Project Management

ASSESSMENT PROJECT: Whether BIM will shake the status of the project manager STUDENT: LV LEI

ASSESSMENT CRITERIA: % MARK

Content

Critical Analysis Structure and Presentation Referencing 40 30 15 15

CHECKLIST OF SPECIFIC ATTRIBUTES

Quality of advice/assembly of data: Excellent Good Satisfactory Room for improvement Poor Clarity of argument/recommendation: Excellent Good Satisfactory Room for improvement Poor Structure of assignment: Excellent Good Satisfactory Room for improvement Poor Presentation: Excellent Good Satisfactory Room for improvement Poor

ASSESSORS COMMENTS/FEEDBACK:

Please discuss any queries with your tutor

ASSESSOR: DATE:

Whether BIM will shake the status of the project manager

1 Introduction

In recent years, BIM (Building Information Modeling) has been widely used in the field of construction and achieved good results, which has an impact in many aspects of project management and also put forward some new requirements for the abilities and training methods of the project manager. The article analyses the application and development of BIM, the occupational characteristics of the project manager firstly, and then analyses the question that whether BIM will shake the position of the project manager or not, and gives the answer finally.

2 The application and development of BIM

BIM (Building Information Modeling) is the related detailed expression of the project based on the foundation of three dimensional digital technologies and the construction data model of the relevant information of construction engineering project. The application of BIM is used to solve the problem of description in the construction work, is the foundation for designer and engineering technical personnel to responding to a variety of architectural information and working together.

BIM is the digital method used in design, construction and management, this method supports the integrated management environment of construction engineering, and can make the construction work improve efficiency significantly in the whole life cycle and reduce risks. Besides, the structure of BIM is a composite structure contained data model and behavior model, which means that it not only contains data model that related to geometry graph and data, but also contains behavior that related to management, the two parts combined together, so as to be used in simulating the behaviors of the real world. For example, simulating the structural stress conditions and the heat transfer condition of retaining structure. Of course, the behavior simulation relates to the quality of information closely.

The application of BIM can support the continuous application and the real-time application of all kinds of information existed in the project, these information are

high-quality, reliable, high level of integration and can be coordinated fully, which improve the quality and efficiency of design and even the whole project, reduce costs significantly. The immediate benefits brought by the application of BIM are that making construction project faster, cheaper and more accurate, and letting the various types of work cooperate with each other better, so as to reduce the error risk of the drawing. The long-term benefits that brought by the application of BIM beyond the stage of design and implementation, which is good for the operation of construction, maintenance and facilities management in the future, and can save costs.

According to the needs of national resource planning management, under the form of construction life-cycle management and energy saving, the function of BIM in the information construction becoming more and more important. Huge amount of construction brings in a lot of losses caused by information drain in the stage of communication and implementation, the information integration brought by BIM redefines the design process, which improves this situation greatly.

3 The professional characteristics of the project manager

The project manager is the chief of the whole processes of the project implementation, is the organizer of project implementation.

The article analyses the professional characteristics of project managers according to the professional classification. According to different standards, the article classifies profession as the following: conventional type and communication type, line type and spiral type, long-term type and short-term type.

(1)From the point of personality factors, the project manager belongs to communicative career. They need to coordinate the various internal and external relations, and integrate all of the resources for achieving the expected goal. Besides, to the external environment, they also need to develop rich social resources continuously to provides services to the project stages; to the internal environment, they need to take full use of the advantages of each members who participant in the project, so generally speaking, the project manager should has the personality traits of friendliness, enthusiasm and wisdom.

(2)From the point of the direction of career development, the project manager belongs to a spiral development career. Transferring from a specialized area to another expertise

career, the project managers need to have a wealth of knowledge structure and creativity. With the accumulation of professional experiences, the knowledge areas of the project manager is more and more comprehensive, which means that make different areas of expertise link together effectively and integrate with each other. So when the project managers merge into new areas of knowledge, he can learn from the old areas of knowledge, which can open the creative door for the new area.

(3)From the point of the vocation continuing state, the project manager is limited by the life cycle of a single project; it usually is a short-term job. Since any projects have a project life cycle, company can not guarantee that the project is continuous, so it is decided that the choice of project manager's career has strong liquidity and instability.

4 The hard kills and soft skills of the project manager and the function of them in the project management

The ability of the project manager mainly has two parts, namely "soft" skills, which is personality factors, soft skills just like software, is internal and can not be seen; on the other hand "hard" sills, which is management skills and technology skills, the hard skills just like the hardware of the computer, is external and can be seen easily.

First, personality factors mainly reflect in understanding and behaviors during the process of the communication with group members. The project manager with outstanding quality can understand the demands and motivations of other members in the project effectively and also have good communication skills. Generally speaking, personality factors means that the project manager should have appeal, communication skills, responsible ability, high sensitivity to the policy and the surrounding, besides, the project manager also should have the following characteristics: moral both, passionate about work, have the sense of responsibility and dare to bear.

The first one, namely the ability of appeal. The members of the project comes from the various functional and technical departments within the enterprise, every group members' personal qualities, professional competences, personality and objective environment is different, but the enthusiasm of one member will affect others, and even affect the efficiency of the entire team, so the project manager must have the ability of gather together all the members and mobilize subordinates' enthusiasm to improve the level of

management.

The second one, communication skills, namely the ability of listening, advising and understanding others behaviors. The communication ability of the project manager directly affect the problem that whether he can understand other members' behaviors and views effectively. Only listening comprehensively and understanding the spirit of the instructions conveyed by the superior, can the project be operated better. When communicating with subordinates, the project manager should focus on equality, because the sound of subordinates usually is the most basic and most primitive one, which reflects the actual situations encountered in the processes of project operation.

The third one, responding capability. Project is a dynamic process, there will be all kinds of emergencies in the whole project management process, which requires the project manager timely respond to those emergencies, and find the solutions to the problems to let the project going well. If the project manager has no responding capability and can not make decision timely or make wrong decision, the project will be blocked.

