冷库建设节能措施

冷库建设节能措施
冷库建设节能措施

常规冷库建设节能措施浅析

段宗科

摘要:随着冷藏技术的不断发展,冷库容量的迅速扩大,如何高效低能冷藏保鲜已成为制约冷库发展的瓶颈。本文针对如何配置适宜的换热系统,如何提高换热系统的冷藏效率,如何降低冷藏过程中的冷损失等问题,通过技术措施对冷库建设提出了合理化建议。

关键词:冷库、冷藏技术、节能措施、设备配置

Abstract: With the development of refrigeration technology, cold storage capacity expands very rapidly. How can we achieve high-effect and low-energy refrigeration? It has become the bottleneck of the development of cold storage. In this paper, I mainly talk about how to configure the appropriate heat transfer system, how to improve the heat transfer efficiency of refrigeration system and how to reduce the storage in the peocess of cold loss problems. I put forward some rational suggestions on refrigeration storage construction through technical measures.

Key words: refrigeration storage, refrigeration technnology, energy saving measures, device configration

1.引言

冷库是通过制冷设施的热交换,使该空间内的冷藏食品保持稳定低温以达到保鲜或冷藏的仓储系统。食品保鲜或保鲜主要凭借食品冷藏链,将易腐肉类、水产品、果蔬等通过预冷、加工、贮存和冷藏运输,最大限度的保持原有食品的色泽、营养成分及口感,达到食品保

质保鲜,延长食品保存期的目的,起到调剂淡、旺季市场的需求并减少生产与销售过程中经济损耗的作用。

随着人民生活水平的提高,人们对保鲜食品的需求也必将不断增强,截止目前,我国现有冷冻冷藏能力已达900 多万吨,年耗电约35.8万度,与国外同等冷藏量耗能相比,能耗较大,约为日本平均水平的2.5倍,英国平均水平的2倍。当代社会,低碳经济是追求目标,因此,最大限度的做好冷库的节能工作,是行业可持续发展的迫切需要,也是大力发展“资源节约型和环境友好型社会”的基石。鉴于现状,针对冷库存在的耗能高、换热系统配置不合理、运行不协调、管理不科学等问题,切实做好冷库节能工作已是发展之根本。

2.冷库耗能现状

全国现有冷库中,多数冷库仍采用以氨为制冷剂的集中式制冷系统,冷却效果差、生产管理混乱、设备技术陈旧、自动化程度比较低、能耗效率相对低下;同时在地基处理方面也存在严重的缺陷,通过地下换热的方式带走了近22%的能量。我国现有冷库耗能如表1所示。

冷藏库耗电量对比

表1 单位(Kwh/m3.y)

由上表可以看出:我国冷藏企业总体耗电量比较大,全国平均水平远高于国外同行业平均水平,如我国冷藏耗电量全国平均为131

KW h /m3 ? y,是英国平均水平的2 倍多,是日本平均水平的2.5 倍左右,即使是我国冷藏行业比较发达的上海,比国外同行业也仍然存在很大的差别,如上海冷藏企业耗电量平均水平为76 KWh /m3? y,是英国先进水平的4.7 倍左右,日本的2.4 倍左右。

3.冷库建设技术节能措施

⑴配置合理的换热系统

换热系统是冷库的主要耗能系统,主要是由压缩机、冷凝器、空气冷却器及贮液罐等组成。冷库冷藏效果如何,主要表现在对其的选型与配置,尤其是压缩机和冷凝器。

①压缩机的选型与配置技术

压缩机是换热系统的核心部件之一,在冷库设计时往往采用最大负荷来进行压缩机的选型,根据负荷合理调整压缩机的台数或减少压缩机的工作缸数,使系统负荷和压缩机冷量相匹配,防止“大马拉小车”的现象,增加能耗。

在压缩机的选型与配置过程中,尽量选择“1+1”的匹配模式,即用一台较大压缩机配一台小压缩机的模式或者配套两台同等负荷的压缩机,使其均处于最佳运行状态,而非满负荷状态。压缩机的选型应根据实际制冷效果和制冷量大小来确定,压缩机的选型主要依据压缩比、排气量。一般情况下压缩机的压缩比为3.2-3.4,压缩机的级数由压缩效果的能效性确定,一般情况为4-6级。选择空压机的气量要和所需的排气量相匹配,并留有 10%左右的余量。如果用气量大而空压机排气量小,会造成空压机排气压力的大大降低,而不能驱

动风动工具。排气量越大压缩机配的电机越大,不但价格高,而且浪费购置资金,使用时也会浪费电力能源。

②冷凝器的选型与配置技术

目前,国外应用最多冷凝器是蒸发式冷凝器,它具有换热速度快、换热完全、喷淋装置无堵塞等特性,它省去了冷却塔和水泵及循环水池的投资,冷却水流量仅为水冷式冷凝器的1/10,节能效果显著。在常规冷库的建设过程中,应尽量选择主流蒸发式冷凝器,不仅能充分利用外部自然条件实现制冷剂的制冷,同时对降低企业生产成本既有积极的意义。

蒸发式冷凝器的选型方法目前常用的有单位面积冷负荷估算法

与概算-校核法。单位面积冷负荷估算法即先粗选一个冷凝热流密度值, 后再计算冷凝面积, 根据计算结果选择冷凝器的型号及台数。概算-校核法的计算步骤为: (1) 粗估热流密度值,计算冷凝面积; (2) 设计冷凝器盘管的结构,按标准选择配风量与配水量; (3) 按设计的空气参数求出进口空气的焓值,再根据空气流量、冷凝负荷计算出口空气的焓值;(4)计算管内冷凝放热系数、水膜换热系数、水膜表面与湿空气热质当量换热系数, 然后选取各层导热的热阻;(5) 计算传热系数、对数平均温差及所需的冷凝面积。如果计算的结果与预估不符, 再假设热流密度, 直至两者相等为止。

⑵采取地基隔热处理措施

地基隔热处理措施是指针对不同地域的冷库因不同季节地表温

度与库内温度存在的温差,为防止此温差引起的能源浪费而采取的一

系列地基处理措施。它包含特制沙层、隔热层、通气管层及地表层。经过隔热处理后的地基与简单处理的地基相比,相同条件下的能耗前者只是后者的1/4~1/5。在地基隔热处理措施中,最为重要的是隔热层和通气管层的设计,在隔热层设计中需选择适宜的聚高弹性的隔热材料,并运用整体链接技术,使整个冷库地基实现防潮、防震、防局部温变的目的。在通气管道的设计中应注意横向、纵向管道全部联通并在各个方向上的通风措施建设,在通风管道端头还应设置必要的防护网,避免小动物在其内部搭窝而堵塞通风。

