Biological phosphorus and nitrogen removal in a sequencing batch moving bed biofilm reactor

Biological phosphorus and nitrogen removal in a sequencing batch moving bed biofilm reactor
Biological phosphorus and nitrogen removal in a sequencing batch moving bed biofilm reactor

BIOLOGICAL PHOSPHORUS AND NITOGEN REMOVAL IN A

SQUENCHING BATCH MOVING BED BIOFILM REACTOR

H. Helness* and H. ?degaard**

* SINTEF Civil and Environmental Engineering, N-7034 Trondheim - Norway

E-mail: herman.helness@civil.sintef.no

** Faculty of Civil and Environmental Engineering, Norwegian University of Science and Technology

(NTNU), N-7034 Trondheim, Norway

E-mail: Hallvard.Odegaard@bygg.ntnu.no

ABSTRACT

Biological phosphorus and nitrogen removal in biofilm processes have a potential advantage compared to

activated sludge processes, because of less vulnerability with respect to sludge loss and because biofilm

processes, in general, are more compact with a smaller footprint. However, with biological phosphorus removal

a biofilm process differs from an activated sludge process because greater care must be taken to avoid

competition from non-phosphorus accumulating heterotrophic bacteria. Another difference is that in a biofilm

process, nitrification will always occur under conditions favourable for bio-P. Experiments have been carried

out, demonstrating that biological phosphorus and nitrogen removal can be achieved in a moving bed biofilm

reactor operated as a SBR, with simultaneous nitrification, phosphorus uptake and denitrification in the aerobic

phase.

KEYWORDS

Biofilm; biological phosphorus removal; nitrogen removal; moving bed; sequencing batch reactor; wastewater

INTRODUCTION

Biological phosphorus and nitrogen removal in biofilm processes have a potential advantage compared to activated sludge processes, because of less vulnerability with respect to sludge loss and because biofilm processes, in general, are more compact with a smaller footprint.

Most of the research on bio-P has been conducted with activated sludge systems. However, there are reports of bio-P in laboratory or pilot scale biofilm processes were fixed bed filters have been operated in a sequencing batch mode or as a continuos process with several filters in series (Gonzales-Martines and Wilderer, 1991, Goncalves and Rogalla, 1992, Goncalves et. al. 1994, Kerrn-Jespersen et. al. 1994, Morgenroth, 1998). Shin and Park reported bio-P in a laboratory scale sequencing batch reactor (SBR) with a porous biomass carrier (Shin and Park, 1991).

Simultaneous nitrification and denitrification can be achieved under aerobic conditions in the bulk water phase, in a process with a thick biofilm. Oxygen will only penetrate to a certain depth in the biofilm giving an outer aerobic layer, were nitrification occurs. The deeper layers will be anoxic with denitrifying bacteria utilising the nitrate produced by the nitrifyers in the outer layer. Biological phosphorus removal with simultaneous nitrification - denitrification and phosphate uptake in the aerobic phase has been reported in biofilm systems by several authors (Garzón-Zú?iga and González-Martínez, 1996, Castillo et. al. 1998, Helness and ?degaard, 1998 and Pastorelli et.al. 1998).

In this work we have used a sequencing batch moving bed biofilm reactor (SBMBBR) with a plastic biofilm carrier suspended in the wastewater. In this paper we present results, from an ongoing experimental program, with respect to combined biological phosphate and nitrogen removal.

BIO-P IN A MOVING BED BIOFILM PROCESS

In a moving bed biofilm process the solids retention time is governed by sloughing of biomass. At steady state with a constant biomass concentration, the solids retention time (SRT) will correlate with the loading rate of the process. In a sequencing batch reactor used for bio-P, one may define several loading rates referring to the anaerobic phase, the aerobic phase and the total cycle. To avoid competition from non-phosphate accumulating aerobic heterotrophs, all influent COD should be taken up by phosphate accumulating organisms (PAO) in the anaerobic phase. This implies that even at the maximum anaerobic COD-loading rate, one may have a low total COD-loading rate on the process. Based on the biochemical model for bio-P developed by Smolders (Smolders et. al. 1994a, b and 1995) and later formulated for denitrifying phosphate uptake by Kuba (Kuba et.al. 1996a), one may therefore expect the phosphate uptake to be controlled by the availability of poly-β-hydroxy-alkanoates (PHA) in the aerobic phase. Due to the low total COD-loading rate, one will also get nitrification in such a process. In order to ensure complete nitrification, the aerobic phase must be long enough to allow this.

One has, therefore, a situation with potentially conflicting interests, imposing certain limiting factors on the process. In general the ratio of COD to phosphate in the influent must be high enough for removal of all phosphate. In a process with denitrifying phosphate uptake by denitrifying phosphate-accumulating bacteria (DPB), there must also be sufficient ammonium available for denitrification. Given these criteria for the influent quality, the SBR-cycle must be tuned. On one hand the anaerobic COD-loading rate should be kept low enough to avoid competition from non-phosphate accumulating aerobic heterotrophs, and on the other hand the total COD-loading rate should be high enough to give sufficient PHA for phosphate uptake and a net growth of biomass. One strategy for achieving this could be to operate with a relatively short total cycle length in order to have a high enough total COD-loading rate and use a relatively long anaerobic phase to minimise the competition from aerobic heterotrophs. However, one must at the same time keep the aerobic ammonium load low enough to achieve complete nitrification. The minimum length of the aerobic phase may therefore be controlled by the nitrification.

METHODS

The studies were carried out in a laboratory scale SBR (10 l water volume, 53% filling of Kaldnes K1 biofilm media) with a constructed wastewater. A description of the laboratory apparatus has been reported earlier (Helness and ?degaard, 1998).

Acetate was used as carbon source and a phosphate buffer was used as P-source. The total loading rates of acetate measured as COD and phosphorus were varied in the range 0.3 - 1.2 kg SCOD/m3*d and 0.012 - 0.131 kg PO4-P/m3*d respectively. The wastewater also contained ammonium (25 mg NH4-N/l) corresponding to an aerobic loading rate in the range 0.03 - 0.28 kg NH4-N/m3*d. The pH was controlled at 7.0 - 7.5 by addition of HCl (0.5 M) or NaOH (0.5 M). The SBR was operated with a total cycle length of 4 to 6 hours and varying lengths of the anaerobic period (1 to 3 hours). The water volume in the reactor was emptied completely between each cycle. All wastewater analyses were performed according to Norwegian Standard.

RESULTS AND DISCUSSION

Limiting conditions

Before we discuss the results with respect to removal of phosphate and nitrogen we will briefly discuss some factors that set limits to the conditions for sucsessfull operation of the process.

Figure 1A illustrates the importance of competition between PAO and other heterotrophs, and the effect of a too low total COD-loading rate. Figure 1B illustrates the effect of a low COD/P ratio in the feed and the effect of nitrite accumulation.

A B

Fig. 1 Aerobic phosphate removal rate versus aerobic phosphate loading rate at different total COD-loading rates (A), and at different aerobic nitrite accumulation rates (B).

In Figure 1A a plot of the aerobic phosphate-removal rate versus the aerobic phosphate-loading rate is shown for experiments with total COD-loading rates of 0,45 kg SCOD/m3*d and 0,9 kg SCOD/m3*d.

The experiments with a total COD-loading rate of 0,9 kg SCOD/m3*d were run with a COD/P ratio slightly above what was required to achieve complete removal of phosphate, and the results show excellent phosphate removal in some experiments. However, some of the results at this COD-loading rate show a removal of phosphate of only 50%. In these experiments the anaerobic COD removal was low (average 60%) while the average anaerobic COD removal in the experiments with good phosphorus removal was 84%. If the anaerobic period is shorter than necessary for consumption of all influent COD, the fraction of PAO in the biofilm may decrease due to growth of heterotrophs other than those responsible for bio-P in the aerobic period. This in turn will lead to a poor removal efficiency of phosphate. Also, this may cause the phosphate uptake in the aerobic phase to be limited by the amount of COD taken up by the PAO in the anaerobic period, even if the influent COD/P ratio is higher than required for complete removal of phosphate.

In the experiments with a total loading rate of COD of 0,45 kg SCOD/m3*d, the total COD-loading rate is too low to achieve a net growth of biomass. Consequently the removal of phosphate is poor. The minimum total COD-loading rate will depend on the amount of biomass in the system. For the system used in these experiments this value is about 0,5 kg SCOD/m3*d.

In Figure 1B, the aerobic phosphate-removal rate is shown for two sets of experiments at a total COD-loading rate of 0,7 kg SCOD/m3*d. The low COD/P ratio in the feed can be seen from the shift in results towards higher loading rates. These experiments were run with an excess of phosphate relative to COD in

the feed, and complete removal of phosphate was therefore not possible even if all influent COD was consumed in the anaerobic phase. However, in the experiments with a low average nitrite accumulation rate, the phosphate removal rate increases with increasing phosphate loading rate, and is close to the maximum rate possible considering the COD limitation in the feed. In the experiments with nitrite accumulation the aerobic phosphate removal rate shows a maximum value of 0,05 kg PO4-P/m3*d. The reason for this is probably inhibition of the phosphate uptake by nitrite, which has also been reported in other studies, (Christensson 1996, Kuba et. al. 1996b). In this set of experiments the aerobic phase was short (1,7 hours), giving a high ammonium-loading rate, which resulted in incomplete nitrification and accumulation of nitrite.

