公路工程建设监理用表模板(doc 55页)(完美推荐版)

合集下载

公路工程监理使用表格

公路工程监理使用表格

公路工程监理使用表格目录1、总体施工组织设计报审表················································A-102、分项〔分部、〕工程开工申请单··································A-113、施工放样报验单························································A-124、原材料报验单··························································A-135、分项工程施工主要人员报验单············································A-146、进场设备报验单························································A-157、施工方案及主要工艺报审表··············································A-168、专项平安、文明〔环保〕施工方案报批单··································A-179、检验申请单························································A-1810、工序检查报验单·······················································A-1911、下承层检验申请单·················································A-2012、混凝土浇筑申请单·················································A-2113、施工月工作方案单·············································A-2214、施工每周工作方案·················································A-2315、监理巡视记录························································A-2416、监理旁站记录·························································A-2517、监理日志·····························································A-2618、监理日巡视、旁站、抽捡安排表·········································A-2719、工地会议记要·························································A-2820、监理指·····························································A-2921、工程暂时停工指·····················································A-3022、复工申请·····························································A-3123、复工指·····························································A-3224、施工日志·····························································A-3325、工程质量〔平安〕事故处理单·······································A-3426、中间交工证书·························································A-3527、公路工程〔施工段〕交工验收证书··································A-3628、工程缺陷责任终止证书···············································A-37总体施工组织设计报审表施工:合同:施工段:□□□-□□□□监理:编:A-10-分项〔分部、〕工程开工申请单施工:合同:施工段:监理:编:A-11-□□□-□□□□施工放样报验单施工:合同:施工段:□□□-□□□□监理:编:A-12-原材料报验单施工:合同:施工段:□□□-□□□□监理:编:A-13-分项工程施工主要人员报验单施工:合同:施工段:□□□-□□□□监理:编:A-14-进场设备报验单施工:合同:施工段:□□□-□□□□监理:编:A-15-施工方案及主要工艺报审表施工:合同:施工段:专项平安、文明〔环保〕施工方案报批单施工:合同:施工段:监理:编:A-17-□□□-□□□□检验申请批复单施工:合同:施工段:监理:编:A-18-□□□-□□□□工序检查报验单施工:合同:施工段:监理:编:A-19-□□□-□□□□下承层检验申请批复单施工:合同:施工段:监理:编:A-20-□□□-□□□□混凝土浇筑申请单施工:合同:施工段:监理:编:A-21-□□□-□□□□施工月工作方案单施工:合同:施工段:监理:编:A-22-□□□-□□□□施工每周工作方案施工:合同:施工段:监理:编:A-23-□□□-□□□□监理巡视记录施工:合同:施工段:监理:编:A-24-□□□-□□□□监理旁站记录施工:合同:施工段:监理:编:A-25-□□□-□□□□监理日志施工:合同:施工段:监理:编:A-26-□□□-□□□□监理日巡视、旁站、抽捡安排表施工:合同:施工段:监理:编:A-27-□□□-□□□□工地会议记要施工:合同:施工段:监理:编:A-28-□□□-□□□□监理指施工:合同:施工段:监理:编:A-29-□□□-□□□□工程暂时停工指施工:合同:施工段:监理:编:A-30-□□□-□□□□复工申请施工:合同:施工段:监理:编:A-31-□□□-□□□□复工指施工:合同:施工段:监理:编:A-32-□□□-□□□□施工日志施工:合同:施工段:监理:编:A-33-□□□-□□□□工程质量〔平安〕事故处理单施工:合同:施工段:监理:编:A-34-□□□-□□□□中间交工证书施工:合同:施工段:监理:编:A-35-□□□-□□□□公路工程〔施工段〕交工验收证书交工验收时间:编:A-36-□□□-□□□□工程缺陷责任终止证书施工:合同:施工段:监理:编:A-37-□□□-□□□□附:施工项目管理的重点,集中在合同管理、质量管理、进度管理、成本管理、安全管理和信息管理6个方面:1.合同管理方面应在规范、强化招标行为的基础上,执行国的新经济合同法,加强签约的可靠性和合同执行中的变更管理,掌握和运用索赔技术,充分发挥合同在市场经济履约经营中的作用。

