stressed that promoting the comprehensive revitalization should focus on economic construction as the central focus with, pay special attention to grasp the implementation of five development concepts, deepening reform and promoting the all-round opening up, ensuring and improving people's livelihood, strengthen the construction of ecological civilization, "five priorities", play development mix. To with new development concept measure work, and command action, and training cadres, in implement implementation new development concept in the looking for opportunities, and build highlights, and expand advantage; to full deepening reform, break bound the aspects created vitality of system mechanism obstacles; to active advance full aspects opening, participation "in the cast Russian Economic Corridor" construction; to guarantees and improved livelihood, strongly won poverty battle; to strengthening ecological civilization construction, for sustainable development reserved space, for future generations left sky blue, and to green, and water clear of better homes. We must in-depth implement implementation new development concept, insisted to economic construction for Center, firmly caught development this first priority, absorbed make construction, heart no distractions caught development, speed up development "six big industry", in-depth implementation "three big engineering", active create "two big environment", out of a article quality more high, and benefits better, and structure more excellent of transformation development of road. To strengthen ecological construction. On March 22, the deep restructuring examined and adopted the opinion on perfecting compensation mechanism of ecological protection, proposed to explore the establishment of diversified ecological compensation mechanism, progressive realization of forests, grasslands, wetlands and other areas of focus and key ecological function and other important regional ecological compensation coverage, the ecological advantages of the region will be further highlighted. We need to go green eco-building, as the essential policy, in strict accordance with the State of main function region construction requirements, careful implementation and Xiaoxing ' an mountains forest ecological protection and economic restructuring plan for the construction of sky blue, ... Acts prohibited by picking up the remaining wells in standing timber. To focus on forest resource conservation, increase the acquisition and supervision of cold storage, no buy fruit, encourage support to leading enterprises, workers ' cooperatives as a unit, the contract management of forest resources, the rational protection and utilization of resources. To work actively towards policy aimed from the level of the State Forestry Administration formulated regulations to protect forest resources as soon as possible to achieve law and regulation to protect forest resources. Should focus on forest fire prevention. Fire safety is the first priority 房地产开发质量管理体系

2009年5月15日

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a strong momentum of development. So, in the "six" on development, we must be firm in faith, go all out, perseverance, one caught in the end, convinced that Castle is not relaxed, does not reach the target will never give up. Should focus on industrial projects. Project is to accelerate the industrial development of important support and backing. Industrial project construction, my area there are few in number, small size, low level problems. This year, the project as his party has "first project", we have to work hard to project construction. Especially effective during short, catching project shall not, slow, dragging not allowed. All localities should conscientiously implement the project leadership system, timetable, roadmap, and coordinate services, tracking the whole process forward, inverted durations, speeding up progress and seek practical results. Poised to break the project build Set challenges, to accelerate the pace of preliminary formalities, the enterprises have difficulties to pull one way and also help in a timely manner to help businesses market, enhance confidence, urging work as soon as possible. To strengthen the project analysis, proper risk analysis and improve project success rates. (Specific to the XX, we still want to make good use of agricultural advantages, relying on the upper reaches of the forest in the fresh air and XXX pure water and other resources, create high-quality, high-grade green food brands, truly reflect the original character. Meanwhile, adhere to the project as the breakthrough to promote economic development around the "six industrial chain" to pay special attention to forming projects, dig potential projects, focus on key projects, actively cultivating the new leading industries and new sources of economic growth). To promote investment. More accurate professional business, and based my industrial base and resources, aimed at national industrial layout

stressed that promoting the comprehensive revitalization should focus on economic construction as the central focus with, pay special attention to grasp the implementation of five development concepts, deepening reform and promoting the all-round opening up, ensuring and improving people's livelihood, strengthen the construction of ecological civilization, "five priorities", play development mix. To with new development concept measure work, and command action, and training cadres, in implement implementation new development concept in the looking for opportunities, and build highlights, and expand advantage; to full deepening reform, break bound the aspects created vitality of system mechanism obstacles; to active advance full aspects opening, participation "in the cast Russian Economic Corridor" construction; to guarantees and improved livelihood, strongly won poverty battle; to strengthening ecological civilization construction, for sustainable development reserved space, for future generations left sky blue, and to green, and water clear of better homes. We must in-depth implement implementation new development concept, insisted to economic construction for Center, firmly caught development this first priority, absorbed make construction, heart no distractions caught development, speed up development "six big industry", in-depth implementation "three big engineering", active create "two big environment", out of a article quality more high, and benefits better, and structure more excellent of transformation development of road. To strengthen ecological construction. On March 22, the deep restructuring examined and adopted the opinion on perfecting compensation mechanism of ecological protection, proposed to explore the establishment of diversified ecological compensation mechanism, progressive realization of forests, grasslands, wetlands and other areas of focus and key ecological function and other important regional ecological compensation coverage, the ecological advantages of the region will be further highlighted. We need to go green eco-building, as the essential policy, in strict accordance with the State of main function region construction requirements, careful implementation and Xiaoxing ' an mountains forest ecological protection and economic restructuring plan for the construction of sky blue, ... Acts prohibited by picking up the remaining wells in standing timber. To focus on forest resource conservation, increase the acquisition and supervision of cold storage, no buy fruit, encourage support to leading enterprises, workers ' cooperatives as a unit, the contract management of forest resources, the rational protection and utilization of resources. To work actively towards policy aimed from the level of the State Forestry Administration formulated regulations to protect forest resources as soon as possible to achieve law and regulation to protect forest resources. Should focus on forest fire prevention. Fire safety is the first priority

目录

一、房地产开发质量管理体系的构成 (1)

(一)质量管理体系的定义 (1)

(二)质量管理体系的内容 (1)

(三)质量管理体系部门构成 (2)

二、部门职责 (3)

三、工作流程 (7)

四、项目质量管理的主要内容 (7)

五、开发质量管理相关制度 (10)

六、现场管理程序手册 (34)

七、施工过程质量控制细则 (47)

八、“质量一票否决权”的使用规定 (50)

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a strong momentum of development. So, in the "six" on development, we must be firm in faith, go all out, perseverance, one caught in the end, convinced that Castle is not relaxed, does not reach the target will never give up. Should focus on industrial projects. Project is to accelerate the industrial development of important support and backing. Industrial project construction, my area there are few in number, small size, low level problems. This year, the project as his party has "first project", we have to work hard to project construction. Especially effective during short, catching project shall not, slow, dragging not allowed. All localities should conscientiously implement the project leadership system, timetable, roadmap, and coordinate services, tracking the whole process forward, inverted durations, speeding up progress and seek practical results. Poised to break the project build Set challenges, to accelerate the pace of preliminary formalities, the enterprises have difficulties to pull one way and also help in a timely manner to help businesses market, enhance confidence, urging work as soon as possible. To strengthen the project analysis, proper risk analysis and improve project success rates. (Specific to the XX, we still want to make good use of agricultural advantages, relying on the upper reaches of the forest in the fresh air and XXX pure water and other resources, create high-quality, high-grade green food brands, truly reflect the original character. Meanwhile, adhere to the project as the breakthrough to promote economic development around the "six industrial chain" to pay special attention to forming projects, dig potential projects, focus on key projects, actively cultivating the new leading industries and new sources of economic growth). To promote investment. More accurate professional business, and based my industrial base and resources, aimed at national industrial layout- a -

stressed that promoting the comprehensive revitalization should focus on economic construction as the central focus with, pay special attention to grasp the implementation of five development concepts, deepening reform and promoting the all-round opening up, ensuring and improving people's livelihood, strengthen the construction of ecological civilization, "five priorities", play development mix. To with new development concept measure work, and command action, and training cadres, in implement implementation new development concept in the looking for opportunities, and build highlights, and expand advantage; to full deepening reform, break bound the aspects created vitality of system mechanism obstacles; to active advance full aspects opening, participation "in the cast Russian Economic Corridor" construction; to guarantees and improved livelihood, strongly won poverty battle; to strengthening ecological civilization construction, for sustainable development reserved space, for future generations left sky blue, and to green, and water clear of better homes. We must in-depth implement implementation new development concept, insisted to economic construction for Center, firmly caught development this first priority, absorbed make construction, heart no distractions caught development, speed up development "six big industry", in-depth implementation "three big engineering", active create "two big environment", out of a article quality more high, and benefits better, and structure more excellent of transformation development of road. To strengthen ecological construction. On March 22, the deep restructuring examined and adopted the opinion on perfecting compensation mechanism of ecological protection, proposed to explore the establishment of diversified ecological compensation mechanism, progressive realization of forests, grasslands, wetlands and other areas of focus and key ecological function and other important regional ecological compensation coverage, the ecological advantages of the region will be further highlighted. We need to go green eco-building, as the essential policy, in strict accordance with the State of main function region construction requirements, careful implementation and Xiaoxing ' an mountains forest ecological protection and economic restructuring plan for the construction of sky blue, ... Acts prohibited by picking up the remaining wells in standing timber. To focus on forest resource conservation, increase the acquisition and supervision of cold storage, no buy fruit, encourage support to leading enterprises, workers ' cooperatives as a unit, the contract management of forest resources, the rational protection and utilization of resources. To work actively towards policy aimed from the level of the State Forestry Administration formulated regulations to protect forest resources as soon as possible to achieve law and regulation to protect forest resources. Should focus on forest fire prevention. Fire safety is the first priority

一、房地产开发质量管理体系的构成

(一)质量管理体系的定义

管理体系是建立方针和目标并实现这些目标的体系。质量管理体系是在质量方面指挥和控制组织的管理体系,是一个把与质量有关的组织结构、过程和资源等组织起来的有机整体,强调系统性和协调性。

(二)质量管理体系的内容

(1)组织结构质量管理体系中组织结构是指企业为实现质量管理目标,在相应的管理工作中进行分工协作,在职务范围、责任、权力方面所形成的结构体系。组织结构的本质是员工的分工协作关系。这个结构体系的内容主要包括:

