facilitate decision implementation process step by step. Government offices at all levels in accordance with the notice on further strengthening the supervision work of the municipal government requires, and actively carry out supervision from the following aspects. One is to focus supervision on the implementation of the major decisions and arrangements of the municipal government, in leadership on the major issues of concern to implement, on the people reflect strongly on the

hot and difficult problems to solve. Current, to tightly around implement implementation municipal, and Municipal Government proposed of "three a insisted two promote, five big storming six breakthrough" of guideline and General requirements, focus in foster four industry, and construction four base, and created four brand and farmers increase, and project construction, and enterprise reform, and city construction, and private economic, and building harmony social, aspects grasp supervision, makes we of supervision work and city of General thought tune, and and reform development of pulse synchronization. Second, supervision of the breakthrough in innovation, improved methods. Supervision of method, to by passive type to active type change, by everything to focus breakthrough change, by assault supervising to track supervising change, in full using sent letter supervision, and phone urged reported, and heard reported, basic method of while, more to used field check, and random checks, and

1、常用的电线、电缆按用途分有哪些种类,

答:按用途可分为裸导线、绝缘电线、耐热电线、屏蔽电线、电力电缆、控制电缆、通信电缆、射频电缆等。

2、绝缘电线有哪几种,

答:常有的绝缘电线有以下几种:聚氯乙烯绝缘电线、聚氯乙烯绝缘软线、丁腈聚氯乙烯混合物绝缘软线、橡皮绝缘电线、农用地下直埋铝芯塑料绝缘电线、橡皮绝缘棉纱纺织软线、聚氯乙烯绝缘尼龙护套电线、电力和照明用聚氯乙烯绝缘软线等。

3、电缆桥架适合于何种场合,

答:电缆桥架适用于一般工矿企业室内外架空敷设电力电缆、控制电缆,亦可用于电信、广播电视等部门在室内外架设。

4、电缆附件有哪些,

答:常用的电附件有电缆终端接线盒、电缆中间接线盒、连接管及接线端子、钢板接线槽、电缆桥架等。

5、什么叫电缆中间接头,

答:连接电缆与电缆的导体、绝缘屏蔽层和保护层,以使电缆线路连接的装置,称为电缆中间接头。

6、什么叫电气主接线,

答:电气主接线是发电厂、变电所中主要电气设备和母线的连接方式,包括主母线和厂用电系统按一定的功能要求的连接方式。

7、在选择电力电缆的截面时,应遵照哪些规定,

答:电力电缆的选择应遵照以下原则:

(1)电缆的额定电压要大于或等于安装点供电系统的额定电压;

(2)电缆持续容许电流应等于或大于供电负载的最大持续电流;

(3)线芯截面要满足供电系统短路时的稳定性的要求;

(4)根据电缆长度验算电压降是否符合要求;

(5)线路末端的最小短路电流应能使保护装置可靠的动作。

8、交联聚乙烯电缆和油纸电缆比较有哪些优点,

答:(1)易安装,因为它允许最小弯曲半径小、且重量轻;

(2)不受线路落差限制;

(3)热性能好,允许工作温度高、传输容量大;

(4)电缆附件简单,均为干式结构;

(5)运行维护简单,无漏油问题;

(6)价格较低;

(7)可靠性高、故障率低;

(8)制造工序少、工艺简单,经济效益显著。

9、固定交流单芯电缆的夹具有什么要求,为什么,

digging out things, refine, eliminate, and strive to achieve dynamic information highlighting the timeliness, policy focus on targeted, experience information grasp typical problem emphasizes the tendency of information, freedom of information caught ... "Excellence", and accurate, short, does not speak empty words, cliches. "Fast", is the emphasis on timeliness. Who want government leaders to grasp the important information must be collected quickly reported. Especially urgent important information such as events, in strict accordance with the State Council concerning strengthening the emergency notice of significant reporting requirements, not only in the first period of submission to government events, also tracking developments closely, to

submit measures, consequences, treatment and rehabilitation, and so on. Establish a strict responsibility system, of late, fail to hide critical situations, to be held accountable. City and County Government offices and Government departments, we should further perfect duty system, raise the level of response and the ability to respond to emergencies and. Third, to open channels of information. Role of key government information network main channel, building extends to all departments and units, vertical extension to the Township and community information networks, information staff, strengthening the work of information. Finished the basic tasks to be criticized. Did not submit information

for a long time the County (district) and sectoral, this year we will take effective measuresfacilitate decision implementation process step by step. Government offices at all levels in accordance with the notice on further strengthening the supervision work of the municipal government requires, and actively carry out supervision from the following aspects. One is to focus supervision on the implementation of the major decisions and arrangements of the municipal government, in leadership on the major issues of concern to implement, on the people reflect strongly on the hot and difficult problems to solve. Current, to tightly around implement implementation municipal, and Municipal Government proposed of "three a insisted two promote, five big storming six breakthrough" of guideline and General requirements, focus in foster four industry, and construction four base, and created four brand and farmers increase, and project construction, and enterprise reform, and

city construction, and private economic, and building harmony social, aspects grasp supervision, makes we of supervision work and city of General thought tune, and and reform development of pulse synchronization. Second, supervision of the breakthrough in innovation, improved methods. Supervision of method, to by passive type to active type change, by everything to focus breakthrough change, by assault supervising to track supervising change, in full using sent letter supervision, and phone urged reported, and heard reported, basic method of while, more to used field check, and random checks, and facilitate decision implementation process step by step. Government offices at all levels in accordance with the notice on further strengthening the supervision work of the municipal government requires, and actively carry out supervision from the following aspects. One is to focus supervision on the implementation of the major decisions and arrangements of the municipal government, in leadership on the major issues of concern to implement, on the people reflect strongly on the

hot and difficult problems to solve. Current, to tightly around implement implementation municipal, and Municipal Government proposed of "three a insisted two promote, five big storming six breakthrough" of guideline and General requirements, focus in foster four industry, and construction four base, and created four brand and farmers increase, and project construction, and enterprise reform, and city construction, and private economic, and building harmony social, aspects grasp supervision, makes we of supervision work and city of General thought tune, and and

reform development of pulse synchronization. Second, supervision of the breakthrough in innovation, improved methods. Supervision of method, to by passive type to active type change, by everything to focus breakthrough change, by assault supervising to track supervising change, in full using sent letter supervision, and phone urged reported, and heard reported, basic method of while, more to used field check, and random checks, and

答:夹具应无铁件构成闭合磁路,这是因为当电缆线芯通过电流时,在其周围

产生磁力线,磁力线与通过线芯的电流大小成正比,若使用铁件等导磁材料,根据电磁感应可知,将在铁件中产生涡流使电缆发热,甚至烧坏电缆。所以不可使用铁件作单芯交流电缆的固定夹具。

10、以下的热缩电缆头的附件的最大特点和优点是什么,

答:热缩附件的最大特点是用应力管代替传统的应力锥,它不仅简化了施工工艺,还缩小了接头的终端的尺寸,安装方便,省时省工,性能优越,节约金属。热缩电缆附件集灌注式和干包式为一体,集合了这两种附件的优点。

11、电缆敷设前应进行哪些检查工作,

答:(1)支架应齐全、油漆完整。

(2)电缆型号、电压、规格符合设计。

(3)电缆绝缘良好,当对油纸电缆的密封有怀疑时,应进行受潮判断;直埋电缆与小底电缆应经直流耐压试难合格;充油电缆的油样应试验合格。

(4)充油电缆的油压不宜低于1.47MPa。

12、对油纸绝缘电力电缆密封有怀疑时,如何用较简单的办法检查电缆绝缘纸是否受潮, 答:把电缆绝缘纸点燃或放入150?左右的电缆油中检查,无“嘶嘶”声或白色泡沫出现,说明未受潮。

13、电缆标志牌应注明什么内容,编写有何要求,

答:标志牌上应注明电缆线路设计编号、电缆型号、规格及始点,并联使用的电缆应有顺序号。要求字迹清晰、不易脱落。

14、直埋电缆的方位标志应设置在哪些位置,

答:在电缆两端,电缆直线段50~100m处电缆接头几电缆改变方向的弯角处。

15、制作电缆接头用的黄腊绸带、黑玻璃漆带、无碱玻璃丝带等,施工前如何进行排潮处理, 答:(1)恒温干燥法:将绝缘带卷成直径为25~30mm小卷,放入

110~120?恒温干燥箱内烘4~5h,冷却干取出,放入干燥的密封筒内。

(2)油浸排潮法:将绝缘带小卷放入恒温在120~130?的电缆油中,离锅底保持30mm距离,经一定时间后油面不再产生泡沫后取出,装入贮有电缆油的桶中,油位应超过所有装入的物体并将其密封。

