第一部分总则

Part1 Genaral Principle

1.说明instructions

该规格书综述了该船的设计、材料、建造和设备等方面,总布置图作为规格书的一部分。

船厂根据规格书和认可的图纸进行设计、建造、安装设备、检查和试验后交付船东。规格书中没有提及的,但船级社有要求配备,则由船厂供给或配备。在规格书中提及两次或以上的项目只供应或装备一次。

Reviewed the specification for the ship's design, material, construction and equipment, general arrangement as part of the specification.

Shipyard according to specifications and approved drawings for design, construction, equipment installation, inspection and test after delivery of the owner. Specification didn't mention in the book, but the ship's classification society is required, is supplied by shipyard or equipped. In two or more projects are mentioned in the specifications or equipment supply only once.

2、环境条件(沙特阿拉伯-红海)Environmental conditions (Saudi Arabia - the red sea):

所有机械设备和附件均按以下条件设计:

海水温度:32℃

环境温度:45℃

绝对大气压:0.1MPa

相对湿度:85%

All mechanical equipment and accessories are designed according to the following conditions:

The water temperature: 32 ℃

Environment temperature, 45 ℃

The atmospheric pressure: 0.1 MPa

Relative humidity: 85%

3、用途与航区Purpose and sailing area

该拖船主要用于协助万吨级船舶靠离码头,适合在无限航区拖带服务。

The tug is mainly used to assist each ship on the docks, suitable for world-wide towing service.

4、规则、规范或证书Rules, specification or certificate

1)、该拖船在法国船级社(BV)监督下建造,并取得(BV)沿海航区适航证书。

该船悬挂国旗:沙特阿拉伯。

该船的建造、安装的机械、设备和提供的备件符合法国船级社(BV)的钢质海船最新入级建造规范。入级符号为: BV I + HULL + MACH TUG, Unrestricted Navigation。

1), the tug is built under the supervision of bureau veritas (BV), and coastal area airworthiness certificate (BV).

The ship the flags: Saudi Arabia

The ship's construction, installation of machinery, equipment, and provide the spare parts in line with the

bureau veritas (BV) sea-going steel ships of the new classification rules for the construction. Classification symbol is: BV I + HULL + MACH TUG, Unrestricted Navigation。

2)、规范,该船符合:

--国际载重线公约1966

--无线电设备规范

--IMO 稳性规范

--国际吨位规范1969

--国际防污公约1973/78

2), the specification, the vessel in accordance with:

1966 - the international load line convention

- radio equipment specification

- IMO stability specification

1969 - the international tonnage norms

- the international marpol 1973/78

3)、证书,在交船时提供给船东如下证书:

--建造质量证明书(船厂提供)

--船检证书(BV)

--安全设备证书(BV)

--船舶适航证书(BV)

--吨位证书(1969) (BV)

--载重线证书(BV)

--无鼠证书(BV)

--防污证书(BV)

--磁罗经校正(船厂提供)

--拖力证书(船厂提供)

--下水许可(船厂提供)

--安全结构证书(船厂提供)

--安全无线电证书(BV)

--洋马提供的关于主机符合1997 MARPOL 附录VI 对NO X 排放要求的声明

--主机、推动装置、主交流发电机、应急发电机、泵、空压机、锚机、拖钩、电气装置、航行灯、甲板吊、锚和锚链、救生设备、消防设备和/或船级社和/或制造厂商证书和其他船级社和规范要求的证书。

交船时上列证书将交付船东,每证4份,1份正本3份付本。

3), certificate, at the time of delivery to provide shipowners certificate as follows:

- build quality certificate (shipyard

- survey certificate (BV)

- safety equipment certificate (BV)

- seaworthiness certificate (BV)

- tonnage certificate (1969) (BV)

- load line certificate (BV)

- no rat certificate (BV)

- antifouling certificate (BV)

- magnetic compass adjustment (shipyard

- drag certificate (shipyard to provide)

- water license (shipyard

- safety construction certificate (shipyard

- security radio certificate (BV)

--Yanmmar provide about M/E is in line with 1997 MARPOL annex VI statement of NO X emission requirements

- host, driving device, the main ac generator, emergency generator, pump, air compressor, windlass, towing hook, electrical devices, navigation lights, deck cranes, anchor and anchor chain, life-saving equipment, fire equipment, and/or classification society and/or manufacturer certificate and other certificates of classification society and specification requirements.

On delivery the above certificate will be delivery of the owner, each card four, pay the 1 in 3 originals.

5、材料和设备Materials and equipment

船舶建造所采用的材料和设备为BV认可的船用产品。所有使用的钢板,将满足BV船级社的要求,有标签清楚地标明制造厂的名称和试验标记。

Ship construction materials and equipment adopted by the Marine product for BV approval. All use of steel, will meet the requirements of BV classification society, one of the tabs clearly indicate the factory name and logo.

6、船型Ship type

本船为全焊接钢质拖船,单底(局部设双底),单甲板,设三层甲板室,由二台柴油机和二台减速齿轮箱、高弹联轴节、艉轴、艉管装置、可调螺旋桨推进装置驱动。

This ship is all welded steel tugboat, single bottom (partial double bottom), single deck, set three deck room, Two diesel engine and two sets of reduction gear box, high elastic coupling, stern shaft and stern tube device, adjustable propeller propulsion device drivers.

7、纵倾和稳性Trim and stability

本船稳性满足无限航区拖带作业要求。

该船在满载设计吃水时,基本上无纵倾。如果需要可适当设固定压载调整纵倾与横倾。在船舶基本完工时,需作倾斜试验来确定完工空船的重心位置,试验时船东代表、船级社检验师应在现场。并根据试验结果,依照前述规范的要求对空船,满载,90%消耗和拖船的要求进行稳性计算,作出报告。

The ship stability world-wide towing operation requirements.

When the ship in full design draft, basically no trim. If you need can be appropriately set fixed ballast adjustment of trim and heel. On the basic completion of the ship, need to tilt test to determine the completion of empty ship's center of gravity position, owner's representative, in testing the classification society surveyor should be on the scene. And according to the test results, in accordance with the specification requirements for empty vessel, load, 90% of consumption and the requirement of the tug stability calculation, make a report.

8、载重量的确定The determination of weight

载重量是满载吃水时的排水量与空载吃水时的排水量之差。

空船重量由以下部分组成:

1)船体重量包括所有规范和规格书要求的设备和甲板属具重量,但不包括:

a)规范以外要求备件;

b)寝具、亚麻制品、厨房用具、餐具、陶器、玻璃器皿和类似物品;

c)船员和自用品;

d)所有舱柜及管系中的油、水。

2)机械、电气设备的重量、包括规范要求配备的备件的重量,不包括规范以外要求的备件。

3)机器内的水和油

在主机、付机内的水和油及与其相连管系内的水和油。

Weight is a full draft of the difference between the displacement and the displacement of light draft.

Empty weight consists of the following parts:

1) include all specification and the specification requirement of hull weight equipment and deck weight, but does not include:

A) specification requirement spare parts;

B) bedding, linen, kitchen utensils, tableware, crockery, glassware, and similar items;

C) the crew and the supplies;

D) all of the tank and piping of oil and water.

2) the weight of the mechanical and electrical equipment, including the specification requirement with the weight of the spare parts, not including the specification requirements of spare parts.

3) the machine within the oil and water

Within the host, to pay the machine connected to water and oil, and oil and water in the piping system.

9、检查和试验Inspection and test

该船的结构、设备安装和设备调试都将在有船东代表或船级社验船师在场的情况下检查和试验。

检验和检验的日程安排将提交船东。

检验和试验方法根据船厂的标准惯例进行。

焊缝的重要部位将经X射线检查。

检验和试验前必须的资料、计划和日程等都将提交船东代表。

be in the owner's representative or the presence of classification society surveyor inspection and test.

The inspection and test schedule will be submitted to owner.

Inspection and testing method according to the shipyard's standard practice. 2) the important part of the weld will by X-ray examination.

3) before the inspection and testing must be information, plan and schedule will be submitted to owner's representative. 10、进坞Docking 根据需要确定进坞。

According to the need to identify the docking 11、系泊及航行试验The mooring and sea trial 试验依据:BV 海船系泊及航行试验通则。

系泊试验: 海上试验前,必须进行码头系泊试验,码头系泊试验按照船检和船东认可的系泊试验大 纲进行,系泊试验应有船东代表和验船师在场的情况下进行。

航行试验: 当船舶消除系泊试验中发现的故障、缺陷,并取得验船部门签发的试航证书后,将根据船 级社和船东认可的《海上试验大纲》进行海上航行试验。

船厂在系泊及航行试验中,将作好各种试验记录,整理出的试验报告将作为检验和交船的必须技术文 件,并提交给验船部门和船东。

Test on the basis of: general rules of BV sea-going ships mooring and sea trial.

Mooring test: before sea trial, the terminal mooring test must be conducted, the terminal mooring test according to the survey and shipowner, mooring test outline of mooring test should be the presence of owner's representative and surveyor.

Sea trial: when the ship to eliminate faults, defects found in mooring test, and achieved after sea trial certificate, issued by the surveyor department will according to the classification society and shipowner's sea trials "sea test outline".