The last one, high sensitivity to the policy and the surrounding information. The market economy in China still has the characteristics of the traditional government guidance, project management still is the management under the market economy that guided by the government, so ever project management is closely linked with the market changes and relevant policies changes. Understanding the market under the market economy conditions, grasping the changes existed in the surrounding environment is the premise condition before leading projects. That is to say, only has high sensitivity to the policy and surrounding environment, can the project manager adapt to the requirements of the development of the modern project management.

Second, management skills. This requires the project manager to look the whole project as a integration, allocate project resources reasonably, understand and coordinate the relationship between the overall and individual. Only understanding the objective environment of the project clearly, can the project manager make reasonable goals and planning, lead the team to complete the project effectively. And management skills mainly include planning, organizing, controlling, deciding, and overall awareness, the ability to dealing with the relationship between the project and outside world and the ability of

empowerment.

In particular, planning is the method to achieve the established objectives of the project, and the activity to organize the processes of the project implementation in the future. The planning can be divided into four classes: overall planning and local planning, long-term planning and short-term planning. Before the implementation of any project, it is important to make overall planning for achieving the final goals, including time planning, work planning and schedule planning. Planning can ensure the implementation of the project.

Third, technical skills. It means that the project manager should have the ability to deal with some specific activities, especially contains the methods, processes, procedures or technical activities. Specifically including the following points: the skills of using project management tools and techniques, relevant expertise, the ability of using computer, healthy body and a wealth of practical experiences.

5 Whether BIM will shake the position of the project manager in the project or not

As a kind of working content of using IT technology to integrating the project, BIM can optimizes the whole construction process. As a kind of computer application skills, BIM can be used by the project manager to implement management work effectively. From this vies, BIM will not shake the position of the project manager in the construction project, on th contrary, BIM will promote the management of the project manager.

Using BIM to take integration management for the implementation processes of entity object in the construction project can overcome the problems that existed in the traditional management models and technologies, which can achieve fundamental changes in the aspect of transfer channels and cumulative ways. These changes put forward some new requirements for the project manager:

First, to require the project manager to establish the project information concept with BIM as the core and understand the convenience and benefits of BIM for project management works. During the process of construction project, BIM is the core, and transfer and communication of communication must base on BIM. In this case, the project manager should establish a project information communication with the concept of BIM as

the core, this concept includes two aspects: the function of BIM and the differences and connections between BIM and traditional 3D models.

Besides, the application of BIM also requires project manager to grasp the tools and techniques of BIM. Since BIM becomes the core and basis of the information communication, the project manager must fully master the BIM tools, at the same time, the project manager also should fully understand the related skills that will be during the process of implementing project management works.

The last but not the least, the application of BIM requires the project manager fully understand the problems caused by BIM. Since the application of BIM changes the word processes, technological process and the communication ways of the project participants during the period of project management, so the project manager must fully familiar with the problems caused by the application of BIM in the specific work process.

6 Conclusions

As the core concept of IT technology, BIM can optimize the entire processes of construction, the project manager can establishes a project information communication with the concept of BIM as the core, masters tools and technologies related to BIM and understand the problems caused by BIM, so that master the technology of BIM effectively. From this point of view, the project manager can transfer BIM into hard skills, which can help them to manage the project effectively. So BIM will not shake the position of the project manager, but will promote the management of the project manager. From the other side of view, the soft skills of the project manager will not be dominated by the hard skills.

Reference:

[1] Harold Kerzner.(2009).Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley & Sons.

[2] Chen Yan.(2008).The building information model (BIM) in project management information system framework. Construction technology.

[3]Xue Li.(2008).Discussion on project manager competency requirements. China consulting engineering.

[4] Cui Huiqin.(2010).The problems and countermeasures of building enterprise's IT application in management research and practice. Construction technology.

[5] Feng Haidong.(2011).The the functions of project managers in the construction analysis. Research and Development.

[6] Wang Li.(2011).The analysis of the successful project manager. Science and technology information.

模板-项目管理-设计-数据库设计说明书

项目管理体系文件数据库设计说明书 编撰人: 审核人: 审核日期: 保密级别: 文档版本: XXXXXXXXXXXXXXXXXXXXXXXX公司

版本历史

目录 1.引言 (2) 1.1.编写目的 (2) 1.2.背景 (2) 1.3.术语 (2) 1.4.参考资料 (2) 2.总模型图及对象列表 (2) 2.1.总模型图 (2) 2.2.对象列表 (3) 2.2.1.表列表 (3) 2.2.2.视图列表 (3) 2.2.3.存储过程列表 (3) 2.2.4.触发器列表 (4) 3.表信息 (4) 3.1.表的中文名称+物理表名 (5) 3.2.表的中文名称+物理表名 (5) 4.视图信息 (6) 4.1.视图中文名称+物理名称 (6) 4.2.视图中文名称+物理名称 (6) 5.存储过程信息 (6) 5.1.存储过程1 (6) 5.2.存储过程2 (7) 6.触发器信息 (7) 6.1.触发器名称1 (7)

1.引言 1.1.编写目的 {说明编写数据库设计说明书的目的,指出预期的读者。} 1.2.背景 {描述系统产生的背景,包括: a、需开发的软件系统的名称,和英文缩写(可选),项目编号(可选); b、列出此项目的任务提出者、开发者 c、软件系统应用范围、用户。} 1.3.术语 {列出本文件中用到的专门术语、术语定义、外文首字母组词的原词组。} 1.4.参考资料 {本节列出用得着的参考资料,如: 属于本项目的其他已发表的文件; 本文件中各处引用的文件、资料、包括所要用到的软件开发标准。 行业标准和规范。 列出这些文件资料的标题、文件编号、发表日期和出版单位。} 2.总模型图及对象列表 2.1. 总模型图 {给出系统数据库模型图。通过模型图,能够反应库表之间存在的各种关系。}

项目计划管理程序文件

第1页共14页WH-YY-C01 金地集团武汉公司项目计划管理程序 1 武汉公司质量管理体系程序文件文件编号WH-YY-C01 版本号 1.1 版 生效日期2008 年 6 月 30 日 项目计划管理程序 修改状态修订情况修改人修改日期 I根据营运中心部门工作调整,取消管理类计划、 时间纬度计划的管理。 江锋2008-6-25 II III IV 起草邱俊日期2006 年 5 月部门负责人审核邱俊日期2006 年 5 月 主管领导审核易晓辉日期2006 年 7 月 质量管理工作组审核金涛日期2006 年 9 月签发严家荣日期2006 年 9 月

