最新+CPIK+all++Operating+Manual+(81128+e...

最新+CPIK+all++Operating+Manual+(81128+e...
最新+CPIK+all++Operating+Manual+(81128+e...

CPIK Frequency Inverter

Operating Manual

Non-Regenerative 11M 15M 32M 48M 60 105

15RM 32RM 48RM

Regenerative

25R 33R 50R 100R 150R

A company of ThyssenKrupp Elevator ThyssenKrupp Elevator (Korea)

Printer’s imprint

All rights reserved

? Copyright by: ThyssenKrupp Elevator (Korea) Ltd.

55-30, Oryu-dong, Kuro-Ku, Seoul

Printed in Korea, September 2006

The right of reprint or reproduction, even in the case of only partly exploitation, is subject to express, written permission of ThyssenKrupp Elevator (Korea) Ltd.. Any reproduction, copying or storing in data processing machines in any form or by any means without prior permission of ThyssenKrupp Elevator (Korea) Ltd. is regarded as infringement of the current Copyright Act and will be prosecuted. Technical modifications for reasons of improvement or higher safety standard are subject to decisions of ThyssenKrupp Elevator (Korea) Ltd. without prior notice.

The responsibility for the content lies with the editor:

ThyssenKrupp Elevator (Korea) Ltd.

Preface

We are pleased that you decided to purchase a quality product from ThyssenKrupp Elevator (Korea) Ltd.

This operating manual assists you in getting familiar with the frequency inverter and its intended possibilities of use. Important information concerning safety and hazards helps you to safely use the frequency inverter as intended.

Subject to technical alteration.

1. SAFETY (1)

1.1 Explanation of symbols used (1)

1.2 General safety information (2)

2. PRODUCT DESCRIPTION AND INSTALLATION INSTRUCTIONS (5)

2.1 Representation of frequency inverter CPIK (5)

2.2 Description of frequency inverter CPIK (6)

2.2.1 Warnings (6)

2.2.2 Mounting instructions (7)

2.2.3 Technical data (8)

2.2.3.1 General data (8)

2.2.3.2 Type specification (9)

2.2.3.3 External modules (10)

2.2.3.4 Derating (10)

2.2.4 General instructions (10)

2.2.4.1 Mains voltage (10)

2.2.4.2 System configuration (11)

2.2.4.3 Mains connection (11)

2.2.4.4 Isolation of frequency inverter (11)

2.2.4.5 Leakage current (11)

2.2.4.6 Fault current (11)

2.2.4.7 Discharge time of DC link capacitors (11)

2.2.4.8 Electronic ground (11)

2.2.4.9 Run Contactor (11)

2.2.4.10 Internal fan (11)

2.3 Interface (12)

2.3.1 Connection diagram (12)

2.3.2 Frequency inverter Input and Output terminals (Non-Regenerative) (12)

2.3.2.1 Mains (12)

2.3.2.2 Motor and Cables (12)

2.3.2.3 Braking resistor (12)

2.3.2.4 Internal voltage (12)

2.3.2.5 Separately driven motor fan (13)

2.3.2.6 Motor PTC thermistor connection (13)

2.3.2 Frequency inverter Input and Output terminals (Regenerative) (13)

2.3.2.1 Mains (13)

2.3.2.2 Motor and Cables (13)

2.3.4 Encoder connection and CAN communication (14)

2.3.4.1 Encoder connection (14)

2.3.4.2 Encoder signals and CAN communication to control (14)

2.3.4.3 Using the CAN interface to connect the TCM (or TAC50K) control system (14)

2.3.4.4 Switching sequence chart with TCM control (16)

2.3.4.5 Switching sequence chart with TAC50K control (17)

2.3.5 Interface to the lift control (18)

2.3.5.1 Ready message (18)

2.3.5.2 Inputs and outputs (18)

2.3.5.3 Switching sequence chart (19)

2.4 System perturbations, EMC (20)

2.4.1 General (20)

2.4.2 Mounting Instructions (20)

2.4.3 Line choke (20)

2.4.4 Line filter (20)

2.4.5 Installation of other cables (20)

2.5 Dimension sheet (21)

2.5.1 Dimension of CPIK series (21)

2.5.2 External modules (22)

2.5.2.1 DC choke (22)

2.5.2.2 Line filter (standard, not used IT lines) (23)

2.5.2.3 Line choke (25)

3. TRANSPORT AND STORAGE (26)

3.1 General (26)

4. PUTTING INTO OPERATION (28)

4.1 Safety instructions (28)

4.2 Operating instructions (28)

4.3 Points to be observed prior to initial powering on (28)

4.4 Checking the visual displays in the event of errors (28)

4.5 Input of lift-specific values (29)

4.6 Testing the drive for correct functioning (29)

4.7 Drive optimization (30)

4.8 Measuring and setting (31)

4.8.1 LED and measuring points on TMI2 board (31)

4.8.2 LED and measuring points on RMC board (32)

4.8.3 LED and measuring points on RMBK board (Regenerative type) (33)

5. PARAMETER ENTRY (34)

5.1 General (34)

5.2 Operation (34)

5.2.1 Display and change of parameters (34)

5.2.2 Display parameters (35)

5.2.3 Save changed parameters to EEPROM (35)

5.2.4 All parameters as factory-set (35)

5.2.5 Individual parameters as factory-set (36)

5.3 Error stacks (36)

5.3.1 Display error stack (36)

5.3.2 Delete error stack (36)

5.3.3 End error stack (36)

5.3.4 Error description (36)

5.4 Parameters (36)

5.4.1 Variable parameters (36)

5.4.2 Display parameters (45)

6. SHORT-RUN DEVICE (48)

6.1 General (48)

6.2 Settings (48)

50 7. MODERNIZATION (50)

7.1 General (50)

7.2 Modernization by encoder mounted on motor shaft (50)

7.2.1 Rating (50)

7.2.2 Motor adaptation (50)

7.2.3 Settings for synchronous motors (51)

7.2.4 Setting into operation (51)

8. ANNEX (52)

8.1 Declaration of Conformity (52)

8.2 Parameter Setting (55)

8.3 Monitoring Parameter (57)

8.4 Error description (58)

8.5 Extra info for pulse enables power part (PDPINT) (60)

8.6 Extra info for “run contactor problems” (61)

8.7 Connection diagram (62)

8.8 How to use the Hyper-terminal (70)

1. SAFETY

1.1 Explanation of symbols used

The following pictographs and designations are used in this operating manual:

Danger

This symbol draws attention to an extreme danger to life or risk of injury to persons.

Disregard of warning means danger to life !

Danger

This symbol draws attention to an immediate impending danger to life or risk of injury to

persons caused by electric current.

Warning notices must always be observed!

Warning

This symbol draws attention to an impending danger.

Disregard can cause injury to persons or extensive damage to property.

Warning notices must always be observed!

Note

This symbol draws attention to important information and instructions for operation.

Disregard can lead to damages, hazards or failures.

Inspection

This symbol draws attention to inspection sequence.

These inspection notices must be observed in any case. Disregard can lead to injury to

persons or damage to property.

1.2 General safety information

Information about the operating manual

Knowledge of the basic safety requirements is a prerequisite for the safe use and the failure-

free operation of this component.

This operating manual comprises the most important information how to safely use the

component.

The operating manual and, in particular, the safety information must be observed by all persons

who perform any work on the component.

In addition the rules and requirements concerning the regulations for prevention of accidents

which apply to the installation location must be observed.

Duties of the owner and / or the installer

The owner and / or installer ensures that only persons are authorized to work at the component,

who

? are familiar with the requirements concerning safe working and prevention of accidents and

who were trained how to use the component;

? have read the safety information and the warning notices in this operating manual.

Check the compliance of the employee’s method of working with the safety requirements in

regular intervals.

Duties of the employees

Persons who are authorized to perform work at the component are obliged

? to observe the requirements concerning safe working and prevention of accidents;

? to read the safety information and the warning notices in this operating manual prior to start

working.

Training of the employees

Only trained and instructed, technically competent persons shall perform work at the

component.

The competence of the employees must be clearly defined for all tasks concerning putting into

service, operation, maintenance and repair work.

Organizational measures

The owner or the installer must provide the necessary personal protective gear. All existing

safety devices must be checked regularly in accordance with the maintenance plan.

Informal information about safety measures

? The operating manual must always be available at the location of the installation.

? In addition to the operating manual the general and local regulations for the prevention of accidents and environmental regulations must be made available and observed.

? Clearly and easily visible statutory safety instructions must be made available for the users. ? See to it that all information concerning safety and hazards is always visibly and legibly made available on the machine.

Use as intended

The FREQUENCY INVERTER is exclusively designed for use as controller in lift drives in accordance with EN 112015 or EN 12016 as well as EMC directive 89/336/EC.

Installation of the frequency inverter is subject to compliance with the requirements for installation and use of electrically-operated installations (EN 50 178 / VDE 0160 and VDE 0110).

Any other use or any use exceeding the scope of the above definitions is regarded as use outside of the intended purpose. ThyssenKrupp Elevator (Korea) Ltd. cannot be hold liable for any damages resulting from this and for any damages which are caused by any errors of procedure.

Use within the scope of intended purpose also comprises

? observance of all information of the operating manual

? f ulfillment of the instructions applying to putting into service, installation description and inspection and repair work.

Guarantee and liability

The “General sales and delivery terms“ of ThyssenKrupp Elevator (Korea) Ltd. apply generally. Any claims for guarantee and liability are excluded in the case of injury to persons or damage to property resulting from one or several of the causes below:

? use of FREQUENCY INVERTER outside the scope of its intended purpose

? inexpert installation and putting into service of the FREQUENCY INVERTER

? operating the FREQUENCY INVERTER with defective and/or non-operative safety and protective devices

? disregard of instructions of the operating manual

? unauthorized constructional modifications of the FREQUENCY INVERTER

? unsatisfactory supervision of parts which are subject to wear

? inexpert repair work

? catastrophes caused by outside influence and Act of God.

