案例分析(14)说课讲解

案例分析(14)说课讲解
案例分析(14)说课讲解

案例分析

2、某公司以CIF鹿特丹与外商成交一批货物,按发票金额110%投保一切险及战争险。买卖合同中的支付条款规定为“Payment by L/C”。国外来证条款中有如下文句“Payment under this credit will be made by us only after arrival of goods at Rotterdam。”(该证项下的款项的货到鹿特丹后由我行支付)。受益人在审证时未发现,因此,未请对方修改。我外贸公司在交单结汇时,议付行也未提出异议。不幸60%货物在途中被大火烧毁,船到目的港后开征行拒付全部货款。问:(1)开证行拒付是否合理?为什么?

(2)本案有何教训可以吸取?

答:(1)合理。因为信用证方式下,银行付款依据是单据和信用证,而信用证上有“Payment under this credit will be made by us only after arrival of goods at Rotterdam。”(该证项下的款项的货到鹿特丹后由我行支付)的规定,因此虽然是CIF条件下的买卖合同,但银行仍可以根据信用证条款拒付货款。

(2)从本案中我外贸公司应该吸取如下教训:在审查信用证时一定要仔细核对是否有与合同相冲突的条款,例如:CIF条件下是“象征性交货”,而不是“实际交货”,因此不应该再有“货到付款”的承诺条款,否则我方的风险太大。

3、我国某外贸公司与荷兰进口商签订一份皮手套合同,价格条件为CIF鹿特丹,以即期信用证支付,向中国人民保险公司投保了一切险。生产厂家在生产的最后一道工序将手套的湿度降到了最低程度,然后用牛皮纸包好装入双层瓦楞纸箱,再装入20英尺集装箱,货物到达鹿特丹后,检验结果表明,全部货物湿、霉、沾污、变色,损失达8万美元。据分析,该批货物的进出口地均没有异常冷或热,运输途中无异常,运输完全属于正常运输。问:

(1)保险公司对该批货物是否付赔偿责任?为什么?

(2)这批货物的风险自何时起由卖方转移给买方?

(3)进口商对受损货物应否支付货款?为什么?

(4)你认为出口商应如何处理此事?

答:

(1)保险公司不予赔偿,因为这属于商品本身的内在质量缺陷,是保险公司的除外责任。

(2)以CIF条件成交,风险自货物交到装运港的船上起由卖方转移给买方

(3)CIF合同属于象征性交货合同,卖方凭单交货,买方凭单付款,只要卖方所提交的单据符合买卖合同,买方就应该付款。实际交付的货物不符合合同,买方应凭合同和检验检疫证书向卖方索赔。

(4)本案涉及的是商品的内在缺陷,卖方应该理赔。

4、我某公司与英商按CIF伦敦签约,出口瓷器l万件,合同与信用证均规定“装运期3—4月份,每月装运5 000件,允许转船”。我方于3月30日将5 000件装上“万泉河”轮,取得3月30日的提单,又在4月2日将余下的5 000件装上“风庆”轮,取得4月2日的提单,两轮均在香港转船,两批货均由“曲兰西克”一轮运至目的港。

请问:(1)本例做法是否属分批装运?为什么?

(2)卖方能否安全收汇?为什么?

分析意见:

(1)本例做法属于分批装运。因为《跟单信用证统一惯例》规定:“同一船只,同一航次中多次装运货物,即使提单表示不同的装船日期或表明不同的装船港口,只要运输单据注明的目的地相同也不视为分批装运”,但本例中3月30日货装“万泉河”轮,4月2日货装“风庆”轮,即非同一船只,所以,应视作分批装运。

(2)卖方不能安全收汇,因为不符合信用证装运条款的要求。

5、有一份合同,出售中国晶晶米10 000公吨。合同规定:“自2 月份开始,每月装船l 000公吨,分10批交货。”卖方从2月开始交货,但交至第五批大米时,大米品质有霉变,不适合人类食用。因而买方以此为理由,主张以后各批交货均应撤销。

问:(1)上述情况,买方有无这种权利,为什么?

(2)若此份合同交易的是一套大型成套机械设备,再发生第五批品质不符,买方又有无这种权利,为什么?

(3)若此笔交易是凭信用证方式付款,卖方第五批交货违反了交货期,买方有无这种权利,为什么?

分析意见:

(1)买方没有这种权利。因为一个分批交货合同,各批交货都应视为一个独立的合同,况且成交的是大米,品质没有相互依存的关系,但由于第五批大米确实品质不符,所以能就这一批提出索赔。

(2)若成交的是一套大型机械设备,其中一批品质违反合同,那么买方不但可以宣告从这一批开始的以后各批货物无效,而且还可提出退回过去已交付的几批货款。因为一套大型机械设备的分批交货,各批之间的品质是相关联的。

(3)若凭L/C结汇,卖方违反的是交货期,那么买方可以宣告从这一批开始的以后各批均告无效。因为《UCP 600》规定信用证规定在指定的期限分批装运,如其中一批未按信用证规定的期限装运,则信用证对该期以及以后各期均告无效。

5、某货轮从上海港开往新加坡,在航行途中触礁,造成船底被撞穿,海

水涌入,部分货物遭水浸湿,船长为避免船沉,令船强行搁浅。由于船舶受损严重,无法继续行驶,船长决定雇佣拖轮将货轮拖往附近港口修理,检修后重新开往目的地。事后调查这次事故造成的损失有:①1000箱货物由于触礁而被水浸湿;②600箱货物由于搁浅而遭到水渍;③船底因触礁而受损;④船底因搁浅而受损;⑤拖船费用;⑥额外增加的燃油费和船长、船员的工资。

问:(1)什么是单独海损和共同海损?

(2)试分析以上哪些属于单独海损,哪些属于共同海损?并简述理由。

(1)共同海损是指船、货在海运途中遇到共同危险时,船方为了维护船、货的共同安全或使航程得以继续完成,有意识地合理地作出某些特殊牺牲或支付某些特殊费用,这些损失和费用称为共同海损;(2分)单独海损是指由于承保范围内的风险所直接导致的船、货的部分损失,它仅与单独的利益方有关。(2分)

(2)属于单独海损的有:(1)1000箱货被烧毁;(3)主机和部分甲板烧坏,这都是由承保的风险直接导致船、货受损;

属于共同海损的有;(2)600箱货由于灌水受损,这是为解除或减轻风险、人为地有意识的造成的损失,属于共同海损。

共同海损还包括为了确保船货共同安全而支出的特殊费用,所以(4)拖船费用,(5)额外增加的燃料和船长、船员工资也属于共同海损。(6分)

6、有一被保货物——精密仪器一台,货价为15,000美元,载运该货的海轮,在航行中同另一海轮发生互撞事故,由于船身的激烈震动,而使该台仪器受到损坏。事后经专家检验,认为该台仪器如修复原状,则需修理的费用16,000美元,如拆卸为零件出售,尚可收回5,000美元。试问,在上述情况下,这台受损坏仪器应属何种损失?保险公司又应如何处理这一损失案件?