第 2页共 14 页 计划管理程序 1.目的 通过确定项目计划编制的责任部门、规范项目计划编制的程序与深度,从 而达到项目计划编制的合理与可行。 2.范围 适用于武汉公司各个部门各个项目的计划编制工作。计划的考核工作参见 绩效考核制度。 3.定义 业务纬度计划:指按照业务归属分类的计划,包括项目类计划与管理类计划,本程序只涉及到项目类计划。 业务部门:业务部门是指和工程项目开发业务关系紧密的专业部门,以项目开发为工作核心。现阶段业务部门共六个部门,分别是市场营销部、设计管 理部、项目中心、成本管理部、项目开发部、物业公司。 4.职责 营运中心作为公司计划工作的管理与监督考核部门,计划督办作为上述工 作的具体执行人。 计划督办应跟踪检查、督办各项计划的实施情况,经常地收集实际进度数 据并记录。将实际进度与计划进度进行对比分析,发现偏差时,应敦促相关部 门及时采取纠偏措施,当进度出现重大偏差时应及时通报业务总监,由主管副 总经理、营运中心与责任部门讨论确定采取进一步措施。 根据公司所需编制各种计划的内容,将计划划分成两大类:各业务部门以 项目开发为核心编制的项目类计划和各管理部门以公司管理为核心编制的管理 类计划。

公司理财(英文版)题库2

CHAPTER 2 Financial Statements & Cash Flow Multiple Choice Questions: I. DEFINITIONS BALANCE SHEET b 1. The financial statement showing a firm’s accounting value on a particular date is the: a. income statement. b. balance sheet. c. statement of cash flows. d. tax reconciliation statement. e. shareholders’ equity sheet. Difficulty level: Easy CURRENT ASSETS c 2. A current asset is: a. an item currently owned by the firm. b. an item that the firm expects to own within the next year. c. an item currently owned by the firm that will convert to cash within the next 12 months. d. the amount of cash on hand the firm currently shows on its balance sheet. e. the market value of all items currently owned by the firm. Difficulty level: Easy LONG-TERM DEBT b 3. The long-term debts of a firm are liabilities: a. that come due within the next 12 months. b. that do not come due for at least 12 months. c. owed to the firm’s suppliers. d. owed to the firm’s shareholders. e. the firm expects to incur within the next 12 months. Difficulty level: Easy NET WORKING CAPITAL e 4. Net working capital is defined as: a. total liabilities minus shareholders’ equity. b. current liabilities minus shareholders’ equity. c. fixed assets minus long-term liabilities. d. total assets minus total liabilities. e. current assets minus current liabilities. Difficulty level: Easy LIQUID ASSETS d 5. A(n) ____ asset is on e which can be quickly converted into cash without significant loss in value.

06087工程项目管理2016年4月真题及答案

2016年4月高等教育自学考试统一命题考试 工程项目管理试卷 (课程代码 06087) 本试卷满分100分,考试时间l50分钟。 考生答题注意事项: 1.本卷所有试题必须在答题卡上作答。答在试卷上无效,试卷空白处和背面均可作草稿纸。2.第一部分为选择题。必须对应试卷上的题号使用2B铅笔将“答题卡”的相应代码涂黑。3.第二部分为非选择题。必须注明大、小题号,使用0.5毫米黑色字迹签字笔作答。4.合理安排答题空间,超出答题区域无效。 第一部分选择题 一、单项选择题(本大题共l0小题,每小题2分。共20分) 在每小题列出的四个备选项中只有一个是符合题目要求的,请将其选出并将“答题卡” 的相应代码涂黑。未涂、错涂或多涂均无分。 1.按一个总体设计进行的单项工程的总体称为 A.建设项目 B.施工项目 C.单位工程 D.分部工程 2.下列属于建筑分项工程的是 A.基础工程 B.楼地面工程 C.抹灰工程 D.排水工程 3.政府机关建设项目投资主要资金来源渠道是 A.股票 B.银行信贷资金 C.债券 D.国家财政资金 4.项目部中,项目经理属于管理层的 A.决策层 B.协调层 C.执行层 D.作业层 5.BOT是指 A.总承包管理 B.项目管理承包 C.三角管理 D.公共工程特许权 6.下列属于流水施工时间参数的是 A.施工过程 B.施工段 C.流水步距 D.工作面 7.排列图法中累计频率0—80%的属于质量的 A.主要因素 B.次要因素 C.一般因素 D.C类因素 8.不能降低风险发生概率或消除风险的风险应对方式是 A.风险回避 B.风险转移 C.风险缓解 D.风险自留 9.下列属于生产性项目的是 A.工业建设 B.办公用房 C.住宅D.公共绿地 10.通过一定的权力和影响力,对资源进行配置表述的是 A.组织机构 B.组织结构 C.组织行为 D.组织调整 二、多项选择题(本大题共l0小题,每小题3分,共30分) 在每小题列出的五个备选项中至少有两个是符合题目要求的,请将其选出并将“答题卡”的相应代码涂黑。未涂、错涂、多涂或少涂均无分。 11.下列属于项目特征的有 A.一次性 B.约束性 C.不可逆性 D.可逆性