Modifications of FREQUENCY INVERTER

The FREQUENCY INVERTER is adjusted and sealed at the factory.

In case of modifications or damage of the sealing ThyssenKrupp Elevator (Korea) Ltd. cannot be hold liable.

In case of inexpert use there will be the risk of damage to life of the user resp. third parties or impairment of the component or material property.

Failures which may affect safe operation must be eliminated immediately.

Use of FREQUENCY INVERTER and possible hazards

The state-of-the art frequency inverter complies with the safety requirements in force. The frequency inverter shall only be used

? as intended and

? with the safety devices in perfect working condition.

In case of inexpert use there will be the risk of damage to life of the user resp. third parties or impairment of the component or material property.

Failures which may affect safe operation must be eliminated immediately.

Works on the frequency inverter shall only be performed with the lift installation protected against unintentional switching on.

See instructions in chapters

2.2.4.6 Fault current

5.4.1 Variable parameter (P92: discharge of DC link)

2. PRODUCT DESCRIPTION AND INSTALLATION INSTRUCTIONS

2.1 Representation of frequency inverter CPIK

0 Control voltage (1ph AC380V) connection

1 “Ready message“ connection

2 Motor thermo sensor connection

3 DC choke

4 Main voltage (3 ph AC380V) connection

5 Dynamic braking resistor connection

6 Motor connection

7 Parameter Entry Panel interface

8 PC (RS-232C) interface

9 CAN communication and Encoder signal output

10 Encoder connection (Incremental encoder)

11 Encoder connection (Absolute encoder)

Reference of terminals see chapter 8.7 Connection diagram

2.2 Description of frequency inverter CPIK

The description and installation instructions are intended to inform the engineer planning the master lift control about the use of the frequency inverter range CPIK.

The frequency inverter is a pulse inverter with DC link, latest microprocessor technology and IPM

(Intelligent Power Module) solid state power components.

Power vector control and field-oriented motor management by motor-mounted rotary encoder permits maximum dynamic performance and, therefore, load- independent high-quality run performance.

The drive system consisting of CPIK frequency inverter and …ThyssenKrupp motor“ is factory-adjusted.

The motor shall not be adapted to the frequency inverter prior to powering the lift installation on.

Only check whether the adequate motor (see name plate) and encoder type (number of increments) are selected.

Display selection of correct values by parameter P 40 (motor) and P 96 (encoder).

Try to determine the pulse number per revolution through parameter P 105 if unknown. (See chapter

5.4.2 display parameters).

Adaptation in the course of putting the frequency inverter into operation for third-party motors. (See chapter 7. Modernization).

The main features of the frequency inverter range CPIK consists of the following points:

? PWM control with 16 kHz pulse frequency, i.e. no motor noise. This frequency will be reduced

automatically by overload.

? Peak current is available for approx. 10 second during operation. Higher current is available for

approx. 4sec in case of overload (in particular “release of safety gear operation”). However the

switching frequency is reduced to 4 kHz (see chapter 2.2.3.2 Type specification).

? Connection of contactors on mains (before the frequency inverter) or motor side (after the frequency inverter). (See chapter 2.2.4.9 Contactors).

? No integrated fuses. Therefore adaptation of the installation fuses to inverter output

? Control voltage (380~400 V) required.

? Regenerative energy is converted to heat by external brake resistor incase of Non-Regenerative.

? Presetting of running characteristic by short run computer. Monitoring of reference/actual speed.

Monitoring is not effective at “Vi” (inspection speed).

? Isolated integrated voltage detection. Therefore devices can also be used for IT mains.

? Device connection without removing of covers. All cable terminals are on top side and lower side

(motor and brake resister) of device; control terminals are accessible from front side.

? Speed to 2.0 m/s with geared drives

to 6.0 m/s with gearless drives

to 1.25 m/s with third-party motors(modernization jobs)

Observe minimum floor-to-floor distances.

(see chapter 4.8.3 Diagram for determining the min. permissible floor-to-floor distances).

2.2.1 Warnings

? Works on the frequency inverter shall only be performed by trained and qualified personnel. They

must observe the appropriate rules for prevention of accidents and shall be informed about the

danger of electric current to be considered.(See chapter 1.2 General safety information).

? Frequency inverters are electronic devices and, therefore, not fail-safe. The owner of the

installation is responsible for the safety of persons and protection of material property.

? Requirements for the installation and operation of electric systems (EN 50 178 / VDE 0160 and

VDE 0110) must be observed for mounting of frequency inverter.

Protective measures to be taken acc. to local conditions and regulations.

? Electric energy may still be present after shutting off the inverter. (Charge of DC link capacitors).

This applies to defective devices in particular. A warning to this effect is displayed on the device

and must also be present in the operating manual of the lift control.

? The integrated heat sink or other components, too, may still have a temperature > 60 °C during

operation or shortly after powering off the device.

? The external brake resistor may have a temperature > 200 °C during operation.

? The brake resistor should preferably be fitted on the control cabinet roof.

Observe that there is no combustible material above the brake resistor.

? Wall-mounted brake resistors shall not be fitted on / below combustible materials.

These warnings do not claim to be complete.

2.2.2 Mounting instructions

The following points are to be observed:

The frequency inverter is a building part which is designed in protection class IP20.

Mounting dimensions and required free space for ventilation see dimension sheet (chapter 2.5

Dimension sheet).

Vertical mounting position is to be observed and free air inlet/outlet at heat sink provided.

Ventilation apertures are required with the frequency inverter installed in a control cabinet. Power loss see technical data.

Respective measures are required if polluted cooling air impairs the operation of the frequency

inverter (installation of air filter and regular cleaning, for example).

< CPIK Installation and connection of motor cable >

2.2.3 Technical data

2.2.

3.1 General data

Main Power connection, intput

Rated mains voltage [V] 3 phase AC 380, without N

Maximum voltage range [V] 3 phase AC 380 -15%, AC415 +10%

Mains frequency [Hz] Rated 50, range 48 (63)

System configuration TN, TT, IT

Power factor cos ?1 0.98 with rated input current

Line power factor λ0.94 with rated input current

Control Power connection, input

Mains voltage 1 AC 380 V - 25%, AC415 +10%, without N, 50/60 Hz

Power max. Max. 100VA, Max. 200VA (R-type)

If control power voltage is over AC415V, the step-down transformer must exchange AC380/AC220 to AC415/AC220 in CPIK

Protection class and climatic conditions

Protection class IP 20

Permissible coolant temperature [°C] 0 ... 45 Derating for higher temperature

Max. height of installation site [m NN] 1000 Derating for higher heights

Max. relative humidity [%] 95 No icing

Contamination level 2 Acc. to DIN VDE 0160

System perturbations, EMC

Radio-interference level (emission) EN 12015

Interference immunity (immunity) EN 12016

< 0.3

Current harmonic I5/I1

< 0.08 (R-type)

With rated input current 1)

≈35%

Total harmonic distortion THD- F2)

≈10% (R-type)

1) In case of CPIK with operating capacity < 70 % rated output line reactor with higher inductance

required, see chapter 2.5.2.2 Line choke

2) Total harmonic distortion (harmonic RMS current) related to fundamental-frequency current.

Operating mode, characteristics

Alternating duty cycle S5

Duty cycle and ratio [c/h], [ED] 240 with 50%

Open circuit, earth-fault proof yes

Short-circuit proof Acc. to DIN VDE 0160

2.2.

3.2 Type specification

(Non-Regenerative type)

Model CPIK unit 11M 15M 32M 48M 60 105 Input data (mains side)

Rated input current [A] 15 23 29 46 55 83 Peak input current for 10 sec [A] 28 43 58 87 119 165 Rated input power [kVA] 10 15 19 30 36 54 Rated input power for 10 sec [kVA] 18 28 38 57 78 109 Cable cross-sectional area [mm2] 4 4 4 10 16 22 Output data (motor side)

Range of output voltage [V] 3 phase AC 0 ~ 350

Rated output current [A] 16 24 32 48 60 90 Peak output current for 10 sec [A] 30 45 60 90 120 180 Rated output power [kVA] 10 15 19 29 36 55 Peak rated power for 10 sec [kVA] 18 27 36 55 73 109 Cable cross-sectional area [mm2] 4 4 6 10 16 22 Loss power per current [W/A] 17.3 17.3 16.2 16.5 13.6 13.7 Efficiency 0.97

Mechanical data

Dimensions W [mm] 240 240 240 240 344 344 Dimensions H [mm] 450 450 450 450 523 523 Dimensions D [mm] 180 180 180 180 243 243 Minimum top/bottom clearance [mm] 100/100

Fan power of device (free air flow) [m3/h] 138 138 138 138 276 276 Weight [kg] 13 13 14 14 40 42 DC choke No built-in Built-in (Regenerative type)

RM type R type

Model (CPIK) unit

15 32 48 25 33 50 100 150 300 Rated input current [A] 20 27 40 21 28 40 81 121 180 Peak input current for 10 sec [A] 38 58 78 53 70 106 186 279 630 Rated input power [KVA] 15 19 29 14 18 24 48 72 125 Rated input power for 10 sec [KVA] 27 36 55 30 40 59 117 176 370 Cable cross-sectional area [mm2] 4 6 10 4 6 10 25 38 38x2 Rated output voltage [V] 3-phase AC340 3-phase AC440

Range output voltage [V] 3-phase AC0~380 3-phase AC0~480

Rated output current [A] 24 32 48 18 24 35 70 105 180 Peak output current for 10 sec [A] 45 60 90 40 53 77 154 231 450 Rated output power [kVA] 15 19 29 14 18 24 48 72 140 Peak rated power for 10 sec [kVA] 27 36 55 30 40 59 117 176 375 Cable cross-sectional area [mm2] 4 6 10 4 6 10 16 30 30x2 Loss power per current [W/A] 17.3 16.2 16.5 34.6 32.4 42.842.842.842.8 Total Efficiency 0.94

Dimensions W [mm] 440 440 440 440 440 440 600 700 1400 Dimensions H [mm] 1400 1400 1400 1401401400 1800 1900 2200 Dimensions D [mm] 250 250 250 250 250 250 290 350 600 Minimum top/bottom clearance [mm] 100/100

Fan power of device [m3/h] 276 276 414 276 276 414 552

Weight [kg]

EMI filter and AC choke Built in

CPI 300R: To use TKAW product

2.2.