To achieve good phosphate removal the limiting conditions discussed above must be avoided. A low COD/P ratio in the feed can be dealt with by dosage of a carbon source, and maintaining a sufficient total COD-loading rate is a matter of controlling the total cycle length. To avoid competition from non bio-P aerobic heterotrophs, good anaerobic COD removal is essential. Figure 2A shows the anaerobic COD-removal rate versus the anaerobic COD-loading rate. The results so far indicate that the anaerobic COD loading rate should be kept below 2,5 kg SCOD/m3*d in order to have stable performance. However, much higher removal rates have been observed and further studies are required to determine the limits with respect to the anaerobic COD-loading rate.

To avoid inhibition by nitrite accumulation, the aerobic phase should be long enough to achieve complete nitrification. The removal efficiency of ammonium at different aerobic loading rates of ammonium is shown in Figure 2B. The results show that one should operate at an aerobic ammonium loading rate below about 0.2 kg NH4-N/m3*d in order to achieve nitrification efficiency of about 90% with the wastewater used here. In our experimental set-up an aerobic ammonium loading rate of 0.2 kg NH4-N/m3*d corresponds to an aerobic phase of 2.5 hours, which is longer than used in the experiments with a total COD-loading rate of 0.7 kg SCOD/m3*d that were discussed above.

A B

Fig. 2 Anaerobic COD-removal rate versus anaerobic COD-loading rate (A) and removal efficiency of ammonium versus aerobic ammonium loading rate (B).

Phosphate and nitrogen removal

With the criteria discussed above fulfilled the process showed excellent phosphate removal. As expected, the aerobic phosphate uptake showed a strong correlation to the anaerobic phosphate release, Figure 3A. Since production of PHA necessary for phosphate uptake is linked to phosphate release, a high phosphate

of 70%–90%.

A B

Fig. 3 Aerobic phosphate uptake versus anaerobic phosphate release (A), and net aerobic nitrogen removal

rate versus aerobic nitrogen loading rate (B).

Since the only nitrogen fed to the system was ammonium, the results show that nitrification and denitrification can be achieved simultaneously in the aerobic phase of such a process. The DO concentration reached 2 mg O/l shortly after start of aeration, and oxygen was therefore available as electron acceptor in the aerobic phase. As discussed earlier the effect is explained by a layered biofilm were the deeper layers are anoxic.

The results show that good nitrogen removal was achieved only in experiments with good anaerobic COD removal and that these experiments also showed good phosphate removal. Since the COD was removed in the anaerobic phase where there was no nitrate, it is possible that phosphate was removed by bacteria using nitrate as electron acceptor. This is supported by a test were nitrate was added to the reactor at the start of the aerobic phase, resulting in an increased phosphate removal rate (data not shown). However, the ratio of COD removed to nitrogen removed was higher than expected according to the model for denitrifying phosphorus-removing bacteria (DPB) reported by Kuba (Kuba et. al., 1996a). Also, the ratio of nitrogen removed to phosphorus removed varied showing both higher and lower values than expected according to the model reported by Kuba (Kuba et. al., 1996a). Another explanation may be that denitrifying bacteria capable of storing COD in the anaerobic phase were present. We have not seen this reported, but van Loosdrecht proposed that storage polymers might play an important role under conditions were the availability of substrate varies greatly (van Loosdrecht et. al. 1996). Probably the biomass contained a mixed population of DPB and other denitrifying bacteria in the deeper anoxic layers as well as bacteria capable of aerobic phosphate uptake in the outer aerobic layers. The competition between the two groups of denitrifying bacteria may also limit the phosphate removal capacity, even when the other limiting factors discussed above have been dealt with.

With a given influent COD concentration, the consumption of COD by other denitrifying bacteria than DPB may limit the phosphate removal by reducing the amount of COD consumed by DPB and aerobic PAO. To account for this effect an estimate of the amount of COD consumed by non bio-P denitrifying bacteria is needed. Assuming that a fixed fraction of the phosphate uptake is performed by DPB, and that the ratio of phosphate taken up to nitrate denitrified is as reported in the model by Kuba (Kuba et. al. 1996a). This estimate can be found from the ratio of denitrification rate to phosphate uptake rate. One may then calculate the amount of COD consumed by the DPB and thus calculate the amount of phosphate that can be removed in different situations. Comparing this value with the amount of phosphate in the feed will reveal whether the process is phosphate limited or COD limited. In this way one may obtain an estimate of the limiting phosphate loading rate in a given situation.

In order to refer this rate to the aerobic phase of the process, we have calculated the limiting aerobic phosphate-loading rate as the sum of the phosphate load due to the anaerobic phosphate release and the load given by the amount of phosphate in the feed which can be removed. In the calculations we used a ratio of phosphate uptake by DPB to phosphate uptake by aerobic PAO of 0.7. This is an average value found in three batch tests (data not shown) for characterisation of the biofilm as described by Wachtmeister (Wachtmeister et. al.1997). The results of the calculations with all data included are shown in Figure 4. The good correlation between the limiting loading rate and the measured uptake rate indicates that the limiting factors have been accounted for and supports the conceptual model presented earlier.

Fig. 4 Aerobic phosphate removal rate versus limiting aerobic phosphate loading rate.

The calculations demonstrated that the majority of the data are from conditions where the phosphate uptake most probably was COD-limited. In situations with a low COD/P ratio in the feed or competition from non bio-P heterotrophs (denitrifying or not), this is as expected. However, inhibition of the phosphate uptake by nitrite will over time also lead to lower anaerobic COD-uptake because the poly-P pool in the bacteria will be depleted.

The COD consumption for simultaneous phosphate uptake and denitrification by DPB is less than the total COD consumption for aerobic phosphate uptake by PAO and separate denitrification by denitrifying bacteria that do not accumulate phosphate. In a process for combined nitrogen and phosphorus removal, simultaneous nitrification-denitrification and anoxic phosphate uptake is therefore an advantage with respect to COD requirement and plant volume, compared to aerobic phosphate uptake and denitrification in a separate anoxic phase. The question is therefore how to optimise the process in order to favour DPB. The results show that the ratio of COD removed to nitrogen removed and the ratio of nitrogen removed to phosphorus removed are closer to the model (but still too high) in the experiments with a total COD-loading rate of 0,7 kg SCOD/m3*d than in the experiments with a total COD-loading rate of 0,9 kg SCOD/m3*d. We believe that the difference in COD/P ratio in the influent is important in this respect but other factors may also play a role. Further batch experiments are currently being performed in order to

characterise the biomass in the reactor, with respect to the ratio of denitrifying phosphate uptake and

aerobic phosphate uptake under different conditions.

SUMMARY OF REQUIRED CONDITIONS

The results show that biological phosphorus and nitrogen removal can be achieved in a moving bed biofilm

reactor. In evaluating the potential for a full-scale process, one should keep in mind that the results are

from a laboratory scale process operated with a constructed wastewater. However, the obtained removal

rates are about the same as the values reported by Pastorelli, who ran experiments with real wastewater and

added acetate as additional carbon source (Pastorelli et. al.1998).

In Table 1 a summary of the conditions required for efficient biological phosphate and nitrogen removal in

a SBMBBR is presented. The values in the table present the status as of today with respect to criteria for

operating conditions. However, the experimental program continues and the values are therefore not to be

taken as final conclusions. In the table we have used the easily biodegradable soluble COD (BSCOD) as

the fraction of organic matter which should be used when calculating the loading rate.

Table 1, Conditions for efficient phosphate and nitrogen removal in a SBMBBR

Parameter Criteria for P-removal > 95% and

nitrogen removal > 70%

Total BSCOD-loading rate, kg BSCOD/m3*d >

0,5

2,5 Anaerobic BSCOD-loading rate, kg BSCOD/m3*d <

0,2 Aerobic ammonium loading rate, kg NH4-N/m3*d < BSCOD/PO4-P ratio in influent, mg BSCOD/mg PO4-P ~

40

In order to illustrate the fact that these values lead to a compact process, we have calculated the necessary

lengths of the anaerobic and aerobic phase in an example shown below. It must be stressed that this

example only indicates the potential of the process and that experiments with real wastewater need to be

run to verify this.

Given a wastewater with total-COD: 400 mg COD/l, BSCOD: 80 mg BSCOD/l, 3,5 mg PO4-P/l and 25 mg

NH4-N/l, a process scheme where particulate matter is efficiently removed by enhanced primary treatment,

and that the objective in the biological step is to remove soluble phosphate and nitrogen. To meet the

required BSCOD/P ratio an additional 60 mg BSCOD/l must be added, for example as acetic acid.

Assuming that the biofilm media occupies 12% of the reactor volume, a maximum anaerobic loading rate

of 2,5 kg BSCOD/m3*d gives a minimum anaerobic phase of 1,2 hours. A maximum ammonium loading

rate of 0,2 kg NH4-N/m3*d gives a minimum aerobic phase of 2,7 hours. The amount of phosphate released

in the anaerobic phase would be expected to be about 55 mg PO4-P/l. To operate with an aerobic phosphate

loading rate of 0,35 kg PO4/m3*d, the aerobic phase would need to be 3,5 hours for complete phosphate

removal. Thus the total cycle length would have to be set at 4,7 hours. The resulting total BSCOD-loading

rate would then be 0,63 kg BSCOD/m3*d, which should be acceptable.

In addition there will be time needed for filling and emptying of the reactor, and for primary and final separation. However, a residence time of less than 5 hours in the biological step illustrates the potential for

achieving a compact process for combined biological phosphorus and nitrogen removal.

CONCLUSIONS

Biological phosphorus and nitrogen removal can be achieved in a moving bed biofilm reactor operated as a SBR. In order to achieve good phosphorus and nitrogen removal, the length of the anaerobic period should be tuned to achieve near complete removal of easily biodegradable COD in the anaerobic period, and the length of the aerobic period should be long enough for complete nitrification. The total COD-loading rate must at the same time be kept high enough to achieve a net growth of biomass in the reactor.