答:这台精密仪器因船舶互撞而受到损失,受损坏的仪器如拆卸为零件出售,尚可收回5,000美元的价值,但是如果将它修复至原状,则修理费用,达16,000美元,如加上运至目的地的费用总和,超过该货在目的地的价值。在这种情况下,按照惯例,保险公司则视该批货物为推定全损,应属于保险公司赔偿的范围。

在本例中所说的情况属于推定全损的范围。保险公司对于发生推定全损的货物,除按保单的规定,给予赔款外,被保人即货主,应将该货物委付给保险公司,即将该货的权益转让给保险公司,并由被保人签署权力转让书作为证据,从而使保险公司在赔付货款以后,能够自行处理该货的残余部分,并享受该货有关其他权益。

7.某国公司以CIF鹿特丹出口食品1 000箱,即期信用证付款。货到目的港后查验:(1)不符合进口国的标准;(2)收货人只实收998箱,短少2箱。(3)有15箱货物外表情况良好,但箱内货物共短少60公斤。试分析以工情况,进口人应分别向谁索赔,并说明理由是什么?

分析意见:

第(1)种情况应向卖方索赔,因原装货物有内在缺陷。第(2)种情况应向承运

人索赔,因承运人签发清洁提单,在目的港应如数交足。第(3)种情况可以向保险公司索赔,属保险单责任范围,但如进口人能举证原装数量不足,也可向卖方索赔。

8、我某公司向国外A商出口货物一批。A商按时开来不可撤销即期议付信用证,该证由设在我国境内的外资B银行通知并加保兑。我公司在货物装运后,将全套合格单据送交B银行议付,收妥货款。但B银行向开证行索偿时,得到开证行因经营不善已宣布破产。于是,B银行要求我公司将议付的货款退还,并建议我方可委托其向A商直接索取货款。对此你认为我公司应如何处理?为什么?

答:我方完全可以拒绝B银行的退款要求。因为保兑不可撤消信用证方式下,保兑行和开征行都承担第一性的付款责任,只要我方提供了全套合格单据,即使开证行破产,保兑行亦需付款,而不具有收回已付卖方货款的权利。

9.我某公司与外商按CIF条件签订一笔大宗商品出口合同,合同规定装运期为8月份,但未规定具体开证日期。外商拖延开证,我方见装运期快到,从7月底开始,连续多次电催外商开证,直到8月5日,外商才发简电开证,我方怕误装运期,急忙按简电办理装运。8月28日,外商开来信用证正本,正本上对有关单据作了与合同不符的规定。我方审证时未予注意,通过银行议付,银行也未发现,但开证行以单证不符为由,拒付货款。我方以货物及单据均与合同相符为由,根据合同要求买方付款,经过多次交涉未果,最后该批货物被港口海关拍卖处理,使我方遭受款货两空的损失。你认为我方应从中吸取哪些教训?

.答:

(1)合同应明确信用证开到期限;[ 1分]

(2)催证要及时;[ 1分]

(3)不能凭简电装船;[ 1.5分]

(4)对方开证太迟,应提出异议并保留索赔权;[ 1.5分]

(5)审证要认真;[ 1.5分]

(6)发生争议时应做好货物的保全工作。[ 1.5分]

10.我某公司向日本某商以D/P见票即付方式推销某商品,对方答复:如我方接受D/P见票后90 天付款,并通过他指定的A银行代收则可接受。试分析日方提出此项要求的出发点:

分析意见:

日商提出将D/P即期改为90天远期,很显然旨在推迟付款,以利其资金周转。而日商指定A银行作为该批托收业务的代收行,则是为了便于向该银行

工程造价案例分析

工程造价案例分析复习题 一、在正常使用条件下,建设工程的最低保修期限。 依题意答:1、基础设施工程、房屋建筑的地基基础工程和主体结构工程,为设计文件规定的该工程的合理使用年限; 2、屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏,为5年; 3、供热与供冷系统,为2个采暖期、供冷期; 4、电气管线、给排水管道、设备安装和装修工程,为2年。 二、流水施工组织方式的特点。 依题意答:流水施工综合了顺序施工和平行施工的优点,克服了它们的缺点。流水施工组织方式具有以下特点: (1)科学地利用了工作面,争取了时间,计算总工期比较合理。 (2)实现了专业化作业,有利于工人熟练掌握操作技术和改进操作技术,更好地保证工程质量和提高劳动生产率。 (3)实现了连续作业,相邻的专业工作队之间实现了最大限度的合理搭接。 (4)单位时间投入施工的资源量较为均衡,有利于资源供应的组织工作。 (5)为文明施工和进行现场的科学管理创造了有利条件。 三、在寿命周期成本评价法中,权衡分析的对象的五种情况的具体分析。 依题意答:①设置费与维持费的权衡分析;②设置费中各项费用之间的权衡分析; ③维持费中各项费用之间的权衡分析;④系统效率和寿命周期成本的权衡分析; ⑤从开发到系统设置完成这段时间与设置费的权衡分析。 在系统效率SE和寿命周期成本LCC之间进行权衡时,可以采用以下的有效手段:(1)通过增加设置费使系统的能力增大(例如,增加产量)。 (2)通过增加设置费使产品精度提高,从而有可能提高产品的售价。 (3)通过增加设置费提高材料的周转速度,使生产成本降低。 (4)通过增加设置费,使产品的使用性能具有更大的吸引力(例如,使用简便,舒适性提高,容易掌握,具有多种用途等),可使售价和销售量得以提高。 四、招标过程中专业资格审查,内容包括哪些? 依题意答:(1)施工经历,包括以往承担类似项目的业绩; 1/ 5

