工程项目Engineering Project

1. A project execution is usually divided into some elementary phases, such as: engineering,

procurement and transportation, and field construction.

一个工程项目的实施通常可分为几个基本阶段:工程设计、采购和运输、以及现场施工。

2.The contract number of this project is CXC8-8.

这个项目的合同号是CXC8-8。

3.The Seller (vendor) is XX Engineering Corporation .

卖方(卖主)是XX工程公司。

4.The Buyer (customer, client)is XX Corporation.

买方(主顾、顾客)是XX公司。

5.XX contracts for domestic and overseas chemical projects.

XX公司承包国内和海外的化工工程。

6.Are you the Seller’s Representative on the job site?

你是卖方的现场代表吗?

7.I am the Buyer’s General Representative.(GR)

我是买方的总代表。(简称GR)

8.It is an inquiry (commercial and technical proposal, approval, agreement ,protocol, annex,

technical appendix) about this project.

这是这个项目的询价书。(商务和技术报价书、批准书、协议、会议记录、附加条件、技术附件)

9.There is much information in the technical proposal, which including: process flow, process

description, capacity of the plant, performance of the product.

技术报价书中有很多资料,包括:工艺流程、工艺说明、生产能力、产品特性等。10.The project team normally consists of project engineer, design engineer, schedule engineer,

and various specialists.

项目工作组通常包括有项目工程师、设计工程师、计划工程师、以及各类专家。

11.We can evaluate the results of field construction by four criteria, which are quality, time,

cost and safety.

我们可以通过四个指标来评价现场施工的成绩,即质量、时间进度、费用和安全。12.I am responsible for the technical (scheduling, inspection, quality control) work of this

project.( area)

我负责这个项目(区域)的技术(技术、检查、质量控制)工作。

13.Would you tell us the technical characteristic about this project?

你能告诉我们有关这个工程项目的技术特性吗?

14.Please give a description about this project.

请对这个工程项目作一个叙述说明。

15.Do you have any reference materials about this project?

你有关于这个工程项目有参考资料吗?

工程项目管理经典案例分析

背景: 某钢厂改造其烧结车间,由于工期紧,刚确定施工单位的第二天,施工单位还未来得及任命项目经理和组建项目经理部,业主就要求施工单位提供项目管理规划,施工单位在不情愿的情况下提供了一份针对该项目的施工组织设计,其内容深度满足管理规划要求,但业主不接受,一定还要求施工单位提供项目管理规划。 问题: ①项目经理未任命和项目经理部还未建立,就正式发表了施工组织设计,其程序是否正确? ②业主一定要求施工单位提供项目管理规划,其要求是否一定正确? ③项目管理规划是指导项目管理工作的纲领性文件。请简述施工项目管理规划的规划目标及内涵。 ④试说明施工项目管理规划的控制原则。 答:①程序不正确,公司还未任命项目经理,项目经理部还未建立,施工组织设计无人审核和批准,不能发表。 ②施工组织设计可以代替施工项目管理规划,但施工组织设计的内容深度应能满足施工项目管理规划的要求;冶金建设工程中,实际上一直使用施工组织设计代替项目管理规划;施工单位可以向业主说明提供的施工组织设计的内容深度已达到项目管理规划的深度要求,不必再编制项目管理规划。 ③施工项目管理规划的规划目标及内涵有: a.规划目标包括项目的管理目标、质量目标、工期目标、成本目标、安全目标、文明施工及环境保护目标、条件分析及其他内容等; b.内涵包括施工部署、技术组织措施、施工进度计划、施工准备工作计划和资源供应计划和其他文件等。 ④项目管理规划的控制原则为:实现最优化控制;动态控制;主动控制;全过程控制;全要素控制;建立大控制系统的观念;要对规划的实施明确项目经理部各岗位职责、对执行进行检查分析和改进,进一步进行总结。 2、背景: 华北某厂1260m3级高炉扩容改造工程。根据招标文件要求,为了实现快速、高效、优质、低耗地完成扩容改建任务,该扩容改造,应采用高炉整体平移新技术。高炉分两段安装:第一段为移送;第二段为悬吊,高炉本体工程拟定在拼装平台上基本完成,尽量缩短停炉后施工工期,保证业主要求的工期。高炉本体平移作业采用滚动摩擦方式液压缸推送。要求“新、旧高炉中心线重合,标高与原设计标高相符,误差控制在5~8m”。高炉本体移送重量约4500t。推移高度约为36m,推移距离约42m。高炉本体在液压缸推动下,分步向炉基平移。 问题: ①结合本案例谈谈项目目标的制定。 ②结合本案例谈谈项目管理的总体安排。 答:①项目的目标包括质量、安全、进度、成本等目标,施工组织设计、项目质量计划由项目经理部编制,并按 规定程序报批和实施。如质量目标:工程质量一次验收合格率100%,单位工程优良率85%以上,质量达到冶金建设工程优良标准。无重大质量事故,质量管理体系持续有效运行。竭尽全力做好工程服务和投产顺产保驾工作,确保用户满意。 安全目标:工亡事故为零;重伤事故为零;重大机械设备事故为零;重大交通事故为零。 现场目标:在争创优质工程的同时,强化现场文明施工的管理,树立公司良好的形象,建设文明、规范的施工现场。 ②项目管理实施项目经理责任制,项目经理对项目实施全方位的管理,负责项目施工全过程的质量、工期、安全、文明施工、确保履行合同,负责组织编制施工组织设计、项目质量计划、相应的项目管理文件。项目经理是工程项目质量、安全的第一责任人。 结合本案例项目管理的总体安排:强化项目管理,全面响应业主技术要求,严格科学管理、精心组织施工,优质、安全、高速建设高炉扩容改造工程。针对本工程的特点,结合类似工程的经验,我们对本工程的总体思路是:项目管理,科学组织;突出重点,齐头并进;有序安排,提高效率;阶段实施,步步为营;统一调度,道路畅通;质量贯标,安全可靠;发挥优势,缩短工期。

