MTL Eps7700 安全栅样本

MTL Eps7700 安全栅样本
MTL Eps7700 安全栅样本

o Removable terminals

o

modules

o

o Relay and solid state switch modules

o Dual channel variants —

6.3mm per channel

o Electronic fusing

o Direct replacement for MTL700 Series barriers

o Compatible terminal

numbering and safety

descriptions Since its introduction in 1984the MTL700 Series barrier has established itself as the worldwide standard for safety barriers. Known for its quality and reliability, the MTL700 Series is widely used in applications all over the world.

The MTL7700 Series follows closely in the footsteps of the MTL700 but as a DIN rail mounting barrier providing quick and easy installation without the need for special hardware.

Removable terminals are used for ease of installation, maintenance and for providing a loop disconnect by simply unplugging the terminals from the side of the module. Wire entry is also angled to assist wiring within limited space enclosures.

MTL7700 barriers clamp simply and securely onto standard T-section D IN rail, simultaneously making a reliable IS earth connection.

For applications where field power is required for switch inputs or 2-wire transmitters, the MTL7700 Series provides a bussed power feed facility. When used in conjunction with the MTL7798 power feed module the user has a fully protected, electronically fused supply to many barriers with no additional wiring required.

DIN rail mounting safety

barriers MTL7700 SERIES

Shunt-diode safety barriers

MTL7700 active modules are protected

with an electronic fuse for the majority of

applications. The MTL7798 active fused,

power feed module can protect up to 40

other modules using the bussed power

facility and provides a clear indication of a

trip condition via a red LED.

The MTL774X range of barriers offer a

NAMUR compatible input and a choice of

relay or solid state output. The solid state

outputs are floating so switching to ground

or from a power rail into an input is also

possible. The solid state interface also

provides a high frequency transfer for use in

flow or rotation applications.

Dual channel relay or solid state

modules offer the highest packing density

with only 6.3mm per channel and when

used in conjunction with the power bus, offer

users the minimum of wiring with the

maximum packing density and the lowest

cost per channel.

EUROPE (EMEA)Tel: +44 (0)1582 723633 Fax: +44 (0)1582 422283

SPECIFICATIONS

For notes 1 to 7 see 'Terminology' (later in this section)‘Key’ barriers shown in blue Array a Terminals 3 & 7 connected together

*Diagrams show positive versions. All diodes reversed on negative versions. Additional diodes fitted on ac versions.

GENERAL SPECIFICATION

Ambient temperature and humidity limits

–20 to +60°C continuous working –40 to +80°C storage 5–95% RH

Leakage current

For ‘basic’ barriers with a working voltage of 5V or more, the leakage current decreases by at least one decade per volt reduction in applied voltage below the working voltage, over two decades. For the MTL7755ac/7756ac it decreases by at least one decade for a 0.4V reduction in applied voltage.Terminations

Removable terminals accommodate conductors up to 2.5mm 2(13AWG). Hazardous-area terminals are identified by blue labels. Removal force >15N Colour coding of barrier label

Grey:non-polarised

Red:positive polarity (MTL7706 negative to transmitter )Black:negative polarity

White:dummy barrier, MTL7799Weight

140g approx

Mounting and earthing

By 35mm Top Hat DIN rail

DIMENSIONS (mm)

KEY MTL7700 SERIES BARRIERS SUMMARISED

HOW THEY WORK

All MTL7700 Series barriers are based on the same simple principle.Each channel contains two stages of pulse-tested Zener or forward-connected diodes and an ‘infallible’ terminating resistor. In the event of an electrical fault in the safe area, the diodes limit the voltage that can reach the hazardous area and the resistor limits the current. A fuse protects the diodes, and the two stages of voltage limitation ensure continued safety if either stage should fail. No active output-current limiting circuits are employed. All models are certified ‘ia’ for all zones and ‘IIC’ for all explosive atmospheres (except MTL7707P+and MTL7729P+, 'ia' 'IIB').

TERMINOLOGY

1. Safety description

The safety description of a barrier, eg ‘10V 50?200mA’, refers to the maximum voltage of the terminating Zener or forward diode while the fuse is blowing, the minimum value of the terminating resistor, and the corresponding maximum short-circuit current. It is an indication of the fault energy that can be developed in the hazardous area, and not of the working voltage or end-to-end resistance.

2. Polarity

Barriers may be polarised + or –, or non-polarised (‘ac’). Polarised barriers accept and/or deliver safe-area voltages of the specified polarity only. Non-polarised barriers support voltages of either polarity applied at either end.

3. End-to-end resistance

The resistance between the two ends of a barrier channel at 20°C, ie of the resistors and the fuse. If diodes or transistors are present, their voltage drop (transistors ON) is quoted in addition.

4. Working voltage (Vwkg)

The greatest steady voltage, of appropriate polarity, that can be applied between the safe-area terminal of a ‘basic’ barrier channel and earth at 20°C for the specified leakage current, with the hazardous-area terminal open circuit.

5. Maximum voltage (Vmax)

The greatest steady voltage, of appropriate polarity, that can be applied continuously between the safe-area terminal of any barrier channel and earth at 20°C without blowing the fuse. For ‘basic’barriers, it is specified with the hazardous-area terminal open circuit;if current is drawn in the hazardous area, the maximum voltage for these barriers is reduced. The ‘ac’ channels of ‘basic’ barriers and most channels of overvolt-protected barriers withstand voltages of the opposite polarity also – see circuit diagrams.

6. Fuse rating

The greatest current that can be passed continuously (for 1000 hours at 35°C) through the fuse.

7. Star connection

In star-connected barriers, the two channels are interlocked such that the voltage between them cannot exceed the working voltage, Vwkg:this allows for higher cable capacitance or inductance.

8. Maximum safe-area voltage (U m )

The maximum permissible safe-area voltage (U m ) for MTL7700 Series barriers is 250V ac/dc.

area

ACTIVE / ELECTRONICALLY PROTECTED BARRIERS

Accuracy

±2μA under all conditions Safe-area load resistance

0 to 500?Supply current

45mA typical at 20mA and 24V supply 60mA maximum at 20mA and 20V supply

MTL7707+ for switch inputs and switched outputs

The MTL7707+ is a 2-channel shunt-diode safety barrier similar to the MTL7787+ but with built-in electronic overvolt protection. It is intended primarily for safeguarding a hazardous-area switch controlling a relay, opto-coupler or other safe-area load from an unregulated dc supply in the safe area.

The outgoing channel accepts supply voltages up to +35V and is protected against reverse voltages: the return channel is unaffected by voltages up to +250V.

In normal operation the protection circuit introduces only a small voltage drop and shunts less than 1mA to earth, so its overall effect is minimal. If the supply voltage exceeds about 27V, however, causing the Zener diodes to conduct – or if the safe-area load has a very low resistance – the supply current is limited automatically to 50mA,protecting the fuse and power supply and enabling the loop to continue working.

BASIC CIRCUIT

ADDITIONAL SPECIFICATION

Safety description

28V 300?93mA, terminals 1 to 328V Diode, terminals 2 -4Supply voltage

10 to 35V dc with respect to earth Output current

Up to 35mA available Maximum voltage drop

(at 20o C, current not limited)

Iout x 345? + 0.3V, terminals 1 to 3Iout x 25? + 0.9V, terminals 4 to 2Supply current

Iout + 1.6mA, supply <26V

Limited to 50mA, supply >28V or low load resistance

MTL7707P+ for switch inputs and switched outputs, 2W Transmitters (IIB gases)

The MTL7707P+ is a two-channel shunt-diode safety barrier similar to the MTL7787P+, but is designed for use with group IIB gases and features built-in electronic overvolt protection allowing use with unregulated power supplies up to 35V dc. It is intended primarily as a low cost solution for driving IIB certified 2-wire 4/20mA transmitters, but can also be used with controller outputs with current monitoring, solenoid valves and switches. To protect the fuse and enable the loop to continue working, the supply current is limited automatically at 50mA should the output be short-circuited or excess voltage applied.

ACTIVE / ELECTRONICALL Y PROTECTED BARRIERS

The following barriers have built-in overvolt protection, allowing their use with unregulated power supplies. In many applications, eg, sensor inputs or controller outputs, there is insufficient power available to blow the barrier fuse and this additional protection is not necessary.However, where the barrier is connected to a power supply, eg, for energising transmitters, switches, solenoids or local alarms, overvolt protection allows the barriers to be used with unregulated supplies and also gives protection against faulty wiring during commissioning.

MTL7706+ for 'smart' 2-wire 4/20mA transmitters

The MTL7706+ is a 1-channel shunt-diode safety barrier, with built-in electronic overvolt protection, for energising a 2-wire 4/20mA transmitter in a hazardous area. It is powered from a positive supply of 20–35V dc and delivers a 4/20mA signal into an earthed load in the safe area. It is proof against short circuits in the field and in the safe area and is extremely accurate. The MTL7706+ will pass incoming communication signals up to 10kHz from a ‘smart’transmitter, while in the outgoing direction it will pass signals of any frequency likely to be encountered.

