金康合同中英对照

1. Shipbroker

船舶经纪人

2. Place and date

签约日期和地点

3. Owners/Place of business (Cl. 1)

船东/营业地(第一条)

4. Charterers/Place of business (Cl. 1)

租船人/营业地(第一条)

5. Vessel's name (Cl. 1)

船名(第一条)

6. GT/NT (Cl. 1)

总吨/净吨(第一条)

7. DWT all told on summer load line in metric tons (abt.) (Cl. 1)

按夏季载重线确定的全部载重公吨数(大约)(第1 条)

8. Present position (Cl. 1)

船舶动态(第一条)

9. Expected ready to load (abt.) (Cl. 1)

预计作好装货准备的日期(大约)(第1 条)

10. Loading port or place (Cl. 1)

装货港或者装货地点(第一条)

11. Discharging port or place (Cl. 1)

卸货港或者卸货地点(第一条)

12. Cargo (also state quantity and margin in Owners' option, if agreed; if full and complete cargo not agreed state "part cargo") (Cl. 1)

货物(同时载明数量和约定的所有人可选择的范围,如未约定满舱满载货

物,载明“部分货物”)(第1 条)

13. Freight rate (also state whether freight prepaid or payable on delivery) (Cl. 4)

运费率(同时载明运费预付还是到付)(第4 条)

14. Freight payment (state currency and method of payment; also beneficiary and bank account) (Cl. 4)

运费的支付(载明货币名称与支付方式,以及受益人和银行帐号)(第4 条)

15. State if vessel's cargo handling gear shall not be used (Cl. 5)

载明是否不使用船上的货物装卸设备(第5 条)

16. Laytime (if separate laytime for load. and disch. is agreed, fill in a) and b). If total laytime for load. and disch., fill in c) only) (Cl. 6)

装卸时间(如约定装货和卸货的各自的时间,填入a) 和b);如按装货和卸货的合计时间,仅填入c)) (第6 条)

a) Laytime for loading 装货时间

b) Laytime for discharging卸货时间

c) Total laytime for loading and discharging

装货和卸货的合计时间

17. Shippers/Place of business (Cl. 6)

托运人/营业地点

18. Agents (loading) (Cl. 6)

装港代理(第六条)

19. Agents (discharging) (Cl. 6)

卸港代理(第六条)

20. Demurrage rate and manner payable (loading and discharging) (Cl. 7)

滞期费率及支付方式(装货和卸货)(第7 条)

21. Cancelling date (Cl. 9)

解约日(第九条)

22. General Average to be adjusted at (Cl. 12)

共同海损理算(第12 条)

23. Freight Tax (state if for the Owners' account) (Cl. 13 (c))

运费税(载明是否由所有人支付)(第13 条 c 款)

24. Brokerage commission and to whom payable (Cl. 15)

经纪人佣金及向何人支付(第15 条)

25. Law and Arbitration (state 19 (a), 19 (b) or 19 (c) of Cl. 19; if 19 (c) agreed also state Place of Arbitration) (if not filled in 19 (a) shall apply) (Cl. 19)

法律和仲裁(载明第19 条(a),(b),或(c)款;如约定第19 条(c)款,

同时载明仲裁地点)(如未填入,应适用第19 条(a)款)(第19 条)

(a) State maximum amount for small claims/shortened arbitration (Cl.19)

载明小数额索赔/简易仲裁程序适用的最大请求额(第19 条)

26. Additional clauses covering special provisions, if agreed

含有特殊规定的附加条款,如果约定

It is mutually agreed that this Contract shall be performed subject to the conditions contained in this Charter Party which shall include Part I as well as Part II. In the event of a conflict of conditions, the provisions of Part I shall prevail over those of Part II to the extent of such conflict. 兹相互同意应按本租船合同的第一部分和第二部分中所定条件,履行本合

同.当条件发生抵触时,第一部分的规定优先于第二部分,但以所抵触的范围为限.

PART II

“Gencon” Charter (As Revised 1922,1976 and 1994)

1.It is agreed between the party mentioned in Box 3 as the Owners of the Vessel named in Box 5, of the GT/NT indicated in Box 6 and carrying about the number of metric tons of deadweight capacity all told on summer loadline stated in Box 7, now in position as stated in Box 8 and expected ready to load under this Charter Party about the date indicated in Box 9, and the party mentioned as the Charterers in Box 4 that: The said Vessel shall, as soon as her prior commitments have been completed, proceed to the loading port(s) or place(s) stated in Box 10 or so near thereto as she may safely get and lie always afloat, and there load a full and complete cargo (if shipment of deck cargo agreed same to be at the Charterers' risk and responsibility) as stated in Box 12, which the Charterers bind themselves to ship, and being so loaded the Vessel shall proceed to the discharging port(s) or place(s) stated in Box 11 as ordered on signing Bills of Lading, or so near thereto as she may safely get and lie always afloat, and there deliver the cargo.

1. 兹由第3 条所列的下述船舶的所有人与第4 栏所指的承租人,双方协议如下:

船舶名称见第 5 栏,总吨/净吨见第 6 栏,按夏季载重线确定的全部载重量公吨数见第7 栏,现在动态见第8 栏,根据本租船合同预计准备装货的大约日期见第9 栏.

上述船舶在其先前义务履行完毕后,应立即驶往第10 栏所列的装货港口或地点,或船舶能安

全抵达并始终浮泊的附近地点,装载第12 栏所列的货物,满舱满载.(如协议装运甲板货,则由承租人承担风险和责任).承租人须自己负责装运该货.船舶经装载后,应驶往第11 栏所列,在签发提单时指定的卸货港口或地点,或船舶能安全抵达并始终浮泊的附近地点,交付货物.