3.3 External modules

DC-link choke (for CPIK 15M, 32M and 48M)

Item unit CPIK 15M CPIK 32M CPIK 48M

Inductance [mH] 2.2 1.8 1.4

Rated current [A] 23 30 40

Model No. HLD23A-2200 HLD30A-1800 HLD40A-1400

3 phase line filter

Item unit CPIK15M CPIK32M CPIK48M CPIK 60 CPIK 105 Rated current [A] 37 50 90

Model No. A3W4037-TD A3W4050-TD GT3AT-4100

3 phase line choke

Item unit CPIK15M CPIK32M CPIK48M CPIK 60 CPIK 105 Inductance [mH] 3 x 1.2 3 x 0.43 3 x 0.29 3 x 0.15 Rated current [A] 24 34 50 90

Model No. ACL16A1200 ACL34A430 ACL50A290 HL-90A-150 Dynamic Braking Resister (Geared/Gearless)

Item unit CPIK15M CPIK32M CPIK48M CPIK 60 CPIK 105 Minimum value [Ohm]50 / 28 33.3 / 20 25 / 14 20 / 10 16.7 / 8.3

Power consumption [kW] 2 / 3.6 3 / 5.4 4 / 7.2 5 /10 6 / 12

2.2.

3.4 Derating

The permissible output current shall be reduced acc. to below charts for installation sites at height > 1000m NN or coolant temperature > 45°C.

2.2.4 General instructions

2.2.4.1 Mains voltage

Autotransformer on power input required if mains voltage and permissible mains voltage range

differ (AC380V -15% ~ AC415V +10%).

Too low mains voltage shall also be adapted due to fixed motor voltage.

2.2.4.2 System configuration

The frequency inverters are rated for TN, TT or IT systems (see VDE 0100 part 300, November

1985).

2.2.4.3 Mains connection

The cables don’t draw connection between frequency inverter and mains supply. (see VDE 0160,

chapter 5.2.11.1: April 1998).

2.2.4.4 Isolation of frequency inverter

Isolation of frequency inverters is only possible with power and control voltage inputs disconnected since the frequency inverters have separate control voltage inputs.

2.2.4.5 Leakage current

It interfere suppression by Y capacitors between phase and protective earth conductor of frequency inverter and line filter.

The arising leakage current is > 3.5 mA.

Therefore cross-section of the protective earth conductor of supply cable shall be at least 10 mm2

Cu in accordance with VDE 0160, chapter 5.3.2.1: April 1998.

2.2.4.6 Fault current

Fault current with zero-frequency quantity can arise in case of earth contact in frequency inverter.

Therefore the leakage current of the Y capacitors make use of protective equipment against

standard fault current (FI) (pulsating current sensitive) impossible.

The operation manual shall inform that use of protective fault current equipment only does not fulfill the requirements of VDE 0160, chapter 5.2.11.2: April 1998.

AC-DC sensitive fault current protection is recommended. Connection notes of manufacturer are to be observed.

2.2.4.7 Discharge time of DC link capacitors

The recommended residual voltage of 60 V after 5 seconds as required acc. To VDE 0113, part 1, chapter 6.2.3: (June 1993) is not complied with. A warning to this effect is given on the frequency

inverter.

A quick forced discharge by manual short-circuiting is not permissible.

2.2.4.8 Electronic ground

Electronic ground (electronic zero) is electrically connected with the protective earth conductor.

2.2.4.9 Run contactors

The run contactors can be connected on the line side (before the frequency inverter) or on the

motor side (after the frequency inverter).

Contactors with 60 Hz AC coil excitation can be used if connected on line side.

The shielded motor-cable can also be run to the frequency inverter in accordance with the EMC

requirements and the shielded motor cable connected by suitable cable clips.

Coils with DC coil excitation shall be used for motor side connection. This guarantees delayed

release of contactors. The shielded motor cable can be run to the run contactor in accordance with the EMC requirements and the shielded motor cable connected by suitable cable clips. Short and

twisted cabling of the motor lines running to 2 run contactor is recommended.

The contactor coils should be provided with overvoltage protection elements (RC element or free-

wheeling diode).

2.2.4.10 Internal fan

The internal fan for cooling the heat sink is turned on during every run.

If the heat sink temperature exceeds a certain value, the fan will continue running until the heat sink

2.3 Interface

2.3.1 Connection diagram

The connection diagram (see chapter 8.7 connection diagrams) shows an overview of all terminals required for the operation of the frequency inverter.

2.3.2 Frequency inverter Input and Output terminals (Non-Regenerative)

Terminals of top side

No. Symbol Contents

X1.1 PE Input: PE for control voltage

X1.2 380R

X1.4 380S

Input: Control voltage, 1 phase AC 380V

X1.15 RD1

X1.16 RD2

Output: CPIK “Ready contact”

X1.17 TM1

X1.18 TM2

Input: Motor temperature

X1.09 DCL X1.10 DCL DC-link choke ( in case of CPIK15M, 32M and 48M)

If there are no use this choke, must short X1.09 and X1.10

X1.11 L1

X1.12 L2

X1.13 L3

Input: Main power, 3 phase, AC 380V, 50/60 Hz

X1.14 PE Input: PE for Main power

Terminals of lower side

No. Symbol Contents

X1.19 PE Output: PE for Dynamic Braking Resister

X1.20 RA1 Output: IGBT collector terminal for Dynamic Braking Resister

X1.21 RA2 Output: DC link P+ terminal for Dynamic Braking Resister

X1.23 N- Output: DC link N- terminal

X1.24 U

X1.25 V

X1.26 W

Output: Motor power

X1.27 PE Output: PE for motor power

2.3.2.1 Mains

Line input of frequency inverter L1, L2, L3 without N on terminal strip X1, terminals 11, 12, 13 (PE at terminal 14)

2.3.2.2 Motor and Cables

At terminal strip X1, motor output of inverter is terminals 24, 25 and 26 including 27 (PE).

The motor must be connected via a four-core screened line. For reasons of electromagnetic

compatibility, the screen must be connected to the mounting plate over a large surface in the control cabine t in the immediate vicinity of the inverter or run contactor (see chapter 2.2.4.9 run

contactors). Cable clamps to be made provision for adequateness.

The motor cable should not exceed a maximum length of 30 m and the cable should not be run in parallel to signal lines.

2.3.2.3 Dynamic braking resistor

The device invariably accommodates a transistor for driving the braking resistor.

The braking resistor must be always fitted on the outside (preferably on the control cabinet roof,

also see 2.2.1 Warnings). Data for braking resistor refer to 2.2.3.3.

Braking resistor to be connected to terminal strip X1, terminals 20 (RA1) and 21(RA2).

2.3.2.4 Internal voltages

Voltage to internal fan and the internal electronic voltage is supplied via the separate 380 V control voltage connection at terminal strip X1, terminals 2 and 4.

2.3.2.5 Separately driven motor fan

A separately driven fan on the motor must be switched directly from the lift control.

2.3.2.6 Motor PTC thermistor connection

The PTC thermistor accommodated in the motor must be connected to terminal strip X1, terminals

17 and 18.

The frequency inverter shall be shut off approximately 30 seconds after motor over temperature is

reached or termination of current run. The CPIK ready message at terminal strip X 1, terminals 15

and 16 will be removed (relay contact open).

A new run command can be given after the motor has cooled down (ready message present again).

Connect terminals 17 and 18 with a wire jumper in the absence of a motor PTC thermistor.

2.3.3 Frequency inverter Input and Output terminals (Regenerative)

Magnet Contactor and Connector in RMBK Board

Contactor / Connector Pin No. Symbol Contents

2 L1

4 L2

Q1 or MCCB

6 L3

Input: Main power, 3 phase, AC 380V, 50/60 Hz

2 U

4 V

K06.1

6 W

Output: Motor power

1 Coil1-1

2 Coil1-2

3 Coil2-1

X515

4 Coil2-2

Brake Coil

1 PE Input: PE for Control voltage

2 0

X512

3 220

Input: Control voltage

1 220

2 nc X516

3 0 Input: Power for K01, K01.1 (Safety line of TAC50K)

1 Th1.1

2 Th1.2

Brake PTC

3 Th2.1

4 Th2.2

Motor PTC

5 0V

6 LU1

Brake contactor

7 0V

X514

8 LU2

Brake contactor

In case of RM type and R type, refer to connection diagram in chapter 8

2.3.3.1 Mains

Connect main input line of frequency inverter L1, L2, L3 without N on Q1 or MCCB, Connect PE on plate.

2.3.3.2 Motor and Cables

Contact 2, 4 and 6 on magnet contactor K06.1is motor output of inverter

The motor must be connected via a four-core screened line. For reasons of electromagnetic

compatibility, the screen must be connected to the mounting plate over a large surface in the control cabine t in the immediate vicinity of the inverter or run contactor (see chapter 2.2.4.9 run

contactors). Cable clamps to be made provision for adequateness.

The motor cable should not exceed a maximum length of 30 m and the cable should not be run in

parallel to signal lines.

2.3.4 Encoder connection and CAN communication

2.3.4.1 Encoder connection

The incremental encoder for speed measurement is connected to plug X 907 of TMI2 board (9-pole sub-connector / socket). The absolute encoder for speed measurement and magnet pole position is

connected to plug X 917 of TMI2 board (15-pole D-sub-connector / socket). For reasons of

electromagnetic compatibility, the screen is placed on the plug casing over a large surface both on the device side and on the encoder side. The maximum length of the encoder cable should not exceed 40 m.

The pulse number of the encoder is 1024 or 4,096, 16,384 incremental type for asynchronous motor and 2,048 EnDat absolute type for Synchronous motor.

