土建质量工作总结
土建工作总结8篇

土建工作总结8篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作汇报、总结报告、心得体会、合同协议、条据文书、规章制度、演讲致辞、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as work reports, summary reports, reflections, contract agreements, policy documents, rules and regulations, speeches, teaching materials, essay summaries, other sample essays, etc. If you want to learn about different sample essay formats and writing methods, please stay tuned!土建工作总结8篇工作总结是我们不断提高工作效率和质量的重要手段,优秀的工作总结是我不断提高自己工作质量和效率的重要手段,下面是本店铺为您分享的土建工作总结8篇,感谢您的参阅。
土建专业年度质量总结(3篇)

第1篇一、前言随着我国经济的快速发展,基础设施建设步伐不断加快,土建工程作为国家重点投资领域,其质量直接关系到国家财产和人民生命财产安全。
为了全面提高土建工程的质量管理水平,本年度,我单位紧紧围绕“质量第一”的原则,积极开展质量管理工作,现将年度质量总结如下:一、总体工作回顾1. 加强质量管理体系建设本年度,我单位高度重视质量管理体系建设,不断完善质量管理制度,严格执行ISO9001质量管理体系标准,确保了工程质量目标的实现。
2. 提高人员素质为提高土建工程质量管理水平,我单位加大了对员工的培训力度,通过内部培训、外部学习等方式,提高了员工的质量意识和业务技能。
3. 强化过程控制在土建工程实施过程中,我单位严格遵循“预防为主、防治结合”的原则,加强施工过程控制,确保工程质量。
4. 严格验收制度我单位严格执行国家及地方有关工程质量验收规定,确保工程验收合格。
二、主要工作及成效1. 质量管理体系建设(1)完善质量管理制度:本年度,我单位修订了《质量管理制度》、《质量奖惩办法》等制度,明确了质量管理的责任、权限和程序。
(2)加强质量管理培训:组织开展了质量管理体系培训,提高了员工的质量意识和管理能力。
2. 人员素质提高(1)内部培训:开展了土建工程质量管理、施工技术、安全知识等方面的内部培训,提高了员工的专业技能。
(2)外部学习:选派优秀员工参加外部培训,拓宽了员工的知识面,提升了整体素质。
3. 过程控制(1)施工前:对施工图纸、技术规范进行审核,确保施工方案的合理性。
(2)施工中:严格执行施工方案,加强施工现场巡查,及时发现和解决质量问题。
(3)施工后:对已完成的工程进行验收,确保工程质量。
4. 验收制度(1)严格执行国家及地方有关工程质量验收规定,确保工程验收合格。
(2)加强验收人员培训,提高验收质量。
三、存在问题及改进措施1. 存在问题(1)部分员工质量意识不强,对工程质量的重要性认识不足。
(2)施工过程中,部分环节存在质量问题,如材料不合格、施工不规范等。
土建质量周报总结范文

一、周报概述本周,我单位土建施工项目按照既定计划稳步推进,全体施工人员始终保持严谨的工作态度,严格按照施工规范和操作规程执行。
现将本周土建质量工作总结如下:二、本周质量工作进展1. 施工进度本周,土建施工进度按照计划顺利完成。
主要完成了以下工作:(1)地基处理:完成了地基基础的开挖、换填、压实等工作,确保地基承载力满足设计要求。
(2)主体结构施工:完成了主体结构的钢筋绑扎、模板支设、混凝土浇筑等工作,确保结构安全、稳定。
(3)装饰装修施工:完成了室内外墙面、地面、门窗等装饰装修工程,确保施工质量。
2. 质量控制(1)材料管理:严格执行材料进场验收制度,确保所用材料符合设计要求和规范标准。
