杆或其它