General considerations
Offshore engineering is a branch of civil engineering involved with the construction of sea structures, far form the coast. Such structures are normally called platforms. They are usually employed in oil industry, but there are also platforms for broadcasting, navigational lighting, radar surveillance, space operations, oceanographic research and so on. The general design requirements for an offshore platform are similar to any industrial structure; the first step in the design is to develop a concept of the structure based on its functional requirements, environmental restraints and construction method. The function of an offshore platform is to provide a secure working support, so the platform must be structurally adequate to withstand both operational and environmental loading; in addition, it must be practical to construct and economically feasible. Nevertheless, due to their characteristics, to environmental and geographic aspects, to the construction procedures, offshore platforms are very peculiar structures, and several unusual aspects must be taken into account in its design phase: environmental loadings, construction phases, economic aspects, linked to the type, construction procedure and date and to the installation site.
9
Platform functions and types
During the last five decades, several types of offshore platforms haves been designed and used; this variety of platform types is due to different factors: technological and scientific progress, economical factors, need to exploit deeper natural reservoirs, ecological constraints. A possible, of course incomplete, classification is the following one.
steel jacket steel tower steel gravity concrete gravity free standing tower guyed tower spar tower TLP drilling ship Mobile offshore platforms semi-submersible jack up
10
rigid Fixed offshore platforms compliant

Platform functions and types
Fixed offshore platforms are normally used for production, while mobile platforms are almost exclusively used for exploration and drilling phases. The difference between fixed and compliant platforms is in the way they face environmental (namely wind and wave) lateral actions. As its name clearly indicates, a fixed platform is a traditional structure, in the sense that its deformation under lateral loads is small, but it is located into the sea water. Unlike fixed, compliant platforms are designed to move under lateral forces, so that the effects of these forces are mitigated. The trade-off in a compliant platform is between excursion amplitude and restraining force. Compliant platforms are used in deep water, where the stiffness of a fixed platform decreases while its cost increases, and they are the only technical solution in very deep waters (> 500 m). The fluid-structure interaction is a capital aspect in platform design, but it assumes a biggest role in the case of a compliant platform.
11
Platform functions and types
General scheme of offshore platforms in relation with water depth.
drilling ship semi-submersible jack-up jacket
TLP
12

Platform functions and types
Steel jacket: it is the most classical and widely used offshore platform. A typical jacket is shown in the figure. It is composed of three principal parts: the deck, carrying the topsides (living quarters, drilling derrick, consumables, facilities, helideck, flare etc.), the jacket itself and the foundation piles. Steel jackets are normally used in shallow to moderate deep waters (from 20 to 100 m), but they have been used up to 500 m of water.
13
Platform functions and types
If not too big, jackets are built in a dock and then charged onto a barge by a crane. Large jackets are built on one side, directly on a barge or on rails to be the skidded onto a barge. An important characteristic of a jacket is a small floatability: in fact, legs are not plugged, as they are the templates for the piles, and the braces are normally too small to ensure the necessary buoyancy. So, a barge is needed to carry them to the field, where the jacket is put into water by a crane, for small jackets, or directly skidded or rolled off the barge (launching operation) for large jackets.
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
14

Platform functions and types
In the first case, the design phase must take into consideration the lifting phase, while in the second cases a complete analysis of the launching phase must be done, in order to asses the transient stress distribution and to control the actual behaviour of the jacket during the transportation and the launching phases, namely if an additional buoyancy is needed and if the jacket touch the sea bottom during launching. Numerical investigations are normally used to simulate these phases, which considerably condition the design of a steel jacket. In the next pages, these phases are outlined.
15
Launching phases of a steel jacket.
https://www.360docs.net/doc/207382967.html,/album/126570186ZWQFUs
16
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types

Platform functions and types
Two pictures of a jacket installed by a crane and of the mating of a deck and a jacket.
https://www.360docs.net/doc/207382967.html,
17
Platform functions and types
The construction phases of a jacket. 1: construction in a coast yard; 2: transportation by barge on the oil field; 3: launching of the jacket.
https://www.360docs.net/doc/207382967.html,
1
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
3
2
18
https://www.360docs.net/doc/207382967.html,

Platform functions and types
Another characteristic of steel jackets is the foundation system: as previously said, piles are directly inserted into the legs and they directly support the deck. Sometimes, especially for larger platforms, additional skirt piles are necessary. Once the piles driven, they are grouted into the legs to join them to the platform. Once the piles installed and grouted, the deck is placed at the top of the jacket by a crane. Normally, all the installments and facilities are already installed onto the deck before its mating with the deck.
www.structurae.de
https://www.360docs.net/doc/207382967.html,
19
Platform functions and types
Steel tower: it is a large jacket where the piles cannot be inserted in the legs mainly for economical reasons. In fact, too long piles are too expensive. So, when the platform is located in deep waters, the jacket becomes very heavy and the piles cannot be as long as the legs. They become skirt piles inserted in sleeves around the outside of the legs. In this way, the legs are plugged and normally sufficient to ensure the buoyancy: the jacket does not need a barge to be carried on the site, as it floats (eventually with auxiliary buoyancy) and can be towed. This is very convenient both for economical and construction aspects. They exist tower structures installed in more than 400 m water depth.
20

Platform functions and types
Some relevant achievements of jacketed structures.
21
Platform functions and types
Steel gravity platforms: this type of structure, rarely used, uses its own weight to counter the lateral actions due to wind and waves that tend to overturn the platform: the weight is used as a stabilizing force. Nevertheless, the real reason for using gravity platforms is the nature of the soil: when it is of solid rock, it is impossible to drive piles into it, so the gravity solution is the only possible one. Normally, gravity platforms are concrete platforms, but in some cases a steel solution can be adopted, in relation with several factors, mainly economic considerations. Normally, the structure has a certain number of large tanks, flooded by water or by crude oil, to ballast the platform and provide the necessary weight to counter overturning lateral forces. These tanks, in the transportation phase, provide the necessary buoyancy. An important feature of all the gravity platforms is that they can be removed for demobilization or re-use.
22

Platform functions and types
The Maureen Alpha platform is a steel gravity platform with a weight of 112000 t, height of 241 m. It has been installed in 1983 in the North Sea; in 2001 it has been removed and replaced on another oil field.
www.tecnomare.it https://www.360docs.net/doc/207382967.html,
23
Platform functions and types
Loanga platform (Nigeria): it is a steel gravity platform, with inclined risers to optimize the exploitation of the field.
24

Platform functions and types
Concrete gravity platforms: they are the hugest and most impressive structures ever built. In this platforms, the steel structure supporting the deck is totally or partially replaced by a concrete structure of large dimensions.
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
25
Platform functions and types
Concrete gravity platforms are used when some particular circumstances are present:
economical factors: in some cases, the construction of a very large concrete structure can be cheaper than the construction of a steel structure; ecological factors: a concrete platform can be very huge, so as to concentrate onboard some industrial treatments of the crude and to allow a great stocking capacity in the ballast cells; construction conditions: the pile driving operation for a steel jacket needs usually 5 to 10 days; in the North Sea it is rare to have such a period of fine weather; the installation in the oil field of a concrete gravity platform, complete with its deck, requires a shorter period (1 to 2 days); decommissioning aspects: concrete gravity platforms can be decommissioned and eventually re-used; soil conditions: when the soil is made of rock it is impossible to drive piles into it: the gravity solution is then the only one possible; geographical conditions: the presence of calm and deep waters not far from the oil field is an important factor for the construction phases.
26

Platform functions and types
The above factors have often been determinant in the choice of this kind of platforms in the North Sea. Nevertheless, rather recently concrete gravity platforms have been commissioned in other parts of the world (East Russia, Philippines and so on). These structures can reach a height of 400 m and weigh more than 800000 t.
https://www.360docs.net/doc/207382967.html,
27
Platform functions and types
Source: https://www.360docs.net/doc/207382967.html,
28

Platform functions and types
Source: https://www.360docs.net/doc/207382967.html,
29
Platform functions and types
It is important to understand the construction phases of this kind of platforms: the fundamental aspect is the Archimedes' force. In fact, the concrete substructure is built onshore, in a dock under the sea level. Once the base is ready, the dock is flooded and the base floats; it is then towed in deeper but calm waters, where the construction of the substructure continues on the floating base.
https://www.360docs.net/doc/207382967.html,
30
https://www.360docs.net/doc/207382967.html,

Platform functions and types
Once the substructure ready, it is towed in sufficiently deep and calm waters (a fiord gives the optimal conditions) for the mating operation: the deck, carried by two barges with all the topsides, is mated to the concrete substructure just by an operation of ballasting and deballasting the concrete substructure with water. All these operations are outlined in the following scheme.
31
Platform functions and types
Malampaya concrete gravity platform (Philippines; the first concrete gravity platform in Asia): all the construction phases.
1. construction in a dock under the sea level
2. construction of the towers 3. flooding of the dock: the platforms is ready to be towed
32

Platform functions and types
4. towing of the concrete substructure
6. mating
5. ballasting of the concrete substructure
https://www.360docs.net/doc/207382967.html,
7. the final platform
33
Source: https://www.360docs.net/doc/207382967.html,
Platform functions and types
The disaster of Sleipner A: this platform produces oil and gas in the North Sea in a water depth of 82 m. The first concrete base structure for Sleipner A sprang a leak and sank under a controlled ballasting operation during preparation for deck mating in Gandsfjorden outside Stavanger, Norway on 23 August 1991. The loss was caused by a failure in a cell wall, resulting in a serious crack and a leakage that the pumps were not able to cope with. The wall failed as a result of a combination of a serious error in the finite element analysis and insufficient anchorage of the reinforcement in a critical zone. A better idea of what was involved can be obtained from the photos in the following page. The top deck weighs 57,000 t, and provides accommodation for about 200 people and support for drilling equipment weighing about 40,000 t. When the first model sank in August 1991, the crash caused a seismic event registering 3° on the Richter scale, and left nothing but a pile of debris at 220 m of depth. The failure involved a total economic loss of about $700 million.
34

The post accident investigation traced the error to inaccurate finite element approximation of the linear elastic model of the cells (using the popular finite element program NASTRAN). The shear stresses were underestimated by 47%, leading to insufficient design. In particular, certain concrete walls were not thick enough. More careful finite element analysis, made after the accident, predicted that failure would occur with this design at a depth of 62 m, which matches well with the actual occurrence at 65 m.
Source: https://www.360docs.net/doc/207382967.html,/~arnold/disasters/sleipner.html
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
35
Free standing towers: they are classical towers but so slender that their structural behavior is that of a compliant structure: large sway displacements and high oscillating period. Baldpate: the highest, freestanding compliant structure in the world. Characteristics:
water depth: 501 m; sway response cycle: 30 s; lateral displacement: 3 m; cross section: 42.6 x 42.6 m (bottom), 27.4 x 27.4 m (top); weight of the tower: 28900 t; weight of deck and topsides: 2700 t; foundation: 12 piles driven for 130 m.
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
36
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types

Guyed towers: these compliant platforms are composed by a slender jacket, normally pin-joined at its base, whose vertical stable position is ensured by the buoyancy of the structure itself and by a series of mooring catenary lines. The structure can oscillate under the lateral actions, the restoring force being provided by the buoyancy and the mooring lines. The clump weights provide additional restraining forces in case of storm, when they are lifted off the seafloor. These platforms are used for water depth in the range 200-600 m, and they can be re-used.
37
SPAR towers: these platforms are composed by a large steel tube as substructure directly supporting the deck and topsides. The tube is ballasted so as its floating stable equilibrium position is vertical (including topsides), and moored by tensioned risers and by mooring lines (catenaries). On the lateral surface of the large vertical cylinder there are helicoids, installed to counter vortex-shedding.
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html, 38
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types

TLP (Tension Leg Platforms): they are floating structures anchored to the seafloor by a series of vertical tendons (tethers) pretensioned by extra-buoyancy. The tethers are made by steel pipes. A TLP is composed by 4 principal parts: the foundation template, the tethers, the hull and the deck. Some TLPs (e. g. Heidrun) have a concrete hull. TLP are very large structures, able to host great payloads. So, they are used for great fields and can host some refining processes and have a good storage capacity. TLP can be used from 150 m of water depth on, and theoretically there is no limit of water depth for their use. The restoring force is given by extra buoyancy; this is obtained deballasting the TLP hull once the tethers installed. TLPs can be re-used.
https://www.360docs.net/doc/207382967.html,
39
The constructing phases of a TLP are similar to those of a concrete gravity platform, and are sketched in the figure.
a: construction of the hull in a dock; b: towing the hull to the mating site; c: towing the deck to the mating site; d: mating; e: tethers positioning; f: deballasting for tensioning the tethers.
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
40
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types

TLPs have known a wide diffusion all over the world in the last decade. The water depth, in 20 years, has been multiplied by a factor of ten.
Jolliet 536 12,2 55 x55 1950 4170 16602 Snorre 395 24,4 100 x 100 43700 30000 106000 Auger 872 22,6 87,6 x 103,1 21772 35380 66225 290610 Heidrun 345 24 110 x 110 water depth (m) diam. col. (m) column height (m) dimension (m) hull's weight (t) topsides weight (t) displacement (t)
1158 26 54 20321 26018 88450
https://www.360docs.net/doc/207382967.html,
Ursa
41
Some pictures of TLPs (source: Atlantia Offshore LTD).
Magnolia Heidrun
Marlin
Snorre
42
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types

Recently, a new TLP concept has been developed: it is that known as mini TLP. In this solution, only one column is present, just as in the case of spare towers. The column is anchored to the seafloor by pretensioned tethers that are fixed at the end of three pontoons at the bottom of the cylinder. These TLP have a less payload capacity, and are normally used for deep water small fields.
https://www.360docs.net/doc/207382967.html,
Drilling ships: like all the mobile systems, drilling ships are used mostly for the drilling phase, but they can be used, at least temporarily, also as FPS (Floating Production System). A drilling ship is, as its name indicates, a common ship equipped with a drilling system (a derrick tower). It is maintained in its position by a system of mooring catenaries, eventually assisted by servo-motors and GPS positioning.
https://www.360docs.net/doc/207382967.html,
44
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types
https://www.360docs.net/doc/207382967.html,
43
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types

https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
https://www.360docs.net/doc/207382967.html,
Semi-submersibles: as their name indicates, these are special ships, normally composed of two pontoons, some columns and a deck. The deck is equipped for all the drilling operations. A semi-submersible is a complete platform, that can navigate as it is furnished of motors. Once in place, its positioning is provided by a system of catenaries normally controlled by a GPS system. Recently a concrete semi-submersible has been constructed.
45
https://www.360docs.net/doc/207382967.html,/album/126570186ZWQFUs
https://www.360docs.net/doc/207382967.html,/photo/126570186
These legs can be lifted or lowered by motors. When the legs are lifted, the jack-up can navigate just as a common ship. Once arrived on the field, the jack-up lowers the legs so as to be fixed in the drilling place and it lifts itself at the right height above the sea level.
https://www.360docs.net/doc/207382967.html, https://www.360docs.net/doc/207382967.html,/photo/126570186
Jack-ups: these are special mobile platforms, normally used for the drilling operations. They are triangular barges, completely equipped for the drilling operations and disposing of three truss legs.
46
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types
Copyright P. Vannucci – UVSQ paolo.vannucci@meca.uvsq.fr
Platform functions and types

晶闸管

课堂教学安排 晶闸管的结构及性能特点 (一)普通晶闸管 普通晶闸管(SCR)是由PNPN四层半导体材料构成的三端半导体器件,三个引出端分另为阳极A、阴极K和门极G、图8-4是其电路图形符号。 普通晶闸管的阳极与阴极之间具有单向导电的性能,其内部可以等效为由一只PNP 晶闸管和一只NPN晶闸管组成的组合管,如图8-5所示。 当晶闸管反向连接(即A极接电源负端,K极接电源正端)时,无论门极G所加电压是什么极性,晶闸管均处于阻断状态。当晶闸管正向连接(即A极接电源正端,K极接电源负端)时,若门极G所加触发电压为负时,则晶闸管也不导通,只有其门极G 加上适当的正向触发电压时,晶闸管才能由阻断状态变为导通状态。此时,晶闸管阳极A极与阴极K极之间呈低阻导通状态,A、K极之间压降约为1V。 普通晶闸管受触发导通后,其门极G即使失去触发电压,只要阳极A和阴极K之间仍保持正向电压,晶闸管将维持低阻导通状态。只有把阳极A电压撤除或阳极A、阴极K

之间电压极性发生改变(如交流过零)时,普通晶闸管才由低阻导通状态转换为高阻阻断状态。普通晶闸管一旦阻断,即使其阳极A与阴极K之间又重新加上正向电压,仍需在门极G和阴极K之间重新加上正向触发电压后方可导通。 普通晶闸管的导通与阻断状态相当于开关的闭合和断开状态,用它可以制成无触点电子开关,去控制直流电源电路。 (二)双向晶闸管 双向晶闸管(TRIAC)是由NPNPN五层半导体材料构成的,相当于两只普通晶闸管反相并联,它也有三个电极,分别是主电极T1、主电极T2和门极G。图8-6是双向晶闸管的结构和等效电路,图8-7是其电路图形符号。 双向晶闸管可以双向导通,即门极加上正或负的触发电压,均能触发双向晶闸管正、反两个方向导通。图8-8是其触发状态。

钢结构图纸看图要点

1、基础布置图这个算基础预埋板和筋板重量。 2、平台布置图这个是主要的重量所在,比较好看懂,也比较好核算。 3、轴面结构布置图这个主要计算柱子和斜撑横拉等。 4、轴面檩条布置图这个主要算檩条长度,包括窗檩等;拉条一般也在这种图里,通常为圆钢算长度乘以理论重量就行。 5、屋面结构布置、檩条布置等主要计算门架梁等的重量 6、外封图这个主要计算外封面积。采购时按面积采购。 7、节点图这个算是最难算的了如果是想要精确差不多相当于拆了一次钢结构的图。主要算连接板、筋板等的重量。 8、这些重量出来后记得要乘以损耗系数基本就是预算了。 算了几年了一点经验,希望能帮到你,注意有些型材在图中可能重复出现了,要扣除,材料表没有有时只是设计人员忘了,需要你去核实是否需计算在内。 钢结构图纸符号代表含义及识图常识 GJ钢架 GL钢架梁或GJL钢架梁GZ钢架柱或GJZ钢架柱XG系杆 SC水平支撑YC隅撑 ZC柱间支撑LT檩条TL托梁QL 墙梁 GLT刚性檩条WLT屋脊檩条GXG刚性系杆YXB压型金属板SQZ山墙柱XT斜拉条MZ门边柱ML门上梁T拉条CG撑杆HJ桁架FHB复合板 YG:压杆或是圆管(从材料表中分别)XG:系杆LG:拉管QLG:墙拉管QCG:墙撑管GZL直拉条GXL 斜拉条 GJ30-1跨度为30m的门式刚架,编号为1号 1。算量最基本的就是看图纸,土建的人都烦钢构图纸的太乱,其实我也有这种看法,因为平法并没有用在其上面,图样还保留了一前土建制图的原则,所以做为老人看比较习惯(101图集出之前的人),后来像我这样人看钢结构图纸真的看不习惯,不过没有办法,还是要习惯的,我们知道麻烦,但任何事情都有规律的,钢结构的详图结点相当的多,但这些变化真的在算的时候影响相当的

TiO_2_蒙脱石纳米复合材料结构组装过程与表征_古朝建

第41卷第3期人工晶体学报 Vol.41No.32012年6月 JOURNAL OF SYNTHETIC CRYSTALS June ,2012 TiO 2/蒙脱石纳米复合材料结构组装过程与表征 古朝建1,2,彭同江2,孙红娟2 ,吕 霞2,罗利明 1,2 (1.西南科技大学材料科学与工程学院,绵阳621010;2.西南科技大学矿物材料及应用研究所,绵阳621010) 摘要:将氧化钛前驱体钛酸丁酯引入到不同用量十六烷基三甲基溴化铵(CTAB )柱撑蒙脱石的层间域中,经原位水解、脱羟、成核结晶作用制备TiO 2/蒙脱石纳米复合结构材料。采用X 射线衍射(XRD )分析手段对比研究了CTA +/蒙脱石、(Ti (OH )4/CTA +)/蒙脱石和TiO 2/蒙脱石复合结构,揭示了不同阶段样品层间物在蒙脱石层间域中的组装方式。在季铵盐用量不同情况下, CTA +/蒙脱石复合物和(Ti (OH )4/CTA +)/蒙脱石复合物中季铵盐阳离子的排布方式均出现单层平卧、单层倾斜和双层倾斜排布,但单层倾斜和双层倾斜排布的倾斜角度不同,在(Ti (OH )4/CTA +)/蒙脱石层间域中季铵盐阳离子仍起到骨架作用;TiO 2/蒙脱石复合材料中锐钛矿相含量随季铵盐用量的增加而增大,但锐钛矿晶粒的尺寸逐渐减小,蒙脱石层间域对锐钛矿相晶粒的长大和转化为金红石相都具有显著的阻滞作用。 关键词:TiO 2;蒙脱石;层间域;纳米复合结构;组装收稿日期:2012-01-18;修订日期:2012-03-08基金项目:国家自然科学基金(41072033);西南科技大学研究生创新基金(10ycjj08)资助项目作者简介:古朝建(1987-),男,四川省人,硕士研究生。E-mail :guchaojian2005@163.com 通讯作者:彭同江,教授,博士生导师。E- mail :tjpeng@swust.edu.cn 中图分类号:TB333 文献标识码:A 文章编号:1000- 985X (2012)03-0771-08Assembled Structure and Characterization of TiO 2/Montmorillonite Nano-composites GU Chao-jian 1,2,PENG Tong-jiang 2,SUN Hong-juan 2,LV Xia 2,LUO Li-ming 1,2 (1.Institute of Materials Science and Engineering ,Southwest University of Science and Technology ,Mianyang 621010,China ;2.Institute of Mineral Materials &Application ,Southwest University of Science and Technology ,Mianyang 621010,China ) (Received 18January 2012, accepted 8March 2012)Abstract :TiO 2/montmorillonite composites were prepared following in-situ hydrolyzing and thermal treatment route involves the hydrolysis of tetranbutyl titanate (TBT )and crystallization in the presence of organo-clays prepared from montmorillonite treated with different dosage of cetyltrimethyl ammonium bromide (CTAB ). All the resulting materials (CTA +/montmorillonite ,(Ti (OH )4/CTA +)/ montmorillonite and TiO 2/montmorillonite composites )were characterized contrastively by XRD.With different dosage of CTAB ,assembly mode of CTA +/montmorillonite and (Ti (OH )4/CTA +)/montmorillonite in the interlayer space of montmorillonite are both lateral-monolayer ,paraffin-type monolayer and paraffin-type bilayer ,the angle of inclination for paraffin-type monolayer and paraffin-type bilayer are different ,and cetyltrimethyl ammonium play a role of framework in the interlayer space of montmorillonite.The dosage of anatase in TiO 2/montmorillonite composites increases as the dosage of CTAB increasing ,but the size of anatase TiO 2dereases gradually.Interlayer space of montmorillonite could effectively inhibit the growth of anatase crystals and depress the phase transformation from anatase

