钻井英语缩写补充

合集下载

钻井常用的英文缩写

钻井常用的英文缩写

英文钻井日志常用缩写词汇(按照钻井施工顺序排列)DC---------drill collar 钻铤DP---------drill pipe 钻杆TD---------true depth 垂直井深TD---------total depth 总进尺,总深度USG-------united states gallon 美制加仑Hrs---------hours 小时Drlg-------drilling 钻进,钻井Circ--------circulating 循环Hi. Vis.----high viscosity 高粘度CSG-------casing 套管POOH-----pull out of hole 起钻R/U--------rig up 安装SXS-------sacks 袋子WOC------wait on cement 候凝MW--------mud weight 泥浆比重N/U--------nipple up 安装P/U---------pick up 上提,提起TIH--------trip in hole 下钻Cmt--------cement 水泥DCS-------drill collar stem 钻铤柱ISF---------induction-spherically focused log 感应-球形聚焦测井LSS--------long-space sonic (log) 长源距声波测井GR---------gamma ray log 自然伽马测井LCST------lower critical solution temperature 地临界溶液温度R/D--------rig down 拆卸设备N/D--------nipple down 卸下来,拆卸BOPs------blowout preventer stack 防喷器组合结构M/U-------make-up 上扣,连接,接单跟BHA-------bottom hole assembly 下部钻具结构PV---------plastic viscosity 塑性粘度YP---------yield point 屈服点,流动点Sols--------solids 固相含量PH---------acidity or alkalinity 酸碱度Cond.------conditioned 处理,调整LOT--------leak-off test 地层抗破强度试验,套管鞋下边破裂压力试验EMW------equivalent mud weight 当量泥浆比重ROP-------rate of penetration 机械钻速FPH--------feet per hour 英尺/小时WL---------water loss 滤失量,失水B/U---------bring-up 暂停,是停止,中断KCL--------potassium 氯化钾Stds---------stands 钻杆或钻铤立柱JB-----------junk basket 随钻打捞杯L/D---------lay down 卸下,甩下,放下RIH---------run in hole 下钻GB----------globe basket 牙轮打捞篮Jts-----------joints 单根Bttm--------bottom 底,井底,底部Wt----------weight 重量,比重WOB-------weight on bit 钻压DLL--------dual later log 双侧向测井NGT--------natural gamma ray spectroscopy tool 自然伽马能谱测井LDT--------litho-density tool 岩性密度测井HDT--------high-resolution dipmeter tool 高分辨率地层倾角测井MSFL------micro-spherically focused log 微球形聚焦测井CNL--------compensated neutron (porosity) log 补偿中子(孔隙度)测井RFT---------repeat-formation tester 重复式地层测试器WST--------well seismic tool 井场地震仪Fin.---------finish 结束,弄完,干完PB----------plugged (plugging) back 打水泥塞,回填CBL--------cement bond log 水泥胶结测井VDL--------variable density 变密度测井(=VDC)CCL--------casing collar locator log 套管接箍地位器(测井)Pkr----------packer 封隔器DST---------drill stem tester 钻柱测试器TP-----------test pressure 测试压力FSIP--------final shut-in pressure 最终关井压力FSIT--------final shut-in time 最终关井时间F.L.---------fetch/ load 取出/装入Sudd.-------suddenly 突然Perf.--------perforation 射孔,打眼,炮眼Reptd-------reported 汇报,上报。

