三座标测量仪编程作业指导书

三座标测量仪编程作业指导书
三座标测量仪编程作业指导书

固定压片

1.1 1.2

1.3

1.4

2.1 2.2

2.3

2.4 2.5 2.6

2.7 2.8 2.9

2.10 2.11 2.12

2.15

2.13 2.14

2.16 2.17 2.18 2.19 2.20 2.21

2.21 2.22

2.23

2.25 2.26

2.24

2.27 2.28 2.29

2.30 2.31

2.32

2.33 2.34

2.35

2.36 2.38

2.37

2.39

3.1 3.2 3.3 3.4

3.5 3.6

3.7 3.8 3.9

3.12 3.10 3.11

3.13 3.14

3.15

3.16

3.17

3.15 3.16 3.17

3.18 3.19 3.20

3.21 3.22 3.23

3.24 3.25

4.1

4.2 4.3

4.4

4.5 4.6

4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15

4.16 4.17 4.18

4.19

4.20 4.21

4.22 4.23 4.24

4.25 4.26 4.27

4.30

4.28

4.29

4.31

4.33

4.32

4.34

4.35 4.36

4.37 4.38 4.39 4.40 4.41

4.42 4.43

4.44

4.45 4.46 4.47

4.48 4.49 4.50

5.1

5.2 5.3

5.4 5.5

5.6

5.7 5.8

5.9

5.10 5.11 5.12

5.13 5.14 5.15

5.16 5.17 5.18

5.19 5.20 5.21

5.22 5.23 5.24

5.25

5.26

5.27

5.28

5.29

5.27 5.28 5.29

6.2

5.30

6.1

6.3

6.4 6.5

6.6

6.7 6.8 6.9

6.10 6.11 6.12

6.13

6.14 6.15

6.16

7.1

7.2

7.3 7.4 7.5

作业指导书的制作

一. 制作前准备 1. 研读客户或RD提供的数据,将所有的条件及规格汇整成一份“作业注意事项”. 2. 针对样品进行结构分析,将各工程段(SMT、AI、加工、插件、修补、组立)区分,并核对BOM分阶是否正确。 3. 确立零件及组件的加工方式与规格;安规零件的区分。 4. 制定生产的流程,及工作站的安排并编写流程图。 5. 确认工站的安排是否合理,是否有达到平衡工时,是否有重复确认及防止不良流出的功能。 二. 制作S.O.P. 关于S.O.P.的制作原则以清晰、易懂、明确为原则,使作业者可轻易研读并明了作业的内容、顺序、 基准。产线的S.O.P.区分为加工、插件、修补、组立等四个工程段。 1. SOP制作完成后,须经由品保确认,再由生技主管确认。(除制作者以外,签名部分不可使用计算机打 印)。 2. 每一个机种的SOP皆须有一份版本的LIST,用以标明该机种于当时各工作站最新SOP 的版本为何。 3. 须有一份该机种SOP的变更记事,包含该机种全部SOP所有变更的事项LIST。 4. SOP发行于制造单位需使用“A3”规格的纸及品保单位需使用“A4”规格的纸,并皆须有签收。 5. 所有的SOP皆须打印出存盘,并且电子文件皆须有备份” 其实,在产品没有上线前,SOP初稿完成后要工程人员自己先做一次,再要求产线的多个作业员试做,必要时 可以请其他站组没有从事过该项工作的人员来作业,将他们作业过程 中遇到的问题点再改善后加入到SOP中,最后才能定稿,导入批量生产 SOP是最基本的也是最重要的职责,一份完整而且最新最标准的SOP不但可以规范生产流程而且影响整个公司的 运作。很多资深的管理者这样概括一个公司:“一个公司有两 本手册就可以了,一本是红本子(质量手册),一本是蓝本子(SOP),“可见SOP的延伸范围及重要性。 如下是制作SOP(standard operation procedure/标准作业指导书)的一些数据,供参考. 标准作业指导书(S.O.P.) 制作要领 定义: SOP是作业人员的工作准则,将作业人员的工作予说明与规范,以达作业的一致性与标准性。

FMEA作业指导书

长春市科海实业有限责任公司管理文件编号:KH/Z07-GD-024-2015 批准:刘丽 FMEA作业指导书 2015年4月28日发布 2015年5月1日实施长春市科海实业有限责任公司发布

前言 本规定是根据TS16949:2009程序文件对产品质量体系要求制定。本规定由质保部提出并归口。 本规定由质保部负责起草。 本规定主要起草人:庄显坤

1. 目的。 确定过程/产品潜在失效模式;确定设计、制造或装配过程中失效的起因,以减少失效发生或找出失效条件的过程控制变量;编制潜在失效模式分级表,为采取纠正和预防措施提供对策。 2. 范围 适用于新产品、修改产品、设计变更以及应用环境发生变更时的设计、试生产和批量生产。 3. 职责 3.1 技术部为过程/产品失效模式和后果分析的归口部门。 3.2 质量部、设备部、各制造部为配合部门,参与过程/产品失效模式和后果分析的制订及实施。 4. 工作程序 4.1 定义 FMEA是一种分析方法,它确保了产品与过程开发(APQP—先期产品质量策划)的过程中,考虑并且处理了潜在的问题。它是将跨职能小组的集体知识文件化。 4.2 在项目策划过程中,由技术部组织项目工程师、设备部、质量部和制造部相关人员成立FMEA小组进行分析。它贯穿于设计和制造开发过程的每一阶段,并且也可以用于问题解决。 4.3 FMEA小组在产品设计和开发阶段,进行产品的设计失效模式分析,编制《潜在的失效模式和后果分析》;在过程设计和开发阶段,依据过程流程图,分析产品制造过程中的每一工序(工位)动作(操作),评定过程(工序)的风险,填写《过程流程/风险评定表》,并确定需执行PFMEA的中、高风险的过程(工序)。 4.4 FMEA小组的开发是一个涉及整个产品实现过程的多方论证的过动,它的有效实施依赖于良好的策划。这个过程需要大量的时间并且对所需资源的承诺至关重要。FMEA小组开发的关键就是过程所有者以及技术部经理的承诺,因此技术部经理负有开发并维护FMEA 的责任。 4.5 潜在的失效模式及后果分析—设计DFMEA 4.5.1 FMEA表格附后,填入表格的信息说明如下: A FMEA编号