s__plc实验报告

实验1 单容水箱液位调节阀控制 一、实验目的 了解液位控制的构成环节,调节阀的工作原理,熟悉上位机组态王的组态及通讯。通过实验,掌握PID参数整定。 二、实验要求 1.实验前需熟悉实验的设备装置以及管路构成。 2.熟悉仪表装置,如检测单元、控制单元、执行单元等。 3.以4:1标准衰减震荡作为指标,整定出最佳比例度、积分时间和微分时间。 三、实验设备及系统组成 1.实验设备 (1)水泵P102 (2)电动调节阀:工作电源24V AC,控制信号2—10VDC。 (3)液位传感器:量程为0—100%,输出信号4—20mA。 2.系统组成 单容下水箱液位PID控制流程图如图7.1所示。 图7.1 单容下水箱液位调节阀PID单回路控制 测点清单如表7.1所示。 水介质由泵P102从水箱V104中加压获得压力,经由调节阀FV101进入水箱V103,通过手阀QV-116回流至水箱V104而形成水循环;其中,水箱V103的液位由LT103测得,

用调节手阀QV-116的开启程度来模拟负载的大小。本例为定值自动调节系统,FV101为操纵变量,LT103为被控变量,采用PID调节来完成。 需要全打开的手阀:QV102、QV105 需要全关闭的手阀:QV103、QV104、QV107、QV109; 挡板开度:QV116 5mm。 四、控制器编程 1.创建新的项目 启动软件step7-V4.0,默认出现一个新项目窗口,选:文件>另存为,写入你的项目名称。我们这里“单回路PID”为项目名称。 在这个项目里为了实现PID控制功能,使用了一个子程序,它只在PLC第一次运行时调用一次,它的作用是初始化;使用一个中断程序,它每0.1秒调用一次,它的作用是PID 计算,每0.1秒采集一次数据,进行一次计算,输出一次控制信息。 2.建立通信 在第这个阶段,将建立计算机与PLC的通信。在每次打开step7软件时都要通信,否则是离线状态。 在安装软件时己经设置过串口通信参数,但是有时系统安装了别的软件需要更改参数和重新设置,如图4.2.1所示: 图4.2.1 step7中设置通讯参数 设置通讯参数如以下图4.2.2到4.2.5所示。

4章建筑结构图例与符号

第四章建筑结构图例及符号一、建筑结构制图图例

二、结构平面图应按下图的规定采用正投影法绘制,特殊情况下也可采用仰视投影绘制 用正投影法绘制预制楼板结构平面图 节点详图 三、桁架式结构的几何图可用单线图表示,杆件的轴线长度尺寸应标注在构件的上方

对称杆件几何尺寸标注方法 四、结构平面图中索引剖视详图、断面详图编号顺序表示方法 结构平面图中索引剖视详图、断面详图编号顺序表示方法 五、制图比例 在同一张图纸中,相同比例的各图样,应选用相同的线宽组。 绘图时根据图样的用途被绘物体的复杂程度,应选用表中的常用比例,特殊情

基础平面图 圈梁平面图,总图中管沟、 地下设施等 1:200;1:500 1:300 详图1:10;1:20;1:50 1:5;1:30;1:25 六、钢筋的一般表示方法 1、一般钢筋表示方法 序号名称图例说明 1 钢筋横断面 2 无弯钩的钢筋端部下图表示长、短钢筋投影重叠时,短钢筋的端部用45°斜画线表示 3 带半圆形弯钩的钢筋端部 4 带直钩的钢筋端部 5 带丝扣的钢筋端部 6 无弯钩的钢筋搭接 7 带半圆弯钩的钢筋搭接 8 带直钩的钢筋搭接 9 花篮螺钉钢筋接头 10 机械连接的钢筋接头用文字说明机械连接的方式2、预应力钢筋表示方法 序号名称图例 1 预应力钢筋或钢绞线 2 后弦法预应力钢筋段 面无粘结预应力钢筋 断面 3 预应力钢筋断面 4 张拉端锚具 5 固定端锚具

6 锚具的端视图 7 可动连接件 8 固定连接件 3、钢筋网片 序号名称图例 1 一片钢筋平面 图 2 一行相同的刚 筋网平面图 用文字注明焊接网或绑扎网片 4、普通钢筋种类、符号和强度标准值 5.钢筋配置表示法 序号说明图例 1 在结构平面图中配置双层钢筋时,底层钢 筋的弯钩应向上或向左,顶层钢筋的弯钩 则向下或向右 (底层)(顶层) 种类符号直径/mm 强度标准值/(N/mm2) 热扎钢筋HPB 235 (Q235)80~20 235 HRB 335 (20MnSi) 6~50 335 HRB 400 (20MnSiV、 20MnSiNb、 20MnTi) 6~50 400 RRB 400 (K20MnSi) R 8~40 400

(环境管理)重金属离子污染

重金属离子污染 水体重金属离子污染是指含有重金属离子的污染物进入水体对水体造成的污染。矿冶、机械制造、化工、电子、仪表等工业生产过程中产生的重金属废水(含有铬、镉、铜、汞、镍、锌等重金属离子)是对水体污染最严重和对人类危害最大的工业废水之一。废水中的重金属是各种常用水处理方法不能分解破坏的,而只能转移它们的存在位置和转变它们的物理化学状态。因此,重金属废水应当在产生地点就地处理,不同其他废水混合。如果用含有重金属离子的污泥和废水作为肥料和灌溉农田,会使土壤受污染,造成农作物中及进入水体后造成水生生物中重金属离子的富集,通过食物链对人体产生严重危害。 镉:自1995年起,居住在日本富山市神通川下游地区的一些农民得了一种奇怪的病。得病初期,患者只感到腰、背和手足等处关节疼痛,后来发展为神经痛。患者走起路来像鸭子一样摇摇摆摆,晚上睡在床上经常痛得直喊“痛……”因此这种病被称为“痛痛病”,又称为“骨痛病”。得了这种病,人的身高缩短,骨骼变形、易折,轻微活动,甚至咳嗽一声,都可能导致骨折。一些人痛不欲生,自杀身亡。经过调查,造成这种骨痛病的原因是神通川上游的炼锌厂长年累月排放含镉的废水,当地农民长期饮用受到镉污染的河水,并且食用此水灌溉生长的稻米,于是镉便通过食物链进入人体,在体内逐渐积聚,引起镉中毒,造成“骨痛病。 汞: 五十年代初期,在日本九州熊本县水俣镇,由于人食用受甲基汞毒害的鱼类而导致甲基汞中毒,导致中毒者283人,其中60人死亡。症状:口齿不清、步履不稳、面部痴呆进而耳聋眼瞎、全身麻木,最后精神失常,身体弯曲至死亡。其产生的原因是由于工厂生产氯乙烯和醋酸乙烯时采用氯化汞、硫酸、催化剂,把含有机汞的废水、废渣排入水俣湾,使鱼、贝壳类受污染。 锰: 四十多年前,日本有个村庄发生了一起可怕的集体“发疯”事件,有16个村民突然一起“发疯”了。这些“疯子”一会儿哭哭啼啼,一会儿又哈哈大笑;发作时两手乱摇,颤抖不止,而下肢发硬直,如此反复发作,直至“疯死”。这起集体“发疯”事件经多方研究调查,发现这些人喝的是同一口水井中的水,考察水井,又在旁边挖出了大量废旧、破烂的干电池。原来这是水井的水受干电池中某些有害成份污染而造成的。据环境科学研究表明,废旧干电池中的锌、二氧化锰等成分长期埋在地下,会

柱撑蒙脱石及其热处理产物孔性研究(1)

柱撑蒙脱石及其热处理产物孔性研究 作者:朱建喜, 何宏平, 杨丹, 郭九皋, 谢先德 作者单位:朱建喜(淅江大学西溪校区环境科学系,杭州,310028;中国科学院广州地球化学研究所,广州,510640), 何宏平,杨丹,郭九皋,谢先德(中国科学院广州地球化学研究所,广州,510640)刊名: 无机材料学报 英文刊名:JOURNAL OF INORGANIC MATERIALS 年,卷(期):2004,19(2) 被引用次数:7次 参考文献(8条) 1.戴劲草.肖子敬.吴宇航查看详情[期刊论文]-矿物学报 2001(03) 2.Pinnavaia T J查看详情 1983 3.Meier L P.Nueesch R.Madsen F T查看详情 2001 4.Wang Z.Pinnavaia T J查看详情 1998 5.Wu J H.Lerner M M查看详情 1993 6.Sun Kou M R.Mendioroz S.Munoz V查看详情 2000 7.Sychev M.Shubina T.Rozwadowski M查看详情 2000 8.Moreno S.Gutierrez E.Alvarez A查看详情 1997 相似文献(9条) 1.期刊论文甘学锋.Gan Xuefeng柱撑蒙脱石的制备研究-广东化工2009,36(7) 以山西某地膨润土为原料、Keggin离子作柱化剂,制备了柱撑蒙脱石,探讨了浆同含量、柱化剂用量、反应温度、反应时长和pH等因素的影响.将柱撑蒙脱石经过不同温度下煅烧,探讨了其热稳定性.结果表明,蒙脱石柱撑后层间距可增大至2.007 nm,柱化剂用量增大和加酸活化控制适宜pH有利于柱撑效果.柱撑蒙脱石在500℃煅烧后晶体层状结构保持完好. 2.期刊论文丛兴顺.CONG Xing-shun无机柱撑蒙脱石的柱化机理及应用研究进展-枣庄学院学报2007,24(5) 柱撑蒙脱石作为一种新型的多孔材料是当前矿物材料学研究的热点之一,其具有大的比表面积、大小可调的孔径、强的酸性而成为性能优异的吸附剂和催化剂,在石油化工和环保领域具有广阔的应用前景.本文概述了柱撑蒙脱石的制备、柱化机理及其应用等方面的研究进展,指出了柱撑蒙脱石研究中存在的问题(热稳定性,水热稳定性和孔结构等),报道了柱撑蒙脱石研究热点,论述了柱撑蒙脱石研究的发展方向. 3.期刊论文冯新.宋波.吴平霄.廖宗文柱撑蒙脱石改性磷铵及其增效机理研究-矿物岩石地球化学通报 2002,21(4) 本文通过Keggin离子制备了柱撑蒙脱石,并对其进行了酸化处理.盆栽试验研究表明,利用柱撑蒙脱石和酸化柱撑蒙脱石对磷酸二铵进行改性试验处理,生物量显著高于磷铵对照,氮素和磷素利用率显著提高.X射线衍射技术和红外光谱对改性磷铵进行结构研究表明,其晶体结构发生了较大的变化,这种变化减少了氮的损失和磷在土壤中的固定,从而提高磷铵氮磷的生物有效性. 4.学位论文钟钢铬铝基柱撑蒙脱石的制备及其表征2009 本论文对河南信阳钙基蒙脱石进行钠化改性,并利用离子交换法制备了铬铝基柱撑蒙脱石。采用X射线衍射分析、傅立叶变换红外光谱分析、热分析、氮吸附分析等手段对铬铝基柱撑蒙脱石进行了表征,研究了铬铝基柱撑蒙脱石的热稳定性,并对柱化剂离子的晶体结构进行了初步探讨。 本实验以(001)面间距d(001)值作为判断铬铝基柱撑蒙脱石柱撑效果的标准。选择了铬铝基柱撑蒙脱石的较佳制备工艺条件,即Cr/Al离子摩尔比为2:1、OH/(Cr+Al)离子摩尔比为2.0、(Cr+Al)/蒙脱石为10mmol/g、水浴温度为60℃、柱化剂和柱撑产物的老化时间都为48h。XRD分析结果表明:钠基蒙脱石的(001)面间距d(001)值从1.2726nm变成2.0535nm,说明聚合羟基铬铝复合离子已进入蒙脱石层间。傅立叶红外光谱分析结果表明:铬铝柱撑蒙脱石的基本结构在离子交换过程中并没有发生改变,三价铬离子倾向于以铬氧八面体的形式进入铬铝基柱撑蒙脱石层间。氮吸附分析结果表明:铬铝基柱撑蒙脱石的比表面积为170.4㎡/g、孔容为0.1841cm3/g、平均孔径为3.840nm,说明铬铝基柱撑蒙脱石具有较大的比表面积、较大的微孔和较小的介孔。 热分析结果表明:355℃处出现一个吸热谷,这一吸热谷对应着铬铝基柱撑蒙脱石层间柱化剂中的铝氧低聚体分解脱水;在477℃出现的吸热峰由铬铝基柱撑蒙脱石中羟基铬离子的脱羟基引起的。XRD分析结果表明:经过500℃热处理后,铬铝基柱撑蒙脱石的(001)层间距d(001)从2.0535nm为 1.7092nm。红外光谱分析结果表明:铬铝基柱撑蒙脱石经过500℃煅烧后,蒙脱石骨架[Si4O10]n与层间柱化剂离子之间发生了成键反应,形成了Si-O-Al或Si-O-Cr键合。 在铬铝柱化剂离子结构中,三价铬离子以铬氧八面体或畸形铬氧八面体的形式部分替代Keggin离子中铝氧八面体中三价铝离子的位置,并以类似聚合羟基硅铝的结构形式存在于蒙脱石层间。 5.期刊论文吴平霄.张惠芬.郭九皋.王辅亚.刘小勇.WU Ping-Xiao.ZHANG Hui-Fen.GUO Jiu-Gao.WANG Fu-Ya.LIU Xiao-Yong柱撑蒙脱石的微结构变化研究-无机材料学报1999,14(1) 制备了柱撑蒙脱石,并运用27Al核磁共振谱等技术对柱化溶液中的Al的状态进行了研究,运用X射线定向衍射技术、红外光谱、差热、热重分析及原子力显微镜等技术对柱化粘土中Keggin结构的作用及热稳定性进行了研究. 结果表明,AlCl3溶液在[OH-]/[Al3+]=2.4时水解生成的Keggin离子最多. 柱撑蒙脱石层间距在自然状态下为2.53nm,300℃灼烧后层间距稳定在1.83nm,具有较好的热稳定性. 6.期刊论文吴平霄无机插层蒙脱石功能材料的微结构变化研究-现代化工2003,23(7) 使用含Al3+的Keggen离子制备了无机插层柱撑蒙脱石,并运用27Al核磁共振谱等技术对柱化溶液中的Al的状态进行了研究,运用X射线定向衍射技术、

晶闸管的结构以及工作基本知识

一、晶闸管的基本结构 晶闸管(SemiconductorControlled Rectifier 简称SCR )是一种四层结构(PNPN )的大功率半导体器件,它同时又被称作可控整流器或可控硅元件。它有三个引出电极,即阳极(A )、阴极(K )和门极(G )。其符号表示法和器件剖面图如图1所示。 图1 符号表示法和器件剖面图 普通晶闸管是在N 型硅片中双向扩散P 型杂质(铝或硼),形成211P N P 结构,然后在2P 的大部分区域扩散N 型杂质(磷或锑)形成阴极,同时在2P 上引出门极,在1P 区域形成欧姆接触作为阳极。

