WZ12-8 Commissioning Progress
福克直接替代汽车悬挂器说明书

DIRECT-REPLACEMENTINSTALLATION GUIDEDODGE RAM 2500/3500RAM 2500/3500DODGE RAM 2500/3500 (2008-2010)983-02-147 - 2.0 FACTORY RACE SERIES ATS Stabilizer 985-02-131 - 2.0 PERFORMANCE SERIES TS Stabilizer RAM 2500/3500 (2011-2013)983-02-147 - 2.0 FACTORY RACE SERIES ATS Stabilizer 985-02-131 - 2.0 PERFORMANCE SERIES TS Stabilizer605-01-131 REV BCONTENTSINTRODUCTION 1SUPPLIED PART S2DIAGRAM 3 SHOCKSAFETY INSTRUCTIONS 4INSTALLATION GUIDELINES 5STABILIZER SHOCK INSTALLATION 6WARRANTY INFORMATION 8SHOCKS NEED LOVE TOO 9Thank you for choosing FOX direct-replacement, shocks for your vehicle. FOX products are designed, tested, and manufactured by the finest professionals in the industry.FOX recommends that you become completely familiar with the handling characteristics of your modified vehicle before operating it under rigorous conditions, helping to avoid potential rollover situations and other loss of control events. FOX further recommends that you use appropriate protective equipment at all times when operating your vehicle.To achieve the best performance and product longevity, periodic service and maintenance is required. Please refer to the Service and Upgrades section for more information.• Mounting Hardware • Steering Stabilizer •Installation ManualINTRODUCTIONIN THE BOXSUPPLIED PARTS*Hardware Reference is used throughout the installation manual to provide notation of the supplied kit.SHOCK ASSEMBLYFOX PN DESCRIPTION QTY NOTES 983-02-147ATS STEERING STABILIZER 1Dodge RAM 2500/3500(2008-2010)RAM 2500/3500(2011-2013)985-02-129TS STEERING STABILIZER1MOUNTING HARDWEARFOX PN DESCRIPTION *HARDWARE REF.QTYNOTES 026-01-104-1TIE ROD CLAMP TOP A11Clamp mounts the stabilizer to the track bar of thevehicle.026-01-104-2TIE ROD CLAMP BOTTOM A21018-02-046SCREW: 1/4”-20 X 1.25”A34The tie rod clamp uses 4 screws.SHOCK DIAGRAM13721010996618444455PART PART 1Eyelet6Shock Body2Reservior Bridge7Schrader Valve3Reservoir8Adjuster Screw4Wiper Seal9Pinch Bolt5Shaft10Tie Rod Clamp ATS STABILIZERTS STABILIZERSAFETY INSTRUCTIONS• FOX direct-replacement shocks are designed to fit and allow proper clearance with the factory suspension. If aftermarket suspension components are installed it is the customers responsibility to ensure that at full cycle the suspension clears the FOX shocks.• FOX direct-replacement shocks should always be installed as a set for maximum performance.• Proper installation and service procedures are essential for the safe and reliable operation of the suspension components, requiring the experience and tools specially designed for this purpose.Installation and maintenance procedures for this product must be performed by a qualified service technician, to avoid potentially unsafe vehicle handling characteristics, which may result in SERIOUS INJURY or DEATH.• Modifying your vehicle’s suspension will change the handling characteristics of your vehicle. Under certain conditions, your modified vehicle may be more susceptible to loss of control or rollover, which can result in SERIOUS INJURY or DEATH. Thoroughly familiarize yourself with the modified vehicle handling characteristics before any rigorous vehicle operation. Wear protective body gear and a helmet when appropriate. Installation of vehicle roll bars or cage is highly recommended.• FOX direct-replacement shocks are gas-charged and are highly pressurized. Placing shocks in a vise or clamp, applying heat, or attempting to open or service the shock without the proper tools and training can result in SERIOUS INJURY or DEATH. Do not attempt to modify, puncture or incinerate a FOX direct-replacement shock absorber.• Any attempt to misuse, misapply, modify, or tamper with any FOX product voids any warranty and may result in SERIOUS INJURY or DEATH.INSTALLATION GUIDELINES• Always use a chassis lift for the installation of shocks, and make certain that the raised vehicle is securely attached to the lift to prevent the vehicle from slipping, falling, or moving during theinstallation process.• DO NOT install any FOX product without the necessary special tools, expertise and chassis lift or you will subject yourself to the risk of SERIOUS INJURY or DEATH. If you elect to not use a chassis lift(which may result in SERIOUS INJURY or DEATH), ensure that the vehicle is: (1) on level ground, (2) that all tires on the ground during installation are blocked to prevent vehicle movement, (3) that at least two tires are on the ground at all times, and (4) that adequately secured jack stands are used to support the vehicle. NEVER get under the vehicle until you have checked to ensure that the vehicle will be stable during installation.• FOX direct-replacement shocks are designed to fit your vehicle’s shock mounts without modification except the reservoir placement on specific models and applications.NOTICE: Medium-strength thread-lock is recommended on all bolts.1. Please read the INSTALLATION GUIDELINES on page 5 for instructions on how to properly lift and secure the vehicle.NOTICE: Ensure vehicle is at full droop during installation.2. Remove the stock steering stabilizer and tie rod bracket.STOCK STABILIZER REMOVAL• Manufacturer Torque Specs • Torque Wrench•Medium-Strength Thread-LockTOOLS REQUIREDSTABILIZER SHOCK INSTALLATIONFOX STABILIZER INSTALLATION3. Install eyelet end of stabilizer in stock location with adjuster screw pointed down. Torque bolt to 60 ft-lb.4. Compress the stabilizer so 1/4” of shaft isexposed between the eyelet and the body. For ATS models, turning the adjuster screw on the eyelet fully counter clockwise will make compressing the stabilizer easier (Fig. 1).5. Turn the vehicle’s wheels completely to the rightso they rest against the steering stops.Fig. 1: Eyelet installed with 1/4” of shaft exposed.6. Loosely mount the Group A clamp to track bar with the Group A fasteners (Fig. 2).Fig. 2: Loosely mount the stabilizer to the track bar.7. Orient the stabilizer to avoid interference with any parts of the vehicle (suspension, driveline, engine, etc.) through the entire range of steering and suspension travel.8. If interference issues exist and cannot be resolved by rotating the tie rod clamp, rotate the stabilizer reservoir. Loosen pinch bolt on L-bracket between stabilizer clamp to rotate reservoir. Torque pinch bolt to 12 lb-ft.9. With the wheels turned fully to the right and 1/4” of shaft exposed on the stabilizer, tighten Group A clamp bolts to 12 lb-ft.CHECK AND FINAL DETAILS10. Check that the vehicle steers completely in both directions and is limited by the steering stops, not the stabilizer.11. Place vehicle on the ground and check that the steering stabilizer does not interfere with anything (suspension, driveline, engine, etc.) through entire range of steering and suspension travel.NOTICE: If after installing the steering stabilizer a vehicle lift is added or maintenance is performed requiring the removal of the stabilizer (such as a wheel alignment), you must re-mount the tie rod clamp at the vehicle’s new full droop height. Use the same steps outlined above to complete the clamp re-mount.FOX Factory, Inc., a Georgia corporation having an office at 6634 Highway 53 Braselton, GA 30517 (“FOX”),makes the following LIMITED WARRANTY with respect to its suspension products:LIMITED ONE (1) YEAR WARRANTY ON SUSPENSION PRODUCTS.Subject to the limitations, terms and conditions hereof, FOX warrants, to the original retail owner of each new FOX suspension product, that the FOX suspension product, when new, is free from defects in materials and workmanship. Unless otherwise required by law, this warranty expires one (1) year from the date of the original FOX suspension product retail purchase from an authorized FOX dealer or from a FOX authorized Original Equipment Manufacturer where FOX suspension is included as original equipment on a purchased vehicle. If law requires a warranty duration of greater than one (1) year, then, subject to the other provisions hereof, this warranty will expire at the end of the minimum warranty period required by such law.This warranty is conditioned on the FOX suspension product being operated under normal conditions and properly maintained as specified by