●职能结构即完成成本管理目标所需的各项业务工作及其关系,

包括机构设置、业务分工及相互关系。

●层次机构又称组织的纵向结构,即各管理层次的构成。在成本

管理工作中,管理层次的多少,表明企业组织结构的纵向复杂程度。宜设置为3-4个层次,即:公司层次(分公司)项目层次,岗位层次。

●部门机构又称组织的横向结构,即各管理部门的构成。与质量

管理相关的部门主要有党政工团、计财、审计、技术、人事、管理、劳动物资、生产及负责企业制度建设工作的部门。

●职权机构即各层次、各部门在权力和责任方面的分工及相互关

系。由于与质量管理相关的部门较多,在纵向结构上层次也较多,因此,在确定质量管理的职权结构时,一定要注意权力要有层次,职责要有范the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

strong momentum of development. So, in the "six" on development, we must be firm in faith, go all out, perseverance, one caught in the end, convinced that Castle is not relaxed, does not reach the target will never give up. Should focus on industrial projects. Project is to accelerate the industrial development of important support and backing. Industrial project construction, my area there are few in number, small size, low level problems. This year, the project as his party has "first project", we have to work hard to project construction. Especially effective during short, catching project shall not, slow, dragging not allowed. All localities should conscientiously implement the project leadership system, timetable, roadmap, and coordinate services, tracking the whole process forward, inverted durations, speeding up progress and seek practical results. Poised to break the project build Set challenges, to accelerate the pace of preliminary formalities, the enterprises have difficulties to pull one way and also help in a timely manner to help businesses market, enhance confidence, urging work as soon as possible. To strengthen the project analysis, proper risk analysis and improve project success rates. (Specific to the XX, we still want to make good use of agricultural advantages, relying on the upper reaches of the forest in the fresh air and XXX pure water and other resources, create high-quality, high-grade green food brands, truly reflect the original character. Meanwhile, adhere to the project as the breakthrough to promote economic development around the "six industrial chain" to pay special attention to forming projects, dig potential projects, focus on key projects, actively cultivating the new leading industries and new sources of economic growth). To promote investment. More accurate professional business, and based my industrial base and resources, aimed at national industrial layout- 1 -

围,分工要明确,关系要清晰,防止责任不清楚造成相互扯皮推诱,影响管理职能的发挥。

(2)具体程序程序是为进行成本管理活动所规定的途径。这个“途径”应该是最简捷的途径。程序一般应形成文件,称为“程序文件”。编制书面的或文件化的程序,其内容通常包括:活动的目的、范围、职责、权限和工作程序;在工作程序中又要规定:做什么?谁来做?何时、何地做?如何做?使用什么材料、设备和文件做?做到什么程度?如何对活动进行控制和记录。

(3)过程和资源质量管理是贯穿整个发开过程而发生的一个动态过程,需要全员参与。

(三)质量管理体系部门构成

图1-1 ****房地产有限公司组织机构图

图1-2 房地产开发组织结构图

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

二、部门职责

公司办公室:

1、负责对公司会议精神和领导指示贯彻落实情况进行督办检查与协调,协助公司党政领导联系、传达、组织、协调、督促、处理各项日常工作事务;

2、负责公司各类文件资料、档案资料的收集、归档、保管、使用,维护档案安全,完成档案管理检查升级达标工作;

管理部:

1、负责公司各部门/各单位间信息的交流,并负责与相关方的沟通联络;负责公司信息化系统建设与管理;负责公司系统网站管理;负责公司局域网建设、管理及维护工作,组织实施办公自动化工作,并负责办公自动化设备的维护、检修工作;

2、负责公司的一体化管理体系运行;负责公司管理流程、管理标准的制定与完善;负责公司管理规章制度的完善,建立完整的管理体系;负责公司质量管理体系建设及质量认证相关工作;督促、协助下属公司制定与公司相应的各项管理制度,包括工作标准、工作责任、业务流程、协作关系、考核办法等,使各项管理工作逐步纳入标准化、规范化的管理轨道;

3、负责收集与一体化管理体系控制活动有关法律法规和其他要求,确认其适用性;

4、负责组织贯彻落实安全环保等有关法规和政策及管理标准,负责合规性评价。

5、协调、指导所属单位的质量、安全环保监督管理和重大质量、安全环保改进活动;

6、负责公司整体管理运行的监控工作,负责公司内部审核与管理评审的组织工作。

7、负责一体化管理体系策划的控制,研究公司的职能、职权划分,协调各部门之间的工作关系,提出组织机构的设置和调整方案;

8、负责对公司各职能部门履行管理职责的情况和效果进行评审、考核;

人力资源部:

1、负责组织全体员工的培训工作,制定培训计划并组织实施,建立培训档案做好培训记录;

2、负责公司员工的招聘、录用、调配工作;负责各二级单位之间员工流动的审批工作,并办理有关手续。对各二级单位的人事调配、培训、劳动工资管理等工作起协调、服务、监督与管理作用。

3、负责公司员工专业技术资格评审的初审、报送手续和专业技术职务的考核及聘任工作。负责办好特种作业人员的培训、发证、复审工作.

市场开发部

1、根据公司发展需要,进行房地产开发的市场调研,为确定公司房地产开发的投资策略和投资计划提供依据;

2、房地产市场的信息收集、整理、分析与反馈,投资机会研究,市场拓展和新项目酝酿,资源搜索;房地产开发项目策划和项目的可性行分析,包括选址看地、组织开展技术、经济、社会全方位可行性分析;

3、房地产开发项目全过程的跟进与监控管理,保证项目策划意图的the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

实施;包括参与项目规划方案设计和产品设计,参与企业形象宣传和品牌推广、参与制定物业管理方案;

4、根据公司的营销方针和目标,审核开发楼盘和其他房地产项目的营销策划方案;

5、组织进行开发楼盘价格的拟定;销售管理制度的拟定与实施

监控和协调销售网络和销售团队的建设与管理;

6、负责对供方(物资和外包)进行评定,做好评定(招标过程)记录,建立合格供方名录;

7、负责制定采购计划,并实施采购;

8、负责对采购物资进货检验,对不合格物资进行处置;保证采购环保型材料。

技术工程部

1、技术工程部负责公司房地产开发的技术、成本、质量、工程(含项目管理)归口管理工作。负责新开发项目“三同时”相关技术监管工作。

2、审核分公司提供的项目规划和建筑设计任务书、开发建设标准、设计合同,提出相应的意见和建议。

3、按照项目策划书的要求审批规划和建筑设计任务书,对选择的设计单位进行审查确认,负责核查分公司审查的方案、规划和建筑设计图纸、施工图纸。

4、参与项目重点环节的管理与控制,对重大设计变更、重大工程专业进行协调工作。对重大工程事故及工程技术问题提出处理方案。

5、负责二级单位水、电、暖、动力技术方案的审核,参与设备选型

采购与招投标、合同签订、验货与安装调试、竣工验收等过程。

6、负责重大项目水电暖动方案的调研。

7、对在建工程质量进行检查。

开发分公司:

1、贯彻执行公司管理方针、管理目标,制定本单位的管理目标

2、按照公司《管理手册》要求,建立健全本单位的管理体系并保持有效运行;

3、对所承担的业务范围内的开发、服务和产品的质量负责;

4、负责质量目标、计划的贯彻与实施

5、负责施工过程中质量管理各项工作

置业公司:

1、贯彻执行公司管理方针、管理目标,制定本单位的管理目标

2、按照公司《管理手册》要求,建立健全本单位的管理体系并保持有效运行;

3、对所承担的业务范围内的开发、服务和产品的质量负责;

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

三、工作流程

见图

四、项目质量管理的主要内容

(一)决策阶段的质量管理

此阶段质量管理的主要内容是在广泛搜集资料、调查研究的基础上研究、分析、比较,决定项目的可行性和最佳方案。

(二)施工前的质量管理

施工前的质量管理的主要内容是:

1.对施工队伍的资质进行重新的审查,包括各个分包商的资质的审查。如果发现施工单位与投标时的情况不符,必须采取有效措施予以纠正。

2.对所有的合同和技术文件、报告进行详细的审阅。如图纸是否完备,有无错漏空缺,各个设计文件之间有无矛盾之处,技术标准是否齐全等等。应该重点审查的技术文件除合同以外,主要包括:

(1)审核有关单位的技术资质证明文件;

(2)审核开工报告,并经现场核实;

(3)审核施工方案、施工组织设计和技术措施;

(4)审核有关材料、半成品的质量检验报告;

(5)审核反映工序质量的统计资料;

(6)审核设计变更、图纸修改和技术核定书;

(7)审核有关质量问题的处理报告;

(8)审核有关应用新工艺、新材料、新技术、新结构的技术鉴定书;

(9)审核有关工序交接检查,分项、分部工程质量检查报告;

(10)审核并签署现场有关技术签证、文件等。

3.配备检测实验手段、设备和仪器,审查合同中关于检验的方法、标准、次数和取样的规定。

4.审阅进度计划和施工方案。

5.对施工中将要采取的新技术、新材料、新工艺进行审核,核查鉴定书和实验报告。

6.对材料和工程设备的采购进行检查,检查采购是否符合规定的要求。

7.协助完善质量保证体系。

8.对工地各方面负责人和主要的施工机械进行进一步的审核。

9.做好设计技术交底,明确工程各个部分的质量要求。

10.准备好简历、质量管理表格。

11.准备好担保和保险工作。

12.签发动员预付款支付证书。

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

13.全面检查开工条件。

(三)施工过程中的质量管理

1.工序质量控制包括施工操作质量和施工技术管理质量。

(1)确定工程质量控制的流程;

(2)主动控制工序活动条件,主要指影响工序质量的因素;

