英文求职信13—电子工程师

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

英文求职信13—电子工程师

英文求职信模板13—电子工程师

ELECTRONICS ENGINEER(Experien ___d)

Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.

BACKGROUND SUMMARY Over eleven years of extensive

puter/electronics experien ___.Versed in both digital and ___og electronics withspecific emphasis on puter

hardware/software.Special expertise in system and ponent work supervisor responsible for installing/ ___intaining Aret LAN system.Proficient in assembly and C programming languages.Ex ___lent munication skills

including written,verbal and interpersonal.

PROFESSIONAL WORK EXPERIENCE Stevenson Data Systems,Los Angeles,CA 1981-1993 Components Evaluation Engineer 1992-1993 Responsible for the characterization and evaluation of, and approved vendors list for:Power

supplies,oscillators,crystals,and program ___ble logic used in desktop and laptop puters.Evaluated and remended quality

ponents that increased product profitability.Created adn developed power supply test plan used for evqluating third ___ power supplies.Interacted with vendors to resolve problems associated with ponents qualification.Technical advisor for Purchasing.Promoted to engineer II.

Design Evaluation Engineer 1990-1992 Evaluated new puter product designs ,solving enviro ___ental problems on prototype puters.Conducted systems ___ysis on new puter profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus program ___ble load board used for enviro ___ental

testing.Performed reliability lift testing on puter systems.Installed/ ___intained 20 user.Novell,Aret LAN system.Examined system and sub-system sus ___ptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed plete power and load of puter system and subsystem to verify power and load esti ___tions.

Assistant Engineer 1981-1990 Performed extensive hardware evaluation ion prototype puters,tested prototype units for timing violation using the latest state-of-the-art test

equipment,digital oscilloscopes and logic

___yzers.Performed emviro ___ental,ESD and acoustic testing.Designed and built a power-up test used to test prototype puters during cold boot.

EDUCATION Bachelor of Scien ___ in Electrical Engineering --University of Southern California 1990 Associate in Engineering Electronics --University of Southern California 1981

Job descriptions emphasize candidate's aomploshments. Work history is stated in reverse chronological order,with most re ___nt employment listed first.

模板,内容仅供参考

相关文档
最新文档