2. Owners' Responsibility Clause 15

The Owners are to be responsible for loss of or damage to the goods or for delay in delivery of the goods only in case the loss, damage or delay has been caused by personal want of due diligence on the part of the Owners or their Manager to make the Vessel in all respects seaworthy and to secure that she is properly manned, equipped and supplied, or by the personal act or default of the Owners or their Manager.

And the Owners are not responsible for loss, damage or delay arising from any other cause whatsoever, even from the neglect or default of the Master or crew or some other person employed by the Owners on board or ashore for whose acts they would, but for this Clause, be responsible, or from unseaworthiness of the Vessel on loading or commencement of the voyage or at any time whatsoever.

2.所有人责任条款

所有人对货物的灭失,损坏或延迟交付的责任限于造成灭失,损坏或延迟的原因是由于所有人或其经理人本身未尽适当谨慎使船舶各方面适航,并保证适当配备船员,装备船舶和配备供应品,或由于所有人或其经理人本身的行为或不履行职责. 所有人对由于其他任何原因造成的货物灭失,损坏或延迟不负责,即使是由于船长或所有人雇佣的船上或岸上的其他人员的疏忽或不履行职责造成的,如无本条规定,所有人可能须对他们的行为负责,或是由于船舶在装货或开航当时或其他任何时候不适航所造成.

3. Deviation Clause

The Vessel has liberty to call at any port or ports in any order, for any purpose, to sail without pilots, to tow and/or assist Vessels in all situations, and also to deviate for the purpose of saving life and/or property.

3.绕航条款

船舶有权为任何目的以任何顺序挂靠任何港口,没有引航员在船也可航行,在任何情况下拖带和/或帮助他船,亦可为拯救人命和/或财产而绕航.

4. Payment of Freight运费支付

(a) The freight at the rate stated in Box 13 shall be paid in cash calculated on the intaken quantity of cargo.

(a)运费应按第13 栏所列费率,根据装船货物的数量计算,以现金支付.

(b) Prepaid. If according to Box 13 freight is to be paid on shipment, it shall be deemed earned and non-returnable, Vessel and/or cargo lost or not lost. Neither the Owners nor their agents shall be required to sign or endorse bills of lading showing freight prepaid unless the freight due to the Owners has actually been paid.

(b) 预付.如按第13 栏,运费是在装船时支付,则应视为运费已经收取并且是不可退还的,而无论船舶和/或货物是否发生灭失.如果应支付给所有人的运费尚未实际支付则不能要求所有人或其代理人签发或背书表明运费已经预付的提单.

(c) On delivery. If according to Box 13 freight, or part thereof, is payable at destination it shall not be deemed earned until the cargo is thus delivered. Notwithstanding the provisions under (a), if freight or part thereof is payable on delivery of the cargo the Charterers shall have the option of paying the freight on delivered weight/quantity provided such option is declared before breaking bulk and the weight/quantity can be ascertained by official weighing machine, joint

draft survey or tally.

Cash for Vessel's ordinary disbursements at the port of loading to be advanced by the Charterers, if required, at highest current rate of exchange, subject to two (2) per cent to cover insurance and other expenses.

(c) 到付. 如按第13 栏,运费或部分运费在目的地支付,则在货物按按这种方式

交付之前,不应认为运费已经收取.尽管有(a)款规定,如果运费或部分运费在交付货物时支付,承租人应有选择按交付货物的重量/数量支付运费的权利,只要这种选择是在散货分解之前宣布的,并且该重量/数量可由公认的衡重仪器, 共同查验单据或理货加以确定. 如经要求,承租人应现金垫付船舶在装货港的经常费用,而按最高兑换率折合并附加2%抵偿保险费和其他费用。

5. Loading/Discharging

(a) Costs/Risks

The cargo shall be brought into the holds, loaded, stowed and/or trimmed, tallied, lashed and/or secured and taken from the holds and discharged by the Charterers, free of any risk, liability and expense whatsoever to the Owners.

The Charterers shall provide and lay all dunnage material as required for the proper stowage and protection of the cargo on board, the Owners allowing the use of all dunnage available on board. The Charterers shall be responsible for and pay the cost of removing their dunnage after discharge of the cargo under this Charter Party and time to count until dunnage has been removed.

(a)费用/风险

货物应由承租人负责送至舱内,装船,积载和/或平舱,理货,绑扎和/或固定,并从舱内取出和卸船,所有人不承担任何风险,责任和费用.承租人应提供并铺设为适当积载和保护船上货物所需要的垫舱物料,但所有人有权决定是否允许所有这些垫舱物料在船上的使用.根据本租船合同当货物卸船后,承租人应负责将其垫料移走并支付移走垫料所需的费用,花费的时间计入装卸时间,直到垫料已经移走.

(b) Cargo Handling Gear

Unless the Vessel is gearless or unless it has been agreed between the parties that the Vessel's gear shall not be used and stated as such in Box 15, the Owners shall throughout the duration of loading/discharging give free use of the Vessel's cargo handling gear and of sufficient motive power to operate all such cargo handling gear. All such equipment to be in good working order. Unless caused by negligence of the stevedores, time lost by breakdown of the Vessel's cargo handling gear or motive power - pro rata the total number of cranes/winches required at that time for the loading/discharging of cargo under this Charter Party - shall not count as laytime or time on demurrage.

On request the Owners shall provide free of charge cranemen/winchmen from the crew to operate the Vessel's cargo handling gear, unless local regulations prohibit this, in which latter event shore labourers shall be for the account of the Charterers. Cranemen/winchmen shall be under the Charterers' risk and responsibility and as stevedores to be deemed as their servants but shall always work under the supervision of the Master.