国际学术会议常用语英语

学术会议常用表达 1. 有关会议的一般信息 (1)名称 conference academic conference international conference symposium annual meeting/symposium/conference forum, international forum workshop (2)日期 dates/important dates/key dates (3)地点 location/venue conference location/venue (4)主题 issues/themes/(main)topics/scope of conference conference themes/topics topic of interests 2.论文征稿、提交与录用 call for abstract/proposal/paper paper deadline deadline for abstract/full paper/proposal submission submission deadline deadline extended date for mortification of acceptance Paper acceptance/rejection will be informed by…deadline for authors notification camera ready version deadline 3. 会议注册 deadline/closing date for registration registration form registration information registration fees and items official invitation letter payment telegraphic transfer only bank transfer bank draft/check 4. 会议进程及内容 conference schedule/program preliminary conference program final conference program opening ceremony/session keynote session/parallel session/tutorial session keynote speech oral presentation poster presentation tea/coffee break (buffet) lunch/(buffet)supper (welcome)banquet 5. 会议具体细节 opening introduction to speaker theme/paper presentation question and answer comment on speaker closing 6.学术会议的问答讨论环节口语

工程项目管理应遵循的八大原则

工程项目管理应遵循的八大原则 项目管理是企业管理之基、效益之本,当前,项目管理失衡、创效能力不足等问题普遍存在。从实践经验看,项目管理优劣决定了企业效力与可持续发展能力。项目管理优,则企业强大兴盛、政通人和;项目管理劣,则企业动力缺失、举步维艰。加强和优化项目管理,应遵循以下原则: 整合资源,合理投入 规模与能力的矛盾是我们目前面临的首要矛盾。近年来企业业务规模空前巨大,但生产要素严重不足,主要表现是:设备不足、人员短缺、有经验的施工队伍难寻。这三方面的问题解决的如何,直接决定着企业生产经营能否保持平稳有序增长态势。解决这一矛盾的对策就是要科学地整合资源。 要高度重视工装设备的投入问题。关键设备应自主投入,并尽可能选用性能可靠的品牌产品。通用设备、普通设备应充分利用社会现存资源,控制投入,原则上都应通过租赁社会设备或施工队伍自带的方式加以解决,谨防过度投入。设备是提升施工专项能力的重要因素,投入应以形成专业化能力为目标,力求先进适用、相互配套、效能最优、成本最低。 