最新150道历年PMP考试试题及答案解析
PMP考试试题及答案解析1

以下是从历年PMP考试中抽取的有关职业道德的180道典型试题希望对您考试有所帮助•第1题:一位项目成员在执行任务时,对现存的做法有一些改进的意见。
当他与你沟通时,作为项目经理,你应首先____。
(分值:1 答错扣0分)○A汇报部门经理○B认真倾听该组员的意见,并思考这样改进是否恰当○C从其他组员那里获得反馈○D为该组员重新分配更适合的任务正确答案:B试题解答:本题考察倾听他人的观点,力求理解他们。
•第2题:在项目规划的前期,你发现你的一位优秀的项目工程师向你和客户提交了一份项目管理说明书,这份说明书对他的项目管理培训经历进行了一定程度的夸大。
作为一位项目经理,你应该怎么做?(分值:1 答错扣0分)○A立刻解雇这位工程师○B让该工程师注意这个问题,然后将正确的信息更换上去,交给客户○C不做反应,因为他确实表现优秀,而且是为了取得客户的信任○D要求这位工程师完成与说明书中相对应的实际培训,并推迟通知客户正确答案:B试题解答:本题考察不从事或纵容欺骗他人的行为。
•第3题:In order to complete work on your projects, you have been provided confidential information from all of your clients.A university contacts you to help it in its research. Such assistance would require you to provide the university with some of the client data from your files. What should you do?A. Release the information, but remove all references to the clients names.B. Provide high-level information only.C. Contact your clients and seek permission to disclose the information.D. Disclose the information.为了完成你项目的工作,你刚收到来自客户的机密信息。
PMP考试试题及答案解析

以下关于产品范围和项目范围的说法,哪个是正确的?()(分值:1 答错扣0分)○A项目范围服务于产品范围○B项目范围的变化必然引起产品范围的变化○C产品范围的变化必然引起项目范围的变化○D产品范围服务于项目菹围正确答案:A下列哪个文件详细描述了项目的可交付成果,以及为提交这些可交付成果而必须开展的工作?(分值:1 答错扣0分)○A项目管理计划○B项目章程○C工作分解结构○D项目范围说明书正确答案:D试题解答:解析:在定义范围的输出中,项目范围说明书十分重要,考生应该掌握项目范围说明书的定义、作用和内容(参见PMBOK(第4版)第5章5.2.3.1节项目范围说明书)。
、1)项目范围说明书:详细描述项目的可交付成果,以及为提交这些可交付成果而必须开展的工作2)详细项目范围说明书的编制,对项目成功至关重要。
作用1:表明项目干系人之间就项目范围所达成的共讽Common Understanding o 作用2:使项目团队能开展更详细的规划(WBS、成本、进度和质量规划)。
?定义范围先于成本、进度、质量、风险的规划,后面很多过程的输入都有项目范围说明书。
?必须先明确项目范围,制定详细的项目范围说明书并由客膣字之后!才能开始后面的工作。
作用3:作为将来项目决策的根据,指导项目团队的工作。
作用4:为评价变更请求或额外工作是否超出项目边界(Project's Boundaries)提供基准。
.看哪个文件能明确客户所要求的工作是否超出范围(项目边界)——范围说明书。
作用5:更好地定义范围能预防范围变更。
?范围定义得越仔细,后面发生范围变更的可能性就越小。
?定义范围时,要全面考虑所有干系人的需求和期望。
注:情况的改变(如项目拨款被缩减)也会影响项目范围,导致项目范围的修订。
范围管理的思想是给多少钱,办多少事,要防止范围蔓延和镀金3)详细的项目范围说明书包括以下内容:?产品范围描述(Product Scope Description o ?产品验收标准(Product Acceptance Criteria o ?项目可交付成果(Project Deliverables o ?项目的除外责任(ProjectExclusions o ?项目制约因素(Project Constraints o ?项目假设条件(ProjectAssumptions o 注1:为了便于管理干系人的期望,项目范围说明书可明确指出哪些工作不属于本项目范围。