(b)货物装卸设备

除非船上无装卸设备或经当事方协议不使用船上的装卸设备,并在第15 栏中

载明,所有人在整个装卸过程中可以自由使用船上的货物装卸设备并使用充足动力操纵所有这些设备.所有这些设备应处于良好工作状态.如果不是由于装卸人员的疏忽所造成,船上

的货物装卸设备或动力故障引起的时间损失,应按发生故障的设备占根据本租船合同装/卸货物时所要求的起重机/起货机总数的比

例予以扣减,不计入装卸时间或滞期时间. 如果当地规定不加禁止. 经承租人要求,所有人应提供由船员充当的起货机司机/起重机司机来纵船上的货物装卸设备,但所有人对这些司机并不承担责任.如果当地规定不允许,岸上的劳动力应由承租人负责雇佣.起货机司机/起重机司机应由承租人承担风险和责任,并且作为装卸人员应视为承租人的受雇人,当应始终工作在船长的监督之下.

(c) Stevedore Damage

The Charterers shall be responsible for damage (beyond ordinary wear and tear) to any part of the Vessel caused by Stevedores. Such damage shall be notified as soon as reasonably possible by the Master to the Charterers or their agents and to their Stevedores, failing which the Charterers shall not be held responsible. The Master shall endeavour to obtain the Stevedores' written acknowledgement of liability.

The Charterers are obliged to repair any stevedore damage prior to completion of the voyage, but must repair stevedore damage affecting the Vessel's seaworthiness or class before the Vessel sails from the port where such damage was caused or found. All additional expenses incurred shall be for the account of the Charterers and any time lost shall be for the account of and shall be paid to the Owners by the Charterers at the demurrage rate.

(c)装卸人员造成的损害

承租人应对由于装卸人员造成的船舶任何部分的损害(超出正常损耗)负责.这种损害应由船长尽快通知承租人或其代理人和其装卸人员.如果未能如此, 承租人将不承担责任.船长应当尽量取得装卸人员对其责任的书面承认.承租人在航次完成前,有义务修理装卸造成的任何损害,但是船舶从造成或发现这种损害的港口开航前影响船舶适航性或船级的那部分装卸造成的损害必须进行修理.所有发生的额外费用应由承租人负担,损失的任何时间也应由其承担,承租人应按照滞期费率支付给所有人.

6. Laytime装卸货时间

* (a) Separate laytime for loading and discharging

The cargo shall be loaded within the number of running days/hours as indicated in Box 16, weather permitting, Sundays and holidays excepted, unless used, in which event time used shall count.

The cargo shall be discharged within the number of running days/hours as indicated in Box 16, weather permitting, Sundays and holidays excepted, unless used, in which event time used shall count.

* (a)装货和卸货分别计算时间

如果天气许可,货物应在第16 栏规定的连续日/小时数内装完,星期日和节假日除外,除非已经使用,但只计算使用的时间.

如果天气许可,货物应在第16 栏规定的连续日/小时数内卸完,星期日和节假日除外,除非已经使用,但只计算使用的时间.

* (b) Total laytime for loading and discharging

The cargo shall be loaded and discharged within the number of total running days/hours as indicated in Box 16, weather permitting, Sundays and holidays excepted, unless used, in which event time used shall count.

* (b)装货和卸货混合计算时间

如天气许可,货物应在第16 栏规定的总的连续日/小时数内装卸完毕,星期日和节假日除外,

除非已经使用,但只计算使用的时间.

(c) Commencement of laytime (loading and discharging)

Laytime for loading and discharging shall commence at 13.00 hours, if notice of readiness is given up to and including 12.00 hours, and at 06.00 hours next working day if notice given during office hours after 12.00 hours. Notice of readiness at loading port to be given to the Shippers named in Box 17 or if not named, to the Charterers or their agents named in Box 18. Notice of readiness at the discharging port to be given to the Receivers or, if not known, to the Charterers or their agents named in Box 19.

(c)装卸时间的起算

如准备就绪通知书在中午12 点之前(包括12 点)递交,装卸时间从下午 1 时起算;如通知书在12 点以后递交,装卸时间从下一个工作日上午6 时起算。在装货港,通知书应递交给第17 栏中规定的托运人。如未指定则递交给18栏中的承租人或其代理。在卸货港,通知书应递交给收货人,如未知,则递交给19 栏中的承租人或其代理。

If the loading/discharging berth is not available on the Vessel's arrival at or off the port of loading/discharging, the Vessel shall be entitled to give notice of readiness within ordinary office hours on arrival there, whether in free pratique or not, whether customs cleared or not. Laytime or time on demurrage shall then count as if she were in berth and in all respects ready for loading/discharging provided that the Master warrants that she is in fact ready in all respects. Time used in moving from the place of waiting to the loading/ discharging berth shall not count as laytime. If, after inspection, the Vessel is found not to be ready in all respects to load/ discharge time lost after the discovery thereof until the Vessel is again ready to load/discharge shall not count as laytime.

Time used before commencement of laytime shall count.

* Indicate alternative (a) or (b) as agreed, in Box 16.

如船舶到达装/卸港而无泊位,则船舶有权在到达后在办公时间内递交通知书,无论检疫与否,无论清关与否,且如船长保证船舶在各方面均准备完毕,如已靠泊并在各方面做好装/卸准备一样,装卸时间或滞期时间开始计算。从等泊位置移到装/卸泊位的时间不计入装卸时间。如经检验发现船舶未准备就绪,从发现之时起至再次准备就绪的时间不得计入装卸时间。装卸时间起算前已实际使用的时间计为装卸时间。

协议选择(a)或(b),并填入第16 栏。

7. Demurrage

Demurrage at the loading and discharging port is payable by the Charterers at the rate stated in Box 20 in the manner stated in Box 20 per day or pro rata for any part of a day. Demurrage shall fall due day by day and shall be payable upon receipt of the Owners' invoice.