要有效整合人力资源。人是生产要素中最活跃的因素,把合适的人放在合适的岗位上可以发挥出无可估量的潜能。要眼睛向内,努力盘活存量,充分挖掘内部潜力。同时,要广借外力,有效整合社会人力资源为我所用。应注重处理好与现场监理、设计的关系,借用其力量对施工进行技术把关和技术指导。 应优选具备一定管理、技术力量的施工队伍。严管与善待相结合,形成良好的合作关系,我公司总结了五种外包队伍使用模式:一、南坪隧道模式,纯粹使用劳务,用自己的职工当工班长,劳务编入工班,按工效计酬,这种模式适合机械化程度高的施工项目。二、水柏线模式。因投标降价幅度过大,亏损已成定局,通过论证,把工期、价格、质量要求等条件公布出去,公开招标,不仅要求自带设备,还要求先打保证金,全项目部只有20人,管理一插到底,这种模式适合于有一定规模且施工难度不大,地质单一的桥隧项目。三、遵崇模式,两个洞口,一个队伍,设备共同投入,一切开支由我们掌握,工资连效按月发放,工程全部完成后按比例分红,这种模式适用于项目长素质高,管理能力强的项目。四、内蒙模式,造价不高、单价很低,没人愿意去干,经过甄选,选了一家实力强的外包队伍,自行管理,先交保证金,效果也很好,这种模式适用于诚信度高的队伍。五、现在的通用模式,工序分离、工费承包、限额发料、设备租赁、阶段结算。但从原则上讲,我认为像客运专线或宜万线这样的大项目,决不能搞大包,管理、设备、技术骨干力量都必须是我们自己的,经济必须由我们控制。以上三个问题解决好,对缓解规模与能力的矛盾,提升我们的施工能力,有重要意义。 分级管理,优势互补 对施工生产,总公司、集团公司、工程公司应分级分类管理,分别抓自己该抓的事、管自己该管的项目,形成优势互补局面。工程公司全力抓在建,项目管理要“实”,真抓实干;集团分公司要“准”,看人用人准,发现问题准,解决问题精确制导,弹无虚发;总公司要“高”,即解决高层次的问题和带普遍性的问题,解决管理理念问题和重大方案问题,制定方案和措施要高人一筹。一般来说,中小项目、单体工程项目应由工程公司组织管理,特大型项目应由集团公司监控管理,总公司则应对重大特殊项目进行管理把关。总公司、集团公司两级要明确本级当期应监督管理的重点项目,不要出现该管的项目不管、不该管的项目干预过多的现象。 从施工管理责任的划分上,应突出工程公司的主要责任。生产要素集中在工程公司,工程公司应对所有在建项目负责,主要职责应包括:建立健全项目管理责任体系,确保责任明晰,政令畅通,信息反馈及时准确;慎重选择项目经理、项目总工程师等关键岗位的人员,

工程项目管理案例分析(汇编)

工程项目管理案例分析 澳大利亚悉尼港海底隧道工程 澳大利亚悉尼港海底隧道工程是典型的BOT项目融资模式,首先理解BOT融资模式的意义:BOT项目融资(即Build—Operate—Transfer建设~经营~移交)是项目融资的诸多方式中的一种,在我国又被称作”特许权投融资方式。一般有东道国政府或地方政府通过特许权协议,将项目授予项目发起人为此专设的项目公司(Project company),由项目公司负责基础设施(或基础产业)项目的投融资、建造、经营和维护;在规定的特许期内,项目公司拥有投资建造设施的所有权(但不是完整意义上的所有权),允许向设施的使用者收取适当的费用,并以此回收项目投融资、建造、经营和维护的成本费用,偿还贷款;特许期满后,项目公司将设施无偿移交给东道国政府。 悉尼港海底隧道工程的项目背景 针对悉尼港湾大桥车流量逐年增多并己超过大桥设计能力的现状,澳大利亚新南维尔州政府在1979年就向社会公开发出邀请,就解决悉尼港湾的交通问题请私人企业提出建议,最初提出的建议(主要是修建悉尼港湾第二大桥)由于种种原因均未被政府所接受。1986年,澳大利亚最大的私人建设公司Gransfield和日本的大型建设公司之一Kumagai Gumi Co Ltd(熊谷组)联合向州政府提出了建设海底隧道作为悉尼港湾第二通道的建议。州政府在经全面研究后,认为这个建议是可以接受的,于是摇权这两个公司用自有资金对该项目的筹