Output signal of incremental encoder use line drive format

Output signal of absolute encoder use line drive format

Pin assignment of incremental encoder Pin assignment of absolute encoder

Signal X 907, Pin Signal X 917, Pin Ua 1 inverted 1 Ua 1(sinus) 1

Ua 1 2 0V(GND) 2

Ua 2 3 Ua 2 (cosinus) 3 Ua 2 inverted 4 5V 4

Ua 0 5 data 5 Ua 0 inverted 6 shield 6

0 Volt 7 clock 7

PE / shield 8 Ua 1 inverse(sinus) 8

+ 5 Volt 9 Ua 1(sinus) 9

Ua 2 inverse(cosinus) 11

data inverse 13

clock inverse 15

2.3.4.2 Encoder signals and CAN communication to control

The encoder signals from the motor encoder are available at TMI2 board on plug X 906 (D-sub, 15-pole, pins) and can be used in the control (path or speed detection, for example).

The CAN interface signals from the TCM control or TAC50K control are connected at TMI2 board on plug X 906 (D-sub, 15-pole, pins). They are isolated from the frequency inverter electronics by opto-couplers.

Pin assignment:

Signal X 906, Pin Signal X 906, Pin

Ua 1 5 Ua 1 inverted 13

Ua 2 6 Ua 2 inverted 14

0 Volt 7

CAN-L 8 CAN-H 15

Not used All other pins

2.3.4.3 Using the CAN interface to connect the TCM (or TAC50K) control system

The TCM (or TAC50K) interface is used for control command communication and for acknowledge signals between TCM (or TAC50K) and CPIK via CAN bus and for transmission of motor rotary encoder impulses from CPIK to TCM (or TAC50K). There is potential separation between TCM (or

a) Connection with TCM control system

Control commands

start and travel direction signal upwards UP

start and travel direction signal downwards DOWN

run enabled FF

From TCM

speed reference value Vsoll

acceleration set point value asoll

load weighing signal QLMS

switch on travel contactors ESP

To TCM

brake open command EBS

start reference value STS Status signals

travel contactor on acknowledgment QSP From TCM

brake released acknowledgment BR1

motor overtemperature MUET To TCM

RPM zero signal N=0

collective fault signal SMR

b) Connection with TAC50K control system

Control commands from TAC50K (0x33)

Word0 speed command value Vsoll

Word0 pre-torque reference value QLMS

Status signals from TAC50K (0x33)

Word1-Bit0 speed reference /pre-torque reference0 / 1

Word1-Bit1 the Inverter turns on current to the motor RUN

Word1-Bit10 enable for UPS operation UPS

Word1-Bit11 drive enable DE

Word1-Bit13 MC1 contactor ON acknowledgment QSP

Word1-Bit15 brake released acknowledgment BR1

Control commands to TAC50K (0x01)

Word1-Bit0 drive enable DE

Word1-Bit3 when true, CPIK is unable K1-FLT Word1-Bit7 brake open command EBS Word1-Bit8 Acknowledge Motor Contactor1 (Regen type only)RK1 Word1-Bit9 Acknowledge Motor Contactor2 (Regen type only) RK2 Word1-Bit10 Temperature motor / break / line choke (Regen type only) Tmot Word1-Bit11 Acknowledge Break 1 (Regen type only) BK1 Word1-Bit12 Acknowledge Break 2 (Regen type only) BK2

安全生产工作计划

铜川市第一建筑工程有限责任公司 2019年安全生产工作计划 为加强公司施工安全管理工作,有效防范各种安全事故的发生,我单位以“安全第一,预防为主,综合治理”的方针,以及“谁主管,谁负责”的指导思想,认真贯彻落实《中华人民共和国安全生产法》、《中华人民共和国建筑法》、《国务院关于特大安全事故行政贡任追究的规定》、《陕西省建筑工程质量和安全生产管理条例》等各项安全生产法律、法规、规范的实施,全面落实安全目际管理责任制考核,控制各类事故的发生,确保公司各项安全工作目标任务的圓满完成。制定2019年安全生产工作计划如下: 一、安全工作目标 安全管理目标为:全年安全生产杜绝重大安全事故和死亡事故发生,轻伤事故月发生率控制在千分之三。创建市级文明工地2个,力创省级文明工地1个。 二、严格执行安全生产考核制度 根琚《中华人民共和国安全生产法》的要求,我司修订了安全生产责任制,全面落实安全生产责任制度,层层签订安全生产目标责任书,将安全目标责任层层细化与量化,落实到各职能部门、项目部,班组,重要岗位及特殊岗位个人。 三,提升管理水乎、提高业务素质,加强项目人员配备 1、及时修订完善各项安全规章制度,做到安全工作有法可

依、有理有据、根据实际情况调整安全管理重点,根据人员调动,调整安全领导小组成员,积极主动的迎接各项上级安全检查工作,总结各项安全工作中的不足,积极改进,创新创誉。 2、加大安技部人员的专业学习培训,尽快提高安全人员的业务能力,以提高整体安全人员素质。 3、安全员的配备须经培训合格持证上岗 4、坚决执行事故隐患整改领导负责制。实行逐级管理,事故现场中存在的事故隐患必须由安技部负责,限期整改落实 四、加强安全宣传、教育培训,提高员工安全生产意识 1、每年年初召开一次安全教育大会,所有管理人员均需参加学习新知识及全年工作部署。 2、定期召开安全生产例会,每月不少于一次安全例会、安全大检查。每季度不少于一次安全综合评比,奖罚分明,促进安全工作对安全意识淡薄,不重视安全工作的管理人员、施工人员,要进行相应的处罚以确保安全体系正常运行。 3、重视安全培训教育,每季度不少于一次安全教育活动,组织管理人员、施工人员进行安全知识竞赛、观看安全影视、学习有关安全会议精神等,丰富安全活动,更好的达到安全宣传的效果。 4、加强特殊工种岗位作业人员的培训、取证、复审的检查工作。组织特殊工种作业人员接受有关单位进行上岗证培训及换证培训,严禁无证上岗。 5、项目部要广泛利用施工安全简报、黑板报、宣传栏、标

安全生产工作计划(最新版)

安全生产工作计划(最新版) Complete each work in accordance with the work plan. The plan plays a role of supervision and supervision to prevent and correct deviations in the implementation process. ( 工作计划 ) 部门:______________________ 姓名:______________________ 日期:______________________ 编号:MZ-SN-0044

安全生产工作计划(最新版) 2011年是实施“十二五”经济社会发展规划的开局之年,也是全市安全生产“基层基础攻坚年”。为切实保护人民群众生命财产安全,推动我镇安全生产形势进一步稳定好转,结合我镇实际,特制定2011年安全生产工作要点如下: 一、指导思想 2011年全镇安全生产工作的指导思想是:以党的十七届五中全会、市委三届八次全委会和全市经济工作会议精神为指导,深入贯彻落实科学发展观,牢固树立安全发展理念,坚持“安全第一、预防为主、综合治理”方针,认真落实国发〔2010〕3号和渝府发〔2011〕2号文件精神,以实施安全生产“基层基础攻坚年”为主题,以开展落实企业安全生产主体责任行动为主线,以安全生产大宣教大排查大整治大执法专项行动为动力,强力提升政府监管能力,落实企业

主体责任,强化重点行业监管,提高安全保障能力,营造浓厚安全氛围,有效遏制较大事故,坚决防控重特大事故,确保全镇安全生产形势持续稳定,努力为全镇经济社会发展提供强有力的安全保障,确保“十二五”期间安全生产工作良好开局。 XXX图文设计 本文档文字均可以自由修改

安全生产2017年度工作计划.

最新资料,word文档,可以自由编辑!! 精 品 文 档 下 载 【本页是封面,下载后可以删除!】

2017年度安全生产工作计划为进一步贯彻落实“安全第一,预防为主,综合治理”的安全生产方针,强化安全生产目标管理和本质安全管理;并结合公司安全生产实际,特制定2017年安全生产工作计划。第一、安全生产方针与目标 安全生产方针 以人为本安全第一预防为主全员动手综合治理科学管理改善环境持续发展 安全生产目标: 不发生安全事故,不损害人体健康,不破坏环境; 以法制化、标准化、规范化、系统化的方式推进安全生产,进一步完善职业健康安全管理体系,不断提高企业安全管理水平,不断建立安全生产标准化长效机制,确保企业长期安全运行。 第二、提升安全管理水平,完善安全管理基础 要以公司对2017年安全生产目标管理责任为指导,以公司安全管理制度为标准,以安全工作总方针“安全第一,预防为主,综合治理。”为原则,以部门和班组安全管理为基础,以预防重点单位、重点岗位重大事故为重点,落实各项规章制度和安全责任。协同配合推进安全标准化工作,完善安全组织和管理体系,落实安全责任,强化安全管理,并保障有效实施。 1、签订安全生产责任状。根据公司2017年安全目标管理工作要求,把安全生产责任切实落实到每个部门、车间和岗位及个人。实行“员工个人与班组、班组与车间(部门)、车间(部门)与主管领导、主管领导与总经理”实行安全生产目标管理一级保一级的层层签订安全生产责任状,做到在安全工作中各尽其职,各负其责。 3、开展安全标准化建设工作,对照《安全生产标准化规范》完善企业各项安全管理制度、记录台帐。按时完成、改进各项工作。 4、认真贯彻企业各项《安全规章管理制度》,切实加强生产、经营、储运、使用和废弃等各个环节的安全管理工作。完善安全生产管理的长效机制。 5、严格执行企业《重大危险源管理制度》,强化各项监控措施,确保重大危险源安全平稳运行。并深入继续开展消除危险源的工作。 6、严格执行企业《安全生产责任制》,落实安全责任,保证安全所必须的投入,做到组织措施、管理措施、技术措施的认真落实。