Shipyard in the mooring and sea trial, will make a good record of all kinds of test, sort out the test report will be as the inspection and delivery must be technical documents, and submit to check boat department and the owner.

a. 航速测定Speed measurement

测速时海面风力不大于蒲氏三级,潮流平稳,在主机 100% 额定转速时测定航速,测速工具为船装GPS 计程仪):

Wind speed when the surface is not greater than PuShi level 3, smooth trend, measuring speed when the host

100% of rated speed, speed measuring tool for shipped GPS log) :

航速speed =

4

2321V V V ++

b. 急停试验stop test

当船舶全速前进,稳定主机转速将控制柄迅速扳至倒车,直至船舶全速后退,然后控制倒车主机转速,迅速操纵手柄至正车,直至船舶全速前进。记录船舶从命令开始至停止的距离,和船速重新建立起来所需时间。

When ship full speed ahead, stable host speed control handle quickly pull back to, until the ship back at full

speed, and then back control main engine rate of revolution, manipulation of the handle to the ahead rapidly, until the ship full speed ahead. Record the ship from a command to stop the distance, and speed to set up the required time.

c.操舵试验steering test

操舵试验按BV要求进行,在驾驶室控制舵角从一舷35°至另一舷35°,记录所需时间和船舶最大横倾角。

Steering test, required by BV in bridge control rudder Angle 35 ° from one port to another port 35 °, record the required time and maximum heeling Angle of the ship.

d.回转试验turning test

操纵舵桨向右舷转35°,保持至船回转360°,然后将船舶复位,再将舵桨转至左舷35°,保持至船回转360°,记录回转时间、回转半径和倾角。

anipulation of the rudder propeller turn starboard 35 °, maintain to round turn 360 °, and then reset the ship, then transfer the rudder blade to port 35 °, keep to the round turn 360 °, record turn-around time, turning radius and Angle.

e.抛锚试验anchor test

起抛锚试验应在船级社和船东认可的水深处进行。

The anchor test shall be carried out in the depths of the water of the classification society and shipowner.

f.噪音试验noise test

按BV关于噪声的试验条件和方法测定,测试点应包括驾驶室、居住室、前船员大舱和机舱监视室,其标准满足招标规格书要求。

According to BV for the test condition and method of noise measurement, test points should include cabin crew before, living room, large tank and engine room monitoring room, its standard meet the requirements of the tender specification.

g.系柱拖力试验bollard pull force test

系柱拖力是在主机负荷为50%,85%,100%时,正车和倒车时进行,分别测出正车和倒车拖力。

测试方法如图:

Bollard drag force is the host load was 50%, 85%, 100%, the ahead and astern, respectively measured drag force ahead and to the astern.

Test method as shown in figure:

负荷load 50 % 85 % 100 %

转速speed rpm rpm rpm

试验结束绘制拖力曲线,从中求出最大拖力值。Drag force curve drawing test is over, to calculate maximum drag force.

系柱拖力

Bollard pull force

时间time

最大平均系柱拖力 =n T T T T n

++++ (321)

The largest average bollard drag force=

第二部分船体部分

PartII Hull section

1.船体说明The hull specification

1.1基本要点Basic Points

1.2该船为柴油机驱动的轴、桨,无限航区拖轮。

本船为单甲板,三层甲板室,倾斜首柱和方艉型式。驾驶室和居住舱位于前部,机舱棚位于中部。

主船体被五道钢质水密横舱壁分为:

艏尖舱(压载舱);

淡水舱;

储存室,其底部为双层底舱(压载舱);

机舱,其底部有部分双层底舱;

轻油舱;

操舵装置的房间。

主甲板以上的居住舱室和其它舱室如总布置图所示。

主要尺度:

总长(不包括护舷) Loa 40.00m

两柱间长35.12m

型宽10.50m

型深 5.00m

满载型吃水约4.00m

满载排水量约1629t

The ship is diesel engine driven shaft, propeller, world-wide tug.

This ship is a single deck, deck house, three layer inclined stem and stern type. Bridge and living accommodation is located in the front, and is located in the central.

Main hull was five steel watertight bulkhead is divided into:

Fore peak tank (ballast);

Fresh water tank.

At the bottom of the storage room, its for tank (ballast);

At the bottom of the engine room, the part of the tank;

Light oil tank;

Steering gear room.

The main dimensions:

Loa 40.00m length (not including fender)

A length of 35.12 m between the two columns

Type10.50m wide

Type 5.00 m deep

Full draft about4.00m

Load displacement of about 1629 t

1.3舱容

舱容(100%舱容)

柴油燃油舱约100m3

滑油舱约5.0m3

淡水舱约30m3

压载舱约20m3

污油舱约3m3-7m3

1.2 cubic capacity

Capacity (100%) capacity

Diesel fuel oil tank of about 100 m3

Lubricating oil tank is about 5.0 m3

Fresh water tank, about 30 m3

About 20 m3 ballast tank

Dirty oil tank of about 3 m3-7 m3

1.4甲板间高、舷弧和梁拱

a)船体中心线处的甲板间高:

主甲板—艏楼甲板约2.7m 艏楼甲板—驾驶甲板约2.7m

驾驶甲板--驾驶室顶约 2.6m

b)上甲板舷弧

在首垂线处0.78m

在尾垂线处 1.00m

c)梁拱(圆弧梁拱)

上甲板0.19m

1.5推进机械

主机:洋马8EY26W 750rpm

功率:单机2060kw

数量:2台

认可船级社:BV

齿轮箱:GWC49.54 速比:3.4457:1

数量:2台

认可船级社:BV

1.3 deck height, sheer and beam

A) the center line of the hull in deck height:

Main deck, forecastle deck is about 2.7 m

Forecastle deck, navigation deck is about 2.7 m

The driving deck - bridge is about 2.6 m

B) the sheer on deck

In the first vertical 2.70 m

At the tail of the vertical 1.00 m

C) beam (arc beam)

0.19 m on deck

1.4 the propulsion machinery

Host: The horse 8EY26W 750rpm

Power: single 2060kw

Quantity: 2 sets

Recognised classification society: BV

Gear box: GWC49.54 ratio: 3.4457:1

Quantity: 2 sets

Recognised classification society: BV

1.6航速、系柱拖力和续航力

1)试航速度:在设计条件下试航速度为13.5节。

2)设计吃水时的服务航速:12.5节。

3)续航力:在服务航速12.5节时,续航距离约3000海里。

4)系柱拖力:在主机最大持续功率时,正拖系柱拖力67t,倒拖拖力50t。

1.7定员

高级船员2人

船员12人

总和14人

1.5 speed and drag force and endurance bollard

1) trial speed: speed trials in the design conditions of section 13.5.

2) when the design draft service speed: section 12.5.

3) range: in the service speed section 12.5, the radius of about 3000 nm.

4) bollard pull force: the host maximum continuous power, is towing bitt drag 67t, 50 t'd drag drag force.

1.6 capacity

Officers: 2p

The crew: 12p

The sum of the:14p

2.船体结构The hull structure

2.1总述

结构施工按船级社认可的图纸和船厂工艺标准惯例执行。

钢结构,包括铸、锻件制造时均应经过船级社的认可,并确认达到船级社要求的质量。全部船体结构焊接采用手工电弧焊或自动焊和CO2气体保护焊。

所有结构尺寸均按规范要求。如超过船级社要求的特殊加强,如材料等的厚度都按船东的要求执行。

为方便船厂工人出入或通风,可在船体,舱壁和必要处开出入孔,并在施工完毕后复原。

各分段整形需在胎架完成后,方可以吊装合拢。

2.1 an overview

Structure construction according to the classification society approved drawings and shipyard technology standard practice.

Steel structure, including casting, forging shall be approved by the classification society of manufacturing, quality and confirm that meet the requirements of classification society. All the hull structure welded by manual arc welding and automatic welding and CO2 gas shielded welding.

All dimensions are according to the specification requirements. Such as more than the requirements of the classification society special strengthen, such as the thickness of the material are carried out according to the requirement of the shipowner.

For the convenience of shipyard workers in and out or ventilation, can in the hull, bulkheads and necessary open access hole, and after the completion of the construction.

After completion of each section plastic should be in the jig, can hoisting fold.

2.2龙骨

平板龙骨与船体和首柱光顺过渡。

2.3艏柱

艏柱为钢板制造圆弧形前缘,与船体线型光顺连接,并与船体板和龙骨板焊接。

2.4底部结构

在机舱和住舱部分设水密或油密双层底,如总布置图所示。燃油舱由中桁材分成左、右舱。

2.5肋骨

船体基本结构为横骨架式,全船肋骨间距均为500mm, 基本上每隔3个或4个肋位设一道强肋骨。每道肋位均设肋板。甲板室结构为横骨架式。

2.6甲板横梁

甲板结构主要是由甲板纵桁支持的横骨架式,所有甲板板为平焊对接。上甲板在锚机、拖桩等需要处进行加强,甲板大开口角隅为圆弧形,并采用复板加强。

2.2 the keel

Flat keel and hull and stem smooth transition.

2.3 stem

Stem for steel manufacturing circular leading edge, connected to the hull lines fairing, and hull plate and keel plate welding.

2.4 at the bottom of the structure

In the engine room and accommodation part have watertight or oil tight double bottom, as shown in general arrangement plan. Fuel oil tank by girder is divided into left and right in the tank.

2.5 the ribs

Hull structure is transverse frame type, the whole ship frame spacing is 500 mm, basically every three or four bits set a strong ribs. Each floor are set a floor. House is transverse frame type structure.

2.6 deck beams

Main deck structure is supported by the deck longitudinal transverse framing, all deck plate of flat welding butt. On deck in need such as windlass, drag the pile for strengthening, large deck opening corner corner of circular arc form, and USES the double plate.