(3)及时检查工序质量,提出对后续工作的要求和措施;

(4)设置工序质量的控制点。

2.设置质量控制点对技术要求高,施工难度大的某个工序或环节,设置技术和监理的重点,重点控制操作人员、材料、设备、施工工艺等;针对质量通病或容易产生不合格产品的工序,提前制定有效的措施,重点控制;对于新工艺、新材料、新技术也需要特别引起重视。

3.工程质量的预控

4.质量检查包括操作者的自检,班组内互检,各个工序之间的交接检查;施工员的检查和质检员的巡视检查;监理和政府质检部门的检查。具体包括:

(1)装饰材料、半成品、构配件、设备的质量检查,并检查相应的合格证、质量保证书和实验报告;

(2)分项工程施工前的预检;

(3)施工操作质量检查,隐蔽工程的质量检查;

(4)分项分部工程的质检验收;

(5)单位工程的质检验收;

(6)成品保护质量检查。

5.成品保护

(1)合理安排施工顺序,避免破坏已有产品;

(2)采用适当的保护措施;

(3)加强成品保护的检查工作。

6.交工技术资料主要包括以下的文件:材料和产品出厂合格证或者检验证明,设备维修证明;施工记录;隐蔽工程验收记录;设计变更,技术核定,技术洽商;水、暖、电、声讯、设备的安装记录;质检报告;竣工图,竣工验收表等。

7.质量事故处理一般质量事故由总监理工程师组织进行事故分析,并责成有关单位提出解决办法。重大质量事故,须报告业主、监理主管部门和有关单位,由各方共同解决。

(四)工程完成后的质量管理

按合同的要求进行竣工检验,检查未完成的工作和缺陷,及时解决质量问题。制作竣工图和竣工资料。维修期内负责相应的维修责任。

五、开发质量管理相关制度

(一)、工程项目质量管理制度

1.总则

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

工程项目质量管理的目的是,为项目的用户(顾客、项目的相关者等)提供一个高质量的工程和服务,令顾客满意,关键是过程和产品的质量都必须满足项目目标。项目质量管理过程和目标适用于所有项目管理职能和过程,还包括项目决策的质量、项目计划的质量、项目控制的质量等。

项目质量管理的主要对象是工程质量,它是一个综合性的指标,包括如下几个方面:

(1)工程投产运行后,所生产的产品(或服务)的质量,该工程的可用性、使用效果和产出效益,运行的安全度和稳定性;

(2)工程结构设计和施工的安全性和可靠性;

(3)所使用的材料、设备、工艺、结构的质量以及它们的耐久性和整个工程的寿命;

(4)工程的其它方面,如外观造型、与环境的协调,项目运行费用的高低以及可维护性和可检查性等。

2.工程质量管理的几个方面

对一般产品,顾客在市场上直接购置一个最终产品,而不介入该产品的生产过程。而工程的建设过程是十分复杂的,它的顾客(业主、投资者)必须直接介入整个生产过程,参与全过程的、各个环节的、对各种要素的质量管理。

要达到工程项目的目标,取得一个高质量的工程,必须对整个项目过程实施严格的质量控制。质量控制必须达到微观和宏观的统一,过程和结果的统一。

(1) 项目的质量控制过程

由于项目是个渐进的过程,在如图14-l所示的项目控制过程中,任何一个方面出现问题,必然会影响后期的质量控制,进而影响工程的质量目标。

(2) 工程的各个生产要素的质量控制

工程建设,是通过人工、材料、设备、方法即施工工艺(即4M)来完成分项工程,进而完成分部工程、单位工程、单项工程,以至整个工程的。质量控制必须着眼于各个要素、各个分项工程的施工,并直接渗入到材料的采购、供应、储存、使用过程中。

(3) 对生产者,各层次管理人员的控制

工程建设是通过各个项目参加单位的参与进行的,质量控制必须重视对人,及对人的工作的控制。由于项目参加者来自不同的单位,通过合同确定各自的责权利关系,各有其不同的经济利益和目标,这会影响对质量的管理能力和积极性。所以应做到:

a.认真选择任务承担者,重视被委托者的能力。无论是选择咨询公司、设计单位、施工单位和供应商,还是招聘管理人员,不仅要审查他们的资质等级,业务范围,还要审查他们的质量能力及信誉(如是否经过ISO90 00贯标),审查他们过去工程的质量水平、技术水平和装备水平,切不可将工程任务委托给那些没有质量能力的单位、部门或人。

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

b.加强对人员的培训。对业主来说,自己招聘的各种项目管理人员及为项目运行招聘的各种操作和管理人员,都应作培训。有时还要对承包商或分包商的人员进行培训或为其培训提供帮助。

对承包商来说,各种操作人员、管理人员的上岗培训,是质量保证的前提。通过培训增加项目技术知识,以防止出现施工、操作、保养、维修方面的问题。

c.正确的引导。通过合同、责任制、经济奖励等手段激发人们对质量控制的积极性。

在工程过程中,所有项目参加者都应具有质量意识。这里不仅是指重视质量,而且应具备质量管理的知识和经验。

人的问题是质量问题的主要原因,甚至有许多本属于技术、管理、环境等原因造成的质量问题,最终常常还是归结到人的身上。

3.质量和费用的关系

质量和费用是直接联系的,但这里的费用已不局限于建设期费用了,而是指整个工程生命期的费用。在项目策划时必须对项目的可用度和费用作权衡和决策。对一个工程评标,不能一味追求低的报价或将任务委托给报价过低的承包商。

4.工程质量控制的几个影响因素

按照实际工作的统计,质量问题的原因主要出现在如下几个方面:

设计的问题40.1%

施工责任29.3%

材料问题14.5%

使用责任9.0%

其它7.1%

当然还可以采用结构分析方法研究更细的原因。这样从总体上看,设计、施工、材料、使用是造成质量问题的根本原因,进行质量控制同样必须从这几个方面着手。

5.工程项目的质量体系的建立

建立项目的质量体系中应符合如下基本要求:

(1) 最重要的是满足业主、顾客和其他利益相关者的明确的和隐含的需要,使他们满意;

(2) 规划好的一系列互相关联的过程来实施项目,包括项目实施过程和项目管理过程。

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

(3) 通过严密的全方位的控制保证过程和产品的质量都满足项目的目标。

(4) 项目经理必须创建良好的质量环境,包括:

建立项目管理组织机构,以满足项目目标;

依据数据和有关事实根据的信息作决策;

进行开展评价,并将其结果用于质量评价;

项目的质量体系应为参加项目的所有人员了解并贯彻到每个人的工作中,使他们都参与保证项目过程和项目产品的质量工作中;

与承包商、供应商和其他项目参加者建立互利的双赢关系。

(5) 质量体系应有自我持续改进的功能,项目经理应负责持续改进工作:

a. 应指定有质量能力和资质的人员实施、监测及控制质量过程,实施纠正和预防措施,并向他提供必要技术支持。

b. 对项目所属的企业,上层管理者应不断从以前的工程经验中寻求项目各过程质量管理的改进和不断完善,不能将一个项目和项目管理看作一个孤立的过程。应建立信息系统,收集、分析各个项目实施信息,以持续地改进企业管理过程,形成大的循环。

c. 项目组织负责不断地改进自己的过程和活动的质量,应有自身工作评定、内部审核及可能的外部审核作过程,并对此安排所需的时间和资源。

d. 质量体系应根植于项目组织中, 应当是项目管理体系的组成部分。

e. 项目组织应尽可能采用项目所属的企业组织的质量体系和程序,必要时,可修改,这最容易为上层系统接受。

f.应确定项目整个过程中的质量惯例,如文件化、验证、记录、可追溯性、评审和审核要求。并建立项目信息的收集、存贮、更新及检索系统,确保有效利用这些信息。

g.为了控制项目的质量,应在项目过程中应按照项目的进展状况评价项目达到质量目标的程度。评价过程又是促进改进项目质量的机会。

1) 应评定质量计划的适宜性及实施的工作符合质量计划的程度。为了保证工程质量,进度、项目过程、成本花费应是协调的。应确定和评价对项目目标可能产生不利影响的偏离及风险。

2) 对工程质量的评价应由项目经理负责,包括实施者,并吸收其他利益相关者参与。

3) 项目的计划和实施方案中应包括质量的评价目的、评价过程、评价准则及每次评价的要求,并给以足够的时间,以进行度量和评定。项目实施过程中应确保项目这些工作按计划、按照标准进行和结束,并将评价结果纪录编辑成册,按规定时间保存。

4) 评价结果应及时反馈在后期工作上,确保相应的人员及时获得信息,及时采取措施,应明确职责。在项目结束时应对项目的运作进行全面评价。应考虑项目过程中的所有有关记录,考虑业主或顾客及其他利益相关者的反馈意见,编写相应的评价报告,重点突出能为其他项目利用的经验。

6. 工程质量控制中应注意的问题

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

工程项目管理工作中有如下几个问题必须引起注意的:

(1) 工程项目管理不是追求最高的质量和最完美的工程,而是追求符合预定目标的,符合合同要求的工程。工程质量是按照工程使用功能的要求设计的,它是经过与工期、费用优化后确定的,符合工程的整体效益目标。如果追求高质量就会损害其它两个目标,而最终会损害工程整体效益。无论谁提出变动工程质量时一定要先顾及另两个方面。

同时在符合项目功能、工期和费用要求的情况下,又必须追求尽可能地提高质量,不出质量事故,保证一次性成功,通过质量管理避免或减少损失和错误。

(2) 要减少重复的质量管理工作。具体分部工程(工作包的任务)由承包商、实施负责人完成的,这些企业或部门中应有专门从事生产和技术管理的人员,他们应有具体的质量管理工作。这些企业有完备的质量管理系统,它是属于企业内部的领导、协调、计划、培训和组织的任务,实施负责入应负责这些工作,这属于合同内的工作,而项目管理者不必再具体地重复这些工作(除了发现重大问题),但他必须监督各参加单位在任他们负责的范围内用适当的措施、工具和方法来解决质量保证问题。当然也包括对实施中的质量管理工作提供帮助、解答,并积极介入,但如果存在质量问题仍由实施者负责。实践证明,在许多大项目,特别是多层次承(分)包的项目中,质量管理的重复工作现象是普遍存在的,这将导致管理人员的浪费、费用的浪费、时间的延长和信息的泛滥。