软件系统项目建设项目管理文档

目录 1.项目管理 (1) 1.1项目范围管理 (1) 1.2项目时间管理 ......................................................................... 错误!未定义书签。 1.3项目里程碑 (6) 1.4培训方案 (6) 1.5技术支持与售后服务 (7) 1.6项目进度管理 (8) 信息系统项目建设项目管理文档 1.项目管理 1.1项目范围管理 (1)概述 项目范围管理就是要明确项目目标是什么,界定哪些工作必须做,并将项目目标分解到可以独立分包的程度,形成工作分解结构(WBS),并以此作为控制项目范围变更的基准。即项目范围管理是确保项目包含且只包含项目所必须完成的工作。 很多项目经常由于有做不完的报表、解决不完的问题而导致项目无法验收,很大一部分原因就是因为项目的范围没有定义清楚或者项目范围经常发生无可控制的变更所致。事实证明,缺少正确的项目范围定义和范围的核实是导致项目失败的主要因素。 因此,项目管理最重要的也是最难做的一项工作就是确定项目范围,并使项目范围在控制中,这就是项目范围管理的范畴,即项目范围管理就是项目该做什么,不该做什么,以及确保该做的事情必须做到,不该做的事情不能做。 在项目的规划阶段和蓝图设计阶段的前期,我们通过售前阶段的资料和项目

现场的需求调研,确定项目该做什么,这就是经常说的定义项目范围。 (2)管理内容 1、定义项目范围 1)定义项目范围重要的参考资料和依据一般如下: ●项目售前实施方案; ●项目主合同; ●许可软件通用条款及清单; ●咨询实施服务和工作任务书; ●支持服务条款; ●战略合作承诺书; ●建设单位内部正式发问的项目实施意见书。 2)口头承诺 定义范围除了依据上述可见的项目资料外,售前阶段的一些口头承诺也是定义项目范围的重要信息来源,因此在项目准备阶段与售前进行内部交接时,一定不能忘记交接口头承诺的内容,实践证明,口头承诺的往往是在项目实施过程中难以交付的或者需求范围不好清晰界定的,正是范围管理的难点。 通过范围定义,可形成详细的范围说明书,以及对项目管理计划进行更新。 2、项目范围 范围是指项目所提供的产品或服务的总和,它包括以下两种含义: ●产品范围:产品或者服务的特性与功能,其衡量标准为产品要求,即产 品需求说明书。 ●项目范围:为交付所需产品(具有特定属性和功能)和服务而必须完成 的工作,其衡量标准为项目管理计划、项目范围说明书、WBS及WBS词汇 表。 项目实施的产品范围的描述一般应该通过两个维度,即产品功能模块和公司范围两个维度,清晰的描述出哪些公司具体实施、哪些产品的功能模块,对于集团型企业一定要以企业法人作为实施的公司范围。借用EXCEL建立功能模块与法人

有关工程项目管理论文参考范文

有关工程项目管理论文参考范文 ----WORD文档,下载后可编辑修改---- 下面是小编收集整理的范本,欢迎您借鉴参考阅读和下载,侵删。您的努力学习是为了更美好的未来! 有关工程项目管理论文范文一:数据库技术在测绘工程项目管理中的应用【摘要】随着社会不断进步和发展,科学技术水平也在不断提高,促使不断发展测绘技术,会在一定程度上影响测绘工程项目管理的工作。建筑实际施工的时候需要十分庞大的数据。所以,对于建筑整体质量来说,数据库管理就变得十分重要。本文主要分析了测绘工程中数据库技术的应用,并且提出了合理的建议,以便于为以后进一步分析和发展数据库技术提供基础和保障。 【关键词】数据库技术;测绘工程;项目管理;应用 随着不断发展国民经济,城市化进程不断加剧,城市作为勘测单位,每年都需要承接很多工程,怎样有效管理测绘工程项目是未来建筑发展的主要方向。传统的测绘工程项目管理是在纸质文档基础上建立的管理方式,由于科学技术的进步已经逐渐不能满足社会发展需求。本文通过分析测绘工程项目管理中应用地理信息数据库技术,并且分析应用项目的空间位置、产值、合同、时限、属性等相关信息,并且空间化、具体化传统测绘工程项目,以便于达到分析、分类统计、查询测绘工程项的目的,并且还能够在一定程度上降低管理成本以及提高项目管理效率。 一、数据库技术基本概念 数据库技术是一种核心的信息系统技术,是一种借助计算机来辅助管理数据的方式。数据库技术最根本的作用实际上是存储数据、组织数据,并且还能够处理和获取数据信息。数据库技术能够合理应用数据库设计、结构、相关应用、存储管理等方法以及基本理论,并且分析处理数据库中的相关数据信息。数据库技术在应用的时候主要研究目标可以在一定程度上决定数据库研究实际内容。所以数据库技术最根本的就是利用数据来建立管理数据的相关数据库,依据应用系统能够处理分析数据信息,依据数据库的管理系统能够分析处理、修改、删除、添加相关数据信息[1]。 二、测绘工程的基本概念

(精编)工程项目管理课程简介

(精编)工程项目管理课程简介 《工程项目管理》课程简介 课程编号: 课程名称: 工程项目管理 课程名称(英文): Project Management 适用专业:房地产经营与估价(非师范类) 先修课程:土木工程概论、建筑制图与识图、建筑施工组织与进度控制 学时:72 学分: 4 教学层次:专科 课程简介: 本课程是房地产经营与估价专业学生的专业必修课程。通过本课程的学习,为学生建立起工程项目管理的理论体系,培养学生应用项目管理知识解决工程实际问题的能力。本课程以培养未来的项目管理工程师为目标,介绍了项目管理方面的新知识、新技术、新规范和标准,并引入了一些案例,注重理论联系实际,具有较强的实用性。 教材:王芳.范建洲主编,工程项目管理.科学出版社,2007 参考书目: 1.刘金昌,李忠富,杨晓林主编,《建筑施工组织与现代管理》,中国建筑工业出版社,1996 2.张守健,许程洁主编,《施工组织设计与进度管理》,中国建筑工业出版社,2001 3.任宏等主编,《工程项目管理》,高教出版社,2005 考核方式:考试 成绩评定:本课程的总评成绩包括平时成绩和期末考试(或考查)成绩两部分。平时作业和课堂表现占30%,考查作业或试题占70%

《工程项目管理》课程教学大纲 课程编号: 适用专业:房地产经营与估价 学时数:72学分数:4 执笔人:曹跃杰编写时间:2009.9.1 一、课程的性质、任务 本课程是房地产经营与估价专业学生的专业必修课程。通过本课程的学习,为学生建立起工程项目管理的理论体系,培养学生应用项目管理知识解决工程实际问题的能力。本课程以培养未来的项目管理工程师为目标,介绍了项目管理方面的新知识、新技术、新规范和标准,并引入了一些案例,注重理论联系实际,具有较强的实用性。二、课程的教学目的和要求 通过本课程的学习,为学生建立起工程项目管理的理论体系,培养学生应用项目管理知识解决工程实际问题的能力。本课程以培养未来的项目管理工程师为目标,介绍了项目管理方面的新知识、新技术、新规范和标准,并引入了一些案例,注重理论联系实际,具有较强的实用性。 三、课程的教学内容 第一章工程项目管理概论(总学时6) (一)教学要求: 本章主要阐述项目工程管理的内涵、类型、背景和发展趋势,以及与工程项目管理相关的建设工程监理的概念。由于项目管理的核心任务是项目的目标控制,因此,按项目管理学(Project Mangement)的基本理论,没有目标的建设工程不是项目管理的对象。

《工程项目管理》必背知识点

《工程项目管理》考前必背知识点 第一章工程项目管理概论 1.工程项目监理的主要内容(★重点掌握) 2.建设程序(★重点掌握) 3.综合应用:(1)建设工程项目管理程序(★重点掌握) 第二章施工项目管理概述 1.施工项目经理的工作内容(★重点掌握) 2.施工项目管理规划大纲(★重点掌握) 3.施工组织设计的基本内容(★重点掌握) 4.施工项目组织形式(★重点掌握) 第三章流水施工方法 1.组织工程施工的基本方式(★重点掌握) 2.流水施工主要参数(★重点掌握) 3.成倍节奏流水施工进度计划的编制(★重点掌握) 4.异节奏流水施工进度计划的编制(★重点掌握) 5.无节奏流水施工进度计划的编制(★重点掌握) 案例一成倍节奏流水施工的组织方法 某工程项目由A、B、C三个施工过程组成,各施工过程的流水节拍分别为:2周、4周、6周,试组织成倍节拍流水施工。

案例二无节奏流水施工的组织方法 某项工程项目分解为甲、乙、丙、丁4个施工过程,在组织施工时划分为4个施工队,各施工过程在各个施工段的流水节拍如下表,试组织流水施工。 施工段 施工过程 ⅠⅡⅢⅣ甲 2 3 3 2 乙 4 3 3 3 丙 3 3 4 4 丁 4 3 4 1 第四章工程网络计划技术 1.单双代号网络图的绘图规则(★重点掌握) 2.单双代号网络计划时间参数的计算(★重点掌握) 3.单双代号网络图进度计划的编制(★重点掌握) 案例一 网络计划的资料如下表所示,试绘制双代号网络计划图,计算A、B、C、G四项工作的六个时间参数,并找出关键路线,求出总工期。

序号 A B C D E F G H I 紧前工作 A A B、C C、D D E F G、H 持续时间 2 3 4 3 2 2 3 4 4 时间参数表 序号ES EF LS LF TF FF A B C G 第五章施工组织纲要和施工组织总设计的编制 1.总体施工准备的内容(★重点掌握) 2.技术经济指标的计算(★重点掌握) 3.施工组织总设计的编制内容、编制程序(★重点掌握) 4.主要资源配置计划的编制(★重点掌握) 5.施工总平面布置图设计步骤和设计要点(★重点掌握) 第六章单位工程施工组织设计及施工方案编制 1.施工方案编制内容(★重点掌握) 2.施工流向和施工程序的确定(★重点掌握)

浅谈'工程项目方案项目方案解决方法信息化管理解决方法

浅谈工程项目信息化管理 【摘要】我国从工业发达国家引进工程项目管理的概念、理论、组织、方法和手段,历时30余年,在工程实践中取得了不少成绩,但是对于工程项目管理的信息化水平还有待提高。21世纪是一个信息时代,近些年来,我国又不断加大工程建设力度,对工程项目管理的需求也随之提升。对于现代工程项目,信息化管理是发展的必然趋势,能否实现管理的信息化,决定了工程项目整体管理水平的高低。本文通过当下工程项目信息化管理现状,深入分析工程项目信息化管理的要求、难点与影响因素,并积极寻求解决方案,以提高信息化管理水平,进而提高工程项目的整体管理水平。 【关键词】工程项目;信息化管理;BIM 1 引言 21世纪,随着信息时代的到来,工程项目管理必将走向信息化管理,项目管理的核心竞争力也越来越依赖于信息技术。只有充分利用包括信息技术在内的高新技术推进工程项目管理信息化,才能增强项目管理能力和技术手段,提升竞争力,实现跨越式发展,与国际建筑业接轨。 近年来,信息技术在工程项目管理中的应用已经取得了长足发展。在不少相关企业中,已经成功建立了信息网络,并将信息网络作为信息交流和管理不可缺少的工具;有的企业开发了企业管理信息系统,将企业的管理工作搬到计算机系统平台上来进行;更多的企业在工作中使用了各类专业软件,例如专业设计软件、招段标报价软件、进度计划管理软件、合同管理软件、材料管理软件等。总体看来,虽然已经收到了一定的成效,但依然存在一些问题。要想解决这些问题要明确信息化管理的意义,及时发现问题,解决问题,尽决地实现建设工程项目管理的信息化。因此,本文针对工程项目管理信息化建设进行相关探讨。 2 工程项目管理信息化简介 2.1项目管理 项目管理是指在一定的约束条件下,为达到项目目标(在规定的时间和预算费用内,达到所要求的质量)而对项目所实施的计划、组织、指挥、协调和控制

项目管理文档填写及流程管理规范

项目管理文档填写及流程管理规范 1 项目文档管理 (2) 1.1项目前期 (2) 1.2项目中期 (2) 1.3项目后期 (2) 1.4项目整个周期 (3) 1.5硬件及网络布线 (3) 2 项目管理流程 (3) 2.01项目管理整体流程 (3) 2.02项目立项单流程 (5) 2.03项目调研流程 (5) 2.04项目计划审批流程 (6) 2.05项目预算审批流程 (6) 2.06客户上线准备调查报告 (6) 2.07出差申请单 (6) 2.08项目周报 (7) 2.09新增需求单 (7) 2.10项目费用申请单 (7) 2.11问题集审批流程 (8) 2.12项目转售后服务流程 (8) 2.13奖金制定流程 (8) 2.14洽谈报告 (9)