工程造价案例分析

案例分析(三) 1.某建设项目概算已经批准,项目已列入地方年度固定资产投资计划,病得到规划部门批准,准备工作应经完成,根据有关规定采用公开招标,拟定程序如下: 一、向建设部门提出申请。 二、得到批准后,编制招标文件,招标文件中规定外地区单位参加投标需垫付工程款,垫付比例可作为评标条件;本地区单位投标不需要垫付工程款。 三、对申请投标单位发出招标邀请函(4家)。 四、投标文件递交。 五、由地方建设管理部门指定有经验的专家与本单位人员共同组成评标委员会。为得到有关领导的支持,各级领导占评标委员会总数的1/2。 六、召开投标预备会议,由地方政府领导主持会议。 七、投标单位报送投标文件时,A单位在投标截止时间之前3小时,在原方案的基础上,又补充了降价方案,被招标方拒绝。 八、由政府建设部门主持,公证处人员监督,召开开标会,会议上只宣读三家投标单位的取价(另一家投标单位退标)。 九、由于为进行资格预审,故在评标过程中进行投标资格审查。 十、评标后评标委员会将中标结果直接通知了中标单位。 十一、中标单位提出因主管领导生病等原因2个月后再签订承包合同。 经评委会审查华英公司被确定为中标被选人。华英公司提交的投标文件中包括报价中的措施项目费用清单计价表和其他项目清单计价表,填写两表时,对招标方发出的工程量清单的部分工程清单计价进行了分析和估算,具体内容如下: (1)对安装玻璃幕墙工程之指定分包暂定造价RMB1500000.00元;总承单位对上述工程提供协调及施工设施的配合费用45000.00元。 (2)对外围土建工程之指定分包暂定造价RMB500000.00元;总承单位对上述工程提供协调及施工设施的配合费用10000.00元。 (3)总承包单位对设计及供应电梯工程(工程造价约RMB1300000.00元)承包单位的协调及照管的配合费用3000.00元。 (4)总承包包单位对安装电梯工程(工程造价约RMB200000.00元)承包单位的协调及照管的配合费用4000.00元。 (5)总承包单位对设计及供应机电系统工程(工程造价约RMB4500000.00元)承包单位的协调及照管的配合费用2000.00元。 (6)总承包单位对安装机电系统工程(工程造价约RMB750000.00元)承包单位的协调及照管的配合费用4000.00元。 (7)总承包单位对市政配套工程(工程造价约RMB1500000.00元)承包单位的协调及照管的配合费用3000.00元。 (8)预留人民币1500000.00元作为不可预见费。 (9)总承包单位察看现场费用8000.00元。 (10)总承包单位临时设施费70000.00元。 (11)依招标方安全施工要求,总承包单位安全施工增加费10000.00元。 (12)总承包单位环境保护费5000.00元。 问题: 1.该单位招标程序中存在什么问题? 2.评标过程中商务性评审和技术性评审的主要内容是什么?

《建设工程造价案例分析》真题及答案

某工程项目发包人与承包人签订了施工合同,工期4个月,工程内容包括A、B两项分项工程,综合单价分别为360.00元/m3、220.00元/m3;管理费和利润为人材机费用之和的16%;规费和税金为人材机费用、管理费和利润之和的10%,各分项工程每月计划和实际完成工程量及单价措施项目费用见表5.1。 表5.1 分项工程工程量及单价措施项目费用数据表 总价措施项目费用6万元(其中安全文明施工费3.6万元);暂列金额15万元。 合同中有关工程价款结算与支付约定如下: 1、开工日10天前,发包人应向承包人支付合同价款(扣除暂列金额和安全文明施工费)的20%作为工程预付款,工程预付款在第 2、3个月的工程价款中平均扣回); 2、开工后10日内,发包人应向承包人支付安全文明施工费的60%,剩余部分和其它总价措施项目费用在第2、3个月平均支付; 3、发包人按每月承包人应得工程进度款的90%支付;

4、当分项工程工程量增加(或减少)幅度超过15%时,应调整综合单价,调整系数为0.9(或1.1);措施项目费按无变化考虑; 5、B分项工程所用的两种材料采用动态结算方法结算,该两种材料在B分项工程费用中所占比例分别为12%和10%,基期价格指数均为100。施工期间,经监理工程师核实及发包人确认的有关事项如下: 1、第二个月发生现场计日工的人材机费用6.8万元; 2、第四个月B分项工程动态结算的两种材料价格指数分别为110和120。 问题: 1、该工程合同价为多少万元?工程预付款为多少万元? 2.第2个月发包人应支付给承包人的工程价款为多少万元? 3、到第三个月末B分项工程的进度偏差为多少万元? 4、第四个月A、B两项分项工程的工程价款各位多少万元?发包人在该月应支付给承包人的工程价款为多少万元? 答案: 1、合同价[(360×1000+220×700)/10000+7+6+15]×(1+10%)=87.34万元 工程预付款[(360×1000+220×700)/10000+7+6-3.6]×(1+10%)×20%=13.376万元 2、第2、3月支付措施费=(6-3.6×60%)/2=1.92万元

一级造价工程师《案例分析(土建+安装)》真题及答案教学内容

2019年一级造价工程师《案例分析(土建+安装)》真题及答案 试题一:(20 分) 某企业投资新建一项目,生产种市场需求蛟大的产品。项目的基础数椐如下:1.项目建设投资估算为 1600 万元含可抵扣进项税 112 万元),建设期 1 年,运营期 8 年。建设投资(不含可抵扣进项税)全部形成固定资产,固定资产使用年限 8 年,残值率 4%,按直线法折旧。 2.项目流动资金估算为 200 万元,运营期第 1 年年初投入,在项目的运萱期末全部回收 3.项目资金来源为自有资金和贷款,建设投资货款利率为8%按年计息),流动资金利率为5%(按年计息。建设投资贷款的还款方式为运营期前 4 年等额还本利息息照付方式。 4.项目正常年份的设计产能为 10 万件,运营期第 1 年的产能为正常年份产的70%目前市场同类产品的不含税销售价格约为 65-75 元件 5.项目资金投入、收益及成本等基础测算数据见表 1.1。 6.该项目产品适用的增值税税率为 13%,增值税附加综合税率为 10%,所得税税率为 25%。 表 1.1 项目资金投入、收益及成本表 问题: 1.列式计算项目的建设期贷款利息及年固定资产折旧额。 2.若产品的不含税销售单价确定为 65 元/件,列式计算项目运营期第 1 年的增值税、税前利润,所得税,税后利润。 3.若企业希望项目运营期第 1 年不借助其他资金来源能够满足建设投资贷款还款要求,产品的不含税销售单价至少应确定为多少? 4.项目运营后期(建设期贷款偿还完成后),考虑到市场成熟后产品价格可能下年,产品单价拟在65 元的基础上下调 10%, 列式计算运营后期正常年份的资本金净利润率。(注:计算过程和结果教据有小数的,保留两位小数)