2.7支柱和纵桁

按该类船舶的要求设置纵桁。在机舱和船员舱等需要处设支柱。

2.8舱壁

四道水密横仓壁直至上甲板,横舱壁为平板式焊接结构,其上设有垂直扶强材。

另外如总布置所示的厨房、浴室、厕所、机舱棚和贮物间的围壁,均为设有垂直扶强材的平面焊接结构。

2.9基座

主付机推进装置和甲板机械底座为焊接结构,布置在机舱或甲板上,底座以支柱或撑板等适当加强,防止产生过度震动。

2.10舷墙

舷墙由每隔一档肋位设置的折边肘板支承。舷墙在导缆孔,导缆钳等有开口处作局部加强。舷墙在船中部的高度约700mm,在艏部约1000mm。

2.11锚链舱

锚链舱位置如总布置图所示,有足够空间收藏船级社要求的锚链,每根锚链在方便出入的地方安全固定并设可快速释放装置。

锚链舱在船员舱一边和底板设置50mm厚的硬杂木木铺板。

2.7 pillar and girder

According to the requirements of the ship set girder. In the cabin and crew module to a pillar.

2.8 bulkhead

Four watertight wall cross storehouse until the upper deck, transverse bulkhead for plate type welded structure, it is equipped with vertical stiffeners.

In addition as shown in the layout of the kitchen, bathroom, toilet, engine casing, and lay aside content between the walls, are equipped with vertical stiffener plane welding structure.

2.9 the base

Main propulsion machinery and deck machinery base pay machine for welding structure, decorate in the engine room or deck, base to support or brace plate such as strengthening appropriately, prevent excessive vibration.

2.10 the bulwark

Bulwark by every one rib setting of folding bracket support. Bulwark in chock, chock have openings for local reinforcement, etc. Bulwark at waist height of about 700 mm, about 1000 mm in the stem department.

2.11 chain locker

Chain locker location as shown in general arrangement plan, there is enough space to collect the requirements of the classification society chain, each chain where convenient access security fixes and set a quick release device.

Chain locker in the crew compartment side and bottom set 50 mm thick hard miscellaneous mywood planking.

2.12舭龙骨

舭龙骨约300mm宽,布置在船舯部33%船长范围内的两侧舭部,舭龙骨为单板带圆钢缘结构,焊在船体外板的复板上,两端逐步削尖过渡。

2.13海水吸水箱

海水门比其周围的船体板加厚2mm。海底门的开口处以覆板加强。

海底门提供压缩空气管,吹除海底门污物。

2.14分水踵

分水踵为箱形,钢板焊接结构,其上部与平板龙骨紧密结合,分水踵内设加强筋,与船体相接处加设复板。焊接完全结束后,应进行气密试验,确保水密,并加设放水塞。

2.15甲板室

甲板室为钢质结构且有扶强材加强,间距约为500mm。

2.16钢质护舷

本船设置两道半圆管形钢质护舷,尾部加设护下侧护舷,如总布置图所示。钢质护舷的尺寸为1/2φ245mm无缝钢管,壁厚为12mm。

2.12 the bilge keel

Bilge keel of about 300 mm wide, decorate in the both sides of the ship captain midship section 33% within the scope of bilge, bilge keel of veneer tape round steel structure, welding on the plate of ship hull plate, gradually sharpening transition at both ends.

2.13 the sea chest

The water gate than its hull plate thickening around 2 mm. Submarine gate opening a plate to strengthen.

Submarine gate to provide compressed air pipe, sewage blowdown bottom door.

2.14 water heel

Water heel for box, steel plate welded structure, the upper closely integrated with the flat keel, water heel with stiffener, and set up thru hull plate. After the welding completely, should be air tight test, ensure watertight, set up and drain plug.

2.15 deckhouse

Deckhouse for steel structure with stiffeners enhance, distance is about 500 mm.

2.16 steel fender

This vessel set two semicircle tubular steel fender, adding tail down side fender, as shown in general arrangement plan. The size of the steel fender to 1/2 phi 245 mm seamless steel pipe, wall thickness is 12 mm.

3.船舶设备The Marine equipment

3.1航海设备

1)航海用品

2个7×50双筒望远镜(其中1个能夜视)

1个无液气压表

1个空气温度计

1个水温计

2个测深锤(3.2kg,46m 线长)

1个秒表

2个150mm摆幅的倾斜仪

8个船用钟(船长室、轮机长室、船员仓、餐厅、驾驶室和监控室)

绘图仪(16付)1套

1个海图刷

4个包有皮革的海图压铁

1个平行尺

2个放大镜

1个铜质量角器

1个三棱比例尺

三角板360mm1付

3.1 navigation equipment

1) Marine supplies

2 7 x50 binocular telescope (one night)

An aneroid barometer

1 air thermometer

A thermometer

2 lead (3.2 kg, 46 m line length)

A stopwatch

Two 150 mm swing inclinometer

Eight Marine clock (master room, chief engineer room, crew, restaurant, bridge and control room)

1 set of plotter (16)

A chart to brush

4 bags with leather chart of the weight

A parallel rule

2 a magnifying glass

A copper protractor

A triangular scale

Triangle 360 mm1 pay

2)信号设备

提供以下信号设备

3只直径为600mm网状黑球(锚球)

1只Φ300mm船用钟

2个棱形网状黑球(风球)

其他信号灯,见电气部分说明书。

3)旗

本船提供以下所列旗帜:

1套国际信号旗(4号),2面4号国旗,2面5号国旗,1套语言旗,旗绳(棉拉绳)100m。

2) signal equipment

Provide the following signal equipment

Three mesh black ball diameter of 600 mm (anchor)

1 only 300 mm Φ Marine clock

Two prismatic mesh black ball (wind)

Other lights, see the electrical part of the specification.

3) flag

The ship provide flags listed in the following:

1 set of international flag (4), 2, 4 flag,

2 5, flag, flag, 1 set of language halyard (cotton rope) 100 m.

3.2甲板机械deck machinery

1)概述

甲板机械的布置如总布置图所示。

锚机和绞车为液压马达驱动。液压马达的驱动依靠机舱内的液压电动装置。

锚机和绞车不同时操纵。机械材料依据船级社要求及制造者的标准

2)锚机:

型号:液压马达驱动,带2个锚链轮,1个卷筒及2个绞缆轮。

台数:1台

锚链轮待定

载荷×进速:4t x 10m/min

锚及锚链直径: 780kg×Φ26mm

离合器:手动爪形离合器

控制:锚机旁和驾驶室遥控

拖索卷筒:4t x 20m/min / 1t x 60m/min

拖索直径×长度: Φ130mm×120mm丙纶索

制动力:80t

控制:机旁控制

形式:液压式

3)液压动力装置

在机舱里装有一套锚机和绞盘的液压动力装置。

1) overview

Deck machinery layout as shown in general arrangement plan.

Windlass and winch hydraulic motor drive. Rely on hydraulic motor driver cabin hydraulic electric equipment.

Windlass and winch control at the same time. Mechanical materials according to the classification society requirements and maker's standard

2) anchor machine:

Model: hydraulic motor drive, with two chain wheel, one reel and two warping wheel.

Number: 1

Chain wheel to be determined

Load xSpeed: 4 t x 10 m/min

Anchor and anchor diameter: 780 kg x Φ 26 mm

Clutch: manual claw clutch

Control: windlass and bridge near the remote control

Drum: 4 t x 20 m/min / 1 t x 60 m/min

Tow rope diameter x length: Φ 130 mm x 120 mm polypropylene rope

Braking: 80 t

Control: the machine control

Format: hydraulic

3) hydraulic power unit

In the engine room is filled with a set of windlass and winch hydraulic power plant.

3.3.系泊设备

带缆桩,导缆钳,导缆孔等系泊设备的布置如总布置图所示。带缆桩和带缆孔外包3mm厚不锈钢板。

详细系泊设备列如下:

3.3 mooring equipment

Bollard, chock, chock, mooring equipment layout as shown in general arrangement plan. Bollard outsourcing and mooring hole 3 mm thick stainless steel plate.

Mooring equipment listed in detail as follows:

3.4拖索承梁

拖索承梁安装在主甲板上,其位置如总布置图所示。拖索承梁为钢制的,并留活动通道。

3.4 drag SuoChengLiang

Drag SuoChengLiang installed on the main deck, its position as shown in general arrangement plan. Drag SuoChengLiang for steel and stay active channels.

3.5锚、锚链、系泊缆

锚、锚链和系泊缆的配备依据船级社的要求详细情况如下所示:

短杆霍尔艏锚2个,每个重780kg;

艏锚链,焊接式(2级),直径为24mm,长330m。左锚链长165米,右锚链长165米;

丙纶缆绳4根,直径为60mm,每根长120米;

3根Φ130mm×120m的丙纶高强长丝拖缆,其中一根备用;

每节锚链含联接节为27.5米;

锚机链轮前部各安装CB*286-84的闸刀掣链器一只,规格为26-28。

3.6锚链管

一对钢板焊接而成带铸钢锚唇的锚链管安装在船艏部,在船壳端带锚唇,在甲板凸缘处装有覆板。

3.5 the anchor, anchor and mooring line

Anchor, anchor and mooring line equipped with details according to the requirements of the classification society as shown below:

Fore anchor rod hall 2, each weighing 780 kg;

Fore chain, welded (level 2), 24 mm diameter, 330 m long. Left chain length 165 meters, the right chain is 165 meters long;

Polypropylene rope 4 root, diameter of 60 mm, every 120 meters long;

3 root Φ 130 mm x 120 m of polypropylene high strength filament tow rope, one standby;

Each chain including the connecting section is 27.5 meters;

Windlass front sprocket knife switch of each installation CB * 286-286 a chain device, specification of 26 to 28.

