Using MIS 3rd Edition Kroenke_Test bank Ch10

Using MIS 3rd Edition Kroenke_Test bank Ch10
Using MIS 3rd Edition Kroenke_Test bank Ch10

Using MIS, 3e (Kroenke)

Chapter 10 Managing Development

10.1 True/False Questions

1) Systems analysis and design is the process of creating and maintaining information systems. Answer: TRUE

Diff: 1Page Ref: 372

AACSB: Analytic skills

Study Question: Study Question 1

2) Information systems are never off-the-shelf.

Answer: TRUE

Diff: 1Page Ref: 373

AACSB: Analytic skills

Study Question: Study Question 1

3) Systems development is exclusively a technical task for programmers and hardware designers. Answer: FALSE

Diff: 2Page Ref: 372

AACSB: Analytic skills

Study Question: Study Question 1

4) The single most important criterion for information systems success is for users to take ownership of their systems.

Answer: TRUE

Diff: 2Page Ref: 373

AACSB: Analytic skills

Study Question: Study Question 1

5) One of the major purposes of the systems development process is to create an environment in which questions are both asked and answered.

Answer: TRUE

Diff: 2Page Ref: 373

AACSB: Analytic skills

Study Question: Study Question 2

6) Systems development always aims at a fixed target.

Answer: FALSE

Diff: 2Page Ref: 374

AACSB: Analytic skills

Study Question: Study Question 2

7) The average contribution per worker is directly proportional to the team size.

Answer: FALSE

Diff: 2Page Ref: 375

AACSB: Analytic skills

Study Question: Study Question 2

8) According to Brooks' Law, adding more people to a system development project will make the project later.

Answer: TRUE

Diff: 1Page Ref: 375

AACSB: Analytic skills

Study Question: Study Question 2

9) Understaffing is a one of the reasons for diseconomies of scale.

Answer: FALSE

Diff: 2Page Ref: 375

AACSB: Analytic skills

Study Question: Study Question 2

10) The systems development life cycle is the classical process used to develop information systems.

Answer: TRUE

Diff: 2Page Ref: 376

AACSB: Analytic skills

Study Question: Study Question 3

11) The output of the system definition phase of the SDLC is a set of approved user requirements.

Answer: FALSE

Diff: 2Page Ref: 376

AACSB: Analytic skills

Study Question: Study Question 3

12) The output of the system definition phase of the SDLC is a project plan which is the input to the requirements analysis phase.

Answer: TRUE

Diff: 3Page Ref: 376

AACSB: Analytic skills

Study Question: Study Question 3

13) The first step in the systems definition phase of the SDLC is to assess the feasibility of the project.

Answer: FALSE

Diff: 2Page Ref: 376

AACSB: Analytic skills

Study Question: Study Question 3

14) The four dimensions of feasibility are cost, schedule, technical, and organizational feasibility.

Answer: TRUE

Diff: 2Page Ref: 377

AACSB: Analytic skills

Study Question: Study Question 3

15) Technical feasibility refers to the likelihood that existing technology will be able to meet the needs of the system.

Answer: TRUE

Diff: 2Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

16) In a project team, programmers are IS professionals who understand both business and technology.

Answer: FALSE

Diff: 2Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

17) During requirements definition of a project, the team will be heavy with systems analysts. Answer: TRUE

Diff: 2Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

18) Users need to have active involvement in the project after the development stage and during the testing stage.

Answer: FALSE

Diff: 2Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

19) Determining the system's feasibility is the most important phase in the systems development process.

Answer: FALSE

Diff: 2Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

20) The contents of a report or the fields in a data entry form are examples of requirements. Answer: TRUE

Diff: 2Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

21) Existing systems are the only source to determine requirements.

Answer: FALSE

Diff: 2Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

22) The development team will create a data model if the new system involves a new database or substantial changes to an existing database.

Answer: TRUE

Diff: 2Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

23) The data model is constructed on the basis of user interviews and must be validated by those users.

Answer: TRUE

Diff: 2Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

24) The easiest and cheapest time to alter the information system is in the component design phase.

Answer: FALSE

Diff: 2Page Ref: 382

AACSB: Analytic skills

Study Question: Study Question 3

25) Hardware specifications are done in the requirements analysis phase of the SDLC. Answer: FALSE

Diff: 2Page Ref: 383

AACSB: Analytic skills

Study Question: Study Question 3

26) Procedures for normal, backup, and failure recovery operations are developed in the component design phase of the SDLC.

Answer: TRUE

Diff: 2Page Ref: 383

AACSB: Analytic skills

Study Question: Study Question 3

27) Tasks in the implementation phase are to build, test, and convert the users to the new system. Answer: TRUE

Diff: 2Page Ref: 384

AACSB: Analytic skills

Study Question: Study Question 3

28) A test plan consists of sequences of actions that programmers will take when developing the new system.

Answer: FALSE

Diff: 2Page Ref: 384

AACSB: Analytic skills

Study Question: Study Question 3

29) A comprehensive test plan should cause every error message to be displayed.

Answer: TRUE

Diff: 2Page Ref: 384

AACSB: Analytic skills

Study Question: Study Question 3

30) Test plans include only the normal actions that users will take.

Answer: FALSE

Diff: 2Page Ref: 384

AACSB: Analytic skills

Study Question: Study Question 3

31) Developers can reduce the labor cost of testing by writing programs that invoke system features automatically.

Answer: TRUE

Diff: 2Page Ref: 384

AACSB: Analytic skills

Study Question: Study Question 3

32) Beta testing is the first stage of testing.

Answer: FALSE

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

33) Beta testing is the process of allowing future system users to try out the new system on their own.

Answer: TRUE

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

34) The project manager has the final say when the system is ready for use.

Answer: FALSE

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

35) System conversion refers to the process of installing the new system once the system has passed integrated testing.

Answer: TRUE

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

36) With pilot installation, the organization implements the entire system across the entire business.

Answer: FALSE

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

37) With parallel installation, the new system is installed in phases across the organization(s). Answer: FALSE

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

38) With plunge installation, the organization shuts off the old system and starts the new system. Answer: TRUE

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

39) Creating the database and testing the data occurs in the maintenance phase of the SDLC. Answer: FALSE

Diff: 2Page Ref: 386

AACSB: Analytic skills

Study Question: Study Question 3

40) With regard to the software component, software developers group fixes for high-priority failures into a patch that can be applied to all copies of a given product.

Answer: TRUE

Diff: 2Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 3

41) Vendors bundle fixes of low-priority problems into large groups called service packs. Answer: TRUE

Diff: 2Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 4

42) Patches typically involve fixes to hundreds or thousands of problems.

Answer: FALSE

Diff: 2Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 3

43) The maintenance phase usually starts another cycle of the SDLC process.

Answer: TRUE

Diff: 2Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 3

44) One of the problems of the waterfall nature of the SDLC is that the team needs to do more requirements work, even after a phase is supposedly finished.

Answer: TRUE

Diff: 2Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 3

45) Projects that spend too little time documenting requirements are sometimes said to be in analysis paralysis.

Answer: FALSE

Diff: 2Page Ref: 388

AACSB: Analytic skills

Study Question: Study Question 3

46) Small scale projects seldom have professional IT support.

Answer: TRUE

Diff: 2Page Ref: 389

AACSB: Analytic skills

Study Question: Study Question 4

47) Large scale projects tend to be informal and loose.

Answer: FALSE

Diff: 2Page Ref: 389

AACSB: Analytic skills

Study Question: Study Question 4

48) Small scale projects usually involve experienced personnel who can work independently with minimal supervision.