《公路工程造价案例分析》案例

案例24 用测时法进行人工挖基坑土方定额得测定,现场测定情况如下表。 假定基坑体积为75 m,清理整修坑底、坑壁面积为36 m,运土体积为回填后多余得土体,体积为32 m,不考虑运土便道。 据经验,估计非工作耗时(指准备工作时间、合理中断与休息及结束整理时间)占定额时间得15%。 问题: 请用上述资料计算人工挖基坑土方得劳动定额,定额单位取10 m。工作内容为:人工挖、装基坑土方并运出坑外,20m内弃土,清理坑底、坑壁。 参考答案: 加权平均法就是工人人数乘以耗时再相加得到总得耗时,然后再除以总共完成得工程量得到基本时间耗时;而算术平均法就是用工人人数乘以耗时,然后除以相应完成得工程量算出每立方米耗时,最后再进行平均。

(1)按加权平均得方法计算。 ①计算挖土出坑得定额时间。 挖土出坑基本时间耗时: ()()3 ????÷+ 7446+11258+6262+836827+24.1+13.525.2=116.659min/m 挖土出坑定额时间耗时: (非工作耗时占定额时间得15%) ②计算清理整修坑底坑壁得定额时间。 清理整修坑底、坑壁基本时间耗时: 2 (725526628420)(35253015)=5.267min/m ?+?+?+?÷+++ 清理整修坑底、坑壁定额时间耗时: ③计算得手推车运土得定额时间。 手推车运土基本时间耗时: 3(7110812061214128)(19.825.918.713.4)38.149min/m ++++++= ????÷ 手推车运土定额时间耗时: ④计算挖基坑土方得劳动定额。 基坑体积为75 m,清理整修坑底、坑壁面积为36 m,运土体积为为32 m 挖基坑定额时间: 挖基坑得劳动定额: (要计量得为基坑得体积,工程量为75 m,清理、运土等为挖基坑得附属工作,劳动定额定额单位为10 m) (2)按算术平均得方法计算。 ①计算挖土出坑得定额时间。 挖土出坑基本时间耗时: 3(744627)4=116.665m i n/m +1125824.1+626213.5+836825.2 ?÷?÷?÷?÷÷ 挖土出坑定额时间耗时: ②计算清理整修坑底坑壁得定额时间。 清理整修坑底、坑壁基本时间耗时: 2 (72535526256283042015)4 5.283min/m ?÷+?÷+?÷+?÷÷= 清理整修坑底、坑壁定额时间耗时: ③计算手推车运土得定额时间。

一级造价工程师《案例分析》计算公式汇总

一级造价工程师《案例分析》计算公式汇总 1、拟建项目主厂房投资=工艺设备投资×(1+∑Ki) 2、拟建项目工程费与工程建设其她费=拟建项目主厂房投资×(1+∑Ki) 3、预备费=基本预备费+涨价预备费,其中: 基本预备费=工程费与工程建设其她费*基本预备费率 涨价预备费P=∑It[(1+f)t一1](其中:It=静态投资f=上涨率) 4、静态投资=工程费与工程建设其她费+基本预备费 5、投资方向调节税=(静态投资+涨价预备费)*投资方向调节税率 6、建设期贷款利息=∑(年初累计借款+本年新增借款/2)*贷款利率 7、固定资产总投资=建设投资+预备费+投资方向调节税+贷款利息 8、拟建项目总投资=固定资产投资+流动资产投资 9、用扩大指标估算法估算流动资金: 流动资金=拟建项目固定资产投资*固定资产投资资金率 10、实际利率=(1+名义利率/年计息次数)*年计息次数—1 11、用分项详细估算法估算流动资金: 流动资金=流动资产-流动负债,其中: 流动资产=应收(预付)帐款+现金+存货 应收帐款=产成品+年经营成本/年周转次数 现金=(年工资福利+年其她费)/年周转次数 存货=外购原材料燃料动力+在产品+产成品流动负债=应付帐款+外购原材料燃料+外购原材料+燃料动力费/年周转次数 在产品=(年工资福利费+年其它制造费+年外购原材料燃料费+年修理费)/年周转次数

12、销售税金及附加=销售收入*销售税金及附加税率 13、所得税:(销售收入—销售税金及附加—总成本)*所得税率 14、年折旧费=(固定资产原值-残值)÷折旧年限=(固定资产总额-无形资产)(1-残值率)÷使用年限(固定资产总额应包括利息) 15、固定资产余值=年折旧费*(固定资产使用年限-营运期)+残值 16、动态投资回收期=(累计折现净现金流量出现正值得年份—1)+(出现正值年份累计折现净现金流量绝对值/出现正值年份当年折现净现金流量) 17、FIRR=i1+(i2-i1)×[FNPV1÷(FNPV1+|FVPN2|)] 18、总成本费用=经营成本+固定资产折旧费+维简费+摊销费+利息 19、等额本金偿还: 税后利润+折旧费+摊销费≤该年应还本金未分配利润=全部税后利润(不计盈余公积金与应付利润)税后利润+折旧费+摊销费>该年应还本金未分配利润=(该年应还本金+上年亏损)—折旧费-摊销费费 盈余公积金=(税后利润-上年亏损)*10% 税后利润=该年利润总额-(该年利润总额—上年度亏损)所得税率 应付利润=税后利润-盈余公积金—未分配利润 20、摊销费=无形资产/摊销年限 21、年平均利润总额=各年利润总与÷年数 年平均利税总额=年平均利润总额+∑各年销售税金÷n年 22、投资利润(利税)率=年平均利润(利税)总额/项目总投资(包括自有资金) 23、资本金利润率=年平均利润总额÷项目资本金(包括全部自有资金) 24、各年利润总额=年销售收入—年总成本-年销售税金及附加 25、各年利税总额=年销售收入—年总成本费用

(毕业论文)工程造价案例分析

毕业设计说明书

引言 选择住宅楼的工程量清单计算及投标方案设计,目的是可以让自己更加系统地复习和巩固自己所学的专业知识,培养自己综合运用所学理论知识和专业技能的能力。另外还可以让自己学会分析解决一般建筑工程设计、施工、施工组织及概预决算中的实际问题,并熟悉其建筑工程招标和投标工作及建筑施工组织及概预算决算的一般程序、方法。通过编制投标文件,可以培养自己独立思考和解决实际工作的能力,另外还可以让自己更加专业地了解掌握一些施工技术方案以及相关的法律法规。为此我必须在以下几个方面加以综合的训练和提高: (1)系统地巩固和加深已学到的基础理论只是、专业知识和实践取得的经验(2)按照“计算规则”、“计算规范”的具体规定,使用各种手册等参考书进行编制投标文件(商务标和技术标)的独立工作能力。 (3)提高建筑工程概预算的设计能力和识图的基本技能。 (4)培养查阅文献,分析、利用资料进行科研、课题设计的能力。 (5)了解相关工程施工的整个过程和全部内容。 (6)熟悉与招投标相关的各种“法规”、“规则”和相关制度。 这让我为更进一步学习,对建筑行业尤其是招投标领域有更深,更全面的了解,让我在实践中进一步提高我的专业理论知识和实践经验,为我今后的学习打下了坚实的基础。