1项目文档管理 1.1项目前期 《项目整体进度步骤》 《系统功能要求》 《客户资料信息表》 《项目立项表》(产品版本、项目人员) 《项目实施计划表》《项目实施详细时间表.》 《项目预算表》 《系统初始设置表》 《进驻现场准备表》(与系统相关的其他项目时间进度、如设备到长时间、人员安排、机房建设) 《标准培训文档》 1.2项目中期 《服务器设备调试报告》(服务器配置数据库配置) 《POS设备调试报告》(pos机配置型号、系统安装配置) 《其他设备调试报告》(条码打印、电在称、价签、等等) 《培训确认报告》(培训功能模块、时间、人数、部门、负责人确认) 《系统正式使用确认报告》包括转入售后部分 1.3项目后期 《文档提交确认单》 《售后服务单》

1.4项目整个周期 出差申请单(参考财务) 《项目增项需求单》(新需求或变动) 《项目周报》 《项目分配奖金表-部门》 费用申请单(参考财务单据,应用项目当中设备采集、或特殊费用申请单)系统问题集(将项目中遇到的系统问题和客户的一些意见记录成文件,为产品升级提供依据) 1.5硬件及网络布线 《设备验收清单》(包括第三方软件) 网络布线报告(由第三方布线公司提供) 2项目管理流程 2.01项目管理整体流程

完整word版公司理财英文版题库8

CHAPTER 8 Making Capital Investment Decisions I. DEFINITIONS INCREMENTAL CASH FLOWS a 1. The changes in a firm's future cash flows that are a direct consequence of accepting a project are called _____ cash flows. a. incremental b. stand-alone c. after-tax d. net present value e. erosion Difficulty level: Easy EQUIVALENT ANNUAL COST e 2. The annual annuity stream o f payments with the same present value as a project's costs is called the project's _____ cost. a. incremental b. sunk c. opportunity d. erosion e. equivalent annual Difficulty level: Easy SUNK COSTS c 3. A cost that has already been paid, or the liability to pay has already been incurred, is a(n): a. salvage value expense. b. net working capital expense. c. sunk cost. d. opportunity cost. e. erosion cost. Difficulty level: Easy OPPORTUNITY COSTS d 4. Th e most valuable investment given up i f an alternative investment is chosen is a(n): a. salvage value expense. b. net working capital expense.

06087工程项目管理

06087工程项目管理-CAL-FENGHAI-(2020YEAR-YICAI)_JINGBIAN

06087项目管理复习题 一、单选 1.项目的定义是描述项目的性质、用途、建设范围和基本内容。P49 2.关于PDCA循环的特点,错误的是波浪式的前进P186 3.管理与工程项目管理首先开始于制定计划 4.在施工阶段,属于事中控制的是严格工序交接检查P183 中P的意思是计划P185 6.工程项目策划的首要任务,根据建设一图,进行项目的定义和定位P49 7.建筑法规定,不是施工许可证领取的必要条件:有保证进度的措施P20 8.索赔事件发生后28天内,向工程师发出索赔意向通知P231 9.风险预测图,同一曲线上的风险等级是相同的。P66 10.承包商和材料供应商签订的供应合同属于分合同P223 11.办公楼分为会议室、办公室、接待室,这种分解属于按功能面分解。P128 12.招标人和中标人应当在中标通知书发出之日起30日内,按照招标文件和中标人的投标文件订立书面合同P40 13.经济节汇成本是指产品替代进口节省外汇所需要投入的国内资源。P79 14.下列属于第二类危险源的控制方法是提高可靠性P215 15.评标委员会有7人,其中技术经济专家不少于5人 16.安全技术交底最后一项内容是:发生事故后应及时采取的避难急救措施。P212 17.工程规模小,技术不太复杂,工期较短,采用固定总价合同P224 18.组织内部不同职位相互联系,不孤立,具体表现为组织结构 19.投资在2亿元以上的项目可行性研究报告,由国家发改委审核后报国务院审批。P55 20.解决纠纷,不是双方自愿的方式诉讼。P234 21.建筑工程保修期起算时间为竣工验收合格P210不 22.联合体投标,错误的说法是:联合体各方不需指定牵头人。P39 23.施工预算的编制单位是施工单位 24.下面属于事后控制施工质量的是:组织项目竣工总验收P183 25.危险源控制原则中,错误的是应考虑保护重要工作人员的措施P215 26.某项目投资1亿元,其投资估算为亿元P52 27.项目编码,第一个项目第二个子项目第五个任务第三个工作包1253P131 28.按项目建设程序,项目策划可分为建设前期项目构思策划和项目实施策划P47 29.在合同实施前,合同谈判人员应进行合同交底P221 30.属于工程项目建设总进度计划的是工程项目进度计划表 P153× 31.投机风险即造成损失也可能创造额外收益P58 32.不能作为索赔证据资料的是监理工程师施工建议P232 33.施工阶段质量控制是工程项目全过程质量控制的关键环节,其中事后控制为重点控制。P182× 的意思是计划工作预算费用P179× 35.项目只有一个最终目标,即效益目标P8 36.风险预测图中,横坐标表示风险的种类P66× 37.不属于资格审查的要素:没有被行政处罚P39

工程建设项目管理程序文件

目录 第一部分工程项目建设管理机构及权力、职责--------------------------------------- 6 (一)工程项目组织机构--------------------------------------------------------------- 6 (三)监理组织机构 ------------------------------------------------------------------- 7 (一)建设单位的权力-------------------------------------------------------------------- 7 (三)监理单位权力---------------------------------------------------------------------- 8 (一)建设单位的职责-------------------------------------------------------------------- 9 (三)监理单位职责--------------------------------------------------------------------- 10 第二部分工程建设项目流程----------------------------------------------------- 12 (一)基本流程 ------------------------------------------------------------------------- 12 (三)建设项目设计阶段工作流程 ------------------------------------------------------- 15 二、工程建设项目管理流程 ------------------------------------------------------------ 19 (二)招投标基本流程------------------------------------------------------------------- 20 (四)施工准备流程--------------------------------------------------------------------- 24 (六)竣工验收流程--------------------------------------------------------------------- 30

英文版罗斯公司理财习题答案

CHAPTER 8 MAKING CAPITAL INVESTMENT DECISIONS Answers to Concepts Review and Critical Thinking Questions 1. In this context, an opportunity cost refers to the value of an asset or other input that will be used in a project. The relevant cost is what the asset or input is actually worth today, not, for example, what it cost to acquire. 2. a.Yes, the reduction in the sales of the company’s other products, referred to as erosion, and should be treated as an incremental cash flow. These lost sales are included because they are a cost (a revenue reduction) that the firm must bear if it chooses to produce the new product. b. Yes, expenditures on plant and equipment should be treated as incremental cash flows. These are costs of the new product line. However, if these expenditures have already occurred, they are sunk costs and are not included as incremental cash flows. c. No, the research and development costs should not be treated as incremental cash flows. The costs of research and development undertaken on the product during the past 3 years are sunk costs and should not be included in the evaluation of the project. Decisions made and costs incurred in the past cannot be changed. They should not affect the decision to accept or reject the project. d. Yes, the annual depreciation expense should be treated as an incremental cash flow. Depreciation expense must be taken into account when calculating the cash flows related to a given project. While depreciation is not a cash expense that directly affects c ash flow, it decreases a firm’s net

广东省自学考试06087工程项目管理课程考试大纲汇编

广东省高等教育自学考试 《工程项目管理》(课程代码:06087)课程考试大纲 目录 一、课程性质与设置目的 二、课程内容和考核目标 第1章工程项目管理概论 1.1项目 1.2工程项目 1.3工程项目管理 1.4工程项目管理的原则与模式 1.5工程项目管理的发展趋势 第2章工程项目的组织管理 2.1工程项目组织管理概述 2.2工程项目的组织结构 2.3工程项目经理 第3章工程项目前期决策管理 3.1工程项目前期策划 3.2工程项目建议书 3.3工程项目可行性研究 3.4工程项目管理规划 第4章工程项目目标控制 4.1工程项目进度控制 4.2工程项目成本控制 4.3工程项目质量控制 第5章工程项目合同管理 5.1工程项目合同管理概述 5.2工程项目施工合同订立与管理 5.3工程项目施工索赔管理 5.4FIDIC合同条件下的施工管理 第6章工程项目生产要素管理 6.1工程项目生产要素管理概述

6.2工程项目人力资源管理 6.3工程项目材料管理 6.4工程项目机械设备管理 6.5工程项目技术管理 6.6工程项目资金管理 第7章工程项目风险管理 7.1工程项目风险管理概述 7.2工程项目风险识别 7.3工程项目风险评估 7.4风险应对与监控 第8章工程项目职业健康、安全与环境管理8.1工程项目职业健康安全与环境管理 8.2工程项目安全生产管理 8.3工程项目环境管理 第9章工程项目信息管理 9.1概述 9.2工程项目管理信息系统 9.3工程项目技术文件档案管理 9.4项目管理软件 第10章工程项目后期管理 10.1工程项目竣工验收 10.2工程项目竣工结算 10.3工程项目产品回访与保修 10.4工程项目考核评价 三、关于大纲的说明与考核实施要求 附录:题型举例

数据库技术在工程建设项目管理中的应用

数据库技术在工程建设项目管理中的应用 发表时间:2016-06-14T14:10:16.730Z 来源:《工程建设标准化》2016年4月总第209期作者:蒋勇[导读] 在实际项目管理过程中,空间信息采用此项目位置进行表示,与此同时还能够包括此项目图片以及其他相关信息。蒋勇 (贵阳铝镁设计研究院有限公司) 【摘要】随着我国科技不断的发展,信息技术不断发展。为了提高建筑工程的建设效率,可以引用信息技术进行管理,从而保证建设任务的顺利开展。本文以数据库技术在工程建设项目管理中的应用进行了分析,并且以工程物资招标采购中的应用为例进行阐述。 【关键词】数据库;工程建设;项目管理 1、数据库技术概述 1.1技术类型 1.1.1地理信息技术 所谓的地理信息技术是指信息的空间分布,表示地表面物质以及环境的数量、质量、分布、关联以及规则的数字、文字、图形、图像等的总体概括。在实际项目管理过程中,空间信息采用此项目位置进行表示,与此同时还能够包括此项目图片以及其他相关信息。 1.1.2数据库技术 所谓的数据库技术指的就是Access数据库,它主要是以JET为引擎的三维桌面系统数据库系统,它具有操作简单方便,工作界面明了、便于工作人员掌握等特点,因此,就成为了许多小型数据的首选数据库。 1.2数据库技术的管理功能 1.2.1项目信息的导入及修改 每一项的信息到数据库中必须到友好界面进行信息的输入,在实际的输入过程中必须要保证数据和信息的准确性、可靠性这样才能确保使用效果,同时,也可以根据情况的变化及时的对数据进行模仿和修改。 1.2.2数据信息的查询功能 数据库技术中以项目为主的查询称作查询项目;查询项目过程是、在数据库中搜索出所有满足用户指定条件的项目,并将所有查询结果显示给用户。项目信息中的大多数的信息可以作为相关的查询条件。 1.2.3数据信息的统计 在实际工作中,项目统计工作主要是通过系统所提供的用户界面,然后以查询结果报告的形式展现给用户,能够为用户的相关生产管理以及经营决策提供重要的信息基础。 1.2.4相关的数据信息录入以及替换 在实际的工程中,相关数据涉及多个输入,或遵循全新的微机路径,或遵循相关的手动路径。如果接受了手动输入的路径,它就很难避免错误的出现,通常来说,在数据输入时,要确相关数据的可靠性;不能出现偏差值的输入,这样严重影响了工程的发展;在工作过程中如果发现这一类信息数据库出现错误,可以通过相关的措施,并且将他们取代。 2、数据库技术在工程建设项目管理中的应用——以工程物资招标采购中数据库的应用为例 2.1历史采购数据挖掘和诊断 招标采购业务流程中,涉及需求预测、计划申报、招标采购、专家管理、供应商管理等不同业务环节,每项关键业务环节都有丰富的数据信息,这为数据分析提供了基础。将所有历史采购数据进行汇总、梳理,站在物资供应链条的高度,将零散杂乱的字段归类整理成若干类别。在数据整合分类的基础上,对数据质量进行分析。通过资料分析、访谈调研、问卷调查多种途径,了解招标采购管理人员对于数据库分析方向的潜在业务需求,为数据库应用点的提出建立基础。 2.2数据库在招标采购业务中的应用 结合招标采购业务特点,甄选相关数据库应用点,在招标采购业务场景中进行串联,随业务流程进行场景化应用,进而提高招标采购业务管理水平。结合调研访谈、问卷调查结果,招标采购业务流程共包括物资分析、招标分析、供应商分析、专家分析4 个分析范畴,甄选出14 个数据库应用点,分为事前和事后两个时间阶段,具体见图1。

