interpretation-3[1].27_3.28

interpretation-3[1].27_3.28
interpretation-3[1].27_3.28

1.香港特别行政区将保持自由港和独立关税地区的地位。

2.The time period of the handing over of technical documents shall meet the requirements of the recipient’s planned schedule for the project.

3. 上海是个充满活力的大都市,上海市民的生活正发生着深刻的变化。

4. 开发区内的外商投资企业可根据生产经营需要,自行确定其机构设置、人员编制、工资标准、工资形式和奖励、津贴制度。

5. 审批机关逾期未予答复的,视为合同获得批准。

6. 社会力量办学也为发展教育事业作出了贡献。

7. We should integrate the production, processing and marketing of agricultural products.

8. International economic links have been tighter and tighter, and science and technology are advancing by leaps and bounds, both of which are exerting a major influence on world political, economic and social development.

9. The Party and the government will rely on all quarters of society to show concern for laid-off workers and help them with their welfare.

10. China highly values the mediation efforts conducted by UN Secretary-General Kofi Annan for the peaceful settlement of the Iraqi weapons inspection crisis.

1.面临周边邻国货币贬值的压力,中国冒着出口崩溃的危险,保持住其货币汇率的稳定。

2.根据中国的实际情况,中国政府制定了控制数量、提高质量的人口政策。

3.从某种意义上看,环保可以促使企业制定更高的工业标准并着手节能化的生产,提高资

源的使用率。

4.最后我再次感谢各位嘉宾的光临,并祝各位新年身体健康、事业有成、吉祥如意。

5. 这些行为举止表明,他们在接受麦当劳快餐的同时,也逐步接受伴随而来的外国餐桌行为文化。

6. Americans tend to believe that where there is a problem, there must be a solution. That ‘can do’ spirit has survived.

7. Only when the public are asked to supervise the government, the government cannot afford to slacken its efforts, and only when every person assumes his or her responsibility can we ensure the vigor and vitality of government.

8. The role of the UN is indispensable to the achievement of genuine peace and development and to the establishment of a just and reasonable new international order.

9. The world economy is an inter-related and indivisible whole. All members of the international community should step up cooperation and jointly promote a steady growth of world economy in a responsible and risk-sharing spirit.

10. In order to retain Chinese managers, joint ventures also must devise human resource policies that are sensitive to the ways in which Chinese employees differ from those in the West.

专业技术人员时间管理与项目管理

专业技术人员时间管理与项目管理 1.单选题【本题型共30道题】 1.“艾森豪威尔法则”是依据事情的()制定出来的A A.紧急性和重要性 B.紧急性 C.重要性 D.感兴趣程度 2.资源计划必须以()为依据来制定,以使项目组织能够适时地、有计划,地安排合适的资源。B A.项目经理的口头说明 B.进度计划 C.项目出资人的要求 D.用户的意见 3.项目沟通中传递项目信息使用最多的方式是项目报告,()是项目沟通中最为重要的信息传递和沟通方法A A.项目绩效报告 B.项目周报

C.项目月报 D.项目流程图 4.沟通不良是最浪费时间的原因之一。下面不属于避免组织沟通不良而造成时间浪费的是():D A.明确沟通目的 B.有效进行沟通 C.妥善处理冲突 D.对方决定就好,自己懒于发表意见 5.下面不属于完善时间管理计划的技巧的是()C A.保持桌面整洁 B.物归原主 C.制定计划就不再改动 D.列出待办工作清单 6.项目风险管理包括将()和()两方面容C A.积极因素所产生的影响最大化 B.使消极因素产生的影响最小化 C.A和B D.以上都不对

7.()是—种使用或民间统一的标准定额和工程量计算规则去制订项目资源计划的方法A A.统一定额法 B.调查法 C.规章制定法 D.推断法 8.利用线性规划解决问题最基本的方法是()A A.图解法 B.图示法 C.图表法 D.都对 9.下面那个是专业技术人员不愿授权的原因之一()D A.为了保住控制权 B.怀疑别人的能力 C.担心别人的能力胜过白己 D.担心同事不认真做 10.()可谓事务优先排序法的“鼻祖”A

A.ABC时间管理法 B.艾森豪威尔法则 C.外包原则 D.GTD 11.当项目比较大的时候,应该先给自己一个缓冲的时间段,去做()。写出可行性报告,然后给投资人和领导以最终的回复 A A.调研 B.基础工程 C.领导思想工作 D.以上都不对 12.德尔菲法依据系统的程序,采用()发表意见的方式实现的A A.匿名 B.实名 C.集中 D.无规定 13.项目管理的第一步就是项目()阶段A A.启动 B.结束

时间管理与项目管理答案

时间管理练习题 一、单项选择 1、“时间是制造生命的原料”一语出自(B ) 。 A 、林肯 B 、富兰克林 C 、马克思 D 、罗素 2、人们对时间和它流逝产生的兴趣至少始于(A )时代。 A 、古埃及 B 、古巴比伦 C 、罗马帝国时代 D 、中国春秋战国时代 3、将一天分为午前和午后的是从(B )开始的。 A 、古埃及 B 、古罗马 C 、古印度 D 、中国春秋战国时代 4、机械时钟起源于(B ) 。 A 、古埃及 B 、中世纪的欧洲 C 、南美玛雅人 D 、中国汉代 5、机械时钟会通过鸣钟方式来报时在(C ) 。 A 、13世纪 B 、14世纪 C 、15世纪 D 、16世纪 6、“ PDA ”是指(D ) 。 A 、工作进度表 B 、日程工作计划 C 、个人时间表 D 、个人数字助理日程表 7、在日程工作计划和个人数字助理盛行的时代,我们的工作时间安排已经以(C )分钟为一个间隔。 A 、5 B 、10 C 、15 D 、30 8、《更快:所有事情都在加速》的作者是(A ) 。 A 、詹姆斯·格雷克 B 、丹尼尔·布尔斯廷 C 、乔治·史塔克 D 、托马斯·豪特9、《发现者》一书的作者是(B ) 。