中文摘要 建筑业是一个民族、一个国家的支柱产业,其耗费的人力、物力、财力相当巨大。规范建筑市场,使其与国际接轨,让建筑交易市场化,必须实行招投标。招投标的核心是投标文件的编制。如何在激烈以及逐渐市场化规范化的投标市场中中标,投标文件的好坏是重要前提。为此,我在了解了当今招投标的市场形式后,结合《中建芙蓉嘉苑一期2号楼工程》项目,对其进行投标文件(商务标)编制。主要是根据图纸和清单计算规则编制出工程量清单。再计算出综合单价,得出总价。通过编制投标文件来体会工程量清单计价的优势和作用。 关键词: 建筑业投标文件工程量清单 A bstract Construction industry is a national, a country's pillar industry, the cost of manpower and material resources and financial resources are considerable. Regulating the construction market, make its in line with international standards, make construction transaction market, must be carried out on the bidding. Bidding is the core of the preparation of the bid documents. How in the fierce and winning in the market gradually standardized bidding market, the stand or fall of the tender documents is the important premise. For this, I understand today's bidding in the market form, the combination of the zhongjian lotus jia yuan first phase 2 building project "project, to bid documents (business standard). Mainly according to drawings and list of bill of quantities calculation rules. To calculate the comprehensive unit price and total price. Through by the tender documents to understand the advantage of the quantities bill valuation and effect Keywords:architecture industry; biding documentation; details of the engineering capacity

工程造价案例分析学习总结

工程造价案例分析学习总结 第一章建设项目财务评价 【案例一】建设项目投资估算方法详表 预备费=基本预备费+涨价预备费;式中:基本预备费=(工程费+工程建设其他费)×基本预备费率;涨价预备费P=ΣI t[(1+f)-1],式中:I t—建设期第t年的静态投资(工程费+工程建设其他费+基本预备费),f—建设期物价年均上涨率。 建设期贷款利息=Σ(年初累计借款+本年新增借款/2)×贷款利率。 建设投资=工程费+工程建设其他费+基本预备费+涨价预备费,其中前三项构成静态投资。 项目总投资=建设投资+建设期贷款利息+流动资金。 项目流动资金=拟建项目年产量×单位产量占用流动资金的数额; 【案例四】 项目投资现金流量表中,回收固定资产残值的计算:①运营期=固定资产使用年限,固定资产余值=固定资产残值; ②运营期<固定资产使用年限,固定资产余值=(使用年限-运营期)×年折旧费+固定资产残值。 项目可行性研究的主要内容和目的:建设项目的可行性研究是在投资决策前,对拟建项目的原料资源可靠、产品市场趋势、所采用技术上的先进性和适用性、经济上的合理性和有效性以及建设的必要性和可行性进行全面分析、系统论证、方案比较和综合评价,为项目投资决策提供可靠的科学依据。可行性研究的主要内容可概括为四大部分,此四大部分研究是构成项目可行性研究的四大支柱。即①市场研究:通过市场研究论证项目拟建的必要性、拟建规模、建厂条件和建厂地点、企业组织、劳动定员、投资估算和资金筹措;②技术研究:主要研究拟建项目技术上的先进性与可行性,从而确定出拟建项目的设计方案、技术工艺和设备选型;③效益研究:根据以上资料对投资项目进行经济评价,分析其经济上的合理性和盈利性。这是决策的主要依据。所以,经济评价是可行性研究的核心内容;④资源研究:通过资源研究了解原材料市场、资金市场、劳动力市场等对项目规模的选择起着程度不同的制约作用。 静态投资回收期=(累计净现金流量出现正值的年份-1)+︱出现正值年份上年累计净现金流量︱/出现正值年份当年净现金流量。 插值法计算内部收益率FIRR=i1+(i2-i1)×[FNPV1÷(FNPV1+︱FNPV2︱)]

造价工程师《工程造价案例分析》案例分析(四)

某拟建年产3000万吨铸钢厂,根据可行性研究报告提供的已建年产2500万吨类似工程的主厂房工艺设备投资约2400万元。已建类似项目资料:与设备有关的其他各专业工程投资系数,如表1-1所示。与主厂房投资有关的辅助工程及附属设施投资系数,见表1-2。 表1-1与设备投资有关的各专业工程投资系数 加热炉 汽化冷却 余热锅炉 自动化仪表 起重设备 供电与传动 建安工程 0.12 0.01 0.04 0.02 0.09 0.18 0.40 表1-2与主厂房投资有关的辅助及附属设施投资系数 动力系统 点击【造价工程师学习资料】或复制打开https://www.360docs.net/doc/9e8591065.html,?wenkuwd,注册开森

机修系统 总图运输系统 行政及生活福利设施工程 工程建设其他费 0.30 0.12 0.20 0.30 0.20 本项目的资金来源为自有资金和贷款,贷款总额为8000万元,贷款利率8%(按年计息)建设期3年,第1年投入30%,第2年投入50%,第3年投入20%。预计建设期物价年平均上涨率3%,基本预备费率5%。 问题: ⒈已知拟建项目建设期与类似项目建设期的综合价格指数为1.25,试用生产能力指数估算法估算拟建工程的工艺设备投资额;用系数估算法估算该项目主厂房投资和项目建设的工程费与工程建设其他费投资。 ⒉估算该项目的建设投资,并编制建设投资估算表。 ⒊若单位产量占用营运资金额为:0.3367元/吨,试用扩大指标估算法估算该项目的流动资金。确定该项目的总投资。 式中:生产能力指数取1。 ⒉估算主厂房投资:用设备系数估算法 点击【造价工程师学习资料】或复制打开https://www.360docs.net/doc/9e8591065.html,?wenkuwd,注册开森