In the event the demurrage is not paid in accordance with the above, the Owners shall give the Charterers 96 running hours written notice to rectify the failure. If the demurrage is not paid at the expiration of this time limit and if the vessel is in or at the loading port, the Owners are entitled at any time to terminate the Charter Party and claim damages for any losses caused thereby.

7.滞期费

滞期费用由承租人按第20 栏中规定的每日费率,不足一日者按比例计算,按

日支付,并在收到船东的发票后支付. 如未按上述规定支付,船东应给承租人

书面通知其在96 小时内支付,如仍未在此期限内付清,且如船舶在装港,则船东有权在任何时候中止本租约并向其索赔由此引起的任何损失。

8. Lien Clause

The Owners shall have a lien on the cargo and on all sub-freights payable in respect of the cargo, for freight, dead freight, demurrage, claims for damages and for all other amounts due under this Charter Party including costs of recovering same.

8.留置权条款

船舶所有人得因未收取的运费,亏舱费,滞期费和滞留损失和所有应付费用包括为取得该笔收入所花的费用而对货物和该批货物的分租约运费有留置权。

9. Cancelling Clause

(a) Should the Vessel not be ready to load (whether in berth or not) on the cancelling date indicated in Box 21, the Charterers shall have the option of cancelling this Charter Party.

(a)如船舶未能在第21 栏规定的解约日做好装货准备(不论靠泊与否),承租

人有权解除本合同。

(b) Should the Owners anticipate that, despite the exercise of due diligence, the Vessel will not be ready to load by the cancelling date, they shall notify the Charterers thereof without delay stating the expected date of the Vessel's readiness to load and asking whether the Charterers will exercise their option of cancelling the Charter Party, or agree to a new cancelling date. Such option

must be declared by the Charterers within 48 running hours after the receipt of the Owners' notice. If the Charterers do not exercise their option of cancelling, then this Charter Party shall be deemed to be amended such that the seventh day after the new readiness date state in the Owner s’ notification to the charterers shall be the new cancelling date.

The provisions of sub-clause (b) of this Clause shall operate only once, and in case of the Vessel’s further delay, the Charterers shall have the opinion of cancelling the Charter Party as per sub-clause (a) of this Clause.

(b)如船东预计虽谨慎处理仍无法在解约日前准备装货,则应立即通知承租

人其预计准备好的日期,并询问是否解约或同意新的解约日。承租人应在收到该通知后48 小时内宣布,如承租人未行使其解约权,则本租约视为修改如下:船东在通知中宣布的准备完毕日期后的第七天为新的解约日。

(b)款规定只能适用一次,如船舶再次延误,则承租人可选择按本条(a)款解除本租约。

金康合同(AS REVISED 1922, 1976 and 1994)中英文对照

金康合同中英文对照 THE BALTIC AND INTERNATIONAL MARITIME COUNCIL UNIFORM GENERAL CHARTER (AS REVISED 1922, 1976 and 1994) (To be used for trades for which no specially approved form is in force) CODE NAME: "GENCON" 1. It is agreed between the party mentioned in Box 3 as the Owners of the Vessel named in Box 5, of the GT/NT indicated in Box 6 and carrying about the number of metric tons of deadweight capacity all told on summer loadline stated in Box 7, now in position as stated in Box 8 and expected ready to load under this Charter Party about the date indicated in Box 9, and the party mentioned as the Charterers in Box 4 that: The said Vessel shall, as soon as her prior commitments have been completed, proceed to the loading port(s) or place(s) stated in Box 10 or so near thereto as she may safely get and lie always afloat, and there load a full and complete cargo (if shipment of deck cargo agreed same to be at the Charterers' risk and 10 responsibility) as stated in Box 12, which the Charterers bind themselves to ship, and being so loaded the Vessel shall proceed to the discharging port(s) or place(s) stated in Box 11 as ordered on signing Bills of Lading, or so near thereto as she may safely get and lie always afloat, and there deliver the cargo. 1.兹由第3栏所列的下述船舶所有人与第4栏所指的承租人,双方协议如下: 船舶名见第5栏,总/净登记吨见第6栏,货物载重量大约吨数见第7栏,现在动态见第8栏,根据本租船合同作好装货准备的大约时间见第9栏。 上述船舶一旦完成前个合同,应驶往第10栏所列的装货港口或地点,或船舶能安全抵达并始终浮泊的附近地点,装载第12栏所列的货物,满舱满载,(如协议装运甲板货,则由承租人承担风险。)(承租人应提供所有垫船用席子和/或木料及所需隔板。如经要求,船舶所有人准许使用船上任何垫舱木料。)承租人约束自己装运该货,船舶经此装载后,应驶往第11栏所列的,在签发提单时指定的卸货港口或地点,或船舶能安全抵达并始终浮泊的附近地点,交付货物 2. Owners' Responsibility Clause The Owners are to be responsible for loss of or damage to the goods or for delay in delivery of the goods only in case the loss, damage or delay has been caused by personal want of due diligence on the part of the Owners or their Manager to make the Vessel in all respects seaworthy and to secure that she is properly manned, equipped and supplied, or by the personal act or default of the Owners or their Manager. And the Owners are not responsible for loss, damage or delay arising from any other cause whatsoever, even from the neglect or default of the Master or crew or some other person employed by the Owners on board or ashore for whose acts they would, but for this Clause, be responsible, or from unseaworthiness of the Vessel on loading or commencement of the voyage or at any time whatsoever. 2.船舶所有人责任条款 船舶所有人对货物的灭失、损坏或延迟交付的责任限于造成灭失损坏或延迟的原因是由于船舶