常用钻井英语缩写-参考模板

常用钻井英语缩写-参考模板

钻井英语缩写1.DP drill pipe 钻杆2.HWDP heavy weight (wall)drill pipe 加重钻杆3.DC drill collar 钻铤4.BHA bottom hole assembly井下钻具组合5.STB stabilizer 钻杆扶正器6.PNMDC pony non-magneticdrill collar 短无磁钻铤7.SMDC short non-magneticdrill collar 短无磁钻铤8.PDM positive displacementmotor 螺杆9.BOP blowout preventer 封井器10.BOPE blow out preventerequipment 封井器设备11.IBOP inside blowoutpreventer 内防喷工具12.CSG casing 套管13.TBG tubing 油管14.JNT/JT joint 单根15.XO cross-over 配合接头16.IF internal flush 内平17.FH full hole 贯眼18.REG regular 正规19.IU internal upset 内加厚20.EU external upset 外加厚21.EUE external upset 外加厚22.IEU interna l&externalupset 内外加厚23.OH open hole 裸眼24.WOB weight on bit 钻压25.RPM revolutions per minute转速/分钟26.SPM strokes per minute冲程/每分钟27.ECD equivalent circulatingdensity 当量泥浆密度28.MT metric ton 公制吨29.DST drill stem test 钻具测试30.KS key seat 键槽31.KSW key seat wiper 键槽清洁器32.STDS stands 立柱33.VIS viscosity 粘度34.PV plastic viscosity 塑性粘度35.YP yield point 屈服值36.FL filtrate loss 滤失37.WL water loss 失水D true vertical depth垂深39.MD measured depth 测量井深40.TD total depth 总井深41.PBTD plug back total depth人工井底42.PCS piece 件,个43.KOP kick off point 造斜点44.DIR direction 定向45.AZM azimuth 方位46.DEV deviation 井斜47.ROP rate of penetration 机械转速48.ID inside-diameter 内径49.OD outside diameter 外径50.FTG footage 进尺51.PPG pounds per gallon(密度)每加仑磅52.PSI pounds per square inch磅每平方英尺53.SGL single 单根54.LP low pressure 低压55.HP high pressure 高压56.H P horsepower 马力57.HHP hydraulic horsepower水马力58.HTHP high temperaturehigh pressure 高温高压59.AD assistant driller 副司钻60.LCM lost circulationmaterial 堵漏剂61.API American petroleuminstitute 美国石油协会62.IADC internationalassociation of drilling contractors 国际钻井承包商协会PC China nationalpetroleum 中国石油天然气总公司64.P/N part number 零件型号65.S/N serial number 系列号66.N/W net weight 净重67.G/W gross weight 毛重68.P/U pick up 吊起69.M/U make up 接上70.L/D lay down 甩开71.N/U nipple up 接上72.N/D nipple down 卸开73.R/U rig up 安装74.R/D rig down 拆卸75.WOC wait on cement 候凝76.WOW wait on water 等水77.WOW wait on weather 等天气78.WOO wait on order 等指令79.RIH run in hole 下钻80.POOH pull out of hole 起钻81.DR drilling 钻进82.DDR daily drilling report钻井日报表83.RM reaming 扩眼(划眼)84.BR back ream 倒划眼85.TOF top of fish 鱼顶86.SX sacks 袋87.MW mud weight 泥浆密度88.CBU circulate bottom up循环一周89.TOH trip out of hole 起钻90.MWD measurement whiledrilling 随钻测量91.LWD logging while drilling随钻测井92.POB personnel on board井场人员93.SG specific gravity 比重94.NDT non-destructive test无损探伤95.S/I shut in 关井96.PTW permit to work 工作许可97.BPV back pressure valve回压凡尔98.DIBPV drop in backpressure valve 投入式单流阀99.NP neutral point 中和点100.UPS uninterrupted power supply 不间断供电101.RBP retrievable bridge plug 可取回桥塞102.SICP shut in casing pressure 关井套压103.SIDPP shut in drill pipe pressure 关井立压104.MAASP maximum allowable annular surface pressure 最大允许环空压力105.BHT bottom hole temperature 井底温度106.BHP bottom hole pressure 井底压力107.HP hydrostatic pressure 液柱压力108. FP friction pressure 摩擦压力109. SP surface pressure 地面压力110. CP choke pressure 节流压力111.CF capacity factor 容积系数112.DSA drilling spool adaptor 四通转换法兰113. DSA double studded adaptor 双头载丝法兰114. CBHP constant bottom hole pressure 恒定井底压力115. ICP initial circulating pressure 初始循环压力116. FCP.final circulating pressure 终了循环压力117. BUR. build up rate 造斜率118. SS string stabilizer 钻具扶正器119. EMKL emergency kill line 应急压井管线120. RMR reamer 扩眼器121. NBRR near-bit roller reamer 近钻头牙轮扩眼器122. SR string roller reamer 钻具牙轮扩眼器123.RCJBreverse circulation junk basket 反循环打捞蓝124. FPI free point indicator 测卡仪125. PIC person in charge 负责人126. PJSM pre-job safety meeting 作业前安全会127. STK stroke 泵冲128. ACS automatic crown saver 电子防碰天车129. PVT pit volume totalizer 泥浆体积计量器130. IWCF international well control forum 国际井控论坛131. RH rat hole / right hand 大鼠洞/ 井底口袋132. LOT leak off test 地破试验133. PIT pressure integrity test 地破试验134. FIT formation integrity test地层完整性试验135. BTC buttress thread connection 梯形扣136. LTC long thread connection 长圆扣137. STC small thread connection 短圆扣138. CHC circulate hole clean 循环清洗井底139. ODF original drill floor 原始钻台面高度140. FAT first aid treatment 急救处理141. PPF pound per foot 段重142. TOC top of cement 水泥返高143. WBM water base mud 水基泥浆144. OBM oil base mud 油基泥浆145. LOTO lock out tag out 挂牌上锁146. TFA total flow area 总流到面积147. MCC motor control center 马达控制中心148.SABAsupplied air breathing apparatus 空气呼吸器149.SCBA self-contained breathing apparatus 自给式呼吸器150.EPC external pipe coating 钻杆外涂层151.W&W wait and weight 等待加重法152.MSDS material safety data sheet 材料安全数据表153.WBS weld blade stabilizer 焊接式翼片扶正器154.MPI magnetic particle inspection 磁粉探伤155.ESP electric submersible pump 电潜泵156.CP casing pressure/conductor pipe 套压/导管157.TCA tubing and casing annulus 油管与套管环空A casing and casing annulus 套管与套管环空159.LPM liter per minute 升/分钟160.MUT make up torque 上扣扭矩161.MWDP maximum well design pressure 最大井眼设计压力162.NBS near bit stabilizer 近钻头扶正器163.P&A plug and abandon 填井、弃井164.SCR silicon control rectifier/slow circulating rate 可控硅房/低泵冲165.JSA job safety analysis 作业安全分析166.SO slack off 下放167.SWL safe working load 安全工作载荷168.TDS top drive system 顶驱169.VM volumetric method 体积压井法170.DD directional driller 定向司钻171.UPR upper pipe ram 上半封闸板172.LPR lower pipe ram 下半封闸板173.N/A not applicable 不适用的 tank 罐175.DEG degree 度176.bbl barrel 桶177.sec second 秒178.Min minute 分钟179.Hr hour 小时180.FC float collar 浮箍181.FS float shoe 浮鞋182.DVT 分级箍183.CMT cement 水泥,固井184.ft foot 英尺184.in inch 英寸186.lb libra=pound 磅187.L liter 升188.klb kilo-pound 千磅189.WT weight 重量190.@ at 在……位置191.FOSV full opening safety valve 全开式安全阀192.HV high viscosity 高粘193.LV low viscosity 低粘194.BPH barrel per hour 桶每小时195.PG pressure gradient 压力梯度196.CPLG coupling 接箍197.BU balled up 泥包198.ASAP as soon as possible 尽早199.HSE health ,safety and environment 健康,安全和环保201.PA public announcement 202.SWP safety work permit 安全工作许可203.LWP life work permit 204.CWP cold work permit 冷作业许可205.SD shut down 关闭206.CSE confined space entry 207.HWP hot work permit 热作业许可208.EWP electrical work permit 用电许可---精心整理,希望对您有所帮助。