图2、晶闸管载流子分布 二、晶闸管的伏安特性 晶闸管导通与关断两个状态是由阳极电压、阳极电流和门极电流共同决定的。通常用伏安特性曲线来描述它们之间的关系,如图3所示。

图3 晶闸管的伏安特性曲线 当晶闸管AK V 加正向电压时,1J 和3J 正偏,2J 反偏,外加电压几乎全部降落在2J 结上,2J 结起到阻断电流的作用。随着AK V 的增大,只要BO AK V V <,通过阳极电流A I 都很小,因而称此区域为正向阻断状态。当AK V 增大超过BO V 以后,阳极电流突然增大,特性曲线过负阻过程瞬间变到低电压、大电流状态。晶闸管流过由负载决定的通态电流T I ,器件压降为1V 左右,特性曲线CD 段对应的状态称为导通状态。通常将BO V 及其所对应的BO I 称之为正向转折电压和转折电流。晶闸管导通后能自身维持同态,从通态转换到断态,通常是不用门极信号而是由外部电路控制,即只有当电流小到称为维持电流H I 的某一临界值以下,器件才能被关断。 当晶闸管处于断态(BO AK V V <)时,如果使得门极相对于阴极为正,给门极通以电流G I ,那么晶闸管将在较低的电压下转折导通。转折电压BO V 以及转折电流BO I 都是G I 的函数,G I 越大,BO V 越小。如图3所示,晶闸管一旦导通后,即使去除门极信号,器件仍然然导通。 当晶闸管的阳极相对于阴极为负,只要RO AK V V <,A I 很小,且与G I 基本无关。但反向电压很大时(RO AK V V ≈),通过晶闸管的反向漏电流急剧增大,表现出晶闸管击穿,因此称RO V 为反向转折电压和转折电流。 三、晶闸管的静态特性 晶闸管共有3个PN 结,特性曲线可划分为(0~1)阻断区、(1~2)转折区、(2~3)负阻区及(3~4)导通区。如图5所示。

钢结构中构件符号代表含义及识图常识

钢结构中GJ\GL\GZ\XG\SC\YC\ZC\LT\GZL\GXL\CG代表含义 及识图常识 1

GJ钢架 GL钢架梁或GJL钢架梁 GZ钢架柱或GJZ钢架柱 XG系杆 SC水平支撑 YC隅撑 ZC柱间支撑 LT檩条 TL托梁 QL墙梁 GLT刚性檩条 WLT屋脊檩条 GXG刚性系杆 YXB压型金属板 SQZ山墙柱 XT斜拉条 MZ门边柱 ML门上梁 T拉条 CG撑杆 HJ桁架 FHB复合板 YG:压杆或是圆管(从材料表中分别) XG:系杆 LG:拉管 QLG:墙拉管 QCG:墙撑管 GZL直拉条 GXL斜拉条 GJ30-1跨度为30m的门式刚架,编号为1号 1。算量最基本的就是看图纸,土建的人都烦钢构图纸的太乱,其实我也有这种看法,因为平法并没有用在其上面,图样还保留了一前土建制图的原则,所以做为老人看比较习惯(101图集出之前的人),后来像我这样人看钢结构图纸真的看不习惯,不过没有办法,还是要习惯的,我们知道麻烦,但任何事情都有规律的,钢结构的详图结点相当的多,但这些变化真的在算的时候影响相当的小,重要是大的方向把握好,钢结构的结点图也是相当科学的,都和科学受力相对应。有许多是重复或对称等。认真的看都会看出来。对于图纸的特点,我会在下面讲

2。算重量,因为钢结构的算量基本上全是按吨计(板按M2)。钢材+钢材就是钢结构。而钢材多指型钢,对于型钢的分类算量的方法,我也会一一列出。并做出讲解。 3。统计汇总,哈哈,此类应该是不难的,以清单为基本,分类汇总而以了。 识图问路 1。我对钢结构的认识,应该比大家深一些,因为我毕业的时候就进了一家钢结构公司,工作不到两个月,经常的工作就是画一个图纸的钢构件,把这个钢构件看明白了,画出来,他们叫钢结构深化设计(细化方案)做加工所用,说白了,一张钢板怎么加工这样的东东的。我讲的图识别,其它就是03G102上面的东东,大家有机会可以去下载看一下。闲言碎语不多讲,说说吧,钢结构图应该怎么看不头痛。 把握好看图不难的原则,其实很简单,比建筑的施工简单多了,因为他每个部分都有详图,哪里不明白了,就看此图有没有什么详图符号,有就找,其实我看明白的地方不是详图的地方,拿出来与原图一对就明白了,是什么柱,是什么梁就明白了许多。 一.钢结构 1钢结构设计制图分为钢结构设计图和钢结构施工详图两阶段。 2钢结构设计图应由具有设计资质的设计单位完成,设计图的内容和深度应满足编制钢结构施工详图的要求;钢结构施工详图(即加工制作图)一般应由具有钢结构专项设计资质的加工制作单位完成,也可由具有该项资质的其他单位完成。 注:若设计合同未指明要求设计钢结构施工详图,则钢结构设计内容仅为钢结构设计图。 3钢结构设计图 1)设计说明:设计依据、荷载资料、项目类别、工程概况、所用钢材牌号和质量等级(必要时提出物理、力学性能和化学成份要求)及连接件的型号、规格、焊缝质量等级、防腐及防火措施; 2)基础平面及详图应表达钢柱与下部混凝土构件的连结构造详图; 3)结构平面(包括各层楼面、屋面)布置图应注明定位关系、标高、构件(可布置单线绘制)的位置及编号、节点详图索引号等;必要时应绘制檩条、墙梁布置图和关键剖面图;空间网架应绘制上、下弦杆和关键剖面图; 4)构件与节点详图 a)简单的钢梁、柱可用统一详图和列表法表示,注明构年钢材牌号、尺寸、规格、加劲肋做法,连接节点详图,施工、安装要求。 b)格构式梁、柱、支撑应绘出平、剖面(必要时加立面)、与定位尺寸、总尺寸、分尺寸、分尺寸、注明单构件型号、规格,组装节点和其他构件连接详图。 4钢结构施工详图

工业组态实验报告

西华大学实验报告(理工类) 开课学院及实验室:机械工程与自动化学院计算机机房 实验时间 : 年 月 日 一、实验目的 1、掌握组态软件监视窗口各种图形对象的编辑方法; 2、掌握组态软件各种动画连接的方法; 3、掌握组态软件中各种复杂图形对象的组态方法; 4、掌握实时数据库及历史参数的组态方法; 5、掌握自定义主菜单的定义及使用方法; 6、掌握用户组态及用户管理函数的使用的方法。 二、实验内容 1、建立如图1.1所示的反应釜监控窗口; 图1.1 反应釜液位监控主窗口

2、运行时,当按下开始按钮,首先将“入口阀门”打开(变为绿色)向反应釜注入液体;当反应釜内液体高度值大于等于100时则关闭“入口阀门”(变为黑色),而打开“出口阀门”(变为绿色),开始排放反应釜内液体,排放过程中,当液位高度值等于0时,则关闭“出口阀门”(变为黑色),重新打开“入口阀门”,如此周而复始地循环; 3、当按下停止按钮,则同时关闭“入口阀门”和“出口阀门”; 4、点击“实时趋势”按钮,则转入液位实时趋势窗口,如图1.2所示; 5、点击“历史趋势”按钮,则转入液位历史趋势窗口,如图1.3所示; 6、点击“报警处理”按钮,则转入液位报警处理窗口,如图1.4所示; 7、点击“退出系统”按钮,退出应用程序。 8、图1.2、1.3、1.4中的相应按钮同上面的说明,而按下“主窗口”按钮时则转入监控窗口,如图1.1所示; 9、图1.4中的“确认所有报警”按钮用于确认当前发生的所有报警。 图1.2 反应釜液位实时趋势窗口 图1.3 反应釜液位历史趋势窗口

图1.4 反应釜液位报警处理窗口 10、组态用户。 11、自定义主菜单,运行时如图1.5所示。 a)自定义主菜单之文件菜单b) 自定义主菜单之用户管理 图1.5 自定义主菜单 三、实验设备、仪器及材料 计算机、力控PcAuto 3.62或以上版本 四、实验步骤(按照实际操作过程) 1、绘制如图1.1所示监控窗口,并以“监控窗口”为名进行存盘;绘制如图1.2所示监控窗口,并以“实时趋势”为名进行存盘;绘制如图1.3所示监控窗口,并以“历史趋势”为名进行存盘;绘制如图1.4所示监控窗口,并以“报警处理”为名进行存盘。 2、实时数据库组态 在区域0定义模拟量I/O点level,数字量I/O点in_value、out_value、run如图1.6所示。 图1.6 实时数据库组态时定义的I/O点 3、定义I/O设备 选取PLC类别下的“仿真PLC”,定义名为“PLC”的I/O设备。

DCS实验报告.