3.6 the hawse pipe

A pair of steel plate welded together with cast steel anchor lip chain pipe installation in the ship

stem section on the hull side with anchor lip, with a plate on the flange of the deck.

3.7护舷

在船艏、船艉和两舷设置圆柱形空心的橡胶护舷,材料选用优质天然橡胶,如总布置图所示:

3.7 fender

On both sides of the ship bow and stern and set the hollow cylindrical rubber fender, material selection of high quality natural rubber, as shown in general arrangement plan:

按总布置图所示安装旧的进口飞机轮胎护舷(直径约1.1米和1.4米)46个,并且用Φ16镀锌链条悬挂。

3.8雷达桅

一个钢制的雷达桅安装在航海甲板后部船舯处,雷达桅上装有桅灯、拖带灯、号笛、信号灯、踏步等。

3.9烟囱

本船主、付机的排烟管通向尾封板。

3.10舱口盖、人孔

艏部锚链舱和帆缆舱及舵桨舱各设一个B630×630翼形夹扣的风雨密舱口盖。舱口围板的高度、厚度及结构依据规范要求。

油密或水密人孔通过螺栓和螺母固定在舱壁上。人孔盖规格为B400mm×500mm(GB11628-89)。

3.11栏杆及罩

商品混凝土投标书(完整资料).doc

砼商 【最新整理,下载后即可编辑】 北京阜外医院齐鲁分院综合楼 商品混凝土 商 务 标 书 笑嘻嘻笑嘻嘻小有限公司 二○一一年八月二十六日 (副本) 投标书 致:北京阜外医院齐鲁分院综合楼项目部: 一、在研究贵方招标文件和考察施工现场后,我们愿以合理的价格、优惠的条件和良好的服务,遵照招标文件的各项要求,承担北京阜外医院齐鲁医院综合楼的商品混凝土材料的供应。

二、我们同意在规定的开标之日起30 天的投标书有效期,严格遵守本投标书的各项承诺。在此期限届满之前,本投标书始终对我方具有约束力。 三、合同正式签署生效之前,本投标书连同你单位的中标通知书将构成我们双方之间共同遵守的文件,对双方具有约束力。 四、我们理解你单位不一定接受最低报价的投标书或你单位接到的其他任何投标书。同时也理解,你单位不负担我们的任何投标费用。 五、如果你单位接受我们的投标,我们将采取可靠、有力的组织措施和保证手段,确保全面履行我们承诺的各项义务。 六、我们在此声明:投标书中所提交的文件和资料在各方面都是完整、真实和准确的,并对此负法律责任。 投标单位(名称)笑嘻嘻小小有限公司(盖章)

法定代表人或其授权人的代理人:(签字) 通信地址:XXXXXXXX 邮政编码:XXXXXXX 联系电话:XXXXXX 传真:XXXXXXXX 联系人:XXXX 手机:XXXXXXXXXXX 2011 年8 月26 日

商品混凝土报价清单 项目名称:北京阜外医院齐鲁分院综合楼 金额单位: 元 投标单位:(盖章XXXXX混凝土有限公司 法定代表人: 委托代理人:

日期:年月日

预拌混凝土实验室作业指导书要点

、水泥试验操作细则 (一)相关标准 (二)取样方法 1、 对同一水泥厂生产的同期出厂的同品种、同强度等级的水泥 ,以一次进厂(场)的同一 出 厂编号的水泥为一批。但一批的总量不得超过500t ?随机地从不少于3个车罐中各取等 量水泥,经搅拌均匀后,再从中取不少于12kg 水泥作为检验试样.把试样均匀分成两等 份,一份由实验室按标准进行试验,一份密圭寸贮存,以备复验用. 2、 对以进厂(场)的每批水泥,视在厂(场)存放情况,应重新采集试样复验其强度和安定性 存放期超过三个月的水泥,使用前必须进行复验,并按复验结果仲裁. (三)必试项目 1、水泥胶砂强度试验 (1)、材料 a 当水泥从取样至试验要保持 24h 以上时,应把它贮存在基本气密的容器里,容器应与 水泥不发生反应。 b. 标准砂应符合GB/T17671《水泥胶砂强度检验方法ISO 法》的质量要求。 c. 仲裁试验或其它重要试验用蒸馏水,其它试验可用饮用水。 (2)温、湿度 a 水泥试体成型试验温度为20 ±C ,相对湿度大于50%。水泥试样、标准砂、拌和水及 试摸的温度与室温相同。 b.养护箱温度为20±C ,相对湿度大于90%。养护水的温度为20±C (3)、试体成型 a. 成型前将试摸擦净,四周的模板与底座的接触面上应涂一些黄干油,紧密装配,防 止漏浆,内壁均匀刷一薄层机油。 b. 水泥与标准砂的重量比1: 3。水灰比为0.5。 c. 每成型三条试体需称量的材料及用量见下表: GB175-2007 GB/T 176-2008 GB/T 17671-1999 GB/T 1345-2005 GB/T 1346-2011 GB/T 12573-2008 JC/T 738-2004 GB/T 8074-2008 《通用硅酸盐水泥》; 《水泥化学分析方法》; 《水泥胶砂强度检验方法》; 《水泥细度检验方法(80um 筛筛分析)》; 《水泥标准稠度用水量、凝结时间、安定性检验方法》 《水泥取样方法》; 《水泥强度快速检验方法》; 《水泥比表面积测定方法 勃氏法》

混凝土制品项目计划书

混凝土制品项目 计划书 规划设计 / 投资分析

混凝土制品项目计划书说明 全行业仍然实现了15%左右的年增长率,远高于全国经济发展速度(2017年中国GDP预测增长6.7%),也高于建材行业大多数其他产业的发 展速度。全年泡沫混凝土总产量预计超过4000万m3,居全球第一位。 该混凝土项目计划总投资10577.56万元,其中:固定资产投资 8816.98万元,占项目总投资的83.36%;流动资金1760.58万元,占项目 总投资的16.64%。 达产年营业收入13235.00万元,总成本费用10447.04万元,税金及 附加172.53万元,利润总额2787.96万元,利税总额3345.04万元,税后 净利润2090.97万元,达产年纳税总额1254.07万元;达产年投资利润率26.36%,投资利税率31.62%,投资回报率19.77%,全部投资回收期6.56年,提供就业职位297个。 报告根据我国相关行业市场需求的变化趋势,分析投资项目项目产品 的发展前景,论证项目产品的国内外市场需求并确定项目的目标市场、价 格定位,以此分析市场风险,确定风险防范措施等。 ...... 报告主要内容:概论、背景、必要性分析、市场研究、投资建设方案、选址科学性分析、项目工程设计说明、工艺分析、环境保护和绿色生产、

项目安全卫生、风险性分析、项目节能概况、实施方案、项目投资计划方案、经济收益、评价结论等。 “十三五”规划纲要提出要“发展适用、经济、绿色、美观建筑,提 高建筑技术水平、安全标准和工程质量,推广装配式建筑和钢结构建筑”。2015年8月,工信部与住建部联合印发《促进绿色建材生产和应用行动方案》,提出“大力发展装配式混凝土建筑及构配件,引导构配件产业系列 化开发、规模化生产、配套化供应”。 MACRO 泓域咨询

商品混凝土招投标书

北京阜外医院齐鲁分院综合楼 商品混凝土 商 务 标 书 笑嘻嘻笑嘻嘻小有限公司 二○一一年八月二十六日 (副本)

投标书 致:北京阜外医院齐鲁分院综合楼项目部: 一、在研究贵方招标文件和考察施工现场后,我们愿以合理的价格、优惠的条件和良好的服务,遵照招标文件的各项要求,承担北京阜外医院齐鲁医院综合楼的商品混凝土材料的供应。 二、我们同意在规定的开标之日起 30 天的投标书有效期,严格遵守本投标书的各项承诺。在此期限届满之前,本投标书始终对我方具有约束力。 三、合同正式签署生效之前,本投标书连同你单位的中标通知书将构成我们双方之间共同遵守的文件,对双方具有约束力。 四、我们理解你单位不一定接受最低报价的投标书或你单位接到的其他任何投标书。同时也理解,你单位不负担我们的任何投标费用。

五、如果你单位接受我们的投标,我们将采取可靠、有力的组织措施和保证手段,确保全面履行我们承诺的各项义务。 六、我们在此声明:投标书中所提交的文件和资料在各方面都是完整、真实和准确的,并对此负法律责任。 投标单位(名称)笑嘻嘻小小有限公司(盖章) 法定代表人或其授权人的代理人:(签字) 通信地址: XXXXXXXX 邮政编码:XXXXXXX 联系电话: XXXXXX 传真:XXXXXXXX 联系人: XXXX 手机:XXXXXXXXXXX 2011 年 8 月 26 日

商品混凝土报价清单 项目名称:北京阜外医院齐鲁分院综合楼 金额单位: 元 投标单位:(盖章XXXXX 混凝土有限公司 法定代表人: 委托代理人: 日 期: 年 月 日 序号 规 格 单位 数量 单价(不含泵费) 单价(含泵费) 下浮比例(%) 使用部位 1 C40p8+UEA 立方米 1立方米 XXX XXX 3 基础部位 2 C45p8+UEA 立方米 1立方米 XXX XXX 3 基础部位 3 C50p8+UEA 立方米 1立方米 XXX XXX 3 基础部位 4 C40 立方米 1立方米 XXX XXX 3 1-2层 5 C45 立方米 1立方米 XXXX XXX 3 1-2层 备注:泵送剂-----型号:XXXXX------生产厂家:XXXXXXXXX ———质量标准:严格执行JC473-2001-----主要成分:脂肪乳类 合计人民币(大写):

预拌混凝土实验室作业指导书

预拌混凝土实验室作业指导 书

(此文档为Word 格式,下载后可以任意编辑修改!) 预拌混凝土实验室作业指导书 工程名称: 编制单位: 编制人: 审核人: 批准人: 编制日期:年月日 1

一、水泥试验操作细则 ( 一) 相关标准 GB175-2007 《通用硅酸盐水泥》; GB/T 176-2008 《水泥化学分析方法》; GB/T 17671-1999 《水泥胶砂强度检验方法》; GB/T 1345-2005 《水泥细度检验方法(80um筛筛分析) 》; GB/T 1346-2011 《水泥标准稠度用水量、凝结时间、安定性检验方法》; GB/T 12573-2008 《水泥取样方法》; JC/T 738-2004 《水泥强度快速检验方法》; GB/T 8074-2008 《水泥比表面积测定方法勃氏法》 ( 二) 取样方法 1、对同一水泥厂生产的同期出厂的同品种、同强度等级的水泥, 以一次进厂 ( 场) 的同一出厂编号的水泥为一批。但一批的总量不得超过500t. 随机地从不少于 3 个车罐中各取等量水泥, 经搅拌均匀后 , 再从中取不少于12kg 水泥作为检验试样 . 把试样均匀分成两等份, 一份由实验室按标准进行试验, 一份密封贮存 , 以备复验用. 2、对以进厂( 场) 的每批水泥 , 视在厂(场) 存放情况,应重新采集试样复验其 强度和安定性 . 存放期超过三个月的水泥, 使用前必须进行复验, 并按复验结果仲裁 . ( 三) 必试项目 1、水泥胶砂强度试验 2

(1)、材料 a. 当水泥从取样至试验要保持24h 以上时,应把它贮存在基本气密的容器 里,容器应与水泥不发生反应。 b. 标准砂应符合GB/T17671《水泥胶砂强度检验方法ISO 法》的质量要求。 c. 仲裁试验或其它重要试验用蒸馏水,其它试验可用饮用水。 (2)温、湿度 a. 水泥试体成型试验温度为20±2℃,相对湿度大于50%。水泥试样、标准 砂、拌和水及试摸的温度与室温相同。 b. 养护箱温度为20±1℃,相对湿度大于90%。养护水的温度为20±1℃ (3)、试体成型 a. 成型前将试摸擦净,四周的模板与底座的接触面上应涂一些黄干油,紧 密装配,防止漏浆,内壁均匀刷一薄层机油。 b. 水泥与标准砂的重量比1:3。水灰比为0.5 。 c. 每成型三条试体需称量的材料及用量见下表: 材料用量 水泥(g)450± 2 标准砂(g)1350± 5 拌合水(g)225± 1 a. 胶砂搅拌时先把水加入锅里,再加入水泥,把锅放在固定架上,上升至固定 位置,然后立即开动机器,低速搅拌30s 后,在第二个30s 开始的同时均匀地将砂子加入。当各级砂是分装时,从最粗粒级开始,依次将所需的每级砂 量加完。把机器转至高速再拌30s。停拌90s,在第一个15s 内用胶皮刮具将叶片和锅壁上的胶砂刮入中间,再高速搅拌60s。各个搅拌阶段,时间误 3

SM环网柜技术参数样本

SM6系列开关柜产品概述: SM6是可扩展模块组合式,金属密封开关柜系列产品。适用于工矿企业二 次变电站24KV 以下额定频率50HZ 的用户和配电站。可选用开关装置包括:负荷开关,FluarcSF1 SFset 或Evolis 断路器,Rollarc400或400D 接触器,隔离开关。本产品安全可靠应用组合方式多样满足客户不同的系统要求便于安装和操作故广泛应用中低压变电站,工矿配电站。 产品定义: S M 6 功能电气码额定电流额定电压短时耐受电流S M 6系 列 功能电气码: 1:IM, IMC, IMB, IMP:负荷开关进线,出线或连接柜 2:QM, QMC:熔断器+负荷开关柜 3:CRM:带熔断器的接触器柜 4:DM1-A, DM1-D, DM1-S:隔离开关+6FS 断路器柜 5:DMV:隔离开关+真空断路器柜 6:CM, CM2:电流互感器柜 7:GBC-A, GBC-B:电流电压计量柜 8:NSM-C:双电源进线柜 9:GBM:母线升高柜 10:GAM2:进线电缆连接柜 11:TM 站用变柜 使用环境: A 环境温度:上限+40℃,下限-5℃ B 海拔高度:不高于1000m, 如高于1000m 需降容使用。 C 日光直射:不允许日光直射 D 环境污染:无严重的灰尘,烟雾,腐蚀物质污染和易燃气体,蒸汽或盐雾

E 湿度:在24小时内的平均相对湿度不高于95% 在1个月内的平均相对湿度不高于90% 在24小时内的平均蒸汽压不超过2.2KPa 在1个月内的平均蒸汽压不超过1.8KPa 技术参数: 执行标准: 中国GB标准GB3906,GB/T 11022,GB 308 中国DL标准DL/T404,DL/593 国际标准IEC 62271-200,62271-1,62271-105,62271-100,62271-102,60255,60265 UTE标准NFC 13.100, 13.200,64.130,64.160 EDF标准HN64-S-41,64-S-43

项目环境管理计划书

一、工程概况 本工程位于江苏省无锡市太湖大道、长江北路与永乐东路交界处,为无锡金科财富商业广场B地块二期项目,包括三栋高层住宅(H=98.6m)G6#、G8#、G10#,以及配套裙房S06#(三层)、S10#(二层)和地库(一层),每栋高层均设两层地下室(约5.65m),纯地下室为一层,主楼为剪力墙结构,裙楼为框架结构,地下室建筑面积13653㎡,总建筑面积约60808㎡。 承接范围为土建基础工程、主体工程、外立面工程、安装及相关配套等工程。 二、环境方针和环境保护目标 1、环境管理方针 1.1项目部实行以“建设绿色环保工程,营造和谐发展环境”的方针。 1.2环境方针是项目部员工遵循的行为准则,也是我们对遵守环境法律法规,保护环境,预防污染,持续改进环境绩效的承诺,项目部将公司环境方针传达到所有为项目部工作或代表项目部工作的员工,使其认识各自的环境保护责任,增强做好环境保护工作的自觉性。 2、环境保护目标 2.1.为保护施工现场周边生活环境,防止污染和其它公害,“以人为本”,保障人体健康,根据《中华人民共和国环境保护法》及国家和地方相关的法律规定,制定施工现场环保措施。 2.2.环保保护目标:在工程施工期间,对噪声、废水和固体废弃物物进行全面控制,尽量减少这些污染排放所造成的影响。文明施工、保护当地水环境及周边植被不被破坏。 2.3.环境保护指标:在工程施工期间,对噪声、废水、废气和固体废气物的影响满足国家和当地有关法规的要求。 三、环境保护管理体系 1、环保体系 环保小组组长:顾伟东 环保小组副组长:霍胜、赵晓明 环保小组组员:段成刚、张开毅、李森、韩春林、杜学林、熊军、王凯、李海军 2、环境保护工作职责 2.1负责现场施工的项目副经理分管施工现场的环境保护工作。 2.2质安环保部负责检查、监督施工全过程的环保、水保工作和施工区、生活区的环境

商品混凝土的投标书

阜外医院齐鲁分院综合楼 商品混凝土 书 笑嘻嘻笑嘻嘻小 二o—年八月二十六日 (副本)

投标书 致:阜外医院齐鲁分院综合楼项目部: 一、在研究贵方招标文件和考察施工现场后,我们愿以合理的价格、优惠的条件和良好的服务,遵照招标文件的各项要求,承担阜外医院齐鲁医院综合楼的商品混凝土材料的供应。 二、我们同意在规定的开标之日起30 天的投标书有效期,严格遵守本投标书的各项承诺。在此期限届满之前,本投标书始终对我方具有约束力。 三、合同正式签署生效之前,本投标书连同你单位的中标通知书将构成我们双方之间共同遵守的文件,对双方具有约束力。 四、我们理解你单位不一定接受最低报价的投标书或你单位接到

的其他任何投标书。同时也理解,你单位不负担我们的任何投标费用 五、如果你单位接受我们的投标, 我们将采取可靠、有力的组织 措施和保证手段,确保全面履行我们承诺的各项义务。 六、 我们在此声明:投标书中所提交的文件和资料在各方面都是 完整、真 实和准确的,并对此负法律责任。 投标单位(名称)笑嘻嘻小小 (盖章) 法定代表人或其授权人的代理人: ________________________ (签字) 邮政编码:XXXXXXX 传 真:XXXXXXXX 手 机: XXXXXXXXXXX 年8 月26 日 通信地址: XXXXXXXX 联系:XXXXXX 联系人:XXXX 2011

商品混凝土报价清单 项目名称:阜外医院齐鲁分院综合楼 金额单位:元

投标单位:(盖章XXXXX 混凝土 法定代表人:_______________________________ 委托代理人:_______________________________ 日期:__________ 年_____ 月_____ 日

