我国桥梁转体施工技术的发展

我国桥梁转体施工技术的发展
我国桥梁转体施工技术的发展

我国桥梁转体施工技术的发展探析摘要: 转体施工技术扩展了建设桥梁的地域范围。本文介绍了我国桥梁转体施工技术的发展现状,根据桥梁结构的转动方向,可将转体施工技术分为竖转法、平转法、平竖转相结合法三种。全面总结了该施工技术的优缺点和相应的适用范围。最后对我国应用前景提出展望。

关键词:桥梁; 转体施工; 竖转法; 平转法

abstract: rotation construction technology extends the bridge building area. this article introduced our country bridge rotation construction technology development status, according to the bridge structure of the direction of rotation; rotation construction technology can be divided into vertical rotation method, the rotation method, and horizontal and vertical rotary combination method three. a comprehensive summary of the construction technology of the advantages and disadvantages and corresponding application scope. the last of our application prospects were proposed.

key words: bridge; rotation construction; vertical rotation; rotation method

中图分类号: u445. 465 文献标识码: a文章编号:

1 前言

转体施工技术开创了建桥的新思路,扩展了建设桥梁的地域范

桥梁施工技术现状及未来发展趋势

桥梁施工技术现状及未来发展趋势 摘要:目前,随着高科技的快速发展,我国的桥梁建设已经取得了不小的成绩。尽管这些成绩值得我们骄傲,但是,我们也应该清楚的看到,在桥梁施工过程中,还存在着许多技术上的问题。本文针对桥梁施工方法以及在施工过程中应该注意 的问题进行探索。 关键词:桥梁施工技术;现状;发展趋势 随着我国经济建设的高速发展,我国的交通运输行业也是得到了极大的促进 作用,交通运输也是更加的便利,人们的出行更为顺畅,桥梁工程历来都是交通 运输工作中的难点,但是,在人们集思广益的共同努力下,克服许多无法想象的 困难,完成了一个又一个的伟大壮举。这些成绩都离不开桥梁施工技术的高速发展。 一、桥梁施工技术现状分析 1、桥梁施工技术现时表现的优势 目前,我国的经济水平带动科技发展水平的快速提高,道路桥梁建设出现了 成熟的施工技术时代,我国桥梁技术大量引进新型施工技术并不断创新钻研,使 得桥梁施工技术大大突破传统技术,从而大大提高了我国桥梁施工技术。以下就 现在新型的桥梁施工技术来分析探讨。 (1)地基加固技术。地基对于任何建筑来说都是质量之根本,是任何建筑 中最为基础的施工环节。就桥梁而言,在地基加固方面,目前已有较为先进的技术,是对传统地基加固技术的突破。现在的桥梁建设使用了对复合地基加固的施 工技术。该项技术把施工场地的本来土质作为基础,不需要人工改变其土质,综 合性考虑其施工材料和工艺条件的合理选择,从而进行桥梁工程的施工工作。具 体来说,该项技术有很多种比如石灰桩、水泥搅拌桩、碎石桩、水泥碎石桩、渣 土夯填桩和粉煤灰桩等。另外,预应力管桩也基本代替了原先的预应力混泥土材 质的方桩,这也是地基加固技术突破的表现。 (2)钢筋混凝土技术。钢筋技术和混泥土技术是桥梁工程中使用非常普遍的,就目前而言,支撑钢筋和混泥土施工的关键技术点有钢筋施工中的连接技术、预应力技术和混泥土技术。现在,连接技术中,使用了冷压带肋的螺纹钢筋,并 且也逐渐使用了钢绞线和高强度钢丝等,另外,预应力工艺和锚夹具这些设备的 使用也为桥梁工程建设提供了很多帮助,是桥梁工程建设中的重要技术。这些关 键技术的运用,对于传统的桥梁建设技术都是一种创新和突破,在不断的实践中,这些技术的运用是有利于桥梁工程质量的提高的。 (3)防水措施。经济水平的不断提高,我国对于高分子材料的研究也日益 深化,并将其运用到实践中,取得很好的成效。在桥梁工程中的防水方面,就运 用了高分子材料作为防水材料,新型防水材料为桥梁工程的防水施工提供极其明 显的技术支持,另外,柔性防水也逐渐进入实践,并受到大家欢迎,基本成为桥 梁防水工程施工的发展方向。新型防水材料的品种非常之多,大致可以分成四类,一是沥青防水卷材,一是防水涂料,一是高分子的片材,一是胶结密封的材料。 2、桥梁施工技术现时存在的不足 人们对桥梁质量要求越来越高,对于桥梁施工技术来说是一种挑战,目前我 国的桥梁施工技术还存有许多不足,不能满足当前的质量需求,还有很多需要改

道路桥梁工程施工技术方案

道路桥梁工程施工技术方案 1 道路工程 1.1 软基处理 **西路新建右半幅路基软基处理采用真空联合堆载预压法进行处理,在旧路加宽部分采用堆载预压法进行处理。在桥头等特殊路段采用水泥搅拌桩进行软基处理,在靠近高压线铁塔基础附近采用高压旋喷桩处理。本工程真空预压软基处理面积为86302.2平方米,堆载预压软基处理面积为90306.47 平方米,两者中共含有塑料排水板3184944米;桥头和涵洞地基处理的水泥搅拌桩为330213.1 米,高压旋喷桩为29512.0 米。 (一)堆载预压法的施工 1、堆载预压法的施工工艺 2、场地排水沟和排水砂垫层施工 (1)在铺设排水砂垫层之前,在场地四周挖宽40×40cm 的排水沟,场地内设宽30×30cm 的盲沟。盲沟与垫层相接。 (2)砂垫层采用含泥量不超过5%的洁净中粗砂或粒径不超过10cm 的碎石。材料在进场铺设前必须经过筛洗处理,不能有树枝之类杂物。 (3)砂垫层表面要求平整。采用机械配合人工进行摊铺检平,压路机碾压。 3、塑料排水板施工 (1)材料 塑料排水板必须满足国家现行的标准《塑料排水板质量检验标准》(JTJ/T257-96)的检验

要求,在现场随机抽样检验,内容包括:外包装状况、排水板断面与长度、排水板和滤膜的接头情况、滤膜的完好情况,缝线和胶粘的情况等外观情况;排水板复合体和滤膜的强度、延伸率、滤膜的渗透系数和排水板的纵向通水量,滤膜的等效孔径等性能指标。 排水板进场后注意保管,防止日晒雨淋,避免在搬运时损伤滤膜。有破损变质的塑料排水板不能使用。 (2)排水板插设施工 塑料排水板采用RC-100 型插板机静压插设。 在铺设完的砂垫层上,按等边三角形布置打设塑料排水板,插板间距 1.2 米,插板穿透所要处理的软土层并进入砂层至少50cm,上端高出排水砂垫层20cm。 插板时,采用菱形套管套住插板,套管的断面必须接近排水板的尺寸、断面周长较小、入土阻力小、对土扰动小,而又保证打设时套管有足够的刚度。 在插板施工前,根据测量放线,确定插板平面位置。根据所确定的插板位置摆好插板机,利用测量仪器,调整插板套管的垂直度,使插板底脚刚好对准放线的平面位置。 在插板机上安装排水板打设自动检测记录仪,以便记录准确的施工过程。 在插板过程中,不断观察插板的插入深度,保证排水板的插设深度符合设计和规范要求。同时控制排水板的回带量小于《塑料排水板施工规范》(JTJ/T256-96)的规定。 4、加载 (1)荷载要求按设计要求分级施加,每级荷载量要与地基强度相对应; (2)荷载施加按设计加载曲线进行,加载时根据加固面积大小分区有序地进行; (3)在预压过程中,不断地观测加载时地表的沉降和水平位移的变化情况,防止施工过程中发生地基失稳。严格控制荷载的加载速度,当发现地基有超过加载控制标准的异常表现时,要及时采取措施,暂停加载或卸载,待正常后再恢复加载等。地基加载控制标准如下表所示: 5、当地基每天沉降量小于0.2~0.5mm/月时即可卸载停止预压,可以开始挖除超载土方,预压期不小于3 个月。进行路面结构各层施工过程中,垫层(基层)施工后沉降<3mm/月,方能开始下一层(基层、面层)的铺筑。 (二)真空堆载预压法软基处理施工

浅谈我国道路桥梁施工技术的现状及发展趋势

浅谈我国道路桥梁施工技术的现状及发展趋势 浅谈我国道路桥梁施工技术的现状及发展趋势 摘要:近年来,随着社会经济发展速度的加快,信息技术水平的提升,我国道路桥梁工程也获得了突飞猛进的发展,且道路桥梁工程也随之增多,积累了很多施工经验与理论知识。下面文章就道路桥梁施工技术现状进行分析,并在此基础上研究道路桥梁施工技术的发展方向。关键词:道路;桥梁;施工技术;现状;发展方向 中图分类号:TU74 文献标识码: A 引言 随着工业水平的不断提高、科学技术的迅速发展,人们对道路桥梁施工质量的要求越来越高,尤其是从二十世纪中期以来,人们更加关注道路和桥梁的施工质量,能否更方便人们的出行等等。而改革开放以来,我国的道路桥梁建设取得了巨大的成就。目前,我国的大桥跨度已经跃居世界前列,技术水平也在不断的提高。 一、我国道路桥梁施工技术的现状 1、桥梁施工技术无法满足高质量的要求 当前道路桥梁工程的结构强度、耐腐蚀性都无法满足实际需要。具体来说,目前建筑中使用的钢筋混凝土形成技术无法保证其结构的完整性,强度不够,一旦遇到高强度的压力或者及其恶劣的天气,就会出现坍塌。这种传统的钢筋结构抗拉强度低,耐腐蚀性差,长时间使用后一定要进行更换,造成经济损失。2、桥梁施工管理技术落后想要保证桥梁工程的质量,提高技术水平,就一定要对其进行正确科学的管理。但是现如今,各施工单位经常忽略这个问题,施工管理技术落后,管理人员只是在对施工过程进行简单的记录。另外,一些管理者的素质水平和技术能力也不过硬,缺乏一整套正确的管理理念,甚至会出现普通员工代替管理者的情况,造成数据不准确,在施工管理中得不到真实的技术资料。 3、道路桥梁钢筋容易被腐蚀 钢筋是支撑道路桥梁的核心。一旦道路桥梁的钢筋出现锈蚀状况

土木工程桥梁施工技术现状及未来发展趋势

土木工程桥梁施工技术现状及未来发展趋势 发表时间:2018-09-03T09:14:45.700Z 来源:《红地产》2017年9月作者:蒋志建[导读] 为更好的了解土木工程桥梁施工技术的发展现状和趋势,本人查阅大量文献资料,进行深入的调研和探究,总结了目前土木工程桥梁施工技术种类及各种类技术的发展现状及趋势。 一、钢筋混凝土结构桥梁施工技术现状及发展趋势 我国大跨度钢筋混凝土结构的各种桥梁采用的施工方法主要有体外支架法、缆索吊装法、悬臂拼装法、转体法和劲性骨架法。而在外国,发展比较快的桥梁施工技术是悬臂浇筑方,该桥梁施工方法能够适用于地势复杂的地理环境,并且具有很多优点,比如,施工费用低、工期短、施工变形易控制、结构整体性好、对环境破坏小等,进而使钢筋混凝土结构桥梁的竞争优势得到了提升,促进其相关技术不断前进。 钢筋混凝土结构桥梁因为可以有效地利用材料的高强度特性,能够避免混凝土裂缝发生,使结构的重量下降,使桥梁的跨度提高,因此,在桥梁施工中得到了认可。钢筋混凝土结构桥梁施工技术要点如下: 1)钢筋混凝土结构桥梁材料的质量控制。桥梁施工前,对材料进行现场检验,保证材料的强度、刚度、严密性等不同性能参数达到合格标准。采取有效的措施保护波纹管,尽可能地减少焊接操作。2)钢筋混凝土结构桥梁预应力张拉前的准备。力筋形成预应力前,必须检验构件,使其尺寸满足质量要求。保证混凝土的强度符合设计规范。应该清理掉端部的预埋铁板和垫板之间的毛刺、混凝土残渣等。3)钢筋混凝土结构桥梁预应力张拉施工。为了防止波纹管破损,需要重复张拉并且持续一断时间,从而可以防止摩擦力过大。在张拉过程中应该及时检测桥梁上各部位的变形,进而防止过大的裂纹刑场,将对应数据记录备案,为以后施工参考。 今后,应该完善钢筋混凝土结构桥梁施工技术规范和技术标准,并且保证施工过程完成符合技术规范和技术标准。不断地提高桥梁施工的质量,进一步减少裂纹的形成,从而保证桥梁的整体性以及提高桥梁的寿命,同时,系统地研究钢筋混凝土桥梁耐久性评价方法。 二、节段桥梁施工技术现状及发展趋势节段桥梁施工方法主要有以下几种:预制拼装法、悬臂拼装法。 (一)预制拼装法的施工技术 (1)施工技术要点。首先,能够大大地缩短施工周期。和现浇箱梁进行比较,在进行下部结构施工的同时就能够进行节段的预制。若利用工厂化预制和混凝土低温蒸汽养护技术,每一节段的生产周期能够减少到 1 天。同时,因为利用了新型的特种架桥机设备进行节段的逐跨拼装,一跨箱梁的架设时间大概在七天左右,极大到底减少了施工周期。其次,对环境的影响降低。节段拼装时占用比较少的地面道路,施工过程中对地面交通和行人的影响不大,尤其适合城市范围内的高架桥梁施工,不仅能够利用必要的安全措施,而且能够确保原有的交通运行,使桥梁施工的文明程度提高。再次,节段预制拼装工艺能够确保桥梁的线型美观。由于预制时利用密贴镶合匹配浇筑法,而且整根梁的每个节段由同一套模板浇筑而成,确保了梁体线型的一致性。 (2)发展趋势。该方法对设备的一次性投入比较大。桥梁施工中主要用到的设备包括预制模板、小平车、架桥机等,工厂化的预制模板包括能够自动脱模的内、侧模和自动找平的底模,这些都需要由专业的制造工厂进行设计、制造。另外,通用性较差。在节段预制拼装施工中,模板系统和架桥机是较大的投资,只有达到一定的工程量,才能达到一次摊销的目的。因为,每套模板是针对本次施工节段的长度和横断面,如果在以后的施工中运用该项工艺,就需对模板和架桥机进行重新改造。其次,架桥机对纵坡、线性都有一定的限制条件,当桥梁的设计参数不满足要求时,将不能采用此项施工工艺。 (二)节段桥梁悬臂拼装法 (1)技术要点。悬臂拼装法是具竞争力的方案,即主梁在预制场地分段预制,留好预应力孔道,下部结构施工完成后,把梁段运到工地拼装,同时张拉所需的钢束。整个过程的结构体系为先是悬臂结构,合龙后形成连续体系。节段桥梁的分段长度可根据结构的受力要求及施工机具灵活划分。 (2)发展趋势。设计方面,可采用高标号混凝土,预应力体系可多种多样,计算机的使用已使桥梁的结构分析及挠度控制十分简便。与满堂支架法相比,结构由简支到连续,存在结构体系转换问题,预应力及徐变引起的次内力已不容忽视。钢束既可布置在腹板内,也可布置在顶底板内,结构自重大大降低,跨越能力增强。施工方面,可以节省大量的支架、型钢和模板,混凝土质量可以得到保证。对城市桥梁而言,不必用挂篮进行张拉钢束等作业,只需简单的移动支架即可。节段的预制可与下部构造同时进行,一方面大大加快了施工进度,另一方面可减少徐变带来的负面影响,充分发挥力筋的高强性能。节段的安装可充分利用机械化设备,安排在车流量较小的时段进行,对交通影响较小。但是,节段式桥梁的技术要求较高,影响结构的因素较多,施工控制也很严格,对小跨度桥梁由于梁高较低,无工作面张拉连续力筋,不适宜采用节段桥梁。采用悬臂拼装的 PC 连续梁,在技术上可行、经济上合理,机械化程度应用高,有利于工厂化生产,可满足业主对工期和质量的要求及日新月异的城市发展需要,具有较大的优越性,而且在同等造价条件下可以增大跨度,节省下部工程量。悬臂拼装法也适用于曲线梁。 三、预应力现浇桥梁施工技术现状与发展趋势 (一)发展现状。预应力混凝土现浇梁的施工过程是在桥位上安装满堂支架,在支架上进行混凝土的浇筑,如果混凝土的强度满足要求后,将模板和支架卸下的土木工程桥梁施工技术。预应力现浇法施工,当施工的桥梁具有跨径不等特点的时候,利用该方法更加具有优势。原因在于该施工技术不用事先布置施工场地,同时也不用对施工设备进行吊装,从而全部梁体的钢筋不会发生断开的情况,使桥梁具有非常好的整体刚度,进而防止了预制安装产生的接缝和梁体颜色的不同,因此桥梁具有整体上比较好的色泽,同时,如果和碗扣式支架进行配合,能够使桥梁上部梁板架设非常可靠和方便,进而属于目前桥梁施工技术中非常重要的一种施工技术。 预应力混凝土现浇梁施工的技术要点如下所示:(1)合理地进行地基的处理,确保地基具有较好的承载能力,是桥梁施工过程的关键注意事项。为防止支架因沉降过大和沉降不均匀引起连续箱梁横隔梁墩顶负弯矩区产生裂缝,进而使箱梁的总体质量下降以及无法较好的地控制连续箱梁施工标高,一定要对原地面采取处理措施。 (2)支架的确定和安装。支架可以利用钢材、塑料以及其他可以满足设计条件的材料制造。在支架荷载计算的方面,按照现浇梁自身的重力、模板的重力、支架自自身的重力以及桥梁施工荷载求解出必须的基础承载力的大小,并根据计算结果进行地基的处理。地基处理以后接着依据事先设计的计划进行支架的安装。

谈先简支后连续桥梁施工技术

谈先简支后连续桥梁施工技术 摘要:简单阐述了简支变连续的施工方法的产生与发展,说明了此种施工方法的优势。说明了简支变连续施工方法的施工顺序,并着重说明了在施工过程中应注意的事项。最后阐述了关于此种施工方法的施工质量控制。 关键词:施工技术;简支变连续;体系转换; 前言 近二十年来,我国高等级公路快速发展。高等级公路对行车的高速、平稳、舒适性要求极高,这也就对桥梁结构提出了更高的要求。在过去由于各种因素的制约简支梁桥在公路桥梁建设中广泛被运用。但是简支梁桥存在很多无法改变的缺陷,限制了其在高等级公路中的使用。其中主要是因为当车辆高速通过伸缩缝位置时会发生跳车现象,影响行车的舒适性。面对这类问题前人想了很多办法来解决,其中的主要方法就是在施工中用桥面连续的方法对伸缩缝做一些处理。但是随着公路等级的提高道路的设计时速变的越来越大,当行车速度较高时,经过一段时间后,桥面连续位置会发生开裂,这同样会影响行车的舒适性。此外,基础的不均匀沉降也会使桥面连续位置会发生拉裂和脆断。 由调查表明,对于地震多发区,梁桥的破坏主要是因为整体性不好而导致落梁等破坏。由于简支梁桥的整体性比较差,就极大限制了简支梁桥在有地震设防要求的地区的推广使用。为了满足车辆行驶的舒适性要求,也为了满足抗震设防的要求,连续梁桥无疑比简支梁桥更有优势。当代连续梁桥的型式主要包括整体现浇连续梁桥、顶推法施工的连续梁桥和先简支后连续梁桥。相比而言,前两种施工速度慢、造价高,只在一些特殊情况下使用;而先简支后连续梁桥因其造价低、施工速度快等原因,而应用广泛。 1 先简支后连续结构体系的产生和发展 1.1 简支梁桥面连续阶段 如前言中所述,简支梁桥由于伸缩缝的存在严重影响了行车的舒适性。为了解决该问题出现了多种形式的桥面连续简支梁桥。简支梁桥在桥面连续后减少或消除了连续跨内的

桥梁深水基础施工技术

价值工程 0引言 桥梁深水基础的修建是跨海跨江大桥的重要组成部分,深水基础的修建关键在于如何摆脱水深的影响。因为在深水环境下建造基础不仅是施工难题,更是设计难题。在近代,我国主要采用沉箱、沉井技术进行施工;随着桩基础以及钢板桩围堰技术的发展,现代跨海大桥主要采用桩基进行施工;发展到当代,双承台钢管桩基础得到广泛的采用。随着科技的不断进步和发展,用于解决深水施工的双壁钢围堰施工技术逐步获得工程人员的青睐,取得十足的发展。 1工程概况 某桥梁深水承台双壁钢围堰,水深8m ,承台为正方形,尺寸10m ×10m ,厚3m ,河床为密实细砂。本设计承台基础平面图如图1所示,钢围堰平面图如图2所示。 2双壁钢围堰优点分析 双壁钢围堰是一个带有单斜面刃脚的圆形双壁全焊水密钢结构圆筒,有自浮力,有强度更高的双壁钢壳,筒的内、外壁形成的空间称之钢壳。内、外壁由钢板围焊而成,圆筒上、下均不设底板或盖板,钢壳下口以环形单斜面刃脚封闭,钢壳上口敞开,以方便施工时往钢壳内灌注混凝土或注水。 双壁钢围堰施工技术有着明显的优势:①双壁钢围堰具有高强的双壁钢壳,从而可以承受较大的内外水压。②双壁钢围堰具有施工工艺简单,封底后,排水不受施工水位的限制,从而摆脱了施工的季节限制。③墩位处水深对双壁钢围堰施工不能产生显著的影响,在双壁钢围堰施工法进行施工时,如果能够配合使用空气幕下沉技术还可以将围堰下沉到更深的水域,从而扩大了双壁钢围堰施工法的应用范围。④双壁钢围堰下沉就位后,可以直接充当钻孔桩基的施工辅助设施。 3围堰结构选择 根据力学原理进行分析,双壁钢围堰宜制作成圆形,这样不仅制作简便而且下沉时也容易控制。但是当考虑承台结构的尺寸限制时,必须将围堰尺寸加大数倍,从而提高了工程的造价。同时,围堰作为承台和墩(塔)身施工的先决条件,围堰平面形状的选择也必须受到承台尺寸的限制。在实际工程实践中,双壁钢围堰多设计成矩 形、圆形和扇形。在双壁钢围堰法应用早期,一般采用圆形结构。但 是随着桥梁复杂程度的不断提高,其它结构形式也受到人们的普遍关注。在进行围堰结构设计时,必须在综合考虑围堰工程造价、受力特性以及施工难易程度基础上进行选型。 本设计中深水承台尺寸为10m ×10m ,围堰平面形状为正方形,外壁尺寸为15.6m ×15.6m ,内壁尺寸为13m ×13m ,内外壁板均为6mm ,壁腔厚1.3m 。围堰本身实际上是个浮式钢沉井,井壁钢壳是由有加劲肋的内外壁板和若干层水平钢桁架组成,中空的井壁提供的浮力可使围堰在水中自浮,使双壁钢围堰在自浮状态下分层接高下沉。围堰内外壁间设置8个隔舱板,在平面上将围堰分为8块,隔舱板将围堰分为8个互不连通的密封隔舱,利用向隔舱不等高灌水来控制双钢围堰下沉及调整下沉时的倾斜。围堰竖向总高22.5m ,考虑到浪高最大为1.5m ,围堰高出水面部分为2m ,围堰竖向分为5节(4.5m+5m+5m+4m+4m),井壁底部设置刃脚有利于切土下沉。 由于水深较大,为了保证围堰的整体刚度和稳定,在围堰内部设置两层截面形式为工字型内支撑。由于刃脚承受土压力及水压力较大,故刃脚段适当加密水平桁架的竖向间距(0.5m),其余部分水平桁架竖向间距为1m 。面板竖向加劲肋采用L50×5角钢,角钢与面板共同承受外荷载。水平环板采用准200mm ×10mm 钢板,钢板也与面板共同承受外荷载,同时在进行受力计算时,环板与参与受力面板作为桁架的弦杆进行受力计算。 4围堰施工工艺 4.1围堰加工工艺在本次工程中,钢围堰的制作流程如下:①胎架的设置。为了获得满足尺寸要求的围堰,在车间制作的过程中,首先必须设置恰当合适的胎架。组装用的胎架必须具有足够大的刚度,从而避免在组装过程中胎架发生过大的变形。同时,胎架的尺寸必须满足一定的精度,从而确保围堰尺寸的正确性。②钢围堰下料。在进行钢围堰构件下料前,必须对构件进行样本的制作。如果构件中存在无法确定具体尺寸的构件或者连接件时,必须通过实样的制作来确定尺寸。③分块组装。钢围堰主要由环板、壁板以及水平桁架等构件组成,当各构件制作完备后要将这些构件按照一定的次序进行组装。④焊接加工。双壁钢围堰在制作过程中需要进行严密的焊缝处理,焊接前必须对所有焊缝分类进行焊接工艺评定试验。为了双壁钢围堰的整体焊接变形,双壁钢围堰中的内外壁板采用两面自动焊进行。⑤试拼出厂。当围堰的分块加工完毕后,运送到试拼场进行出厂前的试拼,然后再用于施工。 4.2双壁钢围堰的锚碇系统布置根据施工水域水文条件和通航要求,围堰锚碇系统可以采取灵活多变的布置方式。本工程的锚碇布置系统主要如图3所示。 4.3围堰接高当双壁钢围堰的锚碇系统布置妥当后,接下来就要进行围堰接高。围堰接高的方式主要有: ①利用起重的船只将“钢堰”进行吊装接高;②当首节吊装完毕后,将围堰分块用导向船上的起重设备进行接高;③首节采用吊装 ————————————————————— —作者简介:王剑亮(1977-),男,陕西周至人,硕士学历,中铁西北科学研究院 有限公司工程师,研究方向为岩土工程。 桥梁深水基础施工技术研究 Research on Construction Technology of Deepwater Foundations of Bridge 王剑亮Wang Jianliang ;赵建刚Zhao Jian'gang (中铁西北科学研究院有限公司,咸阳712000) (Northwest Research Institute Co.,Ltd of C.R.E.C ,Xianyang 712000,China ) 摘要:随着我国综合国力的不断提升,横跨长江大河的桥梁不断涌现。桥梁的深水基础施工是大跨度桥梁施工的重要组成部分。桥梁深水基 础施工所处的环境比较复杂,在工程实际中一般采用围堰和钢吊箱进行施工。本文以***桥梁深水基础施工为背景,详细的阐述了双壁钢围堰 法在深水基础施工中的应用,并做了简单的数值模拟,验证了双壁钢围堰法的可用性。 Abstract:With the rising of China's comprehensive national strength,the Yangtze river bridge across the river emerge.The deep water foundations of the bridge construction are an important component of the large span bridge construction.Bridge construction in deep water foundations always starts in complex environment,cofferdam and steel construction hanging box are general methods in engineering practice.Based on the construction of the deep water foundations bridge of***in the background,the double-wall steel cofferdams in the deep water were described in detail,and the application of the numerical simulation simplify,finally get the effectiveness of the method of double steel cofferdam. 关键词:深水基础;双壁钢围堰;有限元分析;施工方案Key words:deep water foundations ;double-wall steel cofferdam ;finite element analysis ;construction scheme 中图分类号:U44 文献标识码:A 文章编号:1006-4311(2012)18-0092-02 图1承台平面图(单位:m )图2钢围堰平面图(单位:mm ) ·92·

(整理)公路桥涵施工技术规范标准

第一章总则 第1.0.1条本规适用于公路桥涵新建、改建工程的施工;公路桥涵大、中修工程可参照执行。 第1.0.2条桥涵施工必须做好施工前的准备工作和施工中的技术管理工作,应严格执行本规及有关技术操作规程的规定。 第1.0.3条桥涵施工应积极推广使用经过鉴定的新技术、新工艺、新结构、新材料、新设备,以加速实现公路桥涵施工现代化。 第1.0.4条桥涵施工应节约用地,少占农田,并按照国家有关规定注意防止环境污染。 第1.0.5条凡属隐蔽工程,必须填写隐蔽工程检查证(表)。 第1.0.6条桥涵工程竣工后,应对临时工程、临时辅助设施、临时用地和弃土等及时进行处理,做到工完场清。 第1.0.7条桥涵工程必须文明施工,安全生产,严格遵守安全操作规程,加强安全生产教育,建立和健全安全生产管理制度。

第二章施工准备和施工测量 第一节施工准备 第2.1.1条施工单位承接桥涵任务后,必须组织有关人员对设计文件、图纸、资料进行研究和现场核对,必要时进行补充调查。 第2.1.2条研究设计文件、图纸、资料时,应首先查明是否齐全、清楚,图纸本身及相互之间有无错误和矛盾,如发现图纸和资料欠缺、错误、矛盾等情况,应向建设单位提出,予以补全、更正。较复杂的中桥、大桥和特大桥,一般可要求建设单位进行设计技术交底;施工单位可提出修改意见供建设单位考虑。 第2.1.3条桥涵开工前,应根据设计文件和任务要求,编制施工方案。其容包括:编制依据、工期要求、工程特点、主要工程、材料和机具数量、施工方法、施工力量布置、工程进度要求、完成工作量计划和临时设施的初步规划等。 第2.1.4条大桥、特大桥的实施性施工组织设计,应根据施工方案单独编制,其容应比施工方案明确、详尽。主要容包括:工程特点、主要施工方法、技术措施、施工进度、工程数量、完成工程量计划、机料设备及劳力计划、施工现场布置平面图、施工图纸、施工安全和施工质量保证措施等。 第2.1.5条一般中、小桥涵的实施性施工组织设计,应配合路基施工方案编制,容可以适当简化。 第2.1.6条实施性施工组织设计中规划的临时设施,应包括生产房屋、生活房屋、施工便桥、工程现场外交通道路、工地供电和供水设备及其他小型临时设施等,宜在桥梁正式开工前完成。 第2.1.7条在施工前应充分发扬,对施工方案,技术措施和保证工程质量、施工安全等认真进行研究和深入细致地讨论,做到有计划、有步骤地完成施工。 第2.1.8条施工中可能涉及与其他部门有关的问题,应事先联系,签订协议。 第二节施工测量 第2.2.1条桥涵施工准备阶段及施工过程中,应进行下列测量工作: 1.对建设单位所交付的桥涵中线位置桩、三角网基点桩、水准基点桩等及其测量资料进行检查、核对,若发现桩志不足、不稳妥、被移动或测量精度不符合要求时,应按本节要求进行补测、加固、移设或重新测校,并通知建设单位。 2.补充施工需要的桥涵中线桩; 3.测定墩、台中线和基础桩的位置; 4.测定桥涵锥坡、翼墙及导流构造物位置; 5.补充施工需要的水准点; 6.在施工过程中,测定并检查施工部分的位置和标高; 7.其他施工测量。 为防止差错,施工单位自行测定的重要标志,必须至少由二组相互检查核对,并作则测量和检查核对记录。 第2.2.2条桥涵施工的主要控制标志(或其护桩)均应稳固可靠,保留至工程结束。 第2.2.3条大桥、特大桥的主要控制标志(或其护桩),均应测定其坐标,编号绘于桩志总图上,并注明各有关桩志坐标、相互间的距离、角度、高程等,以免弄错和便于寻找。 第2.2.4条桥涵中线位置、桩间距离的检查校核及墩台位置放样,当有良好的丈量条

浅谈道路桥梁施工技术现状与发展

浅谈道路桥梁施工技术现状与发展 发表时间:2017-11-22T16:39:36.327Z 来源:《防护工程》2017年第18期作者:谭斌[导读] 当前,我国的工业化水平朝着一个较高的层次发展,人们对于道路和桥梁方面的要求也在不断提高。 摘要:道路桥梁施工质量与水平,与当前社会发展之间有着密切的联系。而基于我国在新时期道桥建设过程中积累了丰富的理论知识及施工经验,因此我国道路桥梁建设最大限度地提高了施工水平,为构筑高质量的桥梁工程提供了极大的保障。但是,与此同时我国道路桥梁工程的施工技术还存在着明显的不足,我们应当向前看,还应当继续努力,继续前进。正视这些不足之处并且加以研究,推动施工技术获得新的发展,便成为我国广大桥梁施工技术研究者的研究热点。本文作者结合自己的工作经验并加以反思,对道路桥梁施工技术现状与发展进行了深入的探讨,具有重要的现实意义。关键词:道路桥梁;施工技术;现状;发展趋势 1.当前我国道路桥梁施工技术的现状1.1 我国中小型道路桥梁施工技术所取得的成果当前,我国的工业化水平朝着一个较高的层次发展,人们对于道路和桥梁方面的要求也在不断提高,而由于我国在新时期道桥建设过程中积累了丰富的理论知识及施工经验,使得桥梁建设工作极大地突破了传统技术的瓶颈,为桥梁的建设质量的提升发挥了显著的作用。 1.1.1 地基加固工程桥梁建设中最为基础的部位就是地基加固工程,其在目前的建设已实现了对复合地基加固的施工技术的应用。此项技术是通过渣土夯填桩、碎石桩等复合方法的运用,综合选择优质适用的施工材料及适当的工艺条件,来增强桥梁地基的稳固性,而地基的稳固性直接决定了道路桥梁建设的质量。 1.1.2 防水技术 道路桥梁建设的防水工作不可忽视,随着我国不断加快的对于高分子材料的研究步伐,新型的防水材料开始为桥梁工程建设的防水工程提供显著的技术帮助。其中沥青防水卷材因其具有低温柔性好,达到-25℃不裂纹;耐热性能高,90℃不流淌;延伸性能好,使用寿命长,施工简便,污染小等优点且其良好的效果,受到施工界普遍的认可,而这些都是我国新时期道路桥梁建设科研人员的辛勤劳动成果。 1.1.3 钢筋与混凝土桥梁工程建设中极其普遍其较为基础的部分就是钢筋工程以及混凝土工程。在施工过程中用到最关键的三个技术,分别是混凝土的应用技术、连接技术和预应力技术。在现在的建设过程之中,“预应力”这三个字出现的频率越来越高。在施工过程中,为了提高混凝土的各种性能,先张法与后张法的应用越来越广泛,其道理就是在混凝土构建的预制过程对其预先施加应力以提高混凝土构件的性能。因碳纤维材料具备轻质、高强、耐老化的特点,加固后几乎不增加自重和体积,是非常理想的梁板加固解决方案,为桥梁建设提供了诸多助益,成为桥梁建设的重要技术手段。 1.2 我国道路桥梁施工技术存在的问题1. 2.1 施工技术当中的结构问题我国的道路桥梁施工环境愈来愈复杂,在城市化高速发展的背景之下,以及各种施工技术的不断增多,各项新型材料无法保证不了其结构的完整性,强度也达不到要求,如果遇到了相当恶劣的天气或者是强度很大的压力,就会出现一定的坍塌现象。甚至在一些工程上面,还存在着技术的差异性,致使桥梁建设在整体强度、使用寿命等方面无法得到有效的保障。 1.2.2 相对落后的桥梁施工的管理技术确保施工桥梁工程的高质量需要技术水平的提高以及这项工程进行科学正确的管理。但是到目前为止,许多的施工单位常常会忽略这样的问题,施工管理技术相对的落后。当前的管理技术依然只能对桥梁施工中的各种步骤进行简单技术,而无法做到对整个工程施工的完整性、系统性的动态监管与记录。因此,我国的管理水平在完整性和系统性两个方面有待于提高。此外,一部分的施工管理者的基本技术的能力以及素质水平不高,缺乏一套正确完整的管理的理念,这就导致其无法及时地针对桥梁施工提出高质量的技术应用提议。 1.2.3 钢结构防腐问题亟待解决如果道路桥梁的支撑钢筋出现一定的锈蚀状况以后,就会很容易的缩减桥梁的正常使用寿命,从而使人们的财产以及生命的安全受到严重的威胁。尽管采用了较先进的防腐技术,但是导致钢结构腐蚀的原因有很多种,我们对钢箱梁的防腐仍然要比较重视,而且在实际的养护和维修中也要加强对钢箱梁防腐技术的研究。 2.我国中小型道路桥梁施工技术的发展趋势2.1 施工技术智能化在未来社会前进与发展过程当中,道路桥梁建设中非常重要的一部分就是安全性。但是由于道路施工工程是一个极其复杂的工作,它拥有设计的知识范围广、环节多、环境复杂以及工作艰苦等特点,使完成道路施工工程变得更加艰难。所以对于桥梁工程负责人员来讲,要想实现上述目标,就必须要将现代化通信技术灵活运用在其中,并且采用高科技设备来完成人为很难完成或者是根本不可能完成的工作,使道路桥梁施工工程进入智能化的道路。应当在桥梁的内部设置安全防范预警系统等装备,这样就能够对整个施工过程当中存在的状况进行智能化监督与管理,为施工人员提供优质高效的技术支撑,使测控的精准度、便捷度等皆迅速提高。 2.2 施工技术节能化目前由于人口众多,人均不足等特点,要想可持续的发展下去,必须施工技术节能化,因此国家也在极力的倡导节能减排的重要性。因此,在建设道路桥梁工程过程中需要承担起责任,在施工过程中做到节能环保,在施工过程中运用施工工艺、施工技术、施工材料等,开发新理念和技术。而只有采取节能型的新兴材料和科学的施工方法才能保持经济的可持续发展。 2.3 桥梁结构多元化

公路桥梁施工技术探讨与研究

龙源期刊网 https://www.360docs.net/doc/8b4456913.html, 公路桥梁施工技术探讨与研究 作者:朱克常 来源:《商品与质量·学术观察》2013年第11期 摘要:随着我国桥梁建设飞速发展,公路铁路两用桥重负荷、大跨度、高时速的发展趋势也越来越强,桥梁施工作为桥梁建设重要施工环节,其技术水平的高低对桥梁建设质量的好坏具有直接影响作用。以及其他常见的几种桥梁施工技术,旨在促进与同行的沟通交流,不断提高我国桥梁施工技术水平,为我国桥梁建设发展贡献应有的力量。 关键词:桥梁施工技术探讨研究 桥梁施工技术是工程施工质量的重要环节,因此,各单位必须加强桥梁施工技术探讨与研究,本文重点分析了桥梁下部结构的施工技术,也简单介绍了桥梁上部结构的主要施工方法,另外还论述了预应力混凝土工程、临时支座的预制、承台施工等几项在实际施工中比较常用的桥梁施工技术,希望能为同行提供参考。 1、桥梁下部结构的施工技术 1.1基础施工 一是测量放样。首先平整市场的现场,接着按照测量合格的水准点和导线点利用水准仪、全站仪展开施工放样工作,应重点注意桥梁在勘查阶段建立好的施工控制网的精度,要求其必须能够符合桥梁定线放样的各种施工需要,比如测定长度,定出桥墩的地面标高、边线位置和基础轴线等。等全部这些施工验收合格后,就可以开始下一步施工。 1.2基坑的开挖技术 一是垂直坑壁基坑开挖法,适用于那些构造均匀、天然湿度接近最佳含水量、不发生移动、塌滑、不均匀下沉或松散的基土的开挖。二是斜坡和阶梯形坑壁基坑开挖法,适用于土层结构均匀、湿度正常、基坑深度不超过5米的基土的开挖。三是变坡度坑壁基坑开挖法,主要运用在开挖时需要穿过不同土层的基土开挖[1]。 1.3基础浇筑 首先,把桥墩柱的钢筋运到现场进行绑扎和预埋;其次是桥台基础施工,所需的混凝土由拌和站直接提供,所需的片石混凝土掺配片石应控制在25%的范围以内,把混凝土倒入模内,及时使用振捣棒进度振捣秘书,在浇筑的过程中,必须做好石笋的上下层连接工作,必须注意片石摆放位置,相邻片石之间无论是上下方面还是左右方向都必须保证相隔20到30厘米。 1.4桥台浇筑装模

道路桥梁施工技术发展方向探讨 郑军伟

道路桥梁施工技术发展方向探讨郑军伟 发表时间:2019-04-24T16:11:21.483Z 来源:《防护工程》2019年第1期作者:郑军伟[导读] 只要科学技术在不断地跟着时代的脚步发展变化,道路桥梁的建设也会跟随着时代与科技的脚步不断的取得进步。 黑龙江省八达路桥建设有限公司黑龙江省齐齐哈尔市 150076 摘要:随着改革开放后,中国经济发展迅速,先进的科技逐渐发展,新的材料已经应用到道路桥梁施工建设中,从设计到施工都是不断升级,安全防范措施不断提高,在使用过程中要避免质量问题,一旦发生问题,会影响道路和桥梁的使用安全与结构稳定,不仅影响道路交通安全,也损害国家的经济。 关键词:道路桥梁;施工技术;发展方向;探讨 1导言 只要科学技术在不断地跟着时代的脚步发展变化,道路桥梁的建设也会跟随着时代与科技的脚步不断的取得进步。无论是在质量方面还是在性能方面,道路桥梁都将不断的提高对自身的要求,不断的研发出新型的道路桥梁施工技术来代替旧的道路桥梁施工技术,并以此来满足道路桥梁的发展。 2道路桥梁施工技术应用现状现阶段,我国道路桥梁工程正呈现出快速发展状态,随之带来的不足之处也是愈发严峻,如施工技术较落后、工作人员素质较差及安全意识较薄弱等,都对道路桥梁工程施工质量提升有着不利影响,在此进行详细分析。 2.1裂缝问题 根据实践调查发现,混凝土已成为道路桥梁建设施工的主要材料之一。但具体施工过程中却常常因受自身特征影响出现裂缝隐患,再加上施工人员工作不够严谨,不能按照标准流程执行操作,也容易引发混凝土裂缝问题。具体如下;第一,道路桥梁工程施工前,没有按照标准要求进行混凝土比例配置,使其使用性能无法满足提出要求;第二,混凝土搅拌时工作人员力度轻重不当,致使混凝土受力不均匀,产生裂缝隐患。 2.2钢筋易腐蚀 道路桥梁工程施工过程中,钢筋可以说是支撑整个工程的基础构件,如果钢筋出现腐蚀情况,不但会降低道路桥梁工程使用寿命,还会对人们安全出行带来不利影响。根据相关调查了解到,导致道路桥梁钢筋出现腐蚀现象的影响因素包含众多,如施工材料质量不达标、施工工序出现失误及外界环境影响等,因此要求工作人员做好道路桥梁工程的施工技术质量把控工作。 2.3道路桥梁施工管理问题 为确保道路桥梁工程施工的顺利进行,相关部门需开展全面性的管理工作。就当前情况来说,道路桥梁施工管理仍存在较多问题,会对道路桥梁施工技术应用起到阻碍作用。具体包括以下几点;第一,施工单位对施工管理的重视程度较弱,不具备较完善管理方案,无疑为后期施工操作带来了不利影响;第二,监管工作落实不到位。甚至部分企业不具备监管部门,即便设置监管部门也仅仅只是流于表面形式,根本无法取得最佳监管成效。第三,资金成本问题。随着科技水平的不断提高,部分施工材料和设备早已无法满足新时期发展需求,在此情况下就要更新优化,再加上道路桥梁施工期间的损坏问题,需做好一系列维修工作。但总体来说,上述工作的开展都离不开资金成本,如果不具备充足资金那么维修等工作将不能顺利开展,势必会威胁到经济效益提升。 3道路桥梁施工技术的发展方向现阶段,虽然我国道路桥梁施工技术的水平较之前已经有了明显的提高,但是现存的急需解决的问题也有很多。尽管,施工技术专业人员已经研究并提出了一些新型的施工技术,但这些施工技术并没有被完全应用到实际的施工过程中,新型施工技术的实用性也遭到了质疑,因此,还需要科研人员实施更加深入的探索,不断完善施工技术。毋庸置疑,我国的道路桥梁施工技术的发展势头还是很乐观的,更多的高科技和高水平的施工技术也会随之产生,并被应用到我国的道路桥梁工程建设之中。 3.1 新型施工技术的广泛应用 现阶段,我国的道路桥梁施工技术日新月异,很多的新型施工技术应用到了道路桥梁的施工过程中,例如:波形钢腹板预应力技术。因为,波形钢腹板可以有效减少横载内力和箱梁自重,其抗震性能良好,所以,传统的施工技术必定会被这种新型的技术所取代,新型的技术也会得到广泛的应用。此外,由于波形钢腹板采用的是体外预应力索,优化了腹板内预埋管道制作工艺,操作工期明显缩短。另外,光纤传感技术也被应用于道路桥梁的施工过程中,其较传统的检测技术有着很大的优势。传统的检测技术通常只用于检测路面的硬度指标,其科学性明显不足,不能够准确的检测出道路桥梁的施工质量,而光纤传感技术既能检测道路桥梁结构,又能道路桥梁的使用状态,所检测出的参考信息较为科学,可以及时检测出施工或使用中的质量问题,从而使得道路桥梁施工技术更快、更好的发展。 3.2 提升从业人员的专业素养 对于道路桥梁施工过程中参与建设的从业人员,应当定期对其进行专业知识的培训,使其了解并掌握新型的施工技术,规范其在施工过程中的行为规范。同时,在进行道路桥梁从业人员招聘时,也应当提高对应聘人员素质的要求,以确保其入职后能尽快的融入到施工建设团队中。由优秀的从业人员组建成的施工团队,也是道路桥梁建设顺利进行的重要保障,施工过程中得到了规范的控制,施工工程的总体质量也会提高。 3.3 施工技术的智能化 随着社会的发展,人们的日常生活与道路桥梁的的关系也越来越紧密,道路桥梁的建设是否够更加的便捷与安全,也是人们关注的主要问题之一。然而,只是单纯的依靠人工建设并不能满足当下人们对道路桥梁的便捷性要求,所以,应当将一些高端的技术手段应用到道路桥梁的建设中来。例如:可以在桥梁的内部设立通讯系统与安全防范系统,以此来对道路桥梁施工状态进行实时监管。路桥施工技术的智能化系统的安全性与准确性是非常高的,可以准确的反映出路桥施工的真实情况,所以,道路桥梁施工技术未来也一定会朝着智能化的方向发展。

试述先简支后连续桥梁施工技术

试述先简支后连续桥梁施工技术 试述先简支后连续桥梁施工技术 摘要:本文主要介绍了先简支后连续结构桥梁的结构特点及施工原理,并探讨了其施工形式及施工工艺,最后阐述了先简支后连续桥梁施工的质量控制。 关键词:先简支后连续桥梁施工 中图分类号:K928.78 文献标识码:A 文章编号: 1先筒支后连续结构桥梁的结构特点及施工原理 1.1先简支后连续结构桥梁的结构特点 首先,先简支后连续梁桥主梁截面的形式主要有T梁及箱梁。当跨径小于20 m 时,一般采用小箱梁;当跨径大于 50 m 时多采用箱梁:在20 ~50 m 之阐则多采用T梁。 其次,先简支后连续结构梁桥的支座体系主要是单支座及双支座两种基本形式。单支座梁桥成桥后单支点受力明确,在施工过程中采用临时支座进行体系转换,对施工要求较高。双支座梁桥施工中不进行体系转换,施工较为方便,但因盖梁上是双支座受力,受力不太明确。 1.2先简支后连续结构施工原理 先简支后连续施工主要是在简支梁基础上,设计施工部门展开后期应力连续把多孔板梁连接成连续梁,来减轻单纯简支梁的弯矩承载力,来解决普通空心板梁墩项处桥面的裂缝问题。其施工原理是先预制好空心板梁同时在顶板预留后期应力筋管道和普通连接钢筋,直至梁板安装完成穿好顶板束及焊接好连接筋,待现浇段混凝土达100%后张拉压浆,再来拆掉临时座,最后实现梁体体系转换。 2先简支后连续结构桥梁的优点 先简支后连续桥梁结构是两跨及两跨以上的预应力混凝土梁通过混凝土现浇以及体系转换形成连续的结构。它的优势表现在几个方面:首先,变形小,桥面收缩、刚度大,支座不均匀沉陷等问题对桥梁的影响不大;其次,简支梁的预应力钢束是在工厂进行张拉,而

道路桥梁施工技术

1、路基的作用?与路面共同承担行车载荷。 2、路基按材料分类型?土质路基和石质路基。 3、路基工程的基本要求?①正确、合理的断面尺寸;②具有足够的整体稳定性;③强度; ④水-温稳定性。 4、路基的断面形式?路堤、路堑、半填半挖等形式。 5、路基土质的统一分类?巨粒土(漂石、卵石),粗粒土(砾类、砂类),细粒土(粉质、粘质、有机质),特殊土(黄土、膨胀土、红粘土、盐渍土)。 6、路堤施工特点?①路堤基底处理;②填土要求;③填方压实。 7、基底处理的内容与方法?①伐树除根及表土处理;②耕地、水田的处理;③坡面基底的处理。 8、路堤填料的选择处理:整体要求:①级配良好,粘结能力强,易于压实稳定。②基本上不受水侵软化和冻害影响。处理方法:①含水量调节②化学稳定处理(利用石灰或者水泥)9、路堤填筑方法:①水平分层填筑法②纵向分层填筑法③横向填筑法④联合填筑法。(一般尽可能用①的方法)。 10、路基边坡施工的基本要求:①放样②做好坡度式样③随时测量④留有余量。 11、路堑开挖基本方法:①全断面开挖法②分层横挖法③分段纵挖法④分层纵挖法⑤通道纵挖法。 12、机械化施工:①推土机作业②铲运机作业③挖掘机作业④推土机和铲运机联合作业。 13、石质路基开挖方法:①爆破法开挖②松土法开挖③破碎法开挖。 14、路基压实的作业:①提高填料密实度,减小孔隙率②增强填料颗粒之间的接触面,增大凝聚力,提高内摩阻力,减少变形。 15、压实状况的表征:压实度。 16、影响路基的压实效果主要因素:①土的含水量②土的性质③压实功能④碾压时的温度⑤压实土层的厚度⑥地基或下承层强度⑦碾压机具和方法。 17、压实工作控制内容:①确定最大干密度和最佳含水量②检查控制填土含水量③正确选择和使用压实机械④分层填筑,分层碾压⑤全宽填筑、全宽碾压⑥加强质量检查。 18、桥涵台背填土注意要点:①分层压实,分层检查②检查频率为50㎡检验一点,不足50㎡检验一点③采用小型的手扶振动夯或手扶振动压路机。 19、现场压实度评定方法:①环刀法②灌砂法③利用核子密度计测定。 20、填石路堤压实标准方法:在规定深度范围内,以12t以上振动压路机压实,当压实层顶面稳定,不再下沉时,可判为达到密实状态。土、石混填压实标准方法:①当混合物中巨粒土多余70%时,作业方法接近填石路堤②巨粒土含量低于50%,作业接近于填土路堤。 21、高填方路堤压实:设计无要求时,基地的压实度不应小于90%。 22、各种地面地下排水设施:地面①边沟②截水沟③排水沟④跌水和急流槽;地下①暗沟(盲沟)②排水管③排水涵洞。 23、坡面防护和处理:①抹面②喷浆③勾缝④灌浆⑤嵌补或者铆固。结构物防护:用片石、块石、圆石或者水泥混凝土预制块铺砌护坡,防止坡面风化和被侵蚀。 24、挡土墙种类:按位置①路堑挡土墙②山坡挡土墙③路肩挡土墙④路堤挡土墙按构造形式和特点①石砌重力式②石砌衡重式③钢筋混凝土悬臂式④钢筋混凝土扶壁式⑤柱板式⑥锚杆式⑦锚定板式⑧垛式。 25、软土的工程地质特性:①天然含水率高、孔隙比大②透水性差③压缩性高④抗剪强度低 ⑤触变性和蠕动性⑥抗陷强度低。 26、软土地基加固处理方法:①表层排水法②砂垫层法③稳定剂处治法④开挖换填法⑤强制

相关文档
最新文档