Since the MTL7706+ has no return channel for energising the load,the entire output of the single ‘28V’ channel is available to power the transmitter, providing high output capability. This channel is negatively polarised, and the safe-area signal is in fact the very current that returns through it from the hazardous area, the novel circuit being energised by a built-in floating dc supply derived from the external dc source of power.

To prevent any leakage through the zener diodes and maximise the output voltage available at 20mA, the floating supply is given a rising voltage/current characteristic. A separate circuit limits the current to protect the fuse in the event of a short circuit in the hazardous area.With a 20V supply, the barrier will deliver 16.2V minimum at 20mA for the transmitter and lines and consumes typically 45mA at 24V operation.

BASIC CIRCUIT

ADDITIONAL SPECIFICATION

Safety description

28V 300?93mA Supply voltage

20 to 35V dc w.r.t earth Output current

4 to 20 mA

Voltage available to transmitter and lines

16.2V @ 20mA with 250?load (negative w.r.t. earth)11.0V @ 20mA with 500?load (negative w.r.t. earth)

MTL7742 proximity sensor or switch input with solid state output

The MTL7742 is a single channel switch/prox input barrier with an open collector solid state interface to the safe area equipment. The solid state switch is especially useful for high frequency switching apparatus including pulse and rotational sensors. The power bus terminal can be used to connect power to the module and the input power supply range makes the module suitable for use with unregulated supplies

ADDITIONAL SPECIFICATION

Safety description

10V 19mA Supply voltage

20 to 35V dc with respect to earth Input characteristics

Output energised if input >2.1mA(<2k ?)Output de-energised if input <1.2mA(>10k ?)Output characteristics

Operating frequency dc to 2.5kHz Max off-state voltage 35V Max off-state leakage 10μA

Max on-state voltage drop <1.41V @ 50mA

<1.22V @ 2mA typically <1V

Max on-state current 50mA Supply current

20mA maximum @ 24V

MTL7743 2 channel proximity sensor or switch input and relay outputs

The MTL7743 is a dual channel switch/prox sensor input barrier with a relay interface. This module is ideal for applications where high channel packing densities are required for digital inputs. Power is connected using the power bus terminal.

Safety description

10V 19mA 10V 19mA Supply voltage

22.9 to 30V dc with respect to earth Input characteristics

Relay energised if input >2.1mA(<2k ?)Relay de-energised if input <1.2mA(>10k ?)Relay Contacts

*125V ac 0.5A. Resistive 30V dc, 1A. Resistive Supply current

45mA maximum @ 24V Response time

<10ms

Hazardous Area

* There are limitations for use above 50V. Please refer to the Instruction Manual INM7700.

MTL7700 Series barriers protect devices located in all normally occurring explosive atmospheres, including air/flammable gas mixtures, dusts and fibres. Applications covered include the protection of installations incorporating uncertified devices (‘simple apparatus’) such as thermocouples, switches and resistive sensors, or separately certified ‘energy storing’ (or ‘voltage producing’)apparatus including ac sensors, transmitters and current-to-pneumatic (I/P) converters. Recommended choices for specific applications are discussed briefly in the following pages.

MTL7700 SERIES

BARRIER APPLICATIONS

ANALOGUE INPUTS (HIGH LEVEL)

2-wire transmitters, 4/20mA, conventional and smart The recommended barrier for use with 'conventional' and 'smart'4/20mA transmitters (fed by a 26V regulated supply) is the MTL7787+. This provides up to 12.9V (14.6V for MTL7787P+) at Vwkg and 20mA for a transmitter and its lines as well as 5V for the typical 250?load. This application and this barrier is suitable for use with the optional power bus facility.

The MTL7706+ is recommended for applications where an unregulated supply of up to 35V is used. It provides 16.0V for conventional and Smart transmitters at 20mA, as well as 5V for a typical 250?load. With the MTL7706+ terminal 3 is negative with respect to earth, so the connections to terminals 3 and 4 should be reversed.

ANALOGUE INPUTS (LOW-LEVEL)

Thermocouples and mV sources

The recommended barrier for thermocouples and mV sources is the MTL7760ac. This 2-channel non-polarised barrier retains the ‘earth-free ’ nature of the signal and, providing the receiver ’s input ‘floats ’,rejects common-mode ac and dc interference up to at least 7V and is unaffected by earth faults on the primary element.

Vibration probes

The 3-wire transmitters used with vibration monitoring equipment are invariably supplied by a –24V dc power supply – hence the recommended barrier choice is the negatively-polarised MTL7796–.

Slidewire displacement transducers

The simplest choice is the MTL7760ac. This barrier supplies power and brings back a unipolar signal.

ac sensors, photocells, microphones and turbine flowmeters The MTL7760ac is the recommended choice for these devices. While many of these are designated ‘simple apparatus ’ and thus do not need certification, note that some ac sensors may be subject to a significant level of inductance and will therefore need to be designed and certified for hazardous-area locations.

RTDs

For 3-wire RTDs, a single MTL7755ac barrier is the most economical choice. This is suitable for use with a floating bridge – the two leads from the bridge arms are protected by the barrier with the third (supply) lead being earthed through the barrier. The barrier has a low end-to-end resistance of only 19?/channel to minimise span changes and its channels track within 0.15?(between –20 to +60°C) to minimise zero shift with temperature.

STRAIN-GAUGE BRIDGES

Single strain-gauge bridges

This shows an arrangement using two or three barriers, which is safe in IIC gases. With the MTL7761ac, the circuit is powered from a 14V,230?source; if the bridge resistance is 230?, then the bridge voltage is 7V. If the bridge resistance is 350?, then the bridge voltage is 8.4V.

An MTL7764ac can be used to sense the bridge supply voltage.An MTL7761ac is used here for the mV output.

An MTL7766Pac provides 12.3V for a 350?bridge with a 20V supply. MTL7761Pac's can be used for the sense and pick-off circuits.

4-wire constant-current circuits do not need matched barrier resistances and can be protected by two MTL7761ac barriers. If the increase in loop resistance is too great, use two MTL7755ac barriers instead.

If the bridge circuit is already earthed, the third barrier channel provided by an MTL7756ac is needed. For extreme accuracy, 3channels and an earth-free bridge can be used, a configuration that cancels out the small errors due to barrier leakage.

Channels 1 and 2 (those between terminals 1 & 2, and 2 & 4respectively) track to within 0.15?between –20 and 60°C.

STRAIN-GAUGE BRIDGES (cont)

Double strain-gauge bridges

Quite frequently there is a demand to monitor two load cells, and a possible circuit, safe in IIC, is shown.

Here, the lower voltage drop of the MTL7766Pac is an advantage.The MTL7766Pac supplies power to the bridge(s) whilst two MTL7761Pac barriers interface with the sense and pick-off https://www.360docs.net/doc/9114236970.html,ing 350?bridge systems, the following voltages are available from an MTL7766Pac with a ±10V supply:

1 bridge:13.11V

2 bridges: 9.75V

ANALOGUE OUTPUTS

Controller outputs (I/P converters)

The single-channel MTL7728+ with a voltage drop of 6.66V at 20mA is the recommended choice for most controller outputs. Higher-power versions are available: the MTL7728P+ (5.1V drop) is suitable for IIC applications; the MTL7729P+ (3.68V drop) for IIB applications.

The MTL7787+ and MTL7787P+ are also suitable for controllers containing a resistor which enables the return current to be monitored for high-integrity operation.

For controllers with an output circuit separated from the 0V rail by the control transistor, the 2-channel MTL7787+ is the preferred choice as the return channel can handle up to 26.6V allowing the control signal to be turned off completely. The voltage drop is 8.1V at 20mA. A higher-power version of the latter, the MTL7787P+, is also available.The return channel of these barriers handle up to 26.4V and the maximum voltage drop is only 6.38V

DIGITAL (ON/OFF) INPUTS

Switches

The normal choice is the MTL7787+/7787P+ with a regulated supply. The MTL774X modules are recommended for applications where an unregulated supply of up to 30V for relay output modules,or 35V for solid state output modules, is used.

The MTL7789+ offers a dual channel passive barrier for switch inputs where the input current for each channel is <10mA.

DIGITAL (ON/OFF) OUTPUTS

Alarms, LEDs, solenoids valves, etc

For these applications, the MTL7728+ is recommended. Higher-powered versions are available: the MTL7728P+ is suitable for IIC applications; the MTL7729P+ for IIB applications.

If the control switch is to earth, then the 2-channel MTL7787+ barrier should be used, or, alternatively, the MTL7787P+ higher-power version. If the supply is poorly regulated use the MTL7707+.The MTL7707+ is recommended for applications where an unregulated supply of up to 35V is used.

Switches / Proximity detectors

MTL ’s range of new switch/prox input barriers provide the user with a choice of relay and solid state outputs in single and dual channel versions.