FOX. This warranty is only applicable to FOX suspensions purchased new from an authorized FOX source and is made only to the original retail owner of the new FOX suspension product and is not transferable to subsequent owners. This warranty is void if the FOX suspension product is subjected to abuse, neglect, improper or unauthorized repair, improper orunauthorized service or maintenance, alteration, modification, accident or other abnormal, excessive, or improper use.Should it be determined by FOX in its sole and final discretion, that a FOX suspension product is covered by this warranty, it will be repaired or replaced, by a comparable model, at FOX’s sole option, which will be conclusive and binding. THIS IS THE EXCLUSIVE REMEDY UNDER THIS WARRANTY. ANY AND ALL OTHER REMEDIES AND DAMAGES THAT MAY OTHERWISE BE APPLICABLE ARE EXCLUDED, INCLUDING, BUT NOT LIMITED TO, INCIDENTAL OR CONSEQUENTIAL DAMAGES OR PUNITIVE DAMAGES.This limited warranty does not apply to normal wear and tear, malfunctions or failures that result fromabuse, improper assembly, neglect, alteration, improper maintenance, crash, misuse or collision. This limited warranty gives the consumer specific legal rights. The consumer may also have other legal rights which vary from state to state or country to country. Some states and countries do not allow the exclusion orlimitation of incidental or consequential damages or warranties, and if dictated by law the above limitations or exclusions may not apply to you. If it is determined by a court of competent jurisdiction that a certain provision of this limited warranty does not apply, such determination shall not affect any other provision of this limited warranty and all other provisions shall remain in full effect.THIS IS THE ONLY WARRANTY MADE BY FOX ON ITS SUSPENSION PRODUCTS AND COMPONENTS, AND THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION HEREIN. ANY WARRANTIES THAT MAY OTHERWISE BE IMPLIED BY LAW INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ARE EXCLUDED.WARRANTY INFORMATIONFOX LIMITED WARRANTYTERMS OF WARRANTYFOX SERVICE AND UPGRADESCOMPLETE SERVICES SERVICE MENUS AND PRICING HAVE YOUR FOX SHOCKS SERVICED BY FOX TECHNICIANS. CALL OUR OFF-ROAD AND TRUCK SERVICE CENTER AT 619.768.1800 TO GO OVER THE SERVICE AND UPGRADE OPTIONS AVAILABLE FOR YOUR PROD-UCT. ONCE YOU’VE SETUP YOUR SERVICE AND/OR UPGRADES YOU WILL RECEIVE A RETURN AUTHORIZATION NUMBER AND SHIPPING INSTRUCTIONS.100% street use: every 50,000 miles 50% street/ 50% off-road use: Every 10,000 milesvisit /service。
美国标准双杆螺纹泥浆泵产品说明书

Spec U.S. Standard Type:duplex Minimum Piston Diameter:2½"Maximum Piston Diameter:5"Stroke length:10"Maximum Working Pressure:1,800 PSIRod/Piston Load:13100lb Gallons per Minute:234.0Barrels per Day:8023Brake Horse Power:119.1Gaso, 1740, Duplex, Piston Pump (Mud Pump)Pumps in this series1740174117421743SpecsPump CurvesHover over Power Curves to reveal RPM and GPMPerformance Data Table40 RPM 62.3 HP45 RPM 70.1 HP50 RPM 77.8 HP55 RPM 85.6 HP60 RPM 93.4 HP65 RPM 101.2 HP 70 RPM 109.0 HP 75 RPM 116.8 HP 80 RPM 124.5 HP 85 RPM 132.3 HP 90 RPM 140.1 HP 95 RPM147.9 HP501001502002503005" DIA. — 667 MAX. P.S.I.4¾" DIA. — 739 MAX. P.S.I.4½" DIA. — 824 MAX. P.S.I.4¼" DIA. — 923 MAX. P.S.I.4" DIA. — 1042 MAX. P.S.I.3¾" DIA. — 1186 MAX.P.S.I.3½" DIA. — 1362 MAX.P.S.I.3¼" DIA. — 1579 MAX.P.S.I.3" DIA. — 1800 MAX. P.S.I.2¾" DIA. — 1800 MAX.P.S.I.2½" DIA. — 1800 MAX.P.S.I.Phone:IEQ Industries Ltd PO Box 230097Grand Rapids, MI 49523800.544.9053 |616.452.6882Features/BenefitsGASO DUPLEX PISTON PUMPSRatings published here in are intended to be used only for preliminary planning purposes, and as such carried no warranties whatsoever. All applications for gas opines must be approved in writing. THE INFORMATION CONTAINED HERE IS TRANSCRIBED FROM A GASO TECHNICAL MANUAL FROM THE 1960’S - 70’S. IEQ INDUSTRIES OR THE CUSTODIANS OF THIS WEBSITE ARE NOT RESPONSIBLE FOR ITS CONTENT.Power End SpecificationsPower Frame. High-strength gray iron alloy casting with heavy wall sections, well ribbed to ensure rigid construction and design to fully enclose all working parts.Gears. Continuous to Sykes herringbone construction. Main gear is heat treated high-grade ductile iron. Pinion gear is cut from forged alloy steel and hardened.Crankshaft. Have a center section for mounting main gear. Large diameter crank pinsPinion Shaft. Alloy steel bar stock, machine and precision ground.Bearings. Heavy duty tapered roller bearings on crankshaft. Self-contained double roll bearings on pinion shaft to permit free floating of shaft for self centering of peers.Connecting Rods. Heavy cross section castings with renewable Babbitt lined steel shell bearings and crank and; bronze bushing in cross head end. Lubrication. All power and parts including gears, cross heads, connecting rod bearings, crankshaft bearings and pinion crank shaft bearings, are lubricated by splash system from lubricant in crankcase reservoir.Fluid End SpecificationsPower Frame. Alloys stocked are Molybdenum’s cast iron and cast steel. Fluid ounce can be trimmed out for pumping various liquids. Ductile iron can be furnished upon request.Cylinder Heads. Heavy section alloy casting to match material of pump fluid body.Valve Covers. Heavy section alloy casting to match material of pump fluid body.Liners. All pumps are available with interchangeable pipe liners. Standard materials available are Molybdenums alloyed iron, file hard steel and special corrosion resistant liners.Piston Rods. Various rod materials are available. These are: steel, bronze, stainless steel, file hard steel, and chrome plated steel.Pistons. Molly–iron and bronze bodies fitted with various types of rings or cups are available.slush service pistons can also be furnished.Valves. Valves and seats are available as follows: hardened and ground steel wing guided, bronze wing guided, steal or bronze insert type, direct blood valves for use on cast iron or bronze seats. McClatchie and mission can also be furnished.Stuffing Boxes. All duplex pumps are furnished with replaceable type stuffing boxes which are available in cast iron and bronze.Packing. Standard packing is a set of lip–type packing rings. Other packings can be furnished for special applications.Stuffing Box Lubrication. Furnished by use of regulated flow of oil from a force-feed lubricate or mounted on the pump, with a separate oil line to each stuffing box.Disclaimer IThis website is intended as a reference tool only. It has been constructed from published data that is based on manufacturer's sales and engineering documents that are either current, historical and obsolete. Much of the machinery data contained herein has been re-rated through the years with different engineering criteria which maybe in conflict with legacy data. Much of the content published here is calculated online with the use of dynamic data using formulas and extrapolations considered to be sound engineering formulas and are correct to the degree that the data used is accurate. We have done our best to be as precise as as possible in this posting but do not represent any of the calculations or performance data to be entirely accurate. The data published here is intended to be general information rather than actual and to serve as a reference rather than a technical absolute. The user of such data should confirm such information independently.Copyright and Disclaimers is your resource for Gaso pumps, Gaso pump parts and a supplier of ORIGINAL GASO PARTS and equipment, new used and remanufactured Wheatley, GASO andWheatley/GASO plunger and piston pumps and pump parts and is not affiliated with Wheatley/GASO Inc. or its parent company, National Oilwell Varco,p Copyright ©2017, IntelleQ Holdings, LLC. All rights reserved, *Used under license from IntelleQ Holdings, LLC.。
Volvo 重型卡车轴距和尺寸说明.pdf_1702094628.413504说明书