Answer: FALSE

Diff: 2Page Ref: 389

AACSB: Analytic skills

Study Question: Study Question 4

49) You can trade off project requirements against both time and cost.

Answer: TRUE

Diff: 1Page Ref: 390

AACSB: Reflective thinking

Study Question: Study Question 5

50) A baseline shows the final time and cost budget for a project.

Answer: FALSE

Diff: 1Page Ref: 391

AACSB: Analytic skills

Study Question: Study Question 5

51) In an SDLC, adding more people creates diseconomies of scale.

Answer: TRUE

Diff: 1Page Ref: 391

AACSB: Analytic skills

Study Question: Study Question 5

52) Each task in a project should culminate in one or more results or deliverables. Answer: TRUE

Diff: 1Page Ref: 391

AACSB: Analytic skills

Study Question: Study Question 6

53) A Gantt chart is a hierarchy of the tasks required to complete a project.

Answer: FALSE

Diff: 1Page Ref: 392

AACSB: Analytic skills

Study Question: Study Question 6

54) One of the trade-offs of project management is to take resources from tasks not on the critical path and assign them to tasks on the critical path.

Answer: TRUE

Diff: 1Page Ref: 393

AACSB: Analytic skills

Study Question: Study Question 6

55) Any task not on the critical path can run late without ever delaying the project. Answer: FALSE

Diff: 1Page Ref: 393

AACSB: Analytic skills

Study Question: Study Question 6

56) The initial WBS plan is denoted as the baseline WBS.

Answer: FALSE

Diff: 1Page Ref: 393

AACSB: Analytic skills

Study Question: Study Question 6

57) One of the ways in which companies address the difficulties of scheduling a large-scale project is to avoid the major schedule risks and never develop software in-house.

Answer: TRUE

Diff: 1Page Ref: 393

AACSB: Analytic skills

Study Question: Study Question 6

58) A function point is the sequence of activities that determines the earliest date by which the project can be completed.

Answer: FALSE

Diff: 1Page Ref: 395

AACSB: Analytic skills

Study Question: Study Question 6

59) Configuration control refers to a set of management policies, practices, and tools that developers use to maintain control over the project's resources.

Answer: TRUE

Diff: 1Page Ref: 395

AACSB: Analytic skills

Study Question: Study Question 7

60) Diseconomies of scale is the process by which users agree to one set of requirements, then add a bit more, then add a bit more, until, over time, they have described a completely new project.

Answer: FALSE

Diff: 1Page Ref: 397

AACSB: Analytic skills

Study Question: Study Question 8

10.2 Multiple Choice Questions

1) Which term refers to the process of creating and maintaining information systems?

A) competitive intelligence

B) process mapping

C) systems development

D) marketing management

Answer: C

Diff: 1Page Ref: 372

AACSB: Analytic skills

Study Question: Study Question 1

2) All of the following are components involved in the development of an information system except ________.

A) hardware

B) software

C) data

D) policies

Answer: D

Diff: 1Page Ref: 372

AACSB: Analytic skills

Study Question: Study Question 1

3) Which component of an information system specifically requires business knowledge and an understanding of group dynamics?

A) procedures

B) people

C) data

D) hardware

Answer: A

Diff: 2Page Ref: 372

AACSB: Analytic skills

Study Question: Study Question 1

4) Which component of an information system specifically requires human resource and related expertise?

A) procedures

B) people

C) data

D) hardware

Answer: B

Diff: 2Page Ref: 372

AACSB: Analytic skills

Study Question: Study Question 1

5) Which of the following observations is true?

A) Systems development addresses only three components: hardware, software, and data.

B) Systems development has a much narrower scope than computer program development, which involves software programs, with some focus on data and databases.

C) Systems development is exclusively a technical task.

D) Systems development requires coordinated teamwork of both specialists and nonspecialists with business knowledge.

Answer: D

Diff: 2Page Ref: 372

AACSB: Analytic skills

Study Question: Study Question 1

6) Which of the following sources for software do not apply to information systems?

A) off-the-shelf

B) off-the-shelf with adaptation

C) tailor-made

D) both tailor-made and off-the-shelf with adaptation

Answer: A

Diff: 2Page Ref: 373

AACSB: Analytic skills

Study Question: Study Question 1

7) In information systems development, a business manager cannot pass off ________ to the IT department.

A) data problems

B) procedure problems

C) hardware problems

D) program problems

Answer: B

Diff: 2Page Ref: 373

AACSB: Communication

Study Question: Study Question 1

8) What is the single most important criterion for the success of information systems?

A) Consumers should be aware of systems development.

B) Users should take ownership of their systems.

C) Business managers should take care of all problems.

D) Business managers should understand organizational change.

Answer: B

Diff: 2Page Ref: 373

AACSB: Analytic skills

Study Question: Study Question 1

9) According to Brooks' Law, adding more people to a system development project will

________.

A) lower the total project cost

B) speed up the project

C) delay the project's completion

D) require less coordination

Answer: C

Diff: 1Page Ref: 375

AACSB: Analytic skills

Study Question: Study Question 2

10) Adding more people to a delayed systems development project will further delay the project because ________.

A) it is more difficult to schedule tasks

B) training new people slows down team members

C) it is more difficult to analyze the system requirements

D) it is more difficult to budget project costs

Answer: B

Diff: 2Page Ref: 375

AACSB: Analytic skills

Study Question: Study Question 2

11) The correct sequence for the five phases in the systems development life cycle (SDLC) process is ________.

A) requirements analysis; system definition; system maintenance ; component design; implementation

B) system definition; requirements analysis; component design; implementation; system maintenance

C) requirements analysis; component design; system definition; implementation; system maintenance

D) system definition; component design; requirements analysis; implementation; system maintenance

Answer: B

Diff: 3Page Ref: 376

AACSB: Analytic skills

Study Question: Study Question 3

12) The project plan is made in the ________ phase of the systems development life cycle.

A) requirements analysis

B) system definition

C) component design

D) implementation

Answer: B

Diff: 3Page Ref: 376

AACSB: Analytic skills

Study Question: Study Question 3

13) The systems development life cycle (SDLC) process begins with the ________ phase.

A) requirements analysis

B) system definition

C) component design

D) project planning

Answer: B

Diff: 1Page Ref: 376

AACSB: Analytic skills

Study Question: Study Question 3

14) The first step in the systems definition phase of the SDLC is to ________.

A) plan the project

B) conduct a feasibility study

C) define the goals and scope

D) form the project team

Answer: C

Diff: 1Page Ref: 377

AACSB: Analytic skills

Study Question: Study Question 3

15) Once we have defined the project's goals and scope, the next step is to ________.

A) plan the project

B) assess feasibility

C) determine requirements

D) form the project team

Answer: B

Diff: 1Page Ref: 377

AACSB: Analytic skills

Study Question: Study Question 3

16) What are the four dimensions of feasibility?

A) planning, process, technical, and budgetary feasibility

B) operational, strategic, technical, and tactical feasibility

C) cost, schedule, technical, and organizational feasibility

D) schedule, process, technical, and competitive feasibility

Answer: C

Diff: 1Page Ref: 377

AACSB: Analytic skills

Study Question: Study Question 3

17) An element of ________ feasibility concerns whether the new system fits with legal requirements.

A) cost

B) schedule

C) technical

D) organizational

Answer: D

Diff: 1Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

18) Does the company have a management policy that prohibits releasing customer data? Such a question is critical to understanding ________ feasibility.