The MTL7741 is single channel with a changeover relay output.

The MTL7743 and MTL7744 are dual channel versions affording very high packing densities. Power must be provided to these modules using the power bus facility.

The MTL7745 is a single channel proximity input (or switch input if ‘end of lines ’ resistors are fitted) with relay contacts providing switch and line fault status. The LFD relay contacts close when a fault is detected.

The MTL7742 has a single channel solid state switch that can be configured to switch from a power rail or down to ground. This is also ideal for high switching frequency applications.

SPARE CABLE CORES AND SCREENS

The MTL7799 dummy barrier is used primarily for securing and earthing unused cables and screen connections. Hazardous area terminals 3 and 4 are internally connected to the D IN-rail mounting/earth connection. It also provides a power bus connection for direct connection of power for modules such as the MTL7743 and MTL7744 where no power supply screw terminal is provided.

POSITIVE DC SYSTEMS

Low-level to 12V dc systems

The two channels of the MTL7764+ and MTL7767+ can be combined safely in IIC.

The MTL7764+ can be used for low-level logic return signals whilst the MTL7767+ is used for 6V dc and 12V dc systems.

18V dc systems

The single-channel MTL7722+ is recommended for 18V dc systems.

AC AND DC SYSTEMS

High-level ac and dc systems

The versatile star-connected MTL7765ac and MTL7778ac allow V wkg to be developed from each channel to ground but only allow V wkg to be developed between channels. This provides some common-mode voltage capability and can allow higher cable parameters to be used.

NEGATIVE AND FLOATING POWER SUPPLIES

Digital (on/off) outputs

The MTL7728– is used with a negative power supply and positive earth. Typically used for digital inputs or outputs, as shown.The MTL7728-- can also be used with floating power supplies, for transmitters.

POWER BUS APPLICATIONS

The PB7700 power bus is invaluable for saving installation time and wiring when connecting a 24V dc power source to a number of barriers.

Typical applications include hazardous-area switches, 4/20mA transmitters and proximity detectors. The diagram illustrates the configuration for 4 barriers but up to 40 barriers can be served by this method.

The MTL7798 power feed module would normally be used with standard barriers such as MTL7787+ and MTL7787P+ because the current/voltage trip protection mechanism of the MTL7798 protects the fuses in the barriers.

The MTL7799 dummy barrier can be used instead of the MTL7798 for direct ‘feed-through’ connection of a 24V dc supply onto the power bus. Looping the power feed to each end of the bussed power allows the removal of individual barriers without loss of power to others in the chain.

Other units which can use the power bus facility:

MTL7706

MTL7707+

MTL7707P+

MTL7741

MTL7742

MTL7743

MTL7744

MTL7745

MTL7787+

MTL7787P+

MTL7788+

MTL7788R+

MTL7789+

EUROPE (EMEA)Tel: +44 (0)1582 723633 Fax: +44 (0)1582 422283

TAGGING ACCESSORIES

Two methods of tagging are available which can be used separately or together:1) Individual barrier identification

TH7700 barrier identifiers

TH7700 barrier identifiers are supplied clipped on to the tops of individual barriers to provide transparent holders for identification labels.

2)

Tagging strip method

TAG57 Tagging strip, 1m length

Cut to size. Supplied with reversible tagging strip label suitable for either MTL5000 or MTL7000 Series module spacing.

TGL7700 Tagging strip labels, set of 10 x 0.5m For use with TAG57 tagging strip. Tags are reversible - one side for MTL7700, the other for MTL700.

HOW TO ORDER

MTL7700 barriers

Select by barrier number and polarity, e.g. MTL7728+

APPROVALS

Note :For FM compliance, the MTL7700 Series barriers shall be installed in compliance with the enclosure, mounting, spacing and segregation requirements of the ultimate application.

?Certified to CENELEC IIB/FM Grps C-G only.

MAXIMUM CABLE PARAMETERS

Notes: 1 ac indicates a non-polarised star connected barrier configuration.

2 When the external circuit contains no lumped inductance greater than 10mH, the cable inductance may be increased to the values within

parenthesis.

For further barrier channel configuration data, please refer to the relevant certificate.

Note :The circuit configuration for the output parameters given

in the table ‘Maximum Cable Parameters’ are as follows:-

a- Single channel barrier.

a1- First channel of a dual/triple channel barrier.

a2- Second channel of a dual/triple channel barrier.

a3- Third channel of a dual/triple channel barrier.

b- Both channels of a dual channel barrier connected in

parallel, with respect to earth.

b1- Two channels of a triple channel barrier connected in

parallel, with respect to earth.

b2- Three channels of a triple channel barrier connected in

parallel, with respect to earth.

b3- Both channels of each switch input connected together

c- Both channels of a dual channel barrier interconnected,

with no earth return.

c1- Two channels of a triple channel barrier interconnected,

with no earth return.

c2- Three channels of a triple channel barrier interconnected,

with no earth return. This assumes two of the channels are

in parallel.

CORRELATION BETWEEN MTL7700 — MTL7000 — MTL700 BARRIERS (IIC)

高空作业施工安全合同协议书范本

编号:_____________ 高空作业施工安全合同 甲方:___________________________ 乙方:___________________________ 签订日期:_____ 年_____ 月_____ 日 甲方:乙方: 根据北京市消防及安全管理有关规定,结合北计大厦具体情况,为了保障施工期间的安全,坚持安全第一,

预防为主;本着“谁施工谁负责” “谁主管谁负责”的原则,特与施工单位签订施工安全协议书如下: 一 . 乙方的权力和义务: 1. 乙方应按照《中华人民共和国安全生产法》《消防法》的相关规定,建立严格、有效的施工安全管理制度和安全操作规程,设立施工现场安全管理员。施工单位负责人、安全管理员负责施工现场安全生产及消防安全监督管理工作,以上人员掌握《安全生产法》和《消防法》的有关规定并承担相关责任。 2. 乙方所有现场施工人员持证上岗;特殊工种岗位人员如高空作业、焊工、电工等保证具备相关资格证明。 3. 乙方施工需动用明火(如电、气焊、喷枪、切割机等)或使用易燃易爆材料,保证事先提出书面申请(包括安全措施)报保卫科批准后方可施工。施工现场严格遵守安全操作规程,明火作业现场配置足够的灭火设备和器材,施工现场及相关区域严禁吸烟,完工后仔细清理现场垃圾、杂物全部带走。现场安全员再次进行检查后,确认不存在任何遗留火种、及其它安全隐患后,施工人员方可撤离现场。 4. 乙方工人工作前必须认真检查机械设备、用具、绳子、坐板、安全带有无损坏,确保机械性能良好及各种用具无异常现象方能上岗操作。操作绳、安全绳必须分开。绳根并扎紧系死,靠沿口要加垫软物防止因磨损而断绳,绳子下端一定要接触地面,放绳子时要系安全带。 5. 施工人员上岗前要穿好工作服,戴好安全帽;上岗时要先系好安全带,再系保险锁(安全绳上),然后再系好卸扣,同时坐板扣子要扎紧,固死。施工工具要系好安全绳并拿稳抓牢,手持电动工具要捆绑牢固不得脱落。 6. 下绳时,施工负责人和楼上监护人员要给予指导和帮助。操作时辅助用具要扎紧系牢,以防坠落伤人,同时严禁嬉笑打闹和携带其他无关物品。

最新版消防安全管理制度汇编

消防安全管理档案 消 防 安 全 管 理 制 度 汇 编

消防安全管理制度 为进一步加强武汉市江汉大学文理学院消防安全管理,明确消防安全管理体系和职责,根据《中华人民共和国消防法》、《机关、团体、企业、事业单位消防安全管理规定》,制定本单位消防安全管理制度。 一消防安全管理责任体系和职责 一、消防安全管理责任体系 二、消防安全责任和职责 一、消防安全责任人 消防安全责任人对本学院的消防安全工作全面负责,并应履行下列职责:

a) 组织审定年度消防安全工作计划和消防安全资金预算方案; b) 确定本单位消防安全管理人和各部门消防安全责任人; c) 组织建立消防安全例会制度,每月至少召开一次消防安全工作会议; d) 每月至少参加一次防火检查; e) 组织火灾隐患整改工作,负责筹措整改资金。 二、消防安全管理人 消防安全管理人应履行下列职责: a) 拟订年度消防工作计划和消防资金预算方案; b) 组织制订消防安全制度和操作规程; c) 组织防火检查,每月至少一次; d) 组织整改火灾隐患; e) 组织建立消防组织,每半年至少组织一次消防宣传教育、灭火和应急疏散演练; f) 向消防安全责任人报告消防安全情况,每月至少一次。 三、消防安全管理人员 消防安全管理人员应履行下列职责: a) 分析研究本部门、岗位消防安全工作,及时向上级报告; b) 确定消防安全重点部位,实施日常防火检查、巡查; c) 落实火灾隐患整改措施;

d) 管理、维护消防设施、灭火器材和消防安全标志; e) 组织开展消防宣传,对员工进行教育培训; f) 编制灭火和应急疏散预案,组织演练; g) 记录消防工作开展情况,完善消防档案; h) 完成其它消防安全管理工作。 四、其他人员 其它人员应严格执行消防安全制度和操作规程,参加消防安全培训及灭火和应急疏散演练,熟知本岗位火灾危险性和消防安全常识,发生火灾时及时引导群众疏散。