⑶围护结构采用节能型隔热层厚度

围护结构、隔热层的传热量占冷库总热负荷的20%-35%,所以减少围护结构的热负荷可以达到节能的目的。围护结构得热量Q1= KA (T W-T F)n ,从传热公式可知,传热量与三个因素有关,即传热面积A (m)、传热系数K(W/K·℃)和传热温差ΔT (℃)。传热温差与库外环境温度和贮藏食品所需要的库内温度有关,传热系数主要由围护结构内外壁面的对流换热系数及围护结构热阻构成,围护结构热负荷与保温层厚度成反比,适当增加保温层厚度将有效降低能源损失,减少冷库的运行费用。

⑷提高蒸发温度

适当提高蒸发温度,能缩小传热温差,减少压缩机的功率消耗,提高产冷量,有资料显示,对于压缩机,蒸发温度每升高1℃,每千瓦电机每小时的产冷量将提高2.4%左右,一般制冷装置都是按满负荷条件下设计的,但在实际运行中很多情况不是满负荷运行,所以在

制冷量减少时,提高蒸发温度,即减少传热温差,同样可以达到降温的效果。

⑸减少通过冷藏门的热湿空气浸入

冷库门的开闭将会引起很大的冷量散失,冷藏门的性能不良可能使能耗增加15%或者更多。若不及时关闭冷库门,导致大量的热空气进入冷库,热湿空气的结合容易在冷风机和蒸发器表面结霜,并且还会打破冷库温度场的平衡,加重制冷机组的负担。

减少冷库门的冷损耗应该注意以下几方面:

①设计时应尽量减小冷库门的面积,特别注意降低冷库门高度,研究证明,冷库门高度方向的跑冷要比宽度方向大的多;

②增加风幕阻止冷库冷损耗,并且做到风幕与冷库门的智能化,即伴随着冷库门开闭的同时启动和关闭风幕。

⑹采取智能控制系统,充分利用自然温差

我国昼夜温差大,据统计,冷凝温度每下降1℃,可减少压缩机功耗1.5%, 单位轴功率制冷量将提高2.6%左右。夜间环境温度低,冷凝温度也将会下降,据统计,海洋性气候地区昼夜温差可达到6~10℃,大陆性气候昼夜温差可达10~15℃,南方地区昼夜温差可达到8~12℃,所以增加夜间开机时间,有利于冷库节能。

我国是耗能大国,在国民经济高速发展的今天,大力推广节能技术,普遍采取节能措施是实现全面协调可持续发展的重要举措之一。本文通过对冷库现状分析,针对高耗能的工序提出具体的技术节能措施。低温保鲜储藏是未来的发展方向,推广冷库的节能措施也是必然

趋势。

参考文献

[1] 谢如鹤. 我国冷藏食品运输现状. 观点与角度2005(1):40~41.

[2] 刘斌,杨昭, 谭晶莹,等. 围护结构特性对微型冷库降温性能影响的研究.农业工程学报,2005:235-237.

[3] 喻建华.冷库节能的点滴看法.制冷学报,1981(2):67-70.

[4] 陆紫生.自动化冷库监测及故障诊断专家系统的研究.大连.大连海事学院.2004年3月.

[5] 林桂煌.制冷系统的冷凝压力与能耗关系浅说.冷藏技术,1994(4):22-24

[6]薛福连. 冷库的节能途径和方法. 冷藏技术,1998(4) :17~191.

[7]徐德胜.初级制冷设备维修工应知应会问答,上海交通大学出版社

企业节能降耗方案

企业节能降耗方案 篇一:公司节能降耗措施 **公司节能降耗措施 一、公司上下大力开展节能降耗宣传活动,通过大力加强宣传教育工作,营造“人人讲节约、事事讲节约、时时讲节约”的良好氛围。号召全体职工厉行节约,开展“四个一”(节约一度电、一滴水、一升油、一张纸)、提合理化建议、与经济挂钩,落实奖罚制度,使节能降耗工作力度得到提升。 二、严格控制办公楼的用电,白天必须关闭照明灯,不使用电脑时及时关闭电源,下班后各部室负责人要仔细检查电脑、饮水机、照明灯等电器设备是否断电。 三、加强宿舍管理,将各房间的电表接通并每月对各房间的用电情况进行监控,严禁私接电源和使用电器,有特殊情况需用电器的,需报物业部备案并上报公司领导批准。 四:建立成本管理保障措施。由集团财务部、物业部牵头按照有利于成本管理和生产、生活的需求,将生产和生活分离,分别进行核算和控制,保障成本管理与节能降耗的有效结合与约束。 五、合理有效管理会所、高尔夫的用水、用电。将会所接待、高尔夫草坪用水列入重点监控目标,凡有接待任务和草坪用水、电必须提前一天报物业部,原则上每月底25号——下月1号前高尔夫不得浇灌草坪和鱼池换水。 六、生产车间根据生产任务和峰、谷、平的用电时间段合理安排生产时间,有效降低生产成本。

七、物业部每周一、二必须对生产车间、会所、高尔夫、办公楼、宿舍楼以及园区水、电系统进行一次全面检查和巡视。及时发现故障和隐患,防止跑、冒、滴、漏等问题的发生。并作好巡视、检查记录。 八、加强员工食堂用的管理,教育员工节约用水、用电。九、中央空调系统在小负荷时采用“单冷冻-单冷却”的运行模式,降低空调系统电能的耗用。定期做好风机盘管过滤网、翅片的清洁、保养工作,降低耗电量。 十、各部、室、生产车间要指定专人负责节能降耗的工作,严格管理,真正使园区形成节能降耗的良好氛围。 篇二:公司节能降耗活动方案 第三XX花园管理处节能降耗活动的方案 为积极响应集团号召,充分利用现有资源,避免公司现有资源浪费流失,建设节约型企业;为贯彻集团董事局发出的“四大运动”的决定,使我处全体员工增强节约意识,杜绝浪费行为,养成一个勤俭节约的好习惯。我分处决定开展一次节能降耗活动。根据第三XX实际,特制定本方案。 一、组织机构 为了切实加强对节能降耗活动的有效实施,我分处特成立节能降耗活动领导小组。 组长: 副组长: 二、活动时间 2021年 6月1日——2021年 8 月31日 三活动具体内容及实施要求

冷库节能解决方案

冷库节能解决方案 各位领导: 大家好! 很荣幸能够今天和各位坐在一起,共同探讨关于冷库制冷系统的节能问题,我是烟台凝新制冷科技有限公司的郝涛,在此也对各位领导能在百忙之中光临本会场,表示衷心的感谢和热烈的欢迎! 我们大家都知道,随着经济的发展和人们生活质量的提高,环境污染问题、能源紧张问题和食品安全问题越来越引起世界各国人民的关注。制冷行业发展的趋势是节能、环保和安全。有关资料表明我国冷库年耗电量130KW/年.m3,而国外发达国家仅为我们的一半左右,随着冷链物流业和其他应用领域的迅速发展,需要制冷服务的行业越来越广泛,这就越发突显了节能降耗的重要性,相对于制冷行业,节能降耗在我国大有可为。 下面我们以冷库为例来具体分析一下,可能实现的节能措施。 要做一个合乎规范的成功的冷库工程,可能从土建开始,我们就需要配合用户,因为不是所有的冷库都经过设计院设计,有些用户就是自己找来建筑公司就进行施工,而建筑公司并不是专一的针对冷库建筑的,很多时候会按照土建的传统做法来施工,进而出现偏差。比如,目前的冷库建设过程中,屡屡会遇到地圈梁标高不合乎冷库要求,用户在需要保温的时候,只好砸碎冷库门的地圈梁。相信我们在座的各位领导有的也遇见过类似的情况。 我们从冷库的建设开始来看一下,从开始建设就需要注意的问题,本门学科也是制冷专业的一项专业基础课。

第一,冷库建筑 冷库是用隔热材料建筑的低温密闭式库房,所有的保温材料都具有相对的吸潮性,而保温材料一旦吸潮,它的传热系数会急剧增加,再加上水分可能会冻结,也就达不到原本的保温效果,许多年久失修的冷库就是这样。在建设一座冷库时,从地基开始,就要严格按照冷库建筑来进行,很多用户不重视地面的隔汽防潮层,比如许多果蔬类冷库的建设,除了气调库会做隔汽防潮层之外,很多冷风库就是简单的基础、保温层等。而实际上,以苹果库为例,在冷库使用的过程中,为了保证库内的相对湿度,其地面是长期积水的,试想如果没有良好的隔汽防潮层,地面的保温层就会很快失去作用,这种变化也往往容易被忽视,为了保持温度,我们的机器只有频繁开启,耗电量也就增加了。这在现实生活中处处可见,有的冷库业主埋怨用电多,也有的总是以为自己的机器不好,其实在这个时候,冷库是已经达到设计温度的,与压缩机是没有关系的。只是冷库温升的速度很快,相同的一个小低温库,有的5、6个小时才开一会机器,还有的最多一个小时就开机了。 另外一个建设过程的措施,就是墙壁的土建和保温,在这个过程中,我们工程公司也要注意到和土建的配合,土建工程的传统做法一般是先加盖屋顶后在屋里抹面,但这往往会耽误我们的保温以及安装工作,因为冷库的特殊性,加盖屋盖以后墙面很长时间也不会干透,直接影响下一步的工作。所以,一个有经验的安装公司就会提前告诉客户,让客户对土建方的施工组织进行改变。 有的客户对墙面不加处理就直接进行保温,也在一定程度上增加了冷热

冷库施工安全保证措施(通用版)

冷库施工安全保证措施(通用 版) Security technology is an industry that uses security technology to provide security services to society. Systematic design, service and management. ( 安全管理 ) 单位:______________________ 姓名:______________________ 日期:______________________ 编号:AQ-SN-0268

冷库施工安全保证措施(通用版) 为了加强施工安全管理、维护人身和财产的安全,保障工程施工顺利进行,在施工中必须严格执行有关文明施工安全标准化现场管理规定户按双标化要求组织施工,牢固树立安全文明施工意识,确保本工程安全目标的实现,杜绝安全事故发生。 第一节、建立安全生产管理体系 第二节、安全生产保证措施: 安全生产工作贯彻“安全第一、预防为主”的方针,坚持管生产必须管安全的原则。 1、项目部设专职安全员1名,专职安全员持证上岗,按规定独立行使安全监督检查权利。 2、建立员工安全教育培训制度,经安全教育、培训的员工资料由公司人事教育部门存档,进入计算机备查,未经安全教育、培训

的员工不得上岗作业,特种作业人员应经劳动行政主管部门培训考核,取得职业资格证书方可上岗作业。 3、严格执行安全生产‘六大纪律、十个不准‘,以及消防安全有关条例,制定安全生产责任制,层层签订安全生产责任合同。 4、项目部门坚持每周一班前半小时安全会,教育施工人员遵守施工安全技术标准、操作规程,提高自我保护意识。建立安全台帐,施工现场实行安全标准化管理。 5、健全安全交底制度。各分项工程施工前实行逐级安全、消防技术交底,并不定期地向相关班组长进行交叉作业的安全交底,履行签字手续。特别在施工中采用新工艺、新材料、新结构时应在技术交底中明确保障施工作业人员安全、健康的措施和注意事项。 6、对起重吊装有合理的施工方案,方案应由技术部门审批后执行。起重设备投入使用前,必须经本公司安全部门验收合格。 7、由项目部门设备员对施工安全设施、施工机具、设备定期检查和保养,认真填写设备维修、保养记录,保证施工机具设备的完好有效。

2020年节能降耗工作计划

2020年节能降耗工作计划 导读:范文 2020年节能降耗工作计划 【范文一:乡镇节能降耗工作计划】 为全面实施节能减排工作,建立资源节约型单位,增强广大干部职工的节能意识,加快推进节约型社会建设,根据《中华人民共和国节约能源法》和《公共机构节能条例》,按照相关要求,结合我镇实际情况,制定本工作计划。 一、指导思想 以科学发展观为指导,全面推进节约型机关建设,突出抓好用水、用电、办公用品、公务接待和公务用车等节能工作,引导全员牢固树立资源忧患意识、节约意识和责任意识,反对铺张浪费,从自身做起,从点滴做起,形成崇尚节俭、合理消费的机关文化,以全面节约为重点,建立长效管理机制,扎实推进节能减排工作。 二、加强组织领导,建立长效机制 成立我镇公共机构节能工作领导小组,切实加强对本单位节能工作的组织领导,组长由汪洪军镇长担任,副组长由李鑫副镇长担任。

领导小组下设办公室,主任由赵林担任,建立相应的工作机制,负责我镇日常公共机构节能工作。 三、工作原则 坚持四项原则:一是确保工作有序开展与勤俭节约并行的原则;二是倡导公共节约与自我节俭并进的原则;三是强化节约意识与掌握节约基本知识并重的原则;四是从小处着眼、从小事做起的原则。 四、主要目标 以2015年为基数,全面完成我镇节能减排改造工作,做到办公耗材、办公接待、公务用车等用电、用水、用油比重在去年的基础上有所降低,并对好做法加以总结推广。 五、主要措施 建立健全各项工作制度,形成资源节约的长效机制 1、结合实际制定节能规划和节能方案。 2、建立健全节能降耗督导检查制度和公开通报制度,定期检查

节能降耗工作落实情况。 3、建立健全资源能源消耗的统计报告制度,客观全面反映资源能源消耗的实际情况和节能降耗工作的实际效果。 加强日常管理,认真做好节能降耗工作的每一个环节 1、节约用电。房间、走廊、过道、洗手间、楼梯口等地段照明设备尽量选择安装节能灯泡,设有专人管理,防止“长明灯”现象发生;按规定合理使用空调设备,提倡少开空调,温度设定夏季不应低于26摄氏度,冬季原则不开空调;减少和避免计算机、复印机、打印机、饮水机等设备处于长时间待机状态。 2、节约开支。根据工作需要,严格控制文件印刷数量,直接在电子文本上修改文稿;若需打印,提倡双面用纸,注重信封、复印纸再利用,尽可能降低纸张消耗,减少一次性笔的用量;实行办公自动化、无纸化,能上网联络的不传真,能行文的不开会,控制压缩会议数量和规模。 3、节约用水。加强用水设备的日常维护和管理,杜绝跑冒滴漏、长流水现象;推行使用节能型水阀和卫生洁具;节约绿化用水;个人要养成良好的用水习惯,随手拧紧水龙头。

冷库节能设计方案

冷库节能设计方案 冷库节能主动控制具体项目的计划和实施协作一个具体项目节能主动控制的实施进程一般是通过计划、设备调试、试工作、效果查 核并修正,直至契合计划恳求抵达节能目的为至.当项目恳求内容有 所变比时,可随时修正並满足恳求.冷库的节能一般需要通领先的制 冷改备、适宜的系统匹配、灵话的应变方法和严峻的工作处理得以 实施,医药冷库这就需要制冷技术人员在优化制冷技术计划的基础上,了解节能需要、结合本项目特征,计划出完好的冷库节能主动控制流程图.依据自控流程图,电气自控技术人员才华结束其电气自控计划,一同还能运用其专业知识,使自控流程更为简化和优化.冷库节能是 冷库主动控制首要构成有些,凡冷库主动控制均由制冷和电气两有些内容构成,只要在两方面技术人员的共同努力下才华使冷库主动控制行之有效並使冷库节能落到实处.冷库节能主动控制的试工作也是非常首要的一环,在试工作中应和运用单位和专业厂商坚持密切联系, 与运用单位评论工作效果,与专业厂商参议修正方法.冷库节能主动 控制的若干做法和幻想节能是冷库主动控制的目的之一.对于库房温度和蒸发温度调度多点温度参数的库房温度调度冷库设计以往库房 温度调度以位式调度为主,对蒸发温度一般不作调度,很难抵达好的 节能效果.库房温度志向的控制方法是以库房的平均温度、冷风机的进风及其出风温度为输入参数,编制恰当的控制程序,通过plc进行 调度.如此温库调度可以抵达节能的恳求,也能满足某些库房高精度 温度调度的需要,如今己可抵达0.250c的精度恳求,节能约10%.減少不一样蒸发温度冷间的並联工作由于同一系统的制冷压缩机只能 在同一个蒸发温度下工作,所以不一样蒸发温度的冷间假设并联工作,对于相对蒸发温度较高的冷间就处于不节能的工作情况,该冷间热负荷越高就越不节能.应当尽量避免这种情况的呈现.冷库设计的氟利

冷库工程施工设计方案

第一章编制说明及依据 根据施工合同中质量、工期、安全、经济等要求,编制本工程施工组织设计。 本施工组织设计的主要容包括: 1、阐述说明各分部分项工程的施工方法、主要材料、施工机械设备、劳动力、材料采购、运输、使用、计划安排; 2、结合现场实际情况提出切实可行的工程质量、安全生产、文明施工、工程进度等技术组织措施; 3、同时对关键工序、复杂环节重点提出相应的技术措施,如: ○1高支模施工;本工程每层设计层高均超过4.5m,层层均属高支模; ○2超长混凝土结构施工; ○3如何组织协调多专业、多工种交叉作业的施工; ○4工期特别紧,缩短工期技术措施; ○5雨季施工技术措施、减少扰民噪音、降低环境污染技术措施等。 第一节编制说明 本施工组织设计主要根据国贸易工程设计研究院设计的“中粮()食品物流园新建冷库一、冷库二工程”施工图、我司与中粮集团签定的施工合同及相关的设计技术文件、规等进行编制。本施工组织设计文件编制所涉及的文件资料: 1、“中粮集团()”与我司签定的施工合同。 2、国贸易工程设计研究院设计的“中粮()食品物流园新建冷库一、冷库二工程”施工图。。。。。。。。。 4、我局QEHS质量体系文件(质量手册、程序文件、作业指导书等)。 5、国家及省市现行有关规、规定和标准。 6、根据工程特点、施工现场实际情况、施工环境、施工条件和自然条件的分析。

7、本公司现有的劳动力、技术、机械设备能力和施工管理经验。 第二节编制依据 根据设计施工图纸和技术文件要求,本工程在施工及竣工验收中应遵守国家现行有关规程和规,必须达到国家及省、市行业的有关法规、规的要求: 1、中华人民国建筑法; 2、中华人民国合同法; 3、冷藏库建筑工程施工及验收规(SBJ11-2000) 4、建筑结构制图标准(GB/T50105—2001); 5、建筑结构荷载规(GB50009—2001); 6、建筑桩基技术规(JGJ94—94); 7、地下工程防水技术规(GB50108—2001); 8、建筑工程抗震设防分类标准(GB50223-2004) 9、砼结构工程施工质量验收规(GB50204—2002); 10、钢筋机械连接通用技术规程(JGJ107—96); 11、钢筋焊接及验收规(JGJ18—96); 12、建设工程质量管理条例,国务院令第279号; 13、市经济特区建设工程施工安全条例; 14、建筑工程施工质量验收统一标准(GBJ50300—2001); 15、工程测量规(GBJ50026—93); 16、屋面工程技术规(GB50207—2002); 17、建筑地基基础工程施工质量验收规(GB50202—2002); 18、建筑地面工程施工及验收规(GB50209—2002); 19、混凝土结构工程施工质量验收规(GB50204—2002); 20、蒸压加气混凝土砌块(GB/T11968—1997); 21、建筑装饰装修工程质量验收规(GB50210—2001); 22、塑料门窗安装及验收规程(JGJ103—96); 23、建筑施工扣件式钢管脚手架安全技术规(JGJ130—2001); 24、砌体工程施工质量验收规(GB50203-2002)

节能降耗方案(精选10篇)

节能降耗方案(一): 为用心响应市建委下达的节能降耗文件精神,更好的做好节能降耗工作,我公司以培养意识,严格管理为首要原则,围绕我公司节能降耗总体目标,结合公司实际,特制定年度节能降耗工作计划 1、定期对公司内用水、用电、用油、办公耗材、技术改造等方面的节能降耗工作进行考核总结,节能降耗年度工作计划。继续推进有效的节能措施,对不完善的地方要进行改善,对疏忽的地方要强化管理,为以后节能工作更好的开展带给可靠依据。 2、为了更好的落实各类节能降耗措施、满足能源管理方针,成立节能降耗工作领导小组,落实、检查节能降耗工作开展状况,并进行指导监督,以全面完善、推进节能降耗管理工作迈上新的台阶。 3、修订节能管理制度。为了使节能降耗工作真正落到实处,根据我公司的生产经营现状,进一步修订各类节能管理办法,对其进行梳理,使节能措施更贴合我公司实际状况,确保节能措施执行到位。 5、抓好节能监察和监控。透过限制消耗定额,对水、电、油、车、办公耗材等方面严格执行管理办法和节约措施。加强可用资源重复的利用。 6、根据公司部要求,利用空余时间,组织员工进行学习、讨论,不断强化员工的节能意识。 7、加强班组学习,并鼓励广大职工利用自我的聪明才智为我公司节能降耗工作献计献策活动,结合本公司特点,对节能降耗工作提出合理化推荐。 8、开展节能降耗讲座、培训,让在节能工作中有突出表现的员工或生产专业技术人员,组织相关的节能技术、节能优秀事迹讲座,并组织交流。 9、建立节能目标和评价考核制度,将节能降耗的目标任务细化分解到班、组、个人,重点能耗岗位,签订职责书,严格进行考核。 10、用心挖掘身边节能降耗的典型员工、典型事例。对平时在节能降耗方面有突出贡献的员工、项目、以及节能降耗工作较突出的事迹,进行发掘,在公司内进行宣传。

冷库建设实施方案

冷库建设项目 实施方案 项目名称: 项目单位: 责负人:联系电话:编制日期: 目录 一、基本情况 ...................................................... - 2 - (一)地理环境 ................................................. - 2 - (二)土地资源 ................................................. - 2 - (三)气候特点 ................................................. - 2 - (四)人口与经济情况 .............................. 错误!未定义书签。(五)现有产业及产业支撑情况 ................................... - 3 - 二、项目建设背景 .................................................. - 3

- 三、项目提出的必要性、可行性分析 .................................. - 4 - (一)项目建设的必要性 ......................................... - 4 - (二)项目建设的可行性 ......................................... - 5 - 四、建设地点与规模 ................................................ - 7 - (一)项目建设地点 ............................................. - 7 - (二)项目用地性质 ............................................. - 7 - (三)规模 ..................................................... - 7 - 五、项目建设内容 .................................................. - 7 - (一)技术方案 ................................................. - 7 - (二)建设标准 ................................................. - 9 - (三)建设内容 ................................................. - 9 - 六、资金筹措方案 ................................................. - 10 - 七、项目进度安排 ................................................. - 10 - 八、组织管理和保障措施 ........................................... - 11 - (一)加强项目组织管理 ........................................ - 11 - (二)深入发动,形成合力 ...................................... - 12 - (三)强化标准,保证进度 ...................................... - 12 - (四)齐抓共管,搞好服务 ...................................... - 12 - (五)严格管理,严格奖惩 ...................................... - 12 - 九、效益分析 ..................................................... - 13 - (一)经济效益 ................................................ - 13 - (二)社会效益 ................................................ - 13 - (三)生态效益 ................................................ - 13 - 冷库建设项目实施方案 我社区围绕农业转型发展要求,在巩固提升粮食、经济作物

冷库施工方案

第一章编制依据 本施工方案编制依据: 1、国家现行冷库施工及验收规范。 2、类似工程的施工总结经验及技术成果和同行业技术标准。 3、有关国家方针、政策及省市有关地方性法规。 4、《建筑工程施工质量验收统一标准》(GB 50300-2001) 5、《建筑物隔热用硬质聚氨酯泡沫塑料》(GB10800—89) 现(QB/T3806 内容不变) 6、《建筑工程质量检验评定标准》(GBJ301-88) 7、《新型弹性氰凝》(Q/320801GZ011-2004) 8、相关保温作业技术规程 第二章工程概况 1、工程地点: 2 、工程内容: (1)库房聚氨酯喷涂保温; (2)一层地面保温; (3)保温隔气层防水涂料; 3、工期要求与规定: 根据招标文件要求,合同签订后具备施工调价之日起30 日内。 工程竣工,向建设单位提交竣工报告,由建设单位组织验收,验收时间不作 工期累计;工程验收合格,则提交竣工验收报告的当天即为竣工日期。 第三章施工条件 1、施工基面达到结构主体验收标准。 2、不宜在日平均大气气温10℃以下;空气湿度大于85%情况下喷涂作业; 3、保证生产用水、用电。

第四章施工机械、工具的选择和准备 我们选择气动聚氨酯发泡设备作为主施工设备。 聚氨酯泡沫散布系统,浇注或喷涂的最大输出量可达20 磅/分钟;该设备符合世界环保组织的要求,对于有氟无氟聚氨酯材料均能达到良好的喷涂效果。 我司在本项目施工投入 2 套以上喷涂设备。

第五章施工材料 1、硬泡聚氨酯是以组合聚醚和异氰酸酯为主要材料的双组份材料,通过专用进口设备喷涂而成,具有优异的保温性。采用现场喷涂施工,形成一 层连 续的低吸收 性的泡沫体,故防水性能也同样优良。硬泡聚氨酯在整个系统中是至关重要的, 不仅在产品的配方上要考虑到导热系数、吸水率等技术指标,更要在施工过程中 能掌握其发泡的平整度和厚度,所以对施工设备和施工人员有比较高的要求 。 喷涂聚氨酯保温材料性能指标 序号项目 指标 3 42-45 1 密度,kg/m 2 导热系数,W/(m·k)≤0.022 3 尺寸稳定性(70℃,48h)% ≤ 4 4 压缩强度(形变10%),kpa ≥250 5 吸水率,%≤ 3 6 离火自熄时间,s ≤ 2 2、氰凝性能指标 序号试验 项目指标要求 1 外观 甲组份:棕黄胶状液体乙组份:淡黄色或棕色液体 2 固体含量% ≧50 3 涂料干燥时间性h ≦8 4 不透水性0.3Mpa,30min 不透水 5 低温柔性无裂纹 6 潮湿基面施工性无起泡剥落现象 7 潮湿基面粘结强度Mpa ≧0.5 8 粘结强度Mpa ≧ 1.6 9 扯断伸长率% ≧50

节能降耗施工方案详细版

文件编号:GD/FS-9917 (解决方案范本系列) 节能降耗施工方案详细版 A Specific Measure To Solve A Certain Problem, The Process Includes Determining The Problem Object And Influence Scope, Analyzing The Problem, Cost Planning, And Finally Implementing. 编辑:_________________ 单位:_________________ 日期:_________________

节能降耗施工方案详细版 提示语:本解决方案文件适合使用于对某一问题,或行业提出的一个解决问题的具体措施,过程包含确定问题对象和影响范围,分析问题,提出解决问题的办法和建议,成本规划和可行性分析,最后执行。,文档所展示内容即为所得,可在下载完成后直接进行编辑。 1、工程概况 本工程总建筑面积34164.22平方米,其中地下建筑面积约为10877.08平方米,地上建筑面积约为22344.12平方米,共有1#、2#、3#楼及地下室组成。结构形式:地下室为2层框架结构。1#楼为5层框架结构。2#、3#楼为9层框架结构。 本工程外墙面共有干挂陶板、湿贴面砖、涂料墙面及玻璃幕墙四个装饰面,其中外墙面为干挂陶板位置处外墙采用混凝土加砌块,外墙为湿贴面砖及涂料墙面处采用小型混凝土空心砌块,内墙均用混凝土加气块(包括卫间砌体),砌筑砂浆采用M5混合砂浆。

2、节约型工地创建目标计划 2.1 本工程创建“西安市节约型达标工地”的目标; 2.2 节能降耗指标; 2.2.1万元产值节电控制指标值: 基础阶段:K企×Kd1×Kd2×Kd3=80×0.75×0.8×1=48 KW 结构阶段: K企×Kd1×Kd2×Kd3=80×0.75×1×1=60 KW 2.2.2 万元产值节水控制指标值: 基础阶段:K企×KS1×KS2×KS3=8×0.75×0.95×1.06=6m3 结构阶段:K企×KS1×KS2×KS3=8×0.75× 1.02×1.06=6.5m3 2.2.3 柴油节约率≥8%

冷库安全问题分析

冷库安全问题分析 文章来源:https://www.360docs.net/doc/359311137.html,/ershoulengku 截止到2004年底,全国31个省、市、自治区共有冷库近两万座冷藏总量约为880万吨(不包括贮冰库容量),其中冷却物冷藏量约为140万吨,冻结物冷藏量约为740万吨。按冷库冷藏容量,原国有企业的占总容量的2/3。按冷库数量,原国有与非国有的冷库数量约各占50%。原国有冷库以大中型冷库为主,库龄多在30年左右。非国有冷库则以中、小型为主,库龄多在10年以内。在东部沿海渔村中,在农产品加工较发达省份的乡、镇农村中,100吨上下的小型冷库更是星罗棋布,分布十分广泛。随着肉类工业快速发展,冷库数量和容量迅速增加,构造形式日趋多样性,在建设和管理中的安全问题已日趋尖锐,安全隐患普遍存在,事故频频发生,不仅对企业、行业造成相当的经济损失和人身安全侵害,而且往往因为涉及公共安全而引起全社会的密切关注。 肉类工业是食品工业的骨干,是关系国计民生的重要产业,对促进农牧业生产,发展农村经济,繁荣城乡市场和扩大对外贸易发挥着日益重要的作用。 肉类工业和所有的食品加工工业一样,都无一例外地广泛而深入地应用制冷技术,实现低温下的生产加工、贮存、运输二手冷库及销售,也就是人们常说的冷链系统,冷库是冷链系统的重要节点。 一、冷库的安全问题 冷库的安全涉及方方面面,主要是冷库的火灾和制冷系统事故。 1、火灾 冷库火灾多发生在冷库的围护结构、制冷系统的容器及管络隔热施工和管理之中。建国以来,冷库围护结构长期沿用软木、稻壳,应用历史长达三十多年,并在新建、大修、管理中积累了丰富的经验,但在现阶段已淡出了肉类工业的冷库。90年代以来,冷库中的隔热工程普遍采用聚氨酯,其基本形式有两种:一是钢筋混凝土混合结构,通常为多层冷库,采用现场发泡构造隔热层;二是装配式冷库,采用聚氨脂夹心板(也有的采用聚苯夹心板),多为单层高位冷库。采用聚氨酯以来出现的安全问题除了影响到工程质量,缩短使用寿命,裂、损坏、垮塌以外,最致命的是火灾造成的资产、人身方面的严重损失及不良的社会影响。据粗略统计,仅1995年至2001年的6年中,冷库严重损伤有十几起,冷库火灾也有近20起,还有相当一部分隐情未报。

冷库建设节能措施(新版)

( 安全论文 ) 单位:_________________________ 姓名:_________________________ 日期:_________________________ 精品文档 / Word文档 / 文字可改 冷库建设节能措施(新版) Safety is inseparable from production and efficiency. Only when safety is good can we ensure better production. Pay attention to safety at all times.

冷库建设节能措施(新版) 摘要:随着冷藏技术的不断发展,冷库容量的迅速扩大,如何高效低能冷藏保鲜已成为制约冷库发展的瓶颈。本文针对如何配置适宜的换热系统,如何提高换热系统的冷藏效率,如何降低冷藏过程中的冷损失等问题,通过技术措施对冷库建设提出了合理化建议。 关键词:冷库、冷藏技术、节能措施、设备配置 Abstract:Withthedevelopmentofrefrigerationtechnology,colds toragecapacityexpandsveryrapidly.Howcanweachievehigh-effec tandlow-energyrefrigeration?Ithasbecomethebottleneckofthed evelopmentofcoldstorage.Inthispaper,Imainlytalkabouthowtoc onfiguretheappropriateheattransfersystem,howtoimprovethehe attransferefficiencyofrefrigerationsystemandhowtoreducethe

冷库管理制度

海派仓储部管理规定 为了保障冷库人员和货物安全、提高冷库工作效率和物流对接规范,特制定以下管理规定: 1.严格遵守公司的各项规章制度,按照规定时间上下班,不迟到、不早退、不旷工;请假要提前一天,并交接好自己的工作。迟到、早退发现一次罚款20元;无故旷工罚款50元。 2.上班期间不做与工作无关的事情、不串岗、做好自己的本职工作,严禁打闹。有事脱离岗位要报知冷库负责人,并交接好自己的工作。无故脱岗、打闹视情节严重罚款20-50元。 3.仓管员要按照公司财务要求及时地记录好所有货物进出库的账目,保证账目和实物出入库一致。因账目错误造成出入的,发现一次罚款50元。 4.库内严禁吸烟,严禁明火,发现一次视情节严重重罚100元。 5.严禁食用库内的货品,发现一次重罚200元,情节严重者直接开除。 6.叉车工要熟悉车辆性能,规范操作叉车,工作结束后到指定位置安全充电。野蛮操作导致叉车损坏或撞坏物品的的,视情节严重罚款50-100元。 7.严禁酒后驾车,发现一次罚款50元。 8.叉车行驶中不准做饮食、打电话、吸烟等与驾驶无关的活动,发现一次罚款20元。 9.装卸工要遵守本公司的管理制度,服从安排,装卸货物轻拿轻放,码垛要整齐并注意安全。对因装卸造成货物损毁的,除按照货值进行赔偿外,视情节严重给予20-100元的罚款。 10.严格遵守出入货流程:入货,接仓储部通知-库台点数-开入库单-开出门证;出货,接仓储部通知-开出库单-库台点数-开出门证。不按流程者,发现一次罚款20元。 11.非冷库人员不得进入冷库,其它人员经请示同意后,在本库人员的陪同下方可进入,任何进入冷库的人员必须遵守冷库管理制度。私自入库,视情况而定罚款100元以上。 12.工作结束后要再三确认库中没有其他人员后才可以锁库。 13.有偷盗货品、物料等公司财物行为的,一经发现直接开除并扣除所有工资,情节严重者移交公安机关。 14.按照公司规定期限安排自查和巡检制度,并定期对仓库进行清霜处理,填写相应表格。 15.库内施工须做好安全防范措施,并在相关人员的监督下进行。 以上管理规定自制定之日起实施,解释权归仓储部所有。 日照海派贸易有限公司

节能降耗工作方案

2018年节能降耗工作方案 为贯彻实施公司节约能源的措施,达到降耗增效的目的,xxxxx物业管理服务中心结合项目实际情况,2016年度在节能降耗方面将做以下工作: 一、设备设施节能降耗改造 1、由于xxxxx公区楼道灯为18W节能灯加声控器组合,电子元件不耐突波电压冲击损坏频率极高,无端的增加管理成本,计划对南北楼道灯更换为3WLED灯,现1季度1412支楼道灯已经更换完毕,计划对南北区95盏庭院灯、80盏草坪灯进行改造;庭院灯原设计为70W高卤灯,改造后为10WLED照明灯已完成,草坪灯原设计18w,改造后为5WLED照明已完成,经验证三种灯具均满足现场照明需求。 2、地下车库426支日光灯,因业主入住较少,车位未正式启用,计划在满足当前照明的情况下先行改造100支,随着车库陆续开发逐步增加改造。 3、经勘查小区大堂吊灯为3WLED球泡,无需进行改造,控制大堂吊灯夜间正常开启时间,由安全及工程值班人员22:30及时对大堂灯进行关闭。 4、原示范区多灯头高杆灯由80盏,调整为16盏,湖区景观灯暂不开启。 5、设备运行时间量的管理,对园区景观照明严格制定详细的运行时间表,在保证现场效果的同时做到不浪费,如下表:

将根据实际日、出落时间适当调整。 二、设备运行状态的管理 1、通过公司全体员工节能宣传,落实节能措施,做到人走灯灭,办公区电脑、饮水机、复印机、打印机、传真等用电设备下班后关闭电源;办公用纸,除了正反面使用外,尽量使用无纸化办公。调整办公区卫生间马桶冲水阀水量,面盆水龙头安装节水器。每日对地库临时取水点、卫生间马桶冲水阀、园区管网进行巡检,杜绝给水系统“跑、冒、滴、漏”。另外公司在用电管理方面将设节能降耗监督员一名,专门负责办公区用电管理的监督检查。 2、工程部将坚持对耗电量大的设备设施加强检修与控制,地库风机在用于通风除湿时避开用电高峰阶段开启,夏季没有必要开的空调及时关闭。夜间指派值班人员对各楼层巡视,及时关闭大堂吊灯,杜绝长明灯。坚持做好能耗记录,定期抄电表、抄园区水表,观察水量变化,采用各种表格或图标真实反应出电水用量,通过水、电量化管理分析用水是否合理,如果发现异常,及时上报、分析、修正。 3、将对大厅灯开关、卫生间水龙头、地库临时取水点、设备机房、员工宿舍电源开关等位置进行节能小贴士的张贴。 4、对施工用电进行严格管控,制定相关管理制度与流程,对施工临时用电线路加装电表计费,对公区电箱加装挂锁,防止能源流失。

冷库节能方法介绍Word版

冷库运行管理中的节能方法与措施介绍 一、准确及时调节制冷系统 制冷系统在实际运行中,由于工况条件是不断变化的,只有依靠冷库管理人员的精心操作并准确地调节制冷设备的运行,才能使制冷系统始终处在最理想的工作状态,达到高效节能的效果。 二、合理利用库房,节能减耗 冷藏间的耗电量是按冷藏间耗冷量的多少来计算的,通常包括两部分:一是货物冷却和冷藏时的耗冷量;二是冷藏间本身(即围护结构)及操作管理的耗冷量。 节约用电的关键在于冷藏间的利用率,利用率低的冷藏间耗冷多,耗电也就多。在实际操作中,由于压缩机所配备的电动机功率是按该机制冷能力选定的,也就是库房的耗冷量小于制冷机的制冷能力。冷库在淡季运行时,由于冷藏间存放的货物较少,压缩机运转是“大马拉小车”,浪费了电能。因此,在淡季时可将几个冷藏间内的货物按贮藏温度及时并库,以减少能耗。 三、冷库内照明系统的节能 1、保证操作人员安全的情况下做到及时关灯 冷库照明应在安全、科学、合理的基础上,从节能和环保的角度出发,根据冷库间的面积、高度及库房温度等综合考虑。冷库内的照明一般集中在工作区域内。应在保证操作人员安全的情况下做到及时

关灯,以减少库房的热负荷及电能消耗。

2、采用LED照明系统 同时要尽量采用高效低耗耐压的照明灯具以减少灯具的更换频率。LED照明系统具有环保省电、照度均匀、低温时发光效率良好及供电效率高的优势,是一种极有前景的新型光源,也是今后冷库内照明系统的发展方向。 3、定期放油、除垢和放空气,确保良好热交换效果 资料显示,当蒸发器盘管内有0.1 mm厚的油膜时,为保持设定的温度要求,蒸发温度就要下降2.5 ℃,耗电量增加10%以上;当冷凝器内的水管壁结垢达1.5 mm时,冷凝温度就要比原来的温度上升2.8 ℃,耗电量增加9.7%;当制冷系统中混有不凝结气体,其分压力值达到0.196 mpa时,耗电量将增加约18%。由此可见冷库制冷系统定期放油、除垢和放空气的重要性。 四、冷库蒸发器的合理调节与及时除霜 一般而言,冷库蒸发温度每提高1 ℃,可节能2%~2.5%。因此,在能够满足产品制冷工艺的前提下,可通过调整供液量,尽量提高蒸发温度。 霜层的热阻一般比钢管的热阻大得多,当霜层厚度大于10 mm时,其传热效率下降30%以上。当管壁的内外温差为10 ℃、库温在-18 ℃时,排管蒸发器的制冷系统运行一个月后,其传热系数k 值大约只有原来的70%左右。冷风机结霜特别严重时,不但热阻增大,而且空气的流动阻力增加,严重时将无法送风,所以要适时对蒸发器的表面进行除霜处理。

冷库施工安全保证措施正式样本

文件编号:TP-AR-L2700 In Terms Of Organization Management, It Is Necessary To Form A Certain Guiding And Planning Executable Plan, So As To Help Decision-Makers To Carry Out Better Production And Management From Multiple Perspectives. (示范文本) 编制:_______________ 审核:_______________ 单位:_______________ 冷库施工安全保证措施 正式样本

冷库施工安全保证措施正式样本 使用注意:该解决方案资料可用在组织/机构/单位管理上,形成一定的具有指导性,规划性的可执行计划,从而实现多角度地帮助决策人员进行更好的生产与管理。材料内容可根据实际情况作相应修改,请在使用时认真阅读。 为了加强施工安全管理、维护人身和财产的安全,保障工程施工顺利进行,在施工中必须严格执行有关文明施工安全标准化现场管理规定户按双标化要求组织施工,牢固树立安全文明施工意识,确保本工程安全目标的实现,杜绝安全事故发生。 第一节、建立安全生产管理体系 第二节、安全生产保证措施: 安全生产工作贯彻“安全第一、预防为主”的方针,坚持管生产必须管安全的原则。 1、项目部设专职安全员1名,专职安全员持证上岗,按规定独立行使安全监督检查权利。

2、建立员工安全教育培训制度,经安全教育、培训的员工资料由公司人事教育部门存档,进入计算机备查,未经安全教育、培训的员工不得上岗作业,特种作业人员应经劳动行政主管部门培训考核,取得职业资格证书方可上岗作业。 3、严格执行安全生产‘六大纪律、十个不准‘,以及消防安全有关条例,制定安全生产责任制,层层签订安全生产责任合同。 4、项目部门坚持每周一班前半小时安全会,教育施工人员遵守施工安全技术标准、操作规程,提高自我保护意识。建立安全台帐,施工现场实行安全标准化管理。 5、健全安全交底制度。各分项工程施工前实行逐级安全、消防技术交底,并不定期地向相关班组长进行交叉作业的安全交底,履行签字手续。特别

冷库控制方案

空调系统自动化说明: 1、系统简介 本系统能够实现全天候自动化控制、按设定温湿度调节库内温湿度状态,使之达到冷链验证温湿度的要求,自动调节各工作设备的运行,使其达到合理经济的运行。实时记录各运行数据并生成历史记录报表文件,方面操作人员掌握设备运行状态。可通过互联网进行远程监控;记录故障并发送故障短信至有关人员。 本系统采用自动加手动模式,在紧急情况下可采用人工手动处理,减少故障运行。 2、系统组成 (1)螺杆主机自带控制系统 按照自主设定冷水温度控制主机及主机与蓄冷水箱的循环水泵的运行(设备厂家设计),预留RS485接口或TCP/IP协议。通过相应的连接线缆与库房温湿度控制柜通信连接。以便由库房温湿度控制柜统一进行操作,减少操作程序和操作时间。 (2)库房温湿度控制柜 a、采集库内环境的温湿度数据 每个库房内和走道及相应的位置安装高精度的温湿度传感器,采用RS485标准通信协议,用屏蔽线缆与库房温湿度控制柜内PLC通信口链

接。并同过操作屏幕显示库房内实时温湿度数据,并作为库房内冷风机及电动二通阀的控制依据。 b、控制库内冷风机及电动二通阀运行状态 通过比较温湿度采集的实时温湿度数据与设定的温湿度控制数据比较,控制冷风机及电动二通阀的运行,并在操作屏幕上显示运行状态。 c、控制蓄冷水箱与库内管道的循环水泵的运行状态 控制蓄冷水箱与库内管道的循环水泵的运行状态,控制蓄冷水箱与库房的冷量交换。在库房内无冷风机启动运行时停止运行,经济节能。 d、由大屏幕触摸屏提供操作界面 实时显示各库房内温湿度数据,监控各冷风机、二通阀、循环水泵及主机的运行状态和故障情况。保存库房温湿度历史数据并生成报表,记录故障并发出报警指示。提供工作人员操作界面。 3、系统控制 (1)蓄冷水箱水温控制 库房温湿度控制柜与螺杆主机自带控制系统相应的通信协议组成一个有机的整体,同事又相互独立。由螺杆主机自带控制系统控制蓄冷水箱内蓄冷介质达到控制库体温度所需要的温度数值。由库房温湿度控制柜监控螺杆主机自带控制系统的运行状态,并生成实时监控数据,方便操作管理人员的监管和操作。 (2)库房温度控制

冷库安全问题

冷库安全问题值得密切关注 各省(市、自治区)肉类协会、大区办事处、各专业委员会及会员企业: 肉类工业是食品工业的骨干,是关系国计民生的重要产业,对促进农牧业生产,发展农村经济,繁荣城乡市场和扩大对外贸易发挥着日益重要的作用。 肉类工业和所有的食品加工工业一样,都无一例外地广泛而深入地应用制冷技术,实现低温下的生产加工、贮存、运输及销售,也就是人们常说的冷链系统,冷库是冷链系统的重要节点。 截止到2004年底,全国31个省、市、自治区共有冷库近两万座冷藏总量约为880万吨(不包括贮冰库容量),其中冷却物冷藏量约为140万吨,冻结物冷藏量约为740万吨。按冷库冷藏容量,原国有企业的占总容量的2/3。按冷库数量,原国有与非国有的冷库数量约各占50%。原国有冷库以大中型冷库为主,库龄多在30年左右。非国有冷库则以中、小型为主,库龄多在10年以内。在东部沿海渔村中,在农产品加工较发达省份的乡、镇农村中,100吨上下的小型冷库更是星罗棋布,分布十分广泛。随着肉类工业快速发展,冷库数量和容量迅速增加,构造形式日趋多样性,在建设和管理中的安全问题已日趋尖锐,安全隐患普遍存在,事故频频发生,不仅对企业、行业造成相当的经济损失和人身安全侵害,而且往往因为涉及公共安全而引起全社会的密切关注。 一、冷库的安全问题 冷库的安全涉及方方面面,主要是冷库的火灾和制冷系统事故。 1、火灾 冷库火灾多发生在冷库的围护结构、制冷系统的容器及管络隔热施工和管理之中。建国以来,冷库围护结构长期沿用软木、稻壳,应用历史长达三十多年,并在新建、大修、管理中积累了丰富的经验,但在现阶段已淡出了肉类工业的冷库。90年代以来,冷库中的隔热工程普遍采用聚氨酯,其基本形式有两种:一是钢筋混凝土混合结构,通常为多层冷库,采用现场发泡构造隔热层;二是装配式冷库,采用聚氨脂夹心板(也有的采用聚苯夹心板),多为单层高位冷库。采用聚氨酯以来出现的安全问题除了影响到工程质量,缩短使用寿命,裂、损坏、垮塌以外,最致命的是火灾造成的资产、人身方面的严重损失及不良的社会影响。据粗略统计,仅1995年至2001年的6年中,冷库严重损伤有十几起,冷库火灾也有近20起,还有相当一部分隐情未报。 2、制冷系统的事故 肉类工业中的冷库制冷系统绝大多数采用氨作为制冷剂,在我国的采用已有近百年的历史,已经积累了相当丰富的应用技术与经验,它也是国际公认的最优良的制冷剂。氟里昂制冷剂属于消耗或部分消耗臭氧层物质,其温室效应对地球环境造成威胁,国际公约已限制其应用,故氨作为食品工业制冷剂的前景愈加远大。