A 、詹姆斯·格雷克 B 、丹尼尔·布尔斯廷 C 、乔治·史塔克 D 、托马斯·豪特10、发现经理人和CEO 们的时间分配具有不连续性的管理学家是(C ) 。 A 、迈克尔·罗伯特 B 、丹尼尔·布尔斯廷 C 、亨利·明茨伯格 D 、托马斯·豪特11、时间管理就是对每周可以利用的(D )个小时时间进行控制的法则。 A 、40 B 、35 C 、12 D 、168 12、下列对成功来说至关重要的目标是(B ) 。 A 、使能目标 B 、关键目标 C 、最好具备目标 D 、项目目标 13、目标设定是一个确定所期望实现的结果的(A )过程。 A 、正式 B 、非正式 C 、经常性的 D 、非经常性的 14、下列不是目标应具备的特征的是(D ) 。 A 、明确的书面条款 B 、时间期限 C 、重要性 D 、不可度量性 15、对下属目标进行讨论并达成一致的最佳时机是(C ) 。 A 、人事会议 B 、部门例会 C 、绩效评价会议 D 、年终总结会议 16、如果组织或者外部环境发生了变化,即使达到目标也不再能创造价值,最重要的将是(A ) 。 A 、调整目标 B 、制定目标 C 、分解目标 D 、终止目标 17、在确定目标的优先次序时,我们通常面临着紧急和(B )的两难选择。 A 、非紧急 B 、重要 C 、次要 D 、长期 18、使用目标进行时间管理,其第一步就是要(A ) 。 A 、目标分解 B 、确定优先权 C 、任务排序 D 、估算优先任务耗费时间

专业技术人员时间管理与项目管理.

1.单选题【本题型共30道题】 1。“艾森豪威尔法则"是依据事情的()制定出来的? B.紧急性 A.紧急性和重要性? C.重要性?D.感兴趣程度 2.下面不属于项目管理的发展趋势的是()? C.项目管理的单一化A.项目管理理论、方法、手段的科学化?B.项目管理的全球化? ?D.项目管理的专业化 3。快速阅读可以从几个不同角度进行考察,下面说法错误的是()?? A.速读目的 B.速读性质 D.不用考虑速度结果 C.速读方法? 4.时间计划就是指有计划地管理时间,时间分配是指将时间区域化并将不同的时间段用来做()的事情.? A.重要 B.专门 D.以上都错误 C.特别? 5。在()阶段,需要对项目的需求进行分析,同时应该明确项目目标、界定项目范围,对项目进行可行性分析并提出预期的项目结果? A.项目的计划 B.细节安排 C.完成 D.项目的规划 6.成本控制是使项目实际发生的成本不超出()的工作

A.项目预算范围 B.规定范围 D.现有资产范围 C.现金流范围? 7。项目成本管理又可以称为项目费用管理,是指在规定时间内,为保证实现项目的既定目标,对项目()采取的各种措施? A.实际发生的费用 C.欠款?D.合同费用 B.预算费用? 8。下面不属于消除混乱的办法的是():? C.确定处理文件的时间 B.在日历上注明会议和其他重要时刻? A.丢掉信封? D.不对信息源头进行控制 9.下面不属于整理杂物的技巧的是():??A.统一存放纸张 C.按使用频率存放 B.建立文件夹? D.相关物品不统一存放 10.德尔菲法依据系统的程序,采用()发表意见的方式实现的 C.集中 A.匿名?B.实名? D.无规定 11.(),是情商的核心 A.了解自我 B.管理自我?C.自我激励?D.识别他人情绪 12。___(PMIS)是在组织内部使用的一套系统集成的标准自动化工具.? A.项目管理信息系统

[最新]部编版一年级语文上册 给生字注音(第七单元).docx

给生字注音 第七单元 ( )( )( )( )( )( )( )( ) 睡那海真老师吗同 ( )( )( )( )( )( )( )( ) 什才亮时侯觉得自 ( )( )( )( )( )( )( )( ) 己很穿衣服快蓝又 ( )( )( )( )( )( )( )( ) 笑着向和贝娃挂活 ( )( )( )( )( )( )( )( ) 金哥姐弟叔爷

1、Thank you very much for taking me with you on that splendid outing to London. It was the first time that I had seen the Tower or any of the other famous sights. If I'd gone alone, I couldn't have seen nearly as much, because I wouldn't have known my way about.The weather was splendid on that day, which I thought was rare. I still remember some people told me that in Britain there was weather and no climate. During the same day, it might snow in the morning, rain at noon, shine in the afternoon and be windy before the night falls. So I think I was lucky。 20.8.98.9.202008:5508:55:24Aug-2008:55 2、最困难的事情就是认识自己。二〇二〇年八月九日2020年8月9日星期日 3、有勇气承担命运这才是英雄好汉。08:558.9.202008:558.9.202008:5508:55:248.9.202008:558.9.2020 4、与肝胆人共事,无字句处读书。8.9.20208.9.202008:5508:5508:55:2408:55:24 5、阅读使人充实,会谈使人敏捷,写作使人精确。Sunday, August 9, 2020August 20Sunday, August 9, 20208/9/2020 6、最大的骄傲于最大的自卑都表示心灵的最软弱无力。8时55分8时55分9-Aug-208.9.2020

专业技术人员时间管理与项目管理

1.单选题【本题型共30道题】 1.“艾森豪威尔法则”是依据事情的()制定出来的 A.紧急性和重要性 B.紧急性 C.重要性 D.感兴趣程度 2.下面不属于项目管理的发展趋势的是() A.项目管理理论、方法、手段的科学化 B.项目管理的全球化 C.项目管理的单一化 D.项目管理的专业化 3.快速阅读可以从几个不同角度进行考察,下面说法错误的是()