OCA20视频接触角测量仪使用注意事项

OCA20视频接触角测量仪使用注意事项 1.开机 必须先打开主机开关,再打开SCA20操作软件,软件将自动识别OCA主机及其附件。 2.样品准备 ●浸润实验前要将注射器、剂量管、注射针置于待测液内进 行彻底浸润。 ●排气泡注射器在待测液内反复快速抽送,确保注射器内盛满 液体,无任何气泡。 ●安装注射器祥见右图,程序如下:A B C D A 使用A键,下移注射平台 B 将注射器推入D槽,并轻轻地旋紧右侧旋钮。 C 使用B键,上移注射平台,使其与注射器活塞相接触

D 锁紧C活塞夹 3.测量 ●接触角的测量 必须使用SNS的注射针进行测量,超疏材料最好使用 SNS021/011的注射针。 静态接触角测量时,使用Sessile drop 进行计算 动态接触角测量时,使用Sessile drop (needle)进行计算 按键操作顺序:—————静态测量 ———————动态测量 注意针尖不能触及固体样品 注意两条基线必须放在注射针口的下方 ●表面/界面张力的测量 必须使用SNP的注射器进行测量 在结果框(result collection window)的system 栏内,必须填入被测液体和环境相的密度数值,在M-inf栏内必须填入注射针的外径。(2.41mm或1.65mm) 使用pendant drop 进行计算 液滴的滴速必须选择“very slow”的速度进行测量 按键操作顺序:——— 注意左侧两条基线必须放在注射针上,左侧第三条基线必须放 注射针口处 注意样品台上放置保护膜,以免样品台被腐蚀

注意液滴的大小越大越好,至少占视框的3/4 计算固体表面自由能 按照下表选择与被测固体相对应的计算方法 计算方法所提供的信息所需液体数应用 Zisman 临界表面张力 2 非极性固体PE、PTFE、石蜡Fowkes 表面能的色散部分 1 非极性系统PE、PTFE、石蜡 OWRK(Owens-Wend t-Rabel and Kaelble) 表面自由能的色散 部分和极性部分 2 一般 聚合物、铝、涂 层、清漆 Extended Fowkes 表面自由能的色散 部分、极性部分以及 氢键力的分布 3 表面特性的特殊 问题 聚合物、乳液 Wu (Harmonic Mean) 表面自由能的色散 力和极性力的分布 2(至少一种 极性液体) 低能系统 有机溶液、聚合 物、有机染料 酸碱理论色散力,酸度 3 表面特性的特殊 问题 生物系统 状态平衡理论表面自由能 1 一般聚合物、铝、涂层、清漆 Schultz 1 (Polar Drop Phase) 表面自由能中色散 力和极性力的分布 2 高能系统金属、玻璃 Schultz 2 (Polar Bulk Phase) 表面自由能中色散 力和极性力的分布 2 高能系统 聚合物、铝、涂 层、清漆 选择多种已知表面张力(极性及色散)的液体 测量已知液体与未知固体的接触角,并将数值导入SE window 在SE window内计算固体表面自由能及其分布。

FMEA编制作业指导书

文件编号JH-GL-GC-046编制工程部批准黄剑1.目的 根据《风险和机遇控制程序》里的要求,特制定潜在失效模式作业指导书,本指导书规定了潜在失效模式报告的编制要求及方法。 2.范围 适用于公司所有产品FMEA的编制和实施,包含设计、打样、试生产和批量生产阶段。 3.术语 DFMEA:设计潜在失效模式。 PFMEA:过程潜在失效模式。 4.职责 4.1 研发部负责牵头与设计或变更有关FMEA的编制和修订工作。 4.2 工程部负责牵头过程或工艺改进有关的FMEA的编制和修订工作。 4.3 研发部、生产部、工程部、质管部等都参与到过程与设计FMEA的讨论、制作和修改。 5. 编制和修订FMEA的时机 5.1设计过程中需编制设计FMEA,避免出现以往的失误和设计可能出现的误区,以便使设计过程最佳,节约设计成本。 5.2 试生产时需要编制过程FMEA,借鉴以往的最优控制经验,使试生产过程风险可控。 5.3 在试生产结束后升级试生产过程FMEA到量产过程FMEA,总结试生产遇到的问题,增加或优化到量产的过程FMEA中。 5.4 量产中遇到质量问题时或客户投诉质量问题时需不断完善过程FMEA。 5.5产品更改、过程更改、顾客反馈的信息以及纠正和预防措施对FMEA有影响时,需重新进行FMEA 分析与修订。 6. FMEA的分析对象 FMEA的优先分析对涉及风险系数较大的工艺过程的工序。 7. FMEA 的编制 7.1明确设计/过程FMEA表中各栏目的含义: a) 设计/过程功能要求:工序号、工序名称和该工序主要的工作内容。 b) 潜在失效模式:可能出现不满足要求的缺陷形式。 c) 潜在失效的后果:通过分析缺陷形式给下道工序带来后果,推至最终顾客,首先确定给最终顾客带来的后果,然后是给下道工序带来后果。 d) 潜在失效的起因:造成缺陷形式的原因。 e) 现行设计/过程控制:现行对设计/过程所采用的控制方法,包括防错、过程控制和检验。 f) 建议措施:经过RPN,认为现行过程控制不足以控制过程,而提出的新的控制方法,包括防错、过程控制和检验。