Important NotesChassis DimensionsCab Height: +39 mm for CAB-CRW.Front Axle to Back of Cab: +1186 mm for CAB-CRW, +237 mm for CAB-SSLP. D-measure includes a front clearance of 50 mm and for rigid trucks also a subframe of 120 mm.Height can vary ± 20 mm for leaf and ± 10 mm for air suspension. All dimensions are for unladen chassis and any tag axles down.Weight and dimensions are based upon the following tyres:Chassis weight includes oil, water, AdBlue, 0 litres fuel and without driver. Kerb weight can vary ± 3%.Turning diameters are theoretically calculated.Legal weights can differ from country to country.For more detailed weight information, including optional equipment weights, ask your Volvo sales contact to enter your specification into the Volvo Weight Front Axle Tyres: 275/70R22.5Chassis Dimensions [mm]WB Wheelbase3350350038004100A Overall Chassis Length6645 6975 7425 7955 D Center of rear axle to front of body 2690 2840 3140 3440 N Rear Overhang (Min.) 1515 1685 1885 2085 NRear Overhang (Max.)1975215523052535Y Center of Gravity for Payload (Min.) 495 521 565 614 Y Center of Gravity for Payload (Max.) 1006 1056 1149 1246Chassis Weights [kg]Front Axle 3630 3625 3630 3630 Rear Axle 1810 1830 1855 1885 Kerb Weight5440 5455 5485 5515 Payload (including body, driver, fuel, etc.) 6560 6545 6515 6485Turning Diameter [mm]Turning Circle Diameter Kerb to Kerb 14200 14700 15800 16900Turning Circle Diameter Wall to Wall15200 15700 1680017900Plated Weights [kg]PlatedDesignGross Vehicle Weight12000 12000 Gross Combination Weight 16500 16500 Front Axle 5600 5600 Rear Axle 7400 7400■ Standard Equipment □ Optional EquipmentFor more detailed information about cab and powertrain equipment, please refer to separate specification sheets.For all possible options and combinations of options please consult your Volvo sales contact who can create a specification to match your requirements using the Volvo Sales Support system (VSS).■ UNIFORM Transport Adaption - Basic platform vehicleCORE COMPONENTS ■ RAD-L80 Rear suspension - 80mm parabolic rear springs □ CAB-CRW Cab - Four-door, six seat crewcabDesigned and built to Swedish impact and ECE R29 regulations□ CAB-DAY Cab - Day, with steel safety cage design.Designed and built to Swedish impact and ECE R29 regulations□ CAB-SSLP Cab - Comfort with additional storage space or optional fold upbunk behind the driver - with steel safety cage design. Designed and built to Swedish impact and ECE R29 regulations.■ EU6SCR Emission level - Euro VI step E ■ D8K250 Engine - D8K250 six-cylinder 7.7 litre developing 250hp at2100rpm.Peak torque 950Nm at 900-1700rpm.□ D8K280 Engine - D8K280 six-cylinder 7.7 litre developing 280hp at2100rpm.Peak torque 1050Nm at 950-1700rpm.■ ZTO1006 Gearbox - Manual 6-speed overdrive □ EBR-CEB Engine brake type - Compression - producing 170kW at2800rpm■ EBR-EPG Engine brake type - Exhaust brake controlled by steeringcolumn switchPackages □ DRIVEFL Cab Package - Drive □ VISIFL Visibility package□ AUDIODAB Audio System - Digital DAB AM/FM Radio with Bluetooth -without CD player■ AUDIOPD Audio - Preparation for DAB radio including amplifier and aerial CHASSIS ■ FST-PAR3 Front suspension - Parabolic front springs with shockabsorbers and anti-roll bar■ FAL5.6 Front Axle Design Capacity - 5.6 tonne ■ RSTAB1 Rear anti-roll bar - Normal stiffness ■ EBS-MED Brake package - EBS medium including traction control & hillhold■ RST-PAR3 Rear suspension - Stiffer parabolic rear springs ■ FST8080 Chassis frame thickness - 8 mm web and flange ■ 2BATT170 Battery Capacity - 2 x 170 Ah on the left-hand side ■ R130P Right fuel tank - 130-litre plastic Min volume 130l Max volume 215l ■ UL-FUEL Left fuel tank - Without ■ ADTP-R Adblue tank position - Chassis mounted on the right-hand side □ WHC-FIX1 Wheel chock - One fixed design □ WHC-FIX2 Wheel chocks - Two fixed design□ TOWMBRH Tow member - High mounted in centre of frame - Check theGCW in the "Truck Use" section of this specification□ C-RO40AG Drawbar coupling - Rockinger 400 G145■ TOWF-NO1 Front towing device - One pin in bumper □ TOWF-NO2 Front towing device - Two pins in bumper□ TOWR-ONE Light trailer coupling - Pintle type hitch attached to rear crossmember for an unbraked trailer□ TREL15 Trailer electrical connection - Single 15 pin - ADR certified □ TBC-EC Trailer brakes with EC palm coupling connectorsdelivery only□ 2024GSR GSR2 Safety Package - includes moving off information, cyclistand pedestrian side sensors, reverse camera, driver alert support, tyre pressure monitoring, intelligent speed assist, alcohol lock preparation interface, emergency brake lights and automatic headlight switchingWHEELS & TYRES ■ RT-STEEL Wheels - Steel rims □ SPWT-F Spare wheel & tyre - Spare with front tyre pattern □ SWCP-T Spare wheel supplied temporarily strapped to chassis □ SWCP-TP Spare wheel carrier tranport mounted on frame (spare wheelcarrier not included)□ JACK-10T 10 tonne bottle jack□ GAUGE-TP Tyre pressure gaugeDRIVELINE EQUIPMENT ■ CS39A-O Clutch - Single plate 395mm (16") □ TC-HWO Transmission oil cooler - water to oil■ 1COMP500 Air compressor - Single cylinder 360 cc - 500 litres per minute □ 2COM1080 Air compressor - Two-cylinder 1080 litres per minute ■ AIRIN-HI Air intake - Mounted behind cab on the left-hand side □ AIRIN-RL Air intake - Chassis mounted behind cab on the left-hand side ■ ACL1ST Air filter - Single element □ ACL1ST-S Air filter - two-stage element ■ 24AL110B Alternator capacity - 110 amp □ CCV-C Closed crankcase ventilation ■ CCV-OX Open crankcase ventilation with oil separator and amaintenance free gas centrifuge□ EST-AID Engine starting aid -Preheating element in the air inlet manifold □ PTER-100 Engine power-take-off - Rear-mounted with DIN100/ISO7646flange□ PTER-DIN Engine power-take-off - Rear-mounted with DIN5462 (female)splined shaft for a close-coupled pump□ PTER1400 Engine power-take-off - Rear-mounted with SAE 1410 flange □ PR-HF4S Live-drive PTO for Allison gearbox output 400Nm for flangeconnectionmounted on the side of the torque convertor□ PR-HF4SH Live-drive high speed PTO for Allison gearbox output 400Nmfor hydraulic pump connectionmounted on the side of the torque convertor□ PR-HF6S Live-drive PTO for Allison gearbox output 600Nm for flangeconnectionmounted on the side of the torque convertor□ PR-HP4S Live-drive PTO for Allison gearbox output 400Nm for hydraulicpump connectionmounted on the side of the torque convertor□ PR-HP4SH Live-drive high speed PTO for Allison gearbox output 400Nmfor hydraulic pump connectionmounted on the side of the torque convertor□ PR-HP6S Live-drive PTO for Allison gearbox output 600Nm for hydraulicpump connectionmounted on the side of the torque convertor□ PTR-FH5 Rear PTO Gearbox S88 flange DIN connection □ PTR-PH4 Rear PTO Gearbox S88 pump DIN connection □ PTR-PK Electrical and solenoid prep kit for gearbox PTO □ PTR-ZF4 Rear PTO Gearbox 320Nm flange connection □ PTR-ZF6 Rear PTO Gearbox 320Nm flange connection ■ ETC Electronic throttle control - dash mounted switch for PTOspeed controlCAB INTERIOR □ STWPOS-L Steering wheel position - LEFT-HAND DRIVE ■ STWPOS-R Steering wheel position - RIGHT-HAND DRIVEdemand from 21/08/2023CAB EXTERIOR□ SUNV-B Exterior sun visor - Smoked grey■ SUNV-PK Exterior sun visor preparation kit only□ BEACON-P Roof beacons - switch and wiring preparation only□ BEACONA2 Roof-mounted beacons - Two LED amber beacons mounteddirect on roofSUPERSTRUCTURE PREPARATIONS□ FBA-BTF Lower front body attachments - For torsionally flexible -platform body□ FBA-BTSF Lower front body attachments - For torsionally semi-flexiblebody - box or curtainsider□ RBA-T2 Rear body attachments - Divided□ TAILPREP Taillift preparation kit - cab switch and warning in driver displayDELIVERY SERVICES□ TGW-4G Telematics gateway - GSM/GPRS/4G modem, WLAN■ WVTA EC Whole Vehicle Type Approved - First stage chassis cab■ Standard Equipment □ Optional EquipmentFor more detailed information about cab and powertrain equipment, please refer to separate specification sheets.For all possible options and combinations of options please consult your Volvo sales contact who can create a specification to match your requirements using the Volvo Sales Support system (VSS).。
PBK9-series高精度称体产品说明书