A.速读目的 B.速读性质 C.速读方法 D.不用考虑速度结果 4.时间计划就是指有计划地管理时间,时间分配是指将时间区域化并将不同的时间段用来做()的事情。 A.重要 B.专门 C.特别 D.以上都错误 5.在()阶段,需要对项目的需求进行分析,同时应该明确项目目标、界定项目范围,对项目进行可行性分析并提出预期的项目结果 A.项目的计划 B.细节安排 C.完成 D.项目的规划

6.成本控制是使项目实际发生的成本不超出()的工作 A.项目预算范围 B.规定范围 C.现金流范围 D.现有资产范围 7.项目成本管理又可以称为项目费用管理,是指在规定时间内,为保证实现项目的既定目标,对项目()采取的各种措施 A.实际发生的费用 B.预算费用 C.欠款 D.合同费用 8.下面不属于消除混乱的办法的是(): A.丢掉信封 B.在日历上注明会议和其他重要时刻

C.确定处理文件的时间 D.不对信息源头进行控制 9.下面不属于整理杂物的技巧的是(): A.统一存放纸张 B.建立文件夹 C.按使用频率存放 D.相关物品不统一存放 10.德尔菲法依据系统的程序,采用()发表意见的方式实现的 A.匿名 B.实名 C.集中 D.无规定 11.(),是情商的核心

人教版一年级语文上册生字表--带拼音

人教版一年级语文上册生字表 生字表1 bà mā wǒ 爸妈我 dà mǐ tǔdì mǎ 大米土地马 huā ɡē dì ɡè huà 花哥弟个画 xià xǐ yīfu jī 下洗衣服鸡 zuò ɡuò le bú lè 做过了不乐 chū dú shū qí chē de huà 出读书骑车的话 nǐ tā shuǐ bái pí zi zài 你他水白皮子在 xiǎo ài chī yú hé niú cǎo hǎo 小爱吃鱼和牛草好jiā fēi jī yǒu ér hé rù xiào 家飞机有儿河入校

shān tián zuǒ piàn yòu fēnɡyún tā 山 田左片右风云她 lǎo shī wén duǒ étiáo yǔ tiān qiáo 老师文朵鹅条雨 天桥 yí qù èr sān lǐ sì wǔ liù qī bājiǔshí 一去二三里四五六七八九十 kǒu ěr mù yánɡniǎo tù rì yuè huǒ mù hé zhú口耳目羊鸟兔日月 火木禾竹 shā fā bào zhǐ tái dēnɡdiàn shì wǎn shɑnɡsòn ɡɡuǒ xiào yě沙发 报纸台灯电视 晚上送果笑也 dǎ qiú bá pāi tiào ɡāo pǎo bù zú xiǎnɡkè zh ēn shēn tǐ 打球拔拍跳高跑步足 响课真身体 yuǎn sè jìn tīnɡwú shēnɡchūn hái rén lái j

īnɡ 远色近听无 声春还人来惊 duì shuō shì yè yuán xià qiū xuě dùjiù dōnɡ对说是叶圆夏 秋雪肚就冬 pái zhōnɡyóu liú chànɡliǎnɡàn shù miáo lǜ jiānɡnán 排中游 流唱两岸树苗 绿江南 nǎ zuò fánɡpiào liɑnɡqīnɡmén chuānɡxiānɡwūyào men 哪座房漂亮青 门窗香屋要们 yékē dào ɡěi chuān nuǎn lěnɡkāi sǎn rè 爷棵到给穿 暖冷开伞热 jìnɡyè chuánɡɡuānɡjǔ tóu wànɡdī ɡù xiānɡ静夜床光举

【项目管理知识】时间管理:项目经理如何管理好自己的时间

时间管理:项目经理如何管理好自己的时间项目经理要带领项目团队建设好一个项目,所需要关注和落实的事情很多,如果从时间管理方面来说,项目经理既需要管理好项目团队成员的时间,同时也需要管理好项目经理自己的时间,两方面缺一不可。由于项目团队成员的工作比较单一,因此管理好项目团队成员的时间相对来说比较容易,可以通过详尽的WBS分解、合理的项目计划和及时的项目监控来实现;但项目经理特别是大型项目的项目经理往往琐事缠身,好象每件事情都很重要都需要处理,如何在“百事缠身”的环境下,管理和充分利用好自己的时间,是困扰项目经理的一个大问题。 本人总结了这些年从事项目管理的一些经验,拟从以下五个方面试图给出该问题的解决方案。 (一)给自己规划好工作 项目经理比较擅长规划项目团队成员的工作,但往往会忽视规划自己的工作,这种做法是很危险的;有的项目经理甚至认为自己的时间自己控制和把握就行了,根本就不需要规划,这种观点更是极其错误的。 项目经理自身的时间是相当宝贵的,如果规划和利用不好,则会给项目绩效带来很大的影响,有时甚至是“致命”的。项目经理特别是大型项目的项目经理每天都有项目会议、工作协调、思想交流等琐事缠身,如果不善于规划好自己的时间,则每天都会忙得不可开交,但各种各样的事务仍然是“剪不断,理还乱”。 认为著名的帕累托作时间能产生明显轻重之分的。经过多年的项目实践,认为这样一条处事规则比较有指导意义:“项目经理有效利用时间并尽量使工作价值化的有效方法是:每天工作之前确定当天重要紧急的六件事情,并按轻重