测量仪器操作规程教程文件

测量仪器操作规程

测量仪器操作规程 2016年3月

目录 水准仪操作规程 (2) 经纬仪操作规程 (4) 全站仪操作规程 (8) GPS操作规程 (11)

水准仪操作规程 1.目的和适用范围 为了正确使用测量仪器,确保仪器的完好率和利用率,适用于本项目所有水准仪的操作。 2.引用标准:使用说明书 3.进行水准标高测量时,应按以下操作规程使用: 3.1整平 先将三脚架两只铁脚踩入土中,观测者操纵三脚架的一条腿前、后、左、右移动,直到圆水准气泡基本居中时,固定这条腿不动,然后调节三个脚螺旋使气泡完全居中(仪器内设自动安平)。 3.2瞄准 先转动目镜对光螺旋,使十字丝的成像清晰,然后放松固定螺旋,用望远镜筒外的缺口和准星瞄准水准尺,粗略地进行物镜对光,当在望远镜内看到水准尺像时,即将固定螺旋固定,转动微动螺旋,使十字丝纵丝靠近水准尺的一侧。 3.3读数 读数时要按由小到大的方向,应先用十字丝横丝估读出毫米数,然后再读米、分米、厘米数。 4.进行水准标高测量前注意事项: 4.1检查水准仪及配套工具是否带齐,包括测量尺、脚架、水准点标高资料等。 4.2架设时,应先把脚架螺旋旋紧,在地面上踩紧脚架。对水准仪进行精平调整,对后视水准点后进行标高测量。 4.3在标高测量时,须转点搬移过程中,应检查好仪器的螺旋是否拧紧,防止掉损仪器。 5.水准仪自检规程 5.1圆水准器的检验和校正: 5.1.1检验方法:

①转动脚螺旋使圆水准气泡居中; ②将仪器旋转180度,如气泡居中,则正常,否则需校正。 5.1.2校正方法: ①首先整平仪器,使圆水准气泡居中,旋转180度,调整脚螺 旋,使气泡退回到偏离量的一半; ②松开圆水准仪的固定螺旋,用拔针,拔动圆水准器的校正螺 丝,使气泡居中; 重复第②步直到,仪器转到任何位置,圆水准气液始终居中。 5.2I角的检验与校正 5.2.1检验方法: ①在平坦地面上选取相距100m的高差为ΔHA、ΔHB两点; ②将水准仪置于A、B两点之间,在距A或B点,1m处测其高差Δ H′ ③若ΔH=ΔH′则正常,否则需校正。 5.2.2校正方法: ①将需校正的仪器整平置于A、B之间的A 端或B 端,在A 尺 上读出a1; ②然后读出B尺,其读数为a1+ΔH′,用拔针拔动校正螺旋使 a1+ΔH′=a1+ΔH 重复以上步骤,使仪器放任一位置,a1+ΔH′=a1+ΔH。 5.3十字丝的检验与校正 5.3.1检验方法: ①整平仪器,将横丝对准一固定点;

FMEA分析作业指导书

FMEA分析作业指导书

PFMEA分析作业指导书 1 PFMEA的概念 PFMEA是在铸件试生产前主要采用的一种分析技术,用以最大限度的保证潜在的失效模式及其产生的原因得到了充分的考虑和论述,FMEA以最严密的方式总结开发一个产品时开发小组的一种思想,其中包括根据以往的经验,可能会出现的一些问题的分析,这种系统化的方法体现了一个工程师在任何策划过程中正常经历的思维过程,并使之规范化。 2PFMEA的目的 (a)发现和评价产品/过程中潜在的失效及其失效后果; (b)找到能够避免或减少这些潜在失效发生的措施; (c)将上述整个过程文件化。它是对设计过程的更完善化,以明确必须做什么样的设计和过程才能满足顾客的需要。 3 PFMEA分析的要求 (a)人员要求:在FMEA的编制工作中,负责人员被预期的能够直接地和主动地联系所有部门的代表。但是FMEA的输入还是应该依靠小组的努力。小组应该由知识丰富的人员所组成(如:对铸造工艺、机加工、检测等方面的工程人员)过程FMEA应该成为促进不同部门之间充分交换意见的催化剂,从而提高整个小组的工作小平。 (b)适时性要求:FMEA是一个“事发前”的行为,而不是“后见之明”的行动。为达到最佳效益,FMEA必须在过程失效模式被无意地纳入过程之前进行事先花时间适当地完成FMEA 分析,能够更容易、低成本地对过程进行修改,从面减轻事后修改的危机。 4 PFMEA中严重度、频度和探测度的评价准则 后果评定准则:后果的严重度 这级别导致当一个潜在失效模式 造成了在最终顾客和/或制造/组装 工厂的缺陷,应该随时首先考虑到 最终顾客。如果在两者都发生缺 陷,则采用较高一级的严重度。 (顾客后果) 评定准则:后果的严重度 这级别导致当一个潜在失效模式造成了 在最终顾客和/或制造/组装工厂的缺陷, 应该随时首先考虑到最终顾客。如果在 两者都发生缺陷,则采用较高一级的严 重度。 (制造/组装后果) 级 别 无警告的危害严重级别很高。潜在失效模式影响 车辆安全运行和/或包含不符合政 府法规的情形。失效发生时无警 告。 或,可能危及作业员(机器或组装)但 无警告。 10 有警告的严重危害严重级别很高。潜在失效模式影响 车辆安全运行和/或包含不符合政 府法规的情形。失效发生时有警 告。 或,可能危及作业员(机器或组装)但 有警告。 9