备自投工作原理

微机备自投装置的基本原理及应用 本文介绍了微机线路备自投保护装置特性和应用中的供电方式,阐述其应用于母联备自投工作和线路备自投的工作原理及备自投保护装置运行条件及动作条件。 备自投保护供电方式技术条件 1.引言 随着我国人民生产生活的现代化程度日益提高,人们对电力的需求和依赖程度也在倍增,对电能质量的要求也更加严格,供配电在各个领域也不断向自动化、无人值守、远程控制、不间断供电的目标迈进。有些电力用户尤其对不间断供电的要求显得更加突出。我国的电力供应主要还是依靠国家电网供电,电力缺口也在不断增大,尤其在用电高峰期缺电现象严重,为此很多大型企业便自建电厂或配备发电机,因此各种电源的相互切换,保证电源的不间断供电和供电的高可靠性成了现代配电工程中保护和控制回路的重要部分。在GB50062 《电力装置的继电保护和自动装置设计规范》中的第十一章也明确规定了备用电源和备用设备的自动投入的具体要求。 微机线路备自投保护装置使系统自动装置与继电保护装置相结合,是一种对用户提供不间断供电的经济而又有效的技术措施,它在现代供电系统中得到了广泛的应用。在此只对微机线路备自投保护装置在电力系统中两种备自投方式和基本原理进行探讨。

微机线路备自投保护装置(以下简称备自投)核心部分采用高性能单片机,包括CPU模块、继电器模块、交流电源模块、人机对话模块等构成,具有抗干扰性强、稳定可靠、使用方便等优点。其液晶数显屏和备自投面板上所带的按键使得操作简单方便,也可通过RS485通讯接口实现远程控制。装置采用交流不间断采样方式采集到信号后实时进行傅立叶法计算,能精确判断电源状态,并实施延时切换电源。备自投具有在线运行状态监视功能,可观察各输入电气量、开关量、定值等信息,其有可靠的软硬件看门狗功能和事件记录功能。 产品在不同的电压等级如110kV、10kV、0.4kV系统的供配电回路中使用时需要设定不同的电气参数,在订货时必须注明。在选择备自投功能时则一定不可以投入低电压保护,以免冲突引起拒动或误动。 变配电站备自投有两种基本的供电方式。第一种如图1所示母联分段供电方式,母联开关断开,两个工作电源分别供电,两个电源互为备用,此方式称为母联备自投方式。第二种如图2所示双进线向单母线供电方式,即由一个工作电源供电,另一个电源为备用,此方式称为线路备自投方式。

安全生产工作计划(精选5篇)

安全生产工作计划(精选5篇) 安全生产工作计划(精选5篇) 时间流逝得如此之快,成绩已属于过去,新一轮的工作即将来临,是时候认真思考工作计划如何写了。好的工作计划都具备一些什么特点呢?以下是WTT精心整理的安全生产工作计划(精选5篇),希望能够帮助到大家。 安全生产工作计划1 今年安全生产工作的总体思路是:继续深入开展“安全生产年”活动,严格落实安全生产责任制,坚持“安全第一,预防为主”,把安全生产列入征费管理的重要议事日程,抓好日常安全工作及安全防范措施,结合安全生产目标责任制,总结经验,找出差距,确保全年安全生产无事故,现提出以下工作计划: 一、总体目标: 落实日常安全生产工作,狠抓安全文明建设,有效防止各类安全事故的发生,特别是严防重特大事故的发生;结合安全生产目标责任制,加强队伍安全文明建设,着实提升安全生产管理水平。 二、总体工作: 1、注重预防为主,健全教育宣传、知识普及体系和重点领域以及班组、岗位的隐患排查网络体系,丰富各类安全生产应急预案,完善举报监督体系。

2、注重加强监管,重点抓住收费岗亭、财务、宿舍等易发生安全事故的地方,经常性地开展隐患排查整改。 3、注重落实责任,把安全生产责任落实到部门、落实到每一个员工。 4、强化基础,加强队伍建设和服务创新,加快安全监管装备建设、安全生产信息体系建设。 5、强化机制,加强协调配合,形成上下联动、左右协调的运转机制,安全检查小组成员既要分工负责、更要形成合力,最大限度地遏制安全事故的发生。 三、每季/每月的安全工作重点: 第一季度:开展安全生产大检查、与各责任人签订安全责任书、加强重点部位的检查及安全宣传教育培训等。 1、一月份春节前安全生产大检查:加强职工队伍的管理,做好防火防盗,加强危险区等重点部位的管理和检查。 2、二月份督促各科室所有职工做好节前后安全生产工作。 3、三月份进行多种安全演练及安全宣传教育培训。 第二季度:根据应急预案加强安全演练及安全业务培训,做好安全生产宣传月活动等。 1、4月份“5·1”节前安全生产大检查。 2、5月份安全演练及安全业务培训;做好安全宣传活动的前期准备工作。

110kV进线备自投装置的应用研究

110kV进线备自投装置的应用研究 【摘要】结合电网的实际情况,对110kV进线备自投装置在运用中的电压电流回路、开关量回路以及跳合闸回路的接入问题和备自投动作逻辑的问题进行分析,针对存在的问题,提出了具体的、可行的解决方案,进一步提高了110kV 备自投装置在电网中的动作成功率和可靠性,进而提高电力系统的供电可靠性。 【关键词】110kV进线备自投;电压电流回路;跳合闸回路;开关量回路;动作逻辑; 1 前言 电力系统提高供电可靠性的方法大致有几种:一是采用环网供电,这种方式大大提高了供电可靠性,但多级环网对系统的稳定不利,在中低压电网中较少采用;二是多电源供电,这种方式在提高供电可靠性的同时会带来继电保护配合等方面的困难。因此,在中低压电网中较为广泛选择的供电方式为单路电源供电,当出现故障时自动切换至备用电源供电的方式,简称进线备自投。为确保进线备自投装置能正确动作,其二次电压、电流回路、开关量回路、跳合闸回路必须接法正确,并且,备自投的动作逻辑必须满足系统的运行方式。只有这样才能提高110kV备自投装置在电网中的动作准确性,进而提高电力系统的供电可靠性。 2 电压、电流回路 为了能正确反映一次设备的运行状况,应根据一次设备的接线方式引入母线电压。在实际运行中,参与备投的两条线路都接在同一段母线上,所以,引入该母线电压即可。但也存在单母带分段开关的接线方式,在这种情况下就需要分别引入两段母线的电压。另外,为了判断线路的运行状态,还需要引入线路电压。与此同时,为了防止因为PT断线引起的备自投误动,需要引入线路电流作为闭锁条件,就是说,当装置光是检测到母线无压,线路有压的情况下是不允许动作的,还需要判断线路没有电流后才能动作出口。 3 跳、合闸回路 3.1 跳闸回路 进线备自投的跳闸回路一般可通过保护跳闸、手跳和永跳三种方式实现。(1)保护跳闸方式。采用这种方式必须要考虑闭锁重合闸问题,因为采用保护跳开工作线路开关后,保护装置会误认为开关偷跳而启动重合闸,从而将原已被分开的线路开关又重新合上,导致无法隔离有故障的原工作线路。由于备自投装置不能采集到运行开关跳位的开入,会终止下一个逻辑,会使得备自投装置无法正常工作。因此,应选用另一副跳闸输出接点去闭锁该线路保护的重合闸。在按照此方法接线时应注意:由于一些备自投装置在设计时跳闸输出接点只有一副,这就要求工程技术人员在审图时就要求厂家多配一付跳闸出口接点来实现此功能。(2)

最新安全生产工作计划3篇

一、指导思想: 认真贯彻实施国家安全生产法律法规、集团《关于印发年安全环保工作要点的通知》[]号文)以及上级部门相关安全生产规定,坚持安全为主、预防为主及综合治理的方针。强化监管,深化整治,夯实基础,细化责任,严格执行。以法制化、标准化、规范化、系统化的方式推进安全生产,进一步完善职业健康安全管理体系,不断提高企业本质安全水平,建立安全生产长效机制,确保企业长周期安全运行。 二、控制目标: 无因工死亡事故;无重大泄漏、中毒事故;无重大火灾或爆炸事故;无重大特种设备事故;无负主要责任的重大交通事故或公共安全事故;无重伤事故; 一般事故造成的直接经济损失≤40元/百万元产值(现价) 千人轻伤率控制在0。5‰(月均)以下。 三、工作要点: ㈠通过技术进步促进安全生产。提高本质安全水平。 1进一步完善工艺措施安全性以及极限操作的评估机制。抓好平稳操作,逐渐树立系统地平衡操作的观念,并系统地进行改进。 2继续探索化学反应模式的系统改进。提高化学反应的安全性,优化工艺过程,减少生产过程中的危险因素,不断提高本质安全水平。 3抓好苯胺、聚碳扩产等建设项目安全“三同时”工作。确保项目建设、运行安全。 4继续深化以消灭危险源为目标。尽可能消除或减少危险源,实现化工过程放热过程和用热过程集成联动,将化学反应热和工艺余热回收利用,完善全厂热交换网络,进一步优化热量的梯级利用。 5设备管理部门对企业特种设备(锅炉、压力容器、压力管道、起重机械等)及其安全附件按期进行检验。对检验为有缺陷的设备要及时停用或降级监护使用,并有计划地更换相应的设备或管线。 6继续抓好危险化学品的管理。进一步完善重大危险源的监控措施。增设醒目的安全标识。加强厂区道路整治,确保危化品运输安全。 7加强现场围堰的完善及规范管理。 ㈡推进安全标准化工作。落实安全责任,强化安全管理,并保障有效实施。 1进一步完善安全生产的目标责任制管理。落实到每个岗位、每个人。 2实施全过程风险管理。完善风险评价组织。切实落实各项风险控制措施,对重大风险要制定风险削减计划并予以落实(过程改进)确保作业活动的风险在可承受范围内。组织职业健康安全管理体系的评审,实现管理承诺,保持体系持续合规、有效运行。

2021安全生产工作计划表格(新版)

2021安全生产工作计划表格 (新版) Frequent work plans can improve personal work ability, management level, find problems, analyze problems and solve problems more quickly. ( 工作计划) 部门:_______________________ 姓名:_______________________ 日期:_______________________ 本文档文字可以自由修改