缓急完成”。这里强调“六”件事的理由是:如果规划的事情太少,则很难完成较重要的工作;如果规划的事情太多,则工作很可能失去重点。 当然,以上规则也不是“金科玉律”,项目经理可以根据实际情况规划自己当天所需要完成的事情(如五件事情或七件事情等),但一定要确保“该完成的重点工作一定完成了”,同时也要避免“捡了芝麻?G了西瓜”的现象出现。 曾做过一个调查,发现大部分的项目经理,都有采用小卡片每天规划自己重点工作的习惯。 (二)懂得放弃 “没有用不完的时间,只有做不完的事”。 我身边有一些项目经理,他们认为只有将所有的事情做完做好才能放心,实际情况往往是事情做不完,有时甚至是一些重要的事情都没有做完,结果延误了项目的工作,给项目带来了较大的影响。 项目经理一定要学会具有敏锐的事物分析能力。项目经理要能明确地判断出什么事情是重要的,什么事情是不重要的;什么事情是值得花时间做的,什么事情是不值得花时间做的。从前面谈到的“至可以大胆地放弃一部分。如果我们真正能把影响项目绩效的重要的“六”件事情(即大约总事情的根据轻重缓急做一部分,没时间就可以干脆放弃。 项目经理学会懂得放弃,是一项难能可贵的本领。我们一定不要将大部分精力花在对项目影响很小甚至几乎没有影响的事情上,这样不但会因为为琐事“疲于奔命”而“荒于要务”,而且会因为“无的放矢”而终“劳而无功”。 (三)善于授权

专业技术人员时间管理与项目管理

1.单选题【本题型共30道题】 1.项目管理计划包括各专项计划和有关说明的()(包括经过批准的更新计划)。 A.总体综合管理计划 B.单独计划 C.复杂计划 D.附加计划 2.()是—种使用国家或民间统一的标准定额和工程量计算规则去制订项目资源计划的方法 A.统一定额法 B.调查法 C.规章制定法 D.推断法 3.()是根据已完成的类似项目对未来项目费用进行估算的一种方法 A.类比估算法 B.历史估算法 C.评估估测法 D.统一估算法 4.()是指项目开工以后到项目竣工验收之前任何一个时点所进行的评价,它又称为项目中间评价 A.项目跟踪评价 B.项目过程评价 C.项目收尾评价

5.德尔菲法依据系统的程序,采用()发表意见的方式实现的 A.匿名 B.实名 C.集中 D.无规定 6.下面不属于有效防止信息泛滥的方法的是(): A.选择有价值的书籍 B.阅读有用的报纸和刊物 C.合理使用电子 D.浏览微博,博客等 7.工作说明书包括经营需要、()、战略计划等 A.产品围说明书 B.产品预算说明书 C.指导性文件 D.理论结果预计书 8.研究和发现哪些项目能够促进国民经济和社会发展,能够提高人民生话水平或者提升企业的竞争力等酌项目发现过程叫做() A.项目识别 B.项目甄选 C.项目准备

9.下面不属于混乱产生的原因的是(): A.“筑巢”本性 B.作为视觉提示物 C.爱因斯坦情结 D.混乱可以说明有创造性 10.制定年计划的原则(): A.越远大越好 B.怎么过的舒服怎么制定 C.抓住重点、兼顾其他 D.制定一个可以随便完成的目标 11.()可谓事务优先排序法的“鼻祖” A.ABC时间管理法 B.艾森豪威尔法则 C.外包原则 D.GTD 12.象限管理法就是用坐标的方式将时间分为()个象限 A.2 B.3 C.4

[最新]部编版一年级语文上册 给生字注音(第六单元).docx

给生字注音 ——课文5-课文8 ()()()()()()()()影前后黑狗左右它 ()()()()()()()()好朋友比尾巴谁长 ()()()()()()()()短把伞兔最公写诗 ()()()()()()()()点要过给当串们以 ()()()()()()()()

成数半空问到方没 ()()()()()()()()更绿出长 1、Thank you very much for taking me with you on that splendid outing to London. It was the first time that I had seen the Tower or any of the other famous sights. If I'd gone alone, I couldn't have seen nearly as much, because I wouldn't have known my way about.The weather was splendid on that day, which I thought was rare. I still remember some people told me that in Britain there was weather and no climate. During the same day, it might snow in the morning, rain at noon, shine in the afternoon and be windy before the night falls. So I think I was lucky。 20.8.98.9.202008:5508:55:34Aug-2008:55 2、最困难的事情就是认识自己。二〇二〇年八月九日2020年8月9日星期日 3、有勇气承担命运这才是英雄好汉。08:558.9.202008:558.9.202008:5508:55:348.9.202008:558.9.2020 4、与肝胆人共事,无字句处读书。8.9.20208.9.202008:5508:5508:55:3408:55:34 5、阅读使人充实,会谈使人敏捷,写作使人精确。Sunday, August 9, 2020August 20Sunday, August 9, 20208/9/2020 6、最大的骄傲于最大的自卑都表示心灵的最软弱无力。8时55分8时55分9-Aug-208.9.2020