混凝土搅拌站操作人员作业指导书学习资料

混凝土搅拌站操作人员作业指导书 一、铲车 1、铲车作业场地应随时清理,保持场地整洁、堆码整齐。 2、铲取物料时,车速不得超过4km/h,不得高速猛撞料堆,并注意轮胎不得打滑。 3、工作后或修理保养时,应停放在平坦、安全的地方,并将铲斗落地。 4、服从生产管理和工作调动,遵守企业劳动纪律。工作当班时间内禁止饮酒,禁止擅离职守。严禁非操作人员操作铲车。 5、铲车下坡时严禁发动机熄火及挂空档滑行,铲斗举升后,禁止斗下站人,机器运转时,中绞接处严禁站人,车辆行驶时,观察四周不得有危险源。 6、在生产过程中,必须关注地材的变化,并在地材发生较大变化时立即告知技术部门相关人员。 7、认真执行有关噪声控制、废水排放和固体废弃物处置的规定,符合环保标准要求。 二、搅拌楼 1、操作者首先应详细学习配料机、混凝土搅拌机使用说明书,了解掌握机械结构及性能,熟悉安装调试、工作注意安全事项,懂得检查保养维修具体项目。使该机组能得到合理利用,保证生产质量及进度,发挥最好的经济效益。

2、操作作业前的准备工作: (1)施工场地平整,机械布局合理,基础要坚实稳固,安装后机械应保持水平。皮带轨道架不得歪扭错位。 (2)电源要正确连接,电器元件不允许有断线、松动、短路现象,控制开关应安全可靠。防止电器元件及电线受损,电机受潮。配电控制箱应装接地线。 (3)配料秤的调试应根据施工混凝土配比量,由工程技术人员和现场操作人员一同进行调试,确保混凝土的配比质量。 (4)检查水泵引水是否充足,泵水龙头是否有回漏水现象,管路是否畅通,泵水时间继电器系统是否准确可靠。混凝土配水量及配水时间(继电器控制)应有工程技术人员调试确定。 (5)检查各齿轮箱的油位和油质,如有不足时应添加,不清洁应更换。 (6)检查运输胶带及三角胶带,调整涨紧度,不得跑偏、打滑,切勿使砂石等落入运转部位。 (7)按搅拌站的性能准备合格的砂石骨料。 3、操作注意事项: (1)操作人员应精神集中,注意观察配料机是否正常,混凝土配比供水量是否合适,拌合机各部工作是否正常。 (2)皮带提升时,严禁在皮带下面站人,以免误伤。清理料坑

高压环网柜技术规格书

中铁城建集团第二工程有限公司物资集中采购招标文件 技术规格书 1.招标物资名称及技术要求 高压环网柜断路器技术条件 型式:一体化真空断路器、三相、单断口。配弹簧操作机构。 1.1额定参数 额定电压(即最高电压):12kV 额定电流: 进线及分断:630A; 额定短路开断电流: 进线及分断:25kA; 额定短路关合电流:63kA(峰值); 额定短时耐受电流: 进线及分断:25kA(4S) 额定峰值耐受电流:63kA; 额定绝缘水平: 雷电冲击耐压:75kV 工频耐压(1min):42kV; 卖方应提供开断小电感电流时的截流值、过电压值 1.2时间参量: 分闸时间:60ms;合闸时间:100ms; 1.3开断与关合工况 额定操作顺序:O-0.3S-CO-180S-CO; 首相开断系数:1.5; 失步开断电流: 进线及分段:25%×25kA; 失步开断恢复电压:2.5×12√3kV 额定电流开断次数:20000 额定容量短路开断电流次数:100 连续机械操作次数:20000 1.4真空灭弧室

中铁城建集团第二工程有限公司物资集中采购招标文件 允许储存期:20年 允许储存期内真空度:不低于6.6×10-2Pa 出厂时真空度:不得大于1.32×10-5Pa 动、静触头允许磨损厚度:2.5mm 1.5操动机构 断路器应采用由电动机储能的弹簧操动机构,电源采用交直流两用220。失去电源时,可以手动储能。 应提供机械手动合分闸装置,以便在失去控制电源时操作断路器。该手动装置应有防误动措施。所有控制设备,包括合分闸线圈,应采用正常工作电压为220的直流系统。 其操作电压范围: 合闸线圈80%~110% 分闸线圈65%~110% 跳闸线圈不应动作的电压≤30% 断路器应安装能显示断路器操作次数的计数器。该计数器与操作回路应无电气联系,且不影响断路器的合分闸操作。操动机构应有防跳跃装置。 2.投标人应提供的技术资料 合格证、产品质量检验证书。 3.合同交货计划 合同交货期参考《物资需求一览表》,详细交货计划和具体供货时间由买方签约时提供。 4.投标物资详细的运输和供应方案 (1)投标人交付的物资应分别按照合同要求交至指定的到货地点。 (2)投标人应充分考虑和了解施工地点的地理位置和运输条件,采用合适有效的运输和货物交付方式,制定保证工程所需物资按时、按量供应的具体措施。 5.验收要求 设备应进行进场验收,其规格、型号应符合设计要求,柜体应无锈蚀或机械损伤,供应商应提供设备的出厂合格证、检验报告、操作手册及操作手柄等工具。 6.质量保证期 自物资交货验收合格之日起【12】个月。

万立方商品混凝土搅拌站项目投资计划书

W O R D文档,可下载修改 目录 项目综述 第一章:总论 第二章:市场调查与研究 第三章:搅拌站原材料供应及其它资源分析第四章:建站规模与产品方案 第五章:建站选址 第六章:设备方案和工程方案 第七章:运输与辅助工程 第八章:节能与环保评价 第九章:组织管理与资源配置 第十章:建站实施计划 第十一章:投资预算 第十二章:融资方案 第十三章:财务评价与盈利能力分析 第十四章:研究结论与建议 第一章:总论

一、项目名称:湘西自治州“建强”45万m3/a商品混凝土搅拌站 二、可行性报告编制的依据 1、申请设立搅拌站的申请书及凤凰县领导及相关部门批示。 2、凤凰县中长期基本建设投资计划及国家、湖南省对商品混凝土的产业政策。 3、投资机会研究比选及凤凰县商品混凝土市场的调研与市场前景、市场份额分析。 4、在此可行性研究报告之前,已进行了初步可行性研究,初步可行性研究的研究结果表明,设立搅拌站是一个良好的投资项目。 三、项目提出的理由和过程 1、商品混凝土近十年来在我国发展十分迅速,连年来投资商品混凝土搅拌站效益可观,投资回报率大大超过了社会平均投资回报率。为了寻求最佳投资机会,我公司专门成立了筹备小组,认为投资搅拌站优于其它投资主要在于:投资回报率高,投资回收期短,市场风险小,市场前景好,可实现持续发展,商品混凝土属国家和地方鼓励发展行业,具有宽松的政府和市场环境。 2、从产业政策上,商品混凝土符合国家和湘西自治州技术政策和产业政策要求,符合保护环境、可持续发展的要求。 3、在建站可选区域方面,我们通过对商品混凝土推广普及较好的城市进行分析比较认为:湘西自治州凤凰县自从开始参与西部大开发建设以来,政府投资开发力度大,商品混凝土市场需求稳步上升的空间大,商品混凝土在凤凰县可持续发展的后劲强,能够获得良好的投资回报。

混凝土作业指导书

五、混凝土作业指导书 1. 编制目的 (1) 2. 编制依据 (1) 3. 适用范围 (1) 4. 施工准备 (1) 工序质量经验收合格 (1) 设备满足方案要求 (1) 供水供电及原材料的保证 (1) 5. 施工方法 (1) 6. 工艺流程 (2) 施工程序 (2) 明挖基础验槽 (2) 施工缝处理 (2) 模板工程 (2) 钢筋工程 (3) 混凝土工程 (3) 大体积混凝土 (9) 高温施工 (10) 冬季施工 (11) 7. 主要机具及设备 (11) 8. 劳动力组织 (11) 9. 质量标准及注意事项 (12) 质量控制要点 (12) 实体质量 (12) 缺陷处理 (12)

10. 安全措施 (14) 11. 文明环保措施 (14)

1. 编制目的 规范混凝土生产、运输、浇筑、养护等过程施工工艺,指导混凝土结构施工。 2. 编制依据 《混凝土结构设计规范》(GB 50010-2010) 《混凝土结构耐久性设计规范》(GB/T 50476-2008) 《建筑工程施工质量验收统一标准》(GB 50300-2001) 《地下铁道工程施工及验收规范》(GB 50299-1999 2003年版) 《地下防水工程质量验收规范》(GB 50208-2002) 《混凝土强度检验评定标准》(GB/T 50107-2010) 《混凝土质量控制标准》(GB 50164-2011) 《混凝土结构工程施工质量验收规范》(GB 50204-2002 2011版) 《混凝土耐久性检验评定标准》(JGJ/T 193-2009) 《铁路混凝土工程施工质量验收标准》(TB 10424-2010) 《铁路桥涵工程施工质量验收标准》(TB 10415-2003) 《大体积混凝土施工规范》(GB 50496-2009) 3. 适用范围 适用于各类现浇结构的普通混凝土施工,不适用于水下混凝土、喷射混凝土、特殊混凝土结构施工。 4. 施工准备 工序质量经验收合格 了解天气预报,避开不利于混凝土浇筑的天气,或准备好应急措施。浇筑前的检查包括明挖基础地基处理,模板、钢筋、预埋件安装质量,混凝土原材料质量,施工缝处理等,必须经过监理工程师检查合格后方可浇筑。 设备满足方案要求 检查机具种类、规格、数量是否符合本次浇筑要求,运转是否正常。 供水供电及原材料的保证

(新)高压环网柜技术规范书

目录 1.总则 2.引用标准 3.使用条件 4.技术参数 5.技术要求 6.附属设备技术参数及要求 7.质量保证及试验(监造) 8.供货商应提供的供货范围和技术文件 9.包装、运输 附录一供方投标文件要求 附录二买方提出的技术文件 附录三试验大纲 附录四售后服务 附录五备品备件及专用工具

1 总则 1.1 本设备技术规范书仅限于10kV户外共箱式交流高压环网柜。它提出了该设备的功能设计、结构、性能、安装和试验等方面的技术要求。 1.2 本设备技术规范书提出的是最低限度的技术要求,并未对一切技术细节作出规定,也未充分引述有关标准和规范的条文,卖方应提供符合或优于本规范书和工业标准的优质产品。 1.3 本设备技术规范书所使用的标准如遇与卖方所执行的标准不一致时,按较高标准执行。 1.4 本设备技术规范书经买、卖双方确认后作为订货合同的技术附件,与合同正文具有同等的法律效力。 1.5 本设备技术规范书未尽事宜,由买卖双方协商确定。 1.6 买方所指定产品厂家的元器件质量由卖方负责。 2 引用标准 户外环网柜各项技术指标应完全满足或更优于下列有关标准: 2.1 符合国际电工委员会IEC694、298、420、265、129、56、529标准。 2.2 符合有关国家标准。 GBll022-89 《高压开关设备通用技术条件》 GB1984-2003 《交流高压断路器》 GB/T16927.1-1997《高电压试验技术》 GB3906-1991 《3-35KV金属封闭开关设备》 GB763-1990 《交流高压电器在长期工作时的发热》 DL/T402-1999 《交流高压断路器订货技术条件》 DL/T593-1996 《高压开关设备的共用订货技术导则》

水泥混凝土项目计划书

水泥混凝土项目计划书 一、水泥混凝土项目背景 实干成就实力,趋势扩大优势。随着众多大项目、大企业的落户,台州制造业将提前走出困境,台州的产业前景非常美好。只要我们立足制造业这个转型升级的主战场,继续这样不遗余力地开拓进取,搭上第四次工业革命的“快车”,未来十年我市将基本形成有利于创业创新的制造业产业生态,制造业结构也更趋合理,制造业自主创新、质量效益、融合发展和绿色发展的水平将进一步提升,在全球产业分工和价值链中的地位也将进一步提升。正如企业家邱继宝所说,“先进制造业给台州一个机会,台州将还世界一个奇迹”。 二、项目名称及承办单位 (一)项目名称 项目名称:水泥混凝土生产制造项目。

(二)项目承办单位 承办单位名称:襄阳某某有限公司。 项目规划设计单位:泓域咨询机构 项目战略合作单位:某某集团、某某研究机构 三、项目建设选址及用地综述 (一)项目建设选址 本期工程项目选址在襄阳某工业园。 (二)项目建设地概况 襄阳,湖北省地级市,国家历史文化名城,楚文化、汉文化、三国文化的主要发源地,已有2800多年建制历史,历代为经济军事要地。素有“华夏第一城池”、“铁打的襄阳”、“兵家必争之地”之称。襄阳位于湖北省西北部,汉江中游平原腹地。襄阳因地处襄水之阳而得名,汉水穿城而过,分出南北两岸的襄阳、樊城隔江相望。两城历史上都是军事与商业重镇。1949年两城合并后称襄樊市;1983年襄阳地区并入地级襄樊市;2010年12月襄樊市更名为襄阳市。现辖3个区(襄州、襄城、樊城)、3个县级市(枣阳、宜城、老河口)、3个县(南漳、保康、谷城)和3

个开发区(襄阳高新技术产业开发区、襄阳经济技术开发区、襄阳鱼梁洲经济开发区),总面积1.97万平方公里,2016年全市实现地区生产总值3694.5亿元,居湖北第三。襄阳名胜古迹旅游以三国文化为主要特色,有隆中风景名胜区、襄阳城等著名景点,刘备“三顾茅庐”“《隆中对》”等故事就发生在这里。襄阳是湖北省域副中心城市和鄂西生态文化旅游圈中心城市。2013年襄阳入围首批国家智慧城市。2014年襄阳入围“信息惠民”国家试点城市。 (三)项目用地性质 本期工程项目计划在襄阳某工业园建设。 (四)项目用地规模 项目拟定建设区域属于工业项目建设占地规划区,建设区总用地面积61917.61平方米(折合约92.83亩),净用地面积61917.61平方米(红线范围折合约92.83亩),土地综合利用率100.00%;项目建设遵循“合理和集约用地”的原则,按照水泥混凝土行业生产规范和要求进行科学设计、合理布局,符合水泥混凝土制造和经营的规划建设要求。 (五)项目用地控制指标

商品混凝土的投标书完整版

商品混凝土的投标书 HEN system office room 【HEN16H-HENS2AHENS8Q8-HENH1688】

北京阜外医院齐鲁分院综合楼 商品混凝土 商 务 标 书 笑嘻嘻笑嘻嘻小有限公司 二○一一年八月二十六日 (副本) 投标书 致:北京阜外医院齐鲁分院综合楼项目部:

一、在研究贵方招标文件和考察施工现场后,我们愿以合理的价格、优惠的条件和良好的服务,遵照招标文件的各项要求,承担北京阜外医院齐鲁医院综合楼的商品混凝土材料的供应。 二、我们同意在规定的开标之日起 30 天的投标书有效期,严格遵守本投标书的各项承诺。在此期限届满之前,本投标书始终对我方具有约束力。 三、合同正式签署生效之前,本投标书连同你单位的中标通知书将构成我们双方之间共同遵守的文件,对双方具有约束力。 四、我们理解你单位不一定接受最低报价的投标书或你单位接到的其他任何投标书。同时也理解,你单位不负担我们的任何投标费用。

五、如果你单位接受我们的投标,我们将采取可靠、有力的组织措施和保证手段,确保全面履行我们承诺的各项义务。 六、我们在此声明:投标书中所提交的文件和资料在各方面都是完整、真实和准确的,并对此负法律责任。 投标单位(名称)笑嘻嘻小小有限公司(盖章) 法定代表人或其授权人的代理人: (签字) 通信地址: XXXXXXXX 邮政编码:XXXXXXX 联系电话: XXXXXX 传真:XXXXXXXX 联系人: XXXX 手机:XXXXXXXXXXX 2011 年 8 月 26 日 商品混凝土报价清单 项目名称:北京阜外医院齐鲁分院综合楼

《混凝土作业指导书》

新建郑州至焦作城际铁路工程HNCJS-NO.2标段 混凝土作业指导书 编制: 复核: 审批: 中铁七局集团有限公司郑州至焦作城际铁路工程项目经理部 2010年11月

混凝土作业指导书 1 目的 明确规定混凝土的拌合、运输、浇筑、振捣、养护、拆模的操作要点和相应的技术要求和工艺,以确保铁路混凝土工程达到耐久性设计要求。 2 编制依据 《客运专线高性能混凝土暂行技术条件》 《有耐久性设计要求的混凝土的配合比设计及生产、施工质量控制细则》 《铁路混凝土结构耐久性设计暂行规定》 《新建郑焦铁路HNCJ-NO.2标施工图设计文件》 3 适用范围 本作业指导书适用于新建郑焦铁路HNCJ-NO.2标大沙河特大桥、待王特大桥、DK59+767.700-DK69+341.090段结构用混凝土。 4、施工方法及工艺要求 4.1 施工准备 4.1.1 针对设计、施工工艺和施工环境条件特点等因素,制定严密的混凝土的施工组织设计,建立完善的施工质量保证体系和健全的施工质量检验制度,明确施工质量检验方法。 4.1.2 对设计文件进行复核,保证施工中采用的相关标准和技术指标正确无误。 4.1.3 对参建人员的资格、施工设备的完好性、原材料和配合比的适用性、

工艺方法的可行性、试验检验手段的科学性等进行复查,保证混凝土工程顺利施工。 4.1.4 混凝土用原材料产地、质量等级、类型等应与试验配合比用原材料一致。应特别注重原材料的质量稳定。选料时,应充分考虑供货厂家的质量管理制度是否健全,生产能力是否满足现场需要,并保持适度储备。 4.1.5 计量设备检查。对生产系统的各计量仪器设备进行计量监督和测试,确定合理的计量参数和计量精度,制定各项保证测量、试验以及施工工艺中各种测试数据准确性的计量措施。 4.1.6承墩台、梁体等重要混凝土结构施工前进行混凝土试浇筑和试养护,以便对混凝土配合比、施工工艺、施工机具以及养护工艺的适用性进行检验。 4.2 拌合 4.2.1骨料堆放场设施 (1)砂、石应有固定的储存地点并悬挂标识牌,标识牌至少应标明骨料产地、名称、规格、进场日期、代表数量和检验状态等。 (2)砂、石应有明确的堆放界限,砂、石或不同级配碎石间有可能产生混杂时应以砖墙或混凝土墙进行分隔。 (3)砂、石堆放应设置规范的厂棚,以达到必要的防晒、防雨和防尘等目的。 (4)砂、石堆场地面应以混凝土进行硬化处理,并设置不小于2%的排水坡度,每种骨料堆场均应设置排水沟。 (5)二级级配的碎石应分场堆放并加以标识。

混凝土项目商业计划书

混凝土项目 商业计划书 泓域咨询 规划设计/投资分析/产业运营

报告摘要 全行业仍然实现了15%左右的年增长率,远高于全国经济发展速度(2017年中国GDP预测增长6.7%),也高于建材行业大多数其他产业的发 展速度。全年泡沫混凝土总产量预计超过4000万m3,居全球第一位。 “十三五”规划纲要提出要“发展适用、经济、绿色、美观建筑,提 高建筑技术水平、安全标准和工程质量,推广装配式建筑和钢结构建筑”。2015年8月,工信部与住建部联合印发《促进绿色建材生产和应用行动方案》,提出“大力发展装配式混凝土建筑及构配件,引导构配件产业系列 化开发、规模化生产、配套化供应”。 该混凝土项目计划总投资8730.17万元,其中:固定资产投资7279.38万元,占项目总投资的83.38%;流动资金1450.79万元,占 项目总投资的16.62%。 达产年营业收入9693.00万元,净利润1585.12万元,达产年纳 税总额963.70万元;达产年投资利润率24.21%,投资利税率29.20%,投资回报率18.16%,全部投资回收期7.01年,提供就业职位151个。

混凝土项目商业计划书目录 第一章总论 第二章项目建设及必要性 第三章项目市场分析 第四章建设内容 第五章土建工程分析 第六章运营管理模式 第七章风险应对评估 第八章 SWOT分析 第九章进度方案 第十章项目投资情况 第十一章经济评价分析 第十二章项目总结、建议

第一章总论 一、项目名称及建设性质 (一)项目名称 混凝土项目 (二)项目建设性质 该项目属于新建项目,依托某某产业园良好的产业基础和创新氛围,充分发挥区位优势,全力打造以混凝土为核心的综合性产业基地,年产值可达10000.00万元。 二、项目承办单位 xxx有限公司 三、战略合作单位 xxx(集团)有限公司 四、项目建设背景 预拌混凝土是指由水泥、集料、水以及根据需要掺入的外加剂、矿物 掺合料等组分按一定比例,在搅拌站经计量、拌制后出售的并采用运输车,在规定时间内运至使用地点的混凝土拌合物。 混凝土是基本建筑材料,广泛运用于各种建筑物和构筑物。预拌混凝 土(或商品混凝土)是从施工建筑行业中分离出来的一个新兴行业,预拌

10kVSF6环网柜技术规范书

IEC-420 (1990)《高压交流负荷开关一熔断器组合电器》 GB11033《额定电压 26/35kV 及以下电力电缆附件基本技术要求》 IEC6052《额定电压 6?35kV 电缆附件试验报告》 3.使用环境条件 1.技术规范 1.总则 1.1 技术规范文件适用于 10kV SF6环网柜的设备订货招标 1.2 本技术文件提出的是最低限度的技术要求, 并未对一切技术细节作出规定, 述有关标准和规范的条文,供方应提供符合本文件和现在最新的国家标准的优质产品。 也未充分引 1.3 本技术文件所使用的标准及规定的条款如遇与投标方所执行的标准不一致时, 准执行。 按较高标 1.4 在合同签定后,我方有权因规范、标准规范等发生变化而提出补充要求。 2.应遵循的标准 按本招标书供货的设备,包括供货方由其它厂家外购的设备和附件都应符合下列标准的最 新版本。 2.1 GB4208-84 2.2 GB3906-92 (IEC529?76)《外壳防护等级的分类》 《3-35kV 交流金属封闭开关设备》 2.3 IEC-298 《交流金属封闭开关设备和控制设备》 2.4 2.5 GB-3804-90 ? 3-63kV 交流高压负荷开关》和 GB1985-89国家标准 2.6 GB11023-89 《高压开关设备六氟化硫气体密封试验导则》 2.7 GB3309-89 《高压开关常温下的机械试验》 2.8 GB2706-89 《交流高压电器动稳定试验方法》 2.9 GB311-83/683 《高压试验方法》 2.10 2.11

3.2 环境温度: -40 C ?40 C 3.3 最大日温差 :25C 3.4 海拔咼度: <1000m 3.5 抗震能力: 地震强度不超过8级 3.1 使用场所:户外

混凝土公司商业计划书

混凝土公司商业计划书前言 1 一、公司概述 2 1、公司简介 2 2、市场描述 2 3、管理团队 2 4、整体项目进度 3 二、市场、竞争分析 3 1、发展趋势 3 2、市场描述 6 3、国内外预拌混凝土产量走势 7 三、产品与服务 11 1、产品与服务 11 2、产品性能 11 3、价值评估 11 4、应用前景 11 5、未来规划 11 四、经营策略 12 1、营销计划 12 2、市场沟通 13 3、技术服务与支持 13 五、财务分析 13

1,主要财务假设 13 六、风险评估及对策 14 1、风险评估 14 2,解决方案 14 七、项目资金说明 15 1、资金需求量 15 2、拟出让股份 15 3、筹资用途 15 4、风险投资者权利 15 八、保险与法律事务 16 九、附录 16 背景 17 公司构架 18 1、公司性质 18 2、组织形式 18 3、部门职责及配置 18 参考文献 20 创业团体简介 21 前言 我们的现状混凝土是土木工程中用途最广、用量最大的一种材料,在我们的生活中无处不在。但混凝土的腐蚀是我们不得不面对的问题,比如混凝土的碳化就是一种常见形

式,大气中的二氧化碳不断向混凝土内部扩散,并与其中碱性水化物,主要为氢氧化钙发生反应的物理化学过程,碳化可使混凝土的PH降至10以下,从而影响到混凝土的功能。因此,降低成本并提高混凝土性能是我们亟待解决的。 我们的对策随着市场的持续增长,混凝土不仅仅要求量大而且其性能也越来越受到我们的关注,所以这需要我们来研究出新型混凝土并不断解决日益紧缺的问题。混凝土应以轻质高强作为发展的主攻方向,为改善混凝土的性能应采取一系列综合措施。如提高混凝土结构的强度,发展轻混凝土,发展改性混凝土,广泛使用外加剂、合理使用掺合料,逐步改造混凝土生产工艺,大力提高混凝土质量。加强基础理论研究:从宏观和微观两个方面进行混凝土各项性能的研究。配合混凝土力学对结构全过程分析的准确化,深化研究各种混凝土在各种受力情况下包括受复合应力时的全曲线研究,特别是连接-滑移全曲线研究,解决更合理和更准确的测试方法。总之研究新型混凝土将是我们的长久发展方向。 我们的蓝图我们认为:实现混凝土研究的科学化、产业化、规模化是必然趋势。它必然能为建筑行业的发展带来更多的契机和动力。我们创立的“衡岳混凝土有限责任公司”不仅仅局限于传统的混凝土,也将立足于高校科研背景,着眼于混凝土行业现状,专注于混凝土品种研发。我们相信,

商品混凝土招标文件

商品混凝土招标文件 商品混凝土采购 XXXX年XX月XX日 商品混凝土供应招标文件编号: XXXXX -X 一、招标人:XXXXXXX 二、招标内容: 2.1、工程名称:XXXXX 2.2工程地点:XXXXXXX 2.3、招标工程范围:XXXX1#、2#、2#、4#、5#楼的基础、主体、装饰所用混凝土。 2.4招标方式:邀请招标 2.4招标范围及相关要求: 本次招标的商砼范围包括:多个品种的商品砼~总计约为50000立方米。招标人提供的规格、数量~投标人可作为参考~但不作为最终数量。 2.5报价方式:按材料的品种、规格分别报出单价、并计算出合价和总价~如果单价总价不符~以单价为准~税前价和税后价要区分说明。报价表中所报价格为到达项目所在地落地价。 XX日~根据项目进度要2.6供货时间:材料计划供应进场日期~XXXX年XX月求~及时进场材料~不耽误工程进度施工。 2.7付款方式: 2.7.1 方式1:当供应商品砼数量达到10000 m3时~验收合格后7日内结算货款的80%。 2.7.2 方式2:投标人也可以提出对招标人更为有利的付款方式。

2.8施工要求:施工期间~每天都浇筑混凝土~要求材料供应商保证施工现场每天都有一台布料车~且施工期间~项目部会根据实际情况选用37米、42米、48米、56米布料车~材料供应商应保证能够随时提供以上型号布料车~以满足工地现场混凝土连续浇筑的施工要求。 三、投标人资格、资质文件和要求 1 .一级资质。 2 .设计生产能力在500m3/h及以上。 4.投标人在法律上和财务上独立并能合法运作~具有法人地位和独立订立合同的权力。 5.投标人在专业技术/设备设施/人员组织/业绩经验等方面具有设计/制造/质量控制/经营管理的相应的资格和能力。 第 2 页 商品混凝土供应招标文件编号: XXXXX -X 6. 投标人具有完善的质量保证体系及其质量认证证明。投标人具有良好的银行资信和商业信誉~没有处于被责令停业或破产状态~且资产未被重组/ 接管和冻结。且无重大违法或商业贿赂的行为发生。 四、投标文件的组成、要求、签署及份数。 ,一,投标文件的组成 1 企业简介 1.1 企业基本情况 填写投标人基本情况表,格式见附表2.1,~投标人须提供的证书~包括投标人将企业资质证书、营业执照、企业近三年来获得的信誉证书及材料质量证书等复印件~装入投标书内~开标后~如招标人需要时投标人应出示对应的原件。 2 投标人现有设备情况格式见附表2.2