A) cost

B) schedule

C) technical

D) organizational

Answer: D

Diff: 1Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

19) ________ feasibility refers to whether existing technology is likely to be able to meet the needs of the new system.

A) Cost

B) Schedule

C) Technical

D) Organizational

Answer: C

Diff: 1Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

20) ________ are IS professionals who understand both business and technology.

A) Software engineers

B) Database administrators

C) Project managers

D) Systems analysts

Answer: D

Diff: 2Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

21) During the requirements definition stage, the team will be heavy with ________.

A) systems analysts

B) programmers

C) testers

D) database designers

Answer: A

Diff: 2Page Ref: 380

AACSB: Analytic skills

Study Question: Study Question 3

22) Identify the most important phase in the systems development process.

A) determining requirements

B) component design

C) implementation

D) system maintenance

Answer: A

Diff: 1Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

23) The primary purpose of the ________ phase of the SDLC approach is to determine and document the specific features and functions of the new system.

A) system definition

B) component design

C) requirements analysis

D) system maintenance

Answer: C

Diff: 2Page Ref: 381

AACSB: Analytic skills

Study Question: Study Question 3

24) The easiest and cheapest time to alter the information system is in the ________ phase.

A) component design

B) requirements analysis

C) implementation

D) system definition

Answer: B

Diff: 2Page Ref: 382

AACSB: Analytic skills

Study Question: Study Question 3

25) The development team determines the job descriptions and functions of people who will use the new system in the ________ phase of the SDLC.

A) system definition

B) component design

C) requirements analysis

D) implementation

Answer: B

Diff: 2Page Ref: 383

AACSB: Analytic skills

Study Question: Study Question 3

26) Hardware specification is done in the ________ phase of the SDLC.

A) system definition

B) component design

C) requirements analysis

D) implementation

Answer: B

Diff: 2Page Ref: 383

AACSB: Analytic skills

Study Question: Study Question 3

27) Procedures for normal, backup, and failure recovery operations are developed in the

________ phase of the SDLC.

A) system definition

B) component design

C) system maintenance

D) implementation

Answer: B

Diff: 2Page Ref: 383

AACSB: Analytic skills

Study Question: Study Question 3

28) Tasks in the ________ phase of the SDLC are to build, test, and convert the users to the new system.

A) system definition

B) component design

C) system maintenance

D) implementation

Answer: D

Diff: 2Page Ref: 384

AACSB: Analytic skills

Study Question: Study Question 3

29) A(n) ________ consists of sequences of actions that users will take when using the new system.

A) activity log

B) quality assurance program

C) test plan

D) project plan

Answer: C

Diff: 2Page Ref: 384

AACSB: Analytic skills

Study Question: Study Question 3

30) The last stage of testing is the ________ test, where future system users try out the new system.

A) commercial

B) acceptance

C) beta

D) alpha

Answer: C

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

31) In a ________ installation, the new system runs alongside the old one until it has been tested and is fully operational.

A) pilot

B) phased

C) parallel

D) plunge

Answer: C

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

32) A ________ installation is the riskiest because the old system is turned off and the new system is turned on.

A) pilot

B) phased

C) parallel

D) plunge

Answer: D

Diff: 3Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

33) If a company installs and tests only a portion of the new system, then repeatedly installs and tests portions of the new system until it is complete, this known as a ________ installation.

A) pilot

B) phased

C) parallel

D) plunge

Answer: B

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

34) Plunge installation is sometimes called ________ installation.

A) direct

B) loop

C) serial

D) operational

Answer: A

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

35) Once the system has passed integrated testing, the organization installs the new system. Which term is used to refer to this activity?

A) post-beta stage

B) system conversion

C) quality audit

D) system control

Answer: B

Diff: 2Page Ref: 385

AACSB: Analytic skills

Study Question: Study Question 3

36) Tracking both failures and requests for enhancements occurs in the ________ phase of the SDLC.

A) implementation

B) maintenance

C) requirements analysis

D) component design

Answer: B

Diff: 2Page Ref: 386

AACSB: Analytic skills

Study Question: Study Question 3

37) Creating the database and testing the data occurs in the ________ phase of the SDLC.

A) implementation

B) maintenance

C) requirements analysis

D) component design

Answer: A

Diff: 2Page Ref: 386

AACSB: Analytic skills

Study Question: Study Question 3

38) Which of the following is done in the maintenance phase of the SDLC?

A) training

B) fixing failures

C) obtaining requirements

D) routine maintenance

Answer: B

Diff: 2Page Ref: 386

AACSB: Analytic skills

Study Question: Study Question 3

39) Software vendors often bundle large bunches of fixes for low-priority problems into groups called ________.

A) technical fixes

B) patches

C) service packs

D) enterprise packs

Answer: C

Diff: 1Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 3

40) With regard to the software component, software developers group fixes for high-priority failures into ________ that can be applied to all copies of a given product.

A) a beta version

B) a patch

C) service packs

D) trial packs

Answer: B

Diff: 1Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 3

41) The main problem of the SDLC approach to systems development is the ________ nature of the process.

A) fluid

B) sporadic

C) waterfall

D) cyclical

Answer: C

Diff: 1Page Ref: 387

AACSB: Analytic skills

Study Question: Study Question 3

42) Which of the following is not one of the reasons for the problems with SDLC?

A) lack of implementation training for users

B) waterfall nature of the SDLC

C) difficulty of documenting requirements in a usable way

D) approximation errors in budgeting and scheduling

Answer: A

Diff: 2Page Ref: 387-388

AACSB: Analytic skills

Study Question: Study Question 3

43) Spending too much time with documenting requirements of the problem leads to ________.

A) blind spots

B) errors of omission

C) analysis paralysis

D) information overload

Answer: C

Diff: 2Page Ref: 388

AACSB: Analytic skills

Study Question: Study Question 3

44) In order to address the problems facing development forecasting, development methodologies other than the SDLC have emerged for developing systems through a series of small, manageable chunks. Which of the following is not one of them?

A) rapid application development

B) integrated development

C) extreme programming

D) object-oriented development

Answer: B

Diff: 2Page Ref: 388

AACSB: Analytic skills

Study Question: Study Question 3

45) Which of the following is a characteristic of a large-scale systems development project?

A) lax security

B) limited budget

C) short development interval

D) IT personnel with diverse backgrounds

Answer: D

Diff: 2Page Ref: 389

AACSB: Analytic skills

Study Question: Study Question 4

航空订票系统开发说明文档

航空订票系统开发说明文档V1.0 姓名:张敬学号:1203121790 1开发环境搭建过程 1.1 软件下载 开发环境所使用的软件名称及其版本信息如下表所示: 软件名称版本信息 JDK jdk1.7.0_01 Tomcat 6.0.35 MyEclipse 10.0 Axis2 axis2-1.6.2-bin axis2-1.6.2-war axis2-eclipse-codegen-plugin-1.6.2 axis2-eclipse-service-plugin-1.6.2 1.2 搭建环境 1. 安装JDK; 环境变量配置如下图1-1: (1)JA V A_HOME:新建一个变量名JA V A_HOME,并把变量值写成C:\Program Files\Java\jdk1.7.1(装JDK时的路径); (2)配置PATH:在系统变量里编辑一个变量名Path,并在其末尾处添加.;%JA V A_HOME%\bin (3)配置CLASSPATH:在环境变量里新建一个变量名CLASSPATH并将变量写成.;%JA V A_HOME%\lib\dt.jar;%JA V A_HOME%\lib\tools.jar