16、电缆外护层的作用是什么,

答:保护内护层不受机械损伤和化学腐蚀,增强机械强度。

17、室外电缆沟应符合哪些要求,

答:电缆沟上部应比地面稍高,加盖用混凝土制作的盖板,电缆应平敷在支架上,有良好的排水管。

18、电缆内护层的作用是什么,

答;使绝缘层不会与水、空气或其他物体接触,防止绝缘受潮和绝缘层不受机械伤害。

digging out things, refine, eliminate, and strive to achieve dynamic information highlighting the timeliness, policy focus on targeted, experience information grasp typical problem emphasizes the tendency of information, freedom of information caught ... "Excellence", and accurate, short, does not speak empty words, cliches. "Fast", is the

emphasis on timeliness. Who want government leaders to grasp the important information must be collected quickly reported. Especially urgent important information such as events, in strict accordance with the State Council concerning strengthening the emergency notice of significant reporting requirements, not only in the first period of submission to government events, also tracking developments closely, to submit measures, consequences, treatment and rehabilitation, and so on. Establish a strict responsibility system, of late, fail to hide critical situations, to be held accountable. City and County Government offices and Government departments, we should further perfect duty system, raise the level of response and the ability to respond to emergencies and. Third, to open channels of information. Role of key government information network main channel, building extends to all departments and units, vertical extension to the Township and community information networks, information staff, strengthening the work of information. Finished the basic tasks to be criticized. Did not submit information

for a long time the County (district) and sectoral, this year we will take effective measuresunannounced visits to survey and news exposure, more powerful of measures, reflected supervision work of seriousness, and just sex and authenticity. In supervision process in the, both understand the work of progress situation, and note summary units, and the sector in work practice in the created of success experience; both found work in the exists of problem, and find associate produced problem of reasons; both for grass-roots of specific problem, proposed solution

of measures and approach, and station in global of height, for Government perfect decision, and guide work proposed macro views, constantly improve supervision work of level. Third, to put the focal point in the system of supervision on the construction. To implement the responsibility system, establish and improve the implementation of the target responsibility system for everyone to task, pressure and power, all your knowledge and wisdom, to find, to form a Government as the main body, inspection Chambers led sector, caught in all aspects of supervision work. To establish supervision authority. Government offices carry out inspection, was authorized by the Government, on behalf of the Government and responsible to the Government, is an important part of government supervision and Extension, has the right to check and coordinate the right, the right to inform the right to criticism, and advice. Departments at all levels should give support to ensure supervision work smoothly. To implementation report system, on main work progress situation to by quarter submitted; on assigned by facilitate decision implementation process step by step. Government offices at all levels in accordance with the notice on further strengthening the supervision work of the municipal government requires, and actively carry out supervision from the following aspects. One is to focus supervision on the implementation of the major decisions and arrangements of the municipal government, in leadership on the major issues of concern to implement, on the people reflect strongly on the hot and difficult problems to solve. Current, to tightly around

implement implementation municipal, and Municipal Government proposed of "three a insisted two promote, five big storming six breakthrough" of guideline and General requirements, focus in foster four industry, and construction four base, and created four brand and farmers increase, and project construction, and enterprise reform, and city construction, and private economic, and building harmony social, aspects grasp supervision, makes we of supervision work and city of General thought tune, and and reform development of pulse synchronization. Second, supervision of the breakthrough in innovation, improved methods. Supervision of method, to by passive type to active type change, by everything to focus breakthrough change, by assault supervising to track supervising change, in full using sent letter supervision, and phone urged reported, and heard reported, basic method of while, more to used field check, and random checks, and

19、使用钢丝钳时应注意些什么,

答:使用前,一定要检查绝缘柄的绝缘是否完好无损,使用时不可用钢丝钳剪

切超过规格所允许的金属线材,并禁止用钢丝钳代替锤子敲打工具,以免损坏。

20、什么叫绝缘强度,

答:绝缘物质在电场中,当电场强度增大到某一极限时就会被击穿,这个导致

绝缘击穿的电场强度称为绝缘强度。

21、交联热收缩电缆附件有哪些优点,

答:这是一种新型材料,它与现在其他类型附件比较具有电气性能优越、体积小、质量小、安装简便、材料配套等优点,另外还具有耐气候、抗污秽性、阻燃自熄等能力。

22、对电缆导体连接点的机械强度有何要求,

答:连接点的机械强度,一般低于电缆导体本身的抗拉强度,对于固定敷设的电力电缆,其连接点的抗拉强度要求不低于导体本身抗拉强度的60%。

23、电力电缆的绝缘层材料应具备哪些主要性能,

答;应具备下列主要性能:

(1)高的击穿强度;

(2)低的介质损耗;

(3)相当高的绝缘电阻;

(4)优良的耐放电性能;

(5)具有一定的柔软性和机械强度;

(6)绝缘性能长期稳定。

24、机械敷设电缆时,牵引强度有何规定,

答:对于铜芯电缆,当牵引头部时,允许牵引强度为70N/cm;对于铝芯电缆,当牵引头部时,允许牵引强度为40N/cm;若利用钢丝网套牵引时,铅护套电缆允许强度为10N/cm; 铅护套电缆为40N/cm。

25、对电缆保护管有何规定,

答:(1)电缆需要穿保护管敷设时,管子内径不应小于电缆外径的1.5倍,混凝土管、陶土管、石棉、水泥管的内径不应小于100mm;

(2)电缆管的弯曲半径应符合所穿入电缆弯曲半径的规定;

(3)每根管子最多不应超过三个弯头,直角弯不应多于2个。

26、如何测量电缆护套的外径,

答:在护套圆周上均匀分布的五点处,测量护套外径和其平均值,其平均外径既为护套的外径。

27、不同截面的铜芯电缆如何连接,

答:不同截面的铜芯电缆连接,可采用开口弱背铜接管,以锡焊法连接,也可

用纯铜棒按不同的截面要求连接成铜接管,以压接法连接。

digging out things, refine, eliminate, and strive to achieve dynamic information highlighting the timeliness, policy focus on targeted, experience information grasp typical problem emphasizes the tendency of information, freedom of information caught ... "Excellence", and accurate, short, does not speak empty words, cliches. "Fast", is the emphasis on timeliness. Who want government leaders to grasp the important information must be collected quickly reported. Especially urgent important information such as events, in strict accordance with the State Council concerning strengthening the emergency notice of significant reporting requirements, not only in the first period of submission to government events, also tracking developments closely, to submit measures, consequences, treatment and rehabilitation, and so on. Establish a strict responsibility system, of late, fail to hide critical situations, to be held accountable. City and County Government offices and Government departments, we should further perfect duty system, raise the level of response and the ability to respond to emergencies and. Third, to open channels of information. Role of key government information network main channel, building extends to all departments and units, vertical extension to the Township and community information networks, information staff, strengthening the work of information. Finished the basic tasks to be criticized. Did not submit information

for a long time the County (district) and sectoral, this year we will

take effective measuresfacilitate decision implementation process step by step. Government offices at all levels in accordance with the notice on further strengthening the supervision work of the municipal government requires, and actively carry out supervision from the following aspects. One is to focus supervision on the implementation of the major decisions and arrangements of the municipal government, in leadership on the major issues of concern to implement, on the people reflect strongly on the hot and difficult problems to solve. Current, to tightly around implement implementation municipal, and Municipal Government proposed of "three a insisted two promote, five big storming six breakthrough" of guideline and General requirements, focus in foster four industry, and construction four base, and created four brand and farmers increase, and project construction, and enterprise reform, and city construction, and private economic, and building harmony social, aspects grasp supervision, makes we of supervision work and city of General thought tune, and and reform development of pulse synchronization. Second, supervision of the breakthrough in innovation, improved methods. Supervision of method, to by passive type to active type change, by everything to focus breakthrough change, by assault supervising to track supervising change, in full using sent letter supervision, and phone urged reported, and heard reported, basic method of while, more to used field check, and random checks, and facilitate decision implementation process step by step. Government offices at all levels in accordance with the notice on further

strengthening the supervision work of the municipal government requires, and actively carry out supervision from the following aspects. One is to focus supervision on the implementation of the major decisions and arrangements of the municipal government, in leadership on the major issues of concern to implement, on the people reflect strongly on the

hot and difficult problems to solve. Current, to tightly around implement implementation municipal, and Municipal Government proposed of "three a insisted two promote, five big storming six breakthrough" of guideline and General requirements, focus in foster four industry, and construction four base, and created four brand and farmers increase, and project construction, and enterprise reform, and city construction, and private economic, and building harmony social, aspects grasp supervision, makes we of supervision work and city of General thought tune, and and reform development of pulse synchronization. Second, supervision of the breakthrough in innovation, improved methods. Supervision of method, to by passive type to active type change, by everything to focus breakthrough change, by assault supervising to track supervising change, in full using sent letter supervision, and phone urged reported, and heard reported, basic method of while, more to used field check, and random checks, and

28、简述10KV交联电缆热缩式制作户内终端头的过程,

答;(1)准备阶段:检查热缩电缆附件是否齐备,型号是否相配,检查并确认电

缆有无潮气后,检查电缆。

(2)切除多余电缆,根据现场情况决定电缆长度。

(3)剥除护层。

(4)焊接接地线,将接地线焊接在钢带上。

(5)填充三叉口及绕包密封胶。

(6)安装三芯分支护套,将护套套入根部,从中部开始收缩,先往根部,再往指部。 (7)剥铜带和外半导电层,剥切三芯分支套口20mm以上的铜带,严禁损伤主绝缘,清除干净半导电层。

