英语版——软件工程复习题

英语版——软件工程复习题
英语版——软件工程复习题

1.The nature of software applications can be characterized by their information ()

a. complexity

b. content

c. determinacy

d. choices "b" and "c"

2. Modern software applications are so complex that it is hard to develop mutually exclusive category names.()

a. True

b. False

3. Software developers succeed more often than they fail, but software failures receive more press coverage.()

a. True

b. False

4. Adding more people to a project that is already behind schedule is a good way to catch up. ()

a. True

b. False

5. Modern CASE tools are more important than the newest hardware for achieving good software quality and productivity.()

a. True

b. False

6. Change cannot be easily accommodated in most software systems, unless a system was designed with change in mind.()

a. True

b. False

7. A general statement of objectives is all that is needed to begin developing a piece of software.()

a. True

b. False

8. The formal technical review is an inadequate substitute for testing regardless of nature of the software defect.()

a. True

b. False

9. What do people mean by the expression "software crisis"?

Answer:This expression is intended to describe the chronic problems associated with software failures, how software is developed, how the growing volume of software is supported, and the difficulties in meeting the growing demand for more software.

10. Explain what is wrong with the notion that software engineering is too time consuming and interferes with a programmer's productivity.

Answer:Producing a lot of code quickly is not the object of software development. The software needs to perform correctly or it will need to be rewritten. Most software products must be maintained for many years after they are developed, the time spent documenting a program and planning for changes is easily justified over the product's lifetime. Studies have shown the later a change is introduced in the development process, the more costly it is to implement.

11. Which of the items listed below is not one of the software engineering layers?()

a. Process

b. Manufacturing

c. Methods

d. Tools

12. What are the three generic phases of software engineering?()

a. definition, development, support

b. what, how, where

c. programming, debugging, maintenance

d. analysis, design, testing

13. Which of these terms is a level name in the Capability Maturity Model?()

a. Ad hoc

b. Repeatable

c. Reusable

d. Organized

CMM。它是对于软件组织在定义、实施、度量、控制和改善其软件过程的实践中各个发展阶段的描述。CMM的核心是把软件开发视为一个过程,并根据这一原则对软件开发和维护进行过程监控和研究,以使其更加科学化、标准化、使企业能够更好地实现商业目标。CMM 分为五个等级:一级为初始级,二级为可重复级,三级为已定义级,四级为已管理级,五级为优化级。

14. Which of these items should be used to select a software process framework?()

a. People

b. Product

c. Project

d. All of the above

15. In which software development problem solving stage are the results delivered?()

a. Status quo

b. Problem definition

c. Technical development

d. Solution integration

16. The linear sequential model of software development is()

a. A reasonable approach when requirements are well defined.

b. A good approach when a working program is required quickly.

c. The best approach to use for projects with large development teams.

d. An old fashioned model that is rarely used any mor

e.

17. The linear sequential model of software development is also known as the ()

a. Classical life cycle model

b. Fountain model

c. Spiral model

d. Chaos model

18. The prototyping model of software development is ()

a. A reasonable approach when requirements are well defined.

b. A useful approach when a customer cannot define requirements clearly.

c. The best approach to use for projects with large development teams.

d. A risky model that rarely produces a meaningful product.

19. The rapid application development model is ()

a. Another name for component-based development.

b. A useful approach when a customer cannot define requirements clearly.

c. A high speed adaptation of the linear sequential model.

d. All of the abov

e.

20. Evolutionary software process models ()

a. Are iterative in nature

b. Can easily accommodate product requirements changes

c. Do not generally produce throw away systems

d. All of the above

21. The incremental model of software development is ()

a. A reasonable approach when requirements are well defined.

b. A good approach when a working core product is required quickly.

c. The best approach to use for projects with large development teams.

d. A revolutionary model that is not used for commercial products.

22. The spiral model of software development ()

a. Ends with the delivery of the software product

b. Is more chaotic than the incremental model

c. Includes project risks evaluation during each iteration

d. All of the above

23. The concurrent development model is()

a. Another name for the rapid application development model.

b. Often used for the development of client/server applications.

c. Only used for development of parallel or distributed systems.

d. Used whenever a large number of change requests are anticipated.

24. The component-based development model is()

a. Only appropriate for computer hardware design.

b. Not able to support the development of reusable components.

c. Dependent on object technologies for support.

d. Not cost effective by known quantifiable software metrics.

25. Describe the phases of the prototyping model for software development?

Answer:Requirements are gathered by having the customer and developer meet and identify whatever objectives and requirements they can. Quick design follows, focusing on representation of the software that will be visible to the customer. A prototype is constructed by the developer and evaluated by the customer and used to refine the requirements. Iteration occurs and the prototype is tuned to satisfy the customer's needs.

26. Describe the role of risk analysis in evolutionary process models like the spiral model. Answer:As each prototype is enhanced by iteration through the process steps, both the technical and management risks are assessed to see if it is still possible to compete the project which its required functionality with acceptable time and cost constraints.

27. Effective software project management focuses on()

a. people, performance, payoff, product

b. people, product, performance, process

c. people, product, process, project

d. people, process, payoff, product

28. The first step in project planning is to ()

a. determine the budget.

b. select a team organizational model.

c. determine the project constraints.

d. establish the objectives and scop

e.

29. Process framework activities are populated with (

a. milestones

b. work products

c. QA points

d. All of the above

30. Which factor is the least important when choosing the organizational structure for a software team? ()

a. degree of communication desired

b. predicted size of the resulting program

c. rigidity of the delivery date

d. size of the project budget

31. One of the best ways to avoid frustration during the software development process is to ()

a. give team members more control over process and technical decisions.

b. give team members less control over process and technical decisions.

c. hide bad news from the project team members until things improve.

d. reward programmers based on their productivity.

32. Which of these software characteristics is not a factor contributing to projec t coordination difficulties?

a. interoperability

b. performance

c. scale

d. uncertainty

33. Which of these software characteristics are used to determine the scope of a software project? (

a. context,lines of code, function

b. context, function, communication requirements

c. information objectives, function, performance

d. communications requirements, performance, information objectives

34. What activity does a software project manager need to perform to minimize the risk of software failure?

a. double the project team size

b. request a large budget

c. allow absolutely no schedule slippage

d. define milestones and track progress

35. Which of these is not a valid reason for measuring software processes, products, and resources?

a. to characterize them

b. to evaluate them

c. to price them

d. to improve them

36. Process indicators enable a software project manager to

a. assess the status of an on-going project

b. track potential risks

c. adjust work flow or tasks

d. all of the above

37. Which of the following items are not measured by software project metrics?

a. inputs

b. markets

c. outputs

d. results

38. Which of the following software quality factors is most likely to affected by radical changes to computing architectures?