2021安全生产工作计划表格(新版) 导语:工作计划是我们完成工作任务的重要保障,制订工作计划不光是为了很好地完成工作,其实经常制订工作计划可以更快地提高个人工作能力、管理水平、发现问题、分析问题与解决问题的能力。 20XX年XX煤业公司秉承“从零开始、向零奋斗”的安全理念,以安全管理精细化标准,基础、基层建设为抓手,使矿井安全生产基础得到进一步夯实,区队自主管理水平进一步提升,实现了安全生产年。现将公司20XX年安全工作总结如下: 一、安全工作效果 通过公司安全工作的积极开展,我公司于20XX年11月13日实现了安全生产20XX天,创XXXXX建局以来安全生产周期最长的记录,并且在公司举办了“安全生产20XX天”大型文艺晚会。通过晚会营造了良好的安全生产文化氛围,极大地激发了广大干部员工继续搞好安全生产的积极性,进而实现了20XX年全年安全生产无事故的目标。 二、主要安全工作开展情况

(一)安全工作亮点 我们一是对全体干部提出了坚持“五项原则”、实现“五项突破”;二是严格干部值班、跟班管理;三是加强干部学习、培训;四是每月根据工作业绩进行绩效考核,由纪委、企管部将考核结果直接与其当月工资挂钩,浮动发放;五是实行安监员、安全副队长现场专盯,并积极开展党员示范岗、工会群监网、团委青年岗等活动,党政工团齐抓共管,形成了安络体系;六是创新隐患治理,规范员工岗位行为。将隐患、“三违”界定标准制成《隐患告知牌》、《“三违”警示牌》牌板,在各生产地区或工作地点吊挂。每班由安全副队长组织职工现场学习,使员 工熟知什么是重大安全隐患、什么是较大安全隐患、什么是“三违”。提高了员工排查隐患、远离“三违”,自主保安的自觉性和主动性;七是开展区队“三星”竞赛活动,提高区队管理水平。从事故、“三违”、隐患三个方面进行考核,当月实现“三零”(零事故、零违章、零隐患)目标,对区队实行正向激励,每月考核一次,并将安全区队考评结果公示;八是扎实开展安全质量标

电力备自投装置原理

《备自投装置》 备自投装置由主变备自投、母联备自投和进线备自投组成。 ①若正常运行时,一台主变带两段母线并列运行,另一台主变作为明备用,采用主变备自投。 ②若正常运行时,每台主变各带一段母线,两主变互为暗备用,采用母联开关备自投。 ③若正常运行时,主变带母线运行,两路电源进线作为明备用,两段母线均失压投两路电源进线,采用进线备自投。 一、#2主变备自投 #1主变运行,#2主变备用,即1DL、2DL、5DL在合位,3DL、4DL在分位,当#1主变电源因故障或其它原因断开,2#变备用电源自动投入,且只允许动作一次。

1、充电条件:a. 66千伏Ⅰ母、Ⅱ母均三相有压; b. 2DL、5DL在合位,4DL在分位; c.当检备用主变高压侧控制字投入时,高压侧220kV母线任意侧有压。以上条件均满足,经备自投充电时间后充电完成。 2、放电条件:a.#2主变检修状态投入; b.4DL在合位; c.当检备用主变高压侧控制字投入时,220kV两段母线均无压, 经延时放电; d.手跳2DL或5DL; e. 5DL偷跳,母联5DL跳位未启动备自投时,且66kV Ⅱ母无压; f.其它外部闭锁信号(主变过流保护动作、母差保护动作); g.2DL、4DL位置异常; h.I母或II母TV异常,经10s延时放电; i.#1主变拒跳; j.#2主变自投动作; k.主变互投硬压板退出; l.主变互投软压板退出。 上述任一条件满足立即放电。 3、动作过程:充电完成后,Ⅰ母、Ⅱ母均无压,高压侧任意母线有压,#1变低压侧无流,延时跳开#1变高、低压侧开关1DL和2DL,联切低压侧小电源线路。确认2DL跳开后,经延时合上#2变高压侧开关3DL,再经延时合#2变低压侧开4DL。

创省级安全生产文明施工标准化工地工作计划

附件1 创省级安全生产文明施工标准化工地工作计划本工程系囯家法官学院四川分院、四川法官学院建设项目教学及办公用房、学员宿舍楼、大门及总平工程,教学及办公用房,其中地下室建筑面积为;地上建筑面积,合计面积。学员宿楼面积,大门门卫面积27m2,总建筑面积为:。 我公司经中标承担工程施工任务后,把本工程列为争创“标准化文明施工”工地之一,并组建以项目经理为组长的争创“标准化文明施工”工地领导小组,落实领导小组的主要工作目标,制定相关管理制度,同时配备有能力、精力、实力的项目班子,争取使该工程成为“标准化文明施工”工地的典型。 二、标准化文明工地施工概况 项目部自进入施工现场起,严格以《建筑施工安全标准JGJ59-2011》以及《施工现场企业形象化管理规定》为细则,积极开展“标准化文明施工”工地的创建活动。公司坚持把创建“标准化文明施工”工地与全员活动贯彻于企业各级管理层,落实于施工的整个过程。项目部组织落实、制度落实、措施落实,并督促细查,树立过程管理精细的思想。整个施工过程坚持按设计图纸、按施工验收统一规范及标准、按操作规程、按施工方案等四项基本原则施工,为业主提交一个质量合格的工程。 (一)文明施工管理 文明施工管理按“净化、绿化、美化、亮化”为目标实施。 1、本工程实行打围作业、封闭式施工,根据工地的地理环境和条件,

砖砌临时施工围墙240厚,墙面抹灰并设置广告宣传画,工地大门处设置施工公告牌等“六牌一图”及现场管理制度牌和学习专栏。 2、内部环境管理,按施工组织设计方案要求,布置、规划施工现场总平面的实施: 1)场内所有主道路及场地全部硬化,采取有组织排水,设有多级沉淀池、过滤池、清水池; 2)现场施工管理办公区为村公所砖混结构房屋; 3)临时设施、积聚设备,建筑材料堆放有序,场内出入口及道路通畅; 4)建材堆码归类整齐,并设有标示牌; 5)场内除有固定绿化带外,还有可移动性绿化盆景,给施工管理、作业人员创建了舒适的工作、学习、生活环境。 3、为了民工的身体健康,丰富民工的业余生活,特增设了饮水区和民工娱乐室;为避免环境污染、防止火灾隐患,场内还增设了民工吸烟点。 4、防尘降噪方面: 1)在大门处设有冲洗设备,对进出场的车辆均进行冲洗,防止扬尘、污染城市;雨水进行有组织排水,严禁污水四处流溢,以免影响市容、市貌和周围居民的身体健康; 2)对暴露的沙、土、建渣等进行覆盖,以防止扬尘; 3)为贯彻执行成都市人民政府“成办发[2004]2号”文件,不使用袋装水泥; 4)对机械(如空压机、搅拌房、切割机)噪音较大处采取有效隔音设施、封闭作业(如:围挡、室内操作等) 5)不扰民,夜间10点以后不进行夜间施工,以保证居民及民工的正常

2019-2020安全生产工作计划

安全生产工作计划 xx年,XX公司将按照市国资委的统一部署,严格落实省、市各级安全生产会议精神,一手抓安全生产基础管理,一手抓安全生产宣传教育,坚决防范各类安全生产事故的发生。现将2018年安全生产工作计划汇报如下: 一、高度重视安全生产工作,进一步强化安全生产责任制,做到安全生产责任到人 为切实做好安全生产工作,2018年,XX公司将进一步强化安全生产责任制,并研究创建安全生产一把手负责制,在总公司成立以班子成员为核心的安全生产领导小组。同时,为彻底排查安全生产中的隐患,公司还将进一步扩大由电气、暖通、土建等方面工程师组成的安全隐患巡检小组的职能,对各部门、各单位潜在的安全隐患进行认真排查,加强对恒信大厦、机械大厦和证券登记公司门市的巡检。对于各种可能导致火灾的电器隐患,公司将责成有关单位尽快筹措资金,由巡检小组给予人员和技术支持,限期整改。 此外,为了明确责任,避免真空,公司还将继续强化落实“总经理—子公司经理(驻厦单位经理)—各部门负责人”的三位一体安全生产责任制,将安全责任层层分解,落实到具体责任人,确保安全生产无缺项,安全责任不漏人。 二、建立完善安全生产的各项制度,真正做到制度到位、责任到位、监管到位 完善的制度是做好各项工作的有力保障。按照加强安全生产的要求,为重点做好恒信大厦的安全消防工作,公司将进一步制定和完善

《恒信大厦消防安全制度》、《恒信大厦消防监控室管理制度》、《恒信大厦巡逻检查制度》,对重点位置实行了“制度上墙”,确保安全生产制度到位。 同时,为了进一步明晰权责,公司还将加大《恒信公司安全生产责任制》、《恒信大厦保卫和消防主管工作责任制》、《恒信大厦消防监控员工作职责》、《恒信大厦保安员防火职责》的执行力度,确保安全生产责任到位。 另外,再好的制度如果执行不力,那也将是空中楼阁。为此,公司一是要布置巡检小组定期到各单位进行巡检,采取节假日前例行检查与每月两次抽查相结合的方式,严格检查安全隐患整改情况;二是要定期召开由安全生产领导小组和各单位负责人参加的安全生产协调会,建立安全事故隐患汇报机制,确定凡发现事故隐患必须向上级部门汇报,否则将按照责任追究制度予以严肃处理;三是要进一步明确奖惩措施,对在安全生产工作中做出突出成绩的给予奖励,对违纪违规的给予严肃纪律处理,确保安全生产监管到位。 三、从“七位三区”彻底排查安全隐患,进一步制定具体细致的防范措施 通过对恒信大厦进行彻底排查,2018年,公司将“七位三区”作为大厦的安全生产工作重点,将采取系列措施。强化整改。“七位”,即涉及明火的敏感部位: 1、餐厅。为彻底解决该火险隐患,我们已将液化气迁至大厦院内,单独设立了煤气间,消除了操作间与煤气间共处一室的隐患。下一步,公司将继续强化对餐厅保温、消毒等大功率电气设备的管理,