钻井专业英语缩写

钻井专业英语缩写

+AbbreviationDP-drill pipe 钻杆HWDP-heavy-weight drill pipe 加重钻杆DC-drill collar 钻铤STB-stabilizer 扶正器SMDC-short non-magnetic drill collar 短无磁钻铤PDM-position displacement motor 泥浆马达NMS-nonmagnetic stabilizer 无磁扶正器RR-roller reamer 滚子扶正器BOP-blowout preventer 防喷器CSG-casing 套管JNT-joint 接头XO-cross-over 配合接头IF-internal flush 内平FH-full hole 满眼REG-regular 正规IU-internal upset 内加厚EU-external upset 外加厚IEU-internal & external up set 内外加厚SH-slim hole 小眼OH-open hole 裸眼WOB-weight on bit 钻压RPM-revolutions per minute 转/分SPM-strokes per minute 冲/分ECD-Equivalent circulating density 当量循环密度MT-metric ton 公制吨BHP-bottom hole pressure 井底压力BHT-bottom hole temperature 井底温度BHST-bottom hole static temperature 井底静止温度BHCT-bottom hole circulating temperature 井底循环温度FBHP-flowing bottom hole pressure 井底流动压力BHA-bottom hole assembly 钻具组合DST-drill stem test 中途测试KS-key seat 键槽KSW-key seat wiper 键槽破坏器STDS-stands 立柱VIS-viscosity 粘度WL-water loss 失水PV-plastic viscosity 塑性粘度YP-yield point 屈服值FV-flitrate loss 失水TVD-true vertical depth 垂深MD-measured depth 测深(斜深)TD-total depth 完井深度KOP-kick of point 造斜点DIR-direction 方位AZM-azimuth 方位DEV-deviation 井斜ROP-rate of penetration 机械钻速ID-inside diameter 内径OD-outside diameter 外径FTG-footage 进尺PPG-pounds per gallon 磅/加仑PSI-pounds per squared inch 磅/平方英寸SGL-single 单根PPM-parts per million 百万分之一HTHP-high temperature high pressure 高温高压AD-assistant driller 副司钻LCM-lost circulation material 堵漏材料HHP-hydraulic horsepower 水马力BUTT-buttress thread 梯形扣ST&C-short round thread 短圆扣LT&C-long round thread 长圆扣NC-numbered connection 数字扣CNPC-China national petroleum corporation 中国石油天然气总公司API-American Petroleum Institute 美国石油学会IADC-International Association of Drilling Contractors 国际钻井承包商协会ASAP-as soon as possible 尽早P/n-part number 零件号N/w-net weight 净重P/U-pick up 吊起M/U-make up 组合L/D-lay down 甩下N/U-nipple up 安装N/D-nipple down 拆卸R/U-rig up 安装WOC-wait on cement 候凝RIH-run in hole 下钻WOO-wait on order 等命令POOH-pull out of hole 起钻DR-drilling 钻进RM-reaming 划眼WOW-wait on water 等水TOF-top of fish 鱼顶SX-sack 袋CPC-cement pump control console 固井泵控制台GEN-generator 发电机MPC-mud pump console 泥浆泵控制台MCC-motor control center 马达控制中心DW-drawworks 绞车RT-rotary table 转盘FWD-forward 正转REV-reverse 反转XFMR-transformer 变压器SCR-silicon controlled rectifier 可控硅整流器MW-mud weight 泥浆比重CBU-circulate bottom up 循环一周TOH-trip out of hole 起钻CSG-casing 套管BS-bit sub 钻头接头SST-survey steering tool 随钻测斜仪MWD-measuring while drilling 随钻测量ISS-interchangeable sleeve stabilizer 可换外套式扶正器WBS-welded blade stabilizer 焊接长条式扶正器BPV-back pressure valve 回压凡尔CHD-casing head 套管头CHS-casing head spool 套管头四通CTT-cup type tester 杯式测试器DS-drilling spool 钻井四通MPB-metal petal basket 水泥伞MSC-multiple stage collar 多级注水泥接箍OTDP-open ended drill pipe 光头钻杆PTT-plug type tester 塞式测式器PPF-pounds per foot 磅/英尺FPM-foot per minute 英尺/分BHP-brake horsepower 制动马力TOC-top of cement 水泥返高LCZ-lost circulation zone 漏失层MVT-mud volume totalizer 泥浆体积累加器CDR-continuous drilling rate logger 钻速连续记录仪FA-flow area 流动面积DFE-derrick floor elevation 钻台面海拔PBD-plug back total depth 回堵井深PBTD-plug back total depth 回堵总长度BHC-bore hole compensated sonic log 井眼补偿声波测井BSL-bore hole sonic log 井眼声波测井CBL-cement bond log 水泥胶结测井CCL-casing collar log 套管接箍测井CDL-compensated density log 补偿密度测井CNL-compensated neutron log 补偿中子测井DLL-double lateral log 双侧向测井ETT-electromagnetic thickness tool 电磁测厚仪FDC-formation density compensated log 地层密度补偿测井GR-gamma ray log 伽玛射线测井GRN-gamma ray neutron log 伽玛-中子测井IEL-induction electrical log 电感应测井ISF-induction spherical focus log 感应球聚焦测井ML-microelectrode log 微电极测井MLL- microelectrode lateral log 微电极侧向测井MSFL-micro spherical focus log 微球聚焦测井SP-spontaneous potential 自然电位VDL-variable density log 变密度测井SNL-sidewall neutron log 井壁中子测井CET-cement evaluation tool固井质量评价工具BT-broken insert 断齿LT-lost insert 掉齿WI-worn insert 齿磨损XWI-excessive worn insert 齿过度磨损C-chipped 齿破碎I-in gage 外径无磨损CR-cored 钻头中心磨空E-eroded 冲蚀G-gage 保径J-journal 轴径L-locked cone 牙轮卡死O-out of gage 外径磨损LC-lost cone 掉牙轮CI-cone interference 牙轮互锁CE-cone erosion 牙轮刺坏CC-cracked circum ferentially 周向裂开SE-seals effective 密封良好SF-seals failure 密封破坏SQ-seals questionable 密封可能破坏LR-lost bearing 掉滚柱LB-lost bearing 掉轴承WT-worn teeth 钢齿磨损BT-broken teeth 断钢齿UW-uniform wear 均匀磨损TT-tracking teeth 齿上磨出深痕LT-lost teeth 掉钢齿CT-chipped teeth 碎钢齿BU-balled up 泥包。