公路工程监理使用表格word版本

公路工程监理使用表格word版本

公路工程监理使用表格目录1、总体施工组织设计报审表················································A-102、分项(分部、单位)工程开工申请批复单··································A-113、施工放样报验单························································A-124、原材料报验单··························································A-135、分项工程施工主要人员报验单············································A-146、进场设备报验单························································A-157、施工方案及主要工艺报审表··············································A-168、专项安全、文明(环保)施工方案报批单··································A-179、检验申请批复单························································A-1810、工序检查报验单·······················································A-1911、下承层检验申请批复单·················································A-2012、混凝土浇筑申请报告单·················································A-2113、施工单位月工作计划报告单·············································A-2214、施工单位每周工作计划·················································A-2315、监理巡视记录························································A-2416、监理旁站记录·························································A-2517、监理日志·····························································A-2618、监理日巡视、旁站、抽捡安排表·········································A-2719、工地会议记要·························································A-2820、监理指令·····························································A-2921、工程暂时停工指令·····················································A-3022、复工申请·····························································A-3123、复工指令·····························································A-3224、施工日志·····························································A-3325、工程质量(安全)事故处理报告单·······································A-3426、中间交工证书·························································A-3527、公路工程(施工段)交工验收证书··································A-3628、工程缺陷责任期终止证书···············································A-37总体施工组织设计报审表施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-10-分项(分部、单位)工程开工申请批复单施工单位:合同号:施工段号:监理单位:编号:A-11-□□□-□□□□施工放样报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-12-原材料报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-13-分项工程施工主要人员报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-14-进场设备报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-15-施工方案及主要工艺报审表施工单位:合同号:施工段号:专项安全、文明(环保)施工方案报批单施工单位:合同号:施工段号:监理单位:编号:A-17-□□□-□□□□检验申请批复单施工单位:合同号:施工段号:监理单位:编号:A-18-□□□-□□□□工序检查报验单施工单位:合同号:施工段号:监理单位:编号:A-19-□□□-□□□□下承层检验申请批复单施工单位:合同号:施工段号:监理单位:编号:A-20-□□□-□□□□混凝土浇筑申请报告单施工单位:合同号:施工段号:监理单位:编号:A-21-□□□-□□□□施工单位月工作计划报告单施工单位:合同号:施工段号:监理单位:编号:A-22-□□□-□□□□施工单位每周工作计划施工单位:合同号:施工段号:监理单位:编号:A-23-□□□-□□□□施工单位:合同号:施工段号:监理单位:编号:A-24-□□□-□□□□施工单位:合同号:施工段号:监理单位:编号:A-25-□□□-□□□□监理日志施工单位:合同号:施工段号:监理单位:编号:A-26-□□□-□□□□监理日巡视、旁站、抽捡安排表施工单位:合同号:施工段号:监理单位:编号:A-27-□□□-□□□□工地会议记要施工单位:合同号:施工段号:监理单位:编号:A-28-□□□-□□□□监理指令施工单位:合同号:施工段号:监理单位:编号:A-29-□□□-□□□□工程暂时停工指令施工单位:合同号:施工段号:监理单位:编号:A-30-□□□-□□□□复工申请施工单位:合同号:施工段号:监理单位:编号:A-31-□□□-□□□□复工指令施工单位:合同号:施工段号:监理单位:编号:A-32-□□□-□□□□施工日志施工单位:合同号:施工段号:监理单位:编号:A-33-□□□-□□□□工程质量(安全)事故处理报告单施工单位:合同号:施工段号:监理单位:编号:A-34-□□□-□□□□中间交工证书施工单位:合同号:施工段号:监理单位:编号:A-35-□□□-□□□□公路工程(施工段)交工验收证书交工验收时间:编号:A-36-□□□-□□□□工程缺陷责任期终止证书施工单位:合同号:施工段号:监理单位:编号:A-37-□□□-□□□□。

公路工程监理实用表格模板

公路工程监理实用表格模板

公路工程监理实用表格模板公路工程监理在工程质量控制和进度管理中起着至关重要的作用,而实用的表格模板则是监理工作中必备的工具。

本文将为大家介绍几种公路工程监理实用表格模板,旨在提高监理工作的效率和准确性。

一、工程进度表格模板公路工程的进度管理是一个复杂而关键的环节,而工程进度表格模板则能够帮助监理人员对工程进度进行全面、系统的掌控。

该表格模板可以包含以下内容:1. 工程施工节点和工作任务2. 工程进度计划和实际完成情况3. 工程施工时间表4. 每个节点的工期、质量要求和验收标准5. 施工单位的施工进度和进度风险评估通过该表格模板,监理人员可以清晰地了解工程进度情况,及时预警和调整,确保工程按时按质完成。