(3) 不同种类的项目,不同的项目部分,项目管理进行质量控制的深度不一样,例如:

对技术复杂设施设备要求较高的,质量重于一切。质量控制对于项目管理者来说比成本控制还重要,项目管理中必须设置专门的质量保证措施和组织。

对一些项目中的特殊部分,如超平地面、门窗外墙装修,则应有细致严密地质量控制。

对有些项目,特别是合作方要介入质量管理的,则项目管理必须提供协调,如安排并协助检查、整理并提交报告等。在这里项目管理常常要为质量保证服务。

对一些新的开发型研究项目,没有或很少有现存的质量标准和管理方法,则项目管理者必须寻找出新的质量管理方法,自己必须直接参与具体的质量管理。

(4) 质量管理是一项综合性的管理工作,除了工程项目的各个管理过程以外还需要一个良好的社会质量环境,最主要的有:

1) 企业的基础管理工作,如标准化工作、质量管理教育、职员的质量意识、信息工作等;

2) 整个社会的价值观念,企业的品牌形象.

(5) 注意合同对质量管理的决定作用。一方面要利用合同达到对质量进行有效的控制,同时又要在合同范围内进行质量管理,超过合同范围则会导致赔偿问题:

l) 合同中对质量要求的说明文件,如图纸、规范,工作量表等应正确、清楚、详细、没有矛盾、应给各方面一个清晰的质量目标。应有定量化的、可执行、可检查的指标,防止质量问题争执。

the first responsibility of the forest, 26th spring area has fully deployed to the fire, has now entered the fire, we have to be on duty, and defend. Determined to overcome paralysis, must not "Twelve-Five" no fires in the past, the reduced requirements during the period. To apply strictly the party with the responsibility, must shoulder the responsibility of the Party Secretary in particular, really practice pipes, it can never shuaishouzhanggui, be sure to layer the implementation falls fire responsibility, to ensure that no major forest fires. To adhere to balanced, correctly handle the relationship between fire and project construction, industrial development, to "never miss or two." Second, to speed up the development of six major industries. Promote development in our region, the key is to give full play to resource advantage to build eco-oriented "big six" system, to create the new engine of economic growth. Firm confidence. Practice has proved that the "big six" of both central and provincial requirements, and meet the actual da hinggan mountains, through active efforts have been showing a

质量管理体系工作年度总结报告

根据管理评审计划,现将公司质量管理体系运行情况做如下总结: 一、管理体系的适宜性、充分性、有效性 1.)管理体系的适宜性: 2014年8月,对公司管理体系文件进行系统地审核;对公司运用的是2012年度贯标发行的质量管理体系文件,结合ISO/TS16949:2009标准和公司组织结构与流程现状实施梳理,由于原《程序文件》仅有17个控制程序,且流程图全部缺失,修订和缺失部分较多,报总经办总经理批准同意,决定对2012版《程序文件》升级改版; 2014年9月和10月完成新的程序文件汇编,目前运行的版本为第2版体系文件。新版体系文件,新编导入:质量体系策划、顾客财产、标识和可追溯性、统计过程四个控制程序文件,对HR、APQP、PPAP、供应商管理和3C标准要求的控制程序进行了修订升级处理;并结合公司过程实际操作流程状态编制了25个控制程序的流程图; 2014年11月完成第2版体系文件的部门会审与发布; 2014年12月完成了各部门相关操作程序流程图的精简版的编制(未发行); 经改版的体系文件更具适宜性; 2.)管理体系的充分性: 第2版质量管理体系文件,在分布上使文件更方便浏览,内容上更符合公司实际情况,在编制形式上系统的标准化、规范化、流程化、精简化、可视化。经过一段时间运行,与前一版相比,认为更适合公司的现状,相关要素过程是充分的、完整的; 3.)管理体系的有效性: 第2版质量管理体系文件能够从政策层面、程序层面和作业层面有效地规范质量管理和技术运作;各类质量记录和技术记录格式规范化、标识规范化,基本能够实现复现工作并起到体系运行证据的作用。 二、质量方针与质量目标实现情况 1.)质量目标实现情况: 公司质量方针:精心操作,规范管理,精益求精,顾客满意; 公司质量目标:产品顾客退货率小于300PPM,三年内达到200PPM以下; 顾客满意度85%,三年内达到95%以上; 2014年度经顾客满意度调查,顾客综合满意率高于90%,无重大投诉事件; 公司质量方针和目标符合目前的工作性质和现状,目标依方针而量化制定,能够指引全员工作方向,并在实际质量管理和技术运作中得到贯彻和执行; 2.)部门质量目标实现情况: 2.1 产品退货率小于300PPM,已实现; 2.2 在用仪器设备或校准率达100%,实现量值溯源; 2.3 人员培训合格持证上岗率达100%,已经过培训,并确认能力; 2.4 检测报告及时率100%,所有检测报告均在约定的时间内提交给相关方; 从以上目标的实现情况可以认为,公司质量方针和目标暂时可以不作更新调整。 三、质量管理体系审核和管理评审情况 1.)体系审核: 为确认公司新版体系文件运行情况,于2014年12月15-17日SMC和12月27-28日PHC 实施一次集中式内审即年度内审;该次内审共查出4项不符合项,建议改善21个点项;SMC 现已经纠正整改完毕并经验证有效,预防措施处于有效推进状态;PHC在积极整改中,计划2015年1月底实现验证/关闭; 2.)外审情况: 2.1)第三方审核: 2014年5月由NQA评审专家对公司管理体系进行了监督评审,发现不符合项四项; 2.2)第二方审核: 2014年接受潜在顾客和在供顾客审核共计20余次的应审工作,顾客建议改进项近100余点项;相关部门和责任人已经及时分析原因,并采取相应的纠正措施;经验证,整改活动有

质量体系内审工作总结范文

质量体系内审工作总结范文 1. 办公室工作总结 从运行质量管理体系以来,办公室工作按照公司《质量手册》和程序文件的要求,认真严密地做好员工培训、管理文件控制等工作,较好完成了各项管理任务,取得了一定的成绩,现将主要体系管理工作总结如下: 一、开展知识、技能培训,全面提高员工素质 为确保质量体系有效运行,适应公司管理、体系执行工作需要,全面提高员工素质,开展了IS09001: 2000版知识培训,工艺技术技巧、检验能力等培训,员工按计划培训率100%,培训考核合格格率达100%。 ①按照《20XX年度培训计划》的要求,组织全体人员学习ISO9001: 2000质量管理体系知识,《程序文件》内容培训,并对相关内容进行了考试、考核合格率达100%。 ②为了提高生产员工的操作技能,开展了产品工艺,操作技能 等培训。考核合格发了上岗证。 ③为加强质量检测力度,还对质检人员制定了培训计划。 二、强化文件和资料控制,实施规范管理 为确保文件和资料控制更加规范,办公室工作总结严格按照 ISO9001 质量管理体系运行要求,对所有文件资料进行了归档,发放等管理工作,确保各类文件、资料的完整性和统一性。 三、建议 在日常工作中,文件的打印、复印需到外部处理,费用较大,建议公司购买一台电脑和打印机,以节省成本,望公司领导批准。 办公室:

20XX 年3 月30 日 2. 生技部工作总结根据公司对我部的工作要求,使公司的生产管理走向正规化、标准化特对员工进行了分工,制定了员工职责,日常工作,经常进行助导、督查。对生产员工进行了技能技术的强化培训,使生产工作有条不紊地开展下去。按照《质量手册》管理职责的要求,负责公司技术管理职能。几个月以来,工作取得显著成效。 一、为了保证生产过程中每一生产工序的质量,我们加强了工装管 理、设备维护。建立了设备台帐。并按计划维护。车间开展了安全生产热潮,并对产品堆放进行了定置管理。经过培训,生产车间员工的自检能力和质量意识均有了较大的提升,但离现代化企业管理的要求还有很大差距,争取在今后的工作中把生产工作干得更好,努力把公司推向更高的层次,为公司的发展贡献力量。 二、对生产员工进行了有效的技能技术培训,使得每位员工能更好的完成本职工作, 提高了员工的主观能动性,从而提高了生产效率。 三、生产现场进行了整理,使得工作环境更加有序;现场整洁为创造宽松而又紧张的工作氛围提供了良好的条件。 四、制订完善的检验规范,根据质量的实际情况,经过同其他部门的沟通,制订了一系列检验规范的提高质量工作的规范化、标准化。 五、认真做好技术文件管理工作,对生技部和质检部用的技术文件进行了复查,各部门文件均保存完整,清晰。

房地产公司的成本控制体系如何建立

房地产公司的成本控制体系如何建立 *****工作职责***** 你按照下面所说的供应(采购)部的职责、结合自己 的房地产开发企业的实际状况研究一下吧: 供应部工作职责和工作标准 一、目的作用: 1.1可作为供应部开展工作的规范依据。 1.2可作为公司领导考核供应部工作业绩的衡量依据。 1.3可作为供应部人员工作中相互监督与协作配合的依据。 二、管理归口 总经理是供应部的上级直接领导。 供应部的工作直接对总经理负责。 三、工作职责 1、采购计划的编制 负责根据生产、总务、设备及检验等各部室物品需求 计划,编制与之相配套的采购计划,并组织具体的实施, 保证经营过程中的物资供应。 2、物资供应: 2.1负责原辅材料、中药材、包装材料、备品、备件、办公用品、检验用品及燃料等的采购供应工作。 2.2认真做好市场调查和预测。掌握物资供应情况。 2.3及时采购物资采购计划中提出的各类物资,做到既要价格合理,又要保证质量。 2.4负责各类采购合同的签订与管理、落实工作,并制订相应的管理制度。 2.5严格执行企业制定的物资供应制度,按照采购原则进行采购作业,根据生产安排做好物资供应的进度控制, 实现物流的优化管理。 3、采购物资的入库与结算: 3.1负责办理购进物资的到货后的相关手续的办理工作。 3.2对不合格产品及时退货。 4、供货单位的质量审核: 4.1参加对供货单位进行质量管理体系的审核工作。