I n s t a ll ati o n I nf o rm ati o nCongratulations on choosing the quality and precision of METTLER TOLEDO. Properuse of your new equipment according to this User manual and regular calibration andmaintenance by our factory-trained service team ensures dependable and accurateoperation, protecting your investment. Contact us about a service agreement tailored toyour needs and budget. Further information is available at/service.There are several important ways to ensure you maximize the performance of yourinvestment:1. Register your product: We invite you to register your product at/productregistrationso we can contact you about enhancements, updates and important notificationsconcerning your product.2. Contact METTLER TOLEDO for service: The value of a measurement is proportionalto its accuracy – an out of specification scale can diminish quality, reduce profits andincrease liability. Timely service from METTLER TOLEDO will ensure accuracy andoptimize uptime and equipment life.–Installation, Configuration, Integration and Training:Our service representatives are factory-trained, weighing equipment experts. Wemake certain that your weighing equipment is ready for production in a costeffective and timely fashion and that personnel are trained for success.–Initial Calibration Documentation:The installation environment and application requirements are unique for everyindustrial scale so performance must be tested and certified. Our calibrationservices and certificates document accuracy to ensure production quality andprovide a quality system record of performance.–Periodic Calibration Maintenance:A Calibration Service Agreement provides on-going confidence in your weighingprocess and documentation of compliance with requirements. We offer a varietyof service plans that are scheduled to meet your needs and designed to fit yourbudget.2 PBK9-series 30233012AContents1 Safety information for operation in the Ex area (4)2 Installation (6)2.1 Preparatory work (6)2.2 Setting up (7)2.3 Levelling (8)2.4 Lengthening and installing connection cable (9)2.5 Equipotential bonding in hazardous areas (9)2.6 Connecting PBK98_APW weighing platforms (10)2.7 Commissioning (13)3 Configuration possibilities (14)3.1 General information (14)3.2 Configuration data in the factory setting (15)4 Planning assemblies (16)4.1 Notes on planning (16)4.2 Preload range (16)4.3 Mounting possibilities (17)5 Dimensions (21)3 30233012A PBK9-series1 Safety information for operation in the Ex area ▲The PBK9-series high precision weighing platforms except PBK989-XS0.6 are approved for operation in Zone2 (gases), Zone 22 (dusts) and DIV 2 hazardous areas. There is an increased risk in injury and damage when using the explosion-protected weighing platforms in a potentially explosive atmosphere. Special care must be taken when working in such hazardous areas. ▲Any protective foils present in the hazardous area, e.g. on the load plate, must always be removed. ▲In hazardous areas, the weighing platforms may only be installed, maintained and repaired by authorized METTLER TOLEDO service personnel. ▲No modifications may be made to the weighing platform and no repair work may be performed on the system modules. Any weighing platform or system modules that are used must comply with the specifications contained in the installation instructions. Non-compliant equipment jeopardizes the intrinsic safety of the system, cancels the "Ex" approval and renders any warranty or product liability claims null and void. ▲The safety of the weighing system is only guaranteed when the weighing system is operated, installed and maintained in accordance with the respective instructions. ▲Also comply with the following: –the instructions for the system modules, –the regulations and standards in the respective country, –the statutory requirement for electrical equipment installed in hazardous areas in the respective country, –all instructions related to safety issued by the owner. ▲The explosion-protected weighing system must be checked to ensure compliance with the requirements for safety before being put into service for the first time, following any service work and every3 years, at least. ▲Prevent the build-up of static electricity. Always wear suitable working clothes when operating or performing service work in a hazardous area. Avoid strong mechanical rubbing of the powder-coated surfaces against any material when operating in Zone 22. ▲Do not use protective coverings for the devices. ▲Avoid damage to the system components. ▲If system damage occurs, the system must be put out of operation immediately. ▲Damaged system components must be replaced petenceEx approval Operation4Safety information for operation in the Ex area PBK9-series 30233012A▲Only install or perform maintenance work on the weighing system in hazardous areas if the following conditions are fulfilled: –the intrinsically safe characteristic values and zone approval of the individual components are in accord with one another, –the owner has issued a permit ("spark permit" or "fire permit"), –the area has been rendered safe and the owner's safety coordinator has confirmed that there is no danger, –the necessary tools and any required protective clothing are provided (danger of the build-up of static electricity). ▲The certification papers (certificates, manufacturer’s declarations) must be present. ▲Lay cabling fixed and securely, bending radius > 5 x cable diameter. ▲Do not cut through cables. ▲The explosion protected PBK9-series high precision weighing platforms may onlybe operated in hazardous areas of Zone 2 (gases), Zone 22 (dusts) and DIV 2 in conjunction with weighing terminals that have the appropriate approval and interface specification.▲The connection cable may not be separated from the weighing terminal while it isenergized.▲Tighten the knurled nut of the M12 connection cable with a tightening torque of 10 Nm. ▲Before setting up the system secure the connection between weighing terminal andweighing platform.InstallationAdditional requirements for Zones 2/22 or DIV 25 Safety information for operation in the Ex area 30233012A PBK9-series2 Installation2.1 Preparatory work2.1.1 Selecting installation location▲The foundation at the installation location must be capable to safely support theweight of the weighing platform at its support points when it carries the maximumload. At the same time, it should so stable that no vibrations occur during weighingoperations. These requirements also apply when the weighing platform is integratedin conveying systems and the like.▲Ensure that the ground at the installation location is even.▲Ensure that there are no vibrations from machines near the installation site.▲Ensure that there are no drafts at the installation site.EXPLOSION HAZARDPBK989-XS0.6 is not approved for hazardous areas.▲Do not use PBK989-XS0.6 in any kind of hazardous areas.2.1.2 Ambient conditions• Use powder-coated/enamelled weighing platforms only in a dry environment.• In a damp environment, in wet operation or when working with chemicals: Usestainless-steel weighing platforms.2.1.3 Accessories➜Completely unpack the accessories provided with the weighing platform.– 1 bottle of oil, suitable for foodstuffs– 1 set of measuring data signs for selectable configurations–Optional: ACC409xx-SICSpro-IDNet converter (incl. identcard kit)6Installation PBK9-series 30233012A2.2 Setting up2.2.1 PBK989-XS0.61. Unpack weighing platform (1), windshield (2), load plate support (3) and load plate (4).2. Mount the load support (3) on the weighing platform.3. Put the windshield (2) on.4. Put the load plate (4) on the load support.2.2.2 PBK989-A3 / PBK989-A61. Remove the weighing platform from the packing.2. Lift off the load plate.3. Remove the transport locks (3 cardboard strips).4. Put the load plate on.2.2.3 PBK989-A15 / PBK989-A30 / PBK-A60➜Remove the weighing platform from the packing.2.2.4 PBK98_-B60 / PBK98_-B1201. Remove the weighing platform from the packing.2. Lift off the load plate.3. Remove the transport locks from the corners (4 cardboard angles).4. Put the load plate on.7 Installation30233012A PBK9-series2.2.5 PBK98_-CC150 / PBK98_-CC3001. Remove the weighing platform from the packing.2. Remove the load plate by pivoting the two side handles (1) outward.3. Remove the transport locks (2 x 2 cardboard strips between lever and base frame + 4 cardboard angles in the corners).4. Replace the load plate (2) so that the symbol is located above the level indicator.5. Make sure that the load supports (3) in the corners of the weighing platform are vertical.2.3Levelling Notes • Only weighing platforms that have been levelled precisely horizontally provide accurate weighing results. • Redo levelling when the weighing platform has been moved.1. Level the weighing platform with the 4 foot bolts (1) using the level indicator (2): The air bubble of the level indicator must come to rest within the ring marking.2. Ensure even contact of the foot bolts. Every foot must stand safely and must have full contact with its entire surface. Check the stability of the weighing platform by pressing down on or rocking it at the corners.3. Lock the foot bolts with the nuts.18Installation PBK9-series 30233012A2.4 Lengthening and installing connection cableThe connection cable may be lengthened.Standard version up to 100 mEx version up to 50 m➜Route the connection cable directly out of the weighing platform to the weighingterminal or the ConBloc (PBK98_APW weighing platforms only).CAUTIONIf the cable is laid in a pipe, ensure that the pipe is of a sufficient diameter.2.5 Equipotential bonding in hazardous areasThe equipotential bonding must be installed by a professional electrician when using theweighing platform in hazardous areas. METTLER TOLEDO Service only has a monitoringand consulting function here.➜Connect equipotential bonding (PA) of all devices (weighing platform and serviceterminal) in accordance with the country-specific regulations and standards. In theprocess, make sure that all device housings are connected to the same potential via1 Serrated lock washer A 4.3 DIN 67982 Hexagonal lock nut M4 DIN 9343 Base frame4 Washer 4.3 DIN 1255 Equipotential bonding clampMounting materials are enclosed with the weighing terminal for hazardous areas, e.g.IND690xx.9 30233012A PBK9-seriesInstallation2.6 Connecting PBK98_APW weighing platforms2.6.1 Typical configurationsTo connect the PBK98-APW weighing platform to its environment, the ConBlock /ConBlock IP66 is recommended.Direct connection to the PLCA210Installation PBK9-series 30233012AConnection to the PLC via Fieldbus module2METTLER TOLEDO components1 PBK98_APW weighing platform2 ConModule connection module / ConBlock IP66 connection module with IP66housing3 Fieldbus module (Profibus, Profinet, DeviceNet, Ethernet/IP, CC-Link)Customer componentsA Connection cable to PLC, RS232 or RS422/RS485B PLCC PC or laptop (for configuration and service purpose)D Standard RS232 cable (DB9 male/female)E Cable, 1 m, D-Sub 9 male <–> open endsF Fieldbus cable2.6.2Installation with weighing platforms used in hazardous areasEXPLOSION HAZARDConBlock / ConBlock IP66 is not approved for hazardous areas.▲Only install the ConBlock / ConBlock IP66 in the safe area.▲Always use a suitable safety barrier to separate equipment located in the hazardousarea from the safe area.11Installation30233012A PBK9-series2.6.3 ConBlock / ConBlock IP66 connection1 System connection side: 10 terminals2 Weighing platform connection side: 2 x 10 terminals3 RS232 interface (D-Sub 9), for configuration and servicingConBlock connections – weighing platform sideThe PBK98_APW weighing platform is delivered with a 12 wire open end cable. The corresponding terminals of the ConBlock are identified by the wire color and the respectivepin designation.ConBlock connections – system sideThe connection terminal strip is grouped according to the following functions: RS232 andRS422/RS485 interface, input voltages and digital inputs and outputs.RS422 / RS485 configurationThe RS422 interface is directly avalable via the connection terminals. For the RS485 configuration, the following signals must be connected:A–: Tx– and Rx–B+: Tx+ and Rx+31212Installation PBK9-series 30233012ALoad cell connector2.7 Commissioning➜Switch on the weighing system at the final location only.When switching on the weighing system for the first time, it will perform an automaticgeo code adjustment using the calibration weight which is integrated in the load cell.13 30233012A PBK9-seriesInstallation3 Configuration possibilities3.1 General information3.1.1 MultiIntervalMultiInterval precision means automatic switchover of the numerical increment (readability) in dependence on the applied load.3.1.2 Single Range and High ResolutionSingle Range and High Resolution mean that the numerical increments (readability) remain the same across the entire weighing range.3.1.3 Additional setting options• All other adjustment variables (adjustment to the weighing process and vibrations, aswell as adjustment of stability monitoring and the zero point correction) are adjusted to the usual user conditions, however, they can be changed in the Scale menu of the weighing terminal if necessary.• When ordering the IDNet option, the ACC409xx-SICSpro-IDNet converter including theidentcard kit and a set of measuring data signs for the selectable configurations is delivered.• If the standard configuration does not meet your needs, it is possible to reconfigure theweighing platform with the terminal. To do this, see the terminal operating instructions.• Apply the selected configuration corresponding to the factory-mounted measuringdata sign to the Identcard, and the Max-Min sign near the IDNet terminal display.• When the configuration is changed, it is also possible to change the preload range inaddition to the weighing range and the readability.NumericalNumerical 14Configuration possibilities PBK9-series 30233012A3.2 Configuration data in the factory setting15 30233012A PBK9-seriesConfiguration possibilities4 Planning assemblies4.1 Notes on planningDue to their design characteristics, the weighing platforms are suitable for installation inconveying systems. The following specifications and dimensional drawings form the basisfor the design of the required assemblies.• The weighing platform may only be supported by the support feet, and never by theframe or lever parts.• The weighing platform may only be permanently installed on the support feet.• Moving or rotating parts on the weighing platform must be designed so that they donot affect the weighing result. Balance rotating parts.• The load plate must be free on all sides so that there is no connection between theload plate and permanently mounted parts, even by falling parts or dirt deposits.• Lay cables or hoses between the weighing platform and other machine parts so thatthey do not exert any force on the weighing platform.CAUTIONWhen mounting assemblies, make sure that no metal chips get into the weighing platform.➜Remove the load plate rfrom the weighing platform before working on the load plate.4.2 Preload rangeThe weight of the structural parts permanently mounted on the weighing platform is referredto as "preload". The preload is electrically compensated in the weighing platform so thatthe full weighing range is available. The maximum preload (or the zero-setting range) thatcan be compensated dispends on the configured weighing range.For the preload range of the individual weighing platform refer to section "3.2 Configurationdata in the factory setting" on page 15.CAUTIONThe assemblies must already be mounted when connecting the weighing platform.16Planning assemblies PBK9-series 30233012A4.3 Mounting possibilitiesMounting possibilities PBK989-A3 / PBK989-A6L Level bubble Dimensions in mm• Bridge assemblies can be mounted in the shaded areas.Recommended mounting type: Bolting on, welding on.• Remove the load plate and drill through for this purpose.• Mounting parts (e.g. bolts and nuts) may extend to a maximum of 7 mm beyond theunderside of the load plate.Technical version: 11/201417Planning assemblies30233012A PBK9-seriesMounting possibilities PBK989-AB15 / PBK989-AB30L Level bubble Dimensions in mm• Bridge assemblies can be mounted in the shaded areas.Recommended mounting type: Bolting on, welding on.• Remove the load plate and drill through for this purpose.• Mounting parts (e.g. bolts and nuts) may extend to a maximum of 7 mm beyond theunderside of the load plate.Technical version: 11/201418Planning assemblies PBK9-series 30233012AMounting possibilities PBK98_-B60 / PBK98_-B120L Level bubble Dimensions in mm• Bridge assemblies can be mounted in the shaded areas.Recommended mounting type: Bolting on, welding on.• Remove the load plate and drill through for this purpose.• Mounting parts (e.g. bolts and nuts) may extend to a maximum of 10 mm beyondthe underside of the load plate.Technical version: 11/201419Planning assemblies30233012A PBK9-seriesMounting possibilities PBK98_-CC150 / PBK98_-CC300L Level bubble Dimensions in mm• Bridge assemblies can be mounted in the shaded areas.Recommended mounting type: Bolting on, welding on.• Remove the load plate and drill through for this purpose.• Mounting parts (e.g. bolts and nuts) may extend to a maximum of 10 mm beyondthe underside of the load plate.Technical version: 11/201420Planning assemblies PBK9-series 30233012A5 DimensionsDimensions PBK989-XS0.6Dimensions in mmH Adjustable with 4 foot boltsMin. H = 115 mmMax. H = 127 mmFS Foot boltRequired area D = 40 mm dia.Spanner size = 17 mmThread = M10C Cable connectionL Level bubbleTechnical version: 11/201421 30233012A PBK9-seriesDimensionsDimensions PBK989-A3 / PBK989-A6Dimensions in mmH Adjustable with 4 foot boltsMin. H = 135 mmMax. H = 147 mmFS Foot boltRequired area D = 40 mm dia.Spanner size = 17 mmThread = M10C Cable connectionL Level bubbleTechnical version: 11/201422Dimensions PBK9-series 30233012ADimensions PBK989-AB15 / PBK989-AB30Dimensions in mmH Adjustable with 4 foot boltsMin. H = 132 mmMax. H = 144 mmFS Foot boltRequired area D = 40 mm dia.Spanner size = 17 mmThread = M10C Cable connectionL Level bubbleTechnical version: 11/201423 30233012A PBK9-seriesDimensionsDimensions PBK98_-B60 / PBK98_-B120Dimensions in mmH Adjustable with 4 foot boltsMin. H = 127 mmMax. H = 152 mmFS Foot boltRequired area D = 35 mm dia.Spanner size = 17 mmThread = M10C Cable connectionL Level bubbleTechnical version: 11/201424Dimensions PBK9-series 30233012ADimensions PBK98_-B60 / PBK98_-B120 with roller conveyerDimensions in mmH Adjustable with 4 foot boltsMin. H = 127 mmMax. H = 152 mmTechnical version: 11/201425 30233012A PBK9-seriesDimensionsDimensions PBK98_-CC150 / PBK98_-CC300Dimensions in mmH Adjustable with 4 foot boltsMin. H = 115 mmMax. H = 140 mmFS Foot boltRequired area D = 35 mm dia.Spanner size = 17 mmThread = M10C Cable connectionL Level bubbleTechnical version: 11/201426Dimensions PBK9-series 30233012ADimensions PBK98_-CC150 / PBK98_-CC300 with roller conveyorDimensions in mmH Adjustable with 4 foot boltsMin. H = 115 mmMax. H = 140 mmTechnical version: 11/201427 30233012A PBK9-seriesDimensionsFor more information/supportMettler-Toledo (Albstadt) GmbHD-72458 AlbstadtTel. + 49 7431-14 0Fax + 49 7431-14 232Subject to technical changes© Mettler-Toledo (Albstadt) GmbH 01/2015 30233012A *30233012A* *30233012A*。
安必信业绩表03中文+英文

公司业绩一览表Reference Project List序号No.项目名称Project Name业主End User年份Year1 中海油洋浦电厂火气系统集成、调试和开车服务CNOOC 2003 CNOOC Yangpu Power Plant Fire & Gas system integration,2 东方-海口天然气管线火气系统集成、调试和开车服务CNOOC 2003 Dongfang-Haikou natural gas pipeline Project Fire and Gas system3 CACT 发现号 FPSO 火气系统升级项目集成、调试和开车服务CACT 2004 CACT Nanhai Faxian FPSO FGS upgrade4 崖城13-1 天然气平台火气系统服务和湿气压缩机火气系统集成、调试和开车服务BP-CNOOC 2004 Y13-1 Platforms FGS Upgrade5 文昌13-1/2油田火气系统服务CNOOC 2006 Wengchang13-1/2 Fire and gas system service6 崖城13-1平台火气系统改造现场探头的提供BP-CNOOC 2004 Y13-1 Platforms FGS detector supply7 JZ9-3平台火气系统现场探头提供CNOOC 2006 JZ9-3 Platform detector supply8 涠洲油田火气系统的服务CNOOC 2006 WZ oilfield FGS service9 中海壳牌蒸汽和发电装置火气系统集成、调试和开车服务CNOOCSHELL 2005 Steam power plant FGS integration10 中海壳牌码头装置F&G火气系统集成、调试和开车服务CNOOCSHELL 2006 Jettry area FGS integration11 中海壳牌罐区F&G火气系统集成、调试和开车服务CNOOCSHELL 2006 Tank yard FGS integration12 涠洲12-1 油田火气系统升级改造、集成和开车服务CNOOC 2006 WZ12-1 FGS upgrade13 文昌13-1/2 LPG 回收项目火气系统设计、集成、安装、调试和开车服务CNOOC 2006No. Project Name End User Year Wengchang13-1/2 LPG Recovery FGS integration14 广东大鹏LNG 管线火气系统集成、调试和开车服务BP-CNOOC 2006 GDLNG pipeline FGS integration15 惠州LNG电厂的火焰和气体检测仪产品CNOOC 2006 Huizhou LNG power plant detector supply16 BP珠海液化石油气公司一期改造项目的火气系统集成、调试和开车服务CNOOC 2006 BP Zhuhai LPG Phase I FGS upgrade17 JZ21-1平台火气系统CNOOC 2006 JZ21-1 Platforms FGS integration18 广东大鹏LNG 扩建4站火气系统集成、调试和开车服务BP-CNOOC 2006 GDLNG 4 expansion stations FGS19 涠洲114平台现场探头升级改造CNOOC 2006 WZ11-4 platform FGS upgrade20 福建LNG站线项目火气系统CNOOC 2006 Fujian LNG Terminal & pipeline Project FGS integration21 中海油JZ9-3E平台火气系统CNOOC 2007 JZ9-3E FGS22 上海LNG紧急停车系统和火气系统CNOOC 2007 Shanghai LNG ESD & FGS integration23 立沙油品储运项目油库及管线工火气系统CNOOC 2008 Lisha Oil Tank FGS integration24 中海广东天然气有限公司仪表及报警系统CNOOC 2008 CNOOC Guangdong Natural Gas project FGS25 中海油湛江分公司WZ114及WZ111平台CO2灭火系统改造CNOOC 2008 WZ11-4 & WZ11-1 CO2 system upgrade26 中海油南海胜利号FPSO锅炉控制系统改造CNOOC 2008 Nanhai Shengli FPSO Boiler Control System Upgrade27 中海油湛江分公司WZ12-1PAP火气系统改造CNOOC 2008 WZ12-1PAP FGS upgradeNo. Project Name End User Year28 中海油Bonan火气系统供货及工程服务CNOOC 2008 Bonan FGS integration29 广石化聚丙烯装置火气系统集成和开车服务SINOPEC 2003 Sinopec Guangzhou Branch PP plant FGS integration30 岳阳中石化壳牌煤气化项目SINOPEC-SHELL2006 Yueyang Shell-Sinopec Coal chemical Project FGS31 南沙油库火气系统集成和开车服务GZ Holdings 2004 Nansha Oil tank FGS integration32 中石化长岭分公司汽油罐区PLC控制系统(PCS, ESD)SINOPEC 2005 Sinopec Changlin Branch Gas oil Tank area PLC system33 陕京天然气管线1线火气系统集成、调试和开车服务Petrochina 2005 Shanxi-Beijing Natural Gas Pipeline FGS integration34 广东大鹏LNG 管线火气系统集成、调试和开车服务BP-CNOOC 2006 Guangdong LNG Pipeline FGS integration35 中石化长岭分公司成品油公路出厂及罐区PLC控制系统SINOPEC 2006 Sinopec Changlin Branch PLC system36 BP珠海液化石油气公司二期扩建项目的火气系统集成、调试和开车服务BP 2007 BP Zhuhai LPG Phase II FGS integration37 欧德油储惠州公司的气体检测仪系统OTDB 2005 OTDB fire and gas system38 广州港发石油化工码头有限公司控制系统GZ-Holdings 2004 Guangzhou GangfaTerminal & jetty control system39 中石化胜利油田垦东12区块2号平台火气系统升级改造SINOPEC 2008 Sinopec Kendong 12-2 platform FGS upgrade40 月东油田A1/A2平台中控系统(PCS,ESD,FGS)CITIC 2008 Yuedong A1/A2 platform control system(PCS,ESD,FGS)41 舟山纳海油污 SCADA系统纳海公司2009 Zhoushan Nahai SCADA system42 万向石油(舟山)SCADA系统集成工程万向集团2009No. Project Name End User Year Wanxiang Zhoushan oil tank terminal SCADA system43 中海油BN II期项目火气系统CNOOC 2009 BN II platform FGS integration44 中海油BZ19-4项目火气系统CNOOC 2009 BZ19-4 FGS integration45 广东LNG可靠性项目火气系统CNOOC+BP 2009 Guangdong LNG Reliability system FGS integration46 广东LNG惠州站火气系统CNOOC+BP 2010 Guangdong LNG Huizhou station FGS integration47 福建LNG项目3#4#罐火气系统CNOOC 2010 Fujian LNG Tank 3# & 4# FGS integration48 福建LNG管线二期火气系统CNOOC 2010 Fujian LNG Pipeline Phase II FGS integration49 中海油PY30-1珠海终端火气系统改造服务CNOOC 2010 PY30-1 Zhuhai Terminal FGS upgrade & construction50 CACT 南海发现号 FPSO H2S检测系统集成、调试、施工CACT 2010 CACT NHFX FPSO H2S monitoring integration and construction51 CACT 南海发现号 FPSO 锅炉改造系统CACT 2010 CACT NHFX FPSO Boiler Control System52 蓝星化工20万吨有机硅项目紧急关断系统招标蓝星化工2010 Blue star XH 200KT Silicones Project Emergency Shut-off System53 CACT热感安装、调试服务CACT 2010 CACT Heat detectors Installation and commissioning services54 CACT南海胜利号FPSO IGS改造CACT 2010 CACT Nanhai Shengli FPSO IGS to upgrade55 广东天然气管网一期管道工程项目广东天然气管网2010 Guangdong Natural Gas Grid Project深圳市安必信科技有限公司The Ambition Technology Ltd 2011-03-3。
中国标准文献分类号CCS

U00/09
船舶综合
U
U10/19
船舶总体
U
U20/29
舾装设备
U
U30/39
船舶专用装备
U
U40/49
船用主辅机
U
U50/59
船舶管路附件
U
U60/69
船舶电气、观通、导航设备
U
U80/89
船舶制造工艺装备
U
U90/99
造船专用工艺设备
U
V00/09
航空、航天综合
V
V10/19
航空、航天材料与工艺
品位、储量及其分析方法分别入各矿产品类。
D80/89
地质勘探设备
D
通用仪器仪表入N91, 凿岩机械入J84, 通用运输、提升机械入J81。
D90/99
矿山机械设备
D
E00/09
石油综合
E
用于生产、流通过程中保证符合文字标准要求的石油产品标样分别入本类各有关类目。
E10/19
石油勘探、开发与集输
E
油气田地面建设、生产设施工程入P类。
F10/19
能源
F
F20/29
电力
F
电站、输配电工程入P类。
F40/49
核材料、核燃料
F
F50/59
同位素与放射源
F
F60/69
核反应堆
F
F70/79
辐射防护与监测
F
F80/89
核仪器与核探测器
F
通用的仪器、仪表入N类。
F90/99
低能加速器
F
G00/09
化工综合
G
造纸入Y30/39, 皮革入Y45/49, 食品发酵、酿造入X60/69, 绝缘漆入K15, 食品添加剂入X40/49, 合成饲料添加剂入B46, 建筑胶粘剂入Q27, 胶鞋入Y78。用于生产、流通过程中保证符合文字标准要求的化工标样分别入本类各有关类目。
红色警戒尤里的复仇代码名对照

==========步兵============终结者------------------ARND--TERMIGUN蓝波--------------------STLN--STALGUN / STALGREN快枪手------------------CLNT---CLINTGUN月球飞行兵 -------------LUNR--Lunarlaser美国大兵----------------E1---M60 / Para /UCPara,UCElitePara盟军警犬----------------ADOG--GoodTeeth / VirtualScanner盟军工程师--------------ENGINEER--DefuseKit / VirtualScanner守护大兵----------------GGI------M60 / MissileLauncher火箭飞行兵--------------JUMPJET---20mm间谍--------------------SPY--MakeupKit海豹部队----------------GHOST -- MP5 / Sapper / C4=yes谭雅--------------------TANY--DoublePistols / Sapper超时空军团兵------------CLEG----NeutronRifle超时空突击队------------CCOMAND[隐藏]--ChronoMP5 / FakeC4心灵突击队--------------PTROOP [YR][隐藏]--MindControl狙击手------------------SNIPE---AWP动员兵------------------E2====M1Carbine / UCM1Carbine,UCEliteM1Carbine苏军警犬----------------DOG--BadTeeth / VirtualScanner防空步兵----------------FLAKT -- FlakGuyGun / FlakGuyAAGun苏军工程师--------------SENGINEER--DefuseKit / VirtualScanner磁爆步兵----------------SHK -- ElectricBolt / AssaultBolt疯狂伊文----------------IVAN--IvanBomber特工--------------------SJJD--没有这个人鲍裏斯------------------BORIS--AKM / Flare超时空伊文--------------CIVAN[隐藏]--IvanBomber恐怖分子----------------TERROR--TerrorBomb辐射工兵----------------DESO--RadBeamWeapon / RadEruptionWeapon尤里新兵----------------INIT--PsychicJab / UCPsychicJab,UCElitePsychicJab 奴隶矿工----------------SLAV--SHOVEL尤里工程师--------------YENGINEER狂兽人------------------BRUTE--Punch / Smash病毒狙击手--------------VIRUS--Virusgun克隆尤里----------------YURI--MindControl / PsiWave超级尤里----------------YURIPR--SuperMindControl / SuperPsiWave心灵突击队--------------YURIPT--[RA2]尤里改------------------YURIPP--[RA2]平民--------------------CIV1 黄衣服女-------CIV2 白衣服-------CIV3 技师-------CIVA 工人样-------CIVB 牛仔-------CIVC 黑衣蓝裤-------CIVBBP 棒球员-------CIVBFM 海滩胖男-------CIVBF 海滩女-------CIVBTM 海滩瘦男-------CIVSFM 老人-------CIVSF 红衣服女-------CIVSTM 黑衣服黄衣服将军---------------VLADIMIR绿衣服将军---------------PENTGEN苏联卫兵----------------CTECH-------WEEDGUY骆驼--------------------CAML =YR奶牛--------------------COW鄂鱼--------------------ALL --- AlligatorBite / VirtualScanner 北极熊------------------POLARB --- BearBite / VirtualScanner 暴龙 ------------------DNOA =YR腕龙--------------------DNOB =YR猴----------------------JOSH --- ChimpBite / VirtualScanner终级保镖----------------SSRV -- Pistola总统--------------------PRES洛马诺夫总理------------RMNV =YR爱因斯坦----------------EINS =YR木乃伊-----------------MUMY =YR-------------WWLF =YR==========车辆==============灰熊坦克----------------MTNK--105mm多功能步兵车------------FV -----HoverMissile幻影坦克----------------MGTK----MirageGun光陵坦克----------------SREF----Comet/SuperComet战斗要塞----------------BFRT--20mmRapid盟军基地车--------------AMCV超时空矿车(倒矿)-------CMON **超时空矿车--------------CMIN机器人坦克--------------ROBO--Robogun坦克杀手----------------TNKD--SABOT榴弹炮--------------HOWI[隐藏,要修改ini]--HowitzerGun恐怖机器人--------------DRON--DroneJump / VirtualScanner防空车------------------HTK --FlakTrackGun / FlakTrackAAGun犀牛坦克----------------HTNK--120mmV3火箭发射车------------V3 -- V3Launcher / V3ROCKET天启坦克----------------APOC 120mmx / MammothTusk苏军基地车--------------SMCV苏军矿车(倒矿)--------HORV **苏军矿车----------------HARV--20mmRapid磁爆坦克----------------TTNK --TankBolt自爆卡车----------------DTRUCK--Demobomb / none狂风坦克----------------LTNK--ATGUN格林机炮坦克------------YTNK--磁电坦克----------------TELE--MagneticBeam / MagneShake策划者------------------MIND--MultipleMindControlTank镭射幽浮----------------DISK--DiskLaser / DiskDrain神经突击车--------------CAOS--ChaosAttack / VirtualScanner 尤里基地车--------------PCV---奴隶矿车----------------SMON--[卸矿]奴隶矿车----------------SMIN--20mmRapid汽车----------CAR 黄色------EUROC 黑色-------SUVB 包厢型-------STANG 跑车型-------SUVW 包厢型校车---------BUS野营车-------WINI小货车-------PICK 东风型-----PTRUCK 皮卡型卡车--------TRUCKA 自爆卡车型--------JEEP =YR卡车(载货)--TRUCKB 东风型豪华轿车-----LIMO计程车-------TAXI警车---------COP挖土机-------CONA宣传车-------PROPA巴士----------DDBX =YR黑色计程车-----BCAB =YR黄色计程车-----YCAB =YR摄影车---------DOLY =YR电车----------CBLC =YR救火车--------FTRK =YR救护车--------AMBU =YR=============舰船=================盟军气垫艇--------------LCRF驱逐舰------------------DEST--155mm / ASWLauncher,ASW海豚--------------------DLPH--SonicZap神盾巡洋舰--------------AEGIS--Medusa航空母舰----------------CARRIER--HornetLauncher / HORNET苏军气垫船--------------SAPC海蝎--------------------HYD--FlakTrackGun / FlakWeapon台风潜艇----------------SUB--SubTorpedo巨型乌贼----------------SQD--SquidGrab / SquidPunch无畏级战舰--------------DRED-- DredLauncher / DMISL尤里气垫船--------------YHVR雷鸣潜艇----------------BSUB --BoomerTorpedo / CruiseLauncher CMISL海岸巡逻船--------------CDEST拖船--------------------TUG游船--------------------CRUISE尼米兹号航空母舰--------CARRIERB将军无畏级战舰----------DREDB维拉迪摩指挥舰----------VLAD============飞机==============夜鹰直升机--------------SHAD--BlackHawkCannon入侵者战机--------------ORCA--Maverick舰载反潜机--------------ASW ** --ASWBomb大黄蜂------------------HORNET **--HornetBomb / HornetCollision黑鹰战机----------------BEAG--Maverick2围攻直升机--------------SCHP -- BlackHawkCannon 160mm基洛夫飞艇--------------ZEP--BlimpBomb米格战机----------------BPLN **--Maverick3间谍飞机----------------SPYP **--SpyCameraWeaponV3火箭------------------V3ROCKET **无畏级导弹--------------DMISL ··雷鸣导弹 ------------------ ------- CMISL **运输机-----------------PDPLANE=============建筑===============GAPOWR 盟军发电厂GAREFN 盟军矿厂GAPILE 盟军兵营GAWEAP 盟军兵工厂GAAIRC 盟军空军指挥部AMRADR 美国空军指挥部--AmericanParaDropSpecial GADEPT 盟军维修厂GAYARD 盟军船厂GATECH 盟军实验室GAROBO 控制中心 ---GAOREP 矿石精鍊器GAWALL 盟军围墙GAPILL 机枪碉堡---Vulcan2NASAM 爱国者飞弹 --RedEye2GAGAP 裂缝产生器ATESLA 光棱塔----PrismShot / PrismSupport GASPYSAT 间谍卫星GACNST 盟军建造场GTGCAN 法国巨炮 GrandCannonWeaponGACSPH 超时空传送仪 --- ChronoSphereSpecial GAWEAT 天气控制器 --- LightningStormSpecialNAPOWR 磁能反应炉NAREFN 苏军矿厂NAHAND 苏军兵营NAWEAP 苏军兵工厂NARADR 苏军雷达 --- SpyPlaneSpecialNADEPT 苏军维修厂NAYARD 苏军造船厂NATECH 苏军实验室NANRCT 核子反应堆 --- NukePayloadNAINDP 工业工厂NAWALL 苏军围墙NABNKR 战斗碉堡NALASR 哨戒炮--VulcanNAFLAK 防空炮--FlakWeaponTESLA 磁暴线圈 -- CoilBolt / OPCoilBolt NACNST 苏军建造厂NAIRON 铁幕 --- IronCurtainSpecialNAMISL 核弹发射井 -- NukeSpecialYAPOWR 生化反应炉YAREFN 奴隶矿厂YABRCK 尤里兵营YAWEAP 尤里兵工厂NAPSIS 心灵感应器 --- PsychicRevealSpecialYAYARD 尤里船厂YAGRND 部队回收厂YATECH 尤里实验室GAFWLL 尤里围墙NATBNK 坦克碉堡YAGGUN 盖特机炮YAPSYT 心灵控制塔----MultipleMindControlTowerNACLON 复制中心YAGNTC 基因突变器 --- GeneticConverterSpecialYAPPET 心灵控制增幅器 --- PsychicDominatorSpecialYACNST 尤里建造场GASAND=沙墙CAAIRP=科技机场---ParaDropSpecialCAOILD=科技钻油厂 --- ProduceCashStartup= @ ProduceCashAmount= @ ProduceCashDelay= CAHOSP=市民医院 [RA2]CAMACH=科技机器商店CAOUTP=科技前哨站----HoverMissileCAPOWR=科技电厂CASLAB=秘密科技实验室CATHOSP=科技医院 [YR]CATIME01=时间机器CATIME02=时间机器CALAB=爱因斯坦实验室GATE1=闸门CABUNK01-04 =燃料库CABHUT=桥梁维修小屋CAGARD01=警卫哨CAMIAM04=救生员休息亭CAUSFGL=美国国旗CACUFGL=古巴国旗CAFRFGL=法国国旗CAGEFGL=德国国旗CAIRFGL=伊拉克国旗CALBFGL=利比亚国旗CARUFGL=俄国国旗CAUKFGL=英国国旗CASKFGL=韩国国旗CALOND04=英国国会CALOND05=大笨钟CALOND06=伦敦塔CAMORR06=理克酒馆CAEGYP01=金字塔CAEGYP02=金字塔CAEGYP03=金字塔CASEAT01=西雅图太空针塔CASEAT02=巨软园区CASTL04=拱门CASYDN03=雪梨歌剧院CAEAST01=复活岛石像CAEAST02=尤里雕像----PrismShot CATRAN03=尤里要塞CAEGYP03=人面狮身像CALUNR01=登月小艇CAMIAM08=亚历桑那纪念馆CAPRS03=世界惊奇博物馆CACHIG04=芝加哥协会大楼CAEURO05=雕像CAFARM06=灯塔CAPARS01=艾菲尔铁塔CAPARS11=巴黎凯旋门CAWASH14=杰佛逊纪念馆CAWASH19=胜利纪念碑CAWASH15=林肯纪念馆CARUS03=克里姆林宫CAWASH01=白宫CATRAN01=地窖CAWASH19=胜利纪念碑CACOLO01=空军学院礼拜堂CARUS08 - 11 =球状戏院CAMISC06=V3 飞弹CAARMY01-04 =军队营帐CAFRMB =移动式厕所CATECH01 =通讯中心AMMOCRAT =弹药箱CAMISC01-02 =油桶。
螺杆零配件英文名大全

螺杆相关专门词汇集合Abrasives, Polishing Belts for Feed Screws Auger ScrewsBall Screws/ BallscrewsBarrel Adapters/End Caps, Injection Barrel Boring MachineryBarrel Heater BandsBarrel Honing-MachineryBarrel JacketsBarrel Resleeving, ExtrusionBarrel Resleeving, InjectionBarrel Resleeving, Twin (Segmented) Barrel Resleeving, Twin ExtrusionBarrel Rupture DiscsBarrel Wear/Alignment Equip.Barrels, BimetallicBarrels, BorescopingBarrels, New NitridedBarrels, New Tool SteelBarrels, New Twin ConicalBarrels, New Twin ParallelBarrels, New, Twin (segmented)Blow Molding Machine RebuildingBlow Molding Machines, ExtrusionBlow Molding Machines, InjectionBlow Molding ProcessorsBlow Molding Trouble Shooting Chrome PlatersControls/InstrumentationConveying Screws/SystemsDryersExpander ScrewsExpeller ScrewsExperts, Consultants, Education & Training Extruder Dies, New & RepairExtruder Drives/MotorsExtruder RebuildingExtruder ScrewsExtruder Trouble ShootingExtruders, Machine, OtherExtruders, Machines, FoodExtruders, Machines, Rubber Extruders, ProcessorsExtruders, Single Screw, Plastic Extruders, Twin ScrewExtruders, Twin, Plastic (Segmented Barrel)Extrusion BarrelsExtrusion Breaker PlatesExtrusion Experts & ConsultantsExtrusion Saw, PullersExtrusion Screen Changers/FiltrationExtrusion ScrewsExtrusion Software, Production Information Systems Extrusion Static MixersFeed Housing/Feeders/HoppersFeed Screw and Barrel Cleaners/PurgingFeed Screw Designers, FoodFeed Screw Designers, OtherFeed Screw Designers, PlasticsFeed Screw Designers, RubberFeed Screw Designers, TimingFeed Screw Gun DrillingFeed Screw Manufacturing SoftwareFeed Screw Milling MachinesFeed Screw Simulation SoftwareFeed Screw Wear/Inspection Equip.Feed Screw, Platings, CoatingFeed Screw, Rebuilding - FeedscrewsFeed Screw/Barrel TreatmentsFeed Screws, Manufacture - FeedscrewsFeed Screws, Segment ShaftsFeed Screws, Segments/Kneading BlocksFeed Screws, Twin RebuildingFeed Screws, Twin, NewGrinders/Grandulators/ShreddersGrinding Wheels for Feed ScrewsHardfacing, Equipment & SuppliesHoning Machinery and Supplies for Barrels Injection Hot RunnersInjection Mold DesignInjection Molders, Processors, MoldersInjection Molding Machine RebuildingInjection Molding Machines, Thermoplastic Injection Molding Machines, ThermosetInjection Molding Trouble ShootingInjection Molds, New & RepairInjection Non-Return V alvesInjection NozzlesInjection Platens, RebuildInjection Tie BarsInjection Toggle Clamp, RebuildJobs, A vailableJobs, WantedLead ScrewsMachinery, SpecialManufacturer RepsMelt Pumps/Gear PumpsMiscPlastics, PolymersProcessing Forums, Books & Web Portals Processing Publications & AssociationsPump ScrewsRecyclers, ProcessorsRecyclers, Processors, Plastic Lumber Rendering ScrewsRolls, Manufacturers-RebuildersRotor type screwsScrew & Barrel Metallurgical Services Screws, Medical, Surgical & BoneScrews, PulpScrews-Worms, Compressor, AirScrews-Worms, FluidSpecialty SteelStatic MixersTemperature ControllersTiming ScrewsWorm ScrewsAdditives, Modifiers and Compounding Archimedes InformationAuger, Information, Advice, Experts-ForumsBall ScrewsBarrel Bore ScopingBarrel V entingBarrelsBlow Molding Information & Advice Compounding, Information, Advice, Experts-Forums ConsultantsConveyor ScrewsExhibitionsExpellersExtruder Melt, Gear PumpsExtruder, CoolingExtruders, ClayExtruders, FoodExtruders, Information, Advice, Experts-Forums Extrusion , Plastic ConsultantsExtrusion diesExtrusion Forums and AdviceExtrusion RollsExtrusion Technical ServicesExtrusion, Aqua FeedExtrusion, BagExtrusion, Biodegradable Packaging Material Extrusion, BrickExtrusion, CeramicExtrusion, CerealExtrusion, CoatingsExtrusion, ConcreteExtrusion, DeckingExtrusion, definitionExtrusion, Education, PlasticsExtrusion, Feed Screw MODELING PROGRAM Extrusion, FiberExtrusion, FilmExtrusion, Fish FeedExtrusion, FoamExtrusion, Food EducationExtrusion, Gear PumpsExtrusion, HeatingExtrusion, MixingExtrusion, PastaExtrusion, Pet foodExtrusion, PipeExtrusion, Plastic, Seminars/Training/Education Extrusion, Plastics, GeneralExtrusion, Polystrene ResinsExtrusion, ProblemsExtrusion, RubberExtrusion, SheetEXTRUSION, SIMULA TIONExtrusion, Trouble shootingExtrusion, Twin ScrewExtrusion, V inyl SidingExtrusion, WaxExtrusion, WoodExtrusion-Pet foodFeed Hoppers/ Feeder ScrewsFeed Screw BreakageFeed screw segments-modular barrelsFeed Screw SoftwareFeed Screw, PicturesFeed Screws and BarrelsFeed Screws, Barrel Coatings and Platings Feed Screws, BarrierFeed Screws, CeramicFeed Screws, DesignsFeed Screws, Tool SteelFood ExtrudersGrooved Feed HousingsHardfacingHIP ProductsInjection Molding/info/education/training Injection ScrewsMixers, IndustrialMoldsPELLETIZINGPlastic LumberPlastic RecyclingPlastic, BottlesPlastic, Injection MoldingPlastic, MagazinesPlastics TrainingPlastics, InformationPowder Coatings-ExtrusionProcess Measurement & Control Purging, Componds, TechniquesScrew Pumps, Positive Displacement Screw Pumps, Progressing Cavity Pumps Screw Pumps, SludgeScrew Pumps-WaterScrew, WormsScrewsScrews, AirScrews, Bulk PowderScrews, PumpScrews, RotaryScrews, TimingScrews, TwinScrews-Medical, Surgical, Bone etc. Tips, nozzles, non return valves。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
PD3M371 WZ12-8 PLATFORM MARS GENERATOR SET COMMISSIONING PROGRESS Item Job To Be Done Delays and date Responsibility Date complete Unit A/B/C REMARRKSWORK DONE UP TO 12 August 2012 Work Completion1 INSTALLATION ANDMILLING OF TURBINEFOUNDATION PADS Holes on pads for Unit Ato be drilled. Heavy rainon 8/12 & no work.COOEC A: 80%B: 100%C: 30%2 INSTALLATION ANDLEVELLING OFTURBINE SKID COOEC/Solar A: 0%B: 80%C: 0%3 INSTALLATION OFANCILLARY SKIDS FORAIR INLET & EXHAUST COOEC/Solar A: 0%B: 0%C: 0%4 TORQUE HOLDINGDOWN BOLTS OFTURBINE SKID COOEC/Solar A: 0%B: 0%C: 0%5 INSTALLATION OFENCLOSURE VENTSYSTEM COOEC/Solar A: 0%B: 20%C: 0%Partiallyassembled atyard.6 INSTALLATION OFENGINE EXHAUSTSYSTEM COOEC/Solar A: 0%B: 0%C: 0%7 INSTALLATION OFENCLOSURE AIR INLETSYSTEM Waiting for silencer. COOEC/Solar A: 0%B: 0%C: 0%8 INSTALLATION OFTURBINE AIR INLETFILTER AND DUCTING COOEC/Solar A: 0%B: 20%C: 0%Partiallyassembled atyard.9 INSTALLATION OF MCC COOEC/Solar A: 0%B: 0%C: 0%10 INSTALLATION OFTURBINE CONTROLCONSOLE COOEC/Solar A: 0%B: 0%C: 0%11 INSTALLATION OF LUBEOIL TANK VENT PIPINGAND DEMISTER COOEC/Solar A: 0%B: 0%C: 0%12 INSTALLATION OF LUBEOIL COOLER & PIPING COOEC/Solar A: 0%B: 0%C: 0%13 FLUSHING OF OILCOOLER &ASSOCIATED PIPING COOEC/Solar A: 0%B: 0%C: 0%14 INSTALLATION OFLIQUID FUEL OILTREATMENT SKID Transferred all skids toopen deck on 8/11.COOEC A: 5%B: 5%C: 5%15 FILLING OF LUBE OILTANK COOEC/Solar A: 0%B: 0%C: 0%Drain valve to beinstalled beforeoil filling.16 INSTALLATION OFGENERATOR COOLER &TERMINAL BOX COOEC/Solar A: 0%B: 0%C: 0%17 INSTALLATION OF FIRECABINET COOEC/Solar A: 0%B: 0%C: 0%CO2 bottles tobe disconnectedbefore load out.18 ALIGNMENT CHECKFOR TURBINE &GEARBOX COOEC/Solar A: 0%B: 0%C: 0%To be done afteroil filling.19 ALIGNMENT CHECKFOR GEARBOX &GENERATOR COOEC/Solar A: 0%B: 0%C: 0%To be done afteroil filling.20 INSTALLATION OFDRAIN & VENT PIPING COOEC/Solar A: 0%B: 0%C: 0%21 INSTALLATION OFBATTERIES COOEC A: 0%B: 0%C: 0%22 LAYING OF ALL CABLERUNS COOEC A: 0%B: 0%C: 0%23 TERMINATION OFWIRING COOEC A: 0%B: 0%C: 0%24 CHECK & CALIBRATEOF ON-SKIDINSTRUMENTATION COOEC/Solar A: 0%B: 0%C: 0%25 WIRING OF MCC ATLOCATION COOEC/Solar A: 0%B: 0%C: 0%26 MEGGER OF MCC MAINBUS & OUT GOINGCABLES COOEC A: 0%B: 0%C: 0%27 POWER UP OF MCC COOEC/Solar A: 0%B: 0%C: 0%JSA is required.28 POINT TO POINTCHECKS COOEC/Solar A: 0%B: 0%C: 0%29 POWER TO CHARGERAND BATTERIES COOEC/Solar A: 0%B: 0%C: 0%30 POWER CHECKS OFCONTROL PANEL ANDINSTALL SOFTWARE Solar A: 0%B: 0%C: 0%31 COMPLETE LOOPCHECKS SOLAR WITHWZ WITNESSA: 0%B: 0%C: 0%32 INSULATION CHECK OFMOTORS COOEC/Solar A: 0%B: 0%C: 0%33 PHASE ROTATIONCHECK OF MOTORS COOEC/Solar A: 0%B: 0%C: 0%34 CHECKING CURRENTOF MOTORS COOEC/Solar A: 0%B: 0%C: 0%35 TEST CRANK OFENGINE SOLAR/COOEC A: 0%B: 0%C: 0%JSA is required.36 MEGGER OFGENERATOR ANDCHECK EXC & PMG COOEC/Solar A: 0%B: 0%C: 0%37 CHECK OF CT WIRINGAT GENERATOR BOX COOEC/Solar A: 0%B: 0%C: 0%38 COMPLETION OF GASTURBINE FIRE ANDFUEL SYSTEMS CO2 bottle heads to bedisconnected untilstarting of turbine unitSOLAR/COOEC A: 0%B: 0%C: 0%39 INSTALLATION OF HVSWITCHGEAR COOEC A: 0%B: 0%C: 0%40 PRESSURE TEST OFOFF-SKID LIQUID & GASFUEL PIPING COOEC A: 0%B: 0%C: 0%100% drained &dry out afterhydraulic test.41 PREPARE FOR LOADOUT SOLAR/COOEC A: 0%B: 0%C: 0%Gen rotor to belocked. Store alldoc & software.42 OFFSHORECOMMISSIONING COOEC/Solar A: 0%B: 0%C: 0%43 CHECK LEVELING &ALIGNMENT AT SEA COOEC/Solar A: 0%B: 0%C: 0%44 PURGE CLEAN OFF-SKID AIR, LIQUID & GASFUEL LINES WZ/COOEC A: 0%B: 0%C: 0%45 HI POT HV CABLES ANDMEGGER OF LVCABLES WZ/COOEC A: 0%B: 0%C: 0%46 HI-POT, MEGGER OFSWITCHGEAR WZ/COOEC A: 0%B: 0%C: 0%47 SWITCHGEARFUNCTIONAL CHECKS WZ/COOEC A: 0%B: 0%C: 0%48 GROUND FAULT CHECK& POWER UP TURBINECONTROL CONSOLE SOLAR A: 0%B: 0%C: 0%49 FUNCTIONAL CHECKFOR ON-SKIDSOLENOIDS SOLAR A: 0%B: 0%C: 0%50 ACTIVATE FIRESYSTEM SOLAR A: 0%B: 0%C: 0%All CO2 bottlesto be operationalcondition.51 LETTING FUEL TO THETURBINE UNIT WZ/COOEC A: 0%B: 0%C: 0%JSA is required.52 STARTING TURBINE CO2 bottle heads to beconnected prior to lightoff SOLAR A: 0%B: 0%C: 0%JSA is required.53 RUNNING TURBINEWITH NO LOAD TOCHECK VOLTS ETC SOLAR A: 0%B: 0%C: 0%54 PHASE ROTATION ANDSYNCRONIZATIONCHECK SOLAR/COOEC A: 0%B: 0%C: 0%55 PUTTING LOAD ONTURBINE SOLAR/WZ/COOECA: 0%B: 0%C: 0%56 SUDDEN LOAD CHECK SOLAR/WZ/COOEC A: 0% B: 0% C: 0%57 POST LUBE CYCLE &FUNCTIONAL TEST SOLAR /WZ/COOECA: 0%B: 0%C: 0%58 KW SHARE WITHOTHER GENSETS SOLAR /WZ/COOECA: 0%B: 0%C: 0%59 KVAR SHARE OFOTHER GENSETS SOLAR A: 0%B: 0%C: 0%60 LOAD SHARE OF SOLARTO EMERGENCYGENSET SOLAR/WZ/COOECA: 0%B: 0%C: 0%Black start test.61 LOAD REJECTION TEST SOLAR/WZ/COOEC A: 0% B: 0% C: 0%62 HANDOVER OF UNIT TOCUSTOMER SOLAR/WZ/COOECA: 0%B: 0%C: 0%。