图1-1 2. 安装并配置Tomcat相关参数; 将tomcat压缩文件apache-tomcat-6.0.35.zip中的内容解压缩到D:\apache-tomcat-6.0.35下,然后安装配置jdk环境变量的方法配增加系统变量。 变量名:TOMCAT_HOME;变量值:D:\apache-tomcat-6.0.35。然后修改系统变量CLASSPATH添加%TOMCAT_HOME%\common\lib\servlet-api.jar;同时修改系统变量Path,添加%TOMCAT_HOME%\bin 3. 安装MyEclipse,并在其中配置JDK和Tomcat相关参数; 4. 将axis2-eclipse-codegen-plugin-1.6.2和axis2-eclipse-service-plugin-1.6.2放至Myeclipse安装目录下的dropins子目录(D:\worksoft\myeclipse\dropins),启动MyEclipse,自动安装; 将axis2.war包拷贝到Tomcat安装目录下的webapps子目录; 启动Tomcat服务器,打开浏览器,输入并访问地址,成功得到Axis2部署成功的信息。如下图1-2所示。

项目管理学习心得体会

项目管理学习心得 非常感谢公司给我这次参加项目管理的培训、提升自我的机会。虽然这两 次培训的过程很辛苦,强度也很大,但付出总有收获,我学到了很多关于项目 管理方面的知识,学会了利用WBS对任务进行层层分解,学会了利用鱼刺图、 流程图等工具进行质量分析,在学习的过程中也发现了自己很多的不足。同时 深刻的体会到项目管理在药品研发中的重要性。这两次培训让我深刻检查和审 视自己知识经验,下面是我对这两次培训的总结和心得体会。 一、沟通是项目管理中桥梁 沟通是人与人之间、人与群体之间思想与感情的传递和反馈的,以求思想 达成一致和感情的通畅。项目能否顺利开展、完成。离不开有效的沟通,一次 次的沟通就好比搭建起一座座桥梁,如果没有这样的一座座桥梁,我们的道路 就不通,也就没有办法进行有效的沟通。在培训中,梁老师在课堂开展了“邮差”的小游戏,在游戏中,我是担任项目组成员,最后我们小组没能完成任务。过 后对游戏过程的思考,给我带来很多的感触,其中重要的一点就是我们项目组 成员没有进行有效的沟通,我发现我们项目组成员A、B、C之间的沟通很多, 但是没有什么明确的目的性,就是各自在埋头苦写,进行着很多无效的沟通, 浪费了很多时间,二十分钟过去了,我们项目组成员A、B、C三人还彼此不清 楚我们之间共有的图案是什么?这就是典型只是停留在形式上的沟通,没有带 着目的性的沟通。另外,做为项目经理的话,有效的沟通对项目开展起着至关 重要的作用,项目经理如果没有掌握好沟通的技巧和沟通的目标性,开展工作 也会带来很多的困难,项目也就无法正常运作下去。结合我们的工作,也存在 很多关于沟通上的问题,做为项目负责人,如果你没有很好的跟组员之间进行 沟通,没有将你的任务明确的交待下去。就会造成项目组成员的开展很多无效、无用的工作,拖慢了进度,浪费了时间,严重的可能还导致项目的失败。 二、团队建设是项目管理的基础。 一个项目如果离开了团队建设,没有了凝聚力、合作、目标、行动、思想。我想这个项目开展起必将因难重重,可想而知,项目也会以失败告终。只有将 团队建设的基础打好,打结实了,我们的项目才能顺利的开展。在一个团队中,或多或少都会存在一些短板的,做为项目经理,你就是要有目的性去培养成员,

航空订票系统代码

#include #include void FlightInsert(); //增加路线 void FlightDelete();//删除路线 void FlightLookup();//航班查询 void FlightRework();//航班路线修改 void FlightBuyticket();//买票 void FlightCancelticket();//取消订票 void Flightclean();//清空 void MainMenu();//主函数 void Display();//显示订票信息 typedef struct Customer //已定票乘客信息{ char Name[10]; // int Amount; //定票数 int Level; //舱位等级 int SeatNum; //座位号 char FlightNum[10]; //所定航班号 struct Customer *next; }Customer; typedef struct Replace //侯补乘客信息{ char Name[10]; //姓名e int Amount; //定票数 int Level; //舱位等级 char FlightNum[10]; //所定航班号 struct Replace *next; }Replace; typedef struct Flight //航班路线信息 { char From[10]; //起点站名 char Des[10]; //终点站名 char FlightNum[10]; //航班号 char PlaneNum[10]; //航班 char Week[20]; //飞机周日

项目管理学习心得

项目管理心得 通过在课堂上的学习,我对项目管理有了一个大概的了解和综合的认识。再在老师的教导下,我对项目管理有了进一步的学习和认识,我真正认识T项目管理在现实生活中的运用。现将我对项目管理的理解总结如下。 项目管理是项目管理在领域的应用。它结合了行业特点并且运用了项目管理技术、理念和方法,包含着多个知识领域(如时间管理、成本管理、质量管理、风险管理、人力资源管理、沟通交流管理及采购管理等)。 由于项目管理是项目管理在领域的应用,因此它有着在信息技术行业的许多特征:任务的明确性、管理工具的先进性、信息沟通的及时性、资源提供的必要性、测试的完善和严谨性、度量的准确性及项目管理的贯穿性等。项目集成管理是指在项目的整个生命周期内,汇集项目管理的知识领域,对所有项目计划,进行整合执行及控制,以保证项目各要素相互协调的全部工作和活动过程。项目集成管理是从全局的、集成的观点出发通过有机的协调项目各个要素(进度、成本、质量和资源等),在相互影响的项目各项具体目标与方案中权衡和选择,尽可能 地消除项目各单项管理的局限性,从而实现最大限度地满足项目干系人的需求和希望的目的。 项目的范围管理影响到信息系统项目的成功。在实践中,“需求蔓延”是信息系统失败最常见的原因之一,信息系统项目往往在项目启动、计划、执行、甚至收尾时不断加入新功能,无论是客户的要求还是项目实现人员对新技术的试验,都可能导致信息系统项目范围的失控,从而使得信息系统项目无论在时间、资源和质量上都受到严重影响。项目管理的首要任务是制定一个构思良好的项目计划,以确定项目的范围、进度和费用。在给定的时间完成项目是项目的重要约束性目标,能否按进度交付是衡量项目是否成功的重要标志。因此,进度控制是项目控制的首要内容,是项目的灵魂。同时,由于项目管理是一个带有创造性的过程,项目不确定性很大,项目的进度控制是项目管理中的最大难点。 项目的成本是项目的全过程所耗用的各种费用的总和。项目的成本管理对于组织来说非常重要,成本管理并不只是把项目的成本进行监控和记录,而是需要对成本数据进行分析,以发现项目的成本隐患和问题,在项目遭受可能的损失之前采取必要的行动。 项目成本管理希望节约项目的费用,但并不意味着要一味减少成本。例如:在信息系统项目中,减少测试无疑能够减少项目的费用,但没有测试,如同许多曾经进行过的信息系统一样,把用户当做测试者,可能对项目造成灾难性的后果,最终,或者使得项目的成本大为提高,或者让项目走向失败的边缘。质量是“使实体具备满足明确或隐含需求能力的各项特征之总和”,明确或隐含的需求是指按项目需求制定的基础性文件。质量管理作为项目管理的一部分,具有非常重要的地位。质量管理的目的是通过执行项目质量管理过程,使用一些基本项目管理工具和技术来保证信息系统的质量。时间、成本、质量是项目管理的三大目标,如果质量不能满足要求,即使进度再快,成本再节省,项目也没有意义。 人是决定组织和项目成败的关键。尤其是在信息系统领域,合格人选很难找到和保留在某个项目中。有效的管理人力资源,是项目经理们认为最困难的一件事情。项目人力资源管理包括为最有效地使用参与项目人员所需的各项过程。它