4.2加强物资供应档案的管理,做好物资信息情报的工作,建立起牢固可靠的物资供应网络,并不断开辟和优化 物资供应渠道。 4.3负责制订物资采购工作各项管理制度。 4.4建立可靠的物资供应基地,会同质量管理部等有关部门做好供应商评估、优化选择、关系处理等工作。使之 按时、按质、按量进行物资供应。 5、负责企业外委托加工的出入库业务。 6、与企业内各部门加强沟通配合,处理好生产经营过 程中发生的各物流管理需求协调平衡的事项和突发问题。 7、完成公司领导交办的其他工作任务。 四、职责权限: 4.1对于未经批准的计划有权拒绝供应。 4.2有权要求仓库保管员提供报库存表。 4.3采购权: 4.3.1食堂用具的采购权。 4.3.2办公用品、用具及劳动保护用品、工装的采购权。 4.3.3卫生用品、用具的采购权。 4.3.4公司内备品、备件、生产用品用具及维修用料的采购权。 4.3.5检验用品及用具的采购权。 4.3.6企业用燃料的采购权 五、工作标准 5.1坚决执行总经理下达的各项工作指令,并且圆满地完成。 5.2根据生产需求计划和物资库存情况编制合理的采购计划,按时、按质、按量地供应企业生产经营所需要的各种物资,为企业生产经营活动提供了物资保障。 5.3严格执行企业物资供应制度,遵守企业制定的采购原则,采购作业及供应商管理、供应渠道的建立等方面的 工作均符合企业规定要求。 5.4与其他部门能够很好地沟通和协作配合,对物资供应发生异常情况或生产任务的临时调整变动,均能较好地 与有关部门协调处理。 5.5根据各部门需注计划,实行定期订购和定量订购方式,达到最小限度地占用流动资金,提高资金使用效益。 5.6对供应商的管理办法行之有效,所建立的物资供应

关于质量管理体系运行情况的总结报告

关于质量管理体系运行情况的总结报告 文稿归稿存档编号:[KKUY-KKIO69-OTM243-OLUI129-G00I-FDQS58-

关于质量管理体系运行情况的总结报告 公司从2002年引入ISO9001-2000质量管理体系以来,质量方针和质量目标以及按程序办事的工作思想已深入人心,从管理上较原来有了脱胎换骨的改变。自从2009 年 12月的管理评审和外审以来,公司各相关部门根据管理评审中提出的问题、外审的不符合项以及纠正和改进建议进行了全面整改,并根据实际运行情况坚持持续改进,不断提升和完善我们的管理体系。现将一年多来体系运行的情况总结如下: 一、前言 鉴于GB/T19001-2008 / ISO9001:2008标准已于2010年度开始执行,为保证公司质量管理体系的正常运行,在公司总经理的领导下、管理者代表的指导下以及各部门的配合下,综合办编制了新版《质量手册》及《程序文件》,并反复征求公司领导和各部门的建议和意见,多次进行修订和完善。2010年5月1日公司开始全面运行 RSFZ-SC-D/0-2010版《质量手册》和RSFZ-CX-D/0-2010版《程序文件》。9 月份开始实施了质量管理体系内部审核,审核涉及体系运行的6个分公司及旗下的12个职能部门,审核范围覆盖了要求的全部条款。10 月份在公司总经理的主持下召开了管理评审,各部门提出了体系持续改进的建议,这标志着公司已经建立了适合公司发展需要的质量管理体系。从质量体系运行以来,所有的部门都按照公司质量体系的要求执行。没有发生任何重大的质量事故和顾客投诉事件。 二、在质量管理体系运行方面做的主要工作: (一)综合管理办公室组织相关部门学习有关质量手册、程序文件和作业指导书,加深对GB/T19001-2008 / ISO9001:2008标准的理解,对内部审核中提出的多个不符合项于一个月内整改到位。 (二)对于上次管理评审中提出的问题进行了整改。加深了对体系文件的学习和理解,为今后工作的条理化、流程化奠定了基础。

内 部 质 量 体 系 审 核 报 告

内部质量体系审核报告 GYSN/QT8206审核日期2009.4.23 审核组长张祥增审核部门企业质量体系涉及的部门、车间审核员俞言俊 审核目的企业建立的质量体系是否符合GB/T19001:2008及其运行有用性。 审核依据GB/T19001:2008、质量手册、程序文件。 审核范围水泥制品的生产服务过程。 1、审核过程综述: 本次质量体系内部审核采取部门抽查形式,共查了技质科、生产科、供应科、销售科、管理层。审核组通过与部门领导交谈、查阅质量记录、察看现场、询问工作人员等方法,对企业质量体系情况进行了检查。审核组认为企业质量体系的持续运行比较有用,质量管理体系各过程的职能得到识别,质量目标已落实展开。 报 2、不合格项简述: 审核中共发现2项不合格项,分别是:①金峰水泥出厂检验报告无28天检验报告,不符合7.4条款,手册第7.0章节4.4.1.2;②Ф600PH管27-16无生产编号,不符合7.5条款,手册第7.0章节4.5.2。 告 3、审核结论: 通过审核,审核组认为目前企业所保持的文件化的质量体系符合标准事 要求,运行有用。企业的质量职能已分配、人员已培训、设施及工作场所符合工艺要求、关键分外工序已进行监视、作业文件配备在工作场所,各个过程均处于受控状态。但未有不合格现象,本次审核共开出2项不合格项项。

4、纠正措施要求: 请相关部门立即整改,十天内完成所有工作! 审核组长:张祥增管理者代表: 日期:2009.4.23日期:2009.4.25 个人工作业务总结 本人于2009年7月进入新疆中正鑫磊地矿技术服务无限公司(前身为“西安中正矿业信息咨询无限公司”),主要从事测量技术工作,至今已有三年。在这三年中,在公司各领导及同事的帮助带领下,按照岗位职责要求和行为规范,努力做好本职工作,认真完成了领导所交给的各项工作,在思想觉悟及工作能力方面有了很大的提高。 在思想上积极向上,能够认真贯彻党的基本方针政策,积极学习政治理论,坚持四项基本原则,遵纪守法,爱岗敬业,具有剧烈的责任感和事业心。积极主动学习专业知识,工作态度端正,认真负责,具有优良的思想政治素质、思想品质和职业道德。 在工作态度方面,勤劳敬业,心爱本职工作,能够正确认真的对待每一项工作,能够主动寻找自己的不够并及时学习补充,始终保持严格认真的工作态度和一丝不苟的工作作风。 在公司领导的关怀以及同事们的支持和帮助下,我迅速的完成了职业角色的转变。 一、回顾这四年来的职业生涯,我主要做了以下工作: 1、参与了新疆库车县新疆库车县胡同布拉克石灰岩矿的野外测绘和放线工作、点之记的编写工作、1:2000地形地质图修测、1:1000勘探剖面测量、测绘内业资料的编写工作,提交成果《新疆库车县胡同布拉克石灰岩矿普查报告》已通过评审。

房地产工程管理体系的建立与实施

房地产工程管理体系的建立与实施 第一讲:房地产工程核心理念介绍暨房地产工程管理人才观 1房地产工程管理行业现状分析 1.1房地产工程管理行业现状背景 1.1.1一个房地产工程项目是由不同的工程管理主体(比如:承建单位、监理单位、房地产企 业、政府建设主管部门、设计院等)共同管理完成的。 1.1.2由于这些工程管理主体对房地产工程项目所承担的社会责任或所站的角度不同,他们所 采用的工程管理方法也是不同的。 1.1.3高校的工程管理教育,基本上是站在施工单位的角度讲工程管理。 1.2作为甲方的房地产企业,采取什么样的工程管理模式才是科学合理的呢?目前,国内对房地产 企业工程管理模式的研究几乎是空白。 1.3中国房地产企业工程管理现状分析 1.3.1现状情况:各个房地产企业,因经营差异、背景区别、阶段不同等原因,采用的工程管 理方法不尽相同,可谓五花八门,没有统一的标准和规范,相互学习与借鉴难度大! 1.3.2中国房地产企业工程管理现状也有共同的地方共同的特点 1.4房地产工程管理存在的普遍问题 1.5房地产企业做成了总承包或建筑施工总承包在房地产项目中无法胜任“总承包”的原因 2房地产工程管理核心理念剖析 2.1房地产工程管理职业经理人卢卫东先生,运用现代项目管理理论,结合多年在品牌地产企业和 民营地产企业的房地产工程管理实操经验,突破承建单位“工艺质量、工艺进度、成本控制” 的工程管理思路,建立起“产品质量、经营进度、投资控制”的房地产企业工程管理体系,以 建筑产品为中心、真正做好客户服务工作,全新演绎房地产工程 “系统协调”(落实营销与 设计意图、把好工程业务关、协助调配资金)管理模式。 2.2房地产企业与承建单位对“铁三角”认识的区别,详见链接。 2.3近期,运用现代项目管理九大体系(范围管理、集成管理、风险管理、时间管理、成本管理、 质量管理、沟通管理、人力资源管理、采购管理)的思路,对提升房地产工程管理水平比较适 用。 2.4房地产工程管理全程策划案例,详见链接。 3中国房地产未来的工程管理方向 3.1非核心业务外包是方向! 3.2未来房地产工程管理方向:各类投资模式下的供方管理。 4房地产工程管理实战体会,详见链接。 4.1三个要素:工程管理资源环境、工程管理理念是否统一、工程管理系统化。 4.2房地产工程管理九大技巧:运用现代项目管理九大体系(范围管理、时间管理、成本管理、 质量管理、集成管理、风险管理、沟通管理、人力资源管理、采购管理)的思路,详见房地 产工程管理全程策划案例。 4.3房地产工程管理四个延伸:建筑产品人性化功能开发 、建筑产品高新技术应用 、建筑产品 质量缺陷维修 、员工与供应商培训。 5中国工程管理研究课程探讨 6房地产工程管理人才观 6.1合格的工程师——熟悉本专业的技术、工序,基本了解本专业的社会工程资源,有一定的沟 通、协调能力,可以胜任一般工程师的要求。 6.2优秀的工程师——熟悉本专业的技术、工序,了解本专业的社会工程资源,了解相关专业基