接触角仪器的操作步骤

一、测试样品的制备: 1.尽量保持测试样品本身的洁净度。 2.尽量保持测试样品表面的水平度。固体粉末样经充分干燥后,压成片状;粘稠状样先溶解在强挥发性溶剂中后成膜,干燥后再测试。 3.确认测试样品的尺寸是否符合要求。最好是直径小于150mm。 4.测试过程中,不可用手接触测试区域。 5.为保证测试结果更符合实际值,测试过程会进行多次测试。 二、测试过程: 1.参数的设置: 启动程序→选择测试向导→普通接触角→选择图像来源→新建一个测试报告(如图一所示)→校正测量界面(如图二所示)→类型1(平面样品)→测量方法(悬滴法)→测试环境(标准环境如图三所示)→测试模式(如图四所示)→测试实时窗口控制主界面(如图五所示) 图一图二 图三图四

图五 2. 吸取测试液体、完成液滴转移过程: 具体操作步骤如下: A 从进样器中滴出液滴,体积为2ul左右。 B 从镜头内可以看到液滴会形成如图1所示图像。然后,将针头向下移动。直到接触到样品表面如图2。注意,不要过度向下,以免压弯针头。 C 移动针头向上。由于表面张力体系的作用,液体会留在样品表面如图3所示。继续移动针头,直到从镜头内消失,通常为3mm左右。 D 通过如上过程,我们完成了一次进样过程。如果您需要再次测第二个位置,请重复如上操作即可。 E 调整水平线位置。通过鼠标选中实时窗口内的红色水平线,然后通过键盘上下键或鼠标调整水平线的位置。请对比图4与图3,前者已经调到水平接触位置。 3. 完成测试液滴转移后,按“测试”,即进入实际测试过程 测试过程,会弹出如下界面:

三、数据的处理及保存 1. 测试数据分析及管理界面如下所示: 2.进入θ/2 法人手修改接触角界面,如下所示: 调整接触角点位置的具体步骤: A 通过逐个选中3个点,将上点位于液滴最上面,左点位于液滴最左边,右点位于液滴最右边。如图所示

模板工程作业指导书样本

模板工程作业指导书样本 1. 适用范围 本作业指导书适用于模板工程施工。 2. 作业准备 (1)在开工以前组织技术人员认真学习施工组织设计,阅读、审核施工图纸,澄清相关技术问题,熟悉规范和施工技术标准。 (2)对施工人员进行技术交底,对参加施工人员进行岗前培训,合格后持证上岗。 (3)组织相关材料的进场工作,确保人员、机具能及时到位。 (4)了解模板及其支架的有关规定:保证工程结构和构件各部分形状尺寸和相互位置的正确;模板必须具有足够的强度、刚度和稳定性,能可靠地承载新浇注混凝土的重量和侧压力,以及在施工过程中所产生的荷载;构造简单,装拆方便,并便于钢筋的绑扎、安装和混凝土的浇注及养护等工艺要求;模板中所有的接缝应平整、严密,不得有漏浆现象。 (5)向工人进行技术交底,并把有关质量标准交代给作业人员。以便自检与互检。 (6)依照验收标准及建设、监理单位要求编制技术资料、施工原始记录、检验批资料表格计划。

(7)制定现场施工安全保证措施,制定针对的应急预案。 (8)作业前现场临时设施如:生活、办公设施、施工场地、设施准备已完成。 3. 技术要求 (1)模板能够满足各个阶段的荷载要求。 (2)尺寸偏差控制在《验标》规定范围内。 (3)每块模板的大小应便于拆装和倒运。 (4)模板设计要求重量轻,结构设计合理; (5)钢模板接缝要少,模板安装使用尽量通用,设计时要考虑工期。 4. 施工程序与工艺流程 施工工艺和流程见下页图。

模板工程施工流程图 5. 施工要求 5.1 施工准备 (1)依据工程设计文件的要求,选择适用于各工程的模板(木模或钢模)进行模板设计,并按《验标》要求计算相应荷载。设计模板时,模板的几何尺寸要符合设计文件的尺寸要求,并保证结构构件各部位相应位置的准确。模板本身及支承系统,计算时要考虑足够的强度、刚度和稳定性,能可靠地承受混凝土荷载和施工荷载,不产生破坏或质量要求标准以外的变形。 (2)在选择模板时,模板的构造和拼合连接要便于安

仪器校验作业指导书

篇一:测量仪器校准作业指导书 1 适用范围 用于校准玻璃量器、容量筒、坍落度测定仪、试模、碎(卵)石标准筛、砂浆分层度测定 仪、混凝土贯入阻力仪、砂浆稠度测定仪、养护室等试验用仪器设备的校准以及工程施工现场使用的混凝土搅拌机自设加水装置、测深水铊、测深仪等设备的校准。 2 职责 2.1 子公司计量管理部门负责对校准计划的实施情况进行检查、监督。 2.2 使用单位计量员负责组织试验人员或测量人员实施校准工作;试验站负责人或测 量班班长对校准结果进行审核。 3 校准用测量仪器和用具 校准玻璃量器:架盘天平(称量1000g,精度1g)。 校准容量筒:台称(称量50kg或100kg,感量50g)、钢直尺(长 500mm,分度值 1mm)、 玻璃板(尺寸以能盖住容量筒口为宜)。 校准坍落度测定仪:钢直尺,长300~500mm,分度值0.5~1mm。 校准试模:游标卡尺(长200mm或以上,分度值0.02mm)、钢直尺(长 300mm,分度值 0.5mm)钢角尺。 校准碎(卵)石标准筛:游标卡尺(200mm,分度值不小于0.02mm)。 校准砂浆分层度测定仪:游标卡尺(300mm,分度值不低于0.02mm)。 校准混凝土贯入阻力仪:游标卡尺(150mm,分度值不低于0.02mm)、200×200mm 平板玻璃一块。 校准砂浆稠度仪:架盘天平(500g,精度1g)、钢直尺(300mm,精度1mm)。 校准混凝土搅拌机加水装置:台称、秒表(或带秒针的手表)、铁桶(或容器)。 校准养护室温度、相对湿度:干、湿温度计和时钟。 校准测深水铊、测深仪:钢卷尺(30m)1把。 校准用测量仪器需经确认合格。 4 玻璃量器校准实施步骤 4.1 外观检查:目测检查玻璃量器有无损坏,是否干净,刻度线是否清淅。 4.2 玻璃量器容积的校准: ⑴记录校准环境温度(最好控制在20±3℃范围内)。准备校准用的蒸馏水或食用自来水。 ⑵量器称重; ⑶将校准用水装入量器内至标称容积的刻线处,称重。⑷⑵、⑶项操作不少于2次,取其平均值为最终值。 4.3 结果评定: 量器无损坏,刻度线清晰,容积偏差在±1%以内为合格。结果评定应予以标识。 4.4玻璃量器的校准为一次性校准。 5 容量筒校准实施步骤 5.1 外观检查:目测检查容量筒有无损坏变形。 5.2 容量筒尺寸测量:用钢直尺在相互垂直的方向测量容量筒直径,取平均值。沿容量筒内边沿测量容量筒高度,每120°测量一点,共测三点,取平均值。 5.3 容量筒容积校核:记录环境温度(最好控制在 20±3℃范围内)称取容量筒和玻璃板重量;然后将容量筒装满饮用水,用玻璃板紧贴筒口滑移排去多余的水和水泡,擦干筒外壁水份后称重。进行2次,取平均值。 5.4 结果评定: 以5.2测得的容量筒尺寸计算其容积,参照以5.3称重法校核的容积,容积偏差在±1%以