机场订票系统

#include #include using namespace std; class Passenger { public: string name; string flight; Passenger *next; Passenger(const string name,string flight,Passenger* p=NULL) { this->name=name; this->flight=flight; this->next=p; } }; class Ticket { private: Passenger *head,*tail;// public: Ticket(); ~Ticket(); void reverseTicket();//订票 void cancelTicket();//退票 void checkTicket();//查询某人是否已定航班 void display();//显示乘客航班信息 }; Ticket::Ticket() { head=tail=NULL; } Ticket::~Ticket() { Passenger* p=head,*q=head; while(p!=NULL) { q=head->next; delete p; p=q; } }

void Ticket::reverseTicket() { string name,flight; cout<<"请输入您的姓名:"<>name; cout<<"请输入您要订的航班号:"<>flight; if(head==NULL) { head=tail=new Passenger(name,flight); cout<<"订票成功"<next) { if(namename) break; else p=p->next; } p->next=new Passenger(name,flight,p->next); cout<<"订票成功"<>name; cout<<"请输入您要退订的航班:"<>flight; Passenger *p=head,*q=head; if((p->name==name)&&(p->flight==flight)) { head=head->next; cout<<"退票成功!"<

航空售票管理系统

摘要 伴随着经济的不断发展,必然带动交通业和旅游业务的不断扩大, 特别是航空售票和订票的信息管理日异复杂, 传统的售票方式已经难以满足快节奏, 高效率的现代生活需求,这就要求航空公司要有一套好的售票数据库系统。 一个正常营运的航空公司需要管理所拥有的飞机、航线的设置、客户的信息等,但更重要的还要提供票务管理。面对各种不同种类的信息,需要合理的数据库结构来保存数据信息以及有效的程序结构支持各种数据操作的执行。对数据的添加、修改、删除及查询等方面的操作应简单易行,并且能够具有较好的稳定性。航空售票管理系统主要采用Delphi 7.0做为开发工具,进行开发与设计的。本系统的使用界面具有十分人性化的特征,具有方便的查询功能,对售票、网上订票等方面的操作应简单易行,并且能够具有较好的稳定性。 关键词: 航空;售票;网上订票;管理系统;数据库;SQL语言。

目录 1.开发一个航空售票管理系统的背景和意义 (1) 1.1.传统售票方式的回顾和特点分析 (1) 1.2.航空售票管理系统的应用现状和前景展望 (1) 2.用计算机开发一个航空售票管理系统的可行性分析 (1) 2.1.技术可行性 (1) 2.2.经济可行性 (2) 2.3.法律可行性 (2) 3.开发环境的选择 (3) 3.1.Delphi 7.0简介 (3) 3.2.开发工具的选择 (3) 4.航空售票管理系统的需求分析 (3) 4.1.系统分析 (4) 4.2.系统功能模块设计 (4) 4.3.功能子模块分析 (5) 4.3.1.网上订票模块 (5) 4.3.2.用户查询模块 (5) 4.3.3.用户订票模 (5) 4.4.后台管理系统 (6) 4.4.1.后台管理系统子模块 (6) 4.5. 民航售票管理系统的顶级数据流程图 (8) 4.6. 民航售票管理系统一级数据流图 (9) 4.7. 数据字典定义 (10) 4.7.1.数据项定义 (10) 4.8.E/R模型 (13) 5.详细设计 (14) 5.1.系统的总体流程图 (14) 5.2.系统各模块的实现 (15) 5.2.1.系统登录窗口 (15) 5.2.2.主界面窗口 (16) 5.2.3.信息操作模块 (17) 5.2.4.送票员模块 (22) 5.2.5.员工管理模块 (23) 5.2.6.系统模块 (24) 5.2.7.售票员模块 (25) 5.2.8.前台订票模块 (26)

航空客运订票系统的设计与实现

课程设计说明书 课程名称 题目航空客运订票系统的设计与实现 院系_电子信息工程学院____ 班级__计算机科学与技术__ 学生______________ 指导教师_____________ 日期_ 2011.12.19-2011.12.30__ 数据结构课程设计任务书

指导教师:时间: 2011.12.8 航空客运订票系统的设计与实现一、简介

1.设计目的: 1.数据结构课程设计是综合运用数据结构课程中学到的几种典型数据结构,以及程序设计语言(C语言),自行实现一个较为完整的应用系统的设计与开发 2.通过课程设计,自己通过系统分析、系统设计、编程调试,写实验报告等环节,进一步掌握应用系统设计的方法和步骤,灵活运用并深刻理解典型数据结构在软件开发中的应用。 3.学会将知识应用于实际的方法,提高分析和解决问题的能力,增加综合能力。 航空空订票系统: (1)熟练掌握链表存储结构及其建立过程和常用操作; (2)熟练掌握队列的建立过程和常用操作; (3)学会自己调试程序的方法并掌握一定的技巧。 2.问题的描述: 航空客运订票的业务包括查询航线和客票预定的信、客票预定和办理退票等,设计一个程序以使上述任务借助计算机完成。 二、数据结构的设计: (1)航班信息:飞机抵达城市、航班号、飞机号、起降时间、航班票价、票价折扣、总位置和剩余位置、以訂票的客户。 (2)客户信息:客户、证件号、座位号。 三、功能(函数)设计: 1.每条航线所涉及的信息有:终点站名、航班号、飞机号、飞行日(星期几)、载客量、余票量、票价格,折扣,已订票的客户(包括、订票量、舱位等级1,2或3)以及等候替补的客户(包括、所需票量); 2.全部数据可以只放在存中; 3.系统能实现的操作和功能如下: a) 查询航线: 根据旅客提出的终点站名输出下列信息:航班号、飞机号、星期几飞行,最近一天航班的日期和余票额; b) 承办订票业务: 根据客户提出的要求(航班号、订票数额)查询该航班票额情况,若尚有余票,则为客户办理订票手续, 输出座位号;若已满员或余票额少于定票额,则需重新询问客户要求。若需要,可登记排队候补; c) 退票业务: 根据客户提供的情况(日期、航班),为客户办理退票手续,然后查询该航班是否有人排队候补,首先询问排在第一的客户,若所退票额能满足他的要求,则为他办理订票手续,否则依次询问其他排队候补的客户。

工程项目管理学习心得

工程项目管理初识浅谈新学伊始,大三紧张的专业课学习也拉开了帷幕。因此,也有幸接触到了“工程项目管理”这门专业课。通过两周的学习,也对这门课有了初步的浅显的认识。 关键词:项目工程项目质量管理成本管理 引言 最近的几十年来,“项目”一词确实已经应用的十分广泛了,它存在于社会的各个领域,充斥着我们日常生活的接触。我们研究的所谓“项目”者,即研究在一定时间内,预定的工作范围内,在限定的资源条件下,需要达到的预定质量水平的,来自社会,生产分配,消费和流通经济循环的领域的一项一次性任务。其强调,“以客户为中心”,“以目标为导向”,“以计划为基础”为核心理念,以“程序化,动态化,体系化,可视化”为特征,强调“优化组合,动态管理”。在当今社会,现代企业的创新,发展,生产效率的提高,竞争能力的增强一般都是通过项目实现的;而在基础设施建设,提高人民生活水平的城市规划,旧城改造,环境保护的公共工程方面,也是通过项目来实现的;另外,随着我国国力的增强,国家投入的科研项目,社会项目和国防项目的资金也在增加,国际间经济利益的竞争其实也是项目的竞争。因此,“项目”这一涵盖了系统工程,管理学和经济学的具体或抽象的表现,在现代社会中的作用已经越来越重要,它推动社会经济的发展,人民生活水平的提高。企业的兴旺,地区的繁荣,国民经济的发展,社会的进步,国防力量的提升,科学技术的发达,已越来越依赖这些项目的成功。