常用钻井英语缩写

常用钻井英语缩写

钻井英语缩写1.DP drill pipe 钻杆2.HWDP heavy weight (wall)drill pipe 加重钻杆3.DC drill collar 钻铤4.BHA bottom hole assembly井下钻具组合5.STB stabilizer 钻杆扶正器drill collar 短无磁钻铤drill collar 短无磁钻铤8.PDM positive displacement motor 螺杆9.BOP blowout preventer 封井器10.BOPE blow out preventer equipment 封井器设备11.IBOP inside blowout preventer 内防喷工具12.CSG casing 套管13.TBG tubing 油管14.JNT/JT joint 单根15.XO cross-over 配合接头16.IF internal flush 内平17.FH full hole xx眼18.REG regular 正规19.IU internal upset 内加厚20.EU external upset 外加厚21.EUE external upset 外加厚22.IEU internal&externalupset 内外xx23.OH open hole 裸眼24.WOB weight on bit 钻压25.RPM revolutions per minute转速/分钟26.SPM strokes per minute冲程/每分钟27.ECD equivalent circulating density 当量泥浆密度28.MT metric ton 公制吨29.DST drill stem test 钻具测试30.KS key seat 键槽31.KSW key seat wiper 键槽清洁器32.STDS stands xx33.VIS viscosity 粘度34.PV plastic viscosity 塑性粘度35.YP yield point 屈服值36.FL filtrate loss 滤失37.WL water loss 失水D true vertical depth垂深39.MD measured depth 测量xx40.TD total depth 总井深41.PBTD plug back total depth人工井底42.PCS piece 件,个43.KOP kick off point 造斜点44.DIR direction 定向45.AZM azimuth 方位46.DEV deviation 井斜48.ID inside-diameter 内径49.OD outside diameter 外径50.FTG footage 进尺51.PPG pounds per gallon (密度)每加仑磅52.PSI pounds per square inch 磅每平方英尺53.SGL single 单根54.LP low pressure 低压55.HP high pressure 高压56.HPhorsepower 马力57.HHP hydraulic horsepower水马力58.HTHP high temperaturehigh pressure 高温高压59.AD assistant driller 副司钻60.LCM lost circulationmaterial 堵漏剂61.API American petroleuminstitute xx石油协会62.IADC international association of drilling contractors 国际钻井承包商协会PC China national petroleum 中国石油天然气总公司64.P/N part number 零件型号65.S/N serial number 系列号67.G/W gross weight 毛重68.P/U pick up 吊起69.M/U make up 接上70.L/D lay down 甩开71.N/U nipple up 接上72.N/D nipple down 卸开73.R/U rig up 安装74.R/D rig down 拆卸75.WOC wait on cement 候凝76.WOW wait on water 等水77.WOW wait on weather 等天气78.WOO wait on order 等指令79.RIH run in hole 下钻80.POOH pull out of hole 起钻81.DR drilling 钻进82.DDR daily drilling report 钻井日报表83.RM reaming 扩眼(划眼)84.BR back ream 倒划眼85.TOF top of fish 鱼顶86.SX sacks 袋87.MW mud weight 泥浆密度88.CBU circulate bottom up 循环一周89.TOH trip out of hole 起钻90.MWD measurement whiledrilling 随钻测量91.LWD logging while drilling随钻测井92.POB personnel on board井场人员93.SG specific gravity 比重94.NDT non-destructive test无损探伤95.S/I shut in 关井96.PTW permit to work 工作许可97.BPV back pressure valve 回压凡尔98.DIBPV drop in back pressure valve 投入式单流阀99.NP neutral point 中和点100.UPS uninterrupted power supply 不间断供电101.RBP retrievable bridge plug 可取回桥塞102.SICP shut in casing pressure 关井套压103.SIDPP shut in drill pipe pressure 关井立压104.MAASPmaximum allowableannular surface pressure 最大允许环空压力105.BHT bottom hole temperature井底温度106.BHP bottom hole pressure井底压力107.HPhydrostatic pressure 液柱压力108.FP friction pressure 摩擦压力109.SP surface pressure 地面压力110. CP choke pressure节流压力111.CF capacity factor容积系数112.DSA drilling spool adaptor 四通转换法兰113.DSA double studded adaptor 双头载丝法兰114.CBHP constant bottom hole pressure 恒定井底压力115.ICP initial circulating pressure 初始循环压力116. FCP.final circulating pressure终了循环压力117. BUR. build up rate造斜率118. SS string stabilizer钻具扶正器119.EMKL emergency kill line应急压井管线120. RMR reamer扩眼器121.NBRR near-bit roller reamer近钻头牙轮扩眼器122. SR string roller reamer钻具牙轮扩眼器123.RCJBreversecirculation junk basket 反循环打捞蓝124. FPI free point indicator测卡仪125. PIC person in charge负责人126. PJSM pre-job safety meeting作业前安全会127. STK stroke泵冲128.ACS automatic crown saver 电子防碰天车129.PVT pit volume totalizer 泥浆体积计量器130.IWCF international well control forum 国际井控论坛131. RH rat hole / right hand大鼠洞/井底口袋132. LOT leak off test地破试验133. PIT pressure integrity test地破试验134.FIT formation integrity test地层完整性试验135.BTC buttress threadconnection 梯形扣136.LTC long thread connection长圆扣137. STC small thread connection短圆扣138. CHC circulate hole clean循环清洗井底139. ODF original drill floor原始钻台面高度140.FAT first aid treatment 急救处理141. PPF pound per foot段重142.TOC top of cement 水泥返高143.WBM water base mud 水基泥浆144.OBM oil base mud 油基泥浆145. LOTO lock out tag out挂牌上锁146.TFA total flow area 总流到面积147.MCC motor control centerxx控制中心148.SABAsupplied airbreathing apparatus 空气呼吸器149.SCBAself-containedbreathing apparatus 自给式呼吸器150.EPC external pipe coating钻杆外涂层151.W&Wwait and weight 等待加重法152.MSDSmaterial safety data sheet 材料安全数据表153.WBS weld blade stabilizer焊接式翼片扶正器155.ESPelectric submersible pump 电潜泵156.CPcasing pressure/conductor pipe 套压/导管157.TCAtubing and casing annulus 油管与套管环空Acasing and casing annulus 套管与套管环空159.LPMliter per minute 升/分钟160.MUT make up torque上扣扭矩161.MWDP maximum well designpressure 最大井眼设计压力162.NBSnear bit stabilizer 近钻头xx器163.P&Aplug and abandon 填井、弃井164.SCRsilicon controlrectifier/slow circulating rate 可控硅房/低泵冲165.JSAjob safety analysis 作业安全分析166.SO slack off下放167.SWLsafe working load 安全工作载荷168.TDStop drive system 顶驱169.VMvolumetric method 体积压井法170.DDdirectional driller 定向司钻171.UPRupper pipe ram 上半封闸板172.LPRlower pipe ram 下半封闸板173.N/Anot applicable 不适用的tank 罐175.DEGdegree 度176.bblbarrel 桶177.sec second秒178.Minminute 分钟179.Hrhour 小时180.FCfloat collar 浮箍181.FSfloat shoe 浮鞋182.DVT分级箍183.CMTcement 水泥,固井184.ftfoot 英尺184.inch 英寸186.lblibra=pound 磅187.Lliter 升188.klbkilo-pound 千磅189.WTweight 重量190.@at 在……位置191.FOSVfull opening safety valve 全开式安全阀192.HVhigh viscosity 高粘193.LVlow viscosity 低粘194.BPHbarrel per hour 桶每小时195.PGpressure gradient 压力梯度196.CPLGcoupling 接箍197.BUballed up 泥包198.ASAPas soon as possible尽早199.HSEhealth ,safetyandenvironment 健康,安全和环保201.PApublic announcement202.SWPsafety work permit 安全工作xx203.LWPlife work permit 204.CWPcold work permit 冷作业许可205.SDshut down 关闭206.CSEconfined space entry207.HWPhot work permit 热作业许可208.EWPelectrical work permit 用电许可。