接触角测量仪OCA操作手册

OCA操作手册

Operating manual DataPhysics OCA Version 1.4, English Firmware-version from 1.11, Software-version from 1.2 Release: November 1999 All Rights, also of translation reserved. No part of this document may be reproduced in any form (print, photocopy, microfilm or any other process) or be processed, multiplied or distributed by any electronic means without the prior written approval of DataPhysics. This does not affect the exceptions expressly stated in Ё53, 54 UrhG. DataPhysics Instruments GmbH does not accept any kind of liability for technical or printing mistakes or defectiveness in this operating manual. We reserve the right to make changes to the content of this operating manual without prior announcement. The use of names, trade names, merchandise descriptions and such in this operating manual does not justify the assumption that such names may simply be used by anyone; often we are concerned with legally protected registered trademarks even if they are not marked as such. Text, graphics and layout Gerhard燤aier Printed in Germany ? Copyright 2020 by DataPhysics Instruments GmbH, Filderstadt ? is a registered trademark of DataPhysics Instruments GmbH, Filderstadt ? IBM and IBM-PC are registered trademarks of International Business Machine Corporation ? Microsoft and Windows are registered trademarks of Microsoft Corporation DataPhysics Instrument GmbH Raiffeisenstra遝34 D-70794 Filderstadt phone ++49 (0)711-770556-0 fax ++49 (0)711-770556-99 email

产品作业指导书制作规范

产品作业指导书制作规范 1 目的和适用范围 为规范《产品作业指导书》的编制内容和流程,提升对产品生产过程的指导作用,特制定本规范。 本规范适用于《产品作业指导书》的制作。 2 规范性引用文件 下列文件对于本文件的应用是必不可少的。凡是注日期的引用文件,仅所注日期的版本适用于本文件。凡是不注日期的引用文件,其最新版本(包括所有的修改单)适用于本文件。 Q/XXX GG007 标准化文件编制、发放、实施、修订标准 Q/XXX GG010 标准化稽核、考核办法 Q/XXX JZ001 订单模板及报料单编制办法 工作责任追究管理规定 3 术语和定义 下列术语和定义适用于本规范。 3.1 产品作业指导书 产品作业指导书是指用以指导某个具体操作过程或事物形成的技术性、可操作性标准技术文件。 3.2 过程 过程是指一组相关的具体作业活动(如插件、装配、调试、包装等)。 3.3 操作流程图 操作流程图是指产品从物料组装成半成品或成品的装配过程。 3.4 操作指导书 操作指导书是指每个工位的操作信息和要求,如操作顺序、操作步骤、工艺要求等。 3.5 工位 工位是指某个人或某一设备完成某一道工序的工作位置。 3.6 工序 工序是指一个(或一组)工人,在一个固定的工作地点(一台机床或一个钳工台),对一个(或同时对几个)工件所连续完成的那部分工艺过程。

4 权责 4.1 技术部技术员负责依据本规范要求编制《产品作业指导书》。 4.2 技术部经理(副经理)负责审批《产品作业指导书》。 4.3 生产部门(含生产部、注塑部)线(组)长、质检部质检员负责对不合理之处提供意见或建议。 4.4 生产部门操作员、质检部质检员负责在实际操作中依据《产品作业指导书》开展生产和落实检验。 4.5 采购部采购员负责供应商所需《产品作业指导书》的审核、签收与供应商的签发、回收等管控。 5 分类 5.1 《产品作业指导书》依据发布形式可分为: a)书面作业指导书(此为本标准描述对象); b)口述作业指导书; c)计算机软件化工作指令; d)音像化工作指令。 5.2《产品作业指导书》依据发布内容可分为: a)用于插件、焊接、打螺丝、检验、组装等具体过程的操作规范(此为本标准描述对象); b)用于指导具体管理工作的各种工作细则、计划和规章制度等; c)用于指导自动化程度高而操作相对独立的标准操作规范。 5.3 本规范中《产品作业指导书》是以电子档形式及书面形式同时会签、发布、实施的标准技术文件,其中生产部门操作员操作应以书面形式为主,技术部技术员保留应以电子档形式为主。 5.4 本规范中《产品作业指导书》的换版及更新均应同步变更电子档及书面形式,且需重新会签、发布、实施,并应在发放时应回收旧版文件。 6 编制原则 6.1《产品作业指导书》编制应遵循“5W1H”原则: a) Where:在哪里使用产品作业指导书; b) Who:什么样的人使用产品作业指导书; c) What:此项作业的名称及内容是什么;