二、质量检查表格模板公路工程的质量控制是确保道路安全和可持续使用的重要环节,而质量检查表格模板则是监理人员质量监督工作的重要工具。

该表格模板可以包含以下内容:1. 施工单位的质量管理制度和质量责任部门2. 工程施工过程中的关键质量节点和质量标准3. 工程施工质量检查的内容和方法4. 施工单位的质量整改措施和整改期限5. 监理人员的质量检查结果和评价通过该表格模板,监理人员可以有条不紊地进行工程质量监督工作,确保工程质量符合规范要求。

三、施工问题汇报表格模板在实际施工过程中,难免会出现各种问题和风险,而及时汇报和解决这些问题则是保证工程进度和质量的关键。

施工问题汇报表格模板可以包含以下内容:1. 工程施工中的问题和风险描述2. 问题产生的原因和可能的影响3. 监理人员的处理意见和解决方案4. 施工单位的整改措施和整改期限5. 问题和整改的跟踪和回访通过该表格模板,监理人员可以及时记录、跟踪和解决施工中的问题,确保工程的顺利进行。

四、工程资料管理表格模板公路工程涉及大量的工程资料和文件,而合理管理这些资料是保证施工和验收无忧的基础。

工程资料管理表格模板可以包含以下内容:1. 工程资料的分类和编码规则2. 工程资料的存档地点和保管责任人3. 工程资料的调取和借阅记录4. 工程资料的销毁和存档期限5. 工程资料的更新和归档方式通过该表格模板,监理人员可以追溯和管理工程资料,提高资料的保密性和可查性。

公路工程监理使用表格-公路工程资料监理用表格

公路工程监理使用表格-公路工程资料监理用表格
表号
表 格 名 称
业 主
总 监 办
高级驻地办
承 包 人
设 代 处
填送时间
填写 份数
备注
高级驻地
驻地办
A-1
施工放样报验单
O
O

A
工程放样后
4
A-2
工程分项开工申请批复单
O
O

A
开工前7天
4
A-2-1
施工单位进场主要负责人统计表
O
O

A
开工前7天
4
A-2-2
施工单位进场人员统计表
O
O

A
开工前7天
4
A-3
承 包 人
设 代 处
填送时间
填写 份数
备注
高级驻地
驻地办
A-22
事故报告单
O
O

A
及时
4
A-23
监理工程师通知(通用)
O
A
O

随时
4
A-24
额外或紧急工程通知
O
A
O

随时
4
A-25
计日工作通知
O
O
A

随时
4
A-26
设计变更通知
O
A
O

O
5
A-27
监理试验月报表

A
O
每月底
3
A-28
工程监理月报表

A
工程质量处理检验反馈单

A
事故后2天
2
A-16
工程交工证书
O
A
O

新版公路工程施工监理规范监理用表表格

新版公路工程施工监理规范监理用表表格
检查结论
处理意见
审核人审核日期年 来自日监理日志监理机构
记 录 人
日期
年 月日
审核人
天气情况
主要施工情况
监理主要工作
问题及处理情况
工程项目
分项工程(中间)交工证书
编号:
施工单位
合同段
监理机构
分项工程
单位、分部工程
中间交工内容 及工程数量等
施工自检结果
施工负责人
申请日期
年 月日
监理接收人
接收日期
年 月日
质量保证资料 及检评资料情况
监理抽检情况及
评述意见和结论
监理工程师
批准日期
年 月日
施工负责人
日期
年 月日
工程项目
监理指令单
编号:
施工单位
合同段
监理机构
签发人
日期
年 月日
(说明监理指令的依据、施工单位不符合规定的事实及整改要求等内容) 请于年月日前回复。
抄送:业主
签收人
日期
年 月日
工程项目
巡视记录
编号:
施工单位
合同段
巡视人
巡视时间
年 月日
巡视的范围
主要施工情况
质里、女全、
环保等情况
发现的问题
及处理意见
编号:
施工单位
合同段
旁 站 人
旁站时间
年 月日
旁站项目
施工过程简述
旁站工作情况
主要数据记录
发现的问题
及处理结果
抽检记录
施工单位
合同段
抽检人
抽检时间
年 月日
工程部位
抽检项目
检查结果