华北电力大学 实验报告 实验名称基于DCS实验平台实现的 水箱液位控制系统综合设计课程名称计算机控制技术与系统 专业班级:自动实 1101学生姓名:潘浩 学号:201102030117成绩: 指导教师:刘延泉实验日期:2014/6/29

基于DCS实验平台实现的 水箱液位控制系统综合设计 一.实验目的 通过使用LN2000分散控制系统对水箱水位进行控制,熟悉掌握DCS控制系统基本设计过程。 二.实验设备 PCS过程控制实验装置; LN2000 DCS系统; 上位机(操作员站) 三.系统控制原理 采用DCS控制,将上水箱液位控制在设定高度。将液位信号输出给DCS,根据PID参数进行运算,输出信号给电动调节阀,由DDF电动阀来控制水泵的进水流量,从而达到控制设定液位基本恒定的目的。系统控制框图如下:

四.控制方案改进 可考虑在现有控制方案基础上,将给水增压泵流量信号引入作为导前微分或控制器输出前馈补偿信号。 五.操作员站监控画面组态 本设计要求设计关于上水箱水位的简单流程图画面(包含参数显示)、操作画面,并把有关的动态点同控制算法连接起来。 1.工艺流程画面组态 在LN2000上设计简单形象的流程图,并在图中能够显示需要监视的数据。 要求:界面上显示所有的测点数值(共4个),例如水位、开度、流量等;执行机构运行时为红色,停止时为绿色;阀门手动时为绿色,自动时为红色。

2.操作器画面组态 与SAMA图对应,需要设计的操作器包括增压泵及水箱水位控制DDF阀手操器: A.设备驱动器的组态过程: 添加启动、停止、确认按钮(启动时为红色,停止和确认时为绿色) 添加启停状态开关量显示(已启时为红色,已停时为绿色) B.M/A手操器的组态过程: PV(测量值)、SP(设定值)、OUT(输出值)的动态数据显示,标明单位,以上三个量的棒状图动态显示,设好最大填充值和最大值;手、自动按钮(手动时为1,显示绿色;自动时为0,显示红色),以及SP、OUT的增减按钮;SP(设定值)、OUT(输出值)的直接给值(用数字键盘)

晶闸管(可控硅)的结构与工作原理

一、晶闸管的基本结构 晶闸管(Semi co ndu cto rC ont roll ed Re ctifier 简称SCR)是一种四层结构(PNPN )的大功率半导体器件,它同时又被称作可控整流器或可控硅元件。它有三个引出电极,即阳极(A )、阴极(K)和门极(G)。其符号表示法和器件剖面图如图1所示。 图1 符号表示法和器件剖面图 普通晶闸管是在N 型硅片中双向扩散P型杂质(铝或硼),形成211P N P 结构,然后在2P 的大部分区域扩散N 型杂质(磷或锑)形成阴极,同时在2P 上引出门极,在1P 区域形成欧姆接触作为阳极。 图2、晶闸管载流子分布 二、晶闸管的伏安特性 晶闸管导通与关断两个状态是由阳极电压、阳极电流和门极电流共同决定

的。通常用伏安特性曲线来描述它们之间的关系,如图3所示。 图3 晶闸管的伏安特性曲线 当晶闸管AK V 加正向电压时,1J 和3J 正偏,2J 反偏,外加电压几乎全部降落在2J 结上,2J 结起到阻断电流的作用。随着AK V 的增大,只要BO AK V V <,通过阳极电流A I 都很小,因而称此区域为正向阻断状态。当AK V 增大超过BO V 以后,阳极电流突然增大,特性曲线过负阻过程瞬间变到低电压、大电流状态。晶闸管流过由负载决定的通态电流T I ,器件压降为1V左右,特性曲线CD段对应的状态称为导通状态。通常将BO V 及其所对应的BO I 称之为正向转折电压和转折电流。晶闸管导通后能自身维持同态,从通态转换到断态,通常是不用门极信号而是由外部电路控制,即只有当电流小到称为维持电流H I 的某一临界值以下,器件才能被关断。 当晶闸管处于断态(BO AK V V <)时,如果使得门极相对于阴极为正,给门极通以电流G I ,那么晶闸管将在较低的电压下转折导通。转折电压BO V 以及转折电流BO I 都是G I 的函数,G I 越大,BO V 越小。如图3所示,晶闸管一旦导通后,即使去除门极信号,器件仍然然导通。 当晶闸管的阳极相对于阴极为负,只要RO AK V V <, A I 很小,且与G I 基本无关。但反向电压很大时(RO AK V V ≈),通过晶闸管的反向漏电流急剧增大,表现出晶闸管击穿,因此称RO V 为反向转折电压和转折电流。

钢结构的符号表示法要点

钢结构的符号表示法 在钢结构工程中,不管是建造单层轻钢门式结构的厂房,还是网架工程,都要预先绘制出能够完整表达这些建筑物的图样,然后才能按此图样进行施工活动,这个图样就是建筑工程图,它是建筑工程上通用的技术语言。在钢结构工程中,为了把许多局部构造和施工要求表达清楚,往往对建筑的细部、零部件等用较大的比例画出来,这种图样就是施工详图。 对钢结构工程进行质量控制,就要首先对详图上的标注符号有一个明确的了解。 一、尺寸线与投影 1尺寸线的标注 钢结构详图的尺寸由尺寸线、尺寸界线、尺寸起止符号所组成。尺寸单位除标高以m为单位外,其余尺寸均以mm为单位,且尺寸标注时不再书写单位。钢结构构件详图中的尺寸线,一个构件基本上为三道尺寸线,由内向外依次是加工尺寸线、装配尺寸线和安装尺寸线,如图1。 图1构件详图的尺寸标注 但是当详图中构件图形相同,仅零件布置或构件长度不同时,也可用一个构件图形及多道尺寸线来表示1、2、3等多个构件,但最多不得超过5个。 当构件图形相同,仅零件布置或构件长度不同时,可用一个构件图形及多道尺寸线来表示A、B、C、D等多个构件,但是最多不能超过5个。 2符号及投影 在钢结构详图上,常用的符号主要有剖面符号、剖切符号、对称符号等,同时还有利用自然投影表示构件的上下位置及侧面的图形,如图2所示。