石油钻井英语缩写及词汇

石油钻井英语缩写及词汇

石油钻井英语缩写及词汇DC: drill collar钻铤DP: drill pipe钻杆HWDP: heavy weight drill pipe加重钻杆X/O: crossover转换接头CSG: casing 套管WOC: wait on cementing侯凝POOH: put out of hole起钻(trip out)短起:short tripRIH: run in hole下钻(trip in)R/U: rig up组装N/U: nipple up组装L/D: lay down甩钻具DD:directional driller:定向司钻(斯伦贝谢的员工)w/: withBOP: blowout preventer防喷器、封井器BHA: bottom hole assembly井底钻具OD: outside diameter外径ID: inside diameter内径IF: internal flush内平FH: full hole贯眼EU: external upset外加厚IU: internal upset内加厚WBM: water base mud水基泥浆OBM: oil base mud油基泥浆TIW: Texas Iron Works全开安全阀MW: mud weight泥浆密度SPP: standpipe pressure立管压力MWD: measure while drilling随钻测量CCL: casing collar log套管接箍测井GR: gamma ray伽马(测井)HTHP: high temperature & high pressure高温高压RPM: round per minute转速SPM: stroke per minute泥浆泵TD: total depth总井深MD: measured depth斜深TVD: true vertical depth垂深PPG: pound per gallonRKB: rotary kelly bushing方钻杆补心GL: ground level地表LCM: loss circulation materials堵漏剂P/U: pick up上提WOB: weight on bit钻压VISC: viscosity泥浆粘度N/D: nipple down拆卸R/D: rig down拆卸SX: sacks袋、包BBL: barrel桶B/U: bottom up循环一周M/U: make up组装LB: poundPSI: pound per square inchESD: emergency shutdown紧急关停装置ROP: rate of penetration进尺速度(机械钻速)ESP:emergency response plan应急响应预案Isolation valve高低压闸门Swab 凡尔提(泥浆泵配件)Hub方卡瓦Bail 吊环Air hoist气葫芦Chain hoist手拉葫芦、倒链V-door (pipe ramp) 斜坡Flowline泥浆天槽Gas buster / poor boy液气分离器Slug pit配浆罐(配药罐)Trip nipple旋转头喇叭口Rotating head旋转头Chickson 活动弯头Trailer/container/cabin/quarter room住井房/生活区Trash pump排污泵Flare pit放喷池/点火池/防火墙pup joint:短节重晶石:bariteWear bushing:防磨套膨润土:gelCasing tally:套管数据Float shoe:浮鞋Float collar:浮匝Protector:护丝WDC:wait on cement:候凝Measure out of hole:校对井深surface casing:表层套管intermediate casing:技术套管production casing:生产套管方瓦:hub卡瓦:slip碳酸钙:calcium carbonate环形防喷器:annular 半封:pipe ram全封:blind ram Drift :通径(vt)Gauge ring:通径规Resistivity:电阻套压:casing pressure油(管)压:tubing pressure XJH:须家河地层KOP:kick-off point:造斜点。