最新整理公路工程监理使用表格

最新整理公路工程监理使用表格

公路工程监理使用表格目录1、总体施工组织设计报审表.................................................................................................................... A-102、分项(分部、单位)工程开工申请批复单....................................................................................... A-113、施工放样报验单..................................................................................................................................... A-124、原材料报验单......................................................................................................................................... A-xxxx 主要人员报验单 .............................................................................................................................................. A-xxxx 单 ............................................................................................................................................ A-xxxx 要工艺报审表 .............................................................................................................. A-16&专项安全、文明(环保)施工方案报批单............................................................................................. A-xxxx 单 ....................................................................................................................................................................A-xxxx 验单 .................................................................................................................................... A-1911、下承层检验申请批复单........................................................................................................................ A-2012、混凝土浇筑申请报告单........................................................................................................................ A-21 xxxx戈U报告单.......................................................................................................... A-22xxxx 计划....................................................................................................................... A-23xxxx ............................................................................................................................................. A-2416、监理旁站记录.......................................................................................................................................... A-25 xxxx ................................................................................................................................................. A-26xxxx、扌由捡安排表 ................................................................................................... A-2719、工地会议记要......................................................................................................................................... A-2820、监理指令................................................................................................................................................. A-2921、工程暂时停工指令................................................................................................................................. A-3022、复工申请................................................................................................................................................. A-3123、复工指令................................................................................................................................................. A-3224、施工日志................................................................................................................................................. A-3325、工程质量(安全)事故处理报告单 ................................................................................................... A-3426、中间交工证书......................................................................................................................................... A-3527、公路工程(_______ 施工段)交工验收证书 ..................................................................................... A-3628、工程缺陷责任期终止证书•A-37总体施工组织设计报审表。

公路工程监理使用表格

公路工程监理使用表格

公路工程监理使用表格目录1、总体施工组织设计报审表················································A-102、分项(分部、单位)工程开工申请批复单··································A-113、施工放样报验单························································A-124、原材料报验单··························································A-135、分项工程施工主要人员报验单············································A-146、进场设备报验单························································A-157、施工方案及主要工艺报审表··············································A-168、专项安全、文明(环保)施工方案报批单··································A-179、检验申请批复单························································A-1810、工序检查报验单·······················································A-1911、下承层检验申请批复单·················································A-2012、混凝土浇筑申请报告单·················································A-2113、施工单位月工作计划报告单·············································A-2214、施工单位每周工作计划·················································A-2315、监理巡视记录························································A-2416、监理旁站记录·························································A-2517、监理日志·····························································A-2618、监理日巡视、旁站、抽捡安排表·········································A-2719、工地会议记要·························································A-2820、监理指令·····························································A-2921、工程暂时停工指令·····················································A-3022、复工申请·····························································A-3123、复工指令·····························································A-3224、施工日志·····························································A-3325、工程质量(安全)事故处理报告单·······································A-3426、中间交工证书·························································A-3527、公路工程(施工段)交工验收证书··································A-3628、工程缺陷责任期终止证书···············································A-37总体施工组织设计报审表施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-10-分项(分部、单位)工程开工申请批复单施工单位:合同号:施工段号:监理单位:编号:A-11-□□□-□□□□施工放样报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-12-原材料报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-13-分项工程施工主要人员报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-14-进场设备报验单施工单位:合同号:施工段号:□□□-□□□□监理单位:编号:A-15-施工方案及主要工艺报审表施工单位:合同号:施工段号:专项安全、文明(环保)施工方案报批单施工单位:合同号:施工段号:监理单位:编号:A-17-□□□-□□□□检验申请批复单施工单位:合同号:施工段号:监理单位:编号:A-18-□□□-□□□□工序检查报验单施工单位:合同号:施工段号:监理单位:编号:A-19-□□□-□□□□下承层检验申请批复单施工单位:合同号:施工段号:监理单位:编号:A-20-□□□-□□□□混凝土浇筑申请报告单施工单位:合同号:施工段号:监理单位:编号:A-21-□□□-□□□□施工单位月工作计划报告单施工单位:合同号:施工段号:监理单位:编号:A-22-□□□-□□□□施工单位每周工作计划施工单位:合同号:施工段号:监理单位:编号:A-23-□□□-□□□□施工单位:合同号:施工段号:监理单位:编号:A-24-□□□-□□□□施工单位:合同号:施工段号:监理单位:编号:A-25-□□□-□□□□监理日志施工单位:合同号:施工段号:监理单位:编号:A-26-□□□-□□□□监理日巡视、旁站、抽捡安排表施工单位:合同号:施工段号:监理单位:编号:A-27-□□□-□□□□工地会议记要施工单位:合同号:施工段号:监理单位:编号:A-28-□□□-□□□□监理指令施工单位:合同号:施工段号:监理单位:编号:A-29-□□□-□□□□工程暂时停工指令施工单位:合同号:施工段号:监理单位:编号:A-30-□□□-□□□□复工申请施工单位:合同号:施工段号:监理单位:编号:A-31-□□□-□□□□复工指令施工单位:合同号:施工段号:监理单位:编号:A-32-□□□-□□□□施工日志施工单位:合同号:施工段号:监理单位:编号:A-33-□□□-□□□□工程质量(安全)事故处理报告单施工单位:合同号:施工段号:监理单位:编号:A-34-□□□-□□□□中间交工证书施工单位:合同号:施工段号:监理单位:编号:A-35-□□□-□□□□公路工程(施工段)交工验收证书交工验收时间:编号:A-36-□□□-□□□□工程缺陷责任期终止证书施工单位:合同号:施工段号:监理单位:编号:A-37-□□□-□□□□。