图2剖面剖切及投影 1—剖面符号2—剖切符号3—右侧投影4—上侧投影5—对称符号6—断开符号 在图2中,用粗实线表示构件主视图中无法看到或表达不清楚的截面形状及投影层次关系的符号则称为剖面符号,编号所用的字体应比详图中的数字粗大一号,如图2中的1。在图中,用粗线只表示剖切处的截面形状而不作投影的符号称作剖切符号,如图2中的2。图2中的5,因构件图形是中心对称的,所以只画出该图形的一半,并在其对称轴线上标注出的符号称为对称符号。 图3是一种连接符号。当构件B与构件A只有一端不相同时,则可在构件A图形上某一位置加旗号连接符号,再将构件B中与构件A不同的部位以连接 符号为基线绘出来,成为构件B。 图3连接符号 1—构件A2—连接符号3—构件B 二、焊缝符号表示法 1基本规定 (1)焊缝符号表示的准则 在制图时,焊缝符号的绘制方法,不是以焊缝的形式进行放大或缩小,而是以简便易行,能形象化地、清晰地表达出焊缝形式的特征为准则。根据这个准则,焊缝基本符号的画法主要是: 1)V形坡口、V形坡口的V形符号夹角一律为90°,与坡口的实际角度及根部间隙的大小无关; 2)单边形坡口焊缝符号的垂线一律在左侧,斜线或曲线在右侧,不随实际焊缝的位置状态而改变;3)角焊缝符号的垂线亦一律在左侧,斜线在右侧,与斜缝的实际状态无关。 (2)焊缝的指引线

铝基柱撑蒙脱石的国内外研究进展

铝基柱撑蒙脱石的国内外研究进展 翁国坚 汤德平 李香祁 刘荣添 (福州大学材料科学与工程学院,福州,350002) 摘 要 铝基柱撑蒙脱石作为一种新型的多孔材料是当前研究的热点之一,其具有大的比表面积、大小可调的孔径及强的化学活性而成为性能优异的吸附剂和催化剂,显示了其在石油化工 和环保等领域的应用潜力。全面综述了当前铝基柱撑蒙脱石的制备、性能表征及其应用等方面的 研究进展。 关键词 蒙脱石 铝柱撑 进展 柱撑蒙脱石是一种由柱化剂(可交换聚合阳离子)在蒙脱石层间呈“柱”状支撑接触的新型层柱状矿物材料。1977年,B rindley[1]首次以无机化合物-聚羟基铝离子为柱化剂合成柱撑粘土,解决了有机阳离子制备粘土热稳定性差问题。80年代开始,柱撑蒙脱石的研究蓬勃发展起来,大部分的多核金属阳离子柱化剂都以具较大体积和较高电荷的羟基铝离子(Keggin)为基础,铝基柱撑蒙脱石因其独特的极性、孔径分布和高比表面积而成为在工业废水处理、石油催化裂化、烯烃聚合氧化等应用方面的研究热点。作者对近年来有关羟基铝柱撑蒙脱石的有关研究和进展进行综述。 1 铝基柱撑蒙脱石的制备及产品特点 铝基柱撑蒙脱石是利用蒙脱石的膨胀性及阳离子交换性使之与柱化剂阳离子交换而得。用柱化剂(羟基铝离子或其他聚合铝基复合阳离子)取代天然蒙脱石层间可交换阳离子,垂直连接并撑开两个相邻的2∶1层。经干燥脱水、煅烧脱羟基等处理得柱撑蒙脱石见图1。111 聚合羟基铝离子柱撑蒙脱石 铝柱撑蒙脱石(A l-PLM s)的制备是把铝柱化剂(A CH)与钠基或钙基蒙脱石进行离子交换反应而得。聚合羟基铝离子柱化剂是通过A l C l3或A l(NO3)3溶液用N a OH溶液滴定或者分别与N a2CO3溶液水解反应制得[1,2]。柱化物的形成受OH A l摩尔比、pH值、反应温度、老化、洗涤方式等因素影响。Bottero用27A l固态核磁共振(NM R)和小角度X射线衍射分析得:柱化剂中羟基铝以不同的聚合形式存在,且与r=OH A l有关,r越大,柱化聚合物团聚成 基金项目:福建省自然科学基金项目(编号E0010011) 福建省教育科研基金项目(编号JA00149) 收稿日期:2002202228 作者简介:翁国坚(19782),男,硕士研究生,材料学专业。

组态软件(实验报告)

组态软件实验报告 专业:电气工程及其自动化 班级: 学号: 姓名:

实验一组态软件概念介绍 实验目的: 介绍组态软件的基本概念应用背景。 介绍组态软件的软件系统结构和功能特点。 认识和比较各个公司组态软件的特点。 以讲述的方式让学生了解组态软件,知道组态软件的由来,组态软件的应用背景,和相关技术特点,从概念上对软件有个初步的认识。 实验内容: 1、介绍组态的概念; 2、计算机监督与控制系统的概念; 3、工控机的特点; 4、原始组态软件和当前组态软件的区别和优缺点; 5、组态软件的基本特性整体结构; 6、介绍各公司组态软件的特点。 实验二软件安装与认知 实验目的: 学习组态软件的安装; 学习组态软件各模块的功能; 区别开发环境和运行环境的操作。 由于组态软件的编程方式是面向对象的方法,以事件触发软件的相关动作。基本操作的熟悉让学生对组态软件运行原理有初步的认识。 实验内容: 1、安装图灵开物组态软件。 2、了解单机版功能与网络版功能的区别。 3、运行演示工程。 4、学习软件界面的功能及基本操作。 实验结果:

实验三工程建立 实验目的: 通过本次实验让学生学习怎么建立一个组态软件工程,建立的各个元素,对应了实际现场的哪些操作,重要的是记住建立工程中的一些关键性步骤。 实验内容: 1、新建组态软件工程。 2、新建计算机节点,了解节点中各功能的含义及配置方法。

3、新建设备,了解组态软件功能设备及驱动的应用方法。 4、新建图页,图页是组态软件界面图形绘制区域。 5、新建标签,了解标签的类型及各种属性,以及标签在工程中作用的区域。实验结果:

钢结构识图图集图标

钢结构识图培训讲义 技术部周耀彬 2009-5-24 第一章识图基础 一、投影及三视图 三视图:正视图(上左)、侧视图(上右)、俯视图(下) 三视图在使用是不一定完整,可能只出现其中两个。 有剖视符号的情况下,按照符号所示方向看物体,无剖视符号时,一般习惯的看图方向是: 侧视图在正视图的右侧时,表示是站在正视图中物体的右侧向左看; 侧视图在正视图的左侧时,表示是站在正视图中物体的左侧向右看; 俯视图表示从上向下看到的正视图中的物体 看图方向的正确至关重要,决定了装配方向的正确与否,由于详图绘制人员的个体差异,选择表达方式上会有所差异,需要在图面上相互印证,如有不一致处及时和制图人员沟通确认。 二、剖面符号和断面符号 1.断面符号 表示从符号处剖开看到的断面,不表示断面后方的其他东西; 2.剖面符号 表示从符号处剖开看到的断面及断面后方的其他东西; 3.在钢构详图中,断面符号和剖面符号使用上有些随意,是因为功能上比较接 近,着重表达的是看物体的方向。 看物的方向是从粗线朝文字的方向看。粗线表示人的眼睛,文字表示看的朝向。

三、索引符号及节点符号 1.不带剖视方向的索引 字母a,如果节点详图不在本图中,就写对应的图纸编号,比如“详图-09”或“09”等。 有时也直接索引出来后直接放大,不用到节点符号,如下图: 2.带剖视符号的索引 与剖(断)面符号类似,看物的方向是从粗线朝细线的方向看。粗线表示人的眼睛,细线表示看的朝向。 四、对称符号

五、焊缝符号* 1.焊缝基本符号(常用):表示焊缝横截面形状的符号 序号名称示意图符号 1 卷边焊缝 2 I形焊缝 3 V形焊缝 4 单边V形焊缝 5 带钝边V形焊缝 带钝边单边V形焊缝 6 角焊缝 7 塞焊缝或槽焊缝 2.辅助符号:表示焊缝表面形状特征的符号 序号名称示意图符号说明 1 平面符号 焊缝表面齐平(一般通过加工)

相关文档
最新文档