a. operation

b. transition

c. revision

d. none of the above

39. Which of the following provide useful measures of software quality?

a. correctness, performance, integrity, usability

b. reliability, maintainability, integrity, sales

c. correctness, maintainability, size, satisfaction

d. correctness, maintainability, integrity, usability

40. To be an effective aid in process improvement the baseline data used must be:

a. based on reasonable guesstimates from past projects

b. measured consistently across similar projects

c. collected over the past 6 months

d. based on all previously completed projects

41. The software engineering environment (SEE) consists of which of the following?

a. customers and users

b. developers and managers

c. hardware platforms and software tools

d. none of the above

42. LOC-based estimation techniques require problem decomposition based on

a. information domain values

b. project schedule

c. software functions

d. process activities

43. FP-based estimation techniques require problem decomposition based on

a. information domain values

b. project schedule

c. software functions

d. process activities

44. Process-based estimation techniques require problem decomposition based on

a. information domain values and data objects

b. project schedule and milestones

c. software functions and process activities

d. none of the above

45. Software risk always involves two characteristics

a. fire fighting and crisis management

b. known and unknown risks

c. uncertainty and loss

d. staffing and budget

46. Three categories of risks are

a. business risks, personnel risks, budget risks

b. project risks, technical risks, business risks

c. planning risks, technical risks, personnel risks

d. management risks, technical risks, design risks

47. Risk projection attempts to rate each risk in two ways

a. likelihood and cost

b. likelihood and impact

c. likelihood and consequences

d. likelihood and exposure

48. Risk tables are sorted by

a. probability and cost

b. probability and impact

c. probability and consequences

d. probability and exposure

49. An effective risk management plan will need to address which of the following issues?

a. risk avoidance

b. risk monitoring

c. contingency planning

d. all of the above

50. Which of the following is not one of the guiding principles of software project scheduling?

a. compartmentalization

b. market assessment

c. time allocation

d. effort validation

51. A task set is a collection of

a. engineering work tasks, milestones, deliverables

b. task assignments, cost estimates, metrics

c. milestones, deliverables, metrics

d. responsibilities, milestones, documents

52. Adaptation criteria are used to determine the

a. costs of product maintenance

b. adjustments to the project schedule

c. best project type classification for a software process

d. recommended degree of rigor for software process

53. For purposes of determining the major engineering tasks and distributing them on the project time line, the project manager should assume that the process model used is

b. iterative

c. evolutionary

d. any of the above

54. The purpose of earned value analysis is to

a. determine how to compensate developers based on their productivity

b. provide a quantitative means of assessing software project progress

c. provide a qualitative means of assessing software project progress

d. set the price point for a software product based on development effort

55. List 3 principles for scheduling software projects.

Answer:Compartmentalization, interdependency, time allocation, effort validation, defined responsibilities, defined outcomes, defined milestones

56. V ariation control in the context of software engineering involves controlling variation in the

a. process applied

b. resources expended

c. product quality attributes

d. all of the above

57. A key concept of quality control is that all work products

a. are delivered on time and under budget

b. have complete documentation

fc. have measurable speciications for process outputs

d. are thoroughly tested before delivery to the customer

58. Statistical quality assurance involves

a. using sampling in place of exhaustive testing of software

b. surveying customers to find out their opinions about product quality

c. tracing each defect to its underlying cause, isolating the"vital few" causes, and moving to correct them

d. tracing each defect to its underlying causes and using the Pareto principle to correct each problem found

59. Software reliability problems can almost always be traced to

a. errors in requirements gathering

b. errors in design and implementation

c. human error

d. errors in operation

60. What is a formal technical review and why is one conducted?

Answer:The purpose of an FTR is to have a group of software engineers examine a discrete work product and determine whether or not the product is free of defects using the software specifications and standards as the review criteria.

61. Which of these are valid software configuration items?

a. case tools

b. documentation

c. executable programs and test data

d. all of the above

62. Which of the following tasks is not part of software configuration management?

b. reporting

c. statistical quality control

d. version control

63. Use-cases are scenarios that describe

a. how software is to be used in a given situation.

b. how CASE tools will be used to construct the system.

c. the build plan for a software product.

d. the test cases for a software product.

64. Information flow represents the manner in which data and control

a. are related to one another.

b. changes each moves through the system.

c. will be implemented in the final design.

d. none of the abov

e.

65. In the context of requirements analysis, two types of problem partitioning are

a. bottom-up and top-down

b. horizontal and vertical

c. subordinate and superordinate

d. none of the above

66. What are the five phases of software requirements analysis?

Answer:

Problem recognition

Evaluation and synthesis

Modeling

Specification

Review

67. What models are created during the analysis phase of a software development process? What is the purpose of each?

Answer:

Data model - shows relationships among system objects

Functional model - describes the functions enabling the transformations of system objects Behavioral model - shows manner that software responds to events initiated from the outside world

68. Which of the following is not an objective for building an analysis model?

a. define set of software requirements

b. describe customer requirements

c. develop an abbreviated简短的solution for the problem

d. establish basis for software design

69. Which of the following is not an area of concern in the design model?

a. architecture

b. data

c. interfaces

d. project scope

70. The importance of software design can be summarized in a single word

a. accuracy

b. complexity

c. efficiency

d. quality

71. What types of abstraction are used in software design?

a. control

b. data

c. procedural

d. all of the above

72. Which of these model types does not represent a software architecture?

a. data

b. dynamic

c. process

d. structural

73. Which of the following is not part of software architecture?

a. algorithm details

b. databases

c. data design

d. program structure

74. An architectural style encompasses which of the following elements?

a. constraints

b. set of components

c. semantic models

d. all of the above

75. The criteria used to assess the quality of an architectural design should be based on system

a. accessibility and reliability

b. data and control

c. functionality

d. implementation details

76. In transaction mapping the first level factoring results in the

a. creation of a CFD

b. derivation of the control hierarchy

c. distribution of worker modules

d. refinement of the module view

77. A necessary supplement to transform or transaction mapping needed to create a complete architectural design is

a. entity relationship diagrams

b. the data dictionary

c. processing narratives for each module

d. test cases for each module

78. Which of the following interface design principles reduce the user's memory load?

a. define intuitive shortcuts

b. disclose information in a progressive fashion

c. establish meaningful defaults

d. all of the above

79. Interface consistency implies that

a. input mechanisms remain the same throughout the application

b. each application should have its own distinctive look and feel

c. navigational methods are context sensitive

d. answers a and b

80. Which of these are objectives for software testing?

a. determine the productivity of programmers

b. eliminate the need for future program maintenance

c. eliminate every error prior to release

d. uncover software errors

81. Black-box testing attempts to find errors in which of the following categories

a. incorrect or missing functions

b. interface errors

c. performance errors

d. all of the above

82. What is the normal order of activities in which software testing is organized?

a. unit, integration, system, validation

b. system, integration, unit, validation

c. unit, integration, validation, system

d. none of the above

83. The first step in any OOA process model are to

a. build an object-relationship model

b. define collaborations between objects

c. elicit customer requirements

d. select a representation language

84. UML (unified modeling language) analysis modeling focuses on the

a. behavioral model and environment model

b. behavioral model and implementation model

c. user model and environmental model

d. user model and structural model

85. Describe the object-oriented software domain analysis process.

Software domain analysis is the identification, analysis, and specification of common, reusable capabilities within a specific application domain in terms of common objects, classes, subassemblies, and frameworks.

86. What are the steps needed to build an object-behavior model?

(1)Evaluate the use-cases to understand the interaction sequence within the system.

(2)Identify events that drive the interaction sequence and how the events relate to specific objects.

(3)Create an event trace for each use-case.

(4)Build a state transition diagram for the system.

(5)Review the object-behavior model to verify accuracy and consistency.