工程造价案例分析

江苏开放大学 形成性考核作业 学号 姓名 课程代码020035 课程名称工程造价案例分析(本)评阅教师 第1 次任务 共 3 次任务

试题一(30分) 某建设项目的相关基础数据如下: 1.按当地现行价格计算,项目的设备购置费为2800万元,已建类似项目的建筑工程费、安装工程费占设备购置费的比例分别为45%、25%,由于时间、地点等因素引起的上述两项费用变化的综合调整系数均为 1.1,项目的工程建设其他费按800万元估算。 2.项目建设期1年,运营期10年。 3.建设投资的资金来源为资本金和贷款。其中贷款为2000万元,贷款年利率为6%(按年计息),贷款合同约定的还款方式为运营期前5年等额还本、付息照付方式。 4.建设投资预计全部形成固定资产,固定资产使用年限为10年,残值率为5%,采用直线法折旧。 5.运营期第1年投入资本金500万元作为流动资金。 6.运营期第1年营业收入、经营成本、营业税金及附加分别为1650万元、880万元、99万元。 7.项目所得税税率为25%。 8.项目计算时,不考虑预备费。 问题: 1.列式计算项目的建设投资。(5’) 解:2800×【1+(45%+25%)×1.1】+800=5756(万元) 2.列式计算项目年固定资产折旧额。(5’) 解:建设期贷款利息为:2000×6%×1/2=60(万元) 项目固定资产投资为:5756+60=5816(万元) 项目固定资产折旧为:=552.52(万元) 3.列式计算项目运营期第1年应偿还银行的本息额。(5’) 解:运营期第1年年初贷款累计为:2000+2000×6%×1/2=2060(万元) 按5年等额还本方式每年应偿还:2060/5=412(万元) 运营期第1年应计息:2060×6%=123.6(万元) 运营期第1年应偿还银行的本息额为:412+123.6=535.6(万元) 4.列式计算项目运营期第1年的总成本费用、税前利润和所得税。(5’) 解:运营期第1年总成本费用为:经营成本+折旧+财务费用=880+552.52+2060×

工程造价案例分析总结知识讲解

造价工程师《工程造价案例分析》模拟试题 一、阅读理解 1.某总承包企业拟开拓国内某大城市工程承包市场。经调查该市目前有A、B两个BOT项目将要招标。两个项目建成后经营期限均为15年。 为了顺利进行投标,企业经营部将在该市的投标全过程按先后顺序分解为以下几项工作:(1)投标申请;(2)接受资格审查;(3)领取招标文件;(4)参加投标预备会;(5)参加现场踏勘;(6)编制投标文件;(7)编制项目可行性研究论证报告;(8)投送投标文件;(9)投标文件内容说明与陈述;(10)参加开标会议;(11)签订合同。 经进一步调研,收集和整理出A、B两个项目投资与收益数据,见表1.1。 表1.1 A、B项目投资与收益数据表 基准折现率为6%,资金时间价值系数见表1.2。 表1.2 资金时间价值系数 按以下步骤求解该问题: (1)计算B项目扩建后总收益的净现值; (2)将各方案总收益净现值和不中标费用损失作为损益值,绘制投标决策树; (3)判断B项目在5年后是否扩建?计算各机会点期望值,并做出投标决策。 (计算结果均保留二位小数。) (1).经营部拟定的各项投标工作的先后顺序有何不妥?(6分) (2).不考虑建设期的影响,分别列式计算A、B两个项目的净现值。(4分) (3).据估计:投A项目中标概率为0.7,不中标费用损失80万元;投B项目中标概率为0.65,不中标费用损失100万元。若投B项目中标并建成经营5年后,可以自行决定是否扩建,如果扩建,其扩建投资4000万元,扩建后B项目每年运营收益增加1000万元。(10分) (1). 答案:不妥之处有:(1)参加投标预备会不应在参加现场踏勘之前; (2)编制项目可行性研究论证报告不应在编制投标文件之后; (3)投标文件内容说明与陈述不应在参加开标会议之前。 (2). 答案:各项目净现值计算: A项目: PVA=-10 000+2000(P/A,6%,5)+2500(P/A,6%,5)(P/F,6%,5)+3000(P/A,6%,5)(P/F,6%,10)

2016年造价工程师案例分析真题与答案

2016年造价工程师案例分析真题及答案 案例一 某企业拟于某城市新建一个工业项目,该项目可行性研究相关基础数据下: 1、拟建项目占地面积30亩,建筑面积1100m2。其项目设计标准、规模与该企业2年前在另一城市修建的同类的项目相同。已建同类项目的单位建筑工程费用为1600元/m2。建筑工程的综合用工量为4.5工日/m2,综合工日单价为80元/工日,建筑工程费用中的材料费占比为50%,机械使用费占比为8%,考虑地区和交易时间差异,拟建项目的综合工日单价为100元/工日,材料费修正系数为1.1,机械使用费的修正系数为1.05,人材机以外的其他费用修正系数为1.08。 根据市场询价,该拟建项目设备投资估算为2000万元,设备安装工程费用为设备投资的15%。项目土地相关费用按20万元/亩计算,除土地外的工程建设其他费用为项目有建安工程费用的15%,项目的基本预备费率为5%,不考虑价差预备费。 2.项目建设期1年,运营期10年,建设投资全部形成固定资产。固定资产是有你先为10年,残值率为5%,直线法折旧。 3.项目运营期第1年投入自有资金200万元作为运营期的流动资金。 4.项目正常年份销售收入为1560万元,营业税金及附加税率为6%,项目正常年份经营成本为400万元。项目运营期第1年产量为设计产量的85%,运营期第2年及以后各年均达到设计产量,运营期第1年的销售收入,经营成本均为正常年份的85%。企业所得税率为25%。

问题: 1.列式计算拟建项目的建设投资。 2.若该项目的建设投资为5500万元,建设投资来源为自有资金和贷款,贷款为3000万元,贷款年利率为7.2%(按月利息),约定的还款方式为运营期前5年等额还本,利息照付方式。分期列式计算项目运营期第1年,第2年的总成本费用和净利润以及运营期第2年年末的项目累计盈余资金,(不考虑企业公积金,公益金提取及投资者股利分配) (计算结果保留两位小数) 【答案】 1.人工费占比=4.5x80/1600=2 2.5%,人工费修正系数=100/80=1.25 人材机以外的其它费用占比=1-22.5%-50%-8%=19.5% 单位建筑工程费=1600x (22.5%x1.25+50%x1.1 +8%x1.05+19.5%x1.08) =1801.36元/m2 建筑工程费=1801.36x11000/1000=1981.496万元 设备安装工程费=2000x15%=300万元 工程建设其他费用=20x30+(1981.496+300)x15%=942.224万元 建设投资=(1981.496+300+2000+942.224〉x (1+5%) =5484.91万元 2.年实际利率=(1+7.2%/12) 12-1=7.442% 建设期利息=3000/2x7.442%=111.63万元 每年还本额=(3000+111.63) /5=622.326万元 运营期第1年应还利息=(3000+111.63) x7.442%=231.568万元 运营期第2年应还利息=(3000+111.63-622.326) x7.442%=185.254万元

2017工程造价案例分析作业题(二)及答案

《工程造价案例分析(一)》作业题(二) (课程代码:03942) 一、案例分析题 某工程双代号施工网络计划如图所示,该进度计划已经监理工程师审核批准,合同工期为23个月。 问题如下: 1.该施工网络计划的计算工期为多少个月?关键工作有哪些? 2.计算工作B、C、G的总时差和自由时差。 3.如果工作C和工作G需共用一台施工机械且只能按先后顺序施工(工作C和工作G 不能同时施工),则该施工网络进度计划应如何调整较合理? 解:1、按工作计算法,对该网络计划工作最早时间参数进行计算: (1)工作最早开始时间ES i-j: ES1-2=ES1-3=0 ES2-4=ES2-5=ES1-2+D1-2=0+4=4 ES3-7=ES1-3+D1-3=0+2=2 ES4-6=ES2-4+D2-4=4+2=6 ES6-8=max{(ES2-5+D2-5),(ES4-6+D4-6)}=max{(4+7),(6+6)}=12 ES7-8=max{(ES2-5+D2-5),(ES3-7+D3-7)}=max{(4+7),(2+6)}=11 (2)工作最早完成时间EF i-j: EF1-2=ES1-2+D1-2=0+4=4 EF1-3=ES1-3+D1-3=0+2=2 … EF6-8=ES6-8+D6-8=12+8=20 EF7-8=ES7-8+D7-8=11+11=22 上述计算也可直接在图上进行,其计算结果如下图所示。该网络计划的计算工期

T c=max{EF6-8,EF7-8}=max{20,22)月=22月。 网络计划时间参数计算图(一) 关键线路为所有线路中持续时间最长的线路,其持续时间等于22个月。 从上图中可见,关键线路为1—2—5—7—8,关键工作为A、E、H。不必将所有工作总时差计算出来后,再来确定关键工作。 2.解:按工作计算法,对该网络计划工作最迟时间参数进行计算: (1)工作最迟完成时间LF i-j: LF6-8=LF7-8=T c=22 LF4-6=LF6-8-D6-8=22-8=14 … LF2-5=min{(LF6-8-D6-8),(LF7-8-D7-8)} =min{(22-8),(22-11))=min{14,11}=11 … (2)工作最迟开始时间LS i-j: LS6-8=LF6-8-D6-8=22-8=14 LS7-8=LF7-8-D7-8=22-11=11 … LS2-5=LF2-5-D2-5=11-7=4 … 上述计算也可直接在图上进行,其结果如上图所示。利用前面的计算结果,根据总时差和自由时差的定义,可以进行如下计算: 工作B:TF1-3=LS1-3-ES1-3=3-0=3 FF1-3=ES3-7-EF1-3=2-2=0 工作C:TF2-4=LS2-4-ES2-4=6-4=2 FF2-4=ES4-6-EF2-4=6-6=0 工作G:TF3-7=LS3-7-ES3-7=5-2=3 FF3-7=ES7-8-EF3-7=11-8=3 总时差和自由时差计算也可直接在图上进行,标注在相应位置,如上图所示,其他工作的总时差和自由时差本题没有要求。 3.解:工作C和工作G共用一台施工机械且需按先后顺序施工时,有两种可行的方案。 (1)方案I:按先C后G顺序施工,调整后网络计划如下图所示。按工作计算法,只需计算各工作的最早开始时间和最早完成时间,即可求得计算工期。

造价工程师《工程造价案例分析》真题答案及解析

2016年造价工程师《工程造价案例分析》真题答案及解析 【案例一】(20分) 某企业拟于某城市新建一个工业项目,该项目可行性研究相关基础数据如下: 1.拟建项目占地面积30亩,建筑面积11000m2,其项目设计标准,规模与该企业2年前在另一城市的同类项目相同。已建同类项目的单位建筑工程费用为1600元/m2,建筑工程的综合用工量为4.5工日/m2,综合工日单价为80 元/工日,建筑工程费用中的材料费占比为50%,机械使用费占比为8%,考虑地区和交易时间差拟建项目的综合工日单价为100元/工日,材料费修正系数为1.1,机械使用费的修正数为1.05,人材机以外的其它费用修正系数为1.08。 根据市场询价,该拟建项目设备投资估算为2000万元,设备安装工程费用为设备投资的15%。项目土地相关费用按20万元/亩计算,除土地外的工程建设其他费用为项目建安工程费用的15%,项目的基本预备费率为5%,不考虑价差预备费。 2.项目建设期1年,运营期10年,建设投资全部形成固定资产。固定资产使用年限为10年,残值率为5%,直线法折旧。 3.项目运营期第1年投入自有资金200万元作为运营期的流动资金。 4.项目正常年份销售收入为1560万元,营业税金及附加税率为6%,项目正常年份年经营成本为400万元。项目运营第1年产量为设计产量的85%,运营期第2年及以后各年均达到设计产量,运营期第1年的销售收入,经营成本均为正常年份的85%。企业所得税率为25%。 问题:

1.列式计算拟建项目的建设投资。 2.若该项目的建设投资为5500万元,建设投资来源为自有资金和贷款,贷款为3000万元,贷款年利率为7.2%(按月计息),约定的还款方式为运营期前5年等额还本,利息照付方式。分期列式计算项目运营期第1年,第2年的总成本费用和净利润以及运营期第2年年末的项目累计盈余资金,(不考虑企业公积金,公益金提取及投资者股利分配)。 (计算结果保留两位小数) 【答案】 1.人工费占比=4.5x80/1600=2 2.5%,人工费修正系数=100/80=1.25 人材机以外的其它费用占比=1-22.5%-50%-8%=19.5% 单位建筑工程费 =1600x(22.5%x1.25+50%x1.1+8%x1.05+19.5%x1.08)=1801.36元/m2 建筑工程费=1801.36x11000/1000=1981.496万元 设备安装工程费=2000x15%=300万元 工程建设其他费用=20x30+(1981.496+300)x15%=942.224万元 建设投资=(1981.496+300+2000+942.224〉x(1+5%)=5484.91万元 2.年实际利率=(1+7.2%/12)12-1=7.442% 建设期利息=3000/2x7.442%=111.63万元 每年还本额=(3000+111.63)/5=622.326万元 运营期第1年应还利息=(3000+111.63)x7.442%=231.568万元 运营期第2年应还利息=(3000+111.63-622.326)x7.442%=185.254万元折旧费=5500x(1-5%)/10=522.5万元

建设工程造价案例分析

建设工程造价案例分析 第一章建设项目投资估算与财务评价案例类型: ※投资估算 ※※财务评价 一、投资估算 1、建设项目投资构成 产投资 2、 法、系数 预备费 基本预备费=(工程费用+工程建设其他费)×基本预备费率 价差预备费: 3、流动资金估算方法 扩大指标估算法 案例一 二、财务评价 总结: 1.实际利率和名义利率