常见的合同通用条款中英文对照

常见的合同通用条款 GENERAL TERMS AND CONDITIONS OF CONTRACT DATED日期 CONTRACT NAME合同名称 by and between合同双方 PARTY A NAME PARTY A甲方名称 and与 PARTY B NAME PARTY B乙方名称 TABLE OF CONTENT PRELIMINARY STATEMENT前言 1. DEFINITIONS定义 2. [OPERATIVE CLAUSES] 具体操作条款 3. CONDITIONS PRECEDENT如有必要,根据交易具体情况设定相应先决条件 4. REPRESENTATIONS AND WARRANTIES 陈述和担保[保证] 5. TERM合同期限 6. TERMINATION合同终止 7. CONFIDENTIALITY保密义务

8. BREACH OF CONTRACT违约 9. FORCE MAJEURE不可抗力 10. SETTLEMENT OF DISPUTES争议的解决 11. APPLICABLE LAW 适用法律 12. MISCELLANEOUS PROVISIONS其他规定 THIS CONTRACT(“Contract”)is made in [city and province], China on this day of ,200 by and between [Party A name],[Party A entity form] established and existing under the laws of China, with its legal address at [address] (hereinafter referred to as “Party A”), and [Party B name], [Party B entity form] organized and existing under the laws of [Party Bjurisdiction of incoporation] with its legal address at [address] (hereinafter referred to as “Party B”). Party A and Party B shall hereinafter be referred to individually as a “Party ” and collectively as the “Parties”. 本合同于年月日由以下两方在[地点]签订: [甲方名称],一家根据中华人民共和国法律组建及存续的[甲方组织形式],法定地址为[甲方法定地址](以下简称“甲方”): [乙方名称],一家根据[乙方所在国]法律组建及存续的[乙方组织形式],法定地址为[乙方法定地址](以下简称“乙方”)。 甲乙双方以下单独称为“一方”,合称为“双方”。 PRELIMINARY STATEMENT 前言 [add background information if appropriate][视交易具体情况决定是否应介绍合同背景] After friendly consultations conducted in accordance with the principles of equality and mutual benefit, the Parties have agreed to [describe subject matter of the Contract] in accordance with Applicable laws and the provisions of this Contract. 双方本着平等互利的原则,经友好协商,依照[相关法律名称]以及其他有关法律,同意按

出口商品买卖合同样本(中英文对照)

qwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiop asdfghjklzxcvbnmqwertyuiopasdfghjk lzxcvbnmqwertyuiopasdfghjklzxcvbn mqwertyuiopasdfghjklzxcvbnmqwert yuiopasdfghjklzxcvbnmqwertyuiopas dfghjklzxcvbnmqwertyuiopasdfghjklz xcvbnmqwertyuiopasdfghjklzxcvbnm qwertyuiopasdfghjklzxcvbnmqwertyu iopasdfghjklzxcvbnmqwertyuiopasdfg hjklzxcvbnmqwertyuiopasdfghjklzxcv bnmqwertyuiopasdfghjklzxcvbnmqw 出口商品买卖合同样本(中英文对照) ertyuiopasdfghjklzxcvbnmqwertyuiop asdfghjklzxcvbnmqwertyuiopasdfghjk lzxcvbnmrtyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiop asdfghjklzxcvbnmqwertyuiopasdfghjk lzxcvbnmqwertyuiopasdfghjklzxcvbn mqwertyuiopasdfghjklzxcvbnmqwert yuiopasdfghjklzxcvbnmqwertyuiopas dfghjklzxcvbnmqwertyuiopasdfghjklz xcvbnmqwertyuiopasdfghjklzxcvbnm qwertyuiopasdfghjklzxcvbnmqwertyu iopasdfghjklzxcvbnmqwertyuiopasdfg hjklzxcvbnmrtyuiopasdfghjklzxcvbnm qwertyuiopasdfghjklzxcvbnmqwertyu iopasdfghjklzxcvbnmqwertyuiopasdfg hjklzxcvbnmqwertyuiopasdfghjklzxcv bnmqwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiop asdfghjklzxcvbnmqwertyuiopasdfghjk lzxcvbnmqwertyuiopasdfghjklzxcvbn mqwertyuiopasdfghjklzxcvbnmqwert yuiopasdfghjklzxcvbnmqwertyuiopas dfghjklzxcvbnmrtyuiopasdfghjklzxcvb

金康合同中英对照

1. Shipbroker 船舶经纪人 2. Place and date 签约日期和地点 3. Own ers/Place of bus in ess (Cl. 1) 船东/营业地(第一条) 4. Charterers/Place of busi ness (Cl. 1) 租船人/营业地(第一条) 5. Vessel's name (Cl. 1) 船名(第一条) 6. GT/NT (Cl. 1) 总吨/净吨(第一条) 7. DWT all told on summer load line in metric tons (abt.) (Cl. 1) 按夏季载重线确定的全部载重公吨数(大约)(第1条) 8. Prese nt positio n (Cl. 1) 船舶动态(第一条) 9. Expected ready to load (abt.) (Cl. 1) 预计作好装货准备的日期(大约) (第1条) 10. Loadi ng port or place (Cl. 1) 装货港或者装货地点(第一条) 11. Discharg ing port or place (Cl. 1) 卸货港或者卸货地点(第一条)