资方式,建设和经营隧道进行全面的可行性研究。主要包括:技术可行性研究,环境影响研究,资金筹措方案。其中就资金筹措方面聘请了澳大利亚WESTPAL银行为财务咨询单位,对筹资方式进行了咨询并提出了初步方案。 该项目的可行性研究报告历时18个月投入400万澳元并在1987年被州政府批准,这两家私人公司为保证该项目的实施正式成立悉尼港隧道有限公司与州政府签订了特许权合同。该项目在经济上是可行的,最终要达到以下目标:政府的财政预算内不承担提供资金的义务,隧道收费要保持在最低水平上,政府承受的风险限制在最低限度上,政府能影响项目的设计、建设和经营,以保证项目的财政能力;长期性的解决悉尼港大桥的的交通问题,政府仅承担项目实际收入与设计收入之间的差额风险,保证项目有足够的收入归还贷款。 资金筹措方面 该项目总投资7.56亿澳元。最后确认的资金安排方案是:政府无息贷款2.23亿澳元(占29%);这部分资金来源于隧道建设期间悉尼大桥的纯收入,澳大利亚最大的私人建筑公司GRANSFIELD与日本的大型建设公司熊谷组的共同项目贷款为4000万澳币元(各2000万,共占5%)和共同项目资本金分700万澳币元(各350万,共占1%)、;西太平洋银行和德意志银行认购债券2.66亿澳元(占35%);Cheunug Kong Infrastructure 出资1.1亿(占15%);DB Capital Partners 出资6600万(占9%);Bilfinger Beeger 出资4400万

商务英语信函写作简洁原则文件

商务英语信函写作地简洁原则 随着全球经济一体化进程地不断发展,世界范围内地经济合作与交流也在不断增多.人们不可能跟自己地贸易伙伴一一亲自会面协商.而且我们常常需要将自己地贸易伙伴做出地各种承诺变成有籍可查地文字记录.这时商务信函就成了取代亲自拜会地一种便宜有效地沟通媒介.我们给贸易伙伴地每一封信都代表着自己 所在公司地形象,显示着公司地水平和实力.“一封好地商务信函有助于促进和发展同客户地关系,在促进达 成新地业务方面起着积极地作用.”(摘自《丹尼尔·肯尼迪方法:推销信创造地奇迹》)所以在写作时我们应该严格遵守并且灵活运用“7C”原则: Completeness(完整)Concreteness(具体) Correctness(正确)Conciseness(简洁) Clearness(明晰)Courtesy(礼貌) Conscientiousness(诚意) 这七个原则是商务信函写作地最基本地指导原则,对于写好一封商务信函起着很重要地作用. 我们知道,在商务活动中,时间和效率对于每一个商务人士来说都是非常重要地.在和自己地贸易伙伴合作和交流地每一个环节上,我们都要尽可能地减少给对方造成时间浪费,以便对方能够在同我们地商务交往中提高效率.写作商务信函最直接地目地就是进行有效地沟通和交流,简洁地表达与有效率地掌握分寸是最重要地.因此,商务信函地写作重点应始终放在“效率”二字上,短小精悍、切中要点.简洁就是用最简单地话语准确地表达自己地意思.而无需以牺牲完整、具体、礼貌为代价.一般不需要礼节性地寒暄,最好是开门见山、直入主题;语言精练,言简意赅.信函中地冗言必须省去,尽可能地将交易地详细事项整理后,简洁地向对方陈述,要尽可能地避免毫无重点而罗嗦冗长地写上好几张地情形.让对方很清楚地了解你想说什么,非常轻易地领会你地意图,从而快捷迅速地做出反应. 在商务写作过程中,笔者认为简洁是最重要地一个环节,同时也是最难做到地.所以下面我将对简洁原则从全文组织结构、段落、句子和词汇这四个方面作一些研究和探讨. 一、压缩篇幅,删繁就简. (一)3W式结构. 一封商务信函地全文结构可以用3W 来表示,即:Why do you write the letter? (第一部分) ;What’s the detailed reason? (第二部分) ;What do you expect your reader to do? (第三部分).我们在上文中已经提到过,商务信函写作地最主要目地就是沟通和交流.收信人或许每天都要看很多地信函,一封冗长、拖沓、空洞、开头就不得要领地信函第一眼看到会让人感到厌烦,从而对写信人地印象大打折扣. 1、第一部分(Why do you write the letter?):在信函地一开头就要目地明确、简明扼要告诉读信者为什么要写这封信,如: 例(1):I am replying to your letter of April 15 asking us to clear our March payment. 这样地开头直接告诉对方写信是为了回复对方4月15日让己方对三月份地订货付款地来信.这样可以使得读信人立刻知道写信地意图,在读信地时候可以有充分地心理准备,或者把注意力集中在问题地重点上.不会因为一些无关紧要地寒暄而分散注意力. 在这方面,我们最应该注意地就是避免中国式地寒暄和问候,不要为了追求客气而落入俗套. 例(2):It was a long time since I saw you in Qing Dao 3 months ago. 这样地信函开头不仅罗嗦、冗长,而且会给收信人一种错觉:这是一封朋友之间相互问候地私人信件.因而将它搁置一边,待自己较为空闲时再看,很可能会因为延迟阅读而给双方带来无可弥补地损失. 2、第二部分(What’s the detailed reason?):即商务信函地征文,叙述事实或者理由来支持信里地第一句.会显出你郑重其事、思想缜密.把所要列举地事实或者理由合并成最重要地一点或者两点,在不影响清楚准确地基础上越简洁越好.如:

工程项目管理专业英语(下) 汉译英

8 1、The construction contract price includes the direct project cost including field supervision expenses plus the markup imposed by contractors for general overhead expenses and profit. 建设工程合同价格由包括现场管理费在内的直接工程费和承包商添加的包括间接费和利润在内的增加值这两部分组成。 2、Within each of the major categories of construction such as residential housing, commercial buildings, industrial complexes and infrastructure, there are smaller segments which have very different environments with regard to price setting. 在建设工程的每一主要类型中(如居住用房、商业建筑、工业建筑和基础建设),有更小的部分,关于价格的制定有非常不同的环境。 3、However, all pricing arrangements have some common features in the form of the legal documents binding the owner and the supplier(s) of the facility. 约束业主和设备供应商的法律文件形式规定的计价方式是有一些相同之处的。 4、Without addressing special issues in various industry segments, the most common types of pricing arrangements can be described broadly to illustrate the basic principles. 在不考虑各建筑类型不同的情况下,最常用的计价方式可以根据概括介绍如下,并说明其基本原则。 5、The basic structure of the bidding process consists of the formulation of detailed plans and specifications of a facility based on the objectives and requirements of the owner, and the invitation of qualified contractors to bid for the right to execute the project. 招投标过程中的基本结构由根据业主的目标和要求编制实施的详细图纸和技术要求说明书,以及邀请合格的承包商为取得工程施工的权利而投标所组成的。 6、In the private sector, the owner has considerable latitude in selecting the bidders, ranging from open competition to the restriction of bidders to a few favored contractors. 在私营部门,业主在选择投标人有相当大的自由,范围从公开竞争的投标人到将投标人限制在若干个业主所喜欢的投标人。 7、In the public sector, the rules are carefully delineated to place all qualified contractors on an equal footing for competition, and strictly enforced to prevent collusion among contractors and unethical or illegal actions by public officials. 在公共项目领域中,需详细的制定规则,以使所有预审合格的承包商在平等基础上竞争,并严格执行,以防止承包商之间的相互串通和政府官员的不道德或违法行为。 8、In such cases, the contractor is permitted to submit a list of unit prices for those tasks, and the final price used to determine the lowest bidder is based on the lump sum price computed by multiplying the quoted unit price for each specified task by the corresponding quantity in the owner's estimates for quantities. 在这种情况下,允许承包商提交这些任务的分部分项工程量的单价表,而于确定最低投标人的最终价格是基于总投标报价时所用的计算方法,既通过将通过承包商对每一具体

公司工程项目管理办法细则

公司工程项目管理办法细则 第一章总则 第一条为全面了解、评估员工工作绩效,提高企业对人力资源控制和配备的有效性,通过科学考核发现人才、使用人才,激发员工积极向上的工作氛围,特制定本制度。 第二章适用范围 第二条本办法适用于集团公司项目及各子公司工程项目管理人员。项目管理人员主要为工程项目负责人、土建工程师、技术管理人员。下列人员不得参加工程项目人员考核: 1、入职未满半年者。 2、停薪留职及复职未满半年者。 3、曾受留职察看处分者。 4、中途离职者。 5、受集团公司监察部门通报批评并年度累计达3次及以上者。 6、其他不适合参与项目管理的。 第三章考核原则 第三条坚持公平、公正、公开的“三公”原则。要求考核者对所有考核对象一视同仁、对事不对人。坚持定量与定性相结合、建立科学的考核要素体系与考核标准。第四条坚持全方位考核的原则。采取定期考核、不定期巡查的多层次考核方法。 第五条坚持责、权、利三者相结合的原则。 第六条坚持实行考核定期化、制度化的原则。

