SQE工作经验谈

SQE工作经验谈
SQE工作经验谈

SQE

, Quality , SQE 4 , , SQE show , , , .

, EE(PCB/FPC/PCBA/FPCA,RLC connector), EE , , , SQE .

show

, -- KPI (key performance indictor)

, SQE , abnormal cases, customer complaint, LRR(lots reject rate),SQE , , , abnormal case SQE performance.

, SQE ability supplier 8D , , , SQE ” .

, supplier sense process , , SQE performance, , production dppm trend chart service(training and so on).

, (responsibility)

,SQE ,

1. audit.

2.

3.NPI(new product )/ECN , ,CIP .

4.GP .

, .

1. audit.

1.1 , PUR/RD/SQM/ESH ,SQE supplier 。 , PUR.

1.2 QPA(quality process audit), , receiving inspection, warehouse, MRB, production line, rework process, OQC and packing&store, record and so on.

, , , , , , , QPA checklist audit.

, 1.training https://www.360docs.net/doc/f08295199.html,ply with WI(work instruction) & SOP

, 3.machine maintained 4.measurement/tool

, 5. 6.

, 7.traceability&Identification 8.SPC, FAI checklist

, 9.ESH 10.

QPA frequency, , case, SQE , audit. , ,SQE , supplier audit process, , , supplier .

1.3 QSA(quality system audit), supplier audit, supplier , ,SQE audit item ,

a. document management

b. supplier .

c. product identification & traceability

d. Process control

e. .

f. Calibration

g. Nonconforming product control.

h. handling, package, storage and delivery

i. Record audit items.

,SQE items , audit , quality system, contact review, .

,QSA .

, supplier performace QBR , PUR, Technology and SQM, PUR-- 35%, T-- 30% SQM -- 35%.

Pur delivery/cost/service

T—technology share / service

SQM—quality issue/ service

Ps: sales , 3 service.

QBR meeting SQM , supplier sales/T/QA(CS) .

product , SQE , SQM .

1.4GPA(Green product audit), audit QSA , . 6 :

a. GPA .

b. Process management system

c. training

d. supplier s

e. EC ( )

f. .

2.

abnormal case, customer complaint LRR , , review FMEA/8D report , , .

, Baseline management, , audit , QA support, .

push supplier FMEA , :

supplier

a. , 。 , , ,

b. , ,

c.buglist, , .

d. .

(customer)

a.defect sample .(8D cycle times)

b.SQE ,review8D report, .

,FMEA supplier , FMEA supplier customer . FMEA , supplier site manager , FMEA , defect , site manager support.

SQE ’ ” .

, SQE ? Supplier ?

SQE , supplier , SQE supplier PE , , source supplier, SQE , , , supplier . SQE supplier , ,PE ’ , cost ,

. issue , , .

,SQE , supplier .

3. NPI(new product )/ECN , ,CIP .

NPI . SQE , , root cause , , , , model , ,SQE , ,SQE , , , issue technology ,SQE support, SQE , ,SQE , , , SQE , , SQE .

( ” , J)

, , , ,SQE NPI .

? .

.

a. ?

,SQE Supplier QA , , new product review review . , ,NPI Technology department, notice QE department, , , supplier Technology QE, PE , . , , SQE Supplier site manager , , .

SQE support Supplier QE , , supplier ,win-win SQE .

b. ?

,part failure history/specific failure data

1. Review supplier new model status in quality meeting.

2. Review fails record and corrective actions.

3. EC list for new product.(in NPI period, according to customer requirement, maybe some have some EC)

4. Co-work with supplier’s PE&ME, planner, RD&IE departments, define the best parameter and define it into SOP.

5. Supplier IPQC should know these failures and audit process according to them.

,transportation readiness.

1. Co-work with supplier related department or field standard, set up new model yield rate criteria.

2.5M checklist (manpower/machine/material/method/environment)

3. Document ready.(QC-FLOW-CHART,SOP,SIP and so on)

4. SPC review (dimension, optical, soldering thickness)

5. Golden sample management setup.

, SQE .

, supplier , ??

,

1. T , , , . .

2. , , supplier , supplier .

function , .( , SQM support, , , .)

3. issue , PUR , PUR .( , PUR ’ , ).

, 1pcs , zero defect items(EE material, , , ),SQE supplier , ,SQE , .

EC .

EC ,VECA&VECN.

VECA supplier ,VECN supplier.

EC ,cycle time ,EC , EC

.

, ,EC , EC ,SQM T, supplier QE T. SQM , , ,EC SQM, supplier QE, EC ,EC , , EC .

a. VECN .

T SQM, ,

T normal , rev, , . T , SQE supplier. SQE issue, , layer out . SQE .

b. VECA .

supplier QE SQE.

VECA items ,

, , (second source ).

issue, supplier , .

,Supplier VECA.

PS:VECA/VECN items .

, document , issue EC .

VECN/VECA ,

1.running change.( )

2.cut-in change.

PUR supplier product , .

:EC docement , SQM supplier .

4.GP .

,XRF , IQC , .

a. GPA .

b. Process management system

c. training

d. supplier s

e. EC

f.

SQE

1. , production co-work

2. QC 7 SPC review supplier 8D report.

3.

4. —ISO9000/TS16949/ISO14000 audit supplier

5.

6. supplier supplier supplier doube win,

相关主题
相关文档
最新文档