项目管理的时间管理解析

摘要:对项目管理的结构框架进行详细的解析以及深入的探究,研究人员发现“与项目有关的时间管理”这一工作内容一方面可以影响项目管理工作的进度规划,另一方面它也可以作为项目管理工作顺利运行的有效方法或者是工具。总之,本文作者主观的认为,积极的对与项目管理有关的时间管理进行探究工作是极为必要的。 关键词:项目管理;时间管理;解析 项目管理作为管理学的一大分支,这一管理工作的落实是在专业知识、技能以及各种科学方法的配合下,对有利资源进行高效的利用,继而在一定的时间期限内达到某种预期结果的目标。时间管理作为项目管理工作中的一个重要组成成分,它与项目的成败,相关企业单位经济利润的取得之间存在很大的关联性。本文作者首先解析项目时间管理里的概念,继而详细的论述项目时间管理在企业项目管理工作过程中应用的途径,最后列举与项目时间管理相关的技术与方法以及其发挥的意义,旨在使时间管理为项目管理工作服务的质量实现最大化。 一、浅析项目时间管理的概念 项目时间管理实施的目的是为了使某一工程项目如期的完成,这一管理过程是系统性的、连续性的。依据自己的管理经验,本文作者认为项目时间管理包含的内容是多种多样的,“按照工期、保证项目工程的质量”这是任何一位项目管理者最希望落实的目标,但是纵观项目管理工作的现状,我们能够切实的感触到工期延后等现象频繁的出现,所以对工程项目的时间进行合理的安排与规划在项目管理工作体系中是十分必要的工作内容。做好项目时间管理这一工作内容,一方面可以使项目如期竣工,另一方面也提高了与项目活动有关资源的利用率,最终达到提高项目管理工作质量的大目标。 二、探究项目时间管理在项目管理工作进程中实施的步骤 本文作者认为时间管理的过程可以细化为6个阶段,每一个阶段有涵盖了一个或者多个管理过程。为了使自己的论述更加的清晰,本文作者在下图的配合下去阐明这6个阶段之间的关联: 1.项目活动的定义 项目时间管理工作的落实使项目总目标得以确立,这样项目管理工作的难易程度就被清晰的罗列出来,项目活动的整体结构被细化为各个细小的环节,此时与该项目活动有关的人员清楚自己要完成的工作任务以及要达到的工作目标。时间管理在项目活动定义阶段的应用,使项目活动清单明确化,为后续项目工程的顺利开展奠定扎实的基础。 2.项目活动开展的顺序 在项目工程实施的进程中,每一项细微的活动的落实都需要有一定的时间与资源的提供,因此项目时间管理在此过程的运用就是将有限的资源以及时间科学合理的配置到各个项目环节中,提高时间与资源的利用价值。此外在项目清单的配合下,项目管理者能够明确各个项目活动之间的关联性以及他们之间的依赖程度,确定工程项目实施的工作流程。总之,项目时间管理能够协助项目管理者确定项目活动开展以及运行的程序,使某一工程项目有规律的运行以及发展。项目时间管理工作在这一阶段的运用,可以借助优先图示法、箭线图示法、条件图示法以及网络模板等科学方法去使项目活动之间的关系组建成一套系统性的项目网络图。 3.辅助完成项目活动工期的预算工作 项目时间管理在每一项活动工期预算评估工作中的应用,可以使估算、加总等与项目工程工期相关的工作顺利的运转,在项目时间管理工作的辅助下,我们可以得到具有整体量化性质的的工期估算数据信息。本文提出这样的注意事项,项目时间管理在这一阶段的应用,一定要考虑风险因素对工期的影响作用,例如地理环境的恶劣、自然灾害的袭击均可能会致

项目时间管理主要包含六个阶段

项目时间管理主要包含六个阶段 项目活动定义项目活动是确定为项目各种可交付成果而必须进行的具体计划活动。将项目工作分解为更小、更易管理的工作包也叫活动或任务,这些小的活动应该是能够保障完成交付产品的可实施的详细任务。在项目实施中,要将所有活动列成一个明确的活动清单,并且让项目团队的每一个成员能够清楚有多少工作需要处理。活动清单应该采取文档形式,以便于项目其他过程的使用和管理。当然,随着项目活动分解的深入和细化,工作分解结构(WBS)可能会需要修改,这也会影响项目的其他部分。例如成本估算,在更详尽地考虑了活动后,成本可能会有所增加,因此完成活动定义后,要更新项目工作分解结构上的内容。活动排序在产品描述、活动清单的基础上,要找出项目活动之间的依赖关系和特殊领域的依赖关系、工作顺序。在这里,既要考虑团队内部希望的特殊顺序和优先逻辑关系,也要考虑内部与外部、外部与外部的各种依赖关系以及为完成项目所要做的一些相关工作,例如在最终的硬件环境中进行软件测试等工作。设立项目里程碑是排序工作中很重要的一部分。里程碑是项目中关键的事件及关键的目标时间,是项目成功的重要因素。里程碑事件是确保完成项目需求的活动序列中不可或缺的一部分。比如在开发项目中可以将需求的最终确认、产品移交等关键任务作为项目的里程碑。在进行项目活动关系的定义时一般采用优先图示法、箭线图示法、条件图示法、网络模板这4种方法,最终形成一套项目网络图。其中比较常用的方法是优先图示法,也称为单代号网络图法。活动工期估算项目工期估算是根据项目范围、资源状况计划列出项目活动所需要的工期。估算的工期应该现实、有效并能保证质量。所以在估算工期时要充分考虑活动清单、合理的资源需求、人员的能力因素以及环境因素对项目工期的

【项目管理知识】浅谈时间管理的关键问题

浅谈时间管理的关键问题 在过去,在组织的视线中,没有时间管理,当然思维中也没有。时间管理被认为是个人问题,个人应自己去进行时间管理,自己去发展时间管理技能。 瓶颈管理理论认为,改善绩效的方法不是改进每个环节、每个步骤,而是改进“瓶颈”(的约束因素),因为系统的整体绩效取决于瓶颈。时间正是管理者和专业人士的约束因素,更重要的是,过分忙碌的管理者和专业人士可能陷入精疲力竭的状态,可能忙得没有时间思考,可能失去工作与生活的平衡……这些都可能终导致严重的问题――失去他们,离开或变得“无能”。 现在,我们必须给予时间管理以应有的重视,我们可以说,时间管理的重要性至少等同于战略、创新、领导力这些看似更为炫目的管理议题,甚至更为重要。不论战略、创新、运营都需要由人去做,也就是说,投入他们的时间和精力。对于管理者和专业人士来说,的约束就是时间,他们只有那么多时间。通常,我们没法通过雇佣更多的人来获得更多的时间。管理层如果太多的话,他们可能会相互妨碍工作,因而不得不花大量的时间去处理摩擦与冲突,管理层太多也会阻碍信息的流通。 对于专业人士来说,更多的人意味着更多的沟通成本,在人数超过一个很小的数目时,就变得弊大于利了。工厂可以雇佣更多的工人来增加产量,数量可以是几千甚至上万,但对于软件开发团队、咨询项目团队,十个人几乎已经是团队规模的极限(这里指的是为完成一个具体任务一起工作的团队)。 在过去,在组织的视线中,没有时间管理,当然思维中也没有。时间管理被认为是个人问题,个人应自己去进行时间管理,自己去发展时间管理技能。在现在,“除了任务目标之外,让知识工自己决定有关工作的一切”这一趋势更使得组织放弃自己在时间管理上的职责。组织至多是在任务分配时会考虑一下