软件工程试题及答案34385

软件工程期末试卷(A) 说明:本试卷为04级计算机专业(专升本)软件工程期末试卷,总计100分,时间100分钟 一、选择题:(每题1分,共20分)(将答案写在题号前的()中) ( C )1. 软件是()。 A. 处理对象和处理规则的描述 B. 程序 C. 程序及其文档 D. 计算机系统 ( B )2. 软件需求规格说明的内容不应包括()。 A. 主要功能 B. 算法的详细描述 C. 用户界面及运行环境 D. 软件的性能 ( B )3. 程序的三种基本控制结构是()。 A. 过程、子程序和分程序 B. 顺序、选择和重复 C. 递归、迭代和回溯 D. 调用、返回和转移 ( D) 4. 面向对象的分析方法主要是建立三类模型,即( )。 A) 系统模型、ER模型、应用模型 B) 对象模型、动态模型、应用模型 C) E-R模型、对象模型、功能模型 D) 对象模型、动态模型、功能模型 ( C ) 5. 在E-R模型中,包含以下基本成分( )。 A) 数据、对象、实体 B) 控制、联系、对象 C) 实体、联系、属性 D) 实体、属性、操作 ( A ) 6. 各种软件维护的类型中最重要的是( )。 A) 完善性维护B) 纠错性维护C) 适应性维护D) 预防性维护 ( B ) 7.软件测试的目标是()。 A. 证明软件是正确的 B. 发现错误、降低错误带来的风险 C. 排除软件中所有的错误 D. 与软件调试相同 ( D )8.软件生命周期中所花费用最多的阶段是() A.详细设计 B.软件编码 C.软件测试 D.软件维护 ( C )9.若有一个计算类型的程序,它的输入量只有一个X,其范围是[-1.0, 1.0],现从输入的角度考虑一组测试用例:-1.001, -1.0, 1.0, 1.001.设计这组测试用例的方法是()A.条件覆盖法 B.等价分类法 C.边界值分析法 D.错误推测法 ( D )10、详细设计的基本任务是确定每个模块的( )设计 A.功能 B.调用关系 C.输入输出数据 D.算法 ( A )11.设函数C(X)定义问题X的复杂程序,函数E(X)确定解决问题X需要的工作量(时间)。对于两个问题P1和P2,如果C(P1)>C(P2)显然E(P1)>E(P2),则得出结论E(P1+P2)>E(P1)+E(P2)就是:() A.模块化的根据B.逐步求精的根据C.抽象的根据D.信息隐藏和局部化的根据 ( D )12.下面几种白箱测试技术,哪种是最强的覆盖准则() A.语句覆盖B.条件覆盖C.判定覆盖D.条件组合覆盖

软件工程导论期末考试试题和答案

1.软件生存周期一般可分为__问题定义__、可行性研究、_需求分析_____、设计编码、__ 测试________、运行与维护阶段。 2.按软件的功能进行划分,软件可以划分为系统软件、支撑软件 和应用软件。 3.可行性研究主要集中在以下四个方面经济可行性、技术可行 性、法律可行性和抉择。 4.用户界面的可使用性是用户界面设计最重要的也是最基本的目标。 5.常见的软件概要设计方法有3大类:以数据流图为基础构造模块结构的___结构化设计 方法_________,以数据结构为基础构造模块的__jackson方法__________,以对象、类、继承和通信为基础的__面向对象设计方法__________。 6.__数据流图________和__数据字典___共同构成系统的逻辑模型。 7.软件测试的方法有__分析方法________和___非分析方法_______(即黑盒法)。 8.单元测试一般以___白盒_____________测试为主,___黑盒______测试为辅。 9.成本估计方法主要有__自底向上估计________、_自顶向下估计_________和算法模型估 计三种类型。 1.下列哪个阶段不属于软件生存周期的三大阶段( C )。 A、计划阶段 B、开发阶段 C、编码阶段 D、维护阶段 2.需求分析是(A )。 3.A、软件开发工作的基础B、软件生存周期的开始 4.C、由系统分析员单独完成的D、由用户自己单独完成的 5.原型化方法是软件开发中一类常用的方法,它与结构化方法相比较,更需要(B )。 6.A、明确的需求定义B、完整的生命周期 7.C、较长的开发时间D、熟练的开发人员 8.软件维护时,对测试阶段未发现的错误进行测试、诊断、定位、纠错,直至修改的回归 测试过程称为( A )。 9.A、改正性维护B、适应性维护 10.C、完善性维护D、预防性维护 11.一般说来,投入运行的软件系统中有错误(A )。

软件工程导论》期末考试试题与答案

《软件工程导论》期末考试-试题与答案 一、填空题 1.软件工程中的结构化分析 SA 是一种面向________的分析方法。 2.软件模块独立性的两个定性度量标准是_________________。 3.软件开发是一个自顶向下逐步细化和求精的过程,而软件测试是一个________的过程。 4. ________和数据字典共同构成了系统的逻辑模型 5. ___________是一种黑盒测试技术,这种技术把程序的输入域划分为若干个数据类,据此导出测试用例。二、单选 题 1.在软件危机中表现出来的软件质量差的问题,其原因是_______。A.软件 研发人员素质太差B.用户经常干预软件系统的研发工作C.没有软件质量标 准 D.软件开发人员不遵守软件质量标准2.在软件质量因素中,软件在异常条件下仍能运 行的能力成为软件的_____。A.安全性B.健壮性C.可用性D.可靠性 3.在下列测试技术中,______不属于黑盒测试技术。A.等价 划分B.边界值分析C.错误推测D.逻辑覆盖 4.软件工程方法是在实践中不断发展着的方法,而早期的软件工程方法主要是指______。A.原型化方法B.结构化方法C.功能化方法D.面向对象方法 5. ______是把对象的属性和操作结合在一起,构成一个独立的对象,其内部信息对外界是 隐蔽的,外界只能通过有限的接口与对象发生联系。A.多态 B.继承C.封装D.消息 6. Jackson 方法是在软件开发过程中常用的方法,使用 Jackson 方法时可以实现______。A.从数据结构导出程序结构B.从数据流图导出初始结构图C.从模块结构导出数据结构D.从模块结构导出程序结构 7.软件测试时为了________而执行程序的过程。A.纠正 错误B.发现错误 C.避免错误 D.证明错误 8.在软件系统中,一个模块应具有什么样的功能,这是由_____决定的。A.总体 设计B.需求分析C.详细设计D.程序设计 9.面向对象分析是对系统进行_________的一种方法。A.需求 分析B.程序设计C.设计评审D.测试验收 10.软件文档是软件工程实施中的重要部分,它不仅是软件开发各阶段的重要依据,而 且影响软件的_______。A.可理解 性B.可维护性C.可扩展性D.可 移植

软件测试工程师笔试题及答案

测试工程师笔试题 一、计算机知识(30分) 1、在Linux系统中,一个文件的访问权限是755,其含义是什么 参考答案: 755表示该文件所有者对该文件具有读、写、执行权限,该文件所有者所在组用户及其他用户对该文件具有读和执行权限。 2、Linux中,如何从root用户切换到普通用户 参考答案:su su user1 切换到user1,但切换后的当前目录还是root访问的目录 su – user1 切换到user1,并且当前目录切换到user1的根目录下(/home/user1/) 3、简述一下C/S模式和B/S模式的区别 参考答案: c/s 是客户端/服务器架构 b/s 是浏览器/服务器架构 C/S模式有以下特点: S模式将应用与服务分离,系统具有稳定性和灵活性 S模式配备的是点对点的结构模式,适用于局域网,有可靠的安全性 3.由于客户端实现与服务器端的直接连接,没有中间环节,因此响应速度快 4.在C/S模式中,作为客户机的计算机都要安装客户机程序,一旦软件系统升级,每台客户机都要安装客户机程序,系统升级和维护较为复杂 B/S模式有以下特点: 1.系统开发、维护、升级方便 每当服务器应用程序升级时,只要在服务器上升级服务应用程序即可,用户计算机上的浏览器软件不需要修改,系统开发和升级维护方便 S模式具有很强的开放性 在B/S模式下,用户通过通用的浏览器进行访问,系统开放性好 S模式的结构易于扩展 由于Web的平台无关性,B/S模式的结构可以任意扩展,可以从包含一台服务器和几个用户的小型系统扩展成为拥有成千上万个用户的大型系统 4.用户使用方便 B/S模式的应用软件都是基于Web浏览器的,而Web浏览器的界面是类似的。对于无用户交换功能的页面。用户接触的界面都是一致的,用户使用方便 4、Windows操作系统中PATH环境变量的作用是什么 参考答案: PATH是Windows操作系统环境变量,PATH作用是用户在命令行窗口执行一个命令,则在PATH变量设置的目录下依次寻找该命令或对应的执行文件,若找到,则执行,若没有找到,则命令行窗口返回无效命令。 5、TCP和UDP有什么区别 参考答案: TCP-有连接,所以握手过程会消耗资源,过程为可靠连接,不会丢失数据,适合大数据量交换UDP-非可靠连接,会丢包,没有校验,速度快,无须握手过程

软件工程试题及答案

4. 面向对象的分析方法主要是建立三类模型,即( D )。 A) 系统模型、ER模型、应用模型 B) 对象模型、动态模型、应用模型 C) E-R模型、对象模型、功能模型D) 对象模型、动态模型、功能模型 5. 在E-R模型中,包含以下基本成分( )。 A) 数据、对象、实体B) 控制、联系、对象C) 实体、联系、属性 D) 实体、属性、操作 9.若有一个计算类型的程序,它的输入量只有一个X,其范围是[, ],现从输入的角度考虑一组测试用例:, , , . 设计这组测试用例的方法是( c ) A.条件覆盖法 B.等价分类法C.边界值分析法 D.错误推测法 10、详细设计的基本任务是确定每个模块的( d )A.功能B.调用关系C.输入输出数据 D.算法 11.设函数C(X)定义问题X的复杂程序,函数E(X)确定解决问题X需要的工作量(时间)。对于两个问题P1和P2,如果C(P1)>C(P2)显然E(P1)>E(P2),则得出结论E(P1+P2)>E(P1)+E(P2)就是:( a ) A.模块化的根据 B.逐步求精的根据 C.抽象的根据 D.信息隐藏和局部化的根据13.面向数据流的设计方法把( D )映射成软件结构。 A.数据流 B.系统结构 C.控制结构 D.信息流 14.内聚程度最低的是( A.偶然 )内聚A.偶然 B.过程 C.顺序 D.时间 15.确定测试计划是在( D )阶段制定的.A.总体设计 B.详细设计 C.编码 D.测试 16.需求分析的产品是( D ) A.数据流程图案 B.数据字典 C.判定表D.需求规格说明书 17.数据字典是软件需求分析阶段的最重要工具之一,其最基本的功能是( C ) A.数据库设计 B.数据通信 C.数据定义 D.数据维护 18.( D )引入了“风险驱动”的思想,适用于大规模的内部开发项目。 A.增量模型 B.喷泉模型 C.原型模型D.螺旋模型 (×)2、系统测试的主要方法是白盒法,主要进行功能测试、性能测试、安全性测试及可靠性等测试。 (×)4、软件需求分析的任务是建立软件模块结构图。 (√)5、尽可能使用高级语言编写程序(×)6、以结构化分析方法建立的系统模型就是数据流图。 (×)7、进行总体设计时加强模块间的联系。(×)8、编码时尽量多用全局变量. (√)9、用CASE环境或程序自动生成工具来自动生成一部分程序.(×)10、软件测试是要发现软件中的所有错误。 1. 软件生命期各阶段的任务是什么答:软件生命期分为7个阶段:1、问题定义:要解决的问题是什么 2、可行性研究:确定问题是否值得解,技术可行性、经济可行性、操作可行性 3、需求分析:系统必须做什么 4、总体设计:系统如何实现,包括系统设计和结构设计 5、详细设计:具体实现设计的系统 6、实现:编码和测试 7、运行维护:保证软件正常运行。 2、软件重用的效益是什么?

2019最新软件工程导论期末考试题库及答案

2019最新软件工程导论期末考试题库及答案 1.填空题 1.一般来说,可以从__一致性__、_完整性___、_现实性____和_有效性___四个方面验证软件需求的正确性。 2.IPO图是_输入、处理和输出图_的简称,它是美国IBM 公司发展完善起来的一种图形工具。 3.系统流程图是描述__物理模型__的传统工具,用图形符 号表达了系统中各种元素之间的_____信息流动_____情况。4.数据流图中的箭头表示数据流,椭圆或圆形表示数据处理,矩形表示数据的源点/终点。5.软件测试的步骤按顺序分别是:___单元测试_____、子系统测试、系统测试(子系统和系统测试通常称为集 成测试)、__确认测试__和_____系统测试(集成测试)____ 6.软件生命周期一般可分为_问题定义_、可行性研究、_需求分析_、设计编码、_测试_、运行与维护阶段。 7.可行性研究主要集中在以下四个方面_经济可行性_、__技术可行性____、__法律可行性___和抉择。 8.在结构化设计中,HIPO图应用在总体设计阶段,由IPO图和_层次图_两部分组成。 9.复杂问题的对象模型通常由下述五个层次组成:主题层、___类与对象_层、__结构___层、_属性_层和__服务_层。 10.实施精化设计的目标是基于模块的“高内聚低耦合” 的原则,提高模块的_独立性。 11.软件生命周期一般可分为___问题定义_、可行性研究、__需求分析__、概要设计__、详细设计、编码、__软件测试_、运行与维护阶段。 12.面向对象的数据存储管理模式分为__文件__、_关系数据库__和__面向对象数据库___三种。 13.单元测试一般以_白盒_测试为主,__黑盒__测试为辅。

软件工程导论复习试题库完整

a(1)在软件工程中,白盒测试法可用于测试程序的内部结构。此方法将程序看作是 A) 路径的集合 B)循环的集合C)目标的集合D)地址的集合 c(2)在下述哪一种测试中,测试程序的设计者必须接触到源程序 I.功能测试Ⅱ. 结构测试 A)均不须B)只有ⅠC)只有ⅡD)Ⅰ和Ⅱ a(3)检查软件产品是否符合需求定义的过程称为 A)确认测试B)集成测试C)验证测试D)验收测试 c(4)下述陈述中,哪一个不是软件健壮性的度量指标? A)失败后重新启动所需的时间B)引起失败的时间所占的百分比 D)失败前的平均工作时间D)在一次失败中数据恶化的概率 b(5)对软件是否能达到用户所期望的要求的测试称为 A) 集成测试B) 有效性测试C) 系统测试D) 验收测试 a(6)在面向数据流的软件设计方法中,一般将信息流分为 A)变换流和事务流B)变换流和控制流 C)事务流和控制流D)数据流和控制流 d(7)软件需求说明书是软件需求分析阶段的重要文件,下述哪个(些)是其应包含的内容 I.数据描述Ⅲ. 模块描述 II.功能描述Ⅳ. 性能描述 A)ⅡB)Ⅲ和ⅣC)Ⅰ、Ⅱ和ⅢD)Ⅰ、Ⅱ和Ⅳ (8)软件测试一般分为三类,即 I.静态测试Ⅱ. 动态测试Ⅲ. 正确性测试 设计测试用例对程序进行测试,应属于 A)ⅠB)ⅡC)Ⅰ和ⅡD)Ⅲ (9)模块独立性是由内聚性和耦合性来度量的,其中内聚性是度量____,耦合性是度量____。 A)模块间联系程度B)模块的功能强度 C)信息隐蔽程度D)模块的复杂程度 (10)软件设计中一般将用到图形工具,下述哪种(些)工具可用作设计的图形工具 I.结构图Ⅱ. 实体关系图Ⅲ. IPO图 II.Ⅳ. 流程图Ⅴ. N-S图 A)Ⅰ和ⅡB)Ⅲ和ⅣC)Ⅰ、Ⅲ、Ⅳ和ⅤD)全部 A (2)C (3)A (4)C (5) B (6)A (7)D (8)B (10)C (11)试判断下列论述中哪个(些)是正确的 I.软件系统中所有的信息流都可以认为是变换流 II.软件系统中所有的信息流都可以认为是事务流 III.事务分析和变换分析的设计步骤基本类似 A)ⅠB)ⅡC)ⅢD)Ⅰ和Ⅲ (12)软件的有效性测试是验证软件的运行是否达到用户的期望,用户的期望应体现于A)详细设计报告B)软件需求说明书 C)总体设计报告D)有效性测试要求 (13)软件设计中的软件过程其主要描述的是 A)模块间关系B)模块操作细节 C)模块控制方法D)模块类型 (14)软件测试是软件件开发过程的重要阶段,是软件质量保证的重要手段,下列哪个(些)是软件测试的任务?

Java软件开发工程师笔试题(答案)

Java工程师笔试题 一、填空题(本大题10小题,每空1分,共20分)。 1.Java语言的三大特性即是: 继承、封装、多态。 2.在Java中,char 型采用____unicode_______编码方案,这样,无论是中文字符还是英文字符,都是占用__2___个字节的内存空间。 3. 形式参数指的是方法被__定义____ 时的参数行,实际参数是方法被__调用__ _ 时所传递进去的变量或值。 4.JSP内置对象中,application对象是代表应用程序上下文,它允许JSP页面与包括在同一应用程序中的任何Web组件共享信息,而session 对象则是每个客户专用的。 5.如果想把一个对象写入一个流,那么这个类就必须实现Seralizable 接口。 6.程序中实现多线程的方法有两种:继承Thread类和实现___Runable _ 接口。 7.多线程中,可以通过调用相应的setPriority() 方法来修改一个线程的相对优先级。 8.面向对象编程的五大设计原则,分别是单一职责、开放封闭、 里氏替换、依赖倒置、接口分离 9.通过Ajax,客户端获取的数据主要有两种类型:文本型和xml 10.Socket通常也称为套接字,用于描述__ ip 和_ _接口 二、选择题(本大题20 小题,每小题2分.共40分)。 1.在JA V A中,如果父类中某些方法不包含任何逻辑,并且需要由子类重写.应该使用( )关键字来声明父类的这些方法: A) final B) static C) abstract D) void 2.在JA V A中,已定义两个接口B和C,要定义一个实现这两个接口的类,以下语句正确的是()。 A) interface A extend B,C B) interface A implements B,C C) class A implements B,C D) class A implements B, implements C

《软件工程》试题及参考答案(第6套)

第一部分选择题 一、单项选择题(本大题共20小题,每小题1分,共20分) 在每小题列出的四个备选项中只有一个是符合题目要求的,请将其代码填写在题后的括号内。错选、多选或未选均无分。 1、()是软件生存期中的一系列相关软件工程活动的集合,它由软件规格说明、软件设计与开发、软件确认、软件改进等活动组成。 A 软件过程 B 软件工具 C 质量保证 D 软件工程 2、在各种不同的软件需求中,功能需求描述了用户使用产品必须要完成的任务,可以在用例模型或方案脚本中予以说明,()是从各个角度对系统的约束和限制,反映了应用对软件系统质量和特性的额外要求。 A 业务需求 B 功能要求 C 非功能需求 D 用户需求 3、软件测试计划开始于需求分析阶段,完成于()阶段。 A 需求分析 B 软件设计 C 软件实现 D 软件测试 4.下面关于面向对象方法中消息的叙述,不正确的是( )。 A. 键盘、鼠标、通信端口、网络等设备一有变化,就会产生消息 B.操作系统不断向应用程序发送消息,但应用程序不能向操作系统发送消息 C. 应用程序之间可以相互发送消息 D.发送与接收消息的通信机制与传统的子程序调用机制不同 5.美国卡内基—梅隆大学SEI提出的CMM模型将软件过程的成熟度分为5个等级,以下选项中,属于可管理级的特征是( )。 A.工作无序,项目进行过程中经常放弃当初的计划 B.建立了项目级的管理制度 C.建立了企业级的管理制度 D.软件过程中活动的生产率和质量是可度量的 6.在McCall软件质量度量模型中,()属于面向软件产品修改。 A.可靠性B.可重用性C.适应性 D.可移植性 7.软件生命周期中所花费用最多的阶段是() A.详细设计 B.软件编码 C.软件测 试 D.软件维护 8.需求分析阶段的任务是确定() A.软件开发方法 B.软件开发工具 C.软件开发费 D.软件系统的功能

软件工程导论期末考试题

一、单项选择题 1.适合于面向对象方法学的软件生存周期模型是( B ) A.瀑布模型 B.喷泉模型 C.螺旋模型 D.增量模型 2.从实用角度看,数据规范化程度在大多数场合选用第( C )范式。 A. 1 B.2 C.3 D.5 3. 可行性分析研究的目的是( A )。 A.项目值得开发否 B.争取项目 C.开发项目 D.规划项目 4. 模块的内聚性最高的是 ( D ) A.逻辑内聚 B.时间内聚 C.偶然内聚 D.功能内聚 5.开发软件所需高成本和产品的低质量之间有着尖锐的矛盾,这种现象称做 ( B ) A. 软件工程 B. 软件危机 C. 软件周期 D. 软件产生 6. 需求分析阶段的任务是确定( D ) A.软件开发方法 B.软件开发工具 C.软件开发费 D.软件系统的功能 7. 完整的软件结构通常用( B )图来表示。 A. IPO 图 B. HIPO 图 C.PAD 图 D.DFD 图 8. 在白盒法技术测试用例的设计中( A )是最弱的覆盖标准。 A.语句 B.路径 C.条件组合 D.判定 9?对象实现了数据和操作的结合,使数据和操作( C )于对象的统一体中。 A.结合 B.隐藏 C.封装 D.抽象 10. 在数据流图中,圆代表( C )。 A.源点 B.终点 C.加工 D.模块 11. 模块内聚度越高,说明模块内各成分彼此结合的程度越( B )。 A.松散 B.紧密 C.无法判断 D.相等 12. 软件测试方法中,黑盒、白盒测试法是常用的方法,其中黑盒测试主要用于测试( B )。 A.结构合理性 B.软件外部功能 C.程序正确性 D.程序内部逻辑 13. 面向对象开发方法中, ( C )是占主导地位的标准建模语言。 A.Booch 方法 B.Coad 方法 C.UML 语言 D.OMT 方法 14. 软件需求分析的主要任务是准确地定义出要开发的软件系统是( C ) A.如何做 B.怎么做 C.做什么 D.对谁做 15. 结构化程序设计的一种基本方法是( C ) A.筛选法 B.迭代法 C.逐步求精法 D.递归法 二、填空题 1. 目前使用最广泛的软件工 程学方法分别是传统方法学和(面向对象方法学 ) )和事务流。 文档 ) 。 ( 重复 )三种结构。 自顶向下 的集成测试方法,对软件结构中下层使 6. 软件维护包括 ( 改正性维护 )、适应性维护、完善性维护、预防性维护。 7. 面向对象方法学建模得到的三个基本子模型是 (对象建模 ) .动态模型、功能模型。 8. 复杂大型问题的对象模型通常由主题 2. 数据流图中信息流的类型有(变换流 3. 软件的定义是:软件 =程序+数据+ 4. 经典结构程序设计包括顺序、选择和 5. 集成测试时对软件结构中上层使用 用 ( 自底向上 ) 的集成测试方法。

软件工程导论试题

软件工程导论试题 一.选择 1、瀑布模型把软件生命周期划分为八个阶段:问题的定义、可行性研究、软件需求分析、系统总体设计、详细设计、编码、测试和运行、维护。八个阶段又可归纳为三个大的阶段:计划阶段、开发阶段和(C)。 A、详细计划 B、可行性分析 C、运行阶段 D、测试与排错 2、从结构化的瀑布模型看,在它的生命周期中的八个阶段中,下面的几个选项中哪个环节出错,对软件的影响最大(C)。 A、详细设计阶段 B、概要设计阶段 C、需求分析阶段 D、测试和运行阶段 3、在结构化的瀑布模型中,哪一个阶段定义的标准将成为软件测试中的系统测试阶段的目标(A)。 A、需求分析阶段 B、详细设计阶段 C、概要设计阶段 D、可行性研究阶段 4、软件工程的出现主要是由于(C)。 A.程序设计方法学的影响 B.其它工程科学的影响 C.软件危机的出现 D.计算机的发展 5、软件工程方法学的目的是:使软件生产规范化和工程化,而软件工程方法得以实施的主要保证是(C) A、硬件环境 B、软件开发的环境 C、软件开发工具和软件开发的环境 D、开发人员的素质 6、软件开发常使用的两种基本方法是结构化和原型化方法,在实际的应用中,它们之间的关系表现为(B) A、相互排斥 B、相互补充 C、独立使用 D、交替使用 7、UML是软件开发中的一个重要工具,它主要应用于哪种软件开发方法(C) A、基于瀑布模型的结构化方法 B、基于需求动态定义的原型化方法 C、基于对象的面向对象的方法 D、基于数据的数据流开发方法 8、在下面的软件开发方法中,哪一个对软件设计和开发人员的开发要求最高(B) A、结构化方法 B、原型化方法 C、面向对象的方法 D、控制流方法 9、结构化分析方法是一种预先严格定义需求的方法,它在实施时强调的是分析对象的(B)A、控制流B、数据流C、程序流D、指令流 10、软件开发的结构化生命周期方法将软件生命周期划分成(A) A、计划阶段、开发阶段、运行阶段 B、计划阶段、编程阶段、测试阶段 C、总体设计、详细设计、编程调试 D、需求分析、功能定义、系统设计11、软件开发中常采用的结构化生命周期方法,由于其特征而一般称其为(A) A、瀑布模型 B、对象模型 C、螺旋模型 D、层次模型 12、软件开发的瀑布模型,一般都将开发过程划分为:分析、设计、编码和测试等阶段,一般认为可能占用人员最多的阶段是(C) A、分析阶段 B、设计阶段 C、编码阶段 D、测试阶段 二.填空 21.系统流程图是描述物理模型的传统工具,用图形符号表示系统中各个元素表达了系统中各种元素之间的(信息流动)情况。 [解析]系统流程图是描述物理系统的传统工具,用图形符号表示系统中的各个元素,如人工处理、数据处理、数据库、文件、设备等,表达了元素之间的信息流动的情况。 22.成本效益分析的目的是从(经济)角度评价开发一个项目是否可行。 [解析]成本效益分析首先是估算将要开发的系统的开发成本,然后与可能取得的效益进行比较和权衡,其目的是从经济角度评价开发一个新的软件项目是否可行。 23.自顶向下结合的渐增式测试法,在组合模块时有两种组合策略:深度优先策略和(宽度优先策略)。 [解析]渐增式测试法有自顶向下结合和自底向上结合两种组装模块的方法,其中自顶向下集成是构造程序结构的一种增量式方式,不需要编写驱动模块,只需要编写桩模块。它从主控模块开始,按照软件的控制层次结构,以深度优先或宽度优先的策略,逐步把各个模块集成在一起。 24.独立路径是指包括一组以前没有处理的语句或条件的一条路径。从程序图来看,一条独立路径是至少包含有一条(在其他独立路径中未有过)的边的路径。 [解析]在基本路径测试中,以详细设计或源程序为基础,导出控制流程图的拓扑结构——程序图,在计算了程序图的环路复杂性之后,确定只包含独立路径的基本路径图,其中独立路径是包括一组以前没有处理的语句或条件的一条路径。从程序图来看,一条独立路径是至少包含有一条在其他独立路径中未有过的边的路径。 25.汇编语言是面向(机器)的,可以完成高级语言无法完成的特殊功能,如与外部设备之间的一些接口工作。 [解析]汇编语言属于低级语言,是一种面向机器的语言,它与高级语言相比有许多优越性:如操作灵活,可以直接作用到硬件的最下层,完成与外部设备的接口工作等,是能够利用计算机硬件特性直接控制硬件设备的唯一语言。 26.在JSP方法中解决结构冲突的具体办法是(中间数据结构或中间文件)。 [解析]JSP方法是面向数据结构的设计方法。它定义了一组以数据结构为指导的映射过程,根据输入、输出的数据结构,按一定的规则映射成软件的过程描述,在JSP方法中解决结构冲突的具体办法是引入中间数据结构或中间文件,将冲突部分分隔开来,建立多个程序结构,再利用中间文件把它们联系起来,构成一个系统的整体。 27.详细设计的任务是确定每个模块的内部特性,即模块的算法、(使用的数据)。 [解析]详细设计的基本任务是为每个模块进行详细的算法设计,为模块内的数据结构进行设计,确定每个模块的内部特性,包括模块的算法和使用的数据。对数据库进行物理设计等。 28.所有软件维护申请报告要按规定方式提出,该报告也称(软件问题)报告。 [解析]在软件维护的流程中,第一步就是制定维护申请报告,也称为软件问题报告,它是维护阶段的一种文档,由申请维护的用户填写。