(2)施工过程控制:加强对施工过程中的质量检查,确保施工质量。
(3)隐蔽工程验收:严格按照隐蔽工程验收标准,做好隐蔽工程验收工作。
(4)质量事故处理:对发现的质量问题,及时进行原因分析、处理,确保问题得到有效解决。
三、下周工作计划1. 施工进度(1)地基处理:完成地基基础验收,转入主体结构施工。
(2)主体结构施工:完成主体结构的钢筋绑扎、模板支设、混凝土浇筑等工作。
(3)装饰装修施工:完成室内外墙面、地面、门窗等装饰装修工程。
2. 质量控制(1)材料管理:继续加强材料进场验收,确保材料质量。
(2)施工过程控制:加强对施工过程中的质量检查,确保施工质量。
(3)隐蔽工程验收:做好隐蔽工程验收工作,确保隐蔽工程质量。
(4)质量事故处理:对发现的质量问题,及时进行原因分析、处理,确保问题得到有效解决。
四、总结本周,我单位土建施工项目在全体施工人员的共同努力下,各项工作进展顺利,质量得到了有效保障。
在今后的工作中,我们将继续发扬严谨的工作作风,确保工程质量和进度,为我国建筑事业做出贡献。
土建质量员工作总结报告

土建质量员工作总结报告
作为土建质量员,我在过去一年中积极参与了各项土建工程的质量管理工作,并在此期间积累了一些宝贵的经验和体会。
现在我将对我的工作进行总结和报告,以便在今后的工作中能够更好地提高工作效率和质量。
首先,我在工作中始终坚持质量第一的原则,严格按照相关规定和标准进行操作。
我及时了解和掌握了工程质量管理的相关政策法规和标准规范,不断提高自身的专业知识和技能,确保工程质量符合国家标准和客户要求。
其次,我注重团队合作,与相关部门和工程人员积极沟通,建立了良好的合作关系。
在工程实施过程中,我及时发现和解决了一些质量问题,得到了相关部门和工程人员的认可和赞扬,为工程的顺利进行提供了有力保障。
另外,我还注重了解和掌握了一些新的质量管理技术和方法,不断提高了自身的工作水平和能力。
我参加了一些相关的培训和学习,学习了一些新的质量管理理论和方法,为工程的质量管理提供了新的思路和方法。
总的来说,我在过去一年中取得了一些成绩和进步,但同时也发现了一些不足之处,需要在今后的工作中不断改进和提高。
我将继续努力,不断提高自身的工作水平和能力,为土建工程的质量管理工作做出更大的贡献。
同时,我也将继续加强与相关部门和工程人员的沟通和合作,共同努力,为工程的质量管理工作提供更好的保障。
土建质量安全工作总结范文

土建质量安全工作总结范文土建质量安全工作总结。
土建工程是指建筑物的主体结构,包括地基、基础、框架和墙体等部分。
在土建工程中,质量安全工作是至关重要的,它直接关系到建筑物的安全性和使用寿命。
因此,对土建质量安全工作进行总结是非常必要的,可以帮助我们更好地认识和掌握土建工程的质量安全管理工作。
首先,土建质量安全工作需要从设计阶段就开始重视。
设计是土建工程的基础,设计合理与否直接关系到工程的质量和安全。
因此,在设计阶段需要严格按照国家相关标准和规范进行设计,确保设计方案的合理性和可行性。
同时,在设计过程中要充分考虑土地的地质条件、气候环境等因素,确保设计方案的安全性和稳定性。
其次,土建施工过程中需要加强质量安全管理。
施工现场是土建工程的关键环节,施工过程中需要加强对施工质量和安全的监督和管理。
要严格按照施工图纸和规范要求进行施工,确保施工质量符合要求。
同时,要加强对施工现场的安全管理,做好施工现场的安全防护措施,防止施工过程中发生安全事故。
最后,土建工程的验收和使用阶段也需要重视质量安全工作。
验收是土建工程的最后一道关,只有通过验收并达到相关标准要求,才能投入使用。
因此,在验收阶段需要严格按照验收标准进行验收,确保土建工程的质量和安全。
同时,在使用阶段也需要加强对建筑物的维护和管理,定期进行检查和维护,确保建筑物的安全和稳定。
总之,土建质量安全工作是土建工程中非常重要的一环,需要从设计、施工到验收和使用全程加强管理。
只有做好质量安全工作,才能确保土建工程的质量和安全,为人民群众的生命财产安全提供保障。
希望各相关部门和单位能够高度重视土建质量安全工作,共同努力,确保土建工程的质量和安全。
土建部分的日常检查上半年工作总结6篇

土建部分的日常检查上半年工作总结6篇篇1一、引言在上半年,我作为土建部分的日常检查负责人,一直致力于全面审查和优化土建项目的各个方面。
通过一系列的检查和总结,我们取得了显著的成果,并为下半年的发展奠定了坚实的基础。
本报告将详细介绍上半年工作的内容和成果,并对未来工作提出建议。
二、工作内容及成果1. 项目进度检查在上半年,我们对所有土建项目的进度进行了全面的检查。
通过实地考察和数据分析,我们确保了项目按计划进行,并针对存在的问题提出了有效的解决方案。
同时,我们与项目团队紧密合作,确保项目按期完成。
2. 质量安全检查质量与安全是土建项目的核心要素。
我们严格按照相关标准和规范,对施工现场进行了全面的安全检查。
针对发现的问题,我们及时整改并加强监督,确保项目的质量和安全。
此外,我们还组织了一系列的安全培训和宣传活动,提高员工的安全意识。
3. 材料管理检查材料管理是土建项目的重要环节。
我们对材料采购、储存和使用等环节进行了全面的检查。
通过优化材料管理流程,我们确保了材料的及时供应和合理使用,降低了项目成本。
4. 技术与人员培训在上半年,我们注重技术与人员的培训。
通过组织内部培训和外部学习,我们提高了员工的专业技能和管理能力。
同时,我们还引入了先进的技术和设备,提高了项目的施工效率和质量。
三、上半年工作亮点1. 成功应对突发事件在上半年,我们面临了多次突发事件,如天气变化、供应链问题等。
通过灵活应对和有效处理,我们确保了项目的顺利进行。
这体现了我们团队的应变能力和专业素养。
2. 创新管理方法在上半年,我们积极创新管理方法。
通过引入新的管理理念和工具,我们优化了管理流程,提高了工作效率。
同时,我们还加强了与项目团队的沟通与合作,确保项目的顺利进行。
四、存在问题及改进措施1. 沟通不畅问题在上半年工作中,我们发现沟通不畅是一个问题。
为了解决这个问题,我们将加强内部沟通,提高信息的流通性和透明度。
同时,我们还将加强与项目团队的沟通与合作,确保项目的顺利进行。
2024年土建质量员工作总结(二篇)

2024年土建质量员工作总结____年是土建质量员工作的重要一年, 该年度我承担了多个项目的质量管理工作, 并在多个方面取得了一定的成绩。
以下是我对____年土建质量员工作的总结。
一、工作概况在____年, 我负责了公司的多个土建项目的质量管理工作, 涉及建筑工程、桥梁工程和道路工程等方面。
在每个项目中, 我积极参与项目规划、设计讨论和施工过程中的质量控制, 确保项目的质量达到预期目标。
二、建立并完善质量管理体系在____年, 我重点推动了公司的质量管理体系的建立和完善。
首先, 我对公司现有的质量管理规章制度进行了全面的审查和更新, 制定了一系列配套制度和操作规范, 确保质量管理的全面覆盖。
其次, 我组织了一系列质量管理培训和技能提升活动, 提高了员工的质量管理意识和能力。
最后, 我积极推动质量管理信息化建设, 在项目中引入了一些质量管理软件和工具, 提高了质量管理的效率和准确性。
三、强化施工现场的质量控制在施工现场的质量控制方面, 我注重落实质量验收规范和工艺标准, 加强了材料的进场检验和工序的质量把控, 确保了施工质量的稳定和可控。
同时, 我加强了对施工单位的质量监督和日常巡检, 及时发现和解决质量问题, 确保了施工过程的顺利进行。
四、参与质量事故处理和纠纷解决作为土建质量员, 我积极参与了公司多个项目中的质量事故处理和纠纷解决工作。
在发生质量问题和安全事故时, 我迅速组织了事故调查小组, 全面梳理了事件的经过和原因, 并提出了相应的整改措施和改进方案。
在处理纠纷时, 我与相关方进行了充分的沟通和协商, 积极解决了纠纷, 保障了项目的正常进行。
五、总结经验教训, 推动质量持续改进____年是我作为土建质量员的第三个年头, 我深刻认识到质量管理工作需要持续改进和提升。
因此, 我在工作总结中总结了项目中的经验教训, 并提出了一些改进的思路和措施。
例如, 加强与施工单位的沟通和合作, 提前介入项目进行质量规划和控制;加强对质检人员的培训和管理, 提高他们的专业水平和质量意识;推行质量奖惩制度, 激励员工积极参与质量管理。
土建工作总结范文6篇

土建工作总结范文6篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如报告范文、策划方案、鉴定材料、心得体会、条据书信、合同协议、规章制度、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as report templates, planning plans, appraisal materials, insights, evidence letters, contract agreements, rules and regulations, teaching materials, essay encyclopedias, and other sample essays. If you would like to learn about different sample formats and writing methods, please pay attention!土建工作总结范文6篇通过工作总结我们可以及时发现并解决工作中的问题,避免重复犯错,提高工作效率,通过工作总结我们可以发现自己在工作中的成长和进步,为个人职业发展提供有力支持,下面是本店铺为您分享的土建工作总结范文6篇,感谢您的参阅。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
土建质量工作总结建筑质量员年终总结我的工作岗位是一名质量员、一个把握工程质量的重要岗位。
工作态度决定一切,工作时一定要一丝不苟,仔细认真。
不能老是出错,有必要时检测一下自己的工作结果,以确定自己的工作万无一失。
工作之余还要经常总结工作教训,不断提高工作效率,并从中总结工作经验。
虽然工作中我会犯一些错误,受到领导的批评,但是我并不认为这是一件可耻的事,因为我认为这些错误和批评可以让我在以后的工作中避免类似错误,而且可以让我在工作中更快的成长起来。
我也深知我的工作的重要性,一个人要在自己的职位上有所作为,就必须要对职位的专业知识熟知,并在不断的学习中拓宽自己的知识面。
所以我本着"把工作做的更好"的目标,扎扎实实干好本职工作,并且在工作之余我努力的学习专业知识充实自己,虽然在工作上会遇到很多挫折但是我相信我自己。
有句话说得好"从哪里跌倒、就从哪里爬起来"我还很年轻秉着笨鸟先飞的思想,我想信只要我付出的比别人多肯定能弥补我在专业知识上的不足。
作为质检员,质检工作的重点:在质检检查之前,做好事前控制工作至关重要,防患于未然才是根本,所以把一切隐患消灭在萌芽状态。
作为质检人员,在工程开工前,一定要全面熟悉情况,包括施工图纸的了解,方案设计、会审工作,都是全程参与,只有采取这样严肃、认真态度,我们的质检工作才能做实做好。
严格按照规定做好各项检验。
首先由个班组自检,自检合格后报请项目部质检人员检查,然后报请监理工程师进行检验签字。
上道工序不合格,下道工序不得施工,做到"五不施工,三不交接"。
"五不施工"即:未进行技术交底不施工;图纸和技术要求不清楚不施工;测量桩和资料未经复核不施工;材料不合格不施工;工程环境污染未经检查签证不施工。
"三不交接"即:无自检记录不交接;不经专业人员验收合格不交接;施工记录不全不交接。
还有做好各道工序的"三检"工作。
在质检过程中,要保持一种动态的监督。
发现及纠正施工中存在的问题。
配合施工员对工程质量作全面的检查,对施工中出现的问题及时提出、纠正。
对特殊工序的施工工艺的施工进行全过程跟踪检查,确保每道工序合格。
检验工作是一项精细的检验过程。
"细节决定成败",在主体施工过程中,曾多次检查发现梁的钢筋加密区错误、柱钢筋连接和梁柱节点不符合规范要求钢筋班组改正;配合项目部巡查解决浇注的柱外观不佳的问题,通过要求木工加强模板支撑和砼浇注工改进震捣工艺来解决漏浆问题;对进场的商品砼严把质量关,每个部位浇注前当场检查混凝土是否符合图纸设计要求,通知试验员取样并做好送检记录。
对事后结果进行总结分析,以便于工作的持续改进。
每天施工结束后对施工过程找出往后容易出现的问题及施工过程中可取之处,写入施工日记;参加项目部例会和每月的业主协调会,对如何工作才能确保取得实质性成果进行总结,不断地提高个人的业务水平;将现场存在的质量问题急需公司协调解决的问题认真反映出来,将公司的与项目部有机的联系在一起。
总结了1年来的工作,虽然取得了一点的成绩,自身也有了很大的进步,但是还存在着不足,工作中偶有因为马虎而造成工作失误,给工作带来不必要的麻烦。
有时工作敏感性还不是很强。
对领导交办的事不够敏感,有时工作没有提前,上报情况不够及时。
许多工作还只能算是一般般。
以后我会以严谨的工作态度仔细完成本职工作。
xx年的结束,xx年的到来,是开端也是结束,展现在自己面前的是一片任自己驰骋的沃土,也分明感受到了沉甸甸的责任,我将进一步发扬优点,改进不足,全力做好本职工作。
要保持良好的精神状态,发扬吃苦耐劳、知难而进、精益求精、严谨细致、积极进取、"敢打敢上"的拼搏精神。
理清工作思路,提高办事效率。
在今后的工作和生活中我将继续学习,深入实践,不断提升自我,不辜负公司给我的这个机会和领导以及同事对我的栽培与信任,我会和公司一起成长。
大路项目部质量部xx年度工作总结大路煤矸石热电一期工程从xx年6月份开工以来,为全面贯彻落实公司质量文化理念“规范施工,一次成优”,围绕着“达标投产,确保行业优质工程,争创鲁班奖”的工程总体目标,在华电总承包起带头兵作用,坚持以技术策划为龙头,以创建过程精品为着力点,以“四新”技术应用为手段,以严格的质量监督为保障,推动工程质量水平整体提高。
在公司各部门领导关心和项目部领导的支持下通过项目部全体员工一直的奋战拼搏、努力进取,克服了天气、环境、远离本部等各种不利因素的影响,现承建的C标段工程质量已圆满完成了本年度的质量目标、指标,下面把今年的工作总体结汇报如下:项目目前基本概况项目部克服各种困难,实现了对节点计划的有效控制。
目前,实际进度情况如下,在保证质量的前提下,使得工程质量始终处于受控状态。
其中(xx.09.18)烟囱基础环梁砼已浇筑完,基坑回填土后期也夯实结束。
(xx.11.22)化学水处理室基础承台已浇筑完毕,基坑回填土也在近期回填完。
工程质量可控在控,满足了工程各进度节点要求。
质量开展情况1、为实现本工程质量创优目标,项目部提前策划编制了各专业精细化施工工艺标准,其目的是唤起全体员工“百年大计,质量第一”的质量意识,项目部积极开展“施工工艺精品示范项目”和“重点质量控制项目”活动,针对本工程的施工特点,对工程施工中质量控制难度较大,容易产生施工质量通病,施工工艺较为复杂,感观要求较高的施工项目,共确定了8项为本工程的“施工工艺精品示范项目”38项“重点质量控制项目”。
各专业针对项目的关键施工工序及技术要点,组织制订施工精品工艺标准及重点质量保证措施,并组织贯彻实施。
项目部定期对重点质量控制项目的实施进行检查。
通过这两项活动的开展,来展现项目质量亮点,从而带动整个工程项目的施工工艺质量水平的提高,树立创优项目与营造项目质量创优氛围。
2、实施质量责任制考核,通过执行质量责任制考核管理办法,落实管理和操作各个岗位的质量责任。
开展质量验收一次通过率考核管理,加强过程质量检查、随机抽查和专项督查,强化质量责任落实和质量奖惩,由于施工队人员配备不到位,烟囱基础外观存在缺陷,我们要求加强现场管理并下发整改单并验收闭环,工程整体质量符合规范要求。
提高质量过程的预控能力,促进工程质量一次成优。
3、严格实行三级质量检验制度,严格按照质量检验计划及检验程序进行验收。
质量部专职质检员围绕流程简化,大部分时间在现场巡查巡视,发现的缺陷均采用口头方式通知整改,效果好整改快,对有些不能及时整改的采取下发整改通知单和罚款单。
另外,在施工过程中,质检人员每天对重要施工环节进行多频次检查和跟班旁站,做到及时发现问题、及时纠正、及时验收。
对一些关键施工工序和关键部位质检员采用旁站方式,如大体积混凝土。
工程实体上项目部坚持出现质量事故“四不放过”原则,对出现问题及时召开专题会对原因进行分析、追溯到位,对出现问题能严肃、认真,整改 __。
为了杜绝质量缺陷与通病的发生,加强质量通病防治,专业及时编制了质量通病防治措施和纠正预防措施,如回填土预防措施、烟囱外观和道路出现裂纹纠正措施等,有效地防止质量通病的发生。
在项目部的共同努力下一直得到业主们的好评,在质量会议上业主监理们要求另两家施工单位在回填土施工和砼养护等要向我们学习。
4、在工程开工时,项目部就根据公司《质量、职业健康安全和环境管理手册》编制了项目管理大纲,项目部质量管理除执行公司各项管理制度外,根据项目管理大纲要求编制了《质量创优规划》、《质量奖罚规定》、《技术质量例会管理规定》、《竣工技术资料编制细则》、《商品混凝土质量控制办法》及各专业《质量检验划分表》等管理文件。
从施工工艺及过程控制上下功夫,注重对施工方案、施工工艺和施工程序的优化工作。
进行策划、评审,吸纳各方建议、施工经验和先进施工技术,最终编制科学合理的施工方案,并在项目施工前对施工作业人员认真交底,做到方案有交底、施工有依据、控制有措施、质量有标准。
施工过程中技术员、质检员及施工班组对一些关键节点依据《工程建设标准强制性条文》从严把关,通过严把质量关来实现创优计划和精品工程的目标。
5、质量管理人员同时严把材料质量关,对到货材料进行入库检验,检查材料的外观质量,物资的品种、规格、型号、等级是否符合工程质量要求,对不合格或不合要求的原材料坚决予以退场,所有材料都经验收合格并报审监理认可后方可用到工程上。
本工程计量器具共计12件,无超期和不做校验的器具在工程中使用。
工程施工过程控制:1:钢筋工程:从原材料抓起,对钢筋进场时的验收、钢筋加工、安装进行严格控制,杜绝了不合格的原材料进场,钢筋加工半成品验收合格后才能现场安装,现场安装检查钢筋接头100%检查,根据规范要求,检验试验覆盖率100%。
2:模板工程:模板从进场时严格验收,集中堆放,在木工厂集中制作,严禁现场制作。
钢筋安装隐蔽验收及模板制作合格后,模板方可进入现场安装。
项目部质量管理人员在模板安装过程中,加强过程控制,多频次地检查,发现接缝不严密、对拉螺杆开孔不符合要求、模板加固不符合要求等问题等能得到迅速整改,做到一次成活,满足要求。
3:混凝土工程:从搅拌站后台抓起,原材料、配合比设计、搅拌、运输、浇筑、养护各个环节均监督到位。
混凝土采用专用运输车运输,混凝土泵送至浇捣部位,实现了混凝土从搅拌、运输至入模的机械化操作。
以上工作,有效地提高了混凝土的整体生产水平和成形后的外观质量。
4:回填土:不符合要求的回填土杜绝进入施工现场。
在施工过程中,严格按作业指导书、规范规程实施,做到分层夯实,检验试验覆盖率100%,试验一次性合格率100%。
质量总结xx年,大路质量部在公司质量部,项目部的领导下,已完成公司、项目部全年质量目标。
为提高专业水平项目部督促建筑科,、质量科回公司培训1次,其中,根据工程进度已编制作业指导书6份,交底率100%。
方案报审5项。
召开月度质量例会6次,周质量例会27次。
完成工程报验:分项工程8项,检验批29 项,隐蔽工程8项,合格率100%,钢筋原材试验21组,钢筋焊接试验11组,砼取样试块25组,回填土试验38组,一次合格率为100%。
全年质量部共开出内部整改单1份,已整改合格,并验收闭环。
工程整体质量符合规范要求。
公司和项目部制定得各项质量目标全部完成。
xx年工作xx年,质量部继续做好质量责任制考核,加大质量奖罚力度,认真执行公司制定的现场十大质量纪律,向各级作业人员宣传《国家电站工程强制性条文》并做好培训事宜,踏踏实实做好重点项目控制实施检查,在完成项目部承建的质量监督工作的同时(抓)做好以下几个方面的工作:1、理顺工程与质量关系,加强质量意识的宣传,努力营造项目部质量管理的氛围,促进质量管理的提升。