第四章考核目的 第七条考核目的: 1、员工转岗、培训、晋升、调薪的重要依据。 2、鞭策后进、激励先进; 3、增强员工沟通、强化团队精神和提升企业竞争能力; 4、确定项目管理人员领取工地补助的重要依据; 第五章考核领导机构 第八条公司成立工程管理人员工地管理考核领导小组(以下简称:考核领导小组),全面负责工程管理人员考核的组织管理工作,公司董事长任考核领导小组组长,总经理、监事长、分管人力资源副总任副组长,集团公司审计部部长任考核办公室主任,市重点项目由集团公司审计部牵头考核。小组成员由集团公司审计部部长、纪检监察室主任、人力资源部部长、财务部部长组成,考核组成员工作经费按6000元/年的标准保障。各子公司的重点项目由子公司于当年年初提交审计部备案,考核由子公司参照本办法出台细则后执行。 第六章考核方法第九条考核为季度考核及年底综合评分相结合的方式。1、对工程管理人员当季度的工作绩效进行考核,考核时间为下一季度第一个月份的1日至5日,遇节假日顺延。2、年度考核得分=季度考核得分平均值3、绩效考核指标详见附表 第十条集团其他业务部门牵头的考核按相关办法执行。第七章考核内容第十一条项目管理人员按“主管领导+现场管理人员”机制实行,人员名单经集团公司研究并正式下文后,原则不予更改。各子公司对工程项目派驻的人员按“项目负责人+现场管理人员”机制实行,须派驻人员的项目必须在年初集团确定推动

国际学术会议常用语英语

国际学术会议常用语英语 Modified by JEEP on December 26th, 2020.

学术会议常用表达 1. 有关会议的一般信息 (1)名称 conference academic conference international conference symposium annual meeting/symposium/conference forum, international forum workshop (2)日期 dates/important dates/key dates (3)地点 location/venue conference location/venue (4)主题 issues/themes/(main)topics/scope of conference conference themes/topics topic of interests 2.论文征稿、提交与录用 call for abstract/proposal/paper paper deadline deadline for abstract/full paper/proposal submission submission deadline deadline extended date for mortification of acceptance Paper acceptance/rejection will be informed by…deadline for authors notification camera ready version deadline 3. 会议注册 deadline/closing date for registration registration form registration information registration fees and items official invitation letter payment telegraphic transfer only bank transfer bank draft/check 4. 会议进程及内容 conference schedule/program preliminary conference program final conference program opening ceremony/session keynote session/parallel session/tutorial session keynote speech

英语商务信函写作模板1 Business Letter I

Business Letter I (商务信函I ) Introduction Business letter is more formal than personal letter and it usually refers to: ?requesting (information, application, etc.) ?complaining (service, good, etc.) ?providing information ?recommending (employee, place to visit, etc.) ?inviting Business letter of requesting (询问性商务信函) Requesting letter is very useful in inquiring of information. It usually consists of inside address, salutation, body of letter, complementary, signature, etc.

三、Sample of business letter of requesting (询问性商务信函的写作范文) Exercises 1.What is the purpose of this letter? What does Guo hope to do? 2.Who is the audience? 3.How might Mr. Moore respond? Try it yourself 1.You’re going to graduate from your high school. Please write a letter to a college or university requesting information about admission procedures (入学程序) and the major (专业) you’re interested in. Use the correct business letter format. 2.You’re going to graduate from the university and you’re interested in working at a foreign company. Please write a letter to inquire information about enrollment (录取) and welfare (福利)(salary, house, training, etc.) in this company. Useful structures in business letter of requesting Could you please… Could you possibly… Would it be possible to… I would be grateful if you would…

工程项目管理常用英语汇编

工艺包process package 工艺设计process design 工艺发表process release 工艺预发表initial process release 工作范围;项目任务范围scope of work ; project scope 工作包work package 工作项work item 任务单项line item 分解结构breakdown structure 工作分解结构work breakdown structure 组织分解机构organizational breakdown structure 项目大项工作分解结构project summary work breakdown structure 承包商标准工作分解结构;工程公司标准工作分解结构contractor's standard work breakdown structure 责任分工矩阵responsibility assignment matrix 风险risk 风险分析risk analysis 风险备忘录risk memorandum 公司本部home office 公司本部服务home office service 公用工程utility 计划plan 项目计划project plan (项目)设计计划(project)engineering plan

(项目)采购计划(project)procurement plan (项目)施工计划(project)construction plan (项目)开车计划(project)start-up plan 专利patent 专利权patent right 产权技术proprietary technology 专利技术licensed technology 专有技术;技术诀窍know-how 许可证license 专利商;许可方licensor 受许可放;受让方licensee (技术)转让费;提成费royalty 许可证费license fee 专有技术费know-how fee 专业discipline 工艺process design ; process engineering 系统systems engineering 设备equipment engineering 布置plant layout engineering 管道设计piping design 管道机械piping mechanical engineering 仪表instruments engineering 电气electrical engineering 建筑architectural engineering

工程项目管理案例分析(DOC)

目录 摘要................................................ - 2 - 一、PDCA循环......................................... - 3 - (一)PDCA循环原理................................ - 3 - (二)PDCA的步骤.. (4) (三)PDCA的特点 (4) 1. 大环套小环,小环保大环,推动大循环 (4) 2. 不断前进、不断提高.......................... - 4 - 3. 形象化 (5) 二、工程概况 (5) 三、第一轮阶段...................................... - 5 - (一)计划阶段................................... - 5 - (二)实施阶段 (6) 1. 组织与经济措施 (6) 2. 合同与技术措施.............................. - 6 - (三)检查总结阶段 (7) 四、第二轮PDCA 循环 (7) (一)加强技术交底 (7) (二)加强操作监督,确保工序衔接.................. - 7 - 五、结论........................................... - 7 - 参考文献............................................. - 8 -

摘要 工程项目管理是以工程项目目标控制(质量控制、进度控制、投资控制)为核心的管理活动,是国际上通行的工程建设项目组织实施方式。在当前的后金融危机时代,建筑业面临着新的机遇和挑战,进一步深化项目管理以提高项目的投资收益是十分必要的。PDCA 循环法是一套以质量提高为目的的、从制定计划到实现计划的循环过程,是管理活动有效实施的基本方法,适用于各种质量管理工作。把PDCA循环法应用于工程项目管理,对提高项目管理水平,推动项目管理的科学化、规范化将起到积极的作用。 关键词:PDCA循环;应用;措施

工程管理专业英语翻译(第二版)徐勇戈

U2-S1什么是项目管理? 建筑项目管理不仅需要对设计和实施过程有所理解,而且需要现代管理知识。建设项目有一组明确的目标和约束,比如竣工日期。尽管相关的技术、组织机构或流程会有所不同,但建设项目同其他一些如航天、医药和能源等准等领域的项目在管理上仍然有共同之处。 一般来说,项目管理和以项目任务为导向的企业宏观管理不同,待项目任务的完成后,项目组织通常也会随之终止。(美国)项目管理学会对项目管理学科有如下定义:项目管理是一门指导和协调人力物力资源的艺术,在项目整个生命周期,应用现代管理技术完成预定的规模、成本、时间、质量和参与满意度目标。 与此形成对照,一般的工商企业管理更广泛地着眼于业务的更加连贯性和连续性。然而,由于这两者之间有足够的相似和差异,使得现代管理技术开发宏观管理可以用于项目管理。 项目管理框架的基本要素可以用图2-1表示。其中,应用宏观管理知识和熟悉项目相关知识领域是不可或缺的。辅助性学科如计算机科学和决策科学也会发挥重要作用。实际上,现代管理实践与各专业知识领域已经吸收应用了各种不同的技术和工具,而这些技术和工具曾一度仅仅被视作属于辅助学科领域。例如,计算机信息系统和决策支持系统是目前常见的宏观管理工具。同样,许多像线性规划和网络分析这样的运算研究工具,现在广泛应用在许多知识和应用领域。因此,图2- 1反映了项目管理框架演变的唯一来源。 具体来说,建设项目管理包含一组目标,该目标可能通过实施一系列服从资源约束的运作来实现。在规模、成本、时间和质量的既定目标与人力、物力和财力资源限制之间存在着潜在冲突。这些冲突应该在项目开始时通过必要的权衡和建立新备选方案来解决。另外,施工项目管理的功能通常包括以下: 1. 项目目标和计划说明书中包括规模、预算安排、进度安排、设置性能需求和项目参与者的界定。 2. 根据规定的进度和规划,通过对劳动力、材料和设备的采购使资源的有效利用最大化。 3. 在项目全过程中,通过对计划、设计、估算、合同和施工的适当协调控制来实施项目各项运作。 4. 设立有效的沟通机制来解决不同参与方之间的冲突。 项目管理学会聚焦九个不同独特领域,这些领域需要项目经理所具有的知识和关注度: 1. 项目宏观管理,确保项目要素有效协调。 2. 项目范围管理,确保所需的所有工作(并且只有所需的工作)。 3. 项目时间管理,提供有效的项目进度。 4. 项目成本管理,确定所需资源和维持预算控制。 5. 项目质量管理,确保满足功能需求。 6 . 项目人力资源管理,有效地开发和聘用项目人员。 7 . 项目沟通管理,确保有效的内部和外部通信。 8. 项目风险管理,分析和规避潜在风险。 9. 项目采购管理,从外部获得必要资源。

公司建设工程项目管理办法

建设工程项目管理办法 第一章总则 第一条为加强对*集团有限公司(以下简称集团公司)建设工程项目的管理,规范投资建设程序,加强过程控制,依据《中华人民共和国建筑法》、《中华人民共和国招标投标法》、《建设工程质量管理条例》等有关法律、法规和集团公司的相关规定,制定本办法。 第二条本规定中的建设工程项目包括集团公司总部或集团公司二级及以下企业投资建设的*研、办公、厂房、住宅及配套用房等各类用途的开发建设项目,以下简称项目。*工类项目,按照**工局有关规定办理。 第二章管理机构及职责 第三条集团公司生产运营部门是建设工程项目的主要管理部门。集团公司其他部门,根据职能分工分别负责项目各方面的监督管理工作。 生产运营部门主要负责房地产类项目年度开发建设方案(包括项目的总体开发建设计划、营运销售计划、资金使用计划、发

包模式等内容),以及项目在规划设计、招标、施工、验收移交等阶段的投资、进度、质量、安全等方面的监督管理。 规划部门主要负责产业类建设项目(项目用于*研生产,含产业园区)的项目建议书、可行性研究报告、固定资产投资计划、项目验收和后评价的监督管理。 法律部门主要负责项目重大风险管控和法律事务监督管理。 纪检监察部门主要负责项目在廉政建设、效能监察、信访等方面的监督管理。 审计部门主要负责对项目进行全过程、全方位的审计监督与评价。 第四条企业应依据土地权属、资金来源等确定项目建设单位,并承担监管责任。建设单位是建设工程项目的投资主体,是建设项目管理的主体,通称业主方或甲方。 第五条建设单位应设立项目建设管理机构,实行规范化管理。项目建设管理机构应制定招投标管理、预决算管理、变更洽商管理、合同管理、质量管理、安全管理等相关管理制度,明确岗位职责和工作流程。 第六条企业内部有建筑、结构、水暖、电气、造价等专业技术人员,具有建筑工程类执业资格或中级以上技术职称,且不少于6人的,可自行组建项目管理机构,对工程建设项目实行自主管理。 第七条企业专业技术人员不足的,应委托项目管理企业进

工程项目管理案例分析

工程项目管理案例分析 “工程项目管理” 案例分析 姓名: 学号: 专业班级: 成绩: 教师评语: 2013年 6 月 12 日 工程项目管理案例分析 目录 1、项目描述 2、项目概况 3、项目经理委派(资格、素质、能力等方面的要求) 4、项目干系人分析 5、项目范围分析(WBS、文字描述) 6、项目经理部组织(人员需求分析、组织结构图) 7、项目的时间、成本、质量管理 8、项目风险管理 9、项目控制 10、项目收尾 11、项目管理总结,经验教训 1项目描述 圣地亚哥城项目由合肥华都房地产开发有限公司开发。圣地亚哥城物业类型包括 花园洋房、多层公寓、高层公寓、商业以及配套公建。作为合肥华都房地产开发

有限公司在合肥打响品牌之战的扛鼎力作,圣地亚哥城具有特殊的意义。为 此, 公司本着大手笔、高品质的原则,聘请世界著名设计师事务所精心策划设计。 1 project description Santiago city project developed by Hefei Huadu Real Estate Development Co., ltd.. Santiago city property types including garden villas, high-rise apartments, senior apartments, commercial and public facilities. As Hefei Huadu Real Estate Development Company Limited brand war in Hefei full carry, Santiago city has a special significance. To this end, the company money, the principle of high quality, is a world-renowned designers carefully planning and design. 2项目概况 行政区域:瑶海区 项目位置:瑶海区临泉东路和王岗大道交叉口东南角 建筑类型:多层,高层 物业类别:普通住宅,公寓 主力户型:75-85平米 开发商:合肥华都房地产开发有限公司 产权年限:70年 容积率:1.93 绿化率:40 总户数:2986