Java软件开发工程师笔试题(答案)

Java软件开发工程师笔试题(答案) Java工程师笔试题 1,填空(此大题10项,每空1分,共20分) 1。Java语言的三个特性是继承性、封装性和多态性2.在Java中,char 使用_ _ _ _ Unicode _ _ _ _ _ _编码方案,因此中文字符和英文字符都占用__2__字节的内存空间 3。当方法由_ _定义时,形参指的是参数行,当方法由_ _调用时,实际参数是传入的变量或值。 4。JSP内置对象,应用程序对象代表应用程序上下文,它允许JSP 页面与包含在同一应用程序中的任何网络组件共享信息,而会话对象是特定于每个客户的 5。如果你想把一个对象写到一个流中,这个类必须实现Seralizable 接口 6。在程序中实现多线程有两种方法:继承线程类和实现_ _ Runable _ interface 7。在多线程中,线程的相对优先级可以通过调用相应的setPriority()方法来修改 8。面向对象编程的五个设计原则是单一责任、开放和封闭、里氏尺度替换、依赖倒置、接口分离。通过Ajax,客户端获取的数据主要有两种类型:文本类型和xml 10。Socket通常也叫socket,用来描述__ ip和_ _ interface 2,多项选择题(这个大题20项,每项2分,共40分)

1。在JA V A中,如果父类中的一些方法不包含任何逻辑并且需要被子类重写,那么父类的这些方法应该使用()关键字来声明:a)final b)static c)abstract d)void 2。在JA V A中,已经定义了两个接口b和c。要定义实现这两个接口的类,下面的语句是正确的() a)接口aextend b,c b)接口a implements b,c c)类a mplements b,c d)类a mplements b,实现c 3。可以在JA V A接口()中定义 A)静态方法b)常量c)构造函数d)抽象方法 4。假设A有构造函数A (int a),那么在A类的其他构造函数中调用的构造函数和语句格式应该是() a)a(x)b)this . a(x)c)this(x)d)super(x) 5。如果x = 1,y = 2,z = 3,表达式y+= z-/++x的值为()a)3b)3.5°c)4d)5 6。下列关于继承的陈述中哪一个是正确的?( )a)子类只继承父类的公共方法和属性:b)子类继承父类的非私有属性和方法: C)子类继承父类的方法,但不继承父类的属性:d)子类继承所有的属性和方法。 7。在爪哇。使用JDBC时对于对同一个SQL语句的多次调用,使用()通常会提高效率 a)语句b)可调用语句c)准备语句d)prarmeters语句8。以下方法无法控制Servlet的生命周期:a)服务b)销毁c) dopost d) init9。可以分配给字节变量的值的范围是()0 ~ 65535 b) (-128) ~ 127 c) (-32,768) ~ 32,

软件工程试题及答案

综合练习一答案 一.选择题: 1.软件危机出现于____,为了解决软件危机,人们提出了用____的原理来设计软件,这是软件工程诞生的基础。 A.50年代末 B.60年代初C.60年代末 D.70年代初 A.运筹学B.工程学 C.软件学 D.软件学 E.数字 2.开发软件需高成本和产品的低质量之间有着尖锐的矛盾,这种现象称作____。 A.软件投机B.软件危机C.软件工程D.软件产生 3.产生软件危机的原因有如下几点,除了______。 A、软件开发过程未经审查 B、软件开发不分阶段,开发人员没有明确的分工 C、所开发的软件,除了程序清单外,没有其他文档 D、采用工程设计的方法开发软件,不符合软件本身的特点 4.软件工程学是应用科学理论和工程上的技术指导软件开发的学科,其目的是____。 A.引入新技术提高空间利用率B.用较少的投资获得高质量的软件 C.缩短研制周期扩大软件功能D.硬软件结合使系统面向应用 5.请按顺序写出软件生命期的几个阶段____,____ ,____,____,____,____。 A.维护 B.测试 C.详细设计 D.概要设计 E.编码 F.需求分析6.瀑布模型把软件生存周期划分为软件定义、软件开发和____三个阶段,而每一阶段又可细分为若干个更小的阶段。 A.详细设计B.可行性分析C.运行及维护D.测试与排错7.划分软件生存周期的阶段时所应遵循的基本原则是_____。 A、各阶段的任务尽可能相关性 B、各阶段的任务尽可能相对独立 C、各阶段的任务在时间上连续 D、各阶段的任务在时间上相对独立 8.一个软件项目是否进行开发的结论是在______文档中作出的。 A、软件开发计划 B、可行性报告 C、需求分析说明书 D、测试报告 9.分析员是____。 A.用户中系统的直接使用者B.用户和软件人员的中间人 C.软件的编程人员 D。用户和软件人员的领导 10.下列叙述中,_______不属于数据字典的作用。 A、作为编码阶段的描述工具 B、为用户与开发人员之间统一认识 C、作为概要设计的依据 D、为需求分析阶段定义各类条目 11.使用结构化分析方法时,采用的基本手段是____。 A.分解和抽象 B.分解和综合C.归纳与推导D.试探与回溯12.结构化系统分析主要是通过____进行分析的。 A.算法分解B.控制结构分解 C.数据结构分解D.处理功能分解13.分层数据流图是一种比较严格又易于理解的描述方式,它的顶层描述了系统的____。 总貌B.细节C.抽象D.软件的作者 13.变换型和事务型是程序结构的标准形式。从某处获得数据,再对这些数据作处理,然后将结果送出是属于____。 A.变换型 B 事务型 14.需求分析说明书不能作为______。

软件工程导论试题

1.办公室复印机的工作过程大致如下: 未接到复印命令时处于闲置状态,一旦接到复印命令则进入复印状态,完成一个复印命令规定的工作后又回到闲置状态,等待下一个复印命令; 如果执行复印命令时发现缺纸,则进入缺纸状态,发出警告,等待装纸,装满纸后进入闲置状态,准备接受复印命令;如果复印时发生卡纸故障,则进入卡纸状态,发出警告等待维修人员排除故障,故障排除后回到闲置状态。 请试画出复印机的状态转换图 答案: 2.录入统计计算某班学生成绩,画出数据流图(DFD)。 学生成绩表数据结构如下: 学号|高数|物理|英语|计算机|法律常识|总分|平均分|不及格门数|升留补| 需求功能如下: (1)录入全班学生各课的考分,生成成绩表; (2)检查各课成绩,修改错误,补充未录入成绩,删除非法成绩; (3)计算总分,平均分;

(4)统计不及格门数,然后再写入升级、补考、留级; (5)打印成绩通知单,交家长。 答案: 3.中国古代在“室”内举办宴会,座位以西为尊,北次之,南再次之,东最次。“按上北下南,左西右东”的方位和长幼尊卑的顺序进行入座。孙坚有四个儿子,分别为孙伯符、 孙叔弼、孙仲谋、孙季佐(长幼顺序已打乱),请根据以上叙述,画出入座顺序的程序流程图以及座位分布图。 答案: 座位分布图 程序流程图: 错误成绩通知

4.简要画出电梯系统用例图 答案: 5. 画出下列伪码程序的程序流程图和盒图:START IF p THEN WHILE q DO f END DO ELSE BLOCK m n END BLOCK

END IF STOP 流程图: 盒图:

软件工程师笔试题及答案

吉运集团 北京信息科技开发公司软件工程师笔记题 ___________________________________________ __________ 姓名:________________ 联系电话:_____________ 期望工资________________ 分)第一部分:选择题(每题5 ) 多选都正确一、以下程序中VB和C#书写的是:( A:Public strName As String 和string strName = new string() B:Public strName As String()和string strName = new string() C:Public strName(10)As String和string[] strName = new string[100]; D:以上答案都正确; 二、以下C#程序中,写法不正确的是( )多选.B :C:\\Windows\\System32 A:C://Windows//System32 D:@C:/Windows/System32 C:@C:\Windows\System32 三、下列选项中,是引用类型的是( ) A. enum类型 B. struct类型 D. int 类型类型C. string ) 四、软件开发过程一般有以下几个阶段,正确的说法是( A:需求分析,概要设计,详细设计,软件编码,软件测试 B:概要设计,需求分析,详细设计,软件编码,软件测试 C:需求分析,详细设计,软件开发,系统上线 D:系统调研,需求讨论,整体设计,系统上线,系统售后 ) 五、以下关于CLR语言描述,不正确的是( 中调用;https://www.360docs.net/doc/2618432957.html,写类,在C#翻译语言,用户可以用.NET是CLR:A. B:有了CRL 在.NET,保证了一种语言具有的功能其它语言也有; C:CLR是在.NET 中间语言,是CPU能看懂的语言; D :以上说法都正确; ( )

软件工程试题库集及答案

综合练习一答案 选择题: 1.软件危机出现于____,为了解决软件危机,人们提出了用____的原理来设计软件,这是软件工程诞生的基础。 A.50年代末B.60年代初C.60年代末D.70年代初 A.运筹学B.工程学C.软件学D.软件学E.数字2.开发软件需高成本和产品的低质量之间有着尖锐的矛盾,这种现象称作____。 A.软件投机B.软件危机C.软件工程D.软件产生 3.产生软件危机的原因有如下几点,除了______。 A、软件开发过程未经审查 B、软件开发不分阶段,开发人员没有明确的分工 C、所开发的软件,除了程序清单外,没有其他文档 D、采用工程设计的方法开发软件,不符合软件本身的特点 4.软件工程学是应用科学理论和工程上的技术指导软件开发的学科,其目的是____。 A.引入新技术提高空间利用率B.用较少的投资获得高质量的软件 C.缩短研制周期扩大软件功能D.硬软件结合使系统面向应用5.请按顺序写出软件生命期的几个阶段____,____ ,____,____,____,____。 A.维护B.测试C.详细设计D.概要设计E.编码F.需求分析6.瀑布模型把软件生存周期划分为软件定义、软件开发和____三个阶段,而每一阶段又可细分为若干个更小的阶段。 A.详细设计B.可行性分析C.运行及维护D.测试与排错7.划分软件生存周期的阶段时所应遵循的基本原则是_____。 A、各阶段的任务尽可能相关性 B、各阶段的任务尽可能相对独立 C、各阶段的任务在时间上连续 D、各阶段的任务在时间上相对独立 8.一个软件项目是否进行开发的结论是在______文档中作出的。 A、软件开发计划 B、可行性报告 C、需求分析说明书 D、测试报告 9.分析员是____。 A.用户中系统的直接使用者B.用户和软件人员的中间人 C.软件的编程人员D。用户和软件人员的领导

软件工程导论期末试题

软件工程导论期末考试试题 一.选择(20分) 1、瀑布模型把软件生命周期划分为八个阶段:问题的定义、可行性研究、软件需求分析、系统总体设计、详细设计、编码、测试和运行、维护。八个阶段又可归纳为三个大的阶段:计划阶段、开发阶段和( C)。 A、详细计划 B、可行性分析 C、运行阶段 D、测试与排错 2、从结构化的瀑布模型看,在它的生命周期中的八个阶段中,下面的几个选项中哪个环节出错,对软件的影响最大(C )。 A、详细设计阶段 B、概要设计阶段 C、需求分析阶段 D、测试和运行阶段 3、在结构化的瀑布模型中,哪一个阶段定义的标准将成为软件测试中的系统测试阶段的目标(A )。 A、需求分析阶段 B、详细设计阶段 C、概要设计阶段 D、可行性研究阶段 4、软件工程的出现主要是由于(C )。 A.程序设计方法学的影响 B.其它工程科学的影响 C. 软件危机的出现 D.计算机的发展 5、软件工程方法学的目的是:使软件生产规范化和工程化,而软件工程方法得以实施的主要保证是(C ) A、硬件环境 B、软件开发的环境 C、软件开发工具和软件开发的环境 D、开发人员的素质 6、软件开发常使用的两种基本方法是结构化和原型化方法,在实际的应用中,它们之间的关系表现为 ( B) A、相互排斥 B、相互补充 C、独立使用 D、交替使用 7、UML是软件开发中的一个重要工具,它主要应用于哪种软件开发方法(C ) A、基于瀑布模型的结构化方法 B、基于需求动态定义的原型化方法 C、基于对象的面向对象的方法 D、基于数据的数据流开发方法

8、在下面的软件开发方法中,哪一个对软件设计和开发人员的开发要求最高(B ) A、结构化方法 B、原型化方法 C、面向对象的方法 D、控制流方法 9、结构化分析方法是一种预先严格定义需求的方法,它在实施时强调的是分析对象的(B ) A、控制流 B、数据流 C、程序流 D、指令流 10、软件开发的结构化生命周期方法将软件生命周期划分成(A ) A、计划阶段、开发阶段、运行阶段 B、计划阶段、编程阶段、测试阶段 C、总体设计、详细设计、编程调试 D、需求分析、功能定义、系统设计 二.填空(20分) 21.系统流程图是描述物理模型的传统工具,用图形符号表示系统中各个元素 表达了系统中各种元素之间的(信息流动)情况。 22.成本效益分析的目的是从(经济)角度评价开发一个项目是否可行。 23.自顶向下结合的渐增式测试法,在组合模块时有两种组合策略:深度优先 策略和(宽度优先策略) 。 24.独立路径是指包括一组以前没有处理的语句或条件的一条路径。从程序图 来看,一条独立路径是至少包含有一条(在其他独立路径中未有过)的边的路径。 25.汇编语言是面向(机器) 的,可以完成高级语言无法完成的特殊功能,如与外部设备之间的一些接口工作。 26.在JSP方法中解决结构冲突的具体办法是(中间数据结构或中间文件)。 27.详细设计的任务是确定每个模块的内部特性,即模块的算法、(使用的数据)。 28.所有软件维护申请报告要按规定方式提出,该报告也称( 软件问题)报告。 29.有两类维护技术:在开发阶段使用来减少错误、提高软件可维护性的面向 维护的技术;在维护阶段用来提高维护的效率和质量的(维护支援)技术。 30.科学工程计算需要大量的标准库函数,以便处理复杂的数值计算,可供选 择的语言有:(FORTRAN语言)、PASCAL语言、C语言和PL/1语言。三.判断(10分)

相关文档
最新文档