2020年CQC内审总结报告及资料

cqc内审总结报告及资料 篇一:CQC内审资料 浙江中宙照明科技有限公司 内部审核记录汇 编 编制:李娜审批:吴松日期:xx1225 浙江中宙照明科技有限公司发布 目录 1.年度内审计划表 2.内审通知单 3.内审实施计划表 4.会 5.审 6.不 7.不 8.末 9.内 议记核检符合符合次会部质 录表查表项报告项分布议签到量体系表 表及审核记录报告 关于下发xx年度内审计划的通知 公司各部门: 根据节能认证F002-xx《资源节约产品认证工厂质量保证能力要求》质量标准的要求,对本公司质量体系在试运行中安排一次全面的内部质量审核,内审时间确定在xx年12月25日。请各部门安排好工作,并做好审核前准备工作。 特此通知 附:内审实施计划 xx年12月20日

xx年度内审计划表 编号:Q/ZZZM-8.2.2-01 编制:计小芳审核:吴松批准:吴岱元时间:xx年12月20日审核实施计划表 篇二:CQC内审资料 浙江中宙照明科技有限公司 内部审核记录汇编 编制:李娜审批:吴松日期:xx1225 浙江中宙照明科技有限公司发布 目录 1.年度内审计划表 2.内审通知单 3.内审实施计划表 4.会 5.审 6.不 7.不 8.末 9.内 议记核检符合符合次会部质 录表查表项报项分议签量体告布表到表系审及记核报录告 关于下发xx年度内审计划的通知 公司各部门: 根据节能认证F002-xx《资源节约产品认证工厂质量保证能力要求》质量标准的要求,对本公司质量体系在试运行中安排一次全面的内部质量审核,内审时间确定在xx年12月25日。请各部门安排好工作,并做好审核前准备工作。 特此通知 附:内审实施计划

质量管理体系运行总结报告【最新版】

质量管理体系运行总结报告 为提高公司管理水平,以GB/T19001-20xx idt ISO9001:20xx 《质量管理体系要求》以及公司制定的《质量管理手册》等指导文件为依据,贯彻以顾客为中心的思想,严格执行体系的各项标准要求。提出了“以人为本科技领先高效管理打造精品”的质量方针和“内部一次检验合格率95% 成品率达97% 顾客满意率达90分”的质量目标,明确了各职能部门的管理职责,促进了质量管理和生产经营工作,保证了产品质量。 一、质量管理体系建立和运行情况 20xx年公司针对ISO9001:20xx质量管理体系运行情况,进行了一次内审,发现3项轻微不符合项。发生的不符合项都经过纠正、整改、确认后结案,确保了不符合项的有效控制。 通过内部审核,确保体系运行的持续改进,各项统计数据显示体系的有效运行,使公司领导与员工的质量意识有了明显的提高,各项基础管理工作不断正规化、程序化,生产质量有了新的提高,顾客反馈的满意度不断提高,在试运行期间从未发生的质量问题和顾客投诉。从总体看,公司的质量方针、目标得以贯彻实施,产品加工质量都得到了有效控制,从而证明公司质量管理体系基本适合公司实际,运行

有效并在持续改进。但同时也应看到,还存在着一些不足,需要在今后的工作中进一步加强整改的力度,使质量体系正常而有效运行。 二、质量方针、目标贯彻实施情况 建立文件化的质量管理体系。办公室按照ISO9001:20xx标准要求,对体系文件进行分类归档,建立了受控文件清单和质量记录清单,对文件发放进行登记,确保体系运行的所有场所均有适用的有关文件的版本,做到归档、发放及时率100%。20xx年做好质量记录的统筹管理,规定质量记录的保存期限,汇集质量记录的样本。 2. 人力资源保障方面 根据从事质量活动人员的能力要求,加强人力资源管理。20xx 年度培训计划,并按计划组织相关人员参加培训,公司于20xx年度计划举办培训8次,已举办培训5次。受训对象分别为领导、车间质量管理员、公司新进员工、车间操作工人、特殊工种等,我们不断完善员工培训档案,确保每一位参加培训的员工都有记录。 同时根据公司发展需求,做好人才招聘和新员工培训的管理工作,20xx年共招聘新员工12人,每位新进员工都经过公司严格的考察和正规的培训。

质量管理体系内部审核全部工作总结

办公室工作总结 从运行质量管理体系以来,办公室工作按照公司《质量手册》和程序文件的要求,认真严密地做好员工培训、管理文件控制等工作,较好完成了各项管理任务,取得了一定的成绩,现将主要体系管理工作总结如下: 一、开展知识、技能培训,全面提高员工素质 为确保质量体系有效运行,适应公司管理、体系执行工作需要,全面提高员工素质,开展了ISO9001:2000版知识培训,工艺技术技巧、检验能力等培训,员工按计划培训率100%,培训考核合格格率达100%。 ①按照《2003年度培训计划》的要求,组织全体人员学习ISO9001:2000质量管理体系知识,《程序文件》内容培训,并对相关内容进行了考试、考核合格率达100%。 ②为了提高生产员工的操作技能,开展了产品工艺,操作技能等培训。考核合格发了上岗证。 ③为加强质量检测力度,还对质检人员制定了培训计划。 二、强化文件和资料控制,实施规范管理 为确保文件和资料控制更加规范,办公室工作总结严格按照ISO9001质量管理体系运行要求,对所有文件资料进行了归档,发放等管理工作,确保各类文件、资料的完整性和统一性。 三、建议 在日常工作中,文件的打印、复印需到外部处理,费用较大,建议公司购买一台电脑和打印机,以节省成本,望公司领导批准。

办公室: 2004年3月30日 生技部工作总结 根据公司对我部的工作要求,使公司的生产管理走向正规化、标准化特对员工进行了分工,制定了员工职责,日常工作,经常进行助导、督查。对生产员工进行了技能技术的强化培训,使生产工作有条不紊地开展下去。按照《质量手册》管理职责的要求,负责公司技术管理职能。几个月以来,工作取得显著成效。 一、为了保证生产过程中每一生产工序的质量,我们加强了工装管理、设备维护。建立了设备台帐。并按计划维护。车间开展了安全生产热潮,并对产品堆放进行了定置管理。经过培训,生产车间员工的自检能力和质量意识均有了较大的提升,但离现代化企业管理的要求还有很大差距,争取在今后的工作中把生产工作干得更好,努力把公司推向更高的层次,为公司的发展贡献力量。 二、对生产员工进行了有效的技能技术培训,使得每位员工能更好的完成本职工作, 提高了员工的主观能动性,从而提高了生产效率。 三、生产现场进行了整理,使得工作环境更加有序;现场整洁为创造宽松而又紧张的工作氛围提供了良好的条件。 四、制订完善的检验规范,根据质量的实际情况,经过同其他部门的沟通,制订了一系列检验规范的提高质量工作的规范化、标准化。 五、认真做好技术文件管理工作,对生技部和质检部用的技术文件进行了复查,各部门文件均保存完整,清晰。 我部将在以后的工作中再接再厉,继续发扬好的工作作风,努力

房地产开发公司质量管理体系的构建

房地产开发质量管理体系 2015年4月27日

目录 一、房地产开发质量管理体系的构成 (1) (一)质量管理体系的定义 (1) (二)质量管理体系的内容 (1) (三)质量管理体系部门构成 (2) 二、部门职责 (3) 三、项目质量管理的主要内容 (8) 四、开发质量管理相关制度 (11) 五、现场管理程序手册 (35) 六、施工过程质量控制细则 (48) 七、“质量一票否决权”的使用规定 (50)

一、房地产开发质量管理体系的构成 (一)质量管理体系的定义 管理体系是建立方针和目标并实现这些目标的体系。质量管理体系是在质量方面指挥和控制组织的管理体系,是一个把与质量有关的组织结构、过程和资源等组织起来的有机整体,强调系统性和协调性。(二)质量管理体系的内容 (1)组织结构质量管理体系中组织结构是指企业为实现质量管理目标,在相应的管理工作中进行分工协作,在职务范围、责任、权力方面所形成的结构体系。组织结构的本质是员工的分工协作关系。这个结构体系的内容主要包括: 职能结构即完成成本管理目标所需的各项业务工作及其关系,包括机构设置、业务分工及相互关系。 层次机构又称组织的纵向结构,即各管理层次的构成。在成本管理工作中,管理层次的多少,表明企业组织结构的纵向复杂程度。宜设置为3-4个层次,即:公司层次(分公司)项目层次,岗位层次。 部门机构又称组织的横向结构,即各管理部门的构成。与质量管理相关的部门主要有党政工团、计财、审计、技术、人事、管理、劳动物资、生产及负责企业制度建设工作的部门。 职权机构即各层次、各部门在权力和责任方面的分工及相互关系。由于与质量管理相关的部门较多,在纵向结构上层次也较多,因

质量管理体系运行工作总结及部门工作报告

质量管理体系运行工作总结及部门工作报告 文件编码(008-TTIG-UTITD-GKBTT-PUUTI-WYTUI-8256)

____________________有限公司 质量管理体系运行工作总结 经过一年多质量管理体系的运行,公司全体员工严格按照质量方针、质量目标以及程序文件执行,贯彻ISO9001:2008质量管理体系标准要求,并根据实际运行情况坚持持续改进,不断提升和完善本公司的管理体系。现将一年多体系运行的情况总结如下: 一、体系运行总体情况 1.公司于2010年8月开始导入ISO质量管理体系推广工作,在总经理的直接领导下,组织开展认证的各项准备工作,建立《质量手册》、《程序文件》及制定各种管理和技术文件,并严格执行体系要求,终于在2011年1月底通过了外审,并于2011年2月18日取得了中国船级社《质量管理体系认证证书》。通过本年度例行内部质量管理体系审核,证明了公司的质量管理体系得到了有效的实施与保持。 2.公司按标准要求制定了公司质量管理体系文件,《文件控制程序》、《记录控制程序》总体运行情况良好。以后应注意:1)确保在使用处可获得适用文件的有效版本,即加强对施工验收规范等的收集和管理;2)确保记录的及时、真实、完整,并注意汇总与保管,以便易于查阅。 3.一年多以来,公司领导通过宣传公司质量方针、目标与检查程序文件执行情况,反复强调产品质量满足顾客要求与法律法规的重要性,倡导以顾客为中心,坚决贯彻“工艺规范,确保质量;持续改进,顾客满意”的质量方针,并将质量目标层层分解,落实到各部门。能明确各岗位人员职责、权限,保证人员、设备、材料等方面的及时供应,确保了生产的连续,质量满足规定要求。

2007质量管理体系运行情况总结报告

质量管理体系运行情况总结报告(2007年度管理评审材料)2007年,人民币加速升值,由此引起流动性过剩,各类产品价格飞涨。虽然国家采取了一轮又一轮的提高存款准备金和存贷款利率等经济调控措施,但各种原辅材料的价格仍然居高不下,给公司的生产经营带来了十分不利的局面。此外,稀土行业竞争的加剧,即使产品销售价格上涨带来的利润也被居高的原辅材料采购价格所蚕食。与此同时,公司上半年又遭受特大的洪涝灾害,部分设备和产品被淹,一些生产线被迫停产,造成重大的经济损失。面对内外交困局面,公司全体员工没有被困难吓倒,上下团结一致,抗洪救灾,积极开展生产自救,并通过加强内部管理,提高产品收率、降低生产成本、节省开支等措施,经过公司领导和全体员工的共同努力,克服了难以想象的困难,生产产量不但没有因洪涝灾害而减少,反而比上年增长46.3%,完成计划115.3%。公司在十分困难的2007年求得了生存。下面就2007年质量管理在质量方针和质量目标的实施,前次管理评审整改措

施的落实以及第二、第三方和内部审核等有关情况总结报告如下:一、质量方针、质量目标的实施情况公司的质量方针:“以科学管理为基础,以技术进步为手段,以创优产品为己任,以顾客满意为宗旨”。2007年贯彻执行质量方针开展的工作和取得成效主要有: 1、以科学管理为基础,公司在2006年对一、二、三车间实行员工工资、奖金总收入与产量、质量、收率、物耗等指标全额挂钩浮动考核成功的基础上,今年继续完善各类指标考核体系,并要求车间制订更加详细的实施办法,把目标、指标分解落实到班组,极大地调动了员工生产的积极性和创造性。生产技术部科学调度车间之间、各栋之间的物料、水、电、汽,保证物流畅通,加强对七栋富Y槽、NdSm/GdTb槽、LaCePrNd槽、HA槽、Eu 线、纯Y槽、TmYbLu线、纯Lu槽、各煅烧炉的重点控制,协调生产与技改工作,保证了生产正常有序地进行。 2、以技术进步为手段,今年进行技术改造,推进技术进步开展的工作主要有:⑴新建年产1000kg 以上纯Lu产品生产线,提高了高

质量管理体系内部审核报告

质量管理体系2016年内部审核报告 一、内部审核的时间:2016年10月18~19日。 二、受审核部门:总经理、管理者代表、行政人事部、质量部、市场营销部、技术部、 开发部、设备工程部、采购部、生产部、仓库。 三、内部审核组成员名单: 组长:XX 第一组:XXX、XXX、XXX、XXX 第二组:XXX、XXX、XXX、XXX 第三组:XXX、XXX、XXX、XXX 四、内部审核目的 1.检查和评价公司的质量管理体系是否符合策划的要求,是否符合ISO 9001:2008标准的要求和适用法律法规的要求,验证对体系实施、保持和持续改进的有效性和充分性; 2.检查质量方针和质量目标的贯彻落实情况,是否在各部门有效展开并得到实施; 3.通过审核进一步验证质量管理体系文件的可操作性; 4.检查如何以顾客为关注焦点,顾客满意和与顾客沟通过程,增强满足顾客要求意识。 五、审核范围 XX公司XXX的生产和服务全过程涉及到的有关的部门和相关岗位。 六、审核依据 1.ISO 9001:2008《质量管理体系要求》标准; 2.公司所策划和制定的质量手册,程序文件、作业文件、技术规范以及相关规定和准则; 3.公司提供产品所适用的法律法规; 4.必要时的相关产品销售合同和质量计划。 七、审核方式 1、与最高管理层人员座谈贯彻实施标准的“领导作用”情况 2、听取各职能部门负责人对自己职责权限情况以及本部门职责范围内的体系运行状况; 3、根据“质量管理体系内部审核计划”的安排,由审核小组分别到应所审的职能部门对其应实施标准的章节条款。对实施状态收集审核发现,审核应用抽样方法进行; 4、对各部门工作现场和生产岗位作业现场的环境适宜性,设备设施管理等状况进行检查。 八、内审首、末次会议参加人员 参加人员有包括总经理、管理者代表、各分管副总、各部门的主管/负责人及审核组

房地产开发公司质量管理体系的构建

房地产开发质量治理体系2015年4月27日

目录 一、房地产开发质量治理体系的构成 (1) (一)质量治理体系的定义 (1) (二)质量治理体系的内容 (1) (三)质量治理体系部门构成 (2) 二、部门职责 (3) 三、项目质量治理的要紧内容 (8) 四、开发质量治理相关制度 (11) 五、现场治理程序手册 (36) 六、施工过程质量操纵细则 (49) 七、“质量一票否决权”的使用规定 (52)

一、房地产开发质量治理体系的构成 (一)质量治理体系的定义 治理体系是建立方针和目标并实现这些目标的体系。质量治理体系是在质量方面指挥和操纵组织的治理体系,是一个把与质量有关的组织结构、过程和资源等组织起来的有机整体,强调系统性和协调性。 (二)质量治理体系的内容 (1)组织结构质量治理体系中组织结构是指企业为实现质量治理目标,在相应的治理工作中进行分工协作,在职务范围、责任、权力方面所形成的结构体系。组织结构的本质是职员的分工协作关系。那个结构体系的内容要紧包括: ●职能结构即完成成本治理目标所需的各项业务工作及其关系,包括机构设置、业务分工及相互关系。 ●层次机构又称组织的纵向结构,即各治理层次的构成。在成本治理工作中,治理层次的多少,表明企业组织结构的纵向复杂程度。宜设置为3-4个层次,即:公司层次(分公司)项目层次,岗位层次。 ●部门机构又称组织的横向结构,即各治理部门的构成。与质量治理相关的部门要紧有党政工团、计财、审计、技术、人事、

治理、劳动物资、生产及负责企业制度建设工作的部门。 职权机构即各层次、各部门在权力和责任方面的分工及相互关系。由于与质量治理相关的部门较多,在纵向结构上层次也较多,因此,在确定质量治理的职权结构时,一定要注意权力要有层次,职责要有范围,分工要明确,关系要清晰,防止责任不清晰造成相互扯皮推诱,阻碍治理职能的发挥。 (2)具体程序程序是为进行成本治理活动所规定的途径。那个“途径”应该是最简捷的途径。程序一般应形成文件,称为“程序文件”。编制书面的或文件化的程序,其内容通常包括:活动的目的、范围、职责、权限和工作程序;在工作程序中又要规定:做什么?谁来做?何时、何地做?如何做?使用什么材料、设备和文件做?做到什么程度?如何对活动进行操纵和记录。 (3)过程和资源质量治理是贯穿整个发开过程而发生的一个动态过程,需要全员参与。 (三)质量治理体系部门构成 图1-1 房地产开发组织结构图

质量管理体系运行情况总结报告

关于质量管理体系运行情况的总结报告 公司从2002年引入ISO9001-2000质量管理体系以来,质量方针和质量目标以及按程序办事的工作思想已深入人心,从管理上较原来有了脱胎换骨的改变。自从2009 年12月的管理评审和外审以来,公司各相关部门根据管理评审中提出的问题、外审的不符合项以及纠正和改进建议进行了全面整改,并根据实际运行情况坚持持续改进,不断提升和完善我们的管理体系。现将一年多来体系运行的情况总结如下: 一、前言 鉴于GB/T19001-2008 / ISO9001:2008标准已于2010年度开始执行,为保证公司质量管理体系的正常运行,在公司总经理的领导下、管理者代表的指导下以及各部门的配合下,综合办编制了新版《质量手册》及《程序文件》,并反复征求公司领导和各部门的建议和意见,多次进行修订和完善。2010年5月1日公司开始全面运行RSFZ-SC-D/0-2010版《质量手册》和RSFZ-CX-D/0-2010版《程序文件》。9 月份开始实施了质量管理体系内部审核,审核涉及体系运行的6个分公司及旗下的12个职能部门,审核范围覆盖了要求的全部条款。10 月份在公司总经理的主持下召开了管理评审,各部门提出了体系持续改进的建议,这标志着公司已经建立了适合公司发展需要的质量管理体系。从质量体系运行以来,所有的部门都按照公司质量体系的要求执行。没有发生任何重大的质量事故和顾客投诉事件。 二、在质量管理体系运行方面做的主要工作: (一)综合管理办公室组织相关部门学习有关质量手册、程序文件和作业指导书,加深对GB/T19001-2008 / ISO9001:2008标准的理解,对内部审核中提出的多个不符合项于一个月内整改到位。 (二)对于上次管理评审中提出的问题进行了整改。加深了对体

房地产公司质量管理体系承诺[116609]

房地产公司质量管理体系承诺[116609] 一.公司领导的重视和亲自参与是质量管理体系能否取得实效的关键,公司总经理通过以下活动,以建立和实施质量管理体系,并持续改进其有效性,同时为所做出的承诺提供证据: a)向全体员工灌输满足顾客要求、合同要求、法规要求的重要性; b)明确管理者代表,在手册中发布任命令; c)主持制定公司的质量方针和质量目标,在手册中以文件形式发布; d)主持组织进行管理评审,并不断寻求改进质量管理体系; e)为质量管理提供必要而且充分的人力、设备、资金,保证质量体系的有效运行。 f)根据顾客的要求和法律法规的规定,公司总经理要针对每个开发项目,强调项目运作中的重点注意事项,并在项目的信息管理、运作过程的监督、适用的法律法规、项目的论证以及人员配备等几个方面,提供相应的资源配备。 二.以顾客为关注焦点 公司的生存和发展依存于顾客,公司总经理将坚持以不断增强顾客满意度作为公司的根本追求,确保: a)将以顾客为关注焦点的意识融入各项质量管理活动中; b)识别并确定顾客的需求和期望,包括公司应尽的责任和义务,以及法律、法规方面的规定要求; c)将顾客的需求转化为具体的质量要求,通过质量体系的运行、与顾客有关过程的控制,达到预期的目标。 三.质量方针 公司的质量方针是:服务用户信守合同赢得信誉塑造形象 3.1公司质量方针的含义是: 服务用户--公司的各种开发经营活动,要紧紧围绕客户的利益开展,不断提高服务水平,最大程度地满足顾客的需求。 信守合同--在项目开发建设的各阶段活动中,严格履行各种合同、协议和约定的规定,不隐瞒欺诈用户,以信取人,为用户::提供良好的投资条件。 赢得信誉--通过对公司各项开发经营活动的控制,确保项目运作质量,在房地产开发行业中创建良好的企业信誉。 塑造形象--在公司的开发经营过程中,不断总结完善,提高公司各项管理水平,塑造良好的公司形象,不断拓展公司的生存和发展空间。 3.2公司总经理负责组织制定质量方针和目标,它体现了公司对质量的承诺,是公司质量管理的宗旨和方向,所有员工都要认真贯彻; 3.3公司将通过宣讲、培训,使职工了解质量方针的内涵,并通过质量体系的有效运行,将质量方针落实到每个员工; 3.4通过定期的管理评审对质量方针进行评审,确保其适宜性和有效性。 四.策划 4.1质量目标 4.1.1公司的质量目标是: a)开发工程项目优良率80%,年递增1%以上; b)顾客满意率95%,年递增0.5%以上;

质量管理体系运行总结报告

质量管理体系运行总结报告 质量管理体系运行总结报告范文 为提高公司管理水平,以GB/T19001-20xxidtISO9001:20xx《质量管理体系要求》以及公司制定的《质量管理手册》等指导文件为依据,贯彻以顾客为中心的思想,严格执行体系的各项标准要求。提出了“以人为本科技领先高效管理打造精品”的质量方针和“内部一次检验合格率95%成品率达97%顾客满意率达90分”的质量目标,明确了各职能部门的管理职责,促进了质量管理和生产经营工作,保证了产品质量。 一、质量管理体系建立和运行情况 20xx年公司针对ISO9001:20xx质量管理体系运行情况,进行了一次内审,发现3项轻微不符合项。发生的不符合项都经过纠正、整改、确认后结案,确保了不符合项的有效控制。 通过内部审核,确保体系运行的持续改进,各项统计数据显示体系的有效运行,使公司领导与员工的质量意识有了明显的提高,各项基础管理工作不断正规化、程序化,生产质量有了新的提高,顾客反馈的满意度不断提高,在试运行期间从未发生的质量问题和顾客投诉。从总体看,公司的质量方针、目标得以贯彻实施,产品加工质量都得到了有效控制,从而证明公司质量管理体系基本适合公司实际,运行有效并在持续改进。但同时也应看到,还存在着一些不足,需要在今后的工作中进一步加强整改的力度,使质量体系正常而有效运行。 二、质量方针、目标贯彻实施情况 建立文件化的质量管理体系。办公室按照ISO9001:20xx标准要求,对体系文件进行分类归档,建立了受控文件清单和质量记录清单,对文件发放进行登记,确保体系运行的所有场所均有适用的有

关文件的版本,做到归档、发放及时率100%。20xx年做好质量记录 的统筹管理,规定质量记录的保存期限,汇集质量记录的样本。 2.人力资源保障方面 根据从事质量活动人员的能力要求,加强人力资源管理。20xx 年度培训计划,并按计划组织相关人员参加培训,公司于20xx年度 计划举办培训8次,已举办培训5次。受训对象分别为领导、车间 质量管理员、公司新进员工、车间操作工人、特殊工种等,我们不 断完善员工培训档案,确保每一位参加培训的员工都有记录。 同时根据公司发展需求,做好人才招聘和新员工培训的管理工作,20xx年共招聘新员工12人,每位新进员工都经过公司严格的考察 和正规的'培训。 3.加强对产品生产过程的控制 供销部建立原材料采购管理办法,原材料采购的每一个步骤的进行都严格按照质量管理体系和采购管理办法的要求。供销部根据生 产任务编制采购计划,按合格供方进行原材料的采购,经仓库验证 和技术部检验合格后,方进入生产工序,完成了原材料合格率100% 的质量目标。每道生产工序严格按照生产工艺、操作规程、质量检 测办事,从而保证了产品生产质量的合格率。同时,为了有效防止 原材料、产品、半成品等不同状态的混用和错用,企管部对摆放的 原料、产品进行了标示,达到了原料储存合格率100%。 4.加强产品质量监督 在生产过程中,我们要求作业人员必须做好自检、专检,把不合格控制在上道工序,严禁不合格带入下道工序,同时,在产品的生 产过程中,严格按公司制定的工艺规程生产,严把质量把关,并认 真做好每次质检记录,并能把检验过程中发现的不合格及时通知车 间进行整改,从整体上提高了产品质量的合格率。 5.为达到产品符合要求所需的基础设施提供管理和维护。生产车间的设备严格按规定进行管理,按公司制定的维护保养规定进行保养,并建立设备日常维护保养记录。工作场所物品归类摆放,杜绝

质量体系内审报告

质量体系内审报告文件管理序列号:[K8UY-K9IO69-O6M243-OL889-F88688]

**公司 质量管理体系内审报告拟制/日期: 批准/日期:

1、审核目的: 根据ISO9001:2008标准和公司的质量手册、程序文件及其它有关的质量体系文件对公司质量管理体系运行情况进行内部审核,以确定公司质量管理体系是否符合ISO9001:2008标准要求,运行是否正常,是否有 效、资源是否充足。 2、审核范围: ISO9001所要求的相关活动及各有关职能部门,包括管理层、行政人事部、研发部、营销部、品管部、采购部、PMC部、生产部、工程部、仓库等。 3、审核依据: ISO9001:2008标准、质量手册、程序文件、ROHS相关控制文件及其他有关文件 4、审核时间:2017年01月10日~2017年01月11日 5、审核组成员: 第一组: 第二组: 第三组: 审核综述: 1)内审结果:本次内部审核共发现不合格项目10项,其中仓库1项,生产部1项,品管部3项,研发部2项,工程部2项,营销部1项。 2)内审主要不符合项阐述:

A、仓储的产品、物料有个别没有按先进先出发货、发料。易造成物料呆 滞、或过期失效。 B、A车间现场成品及功能检查工序有隔离标识;后壳检查工序,检出的不 良品未作标识,只是区分后放入供应商原包装箱内,易造成混料。 C、软件管理确认,未有独立文件明确管理确认 D、客供物料没有检验记录,无检验物料会造成产品零部件不可控。 E、检验试验仪器电流表,有效期为2016年12月1日到期,无校验易导致 检测失效。 F、质量目标文件夹中《2015年度公司质量目标》未及时清理。文件记录没 有及时更新,容易造成用错版本 G、检验试验仪器缺少校准易导致测量误差或失效。 H、工程变更通知单(ECN)未存档管理,不便于识别、查找。 2016年度共有2项外审不符合项和9项内审不符合项;经现场对不符合项进行跟进确认,所有不符合项已关闭,相应的纠正措施得到有效的实施。 4)内审结论: 在为期2天的内审时间里,对每个部门进行抽样审核以检查各部门实施质量管理体系的情况。总体来看,各部门在质量管理体系的运行上基本上符合标准的要求;整个公司的质量管理体系适宜、充分、持续有效。 审核小组已将在内审期间发现的不符合项和各部门负责人在末次会议上进行了深入讨论和分析,提出纠正改善建议并达成共识。审核小组会在承诺改善期内进行的整改工作进行督促和验证,并关闭不符合项。 改进建议: 1.各部门结合自身生产实际情况,组织本部门管理人员系统地学习质量管 理体系文件及相关专业、管理标准,对所管业务明确管理要求,并及时形成相应的质量记录。