2020安全生产工作计划

2020安全生产工作计划 为了认真贯彻落实《中华人民共和国安全生产法》,加强安全生产意识,落实安全责任,实现安全生产目标,创造一个安全稳定的生产环境,特别就这xxxx年下半年生产安全工作计划做一次制定: 一、总体要求。 按照集团公司安全工作会议部署,以及安全目标和生产要求,坚持以人为本,全面,协调,可持续发展的发展观,坚持“安全第一,预防为主”的方针,牢固树立了“安全责任重于泰山“的理念,加强对安全生产工作的领导,全面开展安全检查,继续深化安全生产专项整治,强化基础工作,努力实现服务区安全形势的进一步稳定改善。 二、主要目标。 一是服务区提高生产安全状况,火灾事故为零,重大人员伤亡事故为零,五百以上工伤赔偿事故为零,五百以下工伤事故低于1%。 二是重点部门的安全形势状况要明显改善。发生损失超过1万以上的事故为。食物中毒率为零,商品过期率为零。 三是进一步建立和完善安全生产监督管理体制和工作机制,安全工作建设取得新的进展。 三、具体的安排。

1、xx月份:制定安全生产工作计划。 调整安全生产领导小组,完善各成员的职能,开展安全检查和值班工作,搞好春节假期的安全检查。 2、xx月份:召开安全会议的工作服务区,明确的目标和任务。 明确安全生产监管员、安全生产管理员职责,完善的安全服务领域的应急预案。做好“五一”节日期间的防火,防盗等安全检查,深入开展“安全生产月”活动,制定具体实施工作计划。 3、xx月份:加强食品安全管理。 重点加强对于周边饭店,超市食品安全和消防安全的检查、整治工作,开展预防安全事故为主的工作。 4、xx—xx月份:开展排除火灾隐患的整治普查工作。 在“国庆、中秋”期间的安全生产和稳定工作,开展第四季度的全面安全生产检查工作。

创安全生产文明施工标准化工地工作计划

创安全生产文明施工标准化工地工作计划南坪二标经中标承担工程施工任务后,把本工程列为争创“标准化文明施工”工地之一,并组建以项目经理为组长的争创“标准化文明施工”工地领导小组,落实领导小组的主要工作目标,制定相关管理制度,同时配备有能力、精力、实力的项目班子,争取使该工程成为“标准化文明施工”工地的典型。 一、标准化文明工地施工概况 项目部自进入施工现场起,严格以《建筑施工安全标准JGJ59-99》以及《施工现场企业形象化管理规定》为细则,积极开展“标准化文明施工”工地的创建活动。项目部坚持把创建“标准化文明施工”工地与全员活动贯彻于项目各级管理层,落实于施工的整个过程。项目部组织落实、制度落实、措施落实,并督促细查,树立整个施工过程“安全发展、质量优良、精细管理、效益为本”的思想。整个施工过程坚持按设计图纸、按施工验收统一规范及标准、按操作规程、按施工方案等四项基本原则施工,为业主和用户提交一个质量合格的工程。 (一)文明施工管理 文明施工管理按“净化、绿化、美化、亮化”为目标实施。 1、本工程实行围挡作业、封闭式施工,根据工地的地理环境和条件,临时施工围墙高2M,临时施工围墙并设置广告宣传画,工地大门处设置施工公告牌等“七牌一图”及现场管理制度牌和学习专栏。 2、内部环境管理,按施工组织设计方案要求,布置、规划施工现

场总平面的实施: 1)场内所有场地全部硬化,采取有组织排水,设有多级沉淀池、过滤池、清水池、消防池; 2)现场施工管理办公区为便于拆卸式活动板房; 3)临时设施、积聚设备,建筑材料堆放有序,场内出入口及道路通畅; 4)建材堆码归类整齐,并设有标示牌; 5)场内除有固定绿化带外,还有可移动性绿化盆景,给施工管理、作业人员创建了舒适的工作、学习生活环境。 3、为了员工的身体健康,丰富员工的业余生活,特增设了饮水区和娱乐室;为避免环境污染、防止火灾隐患,场内还增设了员工吸烟区。 4、防尘降噪方面: 1)施工现场安排专人洒水,防止扬尘、污染城市;污水进行有组织排水,严禁污水四处流溢,以免影响周围居民的身体健康; 2)对暴露的沙、土、建渣等进行覆盖,以防止扬尘; 3)对机械(如发电机、打桩机、切割机)噪音较大处采取有效隔音设施、封闭作业(如:围挡、室内操作等) 4)不扰民,夜间10点以后不进行夜间施工,以保证居民及民工的正常休息。 (二)安全施工管理 安全施工严格按照《建筑施工安全检查标准》(JGJ59-99)和各

进线备用电源自投装置设计应该注意的几个问题

进线备用电源自投装置设计应该注意的几个问题 摘要:随着对电网供电可靠性的不断提高,备用电源自投装置开始在电力系统得到普及.但因备自投装置动作原理较为简单,往往会被设计人员在设计时有所勿视由于现场实际、保护、开关等方因素的影响,造成备自投装置不能正常动作.本文结合备自投装置在开平供电局的应用情况,浅谈了备自投设计中应该注意的几个个问题. 关键词: 备自投装置设计注意问题 引言: 由于对电网可靠性要求越来越高,开平供电局变电站多数站已具备两回线及以上的多回供电线路,并较早地在110kV变电站安装进线备自投装置来提高供电可靠性,备自投装置的装设,大大提高了供电可靠性,经过了几年的运行情况,总结并分析了备用投装置在设计时应该注意的几个问题. 注意1:进线备自投跳闸回路的设计问题 进线备自投的跳闸回路一般可通过保护跳闸或手跳两种方式实现,但两种方式都有各自需要注意的问题. (1)采用保护跳闸方式在设计中必须要考虑闭锁重合闸问题,因为采用保护跳开工作线路开关后,保护装置会误认为开关偷跳而启动重合闸将原已被分开的线路开关又重新合上,导致无法隔离有故障的原工作线路,备自投也因此无法正常工作,因此必须用另一副跳闸输出接点去闭锁该线路保护的重合闸.建议设计按此方法接线,由于有一些厂家的备自投在设计时跳闸输出接点只有一副,这就要求我们设计人员在审图时要注意要求厂家多配一付跳闸出口接点来实现此功能. (2)采用手跳方式就可以不用再考虑闭锁重合闸的问题,因为手动跳闸、遥控跳闸的操作回路已经考虑闭锁重合闸了,而且这种设计方式比较简单,但这种设计方式不能加入“手分闭锁备自投”的功能.因为按备自投的设计原则,在人为手分工作线路开关时(如变电站需要全停时)备自投不应该合备用线路开关,实现这种功能是靠保护合后继电器接点接入备自投装置实现的.因此设计中一般要加入“手分闭锁备自投”的回路.但如果备自投采用手跳方式时也加入“手分闭锁备自投”的回路,将会造成备自投通过手跳回路跳开工作线路后,“手分闭锁备自投”回路又闭锁备自投,导致无法合备用线路的矛盾逻辑,因此手跳方式的设计不能加入“手分闭锁备自投”回路,即取消保护合后继电器接点接入备自投装置,这样备自投装置能正确动作.但是,为了防止人为手分工作线路开关时备自投误投备用线路,应在备自投的现场运行规程里要求在人工断开工作线路开关前将备自投退出. 注意2:进线备自投合闸回路的设计问题 进线备自投的合闸回路可接在手合或不经手合(如接在重合闸回路)两种方式实现,备自投合闸的接法是根据保护装置实际进行选取的. (1)在取保护装置的合后继电器来实现“手分闭锁备自投”的功能时,备自投合闸一定要接入手合回路,因为保护装置的合后继电器是接在手合回路中的,是通过手合来起动合后继电器的,备自投在收到保护的合后继电器动作信号才具备其动作条件. (2)比较早期的微机保护,在厂家设计时并没考虑合后继电器的采用,当备自用装置应用于这些保护时,备自投将无法实现“手分闭锁备自投”的功能.此时,备自投的合闸回路可接在手合或不经手合(如接在重合闸回路)均可,但要注意用电源将备自投装置的后合继电器输入接点短接,否则,备自投装置将因为无法满足条作而闭锁装置. 注意3:备自投装置开关位置的接入应取开关机构箱的接点 多数备自投装置只需要取开关位置的一个常闭接点.我们在图纸设计时可通过开关机构箱的开关常闭接点和保护装置的TWJ接点来取得,通常情况下,设计人员为了施工方便(施工方便也是设计人员必须考虑的问题之一)经常会取保护装置的TWJ继电器接点,因为保护装置与备自投装置都是集中在一起放置在继保室的,施工接线时电缆短并且易于施工,相比取安装在开关场的开关机构箱,这一方法就大大降低施工的工作量,这

2020最新年度安全生产工作计划

精选范文、公文、论文、和其他应用文档,希望能帮助到你们! 2020最新年度安全生产工作计划 今年一月份是全国第十二个安全生产月,我乡以全面贯彻实施《安全生产法》及《XX市2020年安全生产月活动方案》为主线, 以深化隐患治理、保障安全生产为主题,用心开展安全生产年、安全生产专项整治,安全生产大检查、安全生产月等活动。经全体同仁的共同努力,全面基本完成了2020年度的各项工作指标,现将一年来的工作总结如下: 一、加强领导、落实职责,努力提高安全生产职责意识。 安环部高度重视安全生产工作,把安全生产工作作为以人为本、保安全、促效益的重点来抓。纳入了安全管理目标体系。安全压倒一切已成为安环部工作的前提,并且也充分认识到了安全生产工作的职责感、紧迫感和使命感。2020年度实现签订了以总经理为安全生产第一职责人的安全生产三级职责制,且建立健全以岗位制为重点的安全生产职责制,完善了安全生产管理网络,逐级分解,具体到人的目标。对外包单位,签订了安全生产承诺书,明确安全职责,把安全生产职责落实到每个环节、每个岗位、每个员工,实现全员,全过程、全方位的安全管理。在环保方面得到了市环保局的关于建设项目试生产(运行)环境保护

