【美联英语】编制用英语怎么说

【美联英语】编制用英语怎么说
【美联英语】编制用英语怎么说

两分钟做个小测试,看看你的英语水平

https://www.360docs.net/doc/b73059469.html,/test/waijiao.aspx?tid=16-73675-0

美联英语提供:编制用英语怎么说

编制英语说法1:

authorized strength

编制英语说法2:

weave

编制英语说法3:

Establishment

编制英语例句:

我们必须让警察人数达到(全部)编制所需的数量。

We must bring the police force up to (full) strength.

当时公司的编制正处於不稳定状态。

Organization of the company was then in a state of flux.

长皮鞭一种长形、细头编制而成的生牛皮或革制鞭,鞭尾有一摁扣

A long, tapering, braided rawhide or leather whip with a snapper on the end.

程序编制员是编制计算机程序的人。

A programmer is a person who prepares a computer program.

处置性是操息通讯编制的本领。

Manageability is the ability to manipulate the communication system.

还有的将摩斯代码编制在毛衣里,由传信者穿着传递消息。

Morse code messages were woven into a sweater that was worn by a courier.

需要在编制预算方面的现金课程?

Need a crash course on building a budget?

信息开发人员评估文档编制需求,并且审阅活动中的信息,看看是否需要文档编制。

Information developers assess documentation needs and review information in the Activity for an indication of whether documentation is needed.

死亡登记在美国是强制性的,CDC用各州生命记录办公室递交的死亡证明数据来编制人口信息。

Death registration is mandatory in the U.S., and the CDC compiles demographic information from death certificate data filed by state vital records offices.

目前,各级政府“十二五”文化产业规划编制工作已经启动。

At present, all levels of governments have already started to work out the12th Five-Year Plan for culture industry.

国土资源地质调查项目经费使用情况总结报告编制是项目承担单位的必做工作。

It is a very important work for undertaking project enterprises to draw up summary report of using geological survey project fund.

例如,帐单编制将聚合来自产品、客户、订单和其他流程(如运输和财务)的信息。

Billing, for example, aggregates information from products, customers, orders, and other processes, such as shipping and financing.

而且,使用nmon分析器,您可以将信息下载到电子表格中,并将其编制为高级管理层希望看到的漂亮的图表。

Furthermore, using the nmon analyzer, you can download information into spreadsheets and compile nice-looking charts that senior management likes to see.

“使用定制Eclipse信息中心为IT解决方案编制文档”系列的下一篇文章将会介绍如何管理重用内容内的变更。

The ne xt article in this “ Document IT solutions with custom Eclipse information centers ” series will describe how to manage change in your reused content.

通过这个信息,我们可以画出甘特图(项目经理的一个主要计划编制工具),如图2所示。

From this information, we can derive the Gantt chart ( one of the key planning tools of a project manager) shown in Figure 2.

不管怎样,资产重用和服务编制可以通过在基于SOA且架构完善的信息管理基础上构建元数据管理来实现。

Nevertheless, the good news is that asset reuse and service orchestration can be achieved by building metadata management on top of well-architected, SOA-based information management.

这些工具还应该,在帮助您管理并跟踪整个流程中的改变时,帮助您编制应用程序,建模及测试转化工作的所有方面。

The tools should also help you code the application, plus model and test all aspects of your transformation effort, while helping you manage and track changes throughout the process.

两分钟做个小测试,看看你的英语水平

相关主题
相关文档
最新文档