高空免责协议

编号:_______________本资料为word版本,可以直接编辑和打印,感谢您的下载 高空免责协议 甲方:___________________ 乙方:___________________ 日期:___________________

甲方: 乙方: 一、前言 1.乙方应认真贯彻执行国家和省、市有关高空作业安全法规、标 准和规范; 2.认真组织实施安全技术措施,确保高空作业安全经费的合理投入; 3.乙方应消除事故隐患制止违章作业和违章作为; 4.负责员工的入场高空作业安全教育和安全技术培训工作; 5.负责对施工现场使用的高空作业安全设备和临时高空作业安全组织检查,合格后方准使用; 6.负责建立高空作业安全岗位责任制,对实际情况组织检查和考评;不使用无证人员上岗作业; 7.不使用伪劣防护设施和用品; 8.发生高空作业安全事故要立即上报,保护好现场,参加事故的调查;拟订高空作业安全预防措施,并组织实施。 二、物件安全 1.高空作业中所用的物料应堆放平稳,不可妨碍安全通道处。 传递物件时不能抛掷。 2.对作业中的走道、通道板和登高用具等,都应随时加以清扫 干净。 3.拆卸下来的物体、剩余材料和废料等都要及时清理和及时运走,

不得任意乱置或向下丢弃。 4.各施工作业场所内,凡有坠落可能的任何物料,都要一律先行撤除,以防坠落伤人。 三、设施安全 1.在施工组织设计中应确定用于现场施工的登高和攀登设施。 现场登高应借助建筑结构或脚手架上的登高设施,也可采用载人的垂直运输设备。进行攀登作业时可使用梯子或采用其他攀登设施。条柱、梁和行车梁等构件吊装所需的直爬梯及其他登高用拉攀件,应在构件施工图或说明内作出规定; 2.攀登的用具,结构构造上必须牢固可靠。供人上下的踏板其使用荷载不应大于1100N)当梯面上有特殊作业,重量超过上述荷载时,应按实际情况加以验算; 3.移动式梯子,均应按现行的国家标准验收其质量。梯脚底部 应坚实,不得垫高使用。梯子的上端应有固定措施。立梯工作角度以75° ±5°为宜,踏板上下间距以30cm为宜,不得有缺档。梯子如需接长使用,必须有可靠的连接措施,且接头不得超过1处。连接后梯梁的强度,不应低于单梯梯梁的强度。折梯使用时上部夹角以35 ~45°为宜,较链必须牢固,并应有可靠的拉撑措施。固定式直爬梯应用金属材料制成。梯宽不应大于50cm支撑应采用不小于」70X 6 的角 钢,埋设与焊接均必须牢固。梯子顶端的踏棍应与攀登的顶面齐 平,并加设1~高的扶手 4.使用直爬梯进行攀登作业时,攀登高度以5m为宜。超过2m

高空作业施工安全管理协议书详细版

高空作业施工安全管理协议书 详细版 Effectively restrain the parties’ actions and ensure that the legitimate rights and interests of the state, collectives and individuals are not harmed ( 协议范本 ) 甲方:______________________ 乙方:______________________ 日期:_______年_____月_____日 编号:MZ-HT-088326

高空作业施工安全管理协议书详细版 甲方:____________________ 乙方:____________________ 签订地点:________________ 根据《中华人民共和国合同法》、《中华人民共和国安全生产法》等规定,甲乙双方经过协商达成以下协议。乙方签订本协议应当视为一经充分理解并全部接受协议内容,若有疑问及不明之处,以甲方的解释为准。 第一条甲方责任: 1.对施工(作业)单位的资质进行审查,向乙方提供本单位的安全生产规章制度。 2.对乙方安全、环境、治安、防火工作进行监督检查,纠正违章指挥和违章作业,发现严重违纪和事故隐患,有权责令停工,监

督整改并按照甲方的管理办法进行处理,对拒不执行甲方意见,严重者终止合同,所造成的一切经济损失由乙方承担。 3.监督乙方识别危险源(危险场所、危险作业、危险设备)、制定防范措施(包括应遵守的规范、作业人员的资质、保护用具、相关设备、周围环境、电源开关等)、制定预案、告知施工(作业)人员在紧急情况下应当采取的应急措施。 4.乙方在施工(作业)过程中出现工伤事故时,甲方在接到乙方通报后有义务积极协助乙方进行现场抢救工作。 第二条乙方责任 1.乙方对施工(作业)过程中的安全、环境、治安、防火工作负主要责任,施工前应指派专人负责访项目的上述工作,佩戴明显的安全标志,接受甲方的统一协调和监督,教育施工(作业)人员遵守安全操作堆积,根据工作特点制定安全措施,做好安全教育和安全技术交代工作,保证进入现场施工(作业)人员经过安全培训教育工作,必须持本岗位有效证件上岗。 2.开工前,将施工(作业)人员的情况如实向甲方报告。有人

工厂消防安全管理制度

工厂消防安全管理制度 消防安全教育培训制度 一、新职工入厂,须进行消防安全的职前培训,培训内容包括:消防安全基本常识、灭火器及消火栓的操作使用等。 二、对每名员工每年至少进行一次消防安全培训教育,培训情况记录存档。 三、公司每个季度对全体职工进行疏散演习,对义务消防队员进行灭火演习专门培训,使每个队员都能熟练使用灭火器材, 四、公司的消防安全责任人、消防安全管理人、专兼职消防管理人员、消防控制室的操作人员等有关人员应接受消防安全专门培训。 五、电焊、气焊、锅炉工等在具有火灾危险区域作业的人员和自动消防系统的操作人员,必须经过消防培训,持证上岗 六、各车间、班组等部门展开消防安全教育、培训工作应根据各部门、各阶段、各字的特点进行针对行的教育。 七、公司通过多种形式开展多种形式开展经常性的消防安全宣传教育。 防火巡查检查制度 一、建立逐级消防安全责任制和岗位消防安全责任制,明确各自职责,落实巡查检查制度。 二、公司安全部人员每日对公司进行防火检查。公司安全部、环安部每月对公司进行防火检查并复查追踪改善。 三、检查中发现火灾隐患,检查人员应填写记录,并按照规定,要求

有关人员在记录上签名, 四、检查部门应将检查情况以书面形式及时通知受检部门,受检部门负责人应按通知要求及时整改火灾隐患 五、对检查中发现的火灾隐患未按规定时间及时整改的,根据公司规定给予处罚。 安全疏散设施管理制度 一、厂内的车间、仓库、宿舍的安全出口门、疏散楼梯、疏散走道的宽度必须按规范设置。 二、所有的疏散出口、楼梯、走道必须配置相应的应急照明和疏散标志。 三、上班时、生产车间、仓库应保证安全出口畅通,安全出口不得上锁。 四、车间、仓库应按规定存放物品,不得堵塞通道。 五、各部门负责人应按规定定期检查疏散标志和应急照明设施是否完好,发现损坏及时维修。 消防控制室值班制度 一、消防控制室坚持24小时值班制度。 二、消防控制室的操作维护人员,应经消防安全专门培训合格后上岗。 三、值班人员不得擅离岗位,应严格按规程操作。 四、值班人员应尽职尽责,如有发生火灾事故,应按有关预案及时处理,并报告有关部门。

个人高空作业免责协议高空作业免责协议书

个人高空作业免责协议高空作业免责协议书协议书是契约文书的一种。是当事人双方(或多方)为了解决或预防纠纷,或确立某种法律关系,实现一定的共同利益、愿望,经过协商而达成一致后,签署的具有法律效力的记录性应用文。下面给大家带来高空作业免责协议书,供大家参考! 第1篇:高空作业免责协议 甲方: 乙方(负责人): 经甲乙双方充分协商,在依据国家相关法律法规和公司相关规定的基础上,本着自愿平等的原则签订此协议。 高空项目名称: 现场施工人员签名: 一、甲方的责任

1、甲方在乙方进行施工时,有权对乙方进行监督、检查、指导,对于检查当中发现的问题,甲方将依据公司相关的奖惩制度进行处罚、情况严重,责令停工。 2、作业过程中出现人员伤害情况,甲方有义务协助乙方做好事故的处理工作,防止事故的扩大化,协助相关部门做好事故的取证工作,但事故发生所产生的一切费用由乙方承担,甲方不承担任何责任。 二、乙方的责任(学生打架调解协议书) 1、乙方负责人是本次工程安全的第一责任人,并应制定该项目工程施工安全方案(操作程序),乙方必须设立专职安全员,负责作业人员的安全防护告知,安全操作规程培训。 2、乙方在作业过程中,应遵守公司的各项规章制度,对于作业时发现的安全隐患,及时采取措施,予以消除。 3、乙方在作业过程中,出现的安全事故,将由乙方承担全部责任,若对公司造成损失,乙方赔偿损失。 4、乙方在作业过程中,禁止酗酒,疲劳作业,违规作业,并佩戴安全带和安全帽等安全设备。

5、在作业开始前,乙方项目负责人应对作业人员进行安全防护措施教育,并有文字存根以备检查,不得安排未经教育的员工进入现场。 甲方:乙方(负责人): 代表签名: 时间:年月日 甲方: 乙方: 一、前言 1.施工方应认真贯彻执行国家和省、市有关高空作业安全法规、标准和规范; 2.认真组织实施安全技术措施,确保高空作业安全经费的合理投入;

高空作业安全责任协议书(施工方与委托方

高空作业安全责任协议书 (业主与施工方) 工程项目:_________________________ 甲方:_________________________ 乙方:_________________________ 经双方充分、友好协商,本着平等互利、公平公正的原则,明确双方责、权利,确保服务 项目能安全优质的按时完成,特签订如下合同: 一、甲方指定乙方为施工,施工期:年月日至年月日止,特殊情况(如遇不可抗力因影响,如暴风雨、雷电等),施工期顺延。 二、施工地点:_________________________________ 三、双方权利和义务: 1、甲方责任和义务 1) 在进场高空施工作业前对乙方负责人进行现场口头的安全事项说明,其内容是:项目 的安全规章制度及对该工程项目有关联的安全注意事项。 2) 为了防止误登,在禁止或不坚固的结构区域,甲方应在这种结构的适当地点挂上警告 牌。 3) 甲方对乙方的施工设备和施工过程负有监督与检查的责任和义务。 2、乙方安全措施与责任 1) 乙方负责人为安全生产责任人,负责该工程项目的日常安全管理工作,严格遵守安全 生产规章制度,并指定专人负责监管安全施工作业。 2) 开工前必须对所属人员进行安全注意事项、措施交底的安全教育,不安排未经安全教 育人员进入作业场所。 3) 教育和监管所属人员不得随意进入非该施工作业项目区域外的场所及触摸、启动机械、 电器、控制阀等设备,否则因由此而引起的事故,乙方负全部责任。

4) 凡在高地面2米及以上的地点进行的工作,都应视作高处作业。 5) 担任高处作业人员必须身体健康,患有精神病、癫痫病及经医师鉴定患有高血压,心 脏病等不宜从事高处作业病的人员,不准参加高处作业。凡发现工作人员有饮酒、精神不振时,禁止登高作业。 6) 在使用吊绳作业时,必须使用安全带。安全带在使用前应进行检查,试验荷重为225 公斤,试验后检查是否有变形、破裂等,并做好试验记录。不合格的安全带应及时处理。 7) 安全带的挂钩或绳子应挂在结实牢固的构件上或专为挂安全带用的钢丝绳上。禁止挂 在移动或不牢固的物件上。 8) 高处工作应一律使用工具袋。较大的工具应用绳拴在牢固的构件上,不准随便乱放, 以防止从高空坠落发生事故。 9) 在进行高处工作时,除有关人员处,不准他人在工作地点的下面行或逗留,工作地点 下面应围栏或装设其他保护装置,防止落物伤人。如在格栅式的平台上工作,为了防止工具和器材掉落,应铺设木板。 10) 不准将工具及材料上下投掷,要用绳系牢后往下或往上吊送,以免打伤下方工作人员 或击毁脚手架。 11) 上下层同时进行工作时,中间必须搭设严密牢固的防护隔板,罩棚或其他隔离设施, 工作人员必须戴安全帽。 12) 冬季在低于零度进行露天高处工作,必要时应该在施工地区附近设有取暖的休息所, 取暖设备应有专人管理,注意防火。遵守安全生产规章制度,并指定专人负责监管安全施工作业。 13) 在6级及以上的大风以及暴雨、打雷、大雾等恶劣天气,应停止露天高处作业。 14) 需使用甲方或与甲方相关的机械、电器等设备、设施,必须经得甲方同意,并对其 安全防护措施负责和承担安全责任。 15) 乙方对该工程项目的安全施工作业以及对参与该工程作业的所的全部人员的安全负责。 16) 乙方负责此项目施工的全部安全责任,如果在施工中发生生产安全事故,由乙方承 担全部的事故责任和经济责任。 四、甲乙双方严格遵守本合同条款,履行各自的职责,搞好文明施工作业。

企业消防安全管理制度范例

太原市中小企业创业服务中心消防安全管理制度范例 (一)消防安全教育、培训制度 1、每年以创办消防知识宣传栏、开展知识竞赛等多种形式,提高全体员工的消防安全意识。 2、定期组织员工学习消防法规和各项规章制度,做到依法治火。 3、各部门应针对岗位特点进行消防安全教育培训。 4、对消防设施维护保养和使用人员应进行实地演示和培训。 5、对新员工进行岗前消防培训,经考试合格后方可上岗。 6、因工作需要员工换岗前必须进行再教育培训。 7、消控中心等特殊岗位要进行专业培训,经考试合格,持证上岗。 (二)防火巡查、检查制度 1、落实逐级消防安全责任制和岗位消防安全责任制,落实巡查检查制度。 2、消防工作归口管理职能部门每日对中心进行防火巡查。每月对单位进行一次防火检查并复查追踪改善。 3、检查中发现火灾隐患,检查人员应填写防火检查记录,并按照规定,要求有关人员在记录上签名。 4、检查部门应将检查情况及时通知受检部门,各部门负责人应每日消防安全检查情况通知,若发现本单位存在火灾隐患,应及时整改。 5、对检查中发现的火灾隐患未按规定时间及时整改的,根据奖惩制度给予处罚。 (三)安全疏散设施管理制度 1、单位应保持疏散通道、安全出口畅通,严禁占用疏散通道,严禁在安全出口或疏散通道上安装栅栏等影响疏散的障碍物。 2、应按规范设置符合国家规定的消防安全疏散指示标志和应急照明设施。 3、应保持防火门、消防安全疏散指示标志、应急照明、机械排烟送风、火灾事故广播等设施处于正常状态,并定期组织检查、测试、维护和保养。 4、严禁在营业或工作期间将安全出口上锁。 5、严禁在营业或工作期间将安全疏散指示标志关闭、遮挡或覆盖。 (四)消防控制中心管理制度 1、熟悉并掌握各类消防设施的使用性能,保证扑救火灾过程中操作有序、准确迅速。 2、做好消防值班记录和交接班记录,处理消防报警电话。 3、按时交接班,做好值班记录、设备情况、事故处理等情况的交接手续。无交接班手续,值班人员不得擅自离岗。 4、发现设备故障时,应及时报告,并通知有关部门及时修复。 5、非工作所需,不得使用中心内线电话。 6、上班时间不准在中心抽烟、睡觉、看书报等,离岗应做好交接班手续。

高空作业安全免责协议书

甲方: 乙方: 一、前言 1.施工方应认真贯彻执行国家和省、市有关高空作业安全法规、标准和规范; 2.认真组织实施安全技术措施,确保高空作业安全经费的合理投入; 3.组织定期安全检查,消除事故隐患制止违章作业和违章作为; 4.负责员工的入场高空作业安全教育和安全技术培训工作; 5.负责对施工现场使用的高空作业安全设备和临时高空作业安全组织检查,合格后方准使用; 6.负责建立高空作业安全岗位责任制,对实际情况组织检查和考评;不使用无 证人员上岗作业; 7.不使用伪劣防护设施和用品; 8.发生高空作业安全事故要立即上报,保护好现场,参加事故的调查;拟订高空作业安全预防措施,并组织实施。 二、物件安全 1.高空作业中所用的物料应堆放平稳,不可妨碍安全通道处。传递物件时不能抛掷。 2.对作业中的走道、通道板和登高用具等,都应随时加以清扫干净。

3.拆卸下来的物体、剩余材料和废料等都要及时清理和及时运走,不得任意乱置或向下丢弃。 4.各施工作业场所内,凡有坠落可能的任何物料,都要一律先行撤除,以防坠落伤人。 三、设施安全 1.在施工组织设计中应确定用于现场施工的登高和攀登设施。现场登高应借助建筑结构或脚手架上的登高设施,也可采用载人的垂直运输设备。进行攀登作业时可使用梯子或采用其他攀登设施。条柱、梁和行车梁等构件吊装所需的直爬梯及其他登高用拉攀件,应在构件施工图或说明内作出规定; 2.攀登的用具,结构构造上必须牢固可靠。供人上下的踏板其使用荷载不应大于1100n。当梯面上有特殊作业,重量超过上述荷载时,应按实际情况加以验算; 3.移动式梯子,均应按现行的国家标准验收其质量。梯脚底部应坚实,不得垫高使用。梯子的上端应有固定措施。立梯工作角度以75°±5°为宜,踏板上下间距以30cm为宜,不得有缺档。梯子如需接长使用,必须有可靠的连接措施,且接头不得超过1处。连接后梯梁的强度,不应低于单梯梯梁的强度。折梯使用时上部夹角以35°~45°为宜,铰链必须牢固,并应有可靠的拉撑措施。固定式直爬梯应用金属材料制成。梯宽不应大于50cm,支撑应采用不小于∟70×6的角钢,埋设与焊接均必须牢固。梯子顶端的踏棍应与攀登的顶面齐平,并加设1~1.5m高的扶手。 4.使用直爬梯进行攀登作业时,攀登高度以5m为宜。超过2m时,宜加设护笼,超过8m时,必须设置梯间平台。 四、高空作业 1.凡在高地面2米及以上的地点进行的工作,都应视作高处作业。凡能在地面上预先作好的工作,都必须在地面上作,尽量减少高处作业。

高空作业安全责任合同协议书范本 标准版

甲方: 乙方: 为了做好阳春市宏业创美广告有限公司外协高空作业的安全管理工作,防止安全事故的发生,确保人身安全,经甲乙双方充分协商,在依据国家相关法律法规和公司相关规定的基础上,本着自愿平等的原则签订此协。 一、甲方的责任: 1、甲方在乙方进入作业现场前,对乙方人员进行安全告知。 2、甲方在乙方进行施工时,有权对乙方进行监督、检查、指导,对于检查当中发现的问题,甲方将依据公司相关的奖惩制度进行处罚和奖励。 3、作业过程中出现人员伤害情况,甲方有义务协助乙方做好事故的处理工作,防止事故的扩大化,协助相关部门做好事故的调查取证工作,但期间发生的一切费用由乙方承担。 二、乙方的职责: 1、本次施工过程中,乙方必须设立专职安全员,负责作业人员的安全防护告知,安全操作规程培训。 2、乙方在作业过程中,应遵守公司的各项规章制度,对于作业时发现的安全隐患,及时采取措施,予以消除。 3、乙方在作业过程中,出现的安全事故,将由乙方承担全部责任,若对公司造成损失,乙方赔偿损失。 4、乙方在作业过程中,禁止酗酒,疲劳作业,违规作业,甲方将不定时进行抽查,在抽查过程中若发现违规行为,甲方将依据公司相关规定对乙方进行处罚。 5、根据规定:乙方的项目负责人,也是安全负责人,负责施工人员的日常安全管理工作,并对乙方作业人员的安全负责。 6、在作业开始前,乙方项目负责人应对作业人员进行安全防护措施教育,并有文字存根以备检查,不得安排未经教育的员工进入现场。

7、不得随意进入非该施工作业项目区域外的场所及触摸、启动机械、电器、控制阀等设备,否则因由此而引起的事故,乙方负全部责任。 8、乙方所使用的工具应对其安全防护措施负责并承担安全责任。发现安全吊绳、安全吊板、安全带如有损坏必须更换,因由此而引起的事故,乙方负全部责任。 三、甲乙双方应严格遵守本协议条款,履行各自职责,搞好文明作业。 四、施工地点范围: 五、验收标准:乙方施工必须符合格力空调公司户外墙体广告的要求,画面平整,压边条牢固。 六、结算方式:协议承包价单价为¥________元/㎡。 七、本协议自签订之日起生效至项目结束,一式两份,甲乙双方各执一份。 八、未尽事宜,甲乙双方本着友好协商的原则解决。 甲方:乙方: 责任人:责任人: 签订日期:签订日期:

事业单位消防安全管理制度

事业单位消防安全管理制度 1、消防安全例会制度 为了认真贯彻中华人民共和国公安部第61号令,关于《机关、团体、企业、事业单位消防安全管理规定》,确实抓好我校消防安全工作,研究、部署、落实好本校的消防安全工作计划和措施,制定本规定。 一、单位每月召开一次消防安全例会,由单位消防安全责任人负责召集。消防安全责任人、消防安全管理人、专兼职消防安全管理人员必须参加会议。 二、消防安全例会研究分析单位消防安全形势,通报火险隐患情况,分析、查找产生隐患的原因,总结教训,制定针对性整改方案和具体落实措施;提出有关重点、难点问题的解决办法;研究部署单位下一阶段的消防安全工作等。 2、用电消防安全管理制度 一、安装和维修电器设备线路,必须由电工按《电力设备技术规范》进行操作,安装接电时需向用电管理部门申请,经审核批准后由电工负责施工。 二、因工作需要必须架设临时用电线路的,应由使用部门用电管理部门提出申请,经审查批准后方可安装,安装的临时电气线路必须符合电器安装规范的有关规定,保证安全用电,用后及时拆除。 三、临时电器线路使用期间,由使用部门监督,电工负责维护,操作人员停止使用时必须及时切断电源,临时电器线路限期使用,最多不得超过一周,确需延期使用的必须办理延期审批手续,否则由电工按期拆除。 四、非电工人员严禁拆装、挪移临时电气线路,否则造成事故的,由使用部门负责人与肇事者承担全部责任。 五、电器设备的操作人员,必须严格遵守安全操作规程,并定期对设备进行检查、维护,及时发现问题及时报告,由专业人员负责维修,工作结束后必须切断电源,做到人走电断。 3、火灾隐患整改制度 一、消防安全责任人应当组织防火检查,督促落实火灾隐患整改,及 时处理涉及消防安全的操作规程。消防安全管理人应当组织实施防火检查和火灾隐患整改工作。 二、各部门对存在的火灾隐患,应当及时予以消除。 三、公司对下列违反消防安全规定的行为,应当责成有关人员当场改 正并督促落实: 1、违章进入生产、储存易燃易爆危险物品场所的; 2、违章使用明火作业或者在具有火灾、爆炸危险的场所吸烟、使 用明火等违反禁令的; 3、将安全出口上锁、遮挡,或者占用、堆放物品影响疏散通道畅通的; 4、消火栓、灭火器材被遮挡影响使用或者被挪作他用的; 5、常闭式防火

高空作业安全责任协议书防盗网

高空作业安全责任协议书 甲方: 乙方: 为了做好_______防盗网拆除及安装的安全管理工作,防止安全事故的发生,确保人身安全,经甲乙双方充分协商,在依据国家相关法律法规的基础上,本着自愿平等的原则签订此协议。 一、甲方的责任: 1、甲方在乙方进入作业现场前,对乙方人员进行安全告知,要求乙方安全施工。 2、甲方在乙方进行施工时,有权对乙方进行监督、检查、指导。若乙方违反相关安全规定、违章施工,有权停止乙方施工。 3、作业过程中出现人员伤害情况,甲方有义务协助乙方做好事故的处理工作,防止事故的扩大化,协助相关部门做好事故的调查取证工作,但期间发生的一切费用由乙方承担。 二、乙方的职责“ 1、本次施工过程中,乙方必须设立安全负责人,负责作业人员的安全防护告知,安全操作规程培训。根据“一岗双责”的规定:乙方的项目负责人,也是安全负责人,负责施工人员的日常安全管理工作,并对乙方作业人员的安全负责。在作业开始前,乙方项目负责人应对作业人员进行安全防护措施教育,不得安排未经教育的员工进入现场。 2、乙方在作业过程中,应做好安全措施,对于作业时发现的安全隐患,及时采取措施,予以消除。 3、乙方在作业过程中,禁止酗酒,疲劳作业,违规作业。 4、不得随意进入非该施工作业项目区域外的场所及触摸、启动机械、电器、控制阀等设备,否则因由此而引起的事故,乙方负全部责任。 5、乙方所使用的工具应对其安全防护措施负责并承担安全责任。发现安全吊绳、安全吊板、安全带等安全防护措施如有损坏必须更换,因由此而引起的事故,乙方负全部责任。 6、乙方在作业过程中,出现的安全事故,将由乙方承担全部责任,若对甲方及第三方造成损失,乙方赔偿损失。施工过程中的施工人员安全责任均由乙方负责。 7、在施工范围内如对第三方(人、物)造成伤害,其后果由乙方负责,并承担全部责任;如对甲方原有设备及成品等物品造成损坏的,由乙方负责对损毁物品进行赔偿。 8、乙方如因管理不善等原因,导致施工现场混乱、发生事故等产生的后果均由乙方承担全部责任并负责赔偿。事情严重的,甲方和乙方有权令其停工整顿,并协助司法部门追究有关人员的刑事责任。 9、乙方在施工中人员凡在离地面两米以上进行的作业,都属于高空作业。所有高空作业者,不论什么工种,进行作业的时间、地点,也不论专业或临时,均应执行高空作业安全管理规定。10、从事高空作业的施工人员,必须进行身体检查。凡患有高血压、心脏病、癫痫病、恐高症及其他不适应高空作业的人员,一律不准从事高空作业的施工。 三、甲乙双方应严格遵守本协议条款,履行各自职责,搞好文明作业。 四、本协议自签订之日起生效至项目结束,一式两份,甲乙双方各执一份。 五、未尽事宜,甲乙双方本着友好协商的原则解决。 甲方:乙方: 责任人:责任人: 签订日期:签订日期:

消防安全管理规章制度文件63978

(一)消防安全教育、培训制度 1、每年以创办消防知识宣传栏、开展知识竞赛等多种形式,提高全体员工的消防安全意识。 2、定期组织员工学习消防法规和各项规章制度,做到依法治火。 3、各部门应针对岗位特点进行消防安全教育培训。 4、对消防设施维护保养和使用人员应进行实地演示和培训。 5、对新员工进行岗前消防培训,经考试合格后方可上岗。 6、因工作需要员工换岗前必须进行再教育培训。 7、消控中心等特殊岗位要进行专业培训,经考试合格,持证上岗。 (二)防火巡查、检查制度 1、落实逐级消防安全责任制和岗位消防安全责任制,落实巡查检查制度。 2、消防工作归口管理职能部门每日对医院进行防火巡查。每月对单位进行一次防火检查并复查追踪改善。 3、检查中发现火灾隐患,检查人员应填写防火检查记录,并按照规定,要求有关人员在记录上签名。 4、检查部门应将检查情况及时通知受检部门,各部门负责人应每日消防安全检查情况通知,若发现本单位存在火灾隐患,应及时整改。 5、对检查中发现的火灾隐患未按规定时间及时整改的,根据奖惩制度给予处罚。 (三)安全疏散设施管理制度 1、单位应保持疏散通道、安全出口畅通,严禁占用疏散通道,严禁在安全出口或疏散通道上安装栅栏等影响疏散的障碍物。

2、应按规范设置符合国家规定的消防安全疏散指示标志和应急照明设施。 3、应保持防火门、消防安全疏散指示标志、应急照明、机械排烟送风、火灾事故广播等设施处于正常状态,并定期组织检查、测试、维护和保养。 4、严禁在营业或工作期间将安全出口上锁。 5、严禁在营业或工作期间将安全疏散指示标志关闭、遮挡或覆盖。 (四)消防设施、器材维护管理制度 1、消防设施日常使用管理由专职管理员负责,专职管理员每日检查消防设施的使用状况,保持设施整洁、卫生、完好。 2、消防设施及消防设备的技术性能的维修保养和定期技术检测由消防工作归口管理部门负责,设专职管理员每日按时检查了解消防设备的运行情况。查看运行记录,听取值班人员意见,发现异常及时安排维修,使设备保持完好的技术状态。 3、消防设施和消防设备定期测试: (1)烟、温感报警系统的测试由消防工作归口管理部门负责组织实施,保安部参加,每个烟、温感探头至少每年轮测一次。 (2)消防水泵、喷淋水泵、水幕水泵每月试开泵一次,检查其是否完整好用。 (3)正压送风、防排烟系统每半年检测一次。 (4)室内消火栓、喷淋泄水测试每季度一次。 (5)其它消防设备的测试,根据不同情况决定测试时间。 4、消防器材管理: (1)每年在冬防、夏防期间定期两次对灭火器进行普查换药。 (2)派专人管理,定期巡查消防器材,保证处于完好状态。 (3)对消防器材应经常检查,发现丢失、损坏应立即补充并上报领导。 (4)各部门的消防器材由本部门管理,并指定专人负责。

2020年消防安全管理制度最新版

消防安全管理制度最新版 (一)消防安全教育、培训制度 1、每年以创办消防知识宣传栏、开展知识竞赛等多种形式,提高全体员工的消防安全意识。 2、定期组织员工学习消防法规和各项规章制度,做到依法治火。 3、各部门应针对岗位特点进行消防安全教育培训。 4、对消防设施维护保养和使用人员应进行实地演示和培训。 5、对新员工进行岗前消防培训,经考试合格后方可上岗。 6、因工作需要员工换岗前必须进行再教育培训。 7、消控中心等特殊岗位要进行专业培训,经考试合格,持证上岗。 (二)防火巡查、检查制度 1、落实逐级消防安全责任制和岗位消防安全责任制,落实巡查检查制度。 2、消防工作归口管理职能部门每日对公司进行防火巡查。每月对单位进行一次防火检查并复查追踪改善。 3、检查中发现火灾隐患,检查人员应填写防火检查记录,并按照规定,要求有关人员在记录上签名。 4、检查部门应将检查情况及时通知受检部门,各部门负责人应每日消防安全检查情况通知,若发现本单位存在火灾隐患,应及时整改。 5、对检查中发现的火灾隐患未按规定时间及时整改的,根据奖惩制度给予处罚。 (三)安全疏散设施管理制度 1、单位应保持疏散通道、安全出口畅通,严禁占用疏散通道,严禁在安全出口或疏散通道上安装栅栏等影响疏散的障碍物。 2、应按规范设置符合国家规定的消防安全疏散指示标志和应急照明设施。 3、应保持防火门、消防安全疏散指示标志、应急照明、机械排烟送风、火灾事故广播等设施处于正常状态,并定期组织检查、测试、维护和保养。 4、严禁在营业或工作期间将安全出口上锁。 5、严禁在营业或工作期间将安全疏散指示标志关闭、遮挡或覆盖。 (四)消防控制中心管理制度 1、熟悉并掌握各类消防设施的使用性能,保证扑救火灾过程中操作有序、准确迅速。 2、做好消防值班记录和交接班记录,处理消防报警电话。 3、按时交接班,做好值班记录、设备情况、事故处理等情况的交接手续。无交接班手续,值班人员不得擅自离岗。 4、发现设备故障时,应及时报告,并通知有关部门及时修复。 5、非工作所需,不得使用消控中心内线电话,非消防控制中心值班人员禁止进入值班室。 6、上班时间不准在消控中心抽烟、睡觉、看书报等,离岗应做好交接班手续。

蜘蛛人高空作业安全协议书

高空作业安全协议书 甲方:北京市朝阳田华建筑集团公司第七分公司 乙方: 施工范围:维修东坝驹子房农民定向安置房一期C区外墙保温涂料工程 一、甲方责任: 1、甲方负责为乙方开据施工任务单,配合乙方为施工创造条件。 2、甲方工程部及物管保安部门负责检查工程的文明施工。消防、安全等情况,及时制止施工现场中存在的各种违章现象,并根据有关规定,按情节轻重对乙方及当事人做出处理。(按小区管理有关规定执行) 3、甲方、物管、业主负责整改后的验收工作。 二、乙方责任: 1、进入小区的所有工人必须遵守小区的规章制度;所有工人必须拿身份证复印件和登记照片到项目部登记。 2、严禁任何人在小区内乱接、乱搭电源电线; 3、非工作人员不准进入施工区,作业人员未经许可,禁止从事非本工种作业; 4、高空作业严禁穿皮鞋和带钉易滑鞋; 5、乙方在施工中不得随意扩大施工占地面积,严禁堵塞交通及楼宇安全疏散通道,各种施工材料,设备不得乱堆乱放。 6、对施工中遗留的各种废料及物品,应做到当天施工当天清理,保证现场和小区楼宇内的清洁卫生。

7、未经物管处负责人许可,不准随意拆除小区安全防护设施和安全标志; 8、严禁在高空向下抛掷任何物品,高空作业必须拴好安全带 9、乙方在施工中杜绝赤膊光脚等不文明现象,施工人员要搞好个人卫生,不得蓬头垢面。 10、乙方违反上述各条款如出现现场混乱,造成小区公告设施和业主室内损失及事故,由乙方负责照价赔偿,严重的甲方除有权令其停工整顿,将追究有关人员的刑事责任。 11、乙方在施工过程中,随时注意安全,期间所发生的一切大小事故,都由乙方自己负责经济和法律责任,甲方不负责任何责任。 12、乙方必须明确施工负责人为第一安全责任人,现场施工负责人为现场安全责任人,乙方第一安全责任人对施工人员及现场安全负全责。 13、凡是在施工过程中因违规操作而造成的一切安全事故均由乙方负全责。 14、乙方必须有国家认可的相关施工资质,施工人员需有“人生意外伤害保 险”。 15、施工人员施工时必须严格按照?高空作业安全规程?施工,对教育仍不服从管理者,甲方有权进行处罚,对情节严重者甲方有权将其清理出商场。 16、乙方施工人员夜间进场施工,应到楼层办理夜间装修申请,凭出入证进场施工,并从商场规定的入口进出,保安有权对夜间装修进出人员进行管理。 17、施工现场严禁吸烟,发现烟头100元/只,当场发现吸烟罚款1000元 18、施工时现场严禁动用明火,确需动用明火时必须到商场安全管理部消控室办理动火手续,经批准的动火现场必须有专人进行现场监护,配备水和灭火器材后方可施工;否则造成的所有损失均由乙方承担,情节严重者将

高空作业安全协议书

高空作业安全协议书 甲方: 乙方: 为确保XX施工中人身、设备的安全,依据《中华人民共和国安全生产法》等法律、法规、规定,明确双方安全责任,确保施工安全,保证员工和其他所有雇员在施工过程中人身健康安全,预防发生各类安全事故,经双方协商,甲乙双方自愿签订本协议书。 一、工程项目名称: 二、工程地址: 三、工程范围: 四、协议期限:年月日--- 年月日 (一)甲方的安全责任: 1、负责向乙方进行安全技术交底,施工进行过程中的安全监督检查; 2、负责对作业人员资格进行审查,发现无证人员上岗的,应及时予以制止; 3、负责对乙方制定的安全生产技术措施进行监督检查; 4、对违反安全生产标准和规章制度的行为进行纠正,必要时令其停工整改。(二)乙方的安全责任: 1、乙方必须贯彻执行国家有关安全生产的方针、政策、法令、法规,遵守国家、行业有关安全施工、文明施工的规定,遵守现场的各项规章制度; 2、乙方必须保证参与本次高空作业施工人员具有高空作业合格证书,持证上岗。保证参与本次高空作业施工人员身体健康,施工前及施工过程中不得饮酒,如发现精神不振时,禁止继续施工。 3、工程开工前,乙方必须组织全体施工人员分工种进行安全教育、合格后方可进入现场施工;必须向施工人员进行安全技术交底,让全体施工人员掌握工程特点及施工安全措施; 4、乙方必须按国家有关规定,为施工人员配备合格的劳动防护用品及安全用具,并保证施工工具、器械使用安全; 5、开工前应对施工机械、工器具及安全防护设施进行一次检查,确保符合安全

规定并不超过检验周期。乙方施工人员应对所在的施工区域、作业环境、操作设施、设备、工器具等进行认真检查,发现隐患立即停止施工,并经落实整改后方准继续施工。在施工期间所使用的各种设备及工用具等均应符合施工要求。各类安全防护设施、遮栏、安全标志牌、警告牌和接地线等乙方不得擅自拆除、更改; 6、在使用吊绳作业时,必须使用安全带。安全带在使用前应进行检查,试验荷重为225公斤;试验后检查是否有变形、破裂等,并做好试验记录。不合格的安全带应及时处理。安全带的挂钩或绳子应挂在结实牢固的构件上或专为挂安全带用的钢丝绳上。禁止挂在移动或不牢固的物件上。 7、高空工作应一律使用工具袋。较大的工具应用绳拴在牢固的构件上,不准随便乱放,以防止从高空坠落发生事故。 8、针对本次施工,设置警戒禁行区域,并配备专职人员全程监督巡视。确保在进行高处工作时,除有关人员处,禁止警戒区域内车辆和人员停留或行走。在6级及以上的大风以及暴雨、打雷、大雾等恶劣天气,应停止露天高空作业。 9、乙方应对工作地段采取的安全技术措施、工作人员状态以及施工中的安全责任负责,如因乙方采取的安全措施不当、违反有关安全规程、规定及本协议所列安全事项而造成的一切事故或对第三方造成损失的,均由乙方承担所造成的经济损失及法律责任。 10、乙方对该工程项目的安全施工作业以及对参与该工程作业的所的全部人员的安全负责。并负责此项目施工的全部安全责任,如果在施工中发生生产安全事故,由乙方承担全部的事故责任和经济责任。 五、乙方施工人员违反有关安全生产规程、制度时,甲方有权予以纠正制止,有权通知乙方并给予经济处罚,直至停止乙方的工作。 六、本安全协议书壹式贰份,甲乙双方各执壹份。 甲方:(公章) 乙方:(公章) 法人或委托代理人:法人或委托代理人:年月日年月日

高空作业安全责任协议书

高空作业安全责任协议书标准化文件发布号:(9312-EUATWW-MWUB-WUNN-INNUL-DDQTY-KII

高空作业安全责任协议书 甲方:桥西鼎丽家居家饰广场 乙方: 为了做好的安全管理工作,防止安全事故的发生,确保人身安全,经甲乙双方充分协商,在依据国家相关法律法规的基础上,本着自愿平等的原则签订此协议。 一、甲方的责任: 1、甲方在乙方进入作业现场前,对乙方人员进行安全告知。 2、甲方在乙方进行施工时,有权对乙方进行监督、检查、指导。 3、作业过程中出现人员伤害情况,甲方不负任何责任。但甲方有义务协助乙方做好事故的处理工作,协助相关部门做好事故的调查取证工作,期间发生的一切费用由乙方承担。 二、乙方的责任: 1、本次施工过程中,乙方必须设立专职安全员,负责作业人员的安全防护告知,安全操作规程培训。 2、乙方施工人员施工时必须严格按照《高空作业操作规程》等有关规定施工,必须持证上岗,并已购买人身意外保险。系好安全带,戴好安全帽,做好必要的安全防护措施。 3、乙方在作业过程中,对于作业时发现的安全隐患,及时采取措施,予以消除。 4、乙方在作业过程中出现的安全事故,将由乙方承担全部责任。 5、乙方人员在作业过程中,禁止酗酒,疲劳作业,违规作业。 6、根据“一岗双责”的规定:乙方的项目负责人,也是安全负责人,负责施工人员的安全管理工作,并对乙方作业人员的安全负责。 7、在作业开始前,乙方项目负责人应对作业人员进行安全防护措施教育,并有文字存根以备检查,不得安排未经教育的员工进入现场。 8、不得随意进入非该施工作业项目区域外的场所及触摸、启动机械、电器、控制阀等设备,否则因由此而引起的事故,乙方负全部责任。 9、乙方所使用的工具应对其安全防护措施负责并承担安全责任。发现安全吊绳、安全吊板、安全带如有损坏必须更换,因由此而引起的事故,乙方负全部责任。 三、甲乙双方应严格遵守本协议条款,履行各自职责,搞好文明安全作业。 四、本协议自签订之日起生效至项目结束,一式两份,甲乙双方各执一份。 五、未尽事宜,甲乙双方本着友好协商的原则解决。 甲方(盖章):乙方(盖章): 代表(签字):负责人(签字): 日期:日期:

消防安全管理制度(上墙)

消防安全管理制度 一、消防安全教育、培训制度 每年以创办消防知识宣传栏、开展知识竞赛等多种形式,提高全体员工的消防安全意识;定期组织员工学习消防法规和各项规章制度;各部门应针对岗位特点进行消防安全教育培训;对消防设施维护保养和使用人员应进行实地演示和培训。 二、防火巡查、检查制度 落实逐级消防安全责任制和岗位消防安全责任制,落实巡查检查制度;检查中发现火灾隐患,检查人员应填写防火检查记录,并按照规定,要求有关人员在记录上签名。 三、安全疏散设施管理制度 单位应保持疏散通道、安全出口畅通,严禁占用疏散通道,严禁在安全出口或疏散通道上安装栅栏等影响疏散的障碍物;应按规范设置符合国家规定的消防安全疏散指示标志和应急照明设施。 四、消防控制中心管理制度 熟悉并掌握各类消防设施的使用性能,保证扑救火灾过程中操作有序、准确迅速;发现设备故障时,应及时报告,并通知有关部门及时修复;发现火灾时,迅速按灭火作战预案紧急处理,并拨打119电话通知公安消防部门并报告部门主管。 五、消防设施、器材维护管理制度 每日检查消防设施的使用状况,保持设施整洁、卫生、完好;发现异常及时安排维修,使设备保持完好的技术状态;消防设施和消防

设备定期测试。 六、火灾隐患整改制度 各部门对存在的火灾隐患应当及时予以消除;在防火安全检查中,应对所发现的火灾隐患进行逐项登记,并做好隐患整改情况记录;对公安消防机构责令限期改正的火灾隐患,应当在规定的期限内改正并写出隐患整改的复函,报送公安消防机构。 七、用火、用电安全管理制度 1、用电安全管理 严禁随意拉设电线,严禁超负荷用电;电气线路、设备安装应由持证电工负责;各部门下班后,该关闭的电源应予以关闭;禁止私用电热器、电炉等大功率电器。 2、用火安全管理 严格执行动火审批制度,确需动火作业时,作业单位应按规定向消防工作归口管理部门申请“动火许可证”;动火作业前应清除动火点附近5米区域范围内的易燃易爆危险物品或作适当的安全隔离,并向保卫部借取适当种类、数量的灭火器材随时备用,结束作业后应即时归还,若有动用应如实报告。 九、义务消防队组织管理制度 义务消防员按照灭火和应急疏散预案每半年进行一次演练,并结合实际不断完善预案;每年举行一次防火、灭火知识考核,考核优秀给予表彰;不断总结经验,提高防火灭火自救能力。 十、灭火和应急疏散预案演练制度

相关文档
最新文档