06087工程项目管理(杨小庄编)总复习

工程项目管理(四川自考版) 第一章工程项目管理概论 1-1项目和工程 项目:具有独特的过程,有开始和结束的日期,由一系列相互协调和受控的活动组成。过程的实施是为了达到规定的目标,包括满足时间·费用·资源等约束条件 项目的特性:一次性;目标性;约束性;寿命周期性;多活动性 项目的特点:目的性;寿命周期性;依赖性;独特性;冲突性 工程项目:是一项固定资产投资的经济活动,他是最为常见的的项目类型。工程项目 时只需要一定量的投资,经过策划·设计和施工等一系列活动,在一定资源约束条件下,以形成固定资产为确定目标的一次性活动 工程项目的基本特征:工程项目的一次性;工程项目的目标性;工程项目的约束性; 工程项目的寿命周期性;工程项目由活动构成 工程项目的其他特征:投资大,建设周期长,不确定因素多,风险大,参与人员多。 工程项目类型:(1)按功能划分:住宅建筑,公用性建筑,工业建筑,基础设施(2)根据任务不同划分:工程项目,工程承包项目,工程勘察设计项目,工程监理项目 工程项目的组成:单项工程(指具有独立的设计文件,竣工后可以独立发挥生产能力 或效益的工程。例如一座工厂的主要车间·辅助车间·办公楼和住宅等),单位工程(单位工程是单项工程的组成部分,可以独立施工,但施工后不能独立发挥生产能力的和 效益的工程。例如一个车间主要有建筑工程,管道安装工程,设备安装工程等单位工 程组成),分部工程(分项工程一般是根据单位工程的部位·构建性质及其他材料或设 备种类等的不同而划分的工程。例如土石方工程·砌筑工程·钢混工程等),分项工程(分项工程一般是按分项工程的施工方法·使用材料·结构构件的不同而划分的。例如挖土·混凝土垫层·回填土等)。 1-2项目管理与工程项目管理项目管 项目管理:是通过项目经理和项目组织的努力,运用系统理论和方法对项目及其资源 进行计划·协调·组织·和控制,旨在实现项目特定目标的管理体系。

数据建模项目管理数据库设计报告

数据建模

数据库设计——项目管理 1.逻辑数据库设计 1.1 项目管理 1.1.1 数据需求 1.顾问公司 一个顾问公司有很多需要管理的项目。 2.项目 每个项目的详细信息包括项目编号、项目名称、计划开始日期、计划截止日期、实际开始日期、实际截止日期、工程计划费用、工程实际费用、客户编号、经理员工号。每个项目有一个用户和一个经理。在整个项目中,项目编号是唯一的。 3.客户 客户信息包括客户编号、客户姓名、客户地址(由城市、街道、州和邮政编码组成)、客户电话号、客户传真号、客户网址、联系人姓名、联系人电话、联系人传真号。其中客户编号唯一。 4.工作包 工作包信息包括工作包编号、计划开始日期、计划截止日期、实际开始日期、实际截止日期、工程计划费用、项目实际费用、项目号。其中,工作包编号是唯一的。 5.员工 员工中每个成员的详细信息包括员工号、角色开始日期、姓名、地址(街区、城市、州、邮编)、工作电话号码、家庭电话号码、传真号、职位、性别、薪水、入职日期、角色号。在整个项目中,员工号是唯一的。员工包括经理、普通员工。 6.角色 角色由角色编号、角色描述、单价。其中,角色编号唯一。 7.文档 文档编号、文档题目、文档日期、版本号、工作包号、撰写员工号。其中文档编号唯一。

8.文档作者 撰写文档的员工包括文档号和员工号。其中文档号和员工号唯一。 9.费用 费用包含信息为费用编号、支出日期、费用描述、花费金额、工作包号、员工号、费用类型号。其中费用编号为主键。 10. 费用类型 费用类型包含信息为费用类型号、费用类型描述。其中,费用类型号是唯一的。 11. 时间 时间信息包含信息为工作包号、员工号、开始工作时间、结束工作时间、工作时间。其中工作包号和员工号唯一。 12. 经理 是员工种类的一种,管理项目,下属很多员工。包含信息为员工号、姓名、地址(街区、城市、州、邮编)、工作电话号码、家庭电话号码、传真号、职位、性别、薪水、入职日期。在整个业务中,员工号是唯一的。 1.1.2 事务需求 1.数据库应该支持下述事务 (a) 创建和维护记录各项目的详细信息和每个员工的记录。 (b) 创建和维护记录客户的详细信息和记录。 (c) 创建和维护员工的详细信息。 (d) 创建和维护记录文档的详细信息和详细记录。 (e) 创建和维护记录角色的信息。 (f) 创建和维护记录工作包的详细信息。 (g) 创建和维护记录费用类型的信息。 (h) 创建和维护记录文档作者的详细信息和详细记录。 2.数据应该能够支持下述查询事务 (a) 以表单形式列出项目名字、经理名字、客户号、客户电话,按项目编码排序。