的核准。 二、认真开展三项活动,全面执法检查。 全面落实科学发展观,坚持安全第一、预防为主、综合治理的方针,认真开展安全生产三项行动(即安全生产宣传教育行动、安全生产执法行动、安全生产治理行动)。基本完成了各项目标任务,实现了全年伤亡事故为0、火灾事故为0、职业病为0、废水、废气100%达标排放、新员工入职培训率为100%、隐患整改率100%、年工伤发生率为6。3%同比预期目标下降了3。7个百分点、特种作业持证率为63%。 三、用心配合相关部门工作,认真开展事故调查。 2020年度全年发生一般事故7起,较大事故1起,(其中生产部7起分别:一班组1起;二班组1起;三班组3起;机加工/设备维修2起)QC部1起,直接经济损失21880。38元,损失工作日137天。同时认真按照事故四不放过的原则,对相关人员进行调查询问取证,对事故原因认真分析,事故职责按照法定原则进行认定,对违规人员严格的进行了经济或行政处罚,为吸取事故教训,防范

2020安全生产工作计划表

2020安全生产工作计划表 在这一年来的安全生产工作中,我工厂采取了强有力的措施,做了大量的工作,消除了不少安全隐患,在取得成绩的同时,我工厂的安全生产形势依然严峻,安全管理工作永远没有终点,在以后的安全管理工作中我工厂将根据实际,明确责任,加大力度,把安全生产工作深入扎实、坚持不懈的抓下去,以确保全工厂安全生产形势稳定。因此,明年我们将着重从以下几个方面开展安全生产工作: 1、根据我工厂实际情况,建立健全各方面的安全生产规章制度、操作规程,把我工厂安全管理工作制度化、规范化,使我工厂安全管理水平上一个新台阶; 2、进一步落实完善安全生产工作责任制,各部门、车间都要与工厂签订安全生产责任书,确保安全生产责任制落到实处;完善安全生产责任追究制度,使安全生产责任真正落实到每个员工、尤其是生产一线的生产和安全管理人员,营造全员参与安全管理的企业安全文化氛围; 3、按要求配备安全管理人员,按规范完成厂区安全设施的布置工作,加大安全经费的投入,确保安全经费富足、到位,同时把安全工作的关口前移,立足防范,狠抓“三违”行为;

4、加大安全生产宣传力度,提高全员安全生产意识及安全文化素质,强化员工的自我保护意识,认真宣传和贯彻落实党和国家关于安全生产的各项方针政策,抓好各项安全整治措施的落实; 5、加强我工厂员工安全教育培训工作,广泛开展安全生产技能培训,在企业中全面提高各级管理人员和生产员工的安全生产意识和安全生产技能,建立一支政治素质过硬、技术全面的安全生产管理队伍和员工队伍; 6、加强我工厂消防安全管理,同时每月组织一次工厂全体人员的消防演练,为“提高我工厂发生火灾后的快速反应能力,最大限度地减少人员伤亡和降低工厂财产损失”提供保障,同时在厂区范围内按要求安装足量的消防设施,加强重点防火区域的消防管理工作,做到勤巡逻、勤发现、勤解决,以消除各项消防隐患; 7、认真按照工厂制定的安全管理制度抓好各类安全生产检查,每月至少开展两次安全生产大检查并进行安全例会,加大事故隐患排查力度,开展各类安全隐患的专项治理工作,确保及时发现、及时解决存在的安全隐患,防止安全事故的发生; 8、加强特种设备的使用和特种作业人员的安全管理工作,严格执行特种作业人员持证上岗制度,及时对特种设备进行自检,严防特种设备带病作业,防止安全事故的发生; 安全生产管理工作永远都没有终点,我工厂将认真贯彻“安全第一,预防为主,综合治理”的方针,强化安全生产管理,把各项安全管理工作落

安全生产文明工作计划

安全防护 文明施工 工 作 计 划 江苏省水利建设工程有限公司淮安市东西偏泓闸项目经理部

一、工程概况 东、西漫水闸(含鱼道、套闸及漫水公路)位于江苏省金湖县银集镇,为淮河入江水道上的四个梯级控制工程之一,具有调节入江水道三河段水位功能,满足供水、灌溉和航运等要求。该工程经三十多年的运行,因老化严重,存在安全隐患,以及现有闸孔规模与拟整治后的淮河入江水道东西偏泓断面不配套,故对东、西漫水闸拆除重建。 东偏泓闸拟在原址拆除重建,距金湖大桥478m。工程总体布置与老闸保持一致,闸上交通桥与漫水公路中心线重合;东偏泓闸共10孔,每孔净宽10m,其中心线与入江水道整治东偏泓中心线一致。鱼道基本维持现状,仅对出口段与闸下翼墙衔接部位略作结构改造。 西偏泓闸、套闸总体布置与现状工程类似,布置于金湖大桥下游,距大桥150m,套闸布置在西侧、偏泓闸布置在东侧,上闸首与偏泓闸并列。西偏泓闸共10孔,每孔净宽10m,套闸闸首净宽8m,西偏泓闸及套闸中心线与入江水道整治西偏泓中心线一致。西偏泓闸上游引河东侧筑矮堤与现有漫水公路衔接,堤顶高程8.0m,宽6.0m,铺设砼路面宽5m。因工程移址后距现有管理所较远(约1km),故拟在岸边建现场值班房150m2。 东、西偏泓节制闸设计流量均为800m3/s,采用钢筋砼开敞式结构。东、西偏泓节制闸各10孔,单孔净宽10m。闸 2

室底板顶高程3.0m,闸墩顶高程8.0m,闸身顺水流向长12.0m。闸上游侧布置交通桥,桥面宽度6.5m,排架宽5.0m,工作桥为“π”型梁,桥面高程15.6m,宽4.5m,梁高1.2m。闸身2孔一联,中墩厚1.1m,边墩厚1.0m,缝墩厚0.8m,闸室总长113.98m。闸上游布置15m长钢筋砼护坦,再布置35m长浆砌石护底与上游抛石防冲槽相接,闸下游布置20m长消力池和10m长砼铺盖,再布置40m长浆砌石护底与下游抛石防冲槽相接,西偏泓闸临套闸部分从消力池开始布置107m长浆砌石。闸门采用升卧平板钢闸门,配QP-2×160KN卷扬式启闭机。现有鱼道在原位保留,东偏泓闸下游西侧翼墙与之平顺相接;西偏泓闸与套闸上闸首底板齐平。东、西偏泓闸均从入江水道大堤建栈桥与闸上工作桥相连,栈桥宽2.6m,采用砼预制空心板铺设,基础为Φ80cm钻孔灌注桩。 上、下游翼墙均采用钢筋砼扶壁式结构,直线接圆弧平面布置型式。东偏泓闸上游翼墙顶高程为8.0m,下游翼墙顶高程为7.0m;西偏泓闸上游翼墙顶高程为8.0m,下游翼墙顶高程为7.4m。 二、安全防护、文明施工措施目标: 1、杜绝重大伤亡事故、重大火灾、重大设备事故、重大交通责任事故等各类重、特大事故。 2、确保不发生死亡事故。

继电保护--备自投的几种方式

1、基本备投方式: 变压器备自投方式 桥备自投方式 分段备自投方式 进线备自投方式 2、备用电源自动投入的基本原理 备用电源自动投入(以下简称备自投)装置一次接线方式较多,但备自投原理比较简单。下面介绍几种变电站中典型的备自投方式原理。对更复杂的备自投方式,都可以看成是这些典型方式的组合。 投入备自投充电过程时:装置上电后,15秒内均满足所有正常运行条件,则备自投充电完毕,备自投功能投入,可以进行启动和动作过程判断;当满足任一退出条件时,备自投立即放电,备自投功能退出。 退出备自投充电过程时:装置上电后,满足启动条件后备自投进行动作过程判断。在正常运行条件或退出条件下,备自投可靠不动作。 2.1、分段备自投 分段备自投接线示意图 a)正常运行条件 1)分段断路器3DL处于分位置,进线断路器1DL、2DL均处于合位置 2)母线均有电压 3)备自投投入开关处于投入位置 b)启动条件 1)II段备用I段:I段母线无压,1DL进线1无流,II段母线有压 2)I段备用II段:II段母线无压,2DL进线2无流,I段母线有压 c)动作过程 1)对启动条件1: 若1DL处于合位置,则经延时跳开1DL,确认跳开后合上3DL 若1DL处于分位置,则经延时合上3DL 2)对启动条件2: 若2DL处于合位置,则经延时跳开2DL,确认跳开后合上3DL 若2DL处于分位置,则经延时合上3DL d)退出条件

1)3DL处于合位置 2)备自投一次动作完毕 3)有备自投闭锁输入信号 4)备自投投入开关处于退出位置 2.2 桥备自投 桥备自接线投示意图 a)正常运行条件 1)桥断路器3DL处于分位置,进线断路器1DL、2DL均处于合位置 2)进线1、进线2均有电压 3)备自投投入开关处于投入位置 b)启动条件 1)进线2有电压,进线1无电压且无电流 2)进线1有电压,进线2无电压且无电 c)动作过程 1)对启动条件1 若1DL处于合位置,则经过延时跳开1DL,确认跳开后,合上3DL 若1DL处于分位置,则经延时后合上3DL 2)对启动条件2 若2DL处于合位置,则经过延时跳开2DL,确认跳开后,合上3DL 若2DL处于分位置,则经延时后合上3DL d)退出条件 1)3DL处于合位置 2)备自投一次动作完毕 3)有备自投闭锁输入信号 4)备自投投入开关处于退出位置 2.3 变压器备自投 变压器备自投接线示意图(一台变压器为主变压器,另一台变压器为辅变压器)a)正常运行条件 1)主变压器各侧断路器处于合位置,辅变压器各侧断路器处于分位置

相关文档
最新文档