正文 那么说了这么多项目的重要性,但其实单就项目一词也不是具体的,所以就有了我们书中所讲的工程项目与项目管理。工程项目是一个工程技术系统的建设和运行为任务的过程。工程项目的根本目的,是通过工程的建设和运行为社会提供合格的产品或服务。本书《工程项目管理》全面论述了工程项目管理系统过程,系统介绍了工程项目的前期策划、范围管理、工程项目组织、项目管理组织、企业中的项目组织、进度管理、成本管理、采购和合同管理、质量管理、风险管理、沟通管理和信息管理等理论、方法和手段。介绍了目前项目管理中计算机应用情况和软件的主要功能。工程项目管理是项目管理的一个重要分支。工程项目推行项目管理的意义可归纳为"三个确保":即可以确保工程项目质量的实现;确保工程项目的如期实现;确保工程项目投资处于受控状态。正因为项目在现代社会的重要作用,所以工程项目管理作为项目管理的一个分支,推行工程项目管理也是很有意义的。 工程项目管理是以尽可能有效的方式取得预期成果的过程。工程项目管理强调的是预期成果,但更重视的是为实现这个结果而形成的整个过程。在整个工程项目管理的实施过程中,为了取得预期成果,往往会综合运用各种现代化管理方法,如:全面质量管理、全面经济核算、全面计划管理、ABC分类法、方针目标管理、滚动工作计划、行为科学、管理经济学、心理学、网络计划管理、电子商务网络等,通过推广运用各种现代化管理方法,建立工程项目管理模式和管理文化,使工程项目管理的整个过程处于受控状态,从而确保工程项目管理目标的实现。 工程项目管理的目标是完成工程项目任务。主要体现在如下三个方面:

数据结构航空订票系统课程设计报告

摘要 飞机在现代的生活中扮演者非常重要的角色。它能够快速的把人们送到自己想要去的地方,既快速,又方便。所以现在坐飞机时很普遍的。但是都到机场去买票浪费时间,因此,航空订票系统应运而生。有了航空订票系统,用户可以在该系统进行飞机票的查询,订票,退票等操作。方便了大家 关键词航空订票系统、查询、订票、退票

目录 摘要........................................................................................................ I 1 需求分析 (2) 1.1 需求概述 (2) 1.2 需求环境 (2) 1.3 功能描述 (2) 2 概要设计 (3) 2.1 程序功能模块 (3) 2.2 程序流程图 (3) 2.3 课程设计的思想 (3) 3 详细设计 (4) 3.1 程序初始化 (4) 3.1.1代码功能 (4) 3.1.2 功能实现代码 (4) 3.2 查询航班信息 (6) 3.2.1代码功能 (6) 3.2.3 功能实现代码 (7) 3.3 订票模块 (8) 3.3.1 代码功能 (8) 3.3.2 功能实现代码 (8)

4 测试与运行 (14) 5结束语..................................................................................................................... ..16 6 参考文献 (17) 7附录..................................................................................................................... .. (18) 1 需求分析 1.1 需求概述 航线管理。每条航线所涉及的信息有:终点站名、航班号、飞机号、飞行周日

项目管理心得体会-总结报告模板

项目管理心得体会 时间过得真快,一眨眼的功夫,这门课已经结束了,总的来说这段时间过的忙碌,充实而快乐。这门课主要教我们的是管理,张总在课上时不时地改正我们的思维方式,说话的技巧,在项目中怎么与甲方沟通,我从总获益匪浅。而且这门课要求我们把项目当成是真实的项目来做,为了让我们有真实的感受,张总还让一些在职的人员作为甲方,来跟我们模拟项目的过程。从整个项目的提出到验收中我学到了很多东西,不管在技术上还是团队合作上我都有颇大的收获。 现在回想当初刚听到要45天完成这个项目时的心情,真是有点感慨。记得刚上课的时候蒋院长就进来说,张总的课是严格的训练,叫我们一定要挺过去,当时觉得有那么夸张吗,不就是一门课,这么多年多难的课都过来了。但是当崔总提出项目时,确实有点让人惊讶,要在45天完成他指定的项目,而且是用c#,当时我们组没人会c#,真的觉得这个有点太紧了,而且因为中间还有别的课要上,又不能把所有的时间精力都放在这个上面。即使我们能在这么短的是时间看c#方面书,把项目赶出来,那质量肯定也不会好到哪去。尽管这样想,我们还是准备做这个项目。前一阵子终于项目通过了验收,虽然搜索的效果不是特别棒,但是我们和甲方的人员还是比较满意的验收时的结果的,这让我们感觉三四十天的努力没有白费,心情当然很爽快啊。 纵观整个项目从给公司起名字,到获取需求,到最后验收的过程,还是有点心得体会的: 第一,要认清形势。 我觉得任何事情一定要在认清形势的基础上再开始考虑如何计划,这样才能让别人满意你的结果而自己也能获得较大的收获。一开始,张总就强调过,我们不应该把这个项目当成还是课堂的项目,完成老师的硬性要求,而是一个真正的公司的项目。这样我们就可以考虑到时间方面的限制和我们在技术上的优势,

UML建模设计航空订票系统

UML 建模设计 航 空 订 票 系 统 姓名:卫飞 班级:1528 学号:2

一、背景 1.1背景概述 随着知识经济的到来,人类已经逐步进入信息化社会,信息增长的速度越来越快,人们希望利用先进的管理理论方法手段来得到并处理越来越多的信息,以提高工作效率和管理水平。由于信息资源对人们生活的重要性,不断提高信息的收集,传输,加以利用等活动,日益成为人们社会生活的重要组成部分。网上机票预订管理系统的产生和发展正好满足人们的这种需求 1.2 主要组成及功能 1、新用户注册,新用户可以注册,注册时输入用户名可以查询用户可不可用,可用就可以注册,注册时可以判断用户输入的密码和验证密码是否相同,相同才给以注册,如果满意可以点注册,注册成功后用户可以选择不用在回到登陆界面,可以直接陆到用户主界面,以后就可以用这个用户登录了,如果不满意,点取消,所有信息清空,重新输入。 2、验证登陆名密码,正确进入主菜单,根据登录时所选的登录方式(客户、管理员)的不同分别对用户设定不同的访问权限(如果是输入的客户用户名和密码正确,选择以客户方式登陆则主界面里面的管理员界面不能用,如果输入的是管理员的相应用户密码正确,以管理员的方式登陆则管理员界面可用)不正确则清空登录框,最多可以输入三次,三次不正确系统会自动