常用钻井英语缩写

常用钻井英语缩写

钻井英语缩写1.DPdrillpipe钻杆2.HWDPheavyweight(wall)drillpipe加重钻杆3.DCdrillcollar钻铤4.BHAbottomholeassembly井下钻具组合5.STBstabilizer钻杆扶正器6.PNMDCponynon-magneticdrillcollar短无磁钻铤7.SMDCshortnon-magneticdrillcollar短无磁钻铤8.PDMpositivedisplacementmotor螺杆9.BOPblowoutpreventer封井器10.BOPEblowoutpreventerequipment封井器设备11.IBOPinsideblowoutpreventer内防喷工具12.CSGcasing套管13.TBGtubing油管14.JNT/JTjoint单根15.XOcross-over配合接头16.IFinternalflush内平17.FHfullhole贯眼18.REGregular正规19.IUinternalupset内加厚20.EUexternalupset外加厚21.EUEexternalupset外加厚22.IEUinternal&externalupset内外加厚23.OHopenhole裸眼24.WOBweightonbit钻压25.RPMrevolutionsperminute转速/分钟26.SPMstrokesperminute冲程/每分钟27.ECDequivalentcirculatingdensity当量泥浆密度28.MTmetricton公制吨29.DSTdrillstemtest钻具测试30.KSkeyseat键槽31.KSWkeyseatwiper键槽清洁器32.STDSstands立柱33.VISviscosity粘度34.PVplasticviscosity塑性粘度35.YPyieldpoint屈服值36.FLfiltrateloss滤失37.WLwaterloss失水Dtrueverticaldepth垂深39.MDmeasureddepth测量井深40.TDtotaldepth总井深41.PBTDplugbacktotaldepth人工井底42.PCSpiece件,个43.KOPkickoffpoint造斜点44.DIRdirection定向45.AZMazimuth方位46.DEVdeviation井斜47.ROPrateofpenetration机械转速48.IDinside-diameter内径49.ODoutsidediameter外径50.FTGfootage进尺51.PPGpoundspergallon(密度)每加仑磅52.PSIpoundspersquareinch磅每平方英尺53.SGLsingle单根54.LPlowpressure低压55.HPhighpressure高压56.H P horsepower马力57.HHPhydraulichorsepower水马力58.HTHPhightemperaturehighpressure高温高压59.ADassistantdriller副司钻60.LCMlostcirculationmaterial堵漏剂61.APIAmericanpetroleuminstitute美国石油协会62.IADCinternationalassociationofdrillingcontractors国际钻井承包商协会PCChinanationalpetroleum中国石油天然气总公司64.P/Npartnumber零件型号65.S/Nserialnumber系列号66.N/Wnetweight净重67.G/Wgrossweight毛重68.P/Upickup吊起69.M/Umakeup接上70.L/Dlaydown甩开71.N/Unippleup接上72.N/Dnippledown卸开73.R/Urigup安装74.R/Drigdown拆卸75.WOCwaitoncement候凝76.WOWwaitonwater等水77.WOWwaitonweather等天气78.WOOwaitonorder等指令79.RIHruninhole下钻80.POOHpulloutofhole起钻81.DRdrilling钻进82.DDRdailydrillingreport钻井日报表83.RMreaming扩眼(划眼)84.BRbackream倒划眼85.TOFtopoffish鱼顶86.SXsacks袋87.MWmudweight泥浆密度88.CBUcirculatebottomup循环一周89.TOHtripoutofhole起钻90.MWDmeasurementwhiledrilling随钻测量91.LWDloggingwhiledrilling随钻测井92.POBpersonnelonboard井场人员93.SGspecificgravity比重94.NDTnon-destructivetest无损探伤95.S/Ishutin关井96.PTWpermittowork工作许可97.BPVbackpressurevalve回压凡尔98.DIBPVdropinbackpressurevalve投入式单流阀99.NPneutralpoint中和点100.UPSuninterruptedpowers upply不间断供电101.RBPretrievablebridgepl ug可取回桥塞102.SICPshutincasingpressu re关井套压103.SIDPPshutindrillpipepr essure关井立压104.MAASPmaximumallowableann ularsurfacepressure最大允许环空压力105.BHTbottomholetemperature 井底温度106.BHPbottomholepressure井底压力107.HPhydrostaticpressure液柱压力108.FPfrictionpressure摩擦压力109.SPsurfacepressure地面压力110.CPchokepressure节流压力111.CFcapacityfactor容积系数112.DSAdrillingspooladaptor 四通转换法兰113.DSAdoublestuddedadaptor 双头载丝法兰114.CBHPconstantbottomholepr essure恒定井底压力115.ICPinitialcirculatingpre ssure初始循环压力116.FCP.finalcirculatingpres sure终了循环压力117.BUR.builduprate造斜率118.SSstringstabilizer钻具扶正器119.EMKLemergencykillline应急压井管线120.RMRreamer扩眼器121.NBRRnear-bitrollerreamer 近钻头牙轮扩眼器122.SRstringrollerreamer钻具牙轮扩眼器123.RCJBreversecirculationjunkbasket 反循环打捞蓝124.FPIfreepointindicator测卡仪125.PICpersonincharge负责人126.PJSMpre-jobsafetymeeting 作业前安全会127.STKstroke泵冲128.ACSautomaticcrownsaver 电子防碰天车129.PVTpitvolumetotalizer泥浆体积计量器130.IWCFinternationalwellcon trolforum国际井控论坛131.RHrathole/righthand大鼠洞/井底口袋132.LOTleakofftest地破试验133.PITpressureintegritytest 地破试验134.FITformationintegritytes t地层完整性试验135.BTCbuttressthreadconnect ion梯形扣136.LTClongthreadconnection 长圆扣137.STCsmallthreadconnection 短圆扣138.CHCcirculateholeclean循环清洗井底139.ODForiginaldrillfloor原始钻台面高度140.FATfirstaidtreatment急救处理141.PPFpoundperfoot段重142.TOCtopofcement水泥返高143.WBMwaterbasemud水基泥浆144.OBMoilbasemud油基泥浆145.LOTOlockouttagout挂牌上锁146.TFAtotalflowarea总流到面积147.MCCmotorcontrolcenter马达控制中心148.SABAsuppliedairbreathingapparatu s空气呼吸器149.SCBAself-containedbreath ingapparatus自给式呼吸器150.EPCexternalpipecoating 钻杆外涂层151.W&Wwaitandweight等待加重法152.MSDSmaterialsafetydatash eet材料安全数据表153.WBSweldbladestabilizer 焊接式翼片扶正器154.MPImagneticparticleinspe ction磁粉探伤155.ESPelectricsubmersiblepu mp电潜泵156.CPcasingpressure/conduct orpipe套压/导管157.TCAtubingandcasingannulu s油管与套管环空Acasingandcasingannulu s套管与套管环空159.LPMliterperminute升/分钟160.MUTmakeuptorque上扣扭矩161.MWDPmaximumwelldesignpre ssure最大井眼设计压力162.NBSnearbitstabilizer近钻头扶正器163.P&Aplugandabandon填井、弃井164.SCRsiliconcontrolrectifi er/slowcirculatingrate可控硅房/低泵冲165.JSAjobsafetyanalysis作业安全分析166.SOslackoff下放167.SWLsafeworkingload安全工作载荷168.TDStopdrivesystem顶驱169.VMvolumetricmethod体积压井法170.DDdirectionaldriller定向司钻171.UPRupperpiperam上半封闸板172.LPRlowerpiperam下半封闸板173.N/Anotapplicable不适用的tank罐175.DEGdegree度176.bblbarrel桶177.secsecond秒178.Minminute分钟179.Hrhour小时180.FCfloatcollar浮箍181.FSfloatshoe浮鞋182.DVT分级箍183.CMTcement水泥,固井184.ftfoot英尺184.ininch英寸186.lblibra=pound磅187.Lliter升188.klbkilo-pound千磅189.WTweight重量190.@at在……位置191.FOSVfullopeningsafetyval ve全开式安全阀192.HVhighviscosity高粘193.LVlowviscosity低粘194.BPHbarrelperhour桶每小时195.PGpressuregradient压力梯度196.CPLGcoupling接箍197.BUballedup泥包198.ASAPassoonaspossible尽早199.HSEhealth,safetyandenvir onment健康,安全和环保201.PApublicannouncement 202.SWPsafetyworkpermit安全工作许可203.LWPlifeworkpermit204.CWPcoldworkpermit冷作业许可205.SDshutdown关闭206.CSEconfinedspaceentry 207.HWPhotworkpermit热作业许可208.EWPelectricalworkpermit 用电许可。

常用钻井英语缩写

常用钻井英语缩写

常用钻井英语缩写Company Document number:WTUT-WT88Y-W8BBGB-BWYTT-19998钻井英语缩写1.DPdrillpipe钻杆2.HWDPheavyweight(wall)drillpipe加重钻杆3.DCdrillcollar钻铤4.BHAbottomholeassembly井下钻具组合5.STBstabilizer钻杆扶正器6.PNMDCponynon-magneticdrillcollar短无磁钻铤7.SMDCshortnon-magneticdrillcollar短无磁钻铤8.PDMpositivedisplacementmotor螺杆9.BOPblowoutpreventer封井器10.BOPEblowoutpreventerequipment封井器设备11.IBOPinsideblowoutpreventer内防喷工具12.CSGcasing套管13.TBGtubing油管14.JNT/JTjoint单根15.XOcross-over配合接头16.IFinternalflush内平17.FHfullhole贯眼18.REGregular正规19.IUinternalupset内加厚20.EUexternalupset外加厚21.EUEexternalupset外加厚22.IEUinterna l&externalupset内外加厚23.OHopenhole裸眼24.WOBweightonbit钻压25.RPMrevolutionsperminute转速/分钟26.SPMstrokesperminute冲程/每分钟27.ECDequivalentcirculatingdensity当量泥浆密度28.MTmetricton公制吨29.DSTdrillstemtest钻具测试30.KSkeyseat键槽31.KSWkeyseatwiper键槽清洁器32.STDSstands立柱33.VISviscosity粘度34.PVplasticviscosity塑性粘度35.YPyieldpoint屈服值36.FLfiltrateloss滤失37.WLwaterloss失水Dtrueverticaldepth垂深39.MDmeasureddepth测量井深40.TDtotaldepth总井深41.PBTDplugbacktotaldepth人工井底42.PCSpiece件,个43.KOPkickoffpoint造斜点44.DIRdirection定向45.AZMazimuth方位46.DEVdeviation井斜47.ROPrateofpenetration机械转速48.IDinside-diameter内径49.ODoutsidediameter外径50.FTGfootage进尺51.PPGpoundspergallon(密度)每加仑磅52.PSIpoundspersquareinch磅每平方英尺53.SGLsingle单根54.LPlowpressure低压55.HPhighpressure高压56.H P horsepower马力57.HHPhydraulichorsepower水马力58.HTHPhightemperaturehighpressure高温高压59.ADassistantdriller副司钻60.LCMlostcirculationmaterial堵漏剂61.APIAmericanpetroleuminstitute美国石油协会62.IADCinternationalassociationofdrillingcontractors国际钻井承包商协会PCChinanationalpetroleum中国石油天然气总公司64.P/Npartnumber零件型号65.S/Nserialnumber系列号66.N/Wnetweight净重67.G/Wgrossweight毛重68.P/Upickup吊起69.M/Umakeup接上70.L/Dlaydown甩开71.N/Unippleup接上72.N/Dnippledown卸开73.R/Urigup安装74.R/Drigdown拆卸75.WOCwaitoncement候凝76.WOWwaitonwater等水77.WOWwaitonweather等天气78.WOOwaitonorder等指令79.RIHruninhole下钻80.POOHpulloutofhole起钻81.DRdrilling钻进82.DDRdailydrillingreport钻井日报表83.RMreaming扩眼(划眼)84.BRbackream倒划眼85.TOFtopoffish鱼顶86.SXsacks袋87.MWmudweight泥浆密度88.CBUcirculatebottomup循环一周89.TOHtripoutofhole起钻90.MWDmeasurementwhiledrilling随钻测量91.LWDloggingwhiledrilling随钻测井92.POBpersonnelonboard井场人员93.SGspecificgravity比重94.NDTnon-destructivetest无损探伤95.S/Ishutin关井96.PTWpermittowork工作许可97.BPVbackpressurevalve回压凡尔98.DIBPVdropinbackpressurevalve投入式单流阀99.NPneutralpoint中和点100.UPSuninterruptedpowersup ply不间断供电101.RBPretrievablebridgeplug 可取回桥塞102.SICPshutincasingpressure 关井套压103.SIDPPshutindrillpipepressur e关井立压最大允许环空压力105.BHTbottomholetemperature 井底温度井底压力液柱压力摩擦压力地面压力节流压力容积系数112.DSAdrillingspooladaptor四通转换法兰双头载丝法兰恒定井底压力初始循环压力终了循环压力造斜率钻具扶正器应急压井管线扩眼器近钻头牙轮扩眼器钻具牙轮扩眼器123.RCJBreversecirculationjunkbasket反循环打捞蓝测卡仪负责人作业前安全会泵冲电子防碰天车泥浆体积计量器国际井控论坛righthand大鼠洞/井底口袋地破试验地破试验地层完整性试验梯形扣长圆扣短圆扣循环清洗井底原始钻台面高度急救处理段重水泥返高水基泥浆油基泥浆挂牌上锁总流到面积马达控制中心148.SABAsuppliedairbreathingapparatus空气呼吸器自给式呼吸器钻杆外涂层&Wwaitandweight等待加重法材料安全数据表焊接式翼片扶正器磁粉探伤电潜泵conductorpipe套压/导管油管与套管环空套管与套管环空升/分钟上扣扭矩最大井眼设计压力近钻头扶正器&Aplugandabandon填井、弃井slowcirculatingrate可控硅房/低泵冲作业安全分析下放安全工作载荷顶驱体积压井法定向司钻上半封闸板下半封闸板Anotapplicable不适用的罐度桶秒分钟小时浮箍浮鞋分级箍水泥,固井英尺英寸=pound磅升千磅重量190.@at在……位置全开式安全阀高粘低粘桶每小时压力梯度接箍泥包尽早,safetyandenvironment健康,安全和环保安全工作许可冷作业许可关闭热作业许可用电许可。

常用钻井工具英文缩写

常用钻井工具英文缩写

常⽤钻井⼯具英⽂缩写钻井英语缩写1.DP drill pipe 钻杆2.HWDP heavy weight (wall) drill pipe加重钻杆3.DC drill collar 钻铤4.BHA bottom hole assembly 井下钻具组合5.STB stabilizer 钻杆扶正器6.PNMDC pony non-magnetic drill collar短⽆磁钻铤7.SMDC short non-magnetic drill collar短⽆磁钻铤8.PDM positive displacement motor 螺杆9.BOP blowout preventer 封井器10. BOPE blow out preventer equipment封井器设备11. IBOP inside blowout preventer 内防喷⼯具12. CSG casing 套管13. TBG tubing 油管14. JNT/JT joint 单根15. XO cross-over 配合接头16. IF internal flush 内平17. FH full hole 贯眼18. REG regular 正规19. IU internal upset 内加厚20. EU external upset 外加厚21. EUE external upset 外加厚22. IEU internal&external upset 内外加厚23. OH open hole 裸眼24. WOB weight on bit 钻压25. RPM revolutions per minute 转速/分钟26. SPM strokes per minute 冲程/每分钟27. ECD equivalent circulating density当量泥浆密度28. MT metric ton 公制吨29. DST drill stem test 钻具测试30. KS key seat 键槽31. KSW key seat wiper 键槽清洁器32. STDS stands ⽴柱33. VIS viscosity 粘度34. PV plastic viscosity 塑性粘度35. YP yield point 屈服值36. FL filtrate loss 滤失37. WL water loss 失⽔38. TVD true vertical depth 垂深39. MD measured depth 测量井深40. TD total depth 总井深41. PBTD plug back total depth ⼈⼯井底42. PCS piece 件,个43. KOP kick off point 造斜点44. DