KPI算法统计

KPI算法统计
KPI算法统计

一, TL9000 返还率

a) 返还率计算公式:

×12100%IRR IRR IRR =

?基本装运周期内的返还数

基本装运周期内的发运数

IRR 基本装运周期内发运数:计算月之前6个月的发货总量(不包括计算月) IRR 基本装运周期内返还数:发货在计算月或之前6个月期间内,并在计算月内返还

的总量。

×12100%YRR YRR YRR =

?基本装运周期内的返还数

基本装运周期内的发运数

YRR 基本装运周期内发运数:计算月之前7~18个月的发货总量.

YRR 基本装运周期内返还数:发货在计算月之前7~18个月期间内,并在计算月内返

还的总量。

×12100%LTR LTR LTR =

?基本装运周期内的返还数

基本装运周期内的发运数

LTR 基本装运周期内发运数:计算月之前19个月之前包括第19个月的期间内的发货总量.

LTR 基本装运周期内返还数:发货在计算月之前19个月并且包括第19个月的期间内,并在计算月内返还的总量。

b) 数据源:PMS 包装出库管理信息系统、Oracle 发货系统报表、Oracle CRC 维修系统与新加坡维修数据库查询报表(GSS: Joy Chen).

c) Return Rate 计算月的定义:上月25日至本月的24日

二, FPY(First Pass Yield)

1. System Product FPY

a) 计算公式:Products FPY=SMT FPY(%)*Unit TEST FPY(%) b) 数据源:MES 系统

Manufacturing Quality Weekly Report (QD:许剑鹏)

2. EMS Yield

a) 计算公式:EMS Yield Rate=Yield/Input

b) 数据源:UT KPI Report (Foxconn: Huang Yuanba/东信:汪盈)

三,LRR (Lot Reject Rate)

a)计算公式:LRR= Rejected Lots/ Inspected Lots

b)数据源:Oracle系统

IQC Weekly Report(QD:徐海平/余红华)

四,CoPQ (Cost of Poor Quality )

1.Def/Slow moving inventory scrap

a)计算公式:Material Cost=Qty*Unit Cost

b)数据源: UTS Item Product Line Report(Finance: Xiao Xiao)

Write off List (Logistic: Zheng Aiqin, Su Jing)

2.TBU EMS Material Attrition

a)计算公式:UT承担金额=盘亏总金额-EMS赔偿总金额

b)数据源:EMS 工厂盘点月报(Logistics: Zhao Yufang)

3.Stop Line Cost

a)计算公式:Stop Line Cost=Down Time(H)/6*$100

b)数据源:Production Monthly Report(GSC: Qian Huan)

4.Slow moving(excess) Inventory handling cost

a)计算公式:持库成本=Slow moving库存金额* (年贷款利率/12 + 保险金利率) +

仓库每月管理费用* Slow moving库存金额/ 库存总金额

b)数据源:Inventory Detail List-System Product(GSC: Wu Xiao)

HSTC aging report (Finance: Shelley Jiang)

Logistic Expense report (Finance: Xiao Xiao)

5.UT Rework Cost (Include related labor and material)

a)计算公式:返工成本=返工工时*每小时的制造工时费+材料费用

b)数据源:Production rework cost monthly report(GSC: Wu Zhiyong)

制造工时费(Finance:Xiao Xiao)

6.TBU CSD/"e 站式"/ Cost

a)计算公式:TBU CSD/"e 站式"/ Cost=运费+材料费+劳务费

b)数据源:Warranty monthly report(Finance: Sharon Yang)

7.CRC Material Cost

a)计算公式:CRC Material Cost=CRC Repair Qty*Material Unit Cost

b)数据源:CRC维修器件明细单(IT: Lily Song)

UTS Item Product Line Report (Finance: Xiao Xiao)

8.RMA inventory Scrap Cost

a) 计算公式:RMA inventory Scrap Cost =Qty*Material Unit Cost b) 数据源:备品备件报废清单(GSS: Joy Chen )

UTS Item Product Line Report (Finance: Xiao Xiao)

9. Freight for returned the parts from field

a) 计算公式:Freight =退货运费+CRC 维修运费 b) 数据源:CRC 维修运费(Finance :Sharon Yang )

退货运费 (Logistic: Li Xiuchun) CRC 维修记录 (CRC: Y u JiaYin)

10. MFG Production RMA Labor Cost

a) 计算公式:RMA Labor Cost =RMA Labor (Hrs )*工时费 b) 数据源:CRC 维修运费(FTE :Chen Ting )

11. Int'l COPQ Cost

a) 计算公式:int ’l Warranty Cost

b) 数据源:int ’l Warranty report (Bobby Forbes)

12. Cost Saving

a) 计算公式:累加各条记录金额 b) 数据源:Finance

13. Cost Control

a) 计算公式:累加各条记录金额 b) 数据源:Oracle 系统

五, 可靠性

A. MTBF

∑====n i i g

i )i

π(λN /

/λ:MTBF Q

E QUI P 1

11计算公式 B.

C. 数据源:MIL-HDBK-217F, BOM

六, RoHS Compliance Rate (by module )

数据源:Agile

计算公式:RoHS Compliance Rate =符合RoHS 的模板数量/总的模板数量

步骤如下:

1)输入条件(product line ,description ,q-state ,P/N ,lifecycle ),从Agile 中导出2424开头的Module 清单;

2)整理清单,剔除重复的(00与05/06同时存在的只计05/06,不计00结尾的); 3)根据描述、Q 状态及P/N 结尾特征,筛选出符合与不符合的器件; 4)根据产品线统计各产品的符合比例;

5)根据统计结果,完成统计报告供相关部门参考。

SQA Team ’s KPI

1、Time To Market Slippage Rate Formula :Date

G1 Actual -Date G4 Actural Date

G4 Planned -Date G4 Actual Rate Slippage Market To Time =

Data Source :Master schedule

2、Gate Sign Off Compliance Rate Formula :Passed

Gates Total #Gates

Signed #Rate Compliance Of f Sign Gate =

Data Source :Team Track

3、PRP Deliverables Compliance Rate

# Total Deliverables Requested by PRP # Actual Deliverables

Formula :PRP Deliverables Compliance Rate=

Data Source :EDOC/PDS

4、Requirement Change Rate

Formula :Requirement Change Rate=

# Changed SRS Items # Total SRS Items

Data Source :SRS/TeamTrack

5、Review Defect Density

Formula :Pages

T otal #Reviewer

by Detected Defects #Density Defect

Review =

Data Source :TeamTrack/Doc Author

6、Review Efficiency

Formula :Hours

Total #Pages

Review #Ef f iciency Review =

Data Source :TeamTrack/Doc Author

7、Review Preparation Time

Formula :Review Preparation Time=Review Meeting Date-Distribute Review Document Date

Data Source :TeamTrack/Doc Author

8、Review Defect Rate

Formula :Hours

Total #Reviewer

by Detected Def ects # Rate Def ect Review =

Data Source :TeamTrack/Doc Author

9、Productivity (LOC)

Formula :Productivity (LOC) = (New+Removed+Modified) Line of Code Data Source :ClearCase

10、Overall Internal Defect Density

Formula :KLOC

Modified)+Removed +(New Defects

Overall #Density Defect Internal Overall =

Data Source :ClearCase/TeamTrack

11、Defect Detection Percentage Formula

phase

after that and during detected defects T otal #phase

a during detected Defects #Percentage Detection Defect =

Data Source :ClearCase/TeamTrack

12、Defect Detection Rate

Formula :def ect

Total #phase

a during detected Def ects #Rate Detection Def ect =

Data Source :ClearCase/TeamTrack

13、Requirement Test Coverage Rate

Formula :Requirement Test Coverage Rate=# Covered SRS Items

# Total SRS Items

Data Source :ST

14、ST Pass Rate Formula :Case

Executed #Cases

Passed #Rate Pass ST =

Data Source :ST

15、Rejected Internal MR Rate Formula :MR

Total #MR

Rejected #Rate MR Internal Rejected =

Data Source :ClearQuest

16、Internal MR Resolution Time(Day)

Formula :MR

Resolved #Time

Resolution Total Time(Day) Resolution MR Internal =

Data Source :ClearQuest

17、Software COPQ

Formula :Software COPQ = Rework Efforts *7$ Data Source :ClearQuest

18、Software Rework Efforts

Formula: Software Rework Efforts = # Defects detected during phase1 * coefficient during phase1 + # Defects detected during phase2* coefficient during phase2……+ # Defects detected during phase5 * coefficient during phase5

Data Source :ClearQuest

19、Resolve Rate of Beta Release Formula :

Beta

Bef ore MR Submitted Total #Beta

Bef ore R Rejected)M +Duplicated +Closed +Verif ied +Resolved (RFB #Release Beta of Rate Resolve +=

Data Source :ClearQuest

20:# Unresolved S1/S2 MR of Beta Release Formula :#(New+Assigned+Failed+Analyzing+InsufficientInfo+Postponed )S1&S2 MR at beta point

Data Source :ClearQuest

21、Field MR Resolution Time SLA Compliance Rate Formula :

period

in this MR Overtime)+(Resolved #period

in this on time MR Resolved #Rate Compliance SLA T ime Resolution MR Field =

Note:

1). Statistic cycle time is 30 days.

2). ‘Overtime MR in this period ’ includes those MR which are not overtime in last period, and become overtime during this period. Data Source :ClearQuest

22、Field MR Closure Time SLA Compliance Rate Formula :

period

in this MR Overtime)+(Closed #period

in this on time MR Closed #Rate Compliance SLA T ime Closure MR Field =

Note:

1). Statistic cycle time is 60 days.

2).‘Overtime MR in this period ’ includes those MR which are not overtime in last period, and become overtime during this period. Data Source :ClearQuest

23、Field MR Resolve Rate Formula :

MR

Total #MR

Rejected)+Duplicated +Closed +Verif ied +Resolved +(RFB #Rate Resolved MR Field =

Data Source :ClearQuest

24、Field MR Close Rate

Formula :MR

Total #MR

Closed #Rate Closed MR Field =

Data Source :ClearQuest

25、Field MR Leak Rate

Formula :MR

Field)+(Dev T otal #MR

Field #Rate Leak

MR Field =

Data Source :ClearQuest

CEM T eam’s

1、Service Request (SR) On Time Response Rate

Formula:

SR On Time Response Rate=On Time Response SR during This Period / Total Response SR during This Period

Note:

For Critical SR, On Time Response means Respond <0.5H

For Major SR, On Time Response means Respond <0.5H

For Minor SR, On Time Response means Respond <2H

Target: 90%

Data Source:Oracle

2、Service Request (SR) On Time Resolved Rate

Formula:

SR On Time Resolving Rate=On Time Resolved SR during This Period / Total Resolved SR during This Period

Note:

For Critical SR, On Time Resolved means Resolved <24H

For Major SR, On Time Resolved means Resolved <72H

For Minor SR, On Time Resolved means Resolved <15Days

Target: 97%

Data Source:Oracle

3、Service Request (SR) On Time Recover Rate

Formula:

SR On Time Recover Rate=On Time Recover SR during This Period / Total Recover SR during This Period

Note:

For Critical SR, On Time Recover means Recover <1H

For Major SR, On Time Recover means Recover <2H

Target: 80%

Data Source:Oracle

4、SR Resolved Rate

Formula:

SR Resolved Rate= Resolved SR during This Period / Total Submit SR during This Period

Data Source:Oracle

5、SR Close Rate

Formula:

SR Close Rate= Closed SR during This Period / Total Submit SR during This Period Data Source:Oracle

Change management

KFE/Mini-KFE项目相关测量指标

项目数量=系统里注册的项目数量累计

数据来源;KFE workflow 后台数据系统

参与率=参与的人次/ 总人数

数据来源;KFE workflow 后台数据系统

关闭率=关闭的项目数量/ 总的项目数量

数据来源:KFE workflow 后台数据系统

Cost saving = 项目产生的收益-投入的费用

数据来源:各项目报告