关闭 3.我的航班界面。你可以点击你想查询的有关机票的信息的按钮(舱位信息查询,客机信息查询,航线查询,客户类型信息查询)获得相关信息的表,根据表的内容,你可以在下面的下拉框中选择你要定的票信息,点确定后在下面会显示你的机票的相关内容,如果满意可以点击订票,把相关信息添加到机票数据库表中,如果不满意,可以点重置,所有信息清空,再重新选择。 4.退票功能。用户可以根据用户信息表中的我的机票信息查询,找出机票号,在输入到机票号查询里,点击查询获得你的机票信息以及价格显示,点击退票则在数据库机票信息表中删除本条信息 二、使用Rose绘制图 分别有:用例图、类图、包图、顺序图、协作图、状态图、活动图、组件图、部署图 情景:机票预订系统是某航空公司推出的一款网上选票系统。其中,未登陆用户只能查询航班信息;以登陆的用户还可以网上购买机票,查看已购买机票,也可以退定机票;系统管理员可以安排系统中的航班信息。此外,该购票系统还可以与外部的一个信用评价系统有交互。当某用户一个月之内退订两次及以上的机票时,需要降低该用户在信用评价系统中的等级。当信用等级过低时,则不允许用户再次购买机票。

项目进度管理学习心得体会3篇

项目进度管理学习心得体会3篇 精品文档,仅供参考

项目进度管理学习心得体会3篇 心得体会是指一种读书、实践后所写的感受性文字。语言类读书心得同数学札记相近;体会是指将学习的东西运用到实践中去,通过实践反思学习内容并记录下来的文字,近似于经验总结。本站为大家整理的相关的项目进度管理学习心得体会供大家参考选择。 项目进度管理学习心得体会篇1 有了计划,就有了明确的奋斗目标,具体的工作程序,就可以更好地统一大家的思想,协调行动,增强工作的自觉性,减少盲目性,调动员工的积极性和创造精神,合理地安排和使用人力、物力,少走弯路,少受挫折,保障工作顺利进行,避免失误。计划一旦形成,就在客观上变成了对工作的要求,对计划实施者的约束和督促,对工作进度和质量的考核标准。 这样,计划又反过来成了指导和推动工作前进的动力。总之,搞好工作计划,是建立部门正常工作秩序,提高工作效率必不可少的程序和手段。编制好工作计划,对于我们的工作,都有十分重要的意义。 为提高工作效率,我们还编制了相关工作计划进度表,部门每一个人在工作例会上必须对自己一周的工作完成情况进行汇报,然后由经理再对部门的工作做出总结,通过表格计划管理有效的加快了工作进度。

其次个人还应该具备良好的心理素质和抵御压力的.能力和具备良好的素养。我们要为公司广结良缘,广交朋友,形成公司与政府部门之间沟通的桥梁,形成人和的氛围和环境。为此要把握交往的技巧、艺术、原则。能力+人脉=成功。维持良好的人脉关系有效的实现工作成功的目标。学会掌握沟通技巧,沟通虽不是技术的问题,但这是保障工作的最基本的职责。对这句话我不仅认同也深有体会,结合工作中遇到的各种情况,让我深刻体会到沟通在工作中及生活中的重要性,高效的沟通可以起到意想不到的效果。 然后在工作中要明确自己所负责的是什么工作,分清什么阶段该做什么,什么环节该做什么,理清了各个环节、各阶段、各条线之间的逻辑关系和相关性,我们的工作思路就更清晰了。同时为了更清楚的了解各职能部门审批流程和审批所需的前置条件,我们编制了工程建设项目及报建流程图,有了这些流程的规范,我们就有了参考目标,很快能熟悉每一个环节,工作做起来也得心应手。 所谓找到正确的方法,以量化工具来规范、标准化的实现项目化管理。掌握正确的方法,用正确的方法做正确的事情。 最后我认为团结是非常重要的。俗话说得好一个巴掌拍不响,这不正是告诉我们这个道理吗?人类社会越来越依赖集体的努力以及越来越多的、有组织的群体规模的扩大,管

民航订票管理系统

实验十三数据库管理系统综合应用 -------民航订票管理系统 一、实验目的: 通过完成从用户需求分析、数据库设计到上机编程、调试和应用等全过程,进一步了解和掌握所讲解的内容。 二、实验简述: 民航订票系统主要分为机场、航空公司和客户三方的服务。航空公司提供航线和飞机的资料,机场则对本机场起飞和降落的航班和机票进行管理,而客户能得到的服务应该有航班线路和剩余票数的查询,以及网上订票等功能。客户又可以分为两类,一类是普通客户,对于普通客户只有普通的查询功能和订票功能,没有相应的机票优惠,另一种是经常旅客,需要办理注册手续,但增加了里程积分功能和积分优惠政策。机场还要紧急应对措施,在航班出现延误时,要发送相应的信息。 三、实验要求: 完成该系统的数据库设计; 用SQL实现数据库的设计,并在SQL Server上调试通过。 四、参考答案: 1、需求分析 (1)航空公司 航空公司的操作流程如图C.1所示。 图C.1 航空公司操作分类表 (2)客户 客户的操作流程如图C.2所示。

图C.2 客户操作分类表 (3)机场 机场的任务是根据航空公司提供的航线和飞机,安排航班,以及航班的机票。如果出现晚点等情况,要记录并发送信息,对特殊客户记录其消费信息,并相应提供优惠。 (4)客户订票 客户订票涉及到多个因素:由客户提出订票申请;由机场管理航班机票;对于特殊客户,除给予票价优惠以外,还要累计里程;订票后需判断是否超员。这些因素涉及到客户资料、航班资料以及由航空公司提供的航线(里程)和飞机(座位数)资料中所提供的相关数据。 客户订票的操作流程如图C.3所示。 2、概念模型设计 数据库需要表述的信息有以下几种: (1)航空公司信息 (2)客户信息 (3)飞机信息 (4)航线信息 (5)航班信息 (6)订票信息 (7)特殊客户积分

C++课程设计—航空售票管理系统

C++课程设计—航空售票管理系统

————————————————————————————————作者:————————————————————————————————日期:

内蒙古科技大学 本科生《C++程序设计》课程设计说明书 题目:航空售票管 理系统 学生姓名:完美主义 学号:XXXXXXXX 专业:计算科学与技术 班级:计2010-1班 指导教师:XXX

【摘要】 随着科技的发展和人们生活水平的日益提高,人们在不断追求更加快捷的交通方式以满足人们快节奏的生活方式,航空系统在交通系统中已扮演着一个越来越重要的角色。然而,交通的快捷离不开信息的快捷。 随着随着计算机的发展和普及,人们的生活方式发生了巨大的改变,计算机在代替和延伸脑力劳动方面发挥着越来越重要的作用。在交通系统中,有大量的数据需要被处理,而这些工作有人来完成几乎是不可能的,而交给计算机处理,就可以很好地满足我们的需求。 航空售票管理系统可以根据乘客和管理人员的要求,进行方便快速的查询、购票、退票和管理等工作。本文介绍了简易航空售票管理系统的实现过程。 【关键词】 航空售票管理系统动态数组类和对象文件操作运算符重载多文件结构

成绩评定标准 课程设计的验收答辩采取“讲解程序+提问+即时编程”的方式。 考核项目评价质量成绩 程序功能完全实现,并能通过答辩。(60%)A能完全正确回答提问; B问题回答的基本意思正确; C不能回答或回答错误,抽取程序小的功能即时编程,能完成; D不能回答或回答错误,即时编程无法完成; 程序设计符合面向对象的思想和原则,结构合理(15)A程序结构层次分明,提取出各个实体类,类的设计合理;B程序结构层次分明,具有客户类和服务类; C类的设计基本正确; D几乎在一个类或者方法中实现了大部分的逻辑,结构不够清晰; 程序的风格(10%)A遵守编码规范,有良好的风格; 以下问题每出现一项成绩降一个等级:1.类、方法和变量命名不符合规范;2.方法和属性前缺少注释; 3.程序没有适当缩进; 设计说明书(15%)从以下几方面考核:1.结构完整2.图表正确3.文字通顺4.版面工整