最新小学一年级语文上册生字表(注音)

字表 识字 1天(tiān) 地(dì) 人(rén) 你(nǐ) 我(wǒ) 他(tā) 2一(yì) 二(èr) 三(sān) 四(sì) 五(wǔ) 上(shànɡ) 下(xià) 3口(kǒu) 耳(ěr) 目(mù) 手(shǒu) 足(zú) 站(zhàn) 坐(zuò) 4日(rì) 月(yuè) 水(shuǐ) 火(huǒ) 山(shān) 石(shí) 田(tián) 禾(hé) 5对(duì) 云(yún) 雨(yǔ) 风(fēnɡ) 花(huā) 鸟(niǎo) 虫(chónɡ) 语文园地一六(liù) 七(qī) 八(bā) 九(jiǔ) 十(shí) 汉语拼音 3爸(bà) 妈(mā) 6棋(qí) 鸡(jī) 4马(mǎ) 土(tǔ) 不(bù)7字(zì) 词(cí) 语(yǔ) 句(jù) 子(zǐ) 5画(huà) 打(dǎ) 8桌(zhuō) 纸(zhǐ) 语文园地二文(wén) 数(shù) 学(xué) 音(yīn) 乐(yuè) 9妹(mèi) 奶(nǎi) 白(bái) 皮(pí) 12草(cǎo) 家(jiā) 是(shì) 10 小(xiǎo) 桥(qiáo) 台(tái) 13车(chē)羊(yánɡ)走(zǒu)也(yě) 11 雪(xuě) 儿(ér) 课文 1秋(qiū) 气(qì) 了(le) 树(shù) 叶(yè) 片(piàn) 大(dà) 飞(fēi) 会(huì) 个(ɡè) 2的(de) 船(chuán) 两(liǎnɡ) 头(tóu) 在(zài) 里(lǐ) 看(kàn) 见(jiàn) 闪(shǎn) 星(xīnɡ) 3江(jiānɡ) 南(nán) 可(kě)采(cǎi) 莲(lián) 鱼(yú) 东(dōnɡ) 西(xī) 北(běi) 4尖(jiān) 说(shuō) 春(chūn) 青(qīnɡ) 蛙(wā) 夏(xià) 弯(wān) 地(de) 就(jiù) 冬(dōnɡ) 语文园地四男(nán) 女(nǚ) 开(kāi) 关(ɡuān) 正(zhènɡ) 反(fǎn) 识字 6远(yuǎn) 有(yǒu) 色(sè) 近(jìn) 听(tīnɡ) 无(wú) 声(shēnɡ) 去(qù) 还(hái) 来(lái) 7多(duō) 少(s hǎo) 黄(huánɡ) 牛(niú) 只(zhǐ) 猫(māo) 边(biān) 鸭(yā) 苹(pínɡ) 果(ɡuǒ) 杏(xìnɡ) 桃(táo) 8书(shū) 包(bāo) 尺(chǐ) 作(zuò) 业(yè) 本(běn) 笔(bǐ) 刀(dāo) 课(kè) 早(zǎo) 校(xiào) 9明(mínɡ) 力(lì) 尘(chén) 从(cónɡ) 众(zhònɡ) 双(shuānɡ) 木(mù) 林(lín) 森(sēn) 条(tiáo) 心(xīn) 10 升(shēnɡ) 国(ɡuó) 旗(qí) 中(zhōnɡ) 红(hónɡ) 歌(ɡē) 起(qǐ) 么(me) 美(měi) 丽(lì) 立(lì) 语文园地五午(wǔ) 晚(wǎn) 昨(zuó) 今(jīn) 年(nián) 课文 5影(yǐnɡ) 前(qián) 后(hòu) 黑(hēi) 狗(ɡǒu) 左(zuǒ) 右(yòu) 它(tā) 好(hǎo) 朋(pénɡ) 友(yǒu) 6比(bǐ) 尾(wěi) 巴(bā) 谁(shuí) 长(chánɡ) 短(duǎn) 反(fǎn) 伞(sǎn) 兔(tù) 最(zuì) 公(ɡōnɡ) 7写(xiě) 诗(shī) 点(diǎn) 要(yào) 过(ɡuò) 给(ɡěi) 当(dānɡ) 串(chuàn) 们(men) 以(yǐ) 成(chénɡ) 8数(shǔ) 彩(cǎi) 半(bàn) 空(kōnɡ) 问(wèn) 到(dào) 方(fānɡ) 没(méi) 更(ɡènɡ) 绿(lǜ) 出(chū) 长(zhǎnɡ) 9睡(shuì) 那(nà) 海(hǎi) 真(zhēn) 老(lǎo) 师(shī) 吗(mɑ) 同(tónɡ) 什(shén) 么(me) 才(cái) 亮 (liànɡ) 10 时(shí) 候(hòu) 觉(jué) 得(de) 自(zì) 己(jǐ) 很(hěn) 穿(chuān) 衣(yī) 服(fú) 快(kuài) 11 蓝(lán) 又(yòu) 笑(xiào) 着(zhe) 向(xiànɡ) 和(hé) 贝(bèi) 娃(wá) 挂(ɡuà) 活(huó) 金(jīn) 语文园地七哥(ɡē) 姐(jiě) 弟(dì) 叔(shū) 爷(yé)

浅谈项目管理中的时间管理

浅谈项目管理中的时间管理 现在,我们必须给予时间管理以应有的重视。因为在过去,在组织的视线中,没有时间管理,当然思维中也没有。时间管理被认为是个人问题,个人应自己去进行时间管理,自己去发展时间管理技能。 我们可以说,时间管理的重要性至少等同于战略、创新、领导力这些看似更为炫目的管理议题,甚至更为重要。不论战略、创新、运营都需要由人去做,也就是说,投入他们的时间和精力。对于管理者和专业人士来说,最大的约束就是时间,他们只有那么多时间。通常,我们没法通过雇佣更多的人来获得更多的时间。管理层如果太多的话,他们可能会相互妨碍工作,因而不得不花大量的时间去处理摩擦与冲突,管理层太多也会阻碍信息的流通。 瓶颈管理理论认为,改善绩效的最佳方法不是改进每个环节、每个步骤,而是改进“瓶颈”(最大的约束因素),因为系统的整体绩效取决于瓶颈。时间正是管理者和专业人士最大的约束因素,更重要的是,过分忙碌的管理者和专业人士可能陷入精疲力竭的状态,可能忙得没有时间思考,可能失去工作与生活的平衡……这些都可能最终导致严重的问题——失去他们,离开或变得“无能”。 对于专业人士来说,更多的人意味着更多的沟通成本,在人数超过一个很小的数目时,就变得弊大于利了。工厂可以雇佣更多的工人来增加产量,数量可以是几千甚至上万,但对于软件开发团队、咨询项目团队,十个人几乎已经是团队规模的极限(这里指的是为完成一个具 体任务一起工作的团队)。 在过去,在组织的视线中,没有时间管理,当然思维中也没有。时间管理被认为是个人问题,个人应自己去进行时间管理,自己去发展时间管理技能。在现在,“除了任务目标之外,让知识工作者自己决定有关工作的一切”这一趋势更使得组织放弃自己在时间管理上的职责。组织至多是在任务分配时会考虑一下每个人的时间应用情况,这不仅和战略无关,甚至被认为是最低层次的问题。对于技术知识、管理技能,组织从未持这样的看法。在这些方面,它们采用内部培训、辅导制度(coach)、派员工参加外部课程等方式帮助员工提升自身能力。瓶颈管理理论认为,改善绩效的最佳方法不是改进每个环节、每个步骤,而是改进“瓶颈”(最大的约束因素),因为系统的整体绩效取决于瓶颈。时间正是管理者和专业人士最大的约束 因素,更重要的是,过分忙碌的管理者和专业人士可能陷入精疲力竭的状态,可能忙得没有时间思考,可能失去工作与生活的平衡……这些都可能最终导致严重的问题——失去他们,离开或变得“无能”。 那么,我们应该如何进行时间管理呢? 给予应有的重要地位,时间管理就已经解决了一半。接下来,我们不是讨论具体工具和细节,而是关注时间管理的一个重要前提准备与三个关键问题。实际上,由于时间管理是一个每天都要进行的活动,复杂的工具只会让人们在短暂的使用之后放弃。瓶颈管理的提出者高德拉特对所有复杂的解决方案都心存怀疑:“复杂的解决方法是行不通的。”只有直达问题核心,也就是聚焦于关键问题,才能进行有效的时间管理。时间管理的一个重要准备任务是“了解你的时间是怎么花掉的”。为什么要这样做不需解释,但它可能会被认为是一个非常简单的任务,认为简单回想一下就可以了。需要强调它的原因正在于此,对于这个问题,我们的“想象”和“现实”常常有很大的差异,甚至完全不同。 找出最重要的一件事,然后去做。有个比较接近的通俗化说法是,“重要的事先做”(First Thing First)。在今年7月份的《哈佛商业评论》上,德鲁克在最新的一篇文章以他96年的丰富经历非常肯定地说:“我还没有碰到过哪位经理人可以同时处理两个以上的 任务,并且仍然保持高效。” 始终做重要的事还在于,它可以让我们避免掉进“嗜急成瘾”的陷阱。我们的事情可以分为

2018小学一年级语文上册生字表(注音)

2018小学一年级语文上册生字表(注音)

字表 识字 1天(tiān) 地(dì) 人(rén) 你(nǐ) 我(wǒ) 他(tā) 2一(yì) 二(èr) 三(sān) 四(sì) 五(wǔ) 上(shànɡ) 下(xià) 3口(kǒu) 耳(ěr) 目(mù) 手(shǒu) 足(zú) 站(zhàn) 坐(zuò) 4日(rì) 月(yuè) 水(shuǐ) 火(huǒ) 山(shān) 石(shí) 田(tián) 禾(hé) 5对(duì) 云(yún) 雨(yǔ) 风(fēnɡ) 花(huā) 鸟(niǎo) 虫(chónɡ) 语文园地一六(liù) 七(qī) 八(bā) 九(jiǔ) 十(shí) 汉语拼音 3爸(bà) 妈(mā)6棋(qí) 鸡(jī) 4马(mǎ) 土(tǔ) 不(bù)7字(zì) 词(cí) 语(yǔ) 句(jù) 子(zǐ) 5画(huà) 打(dǎ)8桌(zhuō) 纸(zhǐ) 语文园地二文(wén) 数(shù) 学(xué) 音(yīn) 乐(yuè) 9妹(mèi) 奶(nǎi) 白(bái) 皮(pí)12草(cǎo) 家(jiā) 是(shì) 10 小(xiǎo) 桥(qiáo) 台(tái)13车(chē)羊(yánɡ)走(zǒu)也(yě) 11 雪(xuě) 儿(ér) 课文 1秋(qiū) 气(qì) 了(le) 树(shù) 叶(yè) 片(piàn) 大(dà) 飞(fēi) 会(huì) 个(ɡè) 2的(de) 船(chuán) 两(liǎnɡ) 头(tóu) 在(zài) 里(lǐ) 看(kàn) 见(jiàn) 闪(shǎn) 星(xīnɡ) 3江(jiānɡ) 南(nán) 可(kě) 采(cǎi) 莲(lián) 鱼(yú) 东(dōnɡ) 西(xī) 北(běi) 4尖(jiān) 说(shuō) 春(chūn) 青(qīnɡ) 蛙(wā) 夏(xià) 弯(wān) 地(de) 就(jiù) 冬(dōnɡ) 语文园地四男(nán) 女(nǚ) 开(kāi) 关(ɡuān) 正(zhènɡ) 反(fǎn) 识字 6远(yuǎn) 有(yǒu) 色(sè) 近(jìn) 听(tīnɡ) 无(wú) 声(shēnɡ) 去(qù) 还(hái) 来(lái) 7多(duō) 少(shǎo) 黄(huánɡ) 牛(niú) 只(zhǐ) 猫(māo) 边(biān) 鸭(yā) 苹(pínɡ) 果(ɡuǒ) 杏(xìnɡ) 桃(táo) 8书(shū) 包(bāo) 尺(chǐ) 作(zuò) 业(yè) 本(běn) 笔(bǐ) 刀(dāo) 课(kè) 早(zǎo) 校(xiào) 9明(mínɡ) 力(lì) 尘(chén) 从(cónɡ) 众(zhònɡ) 双(shuānɡ) 木(mù) 林(lín) 森(sēn) 条(tiáo) 心(xīn) 10 升(shēnɡ) 国(ɡuó) 旗(qí) 中(zhōnɡ) 红(hónɡ) 歌(ɡē) 起(qǐ) 么(me) 美(měi) 丽(lì) 立(lì)语文园地五午(wǔ) 晚(wǎn) 昨(zuó) 今(jīn) 年(nián) 课文 5影(yǐnɡ) 前(qián) 后(hòu) 黑(hēi) 狗(ɡǒu) 左(zuǒ) 右(yòu) 它(tā) 好(hǎo) 朋(pénɡ) 友(yǒu) 6比(bǐ) 尾(wěi) 巴(bā) 谁(shuí) 长(chánɡ) 短(duǎn) 反(fǎn) 伞(sǎn) 兔(tù) 最(zuì) 公(ɡōnɡ) 7写(xiě) 诗(shī) 点(diǎn) 要(yào) 过(ɡuò) 给(ɡěi) 当(dānɡ) 串(chuàn) 们(men) 以(yǐ) 成(chénɡ) 8数(shǔ) 彩(cǎi) 半(bàn) 空(kōnɡ) 问(wèn) 到(dào) 方(fānɡ) 没(méi) 更(ɡènɡ) 绿(lǜ) 出(chū) 长(zhǎnɡ) 9睡(shuì) 那(nà) 海(hǎi) 真(zhēn) 老(lǎo) 师(shī) 吗(mɑ) 同(tónɡ) 什(shén) 么(me) 才

项目管理的时间管理解析

项目管理的时间管理解 析 Company number:【WTUT-WT88Y-W8BBGB-BWYTT-19998】

摘要:对项目管理的结构框架进行详细的解析以及深入的探究,研究人员发现“与项目有关的时间管理”这一工作内容一方面可以影响项目管理工作的进度规划,另一方面它也可以作为项目管理工作顺利运行的有效方法或者是工具。总之,本文作者主观的认为,积极的对与项目管理有关的时间管理进行探究工作是极为必要的。 关键词:项目管理;时间管理;解析 项目管理作为管理学的一大分支,这一管理工作的落实是在专业知识、技能以及各种科学方法的配合下,对有利资源进行高效的利用,继而在一定的时间期限内达到某种预期结果的目标。时间管理作为项目管理工作中的一个重要组成成分,它与项目的成败,相关企业单位经济利润的取得之间存在很大的关联性。本文作者首先解析项目时间管理里的概念,继而详细的论述项目时间管理在企业项目管理工作过程中应用的途径,最后列举与项目时间管理相关的技术与方法以及其发挥的意义,旨在使时间管理为项目管理工作服务的质量实现最大化。 一、浅析项目时间管理的概念 项目时间管理实施的目的是为了使某一工程项目如期的完成,这一管理过程是系统性的、连续性的。依据自己的管理经验,本文作者认为项目时间管理包含的内容是多种多样的,“按照工期、保证项目工程的质量”这是任何一位项目管理者最希望落实的目标,但是纵观项目管理工作的现状,我们能够切实的感触到工期延后等现象频繁的出现,所以对工程项目的时间进行合理的安排与规划在项目管理工作体系中是十分必要的工作内容。做好项目时间管理这一工作内容,一方面可以使项目如期竣工,另一方面也提高了与项目活动有关资源的利用率,最终达到提高项目管理工作质量的大目标。 二、探究项目时间管理在项目管理工作进程中实施的步骤 本文作者认为时间管理的过程可以细化为6个阶段,每一个阶段有涵盖了一个或者多个管理过程。为了使自己的论述更加的清晰,本文作者在下图的配合下去阐明这6个阶段之间的关联: 1.项目活动的定义 项目时间管理工作的落实使项目总目标得以确立,这样项目管理工作的难易程度就被清晰的罗列出来,项目活动的整体结构被细化为各个细小的环节,此时与该项目活动有关的人员清楚自己要完成的工作任务以及要达到的工作目标。时间管理在项目活动定义阶段的应用,使项目活动清单明确化,为后续项目工程的顺利开展奠定扎实的基础。 2.项目活动开展的顺序 在项目工程实施的进程中,每一项细微的活动的落实都需要有一定的时间与资源的提供,因此项目时间管理在此过程的运用就是将有限的资源以及时间科学合理的配置到各个项目环节