工业厂房工程量造价清单
C 建筑及土建工程
Building & Civil Works
16,601,761.76
C 1.00地坪土方工程
Flooring Earthworks
--
C 1.01场地平整
Levelling of the land
m2 - - - - - 3.00-
C 1.02Setting Out
放样
m2 - - - - - 1.50-
C 1.03土方开挖
Excavation of basic Earthwork
m3 - - - - -25.68-
C 1.04土方外运堆及推平
Earthwork Remove Away from & Levelling
m3 - - - - -65.00-
C 1.05Compaction on Backfill Layer at 150mm thk per
layer (Factor 0.95)
回填地面土压实按150mm厚每层 (系数0.95)
m2 - - - - -19.00-
C 2.00地坪工程
Flooring Works
-4,891,066.24
C 2.01放样
Setting Out
m2 - - - - - 3.00-
C 2.02回填场地平整
Ground Leveling
m2 - - - - - 1.50-
C 2.03Compaction On Original Soil Layer (Factor 0.95)
原有地面土压实 (系数0.95)
m2 16,370.00 1,630.00 438.00 222.00 18,660.00 2.8052,248.00
C 2.04Original Soil Compaction Test (Min 500m2/1
Test)
原土土方压实测试 (最少500m2/一次测试)
lot 33.00 4.00 1.00 1.00 39.00150.005,850.00
C 2.05300mm thk Crusher Run
300mm厚级配碎石
m3 4,856.10 2.10 25.05 - 4,883.25182.40890,704.80
C 2.06Compaction on Gravel Layer at 150mm thick per
layer (Factor 0.95)
碎石基层压实按150mm厚每层 (系数0.95)
m3 - -19.00-
C 2.07Gravel Compaction Test (Min 500m2/1 test) 碎石
基层压实测试 (最少500m2/一次测试)
lot 33.00 4.00 1.00 1.00 39.00300.0011,700.00
C 2.08200mm thk C35 Concrete
200mm厚C35 混凝土
m3 3,227.00 - - - 3,227.00506.301,633,830.10
C 2.09?8 钢筋@200x200双层双向
Reinforcement Bar ?8 @ 200x200 Double Layer
both direction
kg 149,492.00 - - - 149,492.00 5.39806,135.61
C 2.10Formwork to Slab
地坪模板
m2 491.10 48.90 13.14 6.66 559.8060.0033,588.00
C 2.11Additional Steel Reinforcement Bar at Manhole
Openings or other Floor Recesses
人孔开口或其他楼板通道处钢筋加固
kg 180.00 - - - 180.00 5.39970.65
C 2.12Additional Steel Reinforcement Bar around
Column
柱子周围钢筋加固
kg 1,630.00 - - - 1,630.00 5.398,789.78
C 2.13100厚C15素混凝土垫层
Thk 100mm C15 Lean Concrete
m3 -436.00-
C 2.141厚改性水泥基弹性防水涂料
Thk 0.8 mm Cementitious And Reactive
Waterproofing
m2 248.00 1,631.00 372.00 92.00 2,343.0042.0098,406.00
C 2.1520厚1:3水泥砂浆找平层
Thk 20mm 1:3 Cement Motar Levelind
m2 248.00 1,736.10 372.00 92.00 2,448.1040.0097,924.00
C 2.1640厚挤塑聚苯板(XPS)
Thk 40mm Extruded Polysyrene Board (XPS)
m2 - 1,732.00 - - 1,732.0047.2081,750.40
C 2.1720厚1:3水泥砂浆找平层
Thk 20mm 1:3 Cement Motar Levelind
m2 - - - - -9.00-
C 2.18150mm厚C20楼板混凝土
Thk 150mm C20 Concrete to Slab
m3 - - - - -506.30-
C 2.19?10钢筋@150x150双层双向
Reinforcement Bar ?10 @ 150x150 Double
Layer both direction
kg - - - - -5,482.38-
C 2.20Metal Aggregate Surface Floor Hardener (6.0
kg/m2)
金属骨料耐磨地面材料表面硬化剂 (6.0 kg/m2)
m2 16,366.00 25.10 - - 16,391.1036.60599,914.26
C 2.21Epoxy Bottom Paint Layer
环氧底漆层
m2 - 13.74 - - 13.7428.00384.72
C 2.222mm Self Levelling Epoxy
2厚自流平环氧涂层
m2 - 167.00 - 167.00253.0042,251.00
C 2.23已完成混凝土地坪表面处理及清洁工作
Completed Concrete Floor Surface Preparation
& Cleaning Works
m2 16,435.00 1,631.00 372.00 92.00 18,530.00 2.5046,325.00
C 2.24地坪分割缝
Floor Cut Joint
m 5,455.00 18.00 - 5,473.0014.0076,622.00
C 2.25地坪伸缩缝
Floor expansion joints
m 50.50 9.50 16.20 1.80 78.0036.002,808.00
C 2.26塑料薄膜(保湿)
Plastic Membrane (Humidity Preservation)
m2 16,435.00 1,631.00 372.00 92.00 18,530.00 4.0074,120.00
C 2.27办公楼地面60厚C15垫层
60 thick C15 cushion course on office building
floor
m2 - 1,631.00 371.90 92.00 2,094.9026.6555,837.46
C 2.28办公楼地面C20细石混凝土
C20 aggregate concrete office building floor
m2 248.00 1,607.00 371.00 97.68 2,323.6834.2879,646.46
工程量 Quantity金额 (元) Amount (RMB)
项目名称
Description
单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号No
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
建筑及土建工程Building & Civil Works
16,601,761.76工程量 Quantity金额 (元) Amount (RMB)
项目名称Description 单位
Unit厂房车间
Workshop
办公楼
Office
Building
车间外配套用
房
Facility
Building
Outside
Workshop
门卫室
Guard Room
泵房及消防水
池
Pump Room
& Fire Water
Tank
总数
Total
综合单价
Unit Rate
总价
Total
序号
No
C
Brand/Offered by
Bidder
品牌/投标人提供
incl.
incl.
incl.
incl.
incl.
incl.
incl.
incl.
incl.
only office area incl.
incl.
incl.
Sikafloor 2 SynTop 1 ,6kg/m2
for Antistatic Raised Flooring
Floor 3
Brand/Offered by
Bidder
品牌/投标人提供
Brand/Offered by
Bidder
品牌/投标人提供
Brand/Offered by
Bidder
品牌/投标人提供
Brand/Offered by
Bidder
品牌/投标人提供
Brand/Offered by
Bidder
品牌/投标人提供
Brand/Offered by
Bidder
品牌/投标人提供
Brand/Offered by
Bidder
品牌/投标人提供
Brand/Offered by
Bidder
品牌/投标人提供