12. Cargo (also state qua ntity and margin in Own ers' opti on, if agreed; if full and complete cargo not agreed state "part cargo") (Cl. 1) 货物(同时载明数量和约定的所有人可选择的围,如未约定满舱满载货 物,载明“部分货物”)(第1条) 13. Freight rate (also state whether freight prepaid or payable on delivery) (Cl. 4) 运费率(同时载明运费预付还是到付)(第4条) 14. Freight payme nt (state curre ncy and method of payme nt; also ben eficiary and bank accou nt) (Cl. 4) 运费的支付(载明货币名称与支付式,以及受益人和银行帐号)(第4条) 15. State if vessel's cargo han dli ng gear shall not be used (Cl. 5) 载明是否不使用船上的货物装卸设备(第5条) 16. Laytime (if separate laytime for load. and disch. is agreed, fill in a) and b). If total laytime for load. and disch., fill in c) only) (Cl. 6) 装卸时间(如约定装货和卸货的各自的时间,填入a)和b);如按装货和卸货的合计时间 ,仅填入c))(第6条) a) Laytime for loadi ng 装货时间 b) Laytime for discharg ing 卸货时间 c) Total laytime for load ing and discharg ing 装货和卸货的合计时间

外贸销售合同中英文对照(1)

可编辑可修改,欢迎下载 销售合同 SALES CONTRACT 卖方: The Seller : Add 买方(The Buyer): Add: 经双方确认订立本合同,具体条款如下: This sales contract is made out as per the following terms and conditions mutually confirmed by both parties: (5) 交货日期及运输方式 : Time of delivery: within 30days after the deposit, four containers each month. Mode of transportation : shipping from SHENZHEN CHINA to INCHEON KOREA (6) 装运标记 : Shipping marks: N/M (7) 装运口岸 : ( 8) 目的口岸 : Port of loading: Shenzhen, China port Port of destination: Incheon port, Korea (9) 付款条件: (10) 包装:Packing Payment: 30% T/T in advance and balance payable against the copy of BL. Four containers each month. 备注:买方应根据卖方公司账户进行付款;如买方款项付到其它任何账户,卖方不承担任何责任。 Note: Buyer shall make a payment based on the seller ’s account, if the buyer any amount paid to the other account, the seller does not bear any responsibility . (11) 附加条款:(本合同其他条款如与本附加条款有抵触时,以本附加条款为准。)

(完整版)商品买卖合同(中英文对照)

商品买卖合同 合同编号(Contract ):NO Goods Sales Contract 买 方(Buyer): 营业执照号码(身份证号) Business License No.(ID No.): 卖 方(Seller): 营业执照号码Business License No.: 签订时间Signing date : 签订地点Signing place : 经双方协商同意,按照<<中华人民共和国合同法>>,签订本合同,并严格遵守履行。 一、标的、金额 the subject and amount 买方向卖方购买如下商品: 货 号 Item No 商 品 名 称 Description 型 号(规格)Mode l No.(specification)) 数 量 Quantity 单 位 Unit 单 价 Unit price 金 额A mount 备 注Rem arks 合计人民币金额(大 写): 佰 拾 万 仟 佰 拾 元整 (空格不够,可附页。凭样定货的,双方可另附约定。) 二、交提(货)日期 Goods delivery date or delivery time 交提(货)时间: 年 月 日,卖方经买方同意,可提前供货。 三、交提(货)地点 Goods delivery place : 。 四、交提(货)方式 Means of goods delivery :第 种 1.卖方送货 2.卖方代运3.买方自提4.其他 。买方收货时,由收货员签字,在送货单上加盖公章或收货专用章。 五、 商品质量(标准)The commodity quality (standard):第 种1.国家标准2.行业标准3.企业标准4、样品标准5、双方另行约定 。凭样交货的商品,应与双方确认的样品及其说明的质量相同,样品应当由双方签章封样保存。如对商品有特殊要求的,可另行约定。合格率低于 ℅为该批商品不合格,买方有权拒收。 六、商品验收Goods inspection and acceptance 验收时间:第 种1.当场验收2. 交货日前 天内验收3.交货后 天内验收。验收方法:第 种1.逐件2.抽样3.其他

外贸合同中英文对照

S ALES CONTRA C T NOo : BS0812 5 DATE: NOV. 6 , 2008 THE S ELLER: BLUE SKY INTE R NATI0 NAL TRADING CO o ,LTD ? 118# 5TH NORTH RI NG ROAD, BE I GINQ P.R. CHINA THE BUYER: STAR CORPORATION 5 KINGROA D DU BAI, UAE T h i s C o ntra c t is made by and b e tw e e n the Buyer and S e llei; wh e reby the Buy e r agree to bu y and the Seller a gree to sell the un d ermen tioned c ommodity a c c ording to t lie term s a nd co n ditions st i pulat e d b e 1 o w 数量和金额可以上下浮动5% P A C K I NG: 2 0 piece s of Baby B 1 anke t s a r e p acked i n one

expo r t sta n dar d c a rt o n, solid co 1 or and s ize i n the s a me c a r ton. 包装:2 0条童毯被装进-项输出品标准硬纸盒、一样颜色利尺寸的装在相同的硬纸盒。 MAR KS: Shipping m a rk i n c 1 udes S TAR ,S/C No。,sty 1 e No o , port o f des tina t ion and c a r t on N o .陵头:运输吱头包括S TA R (公司名)、合同(sal e s contract)号码,款式号码,目的港和纸箱号码 Side mark m u st s how the co 1 o r t the s i ze of c a rton and p i ece s p e r carto n ? 侧唆头必须显示纸箱颜色,规格和每箱(童毯)条数 T I ME OF SHIPMENT:装运期 Wi t liin 60daysupon receip t o f the L / C wh i c h acc ord with relevant c buses o ft h i s Contract。收到符合合同的信用证^六十天内 POR T OF LOADI NG AND DESTINAT I ON:FromTianj i n, Chi nato Dub a i, UAE 装运港目的港 T r an s shipment i s all owed an d p artial shipme nt i s pro h i b i te d o 转运被允许,而且分批装运被禁止. IN S URANCE: To beeffecte d b y the Sei 1 e r for 1 1 0% o f inv o i c e value c ov e r in g Al 1 Ris k s and War Risk s a s p er CIC o f PICC d ated 01/01/1981.保险:卖方按合同金额的110%投保包含的一切险和战争险依照1981年的P I CC规则的CIC条约。 TERMS OF PAYMENT: By irrev o c able Let t er of Cre d i t at 60 d ay s a f t er s igh t, reaching the S e 1 1 er not 1 a te r t han Nov.30, 200 8 an d rem a in i ng v a li d f or n e gotiation in Ch i n a fo r f ur t her 15 days after th e a ffected s hipment o I n c a se of late ar r i v al of the L/C, the Se 1 1 er s hall not be liable for any d e lay i n ship me n t and shall ha v e the right t o res c i n d the c o ntra c t and / o r c 1 aim for damages0付款期限:不可撤销信用证,见票后6 0天付款.卖方收到信用证不得晚于08年月30号.偿付通知议付在中国装船后15天内提交单据,如果信用证迟到,卖方将不负责装船中的任何延迟而且将有权利废止合同和I或损害要求(赔偿)。 DOCUMENTS:文件 +Si g n e d invoice i n t r ipli cate, one or i g i nal o f w hicli s lioul d b e c ertifiedby Chamber of Com mere e o r CCPIT an d legalize d b y UAE em b ass y/co n su 1 ate in sei 1 er's country ? +签署的单据一式三份,一份正本应该被商会或CC PIT (贸促会)检定而且在卖方的国家被阿拉伯联合大公国大使馆I领事法律上认为正当。 +Ful 1 set (3/3) of c 1 ean on board o cean b i 11 o f lading ma r k e d <4fr e ight pr e paid" made out t o orde r blank en d o r sed n o t i fying th e app 1 icant. +全套(3 I 3)清洁海运提单标记"船货预付”空白抬头提单通知申请人。 +In s u r a n ce polic y i n dup lica te end o r s ed in b 1 a nk. +保险单一式两份空白背书。 +P a c k ing list i n t r i p 1 i c ate o +包装目录一式三份 + Cer t if i c at e of ori g in c erti f i e d by Cham b er of C o mmerce o r C CP I T and 1 e ga 1 i zed by U AE em b as s y/consulate in s e lie r "s countr y ?

船舶买卖合同(中英文对照版)

船舶买卖合同翻译(范文) marks2008 SHIPBUILDING CONTRACT 船舶建造合同 DATE: BUYER: ************* (HERE AFTER CALLED “THE PARTY A”) 船东:**************(以下简称甲方) ADD/地址:******************** BULDER:*************** (HERE AFTER CALLED “THE PARTY B”) 船厂:*****************(以下简称乙方) ADD/地址: IMPORT & EXPORT AGENCY: ****************(HERE AFTER CALLED “THE PARTY C”) AS THE AGENCY OF THE SHIPYARD 进出口代理方:****************(以下简称丙方)作为************的出口代理方

ADD/地址:************************ THIS AGREEMENT IS MADE BY BOTH ******AND ********。WHEREAS, THE PARTY A DESIRES TO BUILD A ZC CLASS BULK CARRIER VESSELS OF ****TON (HERE IN AFTER CALLED “THE SHIP”) IN CHINA AND ENTRUSTS THE CONSTRUCTION TO THE PARTY B AGREES TO UNDERTAKE THE CONSTRUCTION OF THE SHIP. :******因为公司发展需要,委托********建造一艘ZC级****吨散货船1艘,经过双方友好协商,达成如下共识。特签订如下船舶建造合同,以资双方共同遵守: 1.SHIP BUILDING CONTENT 工程内容: THE SHIP SHALL BE USED BOTH AS A ZC LEVELS ****TON BULK CARRIER BASED ON THE DIMENSION AS SHOWN BELOW: 甲方委托乙方建造一艘ZC级****T散货船1艘,每台主尺度如下: LOA: M 总长:米 BREADTH: M 型宽:米 DEPTH:

对外贸易合同中英文对照完整版

对外贸易合同中英文对照 完整版 In the legal cooperation, the legitimate rights and obligations of all parties can be guaranteed. In case of disputes, we can protect our own rights and interests through legal channels to achieve the effect of stopping the loss or minimizing the loss. 【适用合作签约/约束责任/违约追究/维护权益等场景】 甲方:________________________ 乙方:________________________ 签订时间:________________________ 签订地点:________________________

对外贸易合同中英文对照完整版 下载说明:本合同资料适合用于合法的合作里保障合作多方的合法权利和指明责任义务,一旦发生纠纷,可以通过法律途径来保护自己的权益,实现停止损失或把损失降到最低的效果。可直接应用日常文档制作,也可以根据实际需要对其进行修改。 合同编号:__________ 签订日期:__________ 签订地点:__________ 电话:_____________ 传真:_____________ 电报:_____________ 电传:_____________ 电话:_____________ 传真:_____________ 电报:______________ 电传:______________

中英文对照版合同翻译样本

1.Sales Agreement The agreement, (is) made in Beijing this eighth day of August 1993 by ABC Trading Co., Ltd., a Chinese Corporation having its registered office at Beijing, the People’ Repubic of China (hereinafter called “Seller”) and International Trading Co., Ltd., a New York Corporation having its registered office at New York, N.Y., U.S.A. (hereinafter called “Buyer”). 2.WITNESSETH WHEREAS, Seller is engaged in dealing of (product) and desires to sell (product)to Buyer, and WHEREAS, Buyer desires to purchase(product) from Sellers, Now, THEREFORE, it is agreed as follows: 3.Export Contract th This Contract is entered into this 5 day of August 1993 between ABC and Trading Co., Ltd. (hereinafter called “Seller”) who agrees to sell, and XYZ Trading Co., Ltd. (hereinafter called “Buyer”) who agrees to buy the following goods on the following terms and condition. 4.Non-Governmental Trading Agreement No. __ This Agreement was made on the_day of_ 19_, BETWEEN _(hereinafter referred to as the Seller) as the one Side and _ (hereinafter referred to as the Buyer) as the one other Side. WHEREAS, the