仪器校验作业指导书样本

篇一: 测量仪器校准作业指导书 1.适用范围 用于校准玻璃量器、容量筒、坍落度测定仪、试模、碎(卵)石标准筛、砂浆分层度测定 仪、混凝土贯入阻力仪、砂浆稠度测定仪、养护室等试验用仪器设备的校准以及工程施工现 场使用的混凝土搅拌机自设加水装置、测深水铊、测深仪等设备的校准。 2.职责 2.1.子公司计量管理部门负责对校准计划的实施情况进行检查、监 督。 2.2.使用单位计量员负责组织试验人员或测量人员实施校准工作; 试验站负责人或测 量班班长对校准结果进行审核。 3.校准用测量仪器和用具 校准玻璃量器: 架盘天平( 称量1000g, 精度1g) 。 校准容量筒: 台称( 称量50kg或100kg, 感量50g) 、钢直尺( 长500mm, 分度值 1mm) 、 玻璃板(尺寸以能盖住容量筒口为宜) 。 校准坍落度测定仪: 钢直尺, 长300~500mm, 分度值0.5~1mm。

校准试模: 游标卡尺( 长200mm或以上, 分度值0.02mm) 、钢直尺( 长 300mm, 分度值 0.5mm) 钢角尺。 校准碎(卵)石标准筛: 游标卡尺( 200mm, 分度值不小于0.02mm) 。校准砂浆分层度测定仪: 游标卡尺( 300mm, 分度值不低于 0.02mm) 。 校准混凝土贯入阻力仪: 游标卡尺( 150mm, 分度值不低于 0.02mm) 、200×200mm 平板玻璃一块。 校准砂浆稠度仪: 架盘天平( 500g, 精度1g) 、钢直尺( 300mm, 精度1mm) 。 校准混凝土搅拌机加水装置: 台称、秒表( 或带秒针的手表) 、 铁桶( 或容器) 。 校准养护室温度、相对湿度: 干、湿温度计和时钟。 校准测深水铊、测深仪: 钢卷尺( 30m) 1把。 校准用测量仪器需经确认合格。 4.玻璃量器校准实施步骤 4.1.外观检查: 目测检查玻璃量器有无损坏, 是否干净, 刻度线是 否清淅。 4.2.玻璃量器容积的校准: ⑴ 记录校准环境温度( 最好控制在20±3℃范围内) 。准备校准用的蒸馏水或食用自来水。

过程FMEA作业指导书

过程FMEA作业指导 书

过程FMEA作业指导书 1.0目的:为了进一步提高制程品质,减少浪费,确保客户要求,减少潜在的危险,特作此作业指导书。 2.0.适用范围 产品模具设计后,正式量产前制作此文件。 3.0.概述 3.1.确定与产品相关的过程潜在失效模式。 3.2.评价失效对顾客的潜在影响。 3.3.确定潜在制造或装配过程失效的起因,确定减少失效发生或找出失效条件的过程控制变量。 3.4.编制潜在失效模式分级表,然后建立考虑纠正措施的优选体系。 4.0责任 4.1制造部PE工程师选取项目并进行分析及根据潜在失效模式分级表确定纠正措施的优选项目. 4.2.制造部模具制造科根据新确定的优选项目进行纠正的实施。 4.3.制造部PE工程师将制造或装配过程的结果编成文件。 5.0过程FMEA表格 5.1.FMEA编号 填入FMEA文件的编号,以便查询。 5.2.项目

填入所分析的系统、子系统或零件的过程名称、编号。 5.3.过程责任 填入部门和小组,如果知道,还应包括供方名称。 5.4.编制者 填入负责准备FMEA工作的工程师的姓名、电话及所在公司名称。 5.5.年型/车型 填入将使用和/或正被分析过程影响的预期的年型及车型(如果已知的话)。 5.6.关键日期 填入初次FMEA预定完成日期,该日期不应超过计划开始生产日期。 5.7.FMEA日期 填入编制FMEA原始稿的日期及最新修订的日期。 5.8.核心小组 列出有权确定和/或执行任务的责任部门和个人姓名。 5.9.过程功能/要求 简单描述被分析的过程或工序,尽可能简单地说明该工艺过程或工序目的。如果工艺过程包括许多具有不同失效模式的工序,那么能够把这些工序作为独立过程列出。 5.10.潜在失效模式 所谓潜在失效模式是指过程可能发生的不满足过程要求和/或设计意图的形式,是对某具体工序不符合要求的描述,它可能是引

电脑验光仪使用流程

电脑验光仪使用流程 1.将电脑验光仪的额托和下颌托进行消毒; 2.嘱病人做到电脑验光仪前、调整座椅高度; 3.嘱病人把下颌放到下颌托上,额头靠紧额托; 4.先检查病人右眼,嘱病人右眼注视视标(并放松); 5.测量光圈对准患者瞳孔中央,电脑验光仪将自动测量病人屈光度,共测量三次取平均值; 6.以相同方法测量左眼; 7.打印测量结果。

非接触电脑眼压测量仪使用流程 1.将非接触电脑眼压测量仪的额托和下颌托进行消毒; 2.嘱病人做到非接触电脑眼压测量仪前、调整座椅高度; 3.嘱病人把下颌放到下颌托上,额头靠紧额托; 4.先检查病人右眼,嘱病人右眼注视视标(并放松); 5.测量光圈对准患者瞳孔中央,非接触电脑眼压测量仪将自动测量病人眼压,共测量三次取平均值; 6.以相同方法测量左眼; 7 .打印测量结果。