In order to evaluate the full scale potential of the process, further studies are required. The experimental program continues with focus on optimisation of the process with respect to denitrifying phosphate uptake, and experiments with real wastewater to verify the results from experiments with constructed wastewater, reported in this paper.

REFERENCES

Castillo, P. A., González-Martínez, S. and Tejero, I. (1998): Biological phosphorus removal using a biofilm membrane reactor.

Operation at high organic loading rates. Proceedings from: AWT98 - Advanced Wastewater Treatment, Recycling and reuse, Milano 14-16 September 1998, Vol. 1, pp. 485-492.

Christensson, M. (1996): Personal communication.

Garzón-Zú?iga, M. A. and González-Martínez, S. (1996): Biological phosphate and nitrogen removal in a biofilm sequencing batch reactor. Wat. Sci. Tech., 34, No. 1-2, pp. 293-301.

Gonzales-Martinez, S. and Wilderer, P.A. (1991): Phosphate removal in a biofilm reactor, Wat. Sci. Tech., 23, pp. 1405-1415. Goncalves, R. F., Rogalla, F. (1992): Biological phosphorus removal in fixed film reactors, Wat. Sci. Tech., 25, No. 12, pp. 165-174.

Goncalves, R. F, Le Grand, L. and Rogalla, F. (1994): Biological phosphorus uptake in submerged biofilters with nitrogen removal, Wat. Sci. Tech., 29, No. 10/11, pp. 135-143.

Helness, H. and ?degaard, H. (1998): Biological phosphorus removal in a sequencing batch moving bed biofilm reactor.

Proceedings from: AWT98 - Advanced Wastewater Treatment, Recycling and reuse, Milano 14-16 September 1998, Vol.

1, pp. 239-246.

Kerrn-Jespersen, J. P., Henze, M. and Strube, R. (1994): Biological phosphorus release and uptake under alternating anaerobic and anoxic conditions in a fixed film reactor, Wat. Res., 28, No. 5, pp. 1253-1255.

Kuba, T., Murnleitner, E., van Loosdrecht. M. C. M. and Heijnen, J. J. (1996): A metabolic model for biological phosphorus removal by denitrifying organisms, Biotechnology and Bioengineering, 52, pp. 685-695.

Kuba, T., van Loosdrecht. M. C. M. and Heijnen, J. J. (1996): Effect of cyclic oxygen exposure on the activity of denitrifying phosphorus removing bacteria, Wat. Sci. Tech, 34, No. 1-2, pp. 33-40.

Morgenroth, E. (1998): Enhanced Biological Phosphorus Removal in Biofilm Reactors, PhD. thesis, Wassergüte- und Abfallwirtschaft, Technische Universit?t München.

Pastorelli, G., Canziani, R., Pedrazzi, L. and Rozzi, A. (1998): Phosphorus and nitrogen removal in moving-bed sequencing batch biofilm reactors. Proceedings from: AWT98 - Advanced Wastewater Treatment, Recycling and reuse, Milano 14-

16 September 1998, Vol. 1, pp. 247-254.

Shin, H-S. and Park, H-S. (1991): Enhanced nutrient removal in porous biomass carrier sequencing batch reactor (PBCSBR), Wat. Sci. Tech., 23, No. 4/6, pp. 719-728.

Smolders, G. J. F., van der Meij, J., van Loosdrecht, M. C. M. and Heijnen, J. J. (1994): Model of the anaerobic metabolism of the biological phosphorus removal process: Stoichiometry and pH influence, Biotechnology and Bioengineering, 43, pp.

461-470.

Smolders, G. J. F., van der Meij, J., van Loosdrecht, M. C. M. and Heijnen, J. J. (1994): Stoichiometric model of the aerobic metabolism of the biological phosphorus removal process, Biotechnology and Bioengineering, 44, pp. 837-848. Smolders, G. J. F., Klop, J. M., van Loosdrecht, M. C. M. and Heijnen, J. J. (1995): A Metabolic Model of the Biological Phosphorus Removal Process: I. Effect of the Sludge Retention Time, Biotechnology and Bioengineering, 48, pp. 222-233.

van Loosdrecht M. C. M., Pot, M. and Heijnen J. J. (1996). Importance of bacterial storage polymers in activated sludge processes. Proceedings from: First IAWQ specialised conference on sequencing batch reactor technology, Munich. Wachtmeister, A., Kuba, T., van Loosdrecht, M. C. M. and Heijnen, J. J. (1997). A sludge characterisation assay for aerobic and denitrifying sludge. Wat. Res. 31(3), 471-478.

Wentzel, M. C., Dold, P. L., Ekama, G. A. and Marais, G. v. R. (1985): Kinteics of biological phosphorus release. Wat. Sci.

Tech. 17, No. 11-12, pp. 57-71.

燃气锅炉超低氮排放改造原理及技术

随着国家政府对环境保护的重视以及近几年连续出台的大气污染防治攻坚战文件来看,各地环保局对当地企业强制要求并执行燃煤锅炉更换为低氮燃气锅炉,普通的燃气锅炉实施低氮改造。普通的燃气锅炉尾气排放的有害颗粒物,例如氮氧化物、一氧化碳等,成为大气污染的罪魁祸首,因此锅炉的低氮改造将会是一些生产企业及供暖单位迫切面临的任务。那么,大家只知道锅炉需要改造,但是,燃气锅炉超低氮排放改造的原理是什么,需要什么技术能实现超低氮排放呢?下面,由中鼎锅炉专业技术人员给大家简单介绍一下。 1、氮氧化物危害 氮氧化物即一氧化氮、二氧化氮等气体,为高温条件下,空气中的氮气和氧气化合反应生成。氮氧化物与空气中的水结合最终会转化成硝酸和硝酸盐,硝酸是酸雨的成因之一;它与其他污染物在一定条件下能产生光化学烟雾污染。酸雨危害是多方面的,包括对人体健康、生态系统和建筑设施都有直接和潜在的危害。酸雨可使儿童免疫功能下降,慢性咽炎、支气管哮喘发病率增加,同时可使老人眼部、呼吸道患病率增加。酸雨还可使农作物大幅度减产,特别是小麦,在酸雨影响下,可减产13%至34%。大豆、蔬菜也容易受酸雨危害,导致蛋白质含量和产量下降。酸雨对森林和其他植物危害也较大,常使森林和其他植物叶子枯黄、病虫害加重,最终造成大面积死亡。 2、氮氧化物排放标准 我们知道用燃气锅炉替代燃煤锅炉能够大大降低污染,普通的燃气锅炉氮氧化物排放高于30毫克,这意味着大部分普通的燃气锅炉都达不到30mg以下,除非配有低氮燃烧机,但是使用低氮燃烧机的锅炉本身也是需要有特殊的要求的,那就是对锅炉炉膛尺寸需要加大,中鼎锅炉最新生产的低氮燃气锅炉专门针对环保政策要求的NOX排放30mg以下,且配置超低氮燃烧器,能安全、稳定、高效地运行,每一台出厂的低氮锅炉均能达到低氮排放达标。

燃气锅炉低氮改造方案培训课件

燃气锅炉低氮改造方案 燃气锅炉低氮排放成为了新时代的新要求,为了保护环境,保证国人健康,燃气锅炉低氮排放势在必行,使命必达。 远大锅炉紧跟时代步伐,积极响应国家政策,时刻不忘研发新产品,不忘为用户谋福利。 远大低氮燃气锅炉:FGR烟气再循环低氮燃烧技术;国外原装进口低氮燃烧器; 压力、水位多重安全防护;PLC触摸屏智能化控制技术。 远大锅炉低氮技术研发历程: 保护环境,节能减排,绿色生产,可持续发展是每一个企业的使命,远大锅炉每年按销售额的5%提取新产品研发费用,专注低氮、节能锅炉技术的研发。 2015年,远大锅炉与芬兰奥林、德国欧科、意大利利雅路、意科法兰等积极合作,通过使用超低NOx燃烧器,增加烟气外循环设计,实现氮氧化物<30mg/m 3排放标准。 NOx成分分析及产生机理: 在燃烧过程中所产生的氮的氧化物主要为NO和NO2,通常把这两种氮氧化物通称为氮氧化物NOx。大量实验结果表明,燃烧装置排放的氮氧化物主要为NO,平均约占95%,而NO2仅占5%左右。

燃料燃烧过程生成的NOx,按其形成分类,可分为三种: 1、热力型NOx (Thermal NOx),它是空气中的氮气在高温下氧化而生成的NOx; 2、快速型NOx(Prompt NOx),它是燃烧时空气中的氮和燃料中的碳氢离子团如CH等反应生成的NOx; 3、燃料型NOx(Fuel NOx),它是燃料中含有的氮化合物在燃烧过程中热分解而又接着氧化而生成的NOx; 燃烧时所形成NO可以与含氮原子中间产物反应使NO还原成NO2。实际上除了这些反应外,NO 还可以与各种含氮化合物生成NO2。在实际燃烧装置中反应达到化学平衡时,[NO2]/[NO]比例很小,即NO转变为NO2很少,可以忽略。 降低NOx的燃烧技术: NOx是由燃烧产生的,而燃烧方法和燃烧条件对NOx的生成有较大影响,因此可以通过改进燃烧技术来降低NOx,其主要途径如下: 1选用N含量较低的燃料,包括燃料脱氮和转变成低氮燃料; 2降低空气过剩系数,组织过浓燃烧,来降低燃料周围氧的浓度; 3在过剩空气少的情况下,降低温度峰值以减少“热反应NO”; 4在氧浓度较低情况下,增加可燃物在火焰前峰和反应区中停留的时间。 减少NOx的形成和排放通常运用的具体方法为:分级燃烧、再燃烧法、低氧燃烧、浓淡偏差燃烧和烟气再循环等。 目前低氮改造方案 1、FGR技术: 即自身再循环燃烧器,对于天燃气锅炉来说目前主流成熟低氮排放技术就是分级燃烧加烟气再循环法即FGR技术,

