简易房安装说明书(卫浴)

BEGIN

BEFORE YOU ·

··

··

ODEON

·

····

Before you install your shower door,please read these instructions carefully to familiarize yourself with the required tools,materials,and installation sequences.Follow the sections that pertain to your particular installation.This will help you avoid costly mistakes.In addition to proper installation,read all operating and safety instructions.

These instructions contain important care,cleaning,and warranty information-Instructions,drawings,and diagrams contained in this manual present information available at the time of printing.Although every attempt has been made to keep them up-to-date,Kohler Company reserves the right to implement product changes without further notice.

Make sure that the bath and the finished wall material are completely installed prior to installing your .

While most illustrations depict ON FLOOR

installation,and where ever possible,illustrations showing specific requirements for each option are given.Where not,dimensions relating to each are included.Tempered glass cannot be cut.

Before commencing installation,KOHLER strongly recommends reading this manual.

Please install this door on Kohler corner.

The shower door requires a flat vertical finished wall.The squareness of the wall is

recommended no more than 4mm/m.KOHLER Company won t take responsibility of the installation quality.

please leave these instructions for the consumer.

CAUTION:Risk of injury or product damage.CAUTION:ATTENTION:IMPORTANT:ODEON NATEO

INSTALLATION INSTRUCTIONS

ROUND SLIDING DOOR

K-17116T

ROUGHING-IN

Colors/Finishes

0White SHP Polished Silver /

SHP

UNIT:mm

Elevation

Plan view

抛光亮银

B

REQUIREMENTS

INSTALLATION

Phillips Screwdriver Pencil

Caulk Gun

Measuring Tape Safety Glasses Center Punch Hammer Knife

Drill &6mm Drilll Bit,3.6mm Regnlar Bit Level

Materials Required

Drop Cloth

Silicone Sealant

Tools Required

6mm 3.6mm

1.Marking and Drilling Wall Jamb Mounting Holes

Measure and mark on the receptor ledge near the wall,dimension "C"out from the back wall.

Align outside edge of wall jamb with the mark made on the receptor https://www.360docs.net/doc/8216464748.html,ing a level,plumb the wall jamb and mark the three wall mounting holes with a pencil.With a center punch,lightly punch the three hole locations for the wall jamb.(On ceramic tile,use a center punch to nick the surface glaze.)Tap the punch lightly with hammer so as not to crack https://www.360docs.net/doc/8216464748.html,e a 6mm drill bit (a masonry bit for ceramic tile).

After drilling,thoroughly clean the receptor edge and wall.Insert plastic anchors in all three holes.Repeat procedure for the other wall jamb.NOTE:Wear Safety Glasses.

1.

C

()

(

)

2.Installing Wall Jambs

Install each wall jamb by aligning the holes in the wall jambs with the holes in the wall.Secure the wall jambs with 6ST4.2x 28screws provided.

Shower Receptor

2.

6ST4.2x 28

4. Install The Infill Glass

3.安装下导轨

取一支导轨,将其两头插入墙边柱放在盆沿上。

注意:检查确保轨道内两端都有封条,并且边缘和导轨边缘平齐。

4.安装固定扇玻璃

将玻璃压进底部导轨。

注意:确保玻璃上的固定孔和底部导轨上的固定孔对齐。确保固定扇玻璃和导轨边缘对齐。

Press fit the infill glass to the bottom rail.

Note:Make sure that the fixing holes in the glass align with the holes in the bottom rail.

Make sure the glass infill panel aligns with the end of the rail.

3.Install The Bottom Rail

Install the bottom rail into the wall jamb on the receptor.

Note:Make sure there are seals in each end of the top and bottom rails,and the end of the seal aligns with the end of the rail.

5. Install The Top Rail

5.安装上导轨

Press fit the top rail to the top end of the both glass infill panels.

Make sure the glass infill panels align with the end of the rail.

按压顶部导轨两侧,使其卡入固定扇玻璃。

注意:确保固定扇玻璃与导轨边缘对齐,确保轨道孔和玻璃孔对齐。

6.Adjust The Top Rail

6.调节上导轨

To make sure that the rails are correctly fitted to the glass infill panels use a tape measure to make sure that the total height of the assembled product is 1850mm.

If higher or lower, try pressing the top rail onto the glass infill panels harder, or insert a wedge into the gap between infill glass and the seal in rail.

确保导轨正确地安装到玻璃固定扇上。用卷尺确保组装产品的总高度为1850mm。

若总高度偏高,尝试更加用力地将顶部导轨压进固定玻璃扇,若总高度偏低,尝试在玻璃和轨道内胶条之间插入楔块。

CLEANING

CARE AND

Your Kohler Shower Enclosure will remain beautiful if you take care of it.

Water conditions in various parts of the country will determine any extra cleaning attention you may have to give to your new shower enclosure.A simple routine of daily care will keep your shower enclosure looking like new.

Kohler does not recommend the use of abrasive cleaners on any of its products.Harsh cleaners will damage the metal or glass finish on your shower enclosre.

An occasional wiping down with a mild detergent diluted in water is all that needed to keep the panels and anodized aluminum parts looking new.

Replace seals,when they show signs of wear, yellowing or are not watertight.Refer to the Kohler Service Parts page.

NATEO

SERVICE PARTS PAGE

ROUND SLIDING DOOR

K-17116T 1062912

Screw,GB/T845

*

*Color code must be specified when ordering.

NATEO SERVICE PARTS PAGE ROUND SLIDING DOOR

K-17116T

相关文档
最新文档