眼A超常规操作流程 1.让患者仰卧在检查床上; 2.检查者坐在患者头侧; 3.向被检眼滴入表面麻醉眼药水,嘱被检者闭眼数分钟,用75%酒精消毒超声探头,待探头酒精挥发干燥; 3.让被检者睁开双眼,并注视正上方某一固定目标; 4.检查者一手持探头,从一侧逐渐移近被检眼; 5. 探头接近角膜表面时,垂直轻轻接触角膜表面; 6.检查者另一手可辅助轻轻撑开被检眼眼睑; 7.在同一点上重复测量多次,取平均值; 8.打印测量结果; 9.完成测量后,向被检眼滴入抗生素眼药水。

眼B超常规操作流程 1. 让患者仰卧在检查床上; 2. 检查者坐在患者头侧; 3.超检查前需将超声耦合剂涂于患者眼睑部位; 4.检查时先对眼球及眼眶作纵切面及横切面扫描,发现病变后,可让患者转动眼球,从多个位置和角度进行动态观察,了解病变性质、位置和范围; 5.打印检查结果; 6.完成测量后,擦去患者皮肤上的超声耦合剂。

工程测量作业指导书

测量工程施工作业指导书遵义建工(集团)务川有限公司

二?一六年^一月 一、等级控制测量(平面)作业指导书 (1) 二、等级水准测量(含等外)作业指导书 (6) 三、地形测量(采集)作业指导书 (10) 四、线路测量作业指导书 (14) 五、沉降观测、变形监测作业指导书 (19) 六、基坑监测作业指导书 (22) 七、GPS/RTK作业指导书 (35) 八、工程测量用仪器设备使用、维护保养要求 (39) 3.1全站仪使用、维护保养 (39) 3.2全球定位系统使用、维护保养 (40) 3.3水准仪使用、维护保养 (42) 4仪器设备维护保养计划 (43)

九、水准仪器的校验 (44) 十、水准仪I角的核查方法 (45)

一、等级控制测量(平面)作业指导书 本作业指导书是针对等级控制测量的特点和作业需要编写的,服务范围是三等导线、一级导线、二级导线、三级导线以下平面控制网、平高控制网、高程控制网的建立和控制点加密。使用本指导书进行测量作业,应遵守《城市测量规范》、《工程测量规范》等规程规范。在遵循务川珍珠大道项目的设计要求下进行作业。 1.0任务接收 项目测量组长接受任务后,明确任务的技术要求和作业工期。 2?作业前准备工作 2.1项目测量组长获得任务后,立即收集相关资料到实地进行踏勘。编写技术设计书。 2.2项目测量组长组织相关人员进行作业准备。组织相关作业人员认真学习有关测量规范 和技术指示或技术设计书,确定作业任务的性质和要求。继续完善测区资料的收集(包括测区所在地点、范围、道路、交通、控制点等)。 2.3项目测量组长根据平面控制等级选择合适的测量仪器,并对仪器进行相关的检校,包 括全站仪、电子手簿或一般记录手簿、脚架、觇牌、棱镜、气压计、温度计等的完好状态,是否处在检定期内,有不合格项目不得用于作业。 2.4项目测量组长组织相关人员熟悉全站仪的使用方法,对仪器进行参数设置如气压、温 度和加乘常数。进行气压、温度改正。 3. 选点、埋石 3.1按《城市测量规范》CJJ 8-99选点密度按P8 2-2条实施。 3.2选点注意事项 3.2.1点位应选在土质坚实的地方或坚固稳定的建筑物顶面上,邻点之间通视良好。测线 离开障碍物和地面距离在1米以上,离开高压线宜大于5米。点位应选取在便于架设仪器和便于观测作业。标混凝土桩便于长期限保存的地方,同时应保证方便低等级加密。 3.2.2选点埋桩时除考虑工作因素外,还要考虑到人身安全的因素。 3.3埋桩

接触角原理概述

实验项目:用接触角测量仪测量材料表面的接触角 一.实验目的: 1.认识和掌握接触角测量仪测量材料表面的接触角的基本原理 2.熟悉接触角测量仪JC2000D1的操作技术 二.实验容: 1.掌握JC2000D1型接触角测量仪的工作原理和操作步骤 2.测量几种材料的表面接触角 三.实验仪器,设备及材料 设备JC2000D1型接触角测量仪,蒸馏水,解玻片,食盐水,样品木板几个 四.基本原理概述 1.接触角定义及应用 当液滴自由地处于不受力场影响的空间时,由于界面力的存在而呈圆球状。但是,当液滴与固体平面接触时,其最终形状取决于液滴部的聚力和液滴与固体间的粘附力的相对大小。当一液滴放置在固体平面上时,液滴能自动地在固体表面铺展开来,或以与固体表面成一定接触角的液滴存在,接触角通俗地说,就是液滴在固体表面自然形成的半圆形态相对于固体平面的外切线,如图1所示。 接触角的应用非常广泛,甚至可以说涉及到身边的每个细节,我们希望汽车玻璃上不沾雨水,但反之我们希望汽车钢板上的油漆永不脱落。其他比如农药和蔬菜叶面;涂料和外墙面,绝缘材料,纳米材料表面化改性等等,从教学科研工农业生产到日常生活。 图1 接触角 假定不同的界面间力可用作用在界面方向的界面力来表示,则当液滴在固体平面上处于平衡位置时,这些界面力在水平方向上的分力之和应等于零,即 (1) 式中、、分别为固-气、液-气和固-液界面力;为液体与固体间的界面和液体表面的切线所夹(包含液体)的角度,称为接触角 (contact angle),在之间。接触角是反应物质与液体润湿性关系