PMP考试试题真题含答案解析(选择题)

PMP考试试题真题含答案解析(选择题)1.项目经理确定项目已超出预算,并将需要管理储备来完成项目。
为完成项目,项目经理应该怎么做?A.a. 获得项目发起人批准使用管理储备B.b. 修改成本资源并使用管理储备C.c. 获得项目发起人的批准,包含额外资金D.d. 执行实施整体变更控制过程,并修改成本基准2.在收到软件开发项目的可交付成果时,客户发现没有遵守他们的编码标准,最终产品不符合质量要求。
项目经理下一步应该怎么做?A.a. 查看质量管理计划B.b. 开展质量审计C.c. 审查项目基准D.d. 与客户协商接受可交付成果3.在一个施工项目的执行阶段,由于环境要求,当地居民希望停止该项目。
项目经理应该怎么做?A.a. 检查事业环境因素B.b. 安排召开变更控制委员会(ccb)会议C.c. 查看风险管理计划D.d. 审查假设情景分析4.项目经理在项目中途发现,一个环境机构的新主任担心该项目可能会对环境造成严重影响,这位新主任正在影响项目发起人。
项目经理下一步应该怎么做?A.a. 将该主任添加到相关方登记册中B.b. 要求项目发起人报告与该主任之间的互动C.c. 继续执行项目D.d. 停止工作,直到该主任的担心得到解决为止5.在项目启动大会之后,分配给项目团队的一位技术专家对被选中参与项目工作表示不满,他的态度对其他团队成员造成负面影响。
项目经理应该怎么做?A.a. 需要人力资源部门替换该技术专家B.b. 尝试了解该技术专家态度的原因,然后根据收集的信息采取进一步的行动C.c. 向该技术专家发出书面警告,指明不当行为是不可容忍的D.d. 向该技术专家分配避免与其他团队成员互动的任务6.一名指导委员会成员提交了一项新请求,这项请求似乎没有得到充分考虑,可能会对项目产生负面影响。
项目经理下一步应该怎么做?A.a. 评估该请求的影响B.b. 记录该请求,并将其提交给变更控制委员会(ccb)C.c. 要求支持的成员说服该指导委员会成员撤回请求D.d. 拒绝该请求,并告知该指导委员会成员拒绝的原因7.一个产品开发项目的第一阶段已经完成,项目团队已经准备好将最终产品转移给负责执行第二阶段的团队。
PMP考试试题及答案解析..

以下是从历年PMP考试中抽取的有关范围管理的180道典型试题,希望对您考试有所帮助以下关于产品范围和项目范围的说法,哪个是正确的?()(分值:1 答错扣0分)下列哪个文件详细描述了项目的可交付成果,以及为提交这些可交付成果而必须开展的工作?(分值:1 答错扣0分)○A项目管理计划○B项目章程○C工作分解结构○D项目范围说明书正确答案:D试题解答:解析:在定义范围的输出中,项目范围说明书十分重要,考生应该掌握项目范围说明书的定义、作用和内容(参见PMBOK(第4版)第5章5.2.3.1节项目范围说明书)。
、1)项目范围说明书:详细描述项目的可交付成果,以及为提交这些可交付成果而必须开展的工作2)详细项目范围说明书的编制,对项目成功至关重要。
作用1:表明项目干系人之间就项目范围所达成的共讽Common Understanding o 作用2:使项目团队能开展更详细的规划(WBS、成本、进度和质量规划)。
?定义范围先于成本、进度、质量、风险的规划,后面很多过程的输入都有项目范围说明书。
?必须先明确项目范围,制定详细的项目范围说明书并由客膣字之后!才能开始后面的工作。
作用3:作为将来项目决策的根据,指导项目团队的工作。
作用4:为评价变更请求或额外工作是否超出项目边界(Project's Boundaries)提供基准。
.看哪个文件能明确客户所要求的工作是否超出范围(项目边界)——范围说明书。
作用5:更好地定义范围能预防范围变更。
?范围定义得越仔细,后面发生范围变更的可能性就越小。
?定义范围时,要全面考虑所有干系人的需求和期望。
注:情况的改变(如项目拨款被缩减)也会影响项目范围,导致项目范围的修订。
范围管理的思想是给多少钱,办多少事,要防止范围蔓延和镀金3)详细的项目范围说明书包括以下内容:?产品范围描述(Product Scope Description o ?产品验收标准(Product Acceptance Criteria o ?项目可交付成果(Project Deliverables o ?项目的除外责任(ProjectExclusions o ?项目制约因素(ProjectYou are taking over a project to develop software for a major hospital chain. After understanding the project requirements, you feel that they should have selected aRequirement should be detected in which process?A、Project auditB、Scope controlC、creater WBSA project manager has just been assigned to a new project and has been given the project charter. The FIRST thing the project manager must do is:A. create a project scope statement.B. confirm that all the stakeholders have had input into the scope.C. analyze project risk.D. begin work on a project management plan.项目经理刚刚分配到新项目上,已经完成项目章程。
历年PMP考试真题与答案解析

历年PMP考试真题及答案1.Which of the following is true about accuracy and precision?A. Precision is consistency and accuracy is correctnessB.Precision is correctness and accuracy is consistencyC.Precision and accuracy are sameD. Precision is used for measuring length and accuracy is used for time measurements Your下列哪个关于准确度和精确度的说法是准确的?A.精确度是说连续性;准确度是说是否符合事实B.精确度是说是否符合事实;准确度是说连续性C.精确度和准确度是一样的D.精确度用来测量长度;准确度用来测量你的时间答案:A 参考:PMBOK2004 CH P1542.Which process group is associated with schedule control, scope control, and cost controlA. Monitoring and ControllingB. PlanningC. ExecutingD. Closing哪个过程组包括进度控制,范围控制和成本控制?A.监控项目B.规划C.执行D.收尾答案:A 参考:PMBOK2004 CH P583.In Probability and Impact Metrics which of the following statement is true?A. For opportunities, the high risk (dark grey) zone offers greatest benefitsB. For opportunities, the low risk (medium grey) zone offers lowest risk and best benefitsC. for Risks the high risk (dark grey) zone offers greatest benefitsD. for Risks the low risk (medium grey) zone should be addressed first关于概率和影响矩阵,下列哪个说法是准确的?A.对机会来说,高风险(黑灰色)区域意味着代表的利益B.对机会来说,低风险(中灰色)区域意味着最低的风险和的利益C.对风险来说,高风险(黑灰色)区域意味着的利益D.对风险来说,低风险(中灰色)区域应该必须首先确定答案:A 参考:PMBOK2004 CH P2104.Zero defects practice or Do it first time is associated with which of the following?A. CrosbyB. JuranC. DemingD. Shewhart零缺陷或者事情一次作对和下列哪个相关?A.克劳斯比B.朱兰C.戴明D.休哈特答案:A5.Which of the following would be the BEST description of project management plan?A. It contains risk, cost, process improvement and other management plans.B. It is one of the outputs of project management software.C. it is milestone.D. it is project scope statement.下列哪个的描述了项目管理计划?A.包括风险、成本、过程改进和其他管理计划B.是项目管理软件的输出之一C.是里程碑D.是项目范围说明书答案:A 解释:用排除法,选一个相对合适的,注意选项B项目管理软件不等于项目管理信息系统6.Purchase order is the simplest example of _________ type of contractA.T&M ContractB. Fixed PriceC. Cost plus Incentive FeeD. Cost plus Fixed Fee采购单是什么类型合同的例子?A.时间材料合同B.固定价格C.成本加奖励费用D.成本加固定费用答案:B 参考:PMBOK2004 CH P230(仔细看能找到原文)7.You are the project manager in East West Construction Company. After the completion of the structure you are visiting the site and checking whether the construction is as per the plan by taking the measurements. This is an example ofA. Risk Identification to prevent issues in the futureB. Active project managementC. Quality Assurance activity - PreventionD. Quality Control Activity - Inspection你是东西建筑公司的项目经理。
PMP考试试题及答案解析

以下关于产品范围和项目范围的说法,哪个是正确的?()(分值:1 答错扣0分)○A项目范围服务于产品范围○B项目范围的变化必然引起产品范围的变化○C产品范围的变化必然引起项目范围的变化○D产品范围服务于项目菹围正确答案:A下列哪个文件详细描述了项目的可交付成果,以及为提交这些可交付成果而必须开展的工作?(分值:1 答错扣0分)○A项目管理计划○B项目章程○C工作分解结构○D项目范围说明书正确答案:D试题解答:解析:在定义范围的输出中,项目范围说明书十分重要,考生应该掌握项目范围说明书的定义、作用和内容(参见PMBOK(第4版)第5章5.2.3.1节项目范围说明书)。
、1)项目范围说明书:详细描述项目的可交付成果,以及为提交这些可交付成果而必须开展的工作2)详细项目范围说明书的编制,对项目成功至关重要。
作用1:表明项目干系人之间就项目范围所达成的共讽Common Understanding o 作用2:使项目团队能开展更详细的规划(WBS、成本、进度和质量规划)。
?定义范围先于成本、进度、质量、风险的规划,后面很多过程的输入都有项目范围说明书。
?必须先明确项目范围,制定详细的项目范围说明书并由客膣字之后!才能开始后面的工作。
作用3:作为将来项目决策的根据,指导项目团队的工作。
作用4:为评价变更请求或额外工作是否超出项目边界(Project's Boundaries)提供基准。
.看哪个文件能明确客户所要求的工作是否超出范围(项目边界)——范围说明书。
作用5:更好地定义范围能预防范围变更。
?范围定义得越仔细,后面发生范围变更的可能性就越小。
?定义范围时,要全面考虑所有干系人的需求和期望。
注:情况的改变(如项目拨款被缩减)也会影响项目范围,导致项目范围的修订。
范围管理的思想是给多少钱,办多少事,要防止范围蔓延和镀金3)详细的项目范围说明书包括以下内容:?产品范围描述(Product Scope Description o ?产品验收标准(Product Acceptance Criteria o ?项目可交付成果(Project Deliverables o ?项目的除外责任(ProjectExclusions o ?项目制约因素(Project Constraints o ?项目假设条件(ProjectAssumptions o 注1:为了便于管理干系人的期望,项目范围说明书可明确指出哪些工作不属于本项目范围。
2022年PMP项目经理认证考试题库及答案

2022年PMP项目经理认证考试题库及答案一、引言PMP(Project Management Professional)认证是项目管理领域公认的最高认证之一,由美国项目管理协会(PMI)颁发。
为了帮助广大考生顺利通过2022年PMP考试,本文整理了一份涵盖各类题型的题库及答案,供考生参考。
二、题库及答案解析1. 单选题(1-20题)(1)以下哪个过程群组包含“制定项目管理计划”过程?A. 启动过程群组B. 规划过程群组C. 执行过程群组D. 监控过程群组答案:B解析:制定项目管理计划属于规划过程群组,其主要目的是确定项目如何执行、监控和控制。
(2)以下哪个工具和技术用于收集需求?A. 问卷调查B. 问卷调查和焦点小组C. 问卷调查、焦点小组和访谈D. 焦点小组答案:C解析:问卷调查、焦点小组和访谈都是收集需求的有效工具和技术。
(3)以下哪个过程用于识别项目风险?A. 识别风险B. 实施定性风险分析C. 实施定量风险分析D. 风险应对计划答案:A解析:识别风险是项目风险管理过程的第一步,用于识别项目可能面临的风险。
(以下是部分单选题,仅供参考)(4)以下哪个过程群组包含“确认范围”过程?(5)以下哪个工具和技术用于项目成本估算?(6)以下哪个过程用于制定项目进度计划?(7)以下哪个工具和技术用于控制项目范围?(8)以下哪个过程群组包含“管理项目团队”过程?(9)以下哪个工具和技术用于项目质量管理?(10)以下哪个过程用于项目沟通管理?2. 多选题(21-30题)(21)以下哪些过程属于项目质量管理知识领域?A. 管理质量B. 管理沟通C. 规划质量管理D. 控制质量答案:ACD解析:项目质量管理知识领域包含规划质量管理、管理质量和控制质量三个过程。
(22)以下哪些过程属于项目成本管理知识领域?A. 估算成本B. 制定预算C. 控制成本D. 规划成本管理答案:ABCD解析:项目成本管理知识领域包含规划成本管理、估算成本、制定预算和控制成本四个过程。
(完整版)PMP考试真题练习题及答案

PMP考试真题练习题及答案(一)1、以下哪一项最能表现某个项目的特征:A、运用进度计划技巧。
B、整合范围与成本。
C、确定期限。
D、利用网络进行跟踪。
2、你作为一个项目经理要为政府建造一个保龄球运动的纪念碑。
这个纪念碑预期能够持续几个世纪。
在这种情况下,认为项目是暂时性的这种说法:A.不适合,因为这个项目需要的结果是持续的B.不适合要建造的产品C.认为项目团队将比本项目要长寿D.不适合,因为这个项目不是在短期内就可以完成的3、以下关于项目特征的说法都正确,除了:A、临时性说明项目的机遇和市场机会短暂B、重复部件的存在也适用项目独特性的特征C、渐进明细是伴随项目前两个特性而产生的D、渐进明细的结果常常会导致范围渐变4、渐进明细的特征常常和那个项目过程联系起来:A、范围规划B、范围定义C、范围变更D、项目计划执行5、以下都是日常运作和项目的共同之处,除了:A、由人来作B、受制于有限的资源和时间C、需要规划、执行和控制D、都是工作6、项目管理是一种先进的管理方法,除了:A、总是涉及具体的产品(服务)B、是独特的运作方式C、具有跨职能调配资源的能力D、划分阶段进行控制7、项目的一个实例是:A.管理一个公司B.生产一种新的计算机C.提供一种技术支持D.实施一种全新的经营程序或流程8、以下关于项目的说法都正确,除了:A.项目就是为了维持经营,确定一组目标B.项目发生在组织中的所有层次上C.项目是组织中那些受日常运作限制无法处理的活动D.项目可以由一个人组成9、项目管理中的“三重制约”是,除了:A.质量B.时间C.成本D.范围10、以下都是项目管理为了达到项目的要求而运用于项目中的内容,除了:A.知识B.风险C.技术D.手段11、管理一个项目包括以下内容,除了:A.识别要求B.确定清楚而又能实现的目标C.权衡质量、范围、时间和费用的要求D.制定符合项目经理期望的计划和说明书12、以下关于项目管理的说法都正确,除了:A.不确定事件或条件即使不影响“三重制约”中的任何一个因素,也可能会构成项目风险B.如果“三重制约”中某一个因素发生变化,其他因素至少有一个会受影响C.项目经理是负责实现项目目标的个人D.只要能在预算内按时提交满足要求的产品就是高质量的项目13、有效的项目管理要求项目管理团队理解和利用以下专业知识领域的知识和技能,除了:A.项目管理知识体系B.应用领域知识、标准与规章制度C.以项目为手段对日常运作进行管理D.处理人际关系技能14、在下列情况下,项目目标得以明确:A、由最高管理层进行沟通B、由项目团队成员制定和沟通C、可以量化D、散发到所有的项目利害关系者15、有关标准和规章制度的说法都正确,除了:A.标准的例子包括电脑磁盘的尺寸和液压流体的热稳定性B.规章制度是在经常和反复的使用中构成了规则,并由公认机构批准的文件C.标准常常在不同的组织层次被要求强制遵守D.规章制度是政府机构施加的要求16、下列有关项目环境的分类都正确,除了:A.文化与社会环境B.国际与政治环境C.自然环境D.组织内的人际关系环境17、以下都是处理人际关系的技能,除了:A.对组织施加影响B.领导和激励C.人事管理、补偿和福利D.谈判与冲突管理18、下列都是Program的正确说法,除了:A.Program是经过协调统一管理以获得单独管理时无法取得的效益的一组互相联系的项目。