(8)安装应力管,管口端部分支套对接后热缩。

(9)安装接线端子。

(10)安装绝缘管。

(11)安装密封管。

(12)核相后安装相色管。

29、户内、户外预制式终端安装步骤有哪些,

答:(1) 将电缆按预定位置就位、固定、清洁表面,参照说明书剥除外护套,如有特殊需要,外护套剥切长度可调整,分别由铜带、外护套铠装引出2组地线。

(2) 由外护套口向上量取需要尺寸,切除多余电缆,套入热缩三指套至三叉口根部由中间加热收缩,由指套上口向上量取规定尺寸(35kv为350~380mm)。去掉多余铜带(保留20mm),再保留半导体预定位置,压接出线端子密封。

30、在什么情况下,现场安装的电动机应进行抽芯检查,

答:电动机有下列情况之一时,应进行抽芯检查:

(1) 出厂日期超过制造厂保证期限者;

(2) 经外观检查或电气试验,质量有可疑时;

(3) 开启式电机经端部检查有可疑时;

(4) 试运转时有异常情况者。

31、发电机手动同期并列应具备哪些条件, 答:发电机并列的三个条件是待并

发电机的电压、频率、相位与运行系统的电压、频率、相位之差小于规定值。

32、母线装置施工完,应进行哪些检查,

答:应进行下列检查:

(1)金属构件的加工、配制、焊接螺接应符合规定;

(2)各部螺栓、垫圈、开口销等零部件应齐全可靠;

(3)母线配制及安装架应符合规定,相间及对地电气距离符合要求;

(4)瓷件、铁件及胶合处应完整,充油套管应无渗油,油位正常;

(5)油漆完整,相色正确,接地良好。

digging out things, refine, eliminate, and strive to achieve dynamic information highlighting the timeliness, policy focus on targeted, experience information grasp typical problem emphasizes the tendency of information, freedom of information caught ... "Excellence", and accurate, short, does not speak empty words, cliches. "Fast", is the emphasis on timeliness. Who want government leaders to grasp the important information must be collected quickly reported. Especially urgent important information such as events, in strict accordance with the State Council concerning strengthening the emergency notice of significant reporting requirements, not only in the first period of submission to government events, also tracking developments closely, to submit measures, consequences, treatment and rehabilitation, and so on. Establish a strict responsibility system, of late, fail to hide critical situations, to be held accountable. City and County Government offices and Government departments, we should further perfect duty system, raise

the level of response and the ability to respond to emergencies and. Third, to open channels of information. Role of key government information network main channel, building extends to all departments and units, vertical extension to the Township and community information networks, information staff, strengthening the work of information. Finished the basic tasks to be criticized. Did not submit information

for a long time the County (district) and sectoral, this year we will take effective measuresunannounced visits to survey and news exposure, more powerful of measures, reflected supervision work of seriousness, and just sex and authenticity. In supervision process in the, both understand the work of progress situation, and note summary units, and the sector in work practice in the created of success experience; both found work in the exists of problem, and find associate produced problem of reasons; both for grass-roots of specific problem, proposed solution of measures and approach, and station in global of height, for Government perfect decision, and guide work proposed macro views, constantly improve supervision work of level. Third, to put the focal point in the system of supervision on the construction. To implement the responsibility system, establish and improve the implementation of the target responsibility system for everyone to task, pressure and power, all your knowledge and wisdom, to find, to form a Government as the main body, inspection Chambers led sector, caught in all aspects of supervision work. To establish supervision authority. Government offices carry out inspection, was authorized by the Government, on behalf of the

Government and responsible to the Government, is an important part of government supervision and Extension, has the right to check and coordinate the right, the right to inform the right to criticism, and advice. Departments at all levels should give support to ensure supervision work smoothly. To implementation report system, on main work progress situation to by quarter submitted; on assigned by facilitate decision implementation process step by step. Government offices at all levels in accordance with the notice on further strengthening the supervision work of the municipal government requires, and actively carry out supervision from the following aspects. One is to focus supervision on the implementation of the major decisions and arrangements of the municipal government, in leadership on the major issues of concern to implement, on the people reflect strongly on the

hot and difficult problems to solve. Current, to tightly around implement implementation municipal, and Municipal Government proposed of "three a insisted two promote, five big storming six breakthrough" of guideline and General requirements, focus in foster four industry, and construction four base, and created four brand and farmers increase, and project construction, and enterprise reform, and city construction, and private economic, and building harmony social, aspects grasp supervision, makes we of supervision work and city of General thought tune, and and reform development of pulse synchronization. Second, supervision of the breakthrough in innovation, improved methods. Supervision of method, to by passive type to active type change, by everything to focus

breakthrough change, by assault supervising to track supervising change, in full using sent letter supervision, and phone urged reported, and heard reported, basic method of while, more to used field check, and random checks, and

33、在35kv及以下电力电缆接头中,改善其护套断开处电场分布的方法有几

种(请列出五种),并简述其方法。

答:(1)胀喇叭口:在铅包割断处把铅包边缘撬起,成喇叭状,其边缘应光滑、

圆整、对称。 (2)预留统包绝缘:在铅包切口至电缆芯线分开点之间留有一段统包绝缘纸。 (3)切除半导电纸:将半导电纸切除到喇叭口以下。

(4)包绕应力锥:用绝缘包带和导电金属材料包成锥形,人为地将屏蔽层扩大,以改善电场分布。

(5)等电位法:对于干包型或交联聚乙烯电缆头,在各线芯概况绝缘表面上包一段金属带,并将其连接在一起。

(6)装设应力控制管:对于35kv及发下热缩管电缆头,首先从线芯铜屏蔽层末

端方向经半导体带至线芯绝缘概况包绕2层半导体带,然后将相应规格折应力管,套在铜屏蔽的末端处,热缩成形。

34、电缆支架的加工应符合哪些要求,

答:(1)钢材应平直,无明显扭曲,下料误差应在5mm范围内,切口应无卷边,毛剌; (2)支架应焊接牢固,无显蓍变形,各横撑间的垂直净距与设计偏差不应大于5mm; (3)金属支架必须进行防腐处理,位于湿热、盐、雾以及有化学腐蚀地区时,应根据设计作特殊的防腐处理。

35、列举出你熟悉的电缆架。

答:拼焊式E型架、装配式E型架、桥式电缆架、电缆托架、挂钩式支架、单

根电缆支架等。

36、敷设电缆应满足哪些要求,

答:应满足以下要求:

(1)安全运行方面,尽可能避免各种外来损坏,提高电缆线路的供电可靠性;

(2)经济方面,从投资最省的方面考虑;

(3)施工方面,电缆线路的路径必须便于旋工和投运后的维修。

37、制作电缆终端头或中间接头的绝缘材料有哪些,

答:有绝缘胶、绝缘带、绝缘管、绝缘手套、绝缘树脂等。

38、简述电缆头制作的一般操作程序。

答:(1)制作前的准备:包括?1阅读安装说明书;?2察看现场;?3备料;?4电缆试潮;?5制作前测试等。

(2)接头的制作过程:包括?1割断多余电缆;?2电缆保护层的剥切;?3导体连接;?4包绕绝缘(或收缩管材);?5安装接头外壳;?6灌注绝缘剂;?7进行密封处理等。 (3)制作后电气测试。

39、电缆保护管的加工应符合哪些要求,

答:(1)管口应无毛剌和尖锐楞角,管口宜做成喇叭形。

(2)电缆管在弯制后,不应有裂缝和显著的凹瘪现象,其弯扁程度不宜大于管子外径10%;电缆管的弯曲半径不应小于所穿入电缆的最小允许弯曲半径。

digging out things, refine, eliminate, and strive to achieve dynamic information highlighting the timeliness, policy focus on targeted, experience information grasp typical problem emphasizes the tendency of information, freedom of information caught ... "Excellence", and accurate, short, does not speak empty words, cliches. "Fast", is the emphasis on timeliness. Who want government leaders to grasp the important information must be collected quickly reported. Especially