2.列式计算建设期贷款利息 3.列式计算固定资产折旧,计算期末回收固定资产余值 4.建设投资借款还本付息计划表 5.总成本费用表:总成本费用构成 6.利润与利润分配表 ?所得税(调整所得税) ?息税前利润 ?息税折旧摊销前利润 ?还款来源:折旧+摊销+净利润 EBIT×100% ?总投资收益率(ROI)= TI NP×100% ?资本金利润率(ROE)= EC 7.资本金现金流量表(CI-CO) 8.项目投资现金流量表(CI-CO) 9.静态、动态投资回收期的计算 10.利息备付率(ICR)=息税前利润÷当年应还利息总和 11.偿债备付率(DSCR)=(息税折旧摊销前利润-所得税)÷(当年应还本金+利息) 12.内部收益率(FIRR) 背景材料: 某拟建生产项目,建设期为2年,运营期为6年。设计年产54万件,每件售价100元。运营期第1年达产60%,第2年达产90%,以后各年均达产100%。其它基础数据见表1.1所示。 表1.1某建设项目财务评价基础数据表单位:万元

有关说明如下: 1.建设投资中有540万元形成无形资产,其余形成固定资产。建设投资贷款利率为5.87%(按季度计息)。固定资产使用年限为10年,残值率为4%,固定资产余值在项目运营期末一次收回。 2.流动资金中有160万元为自有资金(于运营期第一年投入),其余部分贷款,流动资金贷款利率为4%(按年计息)。流动资金在项目运营期期末一次收回并偿还贷款本金。 3.营业税金及附加税率为6%,所得税税率为25%。 4.建设投资贷款本金在运营期的前4年每年等额本金偿还,利息照付。 5.当地政府考虑该项目对当地经济拉动作用,在项目运营期前两年每年给予500万元补贴,补贴收入不计税。 6.维持运营投资按费用化处理,不考虑增加固定资产,无残值。 7.基准收益率15%。 8.无形资产在运营期内均匀摊入成本。 (计算结果取整数) 问题: 1.列式计算年有效利率。

土建工程造价案例分析修订版

土建工程造价案例分析 修订版 IBMT standardization office【IBMT5AB-IBMT08-IBMT2C-ZZT18】

《土建工程造价案例分析》 案例一 某现浇砼框架结构别墅如下图所示,外墙为370厚多孔砖,内墙为240厚多孔砖(内墙轴线为墙中心线),柱截面为370×370mm(除已标明的外,柱轴线为柱中心线),板厚为100mm,梁高为600mm。室内柱、梁、墙面及板底均做抹灰。坡屋面顶板下表面至楼面的净高的最大值为4.24m,坡屋面为坡度1:2的两坡屋面。雨篷YP1水平投影尺寸为2.10×3.00m, YP2水平投影尺寸为1.50×11.55m, YP3水平投影尺寸为1.50×3.90m。请按建筑面积计算规范(GB/T50353-2005)和江苏省04年计价表规定,计算:1、建筑面积; 2、一层内墙砌筑脚手架;3、一层抹灰脚手架;4、外墙砌筑脚手架(山墙外墙脚手架算至山尖1/2处);5、外墙抹灰脚手架。 案例2 某单独招标打桩工程,断面及示意如图所示,设计静力压预应力圆形管桩75根,设计桩长18m(9+9m),桩外径400mm,壁厚35mm,自然地面标高-0.45m,桩顶标高-2.1m,螺栓加焊接接桩,管桩接桩接点周边设计用钢板,根据当地地质条件不需要使用桩尖,成品管桩市场信息价为2500元/m3。本工程人工单价、除成品管桩外其他材料单价、机械台班单价按计价表执行不调整,企业管理费费率7%,利润费率5%,机械进退场费为6500元,检验试验费费率0.2%,临时设施费费率1.0%,安全文明施工措施费按1.8%,工程排污费费率1‰,建筑安全监督管理费费率1.9‰,社会保障费费率1.2%,公积金费率 0.22%,税金费率3.44%,其他未列项目暂不计取,应建设单位要求管桩场内运输按定额考虑。请根据上述条件按《建设工程工程量清单计价规范》(08)列出工程量清单(桩计量单位按“根”),并根据工程量清单按江苏省04计价表和09费用定额的规定计算打桩工程总造价。(π取值3.14;按计价表规则计算送桩工程量时,需扣除管桩空心体积。) (一)分部分项工程量清单

土建工程造价案例分析

《土建工程造价案例分析》 案例一 某现浇砼框架结构别墅如下图所示,外墙为370厚多孔砖,内墙为240厚多孔砖(内墙轴线为墙中心线),柱截面为370×370mm(除已标明的外,柱轴线为柱中心线),板厚为100mm,梁高为600mm。室内柱、梁、墙面及板底均做抹灰。坡屋面顶板下表面至楼面的净高的最大值为4.24m,坡屋面为坡度1:2的两坡屋面。雨篷YP1水平投影尺寸为2.10×3.00m, YP2水平投影尺寸为1.50×11.55m, YP3水平投影尺寸为1.50×3.90m。请按建筑面积计算规范(GB/T50353-2005)和江苏省04年计价表规定,计算:1、建筑面积; 2、一层内墙砌筑脚手架;3、一层抹灰脚手架;4、外墙砌筑脚手架(山墙外墙脚手架算至山尖1/2处);5、外墙抹灰脚手架。 案例2 某单独招标打桩工程,断面及示意如图所示,设计静力压预应力圆形管桩75根,设计桩长18m(9+9m),桩外径400mm,壁厚35mm,自然地面标高-0.45m,桩顶标高-2.1m,螺栓加焊接接桩,管桩接桩接点周边设计用钢板,根据当地地质条件不需要使用桩尖,成品管桩市场信息价为2500元/m3。本工程人工单价、除成品管桩外其他材料单价、机械台班单价按计价表执行不调整,企业管理费费率7%,利润费率5%,机械进退场费为6500元,检验试验费费率0.2%,临时设施费费率1.0%,安全文明施工措施费按1.8%,工程排污费费率1‰,建筑安全监督管理费费率1.9‰,社会保障费费率1.2%,公积金费率0.22%,税金费率 3.44%,其他未列项目暂不计取,应建设单位要求管桩场内运输按定额考虑。请根据上述条件按《建设工程工程量清单计价规范》(08)列出工程量清单(桩计量单位按“根”),并根据工程量清单按江苏省04计价表和09费用定额的规定计算打桩工程总造价。(π取值3.14;按计价表规则计算送桩工程量时,需扣除管桩空心体积。) (一)分部分项工程量清单 清单编码项目名称项目特征计量数量