的重要尺度,可作为润湿与不润湿的界限,时可润湿, 时不润湿。 2.润湿 润湿(wetting)的热力学定义是,若固体与液体接触后体系(固体和液体)的自由能G降低,称为润湿。自由能降低的多少称为润湿度,用来表示。润 湿可分为三类:粘附润湿(adhesional wetting)、铺展润湿 (spreading wetting)和浸湿(immersional wetting)。可从图2看出。 图2 三类润湿 (1)粘附润湿 如果原有的1固面和1液面消失,形成1固-液界面,则此过程的 为: (2) (2)铺展润湿 当一液滴在1固面上铺展时,原有的1固面和一液滴(面积可忽略不计)均消失,形成1液面和1固-液界面,则此过程的为: (3) (3)浸湿 当1固面浸入液体中时,原有的1固面消失,形成1固-液界面,则此过程的为: (4) 对上述三类润湿,和无法测定,如何求?分别讨论如下: (1)粘附润湿

装配作业指导书全

装配作业指导书全 1 2020年4月19日

2 2020年4月19日 机型 SZ-203 工序号 1 文件编号 页码 第一共十八页 作业项目 焊制冷插座连接线 作业时间 版本号 REV: A 受控号 一:作业内容: 附图: 1、 取一五芯连接排线和五芯插座。 2、 将五芯连接排线分别焊于五芯插座相对应 的位置,具体焊法见附图。 二:工艺要求: 1,线位置不能焊错、焊锡不能假焊虚焊, 焊点要饱满。 NO 物料编号 物料/工具名称 规格 数量 1 五芯连接排线 1 2 五芯插座 1 更改 标记 更改内容 签名 日期 制作 X X X XX-X-XX 校对 核准 焊3 和5 焊4 焊2 焊1 焊A

3 2020年4月19日 机型 SZ-203 工序号 2 文件编号 页码 第二共十八页 作业项目 装配制冷头 作业时间 版本号 REV: A 受控号 一:作业内容: 附图: 1、取一制冷钢头检查有无划伤,划痕,瑕疵等 其它不良,将不良品挑出。再将OK 钢头套上橡胶圈后, 把探头连接件装入制冷钢头内压紧,连接件螺丝孔要对齐钢头螺丝孔。 2、取一制冷片在其正反两面均匀地涂上薄薄一层散热膏, 然后将制冷片有字面朝上平整地放入加工好的制冷钢头内压平, 放入制冷片时要注意方向(连接件槽口对准自己,制冷片线在槽 口在左边与其成90度方向)。 3、检查本工位作业内容、良好则投入下一工位。 二:工艺要求: 1、制冷片要装平,要紧贴钢头面。 2、制冷片方向不能装错。 更改 标记 更改内容 签名 日期 制作 X X X XX-X-XX 校对 核准 NO 物料编号 物料/工具名称 规格 数量 1 制冷钢头 1 2 制冷片 1 3 橡胶圈 1 4 探头连接件 1 凹槽

地形测量作业指导书

地形测量作业指导书(一)地形测量工艺流程图

(二)地形测量方法及要求 一、说明 本指导书只适用于工程施工中局部范围内的大比例尺地形图测量。地形测量控制网点是在施工控制网基础上加密得到的,坐标系统和高程系统应与施工坐标系、高程系统相一致。远离工区时,也可以采用北京坐标系或独立坐标系统。比例尺为1:200、1:500、1:1000和1:2000,按正方形或矩形法分幅。图式符号执行国家最新版本的《1:500 1:1000 1:2000地形图图式》。地形测量由于外业数据采集和内业成图所使用的仪器和软件不同而采用不同的方法,不论采用何种方法,成图都必须满足规范要求和用户要求。 本指导书中用字母M表示地形图比例尺分母。 二、图根控制点(包括测站点)的测量 1.一般规定 1.1图根点是直接供测图使用的平面和高程控制点,可在各等级控制点上采用经纬仪交会法、测距导线法、全站仪坐标法、三角高程、水准测量、GPS等方法测量。 1.2图根点或测站点的精度以相对于邻近控制点的中误差来衡量,其点位中误差不应超过图上±0.1㎜;其高程中误差不应超过测图基本等高距的1/10。 1.3为了节约,图根点可以采用临时地面标志。 1.4图根点的密度因测图使用的仪器不同要求也不同,只要能够保证碎部点的平面高程精度即可。 1.5测站点可以在测图过程中根据需要随时测放。 2.图根点测量(略) 三、地形测量测绘内容及取舍

地形图应表示测量控制点、居民地和垣栅、工矿建筑物及其他设施、交通及附属设施、管线及附属设施、水系及附属设施、境界、地貌和土质、植被等各项地物、地貌要素,以及地理名称注记等。并着重显示与测图用途有关的各项要素。 地物、地貌的各项要素的表示方法和取舍原则,除应按现行国家标准地形图图式执行外,还应符合如下有关规定。 1.测量控制点测绘 1.1测量控制点是测绘地形图和工程测量施工放样的主要依据,在图上应精确表示。 1.2各等级平面控制点、导线点、图根点、水准点,应以展点或测点位置为符号的几何中心位置,按图式规定符号表示。 2.居民地和垣栅的测绘 2.1居民地的各类建筑物、构筑物及主要附属设施应准确测绘实地外围轮廓和如实反映建筑结构特征。 2.2房屋的轮廓应以墙基外角为准,并按建筑材料和性质分类,注记层数。1:500与1:1000比例尺测图,房屋应逐个表示,临时性房屋可舍去;1:2000比例尺测图可适当综合取舍,图上宽度小于0.5mm的小巷可不表示。 2.3建筑物和围墙轮廓凸凹在图上小于0.4mm,简单房屋小于0.6mm时,可用直线连接。 2.4 1:500比例尺测图,房屋内部天井宜区分表示;1:1000比例尺测图,图上6mm2以下的天井可不表示。 2.5测绘垣栅应类别清楚,取舍得当。城墙按城基轮廓依比例尺表示,城楼、城门、豁口均应实测;围墙、栅栏、栏杆等可根据其永久性、规整性、重要性等综合考虑取舍。

相关文档
最新文档