毕业论文-航空售票系统设计与实现

摘要 航空售票/订票是航空业务中的一个最基本的业务,从表面上来看,它只是航空业务的一个简单的部分,但是它涉及到资金管理与客户服务等多方面,因此,过去传统的售票已经不能满足现代航空业务流量剧增的客观要求。 本系统——航空售票系统,采用https://www.360docs.net/doc/c110941639.html, 技术作为创建应用程序的方式,以C#作为编程语言,采用SQL Server 数据库作为后台数据库。它是基于Browser/Server结构下形成的数据驱动的Web应用程序。不仅能方便旅客,还能节省航空公司的代理费用,加速资金周转。实现了后台管理员对航空公司、航班和订票信息的维护;前台客户通过注册登陆可以查询航班信息,进行订票和查看自己的购票信息并可以删除管理员未确认的订票信息。同时可以进行购票错误以后的退票信息等功能。 本论文主要涉及软件,数据库与网络技术等。涵盖知识面广,可有效地提高消费者综合运用所学知识分析解决问题的能力,增强消费者对事物的理解与掌握能力,培养消费者掌握科学的研究方法,正确的设计思想,独立思考,勇于进取,探索创新,为今后进一步学习与工作奠定了良好的基础。 关键词航空售票;https://www.360docs.net/doc/c110941639.html,;C#;SQL Server数据库; word版本.

Abstract Ticket / booking is the aviation business in the most basic of business, from the face of it, it's just a simple air part of the business, but it relates to financial management and customer service and other aspects, therefore, has been the traditional ticket Modern air traffic flow can not meet the objective requirements of surge. The system - Air ticketing system, using https://www.360docs.net/doc/c110941639.html, technology as a way to create applications to C # as the programming language, using SQL Server database as the backend database. It is based on Browser / Server structure, formed under the data-driven Web applications. Not only convenient for tourists, but also save the airline agent costs and accelerate cash flow. Administrators realized back airlines, flights and booking information maintenance; receptionists can search for flights by up login information, make reservations and view their own information and tickets can delete the administrator has not confirmed the booking information. Tickets can also refund after wrong information and so on. This paper mainly involves software, database and network technology. Cover the wide range of knowledge, can effectively improve the knowledge of consumers of the integrated use of problem-solving skills, and enhance consumer understanding and grasp of things, cultivating consumer knowledge of scientific research methods, the correct design ideas, independent thinking, courage to forge ahead, exploration and innovation, for further study and work laid a good foundation. Keywords:https://www.360docs.net/doc/c110941639.html, C# SQL Server database air ticket word版本.

民航订票系统

1 绪论 1.1 系统设计的目的 为了方便机场工作人员对机票的管理,提高飞机票的管理效率,降低飞机票管理中的出错率,减少信息交流及其带来不必要的开销。需要设计一个民航订票系统,该系统能及时反映航班及机票的剩余数量等信息,可快速的帮乘客订到想要的机票,而乘客也可以通过该系统实现自助退票的功能。 1.2 实现的目标 该系统是由两个人共同设计实现功能,由于一个人的能力有限,该系统仅能实现录入航班信息、查询航班信息、订购飞机票、退订飞机票等一部分功能(航班的信息存储在文件夹中)。 1.3 课题的研究方法 机票管理系统是实现机场机票的预定、统计和分析,提高机票运用的科学管理水平,充分发挥机票利用率,节省订退票时间。系统的主要设计思想是实现对机票的查询、退订等功能。航班的信息以文件的形式存储,用头文件包含、全局变量定义和结构体定义源代码,用结构体数组来存放顾客名、航班号、座位号等信息,用链式结构存储信息。系统的人机接口采用简单的字符界面进行交互。系统的设计方法是结构化设计方法,采用C语言进行开发。软件开发平台采用Visual C++6.0[1]。

2 软件模块结构图 民航订票系统可以分为四个部分,订票、退票、查询信息、信息载入。 图2.1 民航订票系统模块结构图

3 详细设计 3.1 数据结构设计 用printf()函数输出界面,typedef struct airline{}定义航班的信息,如航班号、飞机号、目的地、座位总数和剩余座位数等。typedef struct customer{}定义顾客信息,如顾客名、所订航班号和座位号等。初始化链表,并在airline、customer 链表中操作,实现系统的功能[1]。 3.2 模块设计 3.2.1 界面设计 用printf()函数输出界面,提示用户选择需要的功能,用条件语句捕捉用户输入的选项,并执行代码,进入用户所选的操作界面。若用户输入非选项的字符,则提示输入错误,提醒用户重新选择。 3.2.2 订票模块设计 进入订票模块后,进行订票。若票已经售完,提示用户不能预订该航班的机票。若还有余票,则提示用户输入个人信息订票。订票成功后,系统中该航班的余票减少相应的数量,并将顾客信息存入文件[2]。代码实现: status book(airline *l,char *flight_num,customer *c,char *name) { airline *p=l; customer *q=c->next ; p=l->next ; for(;q->next !=NULL;q=q->next){} for(;p!=NULL;p=p->next ) { if(strcmp(flight_num,p->flight_num )==0) { if(p->left >0)

《管理信息系统》课程设计报告--航班售票管理系统设计报告

航班售票管理系统设计报告 一、系统分析 (一)可行性分析 国际民航业的激烈竞争又迫使担负国际航线运输任务的航空公司必须尽快推出自己的因特网售票系统,而这些又必须由一个安全的网上订票与支付系统作支持。更重要的还要提供票务管理。面对不同种类的信息,需要合理的数据库结构来保存数据信息以及有效的程序结构支持各种数据操作的执行。航空业身处信息时代的电子商务大潮中,加之传统的售票方式已经不能满足现今航空业的发展,于是航空售票管理系统就自然而然被应用。 由于本系统管理主要是对机票的管理,且每个数据内容具有较强的关联性,涉及的计算过程不是很复杂。因此,比较适合于采用数据库管理。且航空公司用于机票管理的微机都是PIII以上的机器,在存储量、速度方面都能满足数据库运行的要求。在技术难度方面,由于有相关参考文献,还有就是网上资料,特别是参考其它程序的功能,因此完全可以实现系统的投资约50万元,待5年后更新,年使用费约10万元,在经济上是可行的。 (二)需求分析 1、航班售票管理系统开发目标 售票/订票是民航业务中的一个最基本的业务,表面上看,它只是民航业务的一个简单的部分,但是它涉及到资金管理与客户服务等多主面,因此,过去传统的售票方式已经不能满足现代航空业务流量剧增的客观要求,本课程设计便是利用开发工具VF6.0开发一个民航售票管理系统,它能方便快捷地运用在民航业务的营运之中。 2、航班售票管理系统的主要功能 本系统设计主要是根据售票业务的基本流程进行的,系统功能十分强大,包括如下几个方面:订票管理、乘客查询与退票管理、查询飞行时刻窗口和系统维护四方面内容。其中,订票系统至少要满足: (1)每一航班的乘客乘坐飞机的起点、终点、日期和可以使用(预订)的座位等基本信息。 (2)自动显示符合乘客要求的航班及座位是否存在(是否还有空位) (3)查询每一航班的售票订票情况、乘客信息及售票收入金额。 (4)可以按五种方式查询航空公司的航班时刻表信息。 3、航班售票管理系统业务流程分析

相关文档
最新文档