公路工程监理用表

公路工程监理用表

**高速公路(***段)监表汇总**高速公路总监理工程师办公室***至***高速公路常用监理文件名称及报送范围说明:△发件人○抄送件●主送件***至***高速公路常用监理文件名称及报送范围说明:△发件人○抄送件●主送件***至***高速公路监理人员一览表合同号:监理单位:承包商:编号:监表01驻地监理工程师:***至***高速公路承包人组织机构框图承包单位:合同号:监理单位:编号:监表02注:1、列明经理部组织机构。

2、各科室主要人员姓名及岗位。

3、常用联系电话。

***至***高速公路工程开工申请报告监理单位:合同号:承包单位:编号:监表03***至***高速公路开工申请初审报告监理单位:合同号:承包单位:编号:监表04***至***高速公路开工报告批复单监理单位:合同号:承包单位:编号:监表05***至***高速公路施工放样报告单承包单位:合同号:监理单位:编号:监表06***至***高速公路进场设备报验单监理单位:合同号:承包单位:编号:监表07***至***高速公路进场人员报验单承包单位:合同号:监理单位:编号:监表08***至***高速公路进场材料报验单承包单位:合同号:监理单位:编号:监表09***至***高速公路承包人每周工作计划承包单位:合同号:监理单位:编号:监表10***至***高速公路工程报验单承包单位:合同号:监理单位:编号:监表11***至***高速公路***段检验申请批复单承包单位:合同号:LX监理单位:编号:监表11-1***至***高速公路工程检验认可书承包单位:合同号:监理单位:编号:监表12***至***高速公路中间交工证书承包单位:合同号:监理单位:编号:监表13***至***高速公路监理工程师通知承包单位:合同号:监理单位:编号:***至***高速公路备忘录承包单位:合同号:监理单位:编号:监表15***至***高速公路工作指令承包单位:合同号:监理单位:编号:监表16***至***高速公路工程暂时停工指令承包单位:合同号:监理单位:编号:监表17***至***高速公路复工指令承包单位:合同号:监理单位:编号:监表18***至***高速公路工程质量事故处理报告承包单位:合同号:监理单位:编号:监表19***至***高速公路工程变更申请报告承包单位:合同号:监理单位:编号:监表20***至***高速公路变更申请登记承包单位:合同号:监理单位:编号:监表21***至***高速公路变更令承包人:合同号:编号:监表22 致:合同承包商***至***高速公路变更内容及详细说明合同号:变更令号:监表22-1***至***高速公路变更金额明细表合同号:变更令号:监表22-2***至***高速公路工程变更单价协商表合同号:变更令号:监表22-3***至***高速公路变更登记指南合同号:编号:监表23***至***高速公路变更令登记合同号:编号:监表24***至***高速公路索赔申请单承包单位:合同号:监理单位:编号:监表25***至***高速公路月(旬)工程进度表承包单位:合同号:监理单位:起讫时间:监表26***至***高速公路工地会议纪要承包单位:合同号:监理单位:编号:监表27***至***高速公路会议签到表承包单位:合同号:监理单位:编号:监表27-1***至***高速公路年月合同计量资料审核意见承包单位:合同号:监理单位:编号:监表28***至***高速公路工程交工申请报告承包单位:合同号:监理单位:编号:监表29。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

