最全的采矿工程专业英语词汇总结
Chapter 3 .1 Mining method
mining method 采矿方法;
mining operation 采矿作业;transportation 运输;
ventilation 通风;
ground control 顶板管理;
the cost of per ton of coal 吨煤成本;recovery 回采率;
subside v. subsidence n.地表沉陷;subsidence control 地表沉陷控制cover 覆盖层;
overburden 上覆地层;immediate roof 直接顶;
floor 底板;
dip (Pitch)倾角;
hardness 硬度;
strength 强度;
cleavage 解理;
gas,methane 瓦斯daily operation 日常工作
single operation 单一工序
unit operation 单元作业
auxiliary operation辅助作业
cutting n. 切割,掏槽;
blasting n. 爆破
loading n. 装煤
haul v. 运输,搬运
drainage n.排水
power n. 动力power Supply 动力供应
communication n. 通讯
lighting n.照明。
disruption in production 停产;reduction in production 减产;compromise 折衷
room and pillar 房柱式
by far 到目前为止
i n common with … 和…一样underground mining 井工开采outcrop 露头,露出地面的岩层;crosscut 联络巷、石门;
drift 平硐;
entry 平巷;
development stage 开拓阶段;production stage 生产阶段;face 工作面。
continuous miner 连续采煤机;haulage capacity 运输能力;main entry 主巷。barrier pillar 隔离煤柱;
butt entry 区段平巷;
property line 矿井边界线。shearer 滚筒采煤机
planer,Plow 刨煤机
surface mining 露天开采
auger mining 螺旋钻开采
rapid excavation 快速掘进hydraulic mining 水力采矿underground gasification 地下气化ocean mining 海洋采矿
Chapter 3 .2 Mine Preplanning
Hercules【希、罗神】赫尔克里斯, 大力神--> Herculean, adj. 力气极大的;需要大力气的。herculean effort 巨大的努力
inadequacy n.不足,缺乏。transportation facility 运输设备inflationary adj. 通货膨胀的,通货膨胀引起的<--inflation n.胀大, 通货膨胀, (物价)暴涨<--inflate v 膨胀,充气。inflationary process 通货膨胀过程
drive up 抬高,提高drive into 掘进到…
be faced with 面临
monumental adj. [用以加强语气]非常的, 极端的<--monument n.纪念碑coal reserve 煤炭储量electromechanical adj. 机电的←electro(电子的)+mechanical(机械的) electromechanical mine operation 矿井机电作业
staff v. 雇用,聘用
season v 适用,适应
coordinate n. 坐标。v. (使)互相配合,(使)协调,调整。
a multitude(n. 多数,多量)of 大量capital investment 基本建设投资。foremost 最主要的,最重要的,
1Billion = 1,000,000,000 即10亿。
Mt metric ton 公吨。453.5Mt = 500 million tons→0.907Mt = 1 million ton
put into operation 投产,投入使用raise 筹集
the life of the property 矿产/井的使用年限。
commercial value 市场价值,商业价值。
for convenience 为了方便其见minability 可采性
marketability 适销性,可销性
coal reserve 煤矿
nominal,名义上的,极小的。
option 买卖选择权,优先购买权
enter upon 开始
preliminary examination 初步调查operating mine 生产矿井
to the extent that 达到这种程度以致... ;就...来说;在...方面来说;adjacent to 邻近的
surface topography 地面地形,表面地形
coalfield 煤田
measure 层组
coal-bearing measure含煤地层feature 特征;地貌。
structural feature 构造特征
surface improvement 地面上的改造tilled area 耕地
reservoir 水库
power line 电力线,输电线reservation n.保留地;自然保护区
on record n.留有记录的,记录在案的preferred 优先〔选用〕的,首选的traverse 导线。
traverse with compass 罗盘定位。system surveying 系统测量sampling 采样
have a bearing on 对…有影响,与...有关available 有效的,可用的
pricing schedule 定价方案preparation treatment 洗选加工selective adj.有选择性的,选择的
a master plan of operation 总体生产计划。
serve as 用作,作为,起到…作用。basis 基础,根据,依据
since 引导原因状语从句
justify 调整,证明,证明…是正确的,prospecting 勘探
drilling pattern 钻孔布置,钻孔图式basic map 底图,基本地图
log sheet 钻孔柱状图
tabular adj. <==table
tabular record 表格记录
operating management经营管理部门,经营管理
life expectancy 预期使用年限,使用寿命
delivery of supplies 材料供应
sales department 销售部门estimate of the cost 成本估计
Chapter 3.3 Mine development
portal 井筒
expected life of the mine 矿井的设计使用年限
rail haulage 轨道运输
as well as 即…又…
be of +n. 具有…(性质)
drift 平硐
shaft 立井,竖井
slope 斜井
main shaft主立井
auxiliary shaft 副立井
air shaft风井
transfer house 中转煤仓
headframe 井架
hoist house 提升机房,绞车房
skip 箕斗
cage 罐笼
car dump 卸煤设备
storage bin 井底煤仓
deplete 耗尽、衰竭
whether…or…是…还是…
pressure drop 压降
net effect 净效应,有效效应,实际结果
capital cost 基建费用
Chapter 4.1 Walling system introduction
working face 工作面coalface:采煤工作面interconnection:切眼
panel entry:区段平巷
gate entry:工作面顺槽
head gate:区段皮带巷,运输巷
tail gate:区段轨道巷,回风巷headentry:工作面运输巷(下顺槽)tailentry:工作面回风巷(上顺槽)bleeder entry:区段回风巷cross-cut:联络巷
gob, goaf:采空区
end:端头
Longwall mining 长壁采矿法Shortwall mining 短壁采矿法
pillar system. 柱式系统
longwall mining on strike 走向长壁采煤方法
mining in advance / wall advancing mining 前进式采煤方法
mining in retreat / wall retreating mining 后退式采煤方法
inclined longwall mining 倾斜长壁开采
underhand mining 俯采
overhand mining 仰采
Coal mining machine, coal-getting machine 采煤机;
Shearer,滚筒采煤机
Plow,planer 刨煤机
Face conveyor 工作面运输机
Pan line,”溜子”
Chain conveyor 链式运输机Scraper chain conveyor 刮板输送机Armored chain conveyor 铠装运输机
Roof support system:顶板支护系统Friction props:摩擦支柱
Friction metal props:摩擦支柱
Hydraulic prop:液压支柱
Single/Individual hydraulic prop 单体液压支柱
Hydraulic powered self-advanced support:液压自移式支架
roof support 顶板支架
stage loader:转载机
panel belt conveyor 区段皮带运输机electrical control 电力控制装置/设备hydraulic pump 液压泵站
blast mining technology 爆破采煤工艺
conventionally mechanized mining technology 普通机械化采煤
fully mechanized mining technology 综合机械化采煤
fully mechanized mining with sublevel caving technology 综采放顶煤方法
Chapter 4.2 Ground control
工作面周围地层:
Overlying strata 上覆地层:
Main roof 老顶,基本顶Immediate roof 直接顶
Gob采空区--Face—rib(煤壁)Floor 底板
Underlying strata下伏地层
Ground control顶板处理方式:(1)Caving;
(2)Pack。
Stable 切口,机窝
dead work 准备工作,非生产性工作。Mobile belt conveyor 可移式胶带运输机
No exception 无一例外
regular maintenance n.日常修理,定期检修
Downtime 停工期(由于损坏、修理等原因造成的停机时间),停工时间,停机时间Clearance 空隙
Immediate area of the face:工作面的直接区域
Rib line 煤壁线,腰线
heading 掘进头,平巷
up to dip 沿倾斜上行Compression strength 压缩强度Underlying strata 下伏地层
bed separation 离层
On strike 沿走向
Rad =radian,弧度
Cleat 解理
Hold true 有效,适用
Half butt cutting 半垂直切割
Angle of attack 冲角
virgin conditions 原始条件;Harder roof strata
Softer coal seam――uniformly