出口商品买卖合同(中英文对照)

编号:YB-HT-011138 出口商品买卖合同(中英 Contract for the sale of export 甲方: 乙方: 签订日期:年月日 文档中文字均可自行修改 编订:YunBo Network

出口商品买卖合同(中英文对照) 出口商品买卖合同(中英文对照) 编号No._____________ 中国CHINA C.I.F./C.&F. 合同格式 C.I.F./C.&F.From 买受人:______________出卖人:________________ Buyer:______________Seller:________________ 地址:______________地址:________________ Adress:______________Adress:________________ 电挂:______________电挂:________________ Cable:______________Cable:________________

电传:______________电传:________________ Telex:______________Telex:________________ 上述买卖双方按照下列条件于____年____月____日签订合同。 TheSellerandtheBuyerabovenamedhavethis____dayof________ _________enteredintothisContractonthefollowingtermsandc onditions. 1.货物 COMMODITY: 序号 ItemNo. 单位 Description 单价 Unit

金康合同中英文版

“Gencon” Charter (As Revised 1922,1976 and 1994) 1. It is agreed between the party mentioned in Box 3 as the Owners of the Vessel named in Box 5, of the GT/NT indicated in Box 6 and carrying about the number of metric tons of deadweight capacity all told on summer loadline stated in Box 7, now in position as stated in Box 8 and expected ready to load under this Charter Party about the date indicated in Box 9, and the party mentioned as the Charterers in Box 4 that: The said Vessel shall, as soon as her prior commitments have been completed, proceed to the loading port(s) or place(s) stated in Box 10 or so near thereto as she may safely get and lie always afloat, and there load a full and complete cargo (if shipment of deck cargo agreed same to be at the Charterers' risk and responsibility) as stated in Box 12, which the Charterers bind themselves to ship, and being so loaded the Vessel shall proceed to the discharging port(s) or place(s) stated in Box 11 as ordered on signing Bills of Lading, or so near thereto as she may safely get and lie always afloat, and there deliver the cargo. 1.兹由第3栏所列的下述船舶所有人与第4栏所指的承租人,双方协议如下:上述船舶一旦完成前个合同,应驶往第10栏所列的装货港口或地点,或船舶能安全抵达并始终浮泊的附近地点,装载第12栏所列的货物,满舱满载,(如协议装运甲板货,则由承租人承担风险。)(承租人应提供所有垫船用席子和/或木料及所需隔板。如经要求,船舶所有人准许使用船上任何垫舱木料。)承租人约束自己装运该货,船舶经此装载后,应驶往第11栏所列的,在签发提单时指定的卸货港口或地点,或船舶能安全抵达并始终浮泊的附近地点,交付货物。 2. Owners' Responsibility Clause The Owners are to be responsible for loss of or damage to the goods or for delay in delivery of the goods only in case the loss, damage or delay has been caused by personal want of due diligence on the part of the Owners or their Manager to make the Vessel in all respects seaworthy and to secure that she is properly manned, equipped and supplied, or by the personal act or default of the Owners or their Manager. And the Owners are not responsible for loss, damage or delay arising from any other cause whatsoever, even from the neglect or default of the Master or crew or some other person employed by the Owners on board or ashore for whose acts they would, but for this Clause, be responsible, or from unseaworthiness of the Vessel on loading or commencement of the voyage or at any time whatsoever. 2.船舶所有人责任条款 船舶所有人对货物的灭失、损坏或延迟交付的责任限于造成灭失损坏或延迟的原因是由于船

买卖合同(中英文对照)

买卖合同(中英文对照) (供出口合同用) C.I.F./C.&F.编号NO. 合同格式 C.I.F./C.&F.Form 中国 China 买受人:出卖人: Buyer: 地址:地址: Address:Address: 电挂:电挂: Cable:Cable: 电传:电传: Telex:Telex: 上述买卖双方按照下列条件于______年______月______日签订合同 The Seller and the Buyer above named have this ____ dayof ____ ____. entered into this Contract on the follow ingterms and conditions. 1.货物: COMMODITY: 2.合同总价: TOTAL CONTRACT V ALUE: 3.包装: PACKING: 4.保险:□根据中国人民保险公司保险条款按发票金额110% INSURANCE:投保综合险。 Covering All Risks for 110% of the invoice value as perInsurance: Policy of People's Insurance Company of Ch i-na (P. I. C. C. ) □由买方自理。 To be affected by the Buyer. 5.运输标志: SHIPPING MARKS: 6.装运港: INTENDED PORT(S) OF SHIPMENT: 7.目的港: PORT OF DESTINATION: 8.装运期: SHIPMENT PERIOD: 9.付款条件: TERMS OF PAYMENT: □合同货款应由买方通过卖方可接受的银行,按合同总价开出以卖方为受益人的、无追索权、保兑、不可撤销、可转让、可分批装运、可转船的信用证支付。凭______即期汇票在提示第十条所列装运单据时付款。该信用证最迟应于装运期开始前______天开到卖方,而且在装运期结束后15天内仍能在中国有效议付。若买方未能履行上述义务,根据卖方的选择,可终止本合同,或接受本合同的部分或全部,或就由此而发生的任何损失提出索赔。 Payment hereunder shall be made by confirmed; irrevocable andtransferable without recourse letter of credit in favour of the sell-er for the total contract value opened by a bank acceptable to theSeller permitting part shipme

相关文档
最新文档