工程A1开工预付款支付申请表施工单位:合同号:监理单位:编号:致(业主):根据合同条款第条规定,我单位已具备申请第次开工预付款支付条件,现申请支付专用合同条款数据表中约定的开工预付款总额元的%的开工预付款元,请给予审批。

附件:相关证明材料。

承包人:年月日驻地监理工程师意见:签字:年月日总监理工程师或代表意见:签字:年月日业主意见:A2材料、设备预付款支付申请表施工单位:合同号:监理单位:编号:致(业主):根据合同条款第条以及专用合同条款第条的规定,合同约定的材料、设备已进场交货。

材料、设备符合规范要求,存储方法符合要求并经监理工程师认可,现申请支付材料、设备预付款元,请给予审批。

附件: 1、材料设备费用凭证或支付单据; 2、其他资料承包人:年月日驻地监理工程师意见:签字:年月日总监理工程师或代表意见:签字:年月日业主意见:签字:年月日A3到场机械设备、管理人员报验单施工单位:合同号:监理单位:编号:致(总监理工程师或代表):我单位根据合同要求,各种施工机械已经到场,行政、技术、质量等管理人员已经到位,请给予核实。

附件:1、到场机械设备清单; 2、到场管理人员清单。

承包人:年月日到场机械设备陈述(监表A3.1清单附后)到场管理人员陈述(监表A3.2清单附后)驻地监理工程师意见:签字:年月日总监理工程师或代表意见:A3.1到场机械设备清单施工单位:合同号:监理单位:编号:序号机械名称型号单位数量新旧程度自有或租赁备注合同数实到数说明:按照标书所列顺序填写,备注中填写“投标承诺”或“变更”。

第页共页A3.2到场管理人员清单施工单位:合同号:监理单位:编号:姓名性别职称学历年龄工作岗位备注A4实施性总体施工组织设计报审表施工单位:合同号:监理单位:编号:致(业主):现上报工程的实施性总体施工组织设计及附件,请予审查和批准。

附件:实施性总体施工组织设计及附件。

承包人:年月日驻地监理工程师审核意见:签字:年月日总监理工程师或代表审查意见:签字:年月日业主审批意见:签字:年月日A5专项施工方案报审表施工单位:合同号:监理单位:编号:致(总监理工程师或代表):现上报工程的专项施工方案及附件,请予审查和批准。

附件:专项施工方案及附件。

承包人:年月日驻地办专业监理工程师审核意见:签字:年月日驻地监理工程师审查意见:签字:年月日总监办专业监理工程师审核意见:签字:年月日总监理工程师或代表审批意见:签字:年月日A6工地试验室报审表施工单位:合同号:监理单位:编号:致(总监理工程师或代表):根据合同要求,我们已完成工地试验室的筹建,并已收到项目质监机构出具的“公路工程工地试验室备案通知书”及项目业主发放的“云南省公路工程工地试验室考核合格证”。

现上报工程工地试验室启用报告及附件,请予审查和批准。

附件:承包人:年月日驻地监理工程师审查意见:签字:年月日总监理工程师或代表审批意见:A7复测成果报审表施工单位:合同号:监理单位:编号:致(业主):根据合同要求,我们已完成本合同段至长 m的复测,现将复测成果上报,请予审查批准。

附件:1、原始基准点、基准线和基准高程的复测报告;2、地面线复测土石方工程量计算资料;3、其他资料。

承包人:年月日测量专业监理工程师意见:签字:年月日驻地监理工程师意见:签字:年月日设计单位意见:签字:年月日总监理工程师或代表意见:签字:年月日业主意见:签字:年月日A8工程划分报审表施工单位:合同号:监理单位:编号:致(总监理工程师或代表):现上报工程分项、分部、单位工程划分表及附件,请予审查和批准。

附件:工程分项、分部、单位工程划分表及说明。

承包人:年月日驻地监理工程师审查意见:签字:年月日总监理工程师或代表审批意见:A9合同工程开工报审表施工单位:合同号:监理单位:编号:致(业主) :我单位根据合同要求,已完成施工复测报告和实施性总体施工组织设计的编制上报,并经审查批准,各项施工准备工作(机构、人员、机械等)已经就绪,请给予批准开工。

承包人:年月日里程桩号:申请开工日期:附件:1、实施性总体施工组织设计报审表;2、复测成果报审表;3、其他资料。

驻地监理工程师审核意见:签字:年月日总监理工程师或代表审查意见:签字:年月日业主审批意见:签字:年月日A10合同工程开工令施工单位:合同号:监理单位:编号:致(承包人):根据合同通用条款第款的规定,特下达合同工程开工令,请在接到本合同工程开工令后天内开工,工期自年月日起计算。

总监理工程师或代表:年月日批准开工的合同段里程桩号主要工程内容合同完工时间承包人签收年月日签字:A11试验工程施工方案报审表施工单位:合同号:监理单位:编号:致(总监理工程师或代表):现上报工程(桩号)的试验工程施工方案(详见说明和图表),请予审查和批准。

附件:试验工程施工方案及主要工艺说明和图表。

承包人:年月日驻地办专业监理工程师意见:签字:年月日驻地监理工程师意见:签字:年月日总监办专业监理工程师意见:签字:年月日总监理工程师或代表意见:A12试验工程施工总结报审表施工单位:合同号:监理单位:编号:致(总监理工程师或代表):现上报工程(桩号)的试验工程施工总结(详见报告和图表),请予审查和批准。

附件:试验工程施工总结及主要工艺说明和图表。

承包人:年月日驻地办专业监理工程师意见:签字:年月日驻地监理工程师意见:签字:年月日总监办专业监理工程师意见:签字:年月日总监理工程师或代表意见:A13外购构、配件或设备报审表施工单位:合同号:监理单位:编号:致(专业监理工程师):下列构、配件或设备已按合同规定进场,请你查验签证,准予使用。

承包人:年月日序号构、配件或设备名称规格型号数量进场日期质量状况拟用何处专业监理工程师意见:A14总体进度计划报审表施工单位:合同号:监理单位:编号:致(业主):现上报工程总体进度计划,请予审查和批准。

附件:总体进度计划承包人:年月日驻地监理工程师审核意见:签字:年月日总监理工程师或代表审查意见:签字:年月日业主审批意见:签字:年月日A15月进度计划报审表施工单位:合同号:监理单位:编号:致(驻地监理工程师):现上报工程月进度计划,请予审查和批准。

附件:月进度计划承包人:年月日专业监理工程师审查意见:签字:年月日驻地监理工程师审批意见:签字:年月日A16分项(分部)工程开工申请批复表施工单位:合同号:监理单位:编号:致(驻地监理工程师):根据合同要求,我们已经做好下列工程开工前的准备工作,现申请该分项(分部)工程正式开工,请予批准。

承包人:年月日上一步工作检验结果(如果有):申请开工工程项目:计划开工日期:计划完成日期:此项工程负责人姓名:附件:1、进场施工机械设备报验单; 2、进场工程原材料报验单; 3、人员配备报验单; 4、施工测量放样报验单; 5、施工方案及主要工艺报审表; 6、工程分包申请批复单(如有);7、相关试验资料。

专业监理工程师意见:签字:年月日驻地监理工程师意见:A16.1进场施工机械设备报验单施工单位:合同号:监理单位:编号:分项(分部)工程名称施工里程桩号致(专业监理工程师):根据合同要求,以下施工机械设备已经进场且试运行正常,请予查验,并准予使用。

承包人:年月日序设备名称型号单位数量进场日期技术状况号专业监理工程师意见:签字:年月日A16.2进场工程原材料报验单施工单位:合同号:监理单位:编号:分项(分部)工程名称施工里程桩号致(试验专业监理工程师):下列建筑材料经自检试验,符合技术规范要求,报请验证,并准予进场使用。

附件: 1、材料出厂合格证书;2、材料试验报告。

承包人:年月日材料名称材料产地采用标准试验编号试验结果用途(用在何工程或部位)本批材料数量试验专业监理工程师意见:签字:年月日A16.3人员配备报验单施工单位:合同号:监理单位:编号:分项(分部)工程名称施工里程桩号致(专业监理工程师):下列人员(包括项目负责人、技术负责人及质量、安全、环保等施工管理、自检人员及主要操作人员)已按工程需要配备相关人员,请予以审查,并准予批准。

承包人:年月日序号姓名性别职务工作岗位备注专业监理工程师意见:签字:年月日A16.4施工测量放样报验单施工单位:合同号:监理单位:编号:分项(分部)工程名称放样部位(桩号)致(测量专业监理工程师):我单位根据合同要求,已完成本项工程的施工放线,请给予检验审批。

附件:1、施工设计图纸复印件;2、实测地面纵、横断面图;3、施工放线资料、测量记录、计算表等。

项目技术负责人:年月日测量专业监理工程师意见:签字:年月日A16.5施工方案及主要工艺报审表施工单位:合同号:监理单位:编号:致(驻地监理工程师):现上报下列工程的施工方案及主要工艺,请给予审批。

附件:施工方案及主要工艺(包括组织设计、施工方案及主要工艺、技术控制措施、质量控制措施、安全生产保证措施、环境保护与水土保持措施等)。

项目技术负责人:年月日分项(分部)工程名称施工桩号计划开工日期计划完工日期施工方案及主要工艺简要说明:专业监理工程师意见:签字:年月日驻地监理工程师意见:签字:年月日A17工序检验申请批复单施工单位:合同号:监理单位:编号:下列作业已完成,施工请予检验。

所属分部工程名称分项工程名称工程地点及桩号具体部位检验内容要求到场检验时间年月日时承包人递交日期、时间年月日时签字:和签字监理工程师收件日期、时年月日时签字:间和签字监理员、专业监理工程师评述和签字质量证明附件监理员意见:签字:年月日专业监理工程师意见:承包人收到日期及签字:年月日A18分项工程中间交工申请单施工单位:合同号:监理单位:编号:致(驻地监理工程师):下列分项工程业已完工,施工自检合格,质量保证资料齐全,具备中间交工验收条件,申请进行中间交工验收。

承包人:年月日序号分项工程名称里程桩号所属分部工程名称要求到现场检验日期:年月日承包人递交日期、签字:年月日签字:监理工程师收到日期、签字:年月日签字:A19中间交工证书施工单位:合同号:监理单位:编号:监理机构中间交工内容(桩号、项目划分、工程项目、工程数量)分项工程名称桩号工程数量子目号子目名称单位设计数量变更数量竣工数量施工单位签字申请日期监理接收人接收日期监理机构对施工单位中间交工申请的评述意见及其结论监理机构负责人签字日期分部工程名称:所属单位工程:所属建设项目:工程部位:(桩号、墩台号、孔号)施工单位:监理单位:施工单位分项工程备注工程名称质量评定实得分权值加权得分等级合计质量等级加权平均分评定意见单位工程名称:所属建设项目:路线名称:工程地点、桩号:施工单位:监理单位:施工单位分部工程备注工程名称质量评定实得分权值加权得分等级合计质量等级加权平均分评定意见A22合同段工程质量检验评定表项目名称:路线名称:起迄桩号:完工日期:施工单位:监理单位:施工单位单位工程备注工程名称实得分投资额实得分×投资额质量等级合计质量等级合同段评分评定意见A23建设项目工程质量检验评定表项目名称:路线名称:起迄桩号:完工日期:施工单位:监理单位:施工单位合同段备注合同段名称实得分投资额实得分×投资额质量等级合计质量等级建设项目评分评定意见A24工程汇总表工程实得分权值加权得分等级备注加权平均分质量等级计算:复核:年月日A25工程质量缺陷、隐患报告表施工单位:合同号:监理单位:编号:致(总监理工程师或代表):年月日在工程发生工程质量缺陷、隐患,现报告如下:工程名称:发生时间:发生地点、桩号及部位:发生原因:性质:应急措施:承包人签字、日期签字:年月日承包人递交日期、时间、签字年月日时签字:监理工程师收到日期、时间、签字年月日时签字:A26工程质量缺陷、隐患处理方案报审表施工单位:合同号:监理单位:编号:致(业主):现上报年月日在工程发生的工程质量缺陷、隐患的处理方案,请予审批。