消化内科试题

1.重度胃食管反流病的治疗应采用 A A.质子泵抑制剂与促动力药联用 B.H2受体拮抗剂与促动力药联用 C.质子泵抑制剂与粘膜保护药联用 D.促动力药与H2受体拮抗剂联用 E.促动力药、H2受体拮抗剂及粘膜保护药联用2.胃食管反流病治疗至少应维持用药B A.3个月 B.6个月 C.1年 D.1年半 E.2年 3.有关非甾体抗炎药哪项是正确的C A.诱发消化性溃疡与剂量和疗程无关 B.长期服用者约50%有消化性溃疡 C.可穿透上皮细胞而破坏粘膜屏障 D.为弱酸性水溶性药物 E.可促进促胃液素分泌致消化性溃疡 4.抗幽门螺杆菌的根除方案哪项不正确E A.质子泵抑制剂+克拉霉素+阿莫西林 B.质子泵抑制剂+克拉霉素+甲硝唑 C.质子泵抑制剂+阿莫西林+甲硝唑 D.胶体铋+阿莫西林+甲硝唑 E.胶体铋+质子泵抑制剂+甲硝唑

5.消化性溃疡治疗中不属于抑制胃酸分泌的药物是A A.氢氧化铝 B.普鲁本辛(澳丙胺太林) C.丙谷胺 D.雷尼替丁 E.奥美拉唑 6.降低胃酸最有效的药物是D A.H2受体拮抗剂 B.抗胆碱药物 C.促胃液素受体拮抗剂 D.质子泵抑制剂 E.抗酸剂 7.轻、中型溃疡性结肠炎治疗的首选是B A.肾上腺皮质激素 B.水杨酸偶氮磺胺吡啶 C.免疫抑制剂 D.抗生素 E.双歧杆菌制剂 8.治疗重型溃疡性结肠炎应首选C A.水杨酸偶氮磺胺吡啶 B.免疫抑制剂 C.大剂量肾上腺糖皮质激素 D.手术治疗

E.大剂量抗生素 9.治疗轻中度溃疡性结肠炎的主要口服药物有C A.泼尼松 B.环磷酰胺 C.SASP D.甲硝唑 E.抗生素 10.下列哪项不是SASP的副作用E A.恶心、呕吐 B.食欲不振 C.自身免疫性溶血 D.粒细胞减少 E.不可逆性男性不育 11.柳氮磺胺吡啶治疗溃疡性结肠炎的机制是B A.降低肠腔酸度,促进溃疡愈合 B.抑制炎症反应 C.促进肠上皮细胞再生 D.抑制细菌生长 E.免疫抑制作用 12.服用硫酸镁导致的腹泻从发病机制上分类应属于D A.胃肠运动功能异常性腹泻 B.分泌性腹泻 C.渗出性腹泻

燃气锅炉低氮改造施工方案

燃气锅炉低氮改造施工方案 项目名称:xxx燃气锅炉低氮改造工程编制单位: 编制时间:2016年10月13日

第一章工程概况 1.1工程简介 1.1.1本工程为xxx燃气锅炉低氮改造工程。首先需采购新锅炉,拆除原有锅炉、烟囱、电气设备、部分水暖和燃气管道等;然后安装新锅炉,管道、烟囱重新布置。 1.1.2本项目施工范围 1.锅炉房内原有锅炉、采暖及燃气管线、电气设备、烟囱的拆除; 2.锅炉房设备管道安装,其中有锅炉、管道等安装; 3.电气工程,包括电气动力和电气照明; 4.烟囱安装; 5.燃气工程。 第二章施工准备 在工程正式开工前,需现场勘查,确认实际施工条件和工程量,以利于施工的计划的安排和顺利进行。另一方面应该积极设备供货厂家,了解设备技术参数、基础做法、安装尺寸等,为施工做好充足准备。 2.1临时设施 根据现场实际情况,由甲方指定地点作为临时设施存放和现场预制场地。 2.2临时用电 临时用电由甲方指定的地点挂表接入,现场用电包括生产用电和生活用电,施工用电主要为电焊机、切割机、磨光机、照明设施等。临时用电采用三级配电,两级保护,保证用电安全。 2.3临时用水 临时用水从甲方指定地点接入。主要用于生活用水和施工用水,施工用水主要为土建砌筑用水和混凝土基础养护、打压和冲洗用水等。 2.4生产准备

重点完成工作场地布置、临时水源、临时电源、人员组织及进场、机械设备组织及进场计划、工程材料准备及进场计划、图纸会审及设计交底、现场纵横基准线与标高基准点复核等。 2.5技术准备 施工前要认真研究和熟悉本工程设计文件并进行现场核实,组织有关人员学习设计文件,图纸及其它有关资料,使施工人员明确设计者的设计意图,熟悉设计图纸的细节,对设计文件和图纸进行现场校对。 2.6材料准备 针对本工程的施工内容,在开工之前对工程所需锅炉设备、电气、管道、烟囱等制定采购计划,积极联系资质优良的材料厂家并提出详细的进场计划,严格执行验收与检测程序,确保原材料的质量。 第三章施工进度安排 3.1施工部署 本工程为低氮改造工程,首先得安排设备采购订货,尤其是锅炉的采购,预计需要四十天; 其次,组织施工进场,在甲方指定位置引入水电,安排临时生活设施和现场预制加工场地; 第三,拆除需改造设备,锅炉、管路、线路、烟囱等; 第四,根据设计文件和设备参数复核设备基础位置标高,规划管线安装路由、力求布局科学合理; 第五,锅炉、烟囱、电气等新购设备的进场验收; 第六,锅炉、烟囱、管道、仪器仪表、燃气管道设备及电气管线设备安装; 第七,管道系统水压试验、冲洗、防腐保温; 第八,系统冷态调试; 第九,锅炉点火试运行;

柳氮磺吡啶使用注意事项

柳氮磺吡啶使用注意事项 本品口服后,少部分药物在胃和上部肠道吸收。大部分药物进入远端小肠和结肠,在肠微生物作用下分解成5-氨基水杨酸和磺胺吡啶。磺胺吡啶在药物分子中主要起载体作用,在肠道碱性条件下,微生物使重氮键破裂而释出有作用的药物。5-氨基水杨酸有抗炎和免疫抑制作用,能抑制溃疡性结肠炎的急性发作并延长其缓解期。治疗溃疡性结肠炎用肠溶片,口服,成人常用量:初剂量为一日2-3g(8-12片),分3-4次口服,无明显不适,可渐增至一日4-6g(6-24片),待肠病症状缓解后逐渐减量至维持量,一日1.5g-2g(6-8片)。 不良反应:血清磺胺吡啶及其代谢产物的浓度(20-40μg/ml)与毒性有关。浓度超过50μg/ml时具毒性,故应减少剂量,避免毒性反应。 1.过敏反应较为常见,可表现为药疹,严重者可发生渗出性多形红斑、剥脱性 皮炎和大疱表皮松解萎缩性皮炎等;也有表现为光敏反应、药物热、关节及肌肉疼痛、发热等血清病样反应。 2.中性粒细胞减少或缺乏症、血小板减少症及再生障碍性贫血。患者可表现为 咽痛、发热、苍白和出血倾向。 3.溶血性贫血及血红蛋白尿。缺乏葡萄糖6-磷酸脱氢酶患者使用后易发生,在 新生儿和小儿中较成人为多见。 4.高胆红素血症和新生儿核黄疸。由于可与胆红素竞争蛋白结合部位,致游离 胆红素增高。新生儿肝功能不完善,故较易发生高胆红素血症和新生儿黄疸。 偶见发生核黄疸。 5.肝脏损害,可发生黄疸、肝功能减退,严重者可发生急性肝坏死。 6.肾脏损害,可发生结晶尿、血尿和管型尿。偶有患者发生间质性肾炎或肾管 坏死的严重不良反应。 7.恶心、呕吐、胃纳减退、腹泻、头痛、乏力等。一般症状轻微,不影响继续 用药。偶有患者发生艰难梭菌肠炎,此时需停药。 8.甲状腺肿大及功能减退偶有发生。 9.中枢神经系统毒性反应偶可发生,表现为精神错乱、定向力障碍、幻觉、欣 快感或抑郁感。一旦出现均需立即停药。 10.罕见有胰腺炎、男性精子减少或不育症。 注意事项: 1.缺乏葡萄糖-6-磷酸脱氢酶、肝功能损害、肾功能损害患者、血卟啉症、血小 板、粒细胞减少、血紫质症、肠道或尿路阻塞患者应慎用。 2.应用磺胺药期间多饮水,保持高尿流量,以防结晶尿的发生,必要时亦可服 碱化尿液的药物。如应用本品疗程长,剂量大时宜同服碳酸氢钠并多饮水,以防止此不良反应。治疗中至少每周检查尿常规2-3次,如发现结晶尿或血尿时给予碳酸氢钠及饮用大量水,直至结晶尿和血药消失。失水、休克和老年患者应用本品易致肾损害,应慎用或避免应用本品。 3.对呋塞米、砜类、噻嗪类利尿药、磺脲类、碳酸酐酶抑制药及其他磺胺类药 物呈过敏的患者,对本品亦会过敏。 4.治疗中须注意检查以下几项: (1)全血象检查,对接受较长疗程的患者尤为重要。 (2)直肠镜与乙状结肠镜检查,观察用药效果及调整剂量。 (3)治疗中定期尿液检查(每2-3日查尿常规一次)以发现长疗程或高剂量治

燃气锅炉低氮改造施工方案

燃气锅炉低氮改造施工方案

项目名称:xxx燃气锅炉低氮改造工程 编制单位: 编制时间:2016年10月13日 第一章工程概况 1.1工程简介 1.1.1本工程为xxx燃气锅炉低氮改造工程。首先需采购新锅炉,拆除原有锅炉、烟囱、电气设备、部分水暖和燃气管道等;然后安装新锅炉,管道、烟囱重新布置。 1.1.2本项目施工范围 1.锅炉房内原有锅炉、采暖及燃气管线、电气设备、烟囱的拆除; 2.锅炉房设备管道安装,其中有锅炉、管道等安装; 3.电气工程,包括电气动力和电气照明; 4.烟囱安装; 5.燃气工程。 第二章施工准备 在工程正式开工前,需现场勘查,确认实际施工条件和工程量,以利于施工的计划的安排和顺利进行。另一方面应该积极设备供货厂家,了解设备技术参数、基础做法、安装尺寸等,为施工做好充足准备。 2.1临时设施 根据现场实际情况,由甲方指定地点作为临时设施存放和现场预制场地。

2.2临时用电 临时用电由甲方指定的地点挂表接入,现场用电包括生产用电和生活用电,施工用电主要为电焊机、切割机、磨光机、照明设施等。临时用电采用三级配电,两级保护,保证用电安全。 2.3临时用水 临时用水从甲方指定地点接入。主要用于生活用水和施工用水,施工用水主要为土建砌筑用水和混凝土基础养护、打压和冲洗用水等。 2.4生产准备 重点完成工作场地布置、临时水源、临时电源、人员组织及进场、机械设备组织及进场计划、工程材料准备及进场计划、图纸会审及设计交底、现场纵横基准线与标高基准点复核等。 2.5技术准备 施工前要认真研究和熟悉本工程设计文件并进行现场核实,组织有关人员学习设计文件,图纸及其它有关资料,使施工人员明确设计者的设计意图,熟悉设计图纸的细节,对设计文件和图纸进行现场校对。 2.6材料准备 针对本工程的施工内容,在开工之前对工程所需锅炉设备、电气、管道、烟囱等制定采购计划,积极联系资质优良的材料厂家并提出详细的进场计划,严格执行验收与检测程序,确保原材料的质量。 第三章施工进度安排 3.1施工部署 本工程为低氮改造工程,首先得安排设备采购订货,尤其是锅炉的采购,预计需要四十天; 其次,组织施工进场,在甲方指定位置引入水电,安排临时生活设施和现场预制加工场地;

化学预防在AOM DSS模型基础 研究中的启示

化学预防在AOM/DSS模型基础研究中的启示 虽然利用AOM/DSS模型进行化学预防研究的报道数量是十分有限,但是最近和刚出现的研究表明:炎症相关的结肠癌被认为是一种可预防的疾病。到目前为止的基础研究支持用AOM/DSS诱导的小鼠模型作为一个高度相关的系统,而且这种模型在体内化学预防性干预研究中是有意义的。 下面几个部分是概述各种合成和天然膳食成分抑制AOM/DSS诱导肿瘤形成的能力。 环氧合酶(COX-2)抑制剂 在基础研究和临床研究中COX-2对散发性大肠肿瘤发展过程中的明显促进作用已经非常明确,但是抗炎物质如5-氨基水杨酸(5-ASA)对炎症相关性大肠癌的影响仍然存在争议。5-ASA及其衍生物对大肠肿瘤形成的影响已经在AOM/DSS小鼠模型中得到评估。Grimm et al利用低剂量(100mg/kg)和高剂量(300mg/kg)的5-ASA作用于AOM/DSS小鼠模型,研究其化学预防的效果。在这项研究中,小鼠经单次腹腔注射AOM(8mg/kg)后予以2个循环的DSS处理。 同样,给予另一种5-ASA衍生物,即用水杨酸偶氮磺胺吡啶处理AOM/DSS 小鼠,并与与对照组相比,高度异常增生区域的数量减少了20%。在这项研究中仅评估单剂量注射水杨酸偶氮磺胺吡啶后的效果,但是没有评估这种剂量对病变和炎症的形态学亚型的影响。Kohno et al研究报道称在该疾病发生过程中的发展阶段给予水杨酸偶氮磺胺吡啶烟处理,药物对大肠癌抑制效果相对弱些。这种不一致可能是因为实验计划和小鼠品系方面存在着差异。 Kohno et al也报道了用胆烷酸(UDCA)进行处理小鼠,结果抑制AOM/DSS诱导的大肠癌,也没有引起任何有害的影响。 Clapper et al做了一项研究关于评估5-ASA在模型中抑制炎症相关性大肠肿瘤的能力。研究结果表明长期暴露于5-ASA能够减轻炎症相关性大肠癌的损伤。尽管5-ASA大部分有利的影响都归因于它对抑制环氧合酶和前列素H合酶的能力,但是在这项研究中用AOM/DSS诱导的结肠癌模型对照组小鼠与给予5-ASA 处理该模型的小鼠相进行比较,两组的COX-2(基质细胞、上皮细胞)表达水平没有明显差异,该研究结果提示5-ASA的化学预防活性与COX-2表达水平没有关系。实际上,在先前研究中已经表明5-ASA能抑制缺乏COX-2的DLD1结肠癌细胞增值。 Weber等人研究表明5-ASA具有抑制NF-KB活性的能力。NF-KB与靶基因结合力下降会减少一些因子的表达,如促炎性因子、粘附分子、生长因子、炎症介质及抗凋亡基因。5-ASA 衍生物2-14,即一种新的5-ASA衍生物,该衍生物抑制结肠癌细胞增殖的作用是5-ASA的10倍。增殖的细胞核抗原(PCNA)染色证实2-14抗增殖的效果。通过对比,用2-14处理的正常小鼠的结肠黏膜在PCNA染色下并没有明显的变化,从而证实这种化合物基本上不会影响正常结肠

思维导图在元素化合物复习中的应用

龙源期刊网 https://www.360docs.net/doc/5c8049413.html, 思维导图在元素化合物复习中的应用 作者:曾维彭 来源:《年轻人·中旬刊》2019年第09期 摘要:元素化合物知识较多,且物质之间联系较复杂,容量很大,是高三复习的难点之一。笔者通过引入思维导图,研究如何把元素化合物知识显得直观形象,把学生的学习误区变成学习兴趣,解决高三复习的难点。 关键词:思维导图;元素化合物;复习 中圖分类号:G633.8 文献标志码:A 文章编号:1672-3872(2019)20-0212-01 元素化合物知识是高考中必考的知识点之一,题目的设置一般会以元素化合物知识作为载体来考试学生对其掌握程度。但是学生在这一章节的掌握存在很多误区。(1)对知识点掌握不牢固;(2)对元素化合物间的物质变化不是很熟悉;(3)对知识的迁移不是很到位。元素化合物知识太多,学生在记忆的时候只是独立的把这些知识机械地记忆,没有找出他们之间的联系。 1 思维导图概述 思维导图又叫心智导图,是表达发散性思维的有效图形思维工具,简单却又很有效,是一种革命性的思维工具。思维导图自20世纪80年代思维导图传入中国。最初是用来帮助“学习困难学生”克服学习障碍的,但后来主要被工商界(特别是企业培训领域)用来提升个人及组织的学习效能及创新思维能力。它的优点是给你一个支撑点让你凭着想象力和现有的知识去发散,把用不同的符号不同的颜色的线条去把想到的知识以及知识间的联系画在纸上,更直观的让学生了解自己的知识缺陷,弥补不足,也能让教师去发现该学生在思维上不足,给予必要的指导。笔者尝试着利用思维导图作为工具,引导学生将元素化合物的知识建构起来。 2 元素化合物的复习 思维导图呈现一个放射性的思维表达过程,学生可以凭借思维导图发散思维,理清思维脉络。在绘制思维导图的过程中能帮助学生反思学习过程和认知结构,巩固复习知识。 2.1 课前准备 知识储备是画思维导图的基础,要是学生连最基本的化学知识也不记得,那么在建构学习中遇到的障碍会比较大。为了突破这个障碍,笔者会预先几天布置学生将有关的内容利用课余时间进行复习,然后将复习的内容画成思维导图。

初三化学-单元知识总结(思维导图)

知识脉络图 走 进 化 学 世 畀第一单元走进化学世界 组戚■(物质都是由元素组成的)?…一…一' ------- ..结构(分子、原子、离子及其内部结构)畅赏觥诡「娄花:谨<性质(物理性质,化学性质〉 化学研究的对 研究化学的重要逸径是科学探究*而其重要手段是化学实验 化学实验 基本操作 变化规律 化学学习的特点是关注 化的过程及其现象“ 物理变化 化学变化T匕合、分解、置换、复分解 f提出间题 诜计实验方案,确定起歩骤 分析与讨论? 结论 I问题及建议 观察 描述和记录 「交徹 I体验 第二单元我们周围的空气 知识脉络图 }本质区别 C认识常用的九种仪器(名称、实物、示盍图,用途及其注育專项)药品 的取用规则(三不匱则、节约原则、剩余药品处理O) r块状固触锻子》 氮气詡)」约占空气总体积的73%。无色、无味、气体。化学性质不活徴,一般巩F他J [不可燃,也不助燃?用作保护气焊接\灯泡、食品等〉° 稀有气体(He Nev Ar等〉;占6 9毬。狼不活激作保护气,通电发不同颜色光。 二氧化碳(CO?):占0.03% o详见第六单元* 其他气体和杂匮:占0.03% ■, f物理性质:无色、 化学性质 (比较活』 泼,具有、氧 化性,是常 用的氧化剂) 无味、气体,宪度比空气略大,不易溶于水。 严、墮匹(白光、放热、澄清石灰水变浑浊)占燃Z、 2C + 02 = 2 CO 占姝 S +°2 =恥藍紫色火焰、放热、刺激性气味气体〉占墩 4P + 5屯=2P£05(^<放热、浓厚白烟、白色固体) 皎---- 3氏+2% = Fe304(火星四射、放热、黑色固体〕〔蔚可2Mg + 02 =刖耀眼白光、放热、白色固体) 4A1+3O£= 2A1E03<耀眼白光、放热、白色固休) 占懈 2H2+ 0 2= 2H2O 勺 占妒 2C0 + 02= 2C0£ VCH4+202=C02 +-2H20. G炎蓝色或蓝色火焰,放熟 厂工业制法:分离液态空气* (发生物理变化〉 (f 2H2O22H20 + 02f 原理f 2KMnO4= K2HnO4 + MnO£ + O£f I 2KC1O3警 2KC1 + 3O£f 片年奘詈J固体加恐制駿气体(棉花人或反王六直 [固体与鮫氏影温下制取气体 妝第皱詈I排水法〔氧气不易溶于水〉 叹耒衣直丫向上排空气法盪气密度比空气大)固慷,耕末状固体(药匙) I定量(托盘天平:精确到0.1Q 「多童-倾倒(标签、容器口) 少堡T用胶头滴管(垂直、悬空*不能横放或倒置) L定壘T壘筒(平稳、平视)(注意规格的选#)(0. lnL) 使用方法(火柴点燃’外焰加热) 注意事项(使用前,使用时、使用后〉 仪器(试管、蒸发皿、烧杯,烧瓶) ?(l/3x短柄、移动、管口〉 固体(管口〉 物质的加热彳 I注意事项(都要预热、外壁擦干等等) r■方法(水淋刷洗、酸洗或洙涤剂〉 洗涤仪器彳注意事项(热的玻璃仪器不能用冷水恋不能用力刷洗等) I玻璃仪器洗涤干净的标准:不聚水滴、不成股流下 实验步骤:查、装、定、点、收、离、熄4 津賁重 丽j 加热固体制氧就并用排半法收集完汪息事坝 [毕.应先播导管.后停住加热等。验满方法;将带 火星木条伸至瓶口、木条复燃。 l检验方法:将带火星木条伸至瓶中,木条复燃。田 抹J供给呼吸:潜水、/tJ H Jct.LhLJMe- Xi-Jknt 1毕?应先撤导管*后停止加热等。 支持側:炼钢、 I 测定空气中氧气的含量; 、医疗、航空等* 、化工生产、宇航等。 .JW足量红磷在盛有空气的巒闭容器中燃烧。 注竜貝体的实验方法、扌桑作注宣事项等。

煤粉燃烧器

煤粉燃烧器的分析 摘要:本文分析了几种有代表性的预燃室型煤粉稳燃装置的原理及其特性,并根据其原理提出了几种改进的方案。 关键词:回流区;煤粉锅炉燃烧器;钝体 前言:我国电力行业以劣质媒为主要燃料,这是我国能源政策的要求,同时也是我国煤碳资源分布状况、开采运输条件等所决定的。从经济性和发展趋势看,燃油锅炉和燃用优质煤锅炉所占比重将越来越少,燃用劣质煤锅炉,特别是大容量劣质煤锅炉将越来越多。锅炉燃用劣质煤时普遍存在着火困难、燃烧稳定性差、燃尽率低等问题。对于有些煤种,还存在着炉膛水冷壁结焦、尾部受热面磨损腐蚀、排放物严重污染环境等问题。另一方面,要求越来越多的锅炉机组参加电网调峰。锅炉参加电网调峰时,需要改变负荷和调整运行方式,这就进一步加剧了劣质煤锅炉己存在的问题的严重性。这些问题急需解决,而解决这些问题的重要手段就是研制和开发新燃烧设备。 我们小组从《燃烧学》课本上介绍的两种传统煤粉燃烧稳燃装置出发: 旋流稳燃器: 稳燃原理: 旋流射流的一个最大特点就是射流内部有一个反向回流区,旋转的射流不但从射流外侧卷吸周围的介质,而且还从内部回流区内卷吸介质,而内部回流区的烟气温度很高,能有效助燃和稳燃。 存在的问题: 1.预燃筒壁的积粉和结渣: 不能作为主燃烧器在锅炉运行中长期使用,甚至在短期的锅炉点火启动和低负荷稳燃运行使用时也成问题,因预燃室简壁结焦严重或出现局部温度过高而烧毁预燃室. 2.旋流叶片的磨损: 在长期多变负荷运行过程中,旋流叶片受到高速煤粉流的冲刷,容易磨损变形,造成煤粉流的堵塞,影响旋流效果 3.低负荷条件下工作不稳定,容易熄火,需要喷油助燃。 4.对无烟煤等低挥发分含量煤种的效果不好。 钝体直流稳燃器: 稳燃原理: 钝体是不良流线型体,在大雷诺数下流体流经钝体时在钝体的某个位置会是

溃疡性结肠炎常用药物

溃疡性结肠炎常用药物 …… (1)磺胺类: 40年代开始用磺胺药治疗本病,其中以水杨酸偶氮磺胺吡啶(SASP)效果最佳。口服后易在肠内分解为磺胺吡啶及5-氨基水杨酸,对结肠壁组织有亲合力,起到消炎作用。常用于轻、中型病人。始量为0.5g,每日4次,口服。每隔2~3天增加1g,直到获得疗效。每日总量3~6g,个别可达8g。病情稳定,维持量为1.5~2g/日,持续4周以上,后隔3~5 日减量1次,直到每天服用1~2g为止,至少持续1年。然后考虑停药,以降低复发率。对停药后易复发者,可选最小剂量长期维持治疗。有效率在80%以上。其副作用常有恶心呕吐、头痛、全身不适。或引起白细胞减少、关节痛、皮疹、蛋白尿等。尤其是服用每日超过4g 以上者,副作用明显。其他如琥珀酰磺胺噻唑、肽酰磺胺噻唑及复方新诺明等也可选用。 (2)抗生素: 尤对急性暴发型及中毒作结肠扩张者采用抗生素治疗,用前应做细菌培养。如青霉素类、氯霉素、可林达要素、妥布霉素、新型头孢霉素和先锋霉素均可酌情选用。不宜口服以避免胃肠道刺激症状。 (3)灭滴灵:

每日1200mg,分3~4次口服,3~6个月为一疗程,目前尚未有严重副作用的报道。病程越短疗效越佳,病程在一年以上者,有效率在60%~70%。 (4)激素治疗: 包括糖皮质和促肾上腺皮质激素。本类药物能抑制炎症和免疫反应,缓解毒性症状,近期疗效较好,有效率达90%。另外激素可增加食欲,改善病人情绪。如小剂量强的松15mg,可明显减少复发率。并发腹膜炎或腹腔内脓肿形成者不宜应用。 ①口服皮质激素:病情活动期且病变广泛者,强的松每日40~60mg,分3~4次口服。病情稳定逐渐减量,每日10~15mg,持续半年后停药。在减量过程中或停药后,给以柳酸偶氮磺胺吡啶,以防停药后或减量过程中病情复发。 ②局部给药:病变只限于乙状结肠直肠者,可选:含氢化可的松10mg的肛门栓剂,每日2~ 3次;琥珀酸氢化可的松50~100mg 或强的松龙20~40mg溶于50~100ml液体中,每日1~2次,保留灌肠,同时加用SASP及适量的普鲁卡因或中药煎剂,10~15天为一疗程。灌肠后嘱病人平卧位或俯卧位,左、右、侧位等各15~20分钟,以利药后均匀分布粘膜面上。 ③静脉用药:如暴发型、严重活动型及口服无效者多采用。氢化可的松200~300mg或半琥珀酸钠氢化可的松200~300mg,或α-1-磷酸强的松龙40~60mg,10~14天为一疗程。病情稳定后改口服剂,强的松60mg/日口服。

锅炉煤粉燃烧器说明书

LHX-高效节能型锅炉煤粉燃烧器 产 品 说 明 书 西安路航机电工程有限公司

一、工作原理: ①燃烧器是锅炉的主要燃烧设备,他通过各种形式,将燃料和燃烧所需要的空气送入炉膛使燃料按照一定的气流结构迅速、稳定的着火:连续分层次供应空气,使燃料和空气充分混合,提高燃烧强度。 煤粉燃烧器就是利用二次风旋转射流形成有利于着火的回流区,以及旋转射流内和旋转射流与周围介质之间的强烈混合来加强煤粉气流的着火特性。旋转射流的工质除了二次风外,还可以有一次风。在二次风蜗壳的入口处装有舌形挡板,用以调节气流的旋流强度,蜗壳煤粉燃烧器的结构简单,对于燃烧烟煤和褐煤有良好的效果,也能用于燃烧贫煤 运行参数:一次风率r1,一、二次风量比,一、二次风速w1和w2及风速比w1 /w2有关。。锅炉燃烧器使用的是气化原理,能使燃油完全 气化,整个燃烧器采用三级点火方式,先用高能点火器点燃轻柴油,再用轻柴油点燃浓煤粉,最后点燃淡煤粉,实现煤粉全部燃烧。 ②为避免工业锅炉积灰过多,本产品采取炉外排渣系统.进入锅炉体内的烟气灰渣尘只占燃料燃烧总的渣量的15%,其中只有小部分沉于锅炉体内,绝大部分烟气尘随烟气流入炉外的收尘系统.工业锅炉本体只需采用压缩空气吹灰系统即可避免锅炉本体人工掏渣。本产品的使用效果与燃油燃气的工业锅炉效果基本一致。

③本产品燃烧煤种与水煤浆燃烧煤种大大放宽,而不需要特优烟煤,而对于一般烟煤、无烟煤、褐煤等甚至劣质杂煤均可.使用其煤粉燃烬率可达到99%,炉渣含碳量为1%左右.炉渣为黄白色是农业化肥和建材的良好的混合材,以达到循环利用的目的.其耗煤量与一般链条锅炉可节省煤耗为25-30%以上。 二.环保技术指标: 由于燃烧系统的彻底改进,相对于链条式的工业锅炉,由燃煤层燃燃烧方式改为煤粉燃烧方式,同时又采用炉外排渣技术。其中燃烧筒(立式、卧式)的捕渣率能达到85%以上,进入工业炉的炉渣量几乎小于15%以上,只有极小部分烟尘沉于炉内,大部分随烟气流进炉后收尘系统.这样极大的减轻了炉尾部的收尘器的收尘量,进入锅炉内的细微烟尘只需要设置采用压缩空气吹灰孔即可,锅炉必须设置专用检查炉门。本公司依据水膜旋风除尘器的基本原理研发成功:文氏管双级脱硫水雾除尘器(不锈钢等钢结构见另外产品说明书),进而彻底淘汰多年普遍使用的水膜麻石除尘器,使锅炉后的除尘系统简单化,而除尘效果更优。经测算:除尘效率可达到99%,粉尘含量≤100mg/m3,SO2≤250~ 300mg/m3, NO2≤400mg/m3,总体排放指标,可达到国家城市二类地区的环保指标。 三.全线实现PLC全自动热工仪表控制系统

低氮锅炉改造方案

为有效解决当前大气污染防治工作进入瓶颈期、氮氧化物浓度持续高位、夏季O 3反弹的问题,按照环保要求,各相关单位按照文件精神开展燃气锅炉及锅炉的氮氧化物改造工作。 持续开展大气污染防治行动,坚决打赢蓝天保卫战,实现环境效益、经济效益和社会效益多赢。至2020年经过3年努力,大幅减少主要大气污染物排放总量,协同减少温室气体排放,燃气锅炉及锅炉均完成低氮改造,进一步明显降低细颗粒物(PM ) 2.5浓度,明显减少重污染天数,明显改善环境空气质量,明显增强人民的蓝天幸福感。 专业从事燃气锅炉低氮改造工作,以下为改造具体方案,可供参考: 改造施工现场 一、改造施工前准备工作如下: 做好施工人员进场准备,办理各项有关手续,按规定搭设临时设施,如现场布置、工地办公室、仓库、材料堆放场地、临时水、电到位,以及生活、卫生设施的落实。 1.对施工图纸进行全面会审,技术复核,熟悉图纸,了解各种工艺技术、材料性能及施工方法。 2.进一步深化施工组织设计,确定施工方案,认真做好对各工种施工前的技术交底。了解消防配套、弱电综合布线以及土建施工单位的工程实施计划,制定相应的配合施工计划。 3.按材料种类分类,做好垃圾清运工作。 4.根据燃烧器厂家提供的锅炉燃烧器图纸和辅机资料对燃烧器及辅机进行检验。对技术资料、图纸进行检查、清点。

5.仔细阅读燃烧器安装使用说明书,查看厂家对燃烧器安装有无特别要求。 6.带施工图纸到安装现场查看,锅炉基础及附件基础是否与图纸相符,施工现场是否与图纸一致。 7.在施工改造前,锅炉房内先进行断水、断电、断气后,确认无安全隐患,再进行原有燃烧器拆除,必要时采用专用工具。 8.在拆除后对燃烧器法兰接口尺寸进行校核,否则重新加工处理。 9.按照安装图纸施工现场配料,材料包括附件、阀门、仪表、管道、和保温材料等。所用的主要材料、设备及半成品应符合国家或相关部门标准,燃烧器厂家应提供国家特检院出具的燃烧器形式试验报告及证书。 10.之后到现场查看是否具备安装条件,包括锅炉运输道路是否畅通,是否具备锅炉就位的条件,现场是否干净,基础硬化情况,以及水电、工人施工居住条件等。 11.落实技术交底工作:组织各班组长及各工种技术业务骨干进行技术交底、质量交底、安全交底及文明施工交底,并逐级下达全体施工人员进行实施。 已改造完毕20t/h燃气锅炉 二、改造施工工艺及步骤: 1、打开锅炉前盖板,拆除旧燃烧机。 2、拆除后,测量盖板上固定燃烧机的螺栓孔。若孔距和低氮燃烧机的孔距相同,就可以直接安装新的燃烧机。若孔距不同,就要采取相应措施把新燃烧机固定在盖板上。

2021消化系统疾病病人护理测试题及答案(精编试卷) (18)

消化系统疾病病人护理测试题及答案 姓名分数 一、单选题(每题2.5分,共100分) 1、消化性溃疡并发大出血急救的中心环节是: A.补液输血 B.禁食输液 C.止血抗休克 D.手术治疗 E.以上均不是 答案:C 2、对消化性溃疡出血不适用的是 A.口服去甲肾上腺素 B.双气囊三腔管压迫 C.冰盐水洗胃 D.甲氰咪胍静脉注射 E.纤维胃镜下高频电灼 答案:B 3、在西方国家急性胰炎的主要病因除因胆道疾病外是 A.大量饮酒 B.暴饮暴食 C.手术创伤 D.药物刺激 E.钙离子 答案:A 4、肝昏迷病人经治疗神志恢复后可逐渐给予蛋白质饮食,最适宜的选择是 A.动物蛋白质

B.蔬菜、水果 C.碳水化合物 D.植物蛋白质 E.每日蛋白质在40g以上 答案:D 5、哪些药物不引起消化性溃疡 A.阿斯匹林 B.消炎痛 C.强的松 D.碳酸氢钠 E.保泰松 答案:D 6、肝硬化腹水病人为何发生呼吸困难A.合并肺瘀血 B.腹水抬高膈肌 C.引起右心衰竭 D.腹水压迫支气管 E.合并呼吸 答案:B 7、下列消化系统疾病的护理哪项不妥A.呕吐后应漱口 B.便秘时可多吃蔬菜水果 C.腹泻时可多吃高蛋白、高脂饮食D.腹胀时可用肛管排气 E.消化道出血后不宜立即灌肠 答案:C 8、肝昏迷昏迷前驱期最突出的表现是 A.表情欣快,定向力减退 B.精神错乱 C.运动失调

D.肌张力,腱反射亢进 E.意识错乱,行为失常 答案:E 9、结核性腹膜炎最多见的病理分型是 A.粘连型 B.渗出型 C.干酪型 D.混合型 E.坏死型 答案:B 10、关于胃窦炎的治疗,最正确的是 A.维生素B12治疗 B.稀盐酸口服 C.铁剂 D.杀灭HP E.肾上腺皮质激素 答案:D 11、急性胰腺炎产生休克的主要原因是:A.低血容量休克 B.心源性休克 C.疼痛引起神经性休克 D.失血性休克 E.过敏性休克 答案:A 12、轻、中度溃性疡性结肠炎治疗首选药物是A.肾上腺皮质激素 B.水杨酸偶氮磺胺吡啶 C.抗生素 D.手术治疗 E.免疫抑制剂

燃气锅炉低氮改造完成

燃气锅炉低氮改造完成河北艺能锅炉有限责任公司

近年来,北京作为国家的首都,为响应国家的号召节能减排,绿色环保,北京在全国率先开展燃气锅炉低氮改造,从氮氧化物产生源头进行控制。从北京市环保局了解到,截至目前,今年北京市已完成锅炉低氮改造约7000台、2.3万蒸吨,年减排氮氧化物4800吨。 北京市环保局介绍,研究表明,燃气锅炉所排放的氮氧化物,在一定条件下,可成为PM2.5的原料。“燃气锅炉低氮改造”可实现氮氧化物的深度减排。 艺能锅炉有限责任公司是“清煤降氮”的主力企业。该企业技术管理部说,2017年企业的清煤降氮工作,改造共涉及锅炉房330座、锅炉1569台、8777.15蒸吨,建设新供热管线12.47公里,共计投资10多亿元。锅炉企业的此番改造,在单个采暖季可直接减少烟气及氮氧化物排放约1844吨。 据锅炉企业介绍,锅炉清煤降氮、实现达标排放,首先是“超净排放”,在北京市的方庄、科丰等供热厂的大型锅炉,采取“超低氮燃烧器+烟气再循环+尾部SCR”等多种组合脱硝方式,燃气锅炉氮氧化物排放低于15毫克/立方米。 艺能锅炉有限责任公司还推广非化石能源供热,燃煤、燃油锅炉实现清洁能源替代,宜气则气、宜电则电,推广空气源热泵、电蓄热等技术应用。 “十三五”期间,将致力于扩大清洁电蓄热、污水源、地热源、光伏等可再生能源利用。 为确保按期完成国家下达的节能目标任务,河北省政府办公厅日前印发《河北省节能“十三五”规划》。“十三五”期间,河北省将本着“强化双控、倒逼转型,严控增量、优化存量,培育市场、创新机制,突出重点、全面推进”原则,着力推进重点领域、重点区域、重点用能单位节能。 根据规划,河北省节能约束性目标是:到2020年,全省能源消费总量控制在32785万吨标准煤以内,万元国内生产总值能耗下降17%;2017年比2012年削减煤炭消费4000万吨,“十三五”期间煤炭消费总量下降10%左右。

喹诺酮类、磺胺类及其他合成抗菌药

喹诺酮类、磺胺类及其他合成抗菌药 一、喹诺酮类 第一代:奈啶酸(1962) 第二代:吡哌酸(1974),仅适用于泌尿道和肠道感染 疗效差、耐药性发展迅速、应用日趋减少 第三代:氟喹诺酮类(1979) 诺氟沙星(氟哌酸)、氧氟沙星、 环丙沙星、左氧氟沙星、依诺沙星、培氟沙星 口服有效、副作用小、耐药性还未大量产生、发展迅速、临床广泛使用 第四代:新氟喹诺酮类 格帕沙星、加替沙星、莫西沙星、克林沙星 【喹诺酮类药物抗菌作用机制】 DNA回旋酶→干扰DNA复制 ◇对细菌选择性高,不良反应少。 (真核细胞不含有DNA回旋酶) 【喹诺酮类共同特点】 1.抗菌谱广、杀菌 ①尤其对革兰阴性杆菌作用强,包括铜绿假单胞菌在内有强大的杀菌作用(环丙沙星最强); ②对部分革兰阳性菌,如金葡菌及产酶金葡菌也有良好抗菌作用(左氧氟沙星最强); ③某些品种(环丙、左氧氟)对结核杆菌、支原体、衣原体及厌氧菌也有作用; ④新喹诺酮类抗革兰阳性菌作用增强,特别是对肺炎球菌和葡萄球菌;莫西沙星还具有其他氟喹诺酮类所缺乏的抗厌氧菌活性。 阳盛阴不衰 霸气抗厌氧 2.口服吸收良好,体内分布广 可进入骨、关节; 氧氟沙星、环丙沙星、培氟沙星可进入脑脊液; 血浆蛋白结合率低; t1/2较长; 多数以原形经肾排泄,尿药浓度高; 部分经肝脏代谢后,由肾排出; 3.不良反应少,耐受性良好 (1)消化道反应:常见恶心、呕吐、食欲减退。氧氟沙星可致伪膜性肠炎。 (2)过敏:皮疹、血管神经性水肿、光敏性皮炎(洛美沙星多见)等。 (3)中枢神经系统:头痛、眩晕等。 不宜用于中枢神经系统病史者,尤其癫痫病史者。 (4)关节软骨损害:所有氟喹诺酮类在在儿童可引起关节痛及肿胀 故不应用于青春期前儿童或妊娠期妇女。

利用思维导图进行高中元素及其化合物教学

利用思维导图进行高中元素及其化合物教学 徐野在中学化学教学中有许多教学方法,若得到合理使用就能极大的提高学生的学习效率和教师的教学效率。其中一种较为有效的手段——“思维导图",对学生逻辑思维能力的提升以及知识整理能力有很大帮助。化学这门学科的知识点较琐碎,并且涉及许多的化学元素及化合物间的反应方程式。基于此,要想将此门学科讲授的生动形象且内容丰富是非常难的,尤其是在学生学习了化学元素及化合物的性质及各种反应等内容后,在记忆方面也是非常大的考验。因此,在化学元素及化合物的教学中,“思维导图”的运用可以帮助学生理清思路,通过制作思维导图明确每一种元素及化合物之间的转化关系,将多种物质之间的关系串联起来,在头脑中形成知识网,理解性记忆,不再是死记硬背,生搬硬套。比如需要讲解一个化学的反应方程式,就必须要让学生理解物质的性质及反应原理,而物质性质可以从元素的原子结构、物质组成上入手,在关系上就可以表现为将这个元素作为一个主题,然后将它的单质、化合物作为二级内容,接着再根据其性质进行延伸,这样接连的延展过程最终就形成“思维导图”。学生按照自己的思维方式制作出各种形式的思维导图,可以是图画、也可以是流程图,让学生理解每一级、每一个分支的由来,有助于记忆枯燥乏味的化学反应方程式。 1.“思维导图”的制作方法 “思维导图”能够建构出更加有条理的知识框架体系,对所要建构

的内容能够形成知识体系网状结构,有更加清晰明了的认知,这样不仅有利于提高学习的效率,也能为之后的复习打好基础,极大地方便了知识的提取。思维导图的制作步骤如下:首先要选取好一个“主题”,然后对这个主题关联的内容、对象向外进行二级、三级等延展,进行思维的发散。就像是一颗大树干上接了很多的小树杈分支。注意每个级别的“树杈”上都要标注关键词,这样就能形成一个知识点的通路,思维导图也就制作完成了。 2.“思维导图”的课堂应用 在教学过程中,教师可以对某个知识点进行“思维导图”的制作,方便教学,也能够让学生加深对此知识点的理解。也可以做为复习的手段之一,以小组为单位分配制作“思维导图”任务,给学生布置一个相同或者不同的知识点,让他们自己动手去制作“思维导图”,当成课堂作业来完成达到复习的目的。这样他们就能够自己去展开某个知识点的生成以及被生成过程,或者对元素的分类等内容进行展开。也可以做为学生课前自主预习的工具,上课时结合自己的思维导图找到知识疏漏并及时得到补充。同时,在学生制作完成之后上台对自己的作品进行说明,以小组为单位由学生进行作品评选,得选率最高的作品主人就可以得到相应的奖品。这样不仅锻炼了他们的动手能力,又活跃了课堂氛围,在轻松愉悦的环境下对知识进行主动的学习。3.“思维导图”应用的意义 思维导图的利用可以对新知识进行有效的预习,也可以对之前学过的旧知识进行复习。有利于加深之前所学内容的印象,并形成系统

2018年河南省燃气锅炉低氮改造奖补方案

2018年河南省燃气锅炉低氮改造奖补方案 河南远大锅炉是国内最早建立起来的工业锅炉生产单位,我公司主要从事燃气锅炉,生物质锅炉,燃煤锅炉等环保锅炉的研发与生产,燃煤锅炉改造以及低氮锅炉改造等。 很多用户对我省的煤改气,燃气锅炉低氮改造项目不是很清晰,下面简答介绍一下。 为落实国家财政部、环保部《大气污染防治专项资金管理办法》,省财政厅、省环保厅《河南省省级大气污染防治专项资金管理办法》,推动我市大气污染防治工作,进一步改善环境空气质量,市政府决定对2018年度大气污染防治治理项目实施资金奖励或补助,现结合我市实际,制定本方案。 一、奖补原则和范围 (一)奖补原则 “早完成、严标准、多减排、多奖励”原则。 (二)奖补范围 1.严于国家或地方污染物排放标准实施的大气污染工程 治理示范工程改造项目; 2.严于国家、省要求的结构调整项目; 3.在工程治理、节能改造等领域严于国家、省有关要求 的、具有前瞻意义的试点工程项目或科研攻关项目; 4.严于国家、省有关要求的,鼓励类清洁能源结构改造 项目。 (三)资金来源 奖补资金来源中央及省财政拨给本市可用于大气污染防治项目的资金,不足部门由市级财政承担。 二、奖补标准 (一)燃煤锅炉拆改。10蒸吨以上燃煤锅炉拆改实施逐年递减的资金奖补方式,对2018年10月底前(含2016年、2017

年)完成拆改的燃煤锅炉,给予不低于6万元/蒸吨奖补;对2019 年10 月底前完成拆改的燃煤锅炉,给予不低于4 万元/蒸吨奖补。 2016 年、2017 年按期完成拆除任务的10 蒸吨以下(含10 蒸吨)燃煤锅炉给予不低于2万元/蒸吨奖补。 (二)煤气发生炉拆改。2018年10月底前煤气发生炉(含2016 年、2017 年)完成实施拆除或改用清洁能源的,给予拆除单位每台10万元奖补。 (三)生物质锅炉拆改。2018年10月底前(含2016年、2017 年)生物质锅炉实施拆改的,给予不低于2 万元/蒸吨资金奖补。 (四)重点行业示范工程建设。 1.2018 年9 月底前,完成烟气超低排放示范工程建设,污染物排放浓度颗粒物≤10毫克/立方米、二氧化硫≤50毫克/立方米、氮氧化物≤100毫克/立方米的熟料生产水泥企业,市级财政按照设备投资额的15%进行奖补,最高不超过500万/家。 2.2018 年9 月底前,完成烟气超低排放改造示范工程建设,煅烧、焙烧工序烟尘、二氧化硫、氮氧化物排放浓度要分别不高于10毫克/立方米、35毫克/立方米、50毫克/立方米的碳素企业,市级财政按照设备投资额的15%进行奖补,最高不超过500万/家。 3.2018 年9 月底前,完成烟气超低排放改造示范工程建设,烟尘、二氧化硫、氮氧化物排放浓度要分别不高于10毫 克/立方米、35毫克/立方米、50毫克/立方米的生活垃圾焚烧发电、医疗废物、危险废物焚烧处置等设施,市级财政按照设备投资额的15%进行奖补,最高不超过500万/家。 (五)天然气锅炉低氮改造项目。2018年6月底前,完成低氮改造示范工程建设,氮氧化物排放浓度要不高于30毫克/立 方米的天然气锅炉,市级财政按照设备投资额的40%进行奖补; 2018 年9 月底前,完成低氮改造示范工程建设,氮氧化物排放浓度要不高于30毫克/立方米的天然气锅炉,市级财政按照设备投资额的30%进行奖补;2019年4月底前,完成低氮改造工程建设,氮氧化物排放浓度要不高于30毫克/立方米的天然气锅炉,市级财政按照设备投资额的15%进行奖补。

相关文档
最新文档