电线电缆截面积怎样计算

1、常用的电线、电缆按用途分有哪些种类? 答:按用途可分为裸导线、绝缘电线、耐热电线、屏蔽电线、电力电缆、控制电缆、通信电缆、射频电缆等。 2、绝缘电线有哪几种? 答:常有的绝缘电线有以下几种:聚氯乙烯绝缘电线、聚氯乙烯绝缘软线、丁腈聚氯乙烯混合物绝缘软线、橡皮绝缘电线、农用地下直埋铝芯塑料绝缘电线、橡皮绝缘棉纱纺织软线、聚氯乙烯绝缘尼龙护套电线、电力和照明用聚氯乙烯绝缘软线等。 3、电缆桥架适合于何种场合? 答:电缆桥架适用于一般工矿企业室内外架空敷设电力电缆、控制电缆,亦可用于电信、广播电视等部门在室内外架设。 4、电缆附件有哪些? 答:常用的电附件有电缆终端接线盒、电缆中间接线盒、连接管及接线端子、钢板接线槽、电缆桥架等。 5、什么叫电缆中间接头? 答:连接电缆与电缆的导体、绝缘屏蔽层和保护层,以使电缆线路连接的装置,称为电缆中间接头。 6、什么叫电气主接线? 答:电气主接线是发电厂、变电所中主要电气设备和母线的连接方式,包括主母线和厂用电系统按一定的功能要求的连接方式。 7、在选择电力电缆的截面时,应遵照哪些规定? 答:电力电缆的选择应遵照以下原则: (1)电缆的额定电压要大于或等于安装点供电系统的额定电压; (2)电缆持续容许电流应等于或大于供电负载的最大持续电流; (3)线芯截面要满足供电系统短路时的稳定性的要求; (4)根据电缆长度验算电压降是否符合要求; (5)线路末端的最小短路电流应能使保护装置可靠的动作。 8、交联聚乙烯电缆和油纸电缆比较有哪些优点? 答:(1)易安装,因为它允许最小弯曲半径小、且重量轻; (2)不受线路落差限制; (3)热性能好,允许工作温度高、传输容量大; (4)电缆附件简单,均为干式结构; (5)运行维护简单,无漏油问题; (6)价格较低; (7)可靠性高、故障率低; (8)制造工序少、工艺简单,经济效益显著。 9、固定交流单芯电缆的夹具有什么要求?为什么?

电缆平方计算口诀

电缆平方计算口诀 导线的截面积所能正常通过的电流可根据其所需要导通的电流总数进 行选择,一般可按照如下顺口溜进行确定: 十下五,百上二, 二五三五四三界,柒拾玖五两倍半,铜线升级算. 给你解释一下,就是10平方一下的铝线,平方毫米数乘以5就可以了, 要是铜线呢,就升一个档,比如2.5平方的电线电缆,就按4平方计算. 一百以上的都是截面积乘以2, 二十五平方以下的乘以4, 三十五平方以上的乘以3, 柒拾和95平方都乘以2.5,这么几句口诀应该很好记吧, 说明:只能作为估算,不是很准确。 另外如果按室内记住电线6平方毫米以下的铜线,每平方电流不超过 10A就是安全的,从这个角度讲,你可以选择1.5平方的铜线或2.5平方的铝线。 10米内,导线电流密度6A/平方毫米比较合适,10-50米,3A/平方毫米,50-200米,2A/平方毫米,500米以上要小于1A/平方毫米。从这个角度,如果不是很远的情况下,你可以选择4平方铜线或者6平方铝线。如果真是距离150米供电(不说是不是高楼),一定采用4平方的铜线。导线的阻抗与其长度成正比,与其线径成反比。请在使用电源时,特别注意输入与输出导线的电线电缆与线径问题。以防止电流过大使导线过热而造成事故。 导线线径一般按如下公式计算: 铜线: S= IL / 54.4*U` 铝线: S= IL / 34*U`

式中:I——导线中通过的最大电流(A) L——导线的长度(M) U`——充许的电源降(V) S——导线的截面积(MM2) 说明: 1、U`电压降可由整个系统中所用的设备(如探测器)范围分给系统供电用的电源电压额定值综合起来考虑选用。 2、计算出来的截面积往上靠. 绝缘导线载流量估算 铝芯绝缘导线载流量与截面的倍数关系 电线电缆截面(mm 2 ) 1 1.5 2.5 4 6 10 16 25 35 50 70 95 120 截留是界面的倍数 数 9 8 7 6 5 4 3.5 3 2.5 载流量 (A) 9 14 23 32 48 60 90 100 123 150 210 238 300 估算口诀:二点五下乘以九,往上减一顺号走。三十五乘三点五,双双成组减点五。条件有变加折算,高温九折铜升级。穿管根数二三四,八七六折满载流。说明:(1)本节口诀对各种绝缘线(橡皮和塑料绝缘线)的载流量(安全电流)不是直接指出,而是“截面乘上一定的倍数”来表

十分钟快速掌握电线截面积与载流量的关系

十分钟快速掌握电线截面积与载流量的关系 导线安全载流量的计算 我们通常是根据电流来选取截面面积的不同导线。 1,用途 各种导线的截流量(安全用电)通常可以从手册中查找。 但利用口诀再配合一些简单的心算,便可直接算出,不必查表。 导线的截流量与导线的截面有关,也与导线的材料(铝或铜)、型号(绝缘线或裸线等)、敷设方法(明敷或穿管等)以及环境温度(25℃左右或更大)等有关,影响的因素较多,计算也较复杂。 2,口诀 铝心绝缘线截流量与截面的倍数关系: S(截面)=0.785*D(直径)的 平方 口诀一:10下5,100上二,25、35,四三界,70、95,两倍半。 口诀二:穿管、温度,八九折。 口诀三:裸线加一半。 口诀四:铜线升级算。 3,口决说明 口诀是以铝芯绝缘线,明敷在环境温度25℃的条件为准。若条件不同,口诀另有说明。 绝缘线包括各种型号的橡皮绝缘线或塑料绝缘线。 口诀对各种截面的截流量(电流,安)不是直接指出,而是用“截面 乘上一定倍数”来表示。 为此,应当先熟悉导线截面(平方毫米)的排列:

1 1.5 2.5 4 6 10 16 25 35 50 70 95 120 150 185 ....... 生产厂制造铝芯绝缘线的截面通常从2.5开始,铜芯绝缘线则从1开始;裸铝线从16开始,裸铜线则从10开始。 4,口决解释 口诀一:线载流量十下五,百上二,二五三五四三界,七零九五两倍半 解释:10mm2以下的铝导线载流量按5A/平方毫米计算;100mm2以上 的铝导线载流量按2A/平方毫米计算;25mm2的铝导线载流量按4A/ 平方毫米计算;35mm2的铝导线载流量按3A/平方毫米计算;70mm2、95mm2的铝导线载流量按2.5A/平方毫米计算; 口诀二;“穿管、温度,八、九折” 若是穿管敷设(包括槽板等敷设、即导线加有保护套层,不明露的),计算后再打八折;若环境温度超过25℃,计算后再打九折,若既穿管 敷设,温度又超过25℃,则打八折后再打九折,或简单按一次打七折 计算。 例如对铝芯绝缘线在不同条件下载流量的计算:当截面为10平方毫米时,则载流量为10×5×0.8=40安;若为高温,则载流量为 10×5×0.9=45安;若是穿管又是高温,则载流量为10×5×0.7=35安。 口决三:对于裸铝线的载流量,口诀指出“裸线加一半” 即计算后再加一半。这是指同样截面裸铝线与铝芯绝缘线比较,载流 量可加大一半。 例如对裸铝线载流量的计算:当截面为16平方毫米时,则载流量为 16×4×1.5=96安,若在高温下,则载流量为16×4×1.5×0.9=86.4 安6 平方毫米的线电流=32A(安) 口诀四:铜线升级算

电线截面电流计算公式

电线截面电流计算公式 (供参考) 导线的阻抗与其长度成正比,与其线径成反比。请在使用电源时,特别注意输入与输出导线的线材与线径问题。以防止电流过大使导线过热而造成事故。 导线线径一般按如下公式计算: 铜线: S= IL / 54.4*U` 铝线: S= IL / 34*U` 式中:I——导线中通过的最大电流(A) L——导线的长度(M) U`——充许的电源降(V) S——导线的截面积(MM2) 说明: 1、U`电压降可由整个系统中所用的设备(如探测器)范围分给系统供电用的电源电压额定值综合起来考虑选用。 2、计算出来的截面积往上靠. 绝缘导线载流量估算 铝芯绝缘导线载流量与截面的倍数关系 导线截面(mm 2 ) 1 1.5 2.5 4 6 10 16 25 35 50 70 95 120 载流是截面倍 数 9 8 7 6 5 4 3.5 3 2.5 载流量 (A) 9 14 23 32 48 60 90 100 123 150 210 238 300 一般情况下: 铜线每平方毫米6安培。铝线是每平方毫米5安培(仅供快速估算) 4平方的铜线:4*6=24A 6平方的铜线:6*6=36A 10平方的铜线:10*6=60A 16平方的铜线:16*6=96A 4平方的铝线:4*5=20A 6平方的铝线:6*5=30A 10平方的铝线:10*5=50A 16平方的铝线:16*5=90A

一、低压配电室的要求 1) 门应向外开,门口装防鼠板; 2) 有采光窗和通风百叶窗,百叶窗应防雨、雪、小动物进入室内; 3) 电缆沟底应有坡度和集水坑; 4) 不装盘的电缆沟应有沟盖板; 5) 盘前通道大于1.3米,盘后通道大于0.8米,并有安全护栏; 6) 一层配电室地面标高应0.5米以上。 二、配电盘的安装 1) 配电盘应为标准盘,顶有盖,前有门; 2) 配电盘外表颜色应一致,表面无划痕; 3) 配电盘母线应有色标; 4) 配电盘应垂直安装,垂直度偏差小于5o; 5) 拉、合闸或开、关柜门时,盘身应无晃动现象; 6) 配电盘上电流表、电压表等按要求装全; 7) 配电盘上个出线回路应有标示; 8) 配电盘一次母线尽可能用铜排连接,压接螺丝两侧有垫片,螺母侧有弹簧垫片,如用多股塑铜线连接,应压接铜鼻子; 9) 配电盘二次控制线应集中布线,并用塑料带及绑带包扎固定,控制电缆备用线芯在控制电缆分支处螺旋缠绕好; 10) 配电盘的互感器、电动机保护器等小件也应牢固固定好。 三、电缆的安装 1) 电缆沟安装的应先检查电缆沟的走向、宽度、深度、转弯处和各交叉跨越处的预埋管是否符合设计要求; 2) 电缆入沟中后,不必严格将其拉直,应松弛成波浪形; 3) 电缆的两端应留有做检修的长度余量; 4) 电缆固定支架间或固定点间的距离,不应大于1米; 5) 电缆穿管敷设时,管内径不应小于电缆外径的1.5倍,且不小于100毫米; 6) 电缆在埋地敷设或电缆穿墙、穿楼板时,应穿管或采取其他保护措施; 7) 电缆从地下或电缆沟引出地面时,出地面2米的一段应用金属管或罩加以保护; 8) 直埋电缆深度为0.7米,电缆上下应各铺盖100毫米厚的软土或沙,并盖混凝土保护,及埋设电缆标志桩; 9) 直埋电缆时禁止将电缆平行敷设在管道的上面或下面; 10) 一般禁止地面明敷电缆,否则应有防止机械损伤的措施; 11) 相同电压的电缆并列敷设时,电缆间净距应大于35毫米,且不小于电缆外径; 12) 低压与高压电缆应分开敷设。并列敷设时净距不应小于150毫米; 13) 进出配电室的电缆应排列整齐,并用绑线固定好,挂上标志牌; 14) 电缆水平悬挂在钢索上,固定点的距离不应大于0.6米。 四、电动机的安装 1) 检查电动机的名牌,看功率、电压是否符合图纸要求; 2) 检查电动机的接线盒是否正确,螺丝是否有松动,接线盒是否密封良好; 3) 检测电动机的绝缘电阻,新设备应大于1MΩ,旧设备应大于0.5MΩ;

导线截面积的选择

导线截面积的选择 导线面积与电流的关系,选择多少平方的导线? 电流与导线横截面积成正比的关系,导线横截面积越大,允许通过的电流越大.同时,和导线电阻率有关,电阻率越大,允许通过的电流越小,即和导体的材质有关.具体能通过多大的电流,一般<<电工手册>>中都可查到.运算的公式是:允许通过的电流=(电压*导线横截面积)/(导线电阻率*导线的长度) 导线的安全载流量跟它的材质有关,你要知道精确就必须查表。如果大概的话可以这们估算:铜导线,10平方以下的6-7A/平方。 10到20平方 4-5A/平方。 20到50平方 3-4A/平方. 50平方到350平方1-2A/平方如果把各种材料制成长1米、横截面积1平方毫米的导线,在20℃时测量它们的电阻(称为这种材料的电阻率)并进行比较,则银的电阻率最小,其次是按铜、铝、钨、铁、锰铜、镍铬合金的顺序,电阻率依次增大。铝导线的电阻率是铜导线的1.5倍多,它的电阻率p=0.0294Ωmm2/m,铜的电阻率p=0.01851 Ω?mm2/m,电阻率随温度变化会有一些差异。导线截面积与电流的关系一般铜线安全计算方法是: 2.5平方毫米铜电源线的安全载流量--28A。 4平方毫米铜电源线的安全载流量--35A 。 6平方毫米铜电源线的安全载流量--48A 。 10平方毫米铜电源线的安全载流量--65A。 16平方毫米铜电源线的安全载流量--91A 。 25平方毫米铜电源线的安全载流量--120A。如果是铝线,线径要取铜线的1.5-2倍。如果铜线电流小于28A,按每平方毫米10A来取肯定安全。如果铜线电流大于120A,按每平方毫米

5A来取。导线的截面积所能正常通过的电流可根据其所需要导通的电流总数进行选择,一般可按照如下顺口溜进行确定:十下五,百上二, 二五三五四三界,柒拾玖五两倍半,铜线升级算. 给你解释一下,就是10平方一下的铝线,平方毫米数乘以5就可以了,要是铜线呢,就升一个档,比如2.5平方的铜线,就按4平方计算.一百以上的都是截面积乘以2, 二十五平方以下的乘以4, 三十五平方以上的乘以3, 柒拾和95平方都乘以2.5,这么几句口诀应该很好记吧, 说明:只能作为估算,不是很准确。另外如果按室内记住电线6平方毫米以下的铜线,每平方电流不超过10A就是安全的,从这个角度讲,你可以选择1.5平方的铜线或2.5平方的铝线。 10米内,导线电流密度6A/平方毫米比较合适,10-50米,3A/平方毫米,50-200米,2A/平方毫米,500米以上要小于1A/平方毫米。从这个角度,如果不是很远的情况下,你可以选择4平方铜线或者6平方铝线。如果真是距离150米供电(不说是不是高楼),一定采用4平方的铜线。导线的阻抗与其长度成正比,与其线径成反比。请在使用电源时,特别注意输入与输出导线的线材与线径问题。以防止电流过大使导线过热而造成事故。下面是铜线在不同温度下的线径和所能承受的最大电流表格。

功率与电流、电缆截面积

功率与电流、电缆截面积 功率与电流、电缆截面积 电缆截面估算方法一二 先估算负荷电流 1.用途 这是根据用电设备的功率(千瓦或千伏安)算出电流(安)的口诀。 电流的大小直接与功率有关,也与电压、相别、力率(又称功率因数)等有关。一般有公式可供计算。由于工厂常用的都是伏三相四线系统,因此,可以根据功率的大小直接算出电流。 2.口诀 低压伏系统每千瓦的电流,安。 千瓦、电流,如何计算? 电力加倍,电热加半。① 单相千瓦,4.5安。② 单相380,电流两安半。③3.说明 口诀是以伏三相四线系统中的三相设备为准,计算每千瓦的安数。对于某些单相或电压不同的单相设备,其每千瓦的安数,口诀另外作了说明。 ①这两句口诀中,电力专指电动机。在380伏三相时(力率0.8左右),电动机每千瓦的电流约为2安.即将”千瓦数加一倍”(乘2)就是电流,安。这电流也称电动机的额定电流。 【例1】5.5千瓦电动机按“电力加倍”算得电流为11安。 【例2】40千瓦水泵电动机按“电力加倍”算得电流为80安。

电热是指用电阻加热的电阻炉等。三相380伏的电热设备,每千瓦的电流为1.5安。即将“千瓦数加一半”(乘1.5)就是电流,安。 【例1】3千瓦电加热器按“电热加半”算得电流为4.5安。 【例2】15千瓦电阻炉按“电热加半”算得电流为23安。 这句口诀不专指电热,对于照明也适用。虽然照明的灯泡是单相而不是三相,但对照明供电的三相四线干线仍属三相。 只要三相大体平衡也可这样计算。此外,以千伏安为单位的电器(如变压器或整流器)和以千乏为单位的移相电容器(提高力率用)也都适用。即时说,这后半句虽然说的是电热,但包括所有以千伏安、千乏为单位的用电设备,以及以千瓦为单位的电热和照明设备。 【例1】12千瓦的三相(平衡时)照明干线按“电热加半”算得电流为18安。 【例2】30千伏安的整流器按“电热加半”算得电流为45安(指380伏三相交流侧)。 【例3】320千伏安的配电变压器按“电热加半”算得电流为480安(指伏低压侧)。 【例4】100千乏的移相电容器(380伏三相)按“电热加半”算得电流为150安。 ②在伏三相四线系统中,单相设备的两条线,一条接相线而另一条接零线的(如照明设备)为单相220伏用电设备。这种设备的力率大多为1,因此,口诀便直接说明“单相(每)千瓦4.5安”。计算时,只要“将千瓦数乘4.5”就是电流。 同上面一样,它适用于所有以千伏安为单位的单相220伏用电设备,以及以千瓦为单位的电热及照明设备,而且也适用于220伏的直流。 【例1】500伏安(0.5千伏安)的行灯变压器(220伏电源侧)按“单相千瓦、4.5

导线截面积计算[最新]

导线截面积计算[最新] 铝芯绝缘导线载流量与截面的倍数关系 导线截面(mm?) 1 1.5 2.5 4 6 10 16 25 35 50 70 95 120 载流是截面倍数 9 8 7 6 5 4 3(5 3 2(5 载流量(A) 9 14 23 32 48 60 90 100 123 150 210 238 300 估算口诀: 二点五下乘以九,往上减一顺号走。 三十五乘三点五,双双成组减点五。 条件有变加折算,高温九折铜升级。 穿管根数二三四,八七六折满载流。 说明: 本节口诀对各种绝缘线(橡皮和塑料绝缘线)的载流量(安全电流)不是直接指出,而是“截面乘上一定的倍数”来表示,通过心算而得。可以看出:倍数随截面的增大而减小。 “二点五下乘以九,往上减一顺号走”说的是2(5mm?及以下的各种截面铝芯绝缘线,其载流量约为截面数的9倍。如2(5mm?导线,载流量为2(5×9,22(5(A)。从4mm?及以上导线的载流量和截面数的倍数关系是顺着线号往上排,倍数逐次减l,即4×8、6×7、10×6、16×5、25×4。 “三十五乘三点五,双双成组减点五”,说的是35mm?的导线载流量为截面数的3(5倍,即35×3(5,122(5(A)。从50mm?及以上的导线,其载流量与截面数之间的倍数关系变为两个两个线号成一组,倍数依次减0(5。即50、70mm?导线的载流量为截面数的3倍;95、120mm?导线载流量是其截面积数的2(5倍,依次类推。

“条件有变加折算,高温九折铜升级”。上述口诀是铝芯绝缘线、明敷在环境温度25?的条件下而定的。若铝芯绝缘线明敷在环境温度长期高于25?的地区,导线载流量可按上述口诀计算方法算出,然后再打九折即可;当使用的不是铝线而是铜芯绝缘线,它的载流量要比同规格铝线略大一些,可按上述口诀方法算出比铝线加大一个线号的载流量。如16mm?铜线的载流量,可按25mm?铝线计算。 导线截面积与载流量的计算: 10以下乘以5 100以上乘以2 25、35四三开 70、95两倍半 螺线加一半 铜线升级算 穿管、高温89折。 一、一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。一般铜导线的安全载流量为5~8A/mm?,铝导线的安全载流量为3~5A/mm?。 <关键点> 一般铜导线的安全载流量为5~8A/mm?,铝导线的安全载流量为3~5A/mm?。如:2.5 mm? BVV铜导线安全载流量的推荐值 2.5×8A/mm?=20A 4mm?BVV铜导线安全载流量的推荐值4×8A/mm?=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值5~8A/mm?,计算出所选取铜导线截面积S的上下范围: S=< I /(5~8)>=0.125 I ~0.2 I(mm?) S-----铜导线截面积(mm?) I-----负载电流(A) 三、功率计算一般负载(也可以成为用电器,如点灯、冰箱等等)分为两种,一种是电阻性负载,一种是电感性负载。 对于电阻性负载的计算公式:P=UI

电线电缆的计算公式、平方、重量

铜的重量习惯上不用换算的计算方法:截面积×8.89=kg/km 如120平方毫米计算:120×8.89=1066.8kg/km 1 、导体用量:(Kg/Km)=d^ 2 × 0.7854 × G × N × K1 × K2 × C / d=铜线径G=铜比重N=条数K1=铜线绞入率K2=芯线绞入率C=绝缘芯线根数 2、绝缘用量:(Kg/Km)=(D^2 - d^2)× 0.7854 × G × C × K2 D=绝缘外径d=导体外径G=绝缘比重K2=芯线绞入率C=绝缘芯线根数 3、外被用量:(Kg/Km)= ( D1^2 - D^2 ) × 0.7854 × G D1=完成外径D=上过程外径G=绝缘比重 4、包带用量:(Kg/Km)= D^2 × 0.7854 × t × G × Z D=上过程外径t=包带厚度G=包带比重Z=重叠率(1/4Lap = 1.25) 5、缠绕用量:(Kg/Km)= d^2 × 0.7854 × G × N × Z d=铜线径N=条数G=比重Z=绞入率 6、编织用量:(Kg/Km)= d^2 × 0.7854 × T × N × G / cosθ θ = atan( 2 × 3.1416 × ( D + d × 2 )) × 目数/ 25.4 / T d=编织铜线径T=锭数N=每锭条数G=铜比重 比重:铜-8.89;银-10.50;铝-2.70;锌-7.05;镍-8.90;锡-7.30;钢-7.80;铅-11.40;铝箔麦拉-1.80;纸 -1.35;麦拉-1.37 1.护套厚度:挤前外径×0.035+1(符合电力电缆,单芯电缆护套的标称厚度应不小于1.4mm,多芯电缆的标称厚度应不小于1.8mm) 2.在线测量护套厚度:护套厚度=(挤护套后的周长—挤护套前的周长)/2π 或护套厚度=(挤护套后的周长—挤护套前的周长)×0.1592 3.绝缘厚度最薄点:标称值×90%-0.1 4.单芯护套最薄点:标称值×85%-0.1 5.多芯护套最薄点:标称值×80%-0.2 6.钢丝铠装:根数= {π×(内护套外径+钢丝直径)}÷(钢丝直径×λ) 重量=π×钢丝直径2×ρ×L×根数×λ 7.绝缘及护套的重量=π×(挤前外径+厚度)×厚度×L×ρ 8.钢带的重量={π×(绕包前的外径+2×厚度-1) ×2×厚度×ρ×L}/(1+K) 9.包带的重量={π×(绕包前的外径+层数×厚度)×层数×厚度×ρ×L}/(1±K) 其中:K为重叠率或间隙率,如为重叠,则是1-K;如为间隙,则是1+K ρ为材料比重;L为电缆长度;λ绞入系数。 导线截面积与载流量的计算 一、一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。<关键点> 一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。如:2.5 mm2 BVV铜电线电缆安全载流量的推荐值2.5×8A/mm2=20A 4 mm2 BVV铜导线安全载流量的推荐值4×8A/mm2=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值5~8A/mm2,计算出所选取铜导线截面积S的上下范围:S=< I /(5~8)>=0.125 I ~0.2 I(mm2)S-----铜导线截面积(mm2)I-----负载电流(A) 三、功率计算一般负载(也可以成为用电器,如点灯、冰箱等等)分为两种,一种式电阻性负载,一种是电感性负载。对于电阻性负载的计算公式:P=UI 对于日光灯负载的计算公式:P=UIcosф,其中日光灯负载的功率因数cosф=0.5。不同电感性负载功率因数不同,统一计算家庭用电器时可以将功率因数cosф取0.8。也就是说如果一个家庭所有用电器加上总功率

电缆截面计算公式

电缆截面计算公式 一、一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。 一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。 <关键点> 一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。如:2、5 mm2 BVV铜导线安全载流量的推荐值2、58A/mm2=20A4 mm2 BVV铜导线安全载流量的推荐值 48A/mm2=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值 5~8A/mm2,计算出所选取铜导线截面积S的上下范围:S=< I /(5~8)>=0、125 I ~0、2 I(mm2) S-----铜导线截面积(mm2) I-----负载电流(A) 三、功率计算一般负载(也可以成为用电器,如点灯、冰箱等等)分为两种,一种式电阻性负载,一种是电感性负载。对于电阻性负载的计算公式:P=UI 对于日光灯负载的计算公式: P=UIcosф,其中日光灯负载的功率因数cosф=0、5。 不同电感性负载功率因数不同,统一计算家庭用电器时可以将功率因数cosф取0、8。也就是说如果一个家庭所有用电器加上总功率为6000瓦,则最大电流是I=P/Ucosф=6000/220*0、 8=34(A)

但是,一般情况下,家里的电器不可能同时使用,所以加上一个公用系数,公用系数一般0、5。所以,上面的计算应该改写成 I=P*数/Ucosф=6000*0、5/220*0、8=17(A) 也就是说,这个家庭总的电流值为17A。则总闸空气开关不能使用16A,应该用大于17A的。 估算口诀: 二点五下乘以九,往上减一顺号走。 三五乘三点五,双双成组减点五。 条件有变加折算,高温九折铜升级。 穿管根数二三四,八七六折满载流。 说明: (1)本节口诀对各种绝缘线(橡皮和塑料绝缘线)的载流量(安全电流)不是直接指出,而是“截面乘上一定的倍数”来表示,通过心算而得。由表53可以看出:倍数随截面的增大而减小。 “二点五下乘以九,往上减一顺号走”说的是2.5mm’及以下的各种截面铝芯绝缘线,其载流量约为截面数的9倍。如 2.5mm’导线,载流量为2.59=22.5(A)。从4mm’及以上导线的载流量和截面数的倍数关系是顺着线号往上排,倍数逐次减l,即 48、 67、106、1 65、254。

电流与电线截面积的关系

电流与电线截面积的关系 导线截面积与载流量的计算; 一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。 一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为 3~5A/mm2。<关键点> 一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为 3~5A/mm2。如:2.5mm2BVV铜导线安全载流量的推荐值 2.5×8A/mm2=20A4mm2BVV铜导线安全载流量的推荐值4×8A/mm2=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值5~8A/mm2,计算出所选取铜导线截面积S的上下范围:S==0.125I~0.2I (mm2)S-----铜导线截面积(mm2)I-----负载电流(A) 三、功率计算一般负载(也可以成为用电器,如点灯、冰箱等等)分为两种,一种式电阻性负载,一种是电感性负载。对于电阻性负载的计算公式:P=UI 对于日光灯负载的计算公式:P=UIcosф,其中日光灯负载的功率因数cosф=0.5。

不同电感性负载功率因数不同,统一计算家庭用电器时可以将功率因数cosф取0.8。也就是说如果一个家庭所有用电器加上总功率为6000瓦,则最大电流是I=P/Ucosф=6000/220×0.8=34(A) 但是,一般情况下,家里的电器不可能同时使用,所以加上一个公用系数,公用系数一般0.5。所以,上面的计算应该改写成 I=P×公用系数/Ucosф=6000×0.5/220×0.8=17(A) 也就是说,这个家庭总的电流值为17A。则总闸空气开关不能使用16A,应该用大于17A的。 估算口诀: 二点五下乘以九,往上减一顺号走。三十五乘三点五,双双成组减点五。条件有变加折算,高温九折铜升级。穿管根数二三四,八七六折满载流。说明: (1)本节口诀对各种绝缘线(橡皮和塑料绝缘线)的载流量(安全电流)不是直接指出,而是“截面乘上一定的倍数”来表示,通过心算而得 。由表53可以看出:倍数随截面的增大而减小。 “二点五下乘以九,往上减一顺号走”说的是2.5mm’及以下的各种截面铝芯绝缘线,其载流量约为截面数的9倍。如2.5mm’导线,载流量为2.5×9=22.5(A)。从4mm’及以上导线的载流量和截面数的倍数

电线截面积与安全电流的计算

=电线截面积与安全载流量的计算= 一、一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。 一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。<关键点> 一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。如:2.5mm2BVV铜导线安全载流量的推荐值 2.5×8A/mm2=20A4mm2BVV铜导线安全载流量的推荐值4×8A/mm2=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值5~8A/mm2,计算出所选取铜导线截面积S的上下范围:S==0.125I~0.2I (mm2)S-----铜导线截面积(mm2)I-----负载电流(A) 三、功率计算一般负载(也可以成为用电器,如点灯、冰箱等等)分为两种,一种式电阻性负载,一种是电感性负载。对于电阻性负载的计算公式:P=UI 对于日光灯负载的计算公式:P=UIcosф,其中日光灯负载的功率因数cosф=0.5。 不同电感性负载功率因数不同,统一计算家庭用电器时可以将功率因数cosф取0.8。也就是说如果一个家庭所有用电器加上总功率为6000瓦,则最大电流是I=P/Ucosф=6000/220×0.8=34(A) 但是,一般情况下,家里的电器不可能同时使用,所以加上一个公用系数,公用系数一般0.5。所以,上面的计算应该改写成 I=P×公用系数/Ucosф=6000×0.5/220×0.8=17(A) 也就是说,这个家庭总的电流值为17A。则总闸空气开关不能使用16A,应该用大于17A的。 估算口诀: 二点五下乘以九,往上减一顺号走。三十五乘三点五,双双成组减点五。 条件有变加折算,高温九折铜升级。穿管根数二三四,八七六折满载流。 说明: (1)本节口诀对各种绝缘线(橡皮和塑料绝缘线)的载流量(安全电流)不是直接指出,而是“截面乘上一定的倍数”来表示,通过心算而得 。由表53可以看出:倍数随截面的增大而减小。 “二点五下乘以九,往上减一顺号走”说的是2.5mm’及以下的各种截面铝芯绝缘线,其载流量约为截面数的9倍。如2.5mm’

导线截面积计算方法

(1)导线截面积与载流量的计算 (导体的)(连续)截流量(continuous) current-carrying capacity (of a conductor)是指:(导体的)(连续)截流量在规定条件下,导体能够连续承载而不致使其稳定温度超过规定值的最大电流。 导线截面积与载流量的计算 一、一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。如:2.5 mm2 BVV铜导线安全载流量的推荐值2.5×8A/mm2=20A 4 mm2 BVV铜导线安全载流量的推荐值4×8A/mm2=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值5~8A/mm2,计算出所选取铜导线截面积S的上下范围: 导线截面积与载流量的计算 S=< I /(5~8)>=0.125 I ~0.2 I(mm2) S-----铜导线截面积(mm2);I-----负载电流 三、功率计算一般负载(也可以成为用电器,如点灯、冰箱等等)分为两种,一种式电阻性负载,一种是电感性负载。对于电阻性负载的计算公式:P=UI 对于日光灯负载的计算公式:P=UIcos ф,其中日光灯负载的功率因数cosф=0.5。不同电感性负载功率因数不同,统一计算家庭用电器时可以将功率因数cosф取0.8。也就是说如果一个家庭所有用电器加上总功率为6000瓦,则最大电流是I=P/Ucosф=6000/220*0.8=34(A) 但是,一般情况下,家里的电器不可能同时使用,所以加上一个公用系数,公用系数一般0.5。所以,上面的计算应该改写成I=P*公用系数/Ucosф=6000*0.5/220*0.8=17(A)也就是说,这个家庭总的电流值为17A。则总闸空气开关不能使用16A,应该用大于17A的。 四、估算口诀 二点五下乘以九,往上减一顺号走。 三十五乘三点五,双双成组减点五。 条件有变加折算,高温九折铜升级。 穿管根数二三四,八七六折满载流。 说明: 本节口诀对各种绝缘线(橡皮和塑料绝缘线)的载流量(安全电流)不是直接指出,而是“截面乘上一定的倍数”来表示,通过心算而得。倍数随截面的增大而减小。 “二点五下乘以九,往上减一顺号走”,说的是2.5mm’及以下的各种截面铝芯绝缘线,其载流量约为截面数的9倍。如2.5mm’导线,载流量为2.5×9=22.5(A)。从4mm’及以上导线的载流量和截面数的倍数关系是顺着线号往上排,倍数逐次减l,即4×8、6×7、10×6、16×5、25×4。

国标电线平方数和直径一览表

换算方法: 知道电线的平方,计算电线的半径用求圆形面积的公式计算: 电线平方数(平方毫米)=圆周率()×电线半径(毫米)的平方 知道电线的平方,计算线直径也是这样,如: 方电线的线直径是:÷ = ,再开方得出毫米,因此方线的线直径是:2×毫米=毫米。 知道电线的直径,计算电线的平方也用求圆形面积的公式来计算: 电线的平方=圆周率()×线直径的平方/4 电缆大小也用平方标称,多股线就是每根导线截面积之和。 电缆截面积的计算公式: × 电线半径(毫米)的平方× 股数 如48股(每股电线半径毫米)平方的线: ×(× )× 48 = 平方 电缆线国家标准技术参数表 平方16 6A 平方23 平方28 平方42 14A 平方48 25A 平方19 34A

标称截面积铜丝根数单根直径参数截流平方16 6A 平方23 平方28 平方42 14A 平方 48 25A 平方 19 34A 标称截面积计算方法: 标称截面积=单根铜线半径的平方*(圆周率)*铜线根数 国标电线平方数和直径一览表

电线(平方毫米)导体直径(毫米)25℃铜线载流量 18A 26A 438A 644A 10×768A 16×780A 25×7109A 35×7125A 50×19163A 70×19202A 95×19243A 换算方法: 知道电线的平方,计算电线的半径用求圆形面积的公式计算: 电线平方数(平方毫米)=圆周率()×电线半径(毫米)的平方 知道电线的平方,计算线直径也是这样,如: 方电线的线直径是:÷ = ,再开方得出毫米,因此方线的线直径是:2×毫米=毫米。 知道电线的直径,计算电线的平方也用求圆形面积的公式来计算:

导线截面积与电流的关系

导线截面积与电流的关系 一般铜线安全计算方法是: 2.5平方毫米铜电源线的安全载流量--28A。 4平方毫米铜电源线的安全载流量--35A 。 6平方毫米铜电源线的安全载流量--48A 。 10平方毫米铜电源线的安全载流量--65A。 16平方毫米铜电源线的安全载流量--91A 。 25平方毫米铜电源线的安全载流量--120A。 如果是铝线,线径要取铜线的1.5-2倍。 如果铜线电流小于28A,按每平方毫米10A来取肯定安全。 如果铜线电流大于120A,按每平方毫米5A来取。 导线的截面积所能正常通过的电流可根据其所需要导通的电流总数进行选择,一般可按照如下顺口溜进行确定: 十下五,百上二, 二五三五四三界,柒拾玖五两倍半,铜线升级算. 给你解释一下,就是10平方一下的铝线,平方毫米数乘以5就可以了,要是铜线呢,就升一个档,比如2.5平方的铜线,就按4平方计算.一百以上的都是截面积乘以2, 二十五平方以下的乘以4, 三十五平方以上的乘以3, 柒拾和95平方都乘以2.5,这么几句口诀应该很好记吧, 说明:只能作为估算,不是很准确。 另外如果按室内记住电线6平方毫米以下的铜线,每平方电流不超过10A 就是安全的,从这个角度讲,你可以选择1.5平方的铜线或2.5平方的铝线。 10米内,导线电流密度6A/平方毫米比较合适,10-50米,3A/平方毫米,50-200米,2A/平方毫米,500米以上要小于1A/平方毫米。从这个角度,如果不是很远的情况下,你可以选择4平方铜线或者6平方铝线。 如果真是距离150米供电(不说是不是高楼),一定采用4平方的铜线。 导线的阻抗与其长度成正比,与其线径成反比。请在使用电源时,特别注意输入与输出导线的线材与线径问题。以防止电流过大使导线过热而造成事故。 下面是铜线在不同温度下的线径和所能承受的最大电流表格。 导线的阻抗与其长度成正比与线径成反比,请在使用电源时,需 特别注意 输入与输出导线的线径问题,以防止因电流太大引起过热,而造 成意外,下列 表格为导线在不同温度下的线径与电流规格

电线电缆常用计算公式大全

一、电线电缆材料用量 铜的重量习惯的不用换算的计算方法:截面积*=kg/km 如120平方毫米计算:120*=km 1、导体用量:(Kg/Km)=d^2 * * G * N * K1 * K2 * C / d=铜线径 G=铜比重 N=条数 K1=铜线绞入率 K2=芯线绞入率 C=绝缘芯线根数2、绝缘用量:(Kg/Km)=(D^2 - d^2)* * G * C * K2 D=绝缘外径 d=导体外径 G=绝缘比重 K2=芯线绞入率 C=绝缘芯线根数 3、外被用量:(Kg/Km)= ( D1^2 - D^2 ) * * G D1=完成外径 D=上过程外径 G=绝缘比重 4、包带用量:(Kg/Km)= D^2 * * t * G * Z D=上过程外径 t=包带厚度 G=包带比重 Z=重叠率(1/4Lap = 5、缠绕用量:(Kg/Km)= d^2 * * G * N * Z d=铜线径 N=条数 G=比重 Z=绞入率 6、编织用量:(Kg/Km)= d^2 * * T * N * G / cosθ θ = atan( 2 * * ( D + d * 2 )) * 目数 / / T

d=编织铜线径 T=锭数 N=每锭条数 G=铜比重 比重:铜;银;铝;锌;镍;锡;钢;铅;铝箔麦拉;纸;麦拉 ;;;PEF(发泡);;Teflon(FEP);;; 棉布带;PP绳;棉纱线 二、导体之外材料计算公式 1.护套厚度:挤前外径×+1(符合电力电缆,单芯电缆护套的标称厚度应不小于,多芯电缆的标称厚度应不小于) 2.在线测量护套厚度:护套厚度=(挤护套后的周长—挤护套前的周长)/2π 或护套厚度=(挤护套后的周长—挤护套前的周长)× 3.绝缘厚度最薄点:标称值×90% 4.单芯护套最薄点:标称值×85% 5.多芯护套最薄点:标称值×80% 6.钢丝铠装:根数= {π×(内护套外径+钢丝直径)}÷(钢丝直径×λ) 重量=π×钢丝直径×ρ×L×根数×λ 7.绝缘及护套的重量=π×(挤前外径+厚度)×厚度×L×ρ

电缆线的容量计算

电线粗细与功率之间的关系计算 导线截面积与载流量的计算 一、一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。如:2.5 mm2BVV铜导线安全载流量的推荐值2.5×8A/mm2=20A 4 mm2 BVV铜导线安全载流量的推荐值4×8A/mm2=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值5~8A/mm2,计算出所选取铜导线截面积S的上下范围: S=< I /(5~8)>=0.125 I ~0.2 I(mm2) S-----铜导线截面积(mm2) I-----负载电流(A) 三、功率计算一般负载分为两种,一种式电阻性负载,一种是电感性负载。对于电阻性负载的计算公式:P=UI 对于日光灯负载的计算公式:P=UIcosф,其中日光灯负载的功率因数cosф=0.5。不同电感性负载功率因数不同,统一计算家庭用电器时可以将功率因数cosф取0.8。也就是说如果一个家庭所有用电器加上总功率为6000瓦,则最大电流是 I=P/Ucosф=6000/220*0.8=34(A) 但是,一般情况下,家里的电器不可能同时使用,所以加上一个公用系数,公用系数一般0.5。 所以,上面的计算应该改写成 I=P*公用系数/Ucosф=6000*0.5/220*0.8=17(A) 也就是说,这个家庭总的电流值为17A。则总闸空气开关不能使用16A,应该用大于17A的。 估算口诀: 二点五下乘以九,往上减一顺号走。三十五乘三点五,双双成组减点五。 条件有变加折算,高温九折铜升级。穿管根数二三四,八七六折满载流。 说明: (1)本节口诀对各种绝缘线(橡皮和塑料绝缘线)的载流量(安全电流)不是直接指出,而是“截面乘上一定的倍数”来表示,通过心算而得。由表5 3可以看出:倍数随截面的增大而减小。 “二点五下乘以九,往上减一顺号走”说的是2.5mm’及以下的各种截面铝芯绝缘线,其载流量约为截面数的9倍。如2.5mm’导线,载流量为2.5×9=22.5(A)。从4mm’及以上导线的载流量和截面数的倍数关系是顺着线号往上排,倍数逐次减l,即4×8、6×7、10×6、16×5、25×4。 “三十五乘三点五,双双成组减点五”,说的是35mm”的导线载流量为截面数的3.5倍,即35×3.5=122.5(A)。从50mm’及以上的导线,其载流量与截面数之间的倍数关系变为两个两个线号成一组,倍数依次减0.5。即50、70mm’导线的载流量为截面数的3倍;95、120mm”导线载流量是其截面积数的2.5倍,依次类推。 “条件有变加折算,高温九折铜升级”。上述口诀是铝芯绝缘线、明敷在环境温度25℃的条件下而定的。若铝芯绝缘线明敷在环境温度长期高于25℃的地区,导线载流量可按上述口诀计算方法算出,然后再打九折即可;当使用的不是铝线而是铜芯绝缘线,它的载流量要比同规格铝线略大一些,可按上述口诀方法算出比铝线加大一个线号的载流量。如16mm2铜线的载流量,可按25mm2铝线计算。 导线安全载流量计算口诀:10下五,100上二,16、25四,35、50三,70、95两倍半。穿管、温度八、九折,裸线加一半,铜线升级算。 计算数字与倍数的排列关系如下: 对于1.5、2.5、4、6、10 mm2的导线可将其截面积数乘以5倍。 1.5 2.5 4 6 10 ×5A 对于16、25 mm2的导线可将其截面积数乘以4倍。 16 25 ×4A 对于35、50 mm2的导线可将其截面积数乘以3倍。 35 50 ×3A 对于70、95 mm2的导线可将其截面积数乘以2.5倍。 70 95 ×2.5A 对于120、150、185 mm2的导线可将其截面积数乘以2倍。 120 150 185 ×2A 架空正常值,走地面管道数值下降。 2.5平方的电源线最大可以承受电流为2.5*5=12.5A,最大承受功率12.5*220=2750W

电缆截面计算公式

导线截面积与载流量的计算 一、一般铜导线载流量导线的安全载流量是根据所允许的线芯最高温度、冷却条件、敷设条件来确定的。一般铜导线的安全载流量为5~8A/mm2,铝导线的安全载流量为3~5A/mm2。<关键点> 一般铜导线的安全载流量为 5~8A/mm2,铝导线的安全载流量为3~5A/mm2。如:2.5 mm2 BVV铜导线安全载流量的推荐值2.5×8A/mm2=20A 4 mm2 BVV铜导线安全载流量的推荐值4×8A/mm2=32A 二、计算铜导线截面积利用铜导线的安全载流量的推荐值5~8A/mm2,计算出所选取铜导线截面积S的上下范围:S=< I /(5~8)>=0.125 I ~0.2 I(mm2)S-----铜导线截面积(mm2)I-----负载电流(A) 三、功率计算一般负载(也可以成为用电器,如点灯、冰箱等等)分为两种,一种式电阻性负载,一种是电感性负载。对于电阻性负载的计算公式:P=UI 对于日光灯负载的计算公式:P=UIcosф,其中日光灯负载的功率因数 cosф=0.5。不同电感性负载功率因数不同,统一计算家庭用电器时可以将功率因数cosф取0.8。也就是说如果一个家庭所有用电器加上总功率为6000瓦,则最大电流是I=P/Ucosф=6000/220*0.8=34(A) 但是,一般情况下,家里的电器不可能同时使用,所以加上一个公用系数,公用系数一般0.5。所以,上面的计算应该改写成I=P*数/Ucosф=6000*0.5/220*0.8=17(A) 也就是说,这个家庭总的电流值为17A。则总闸空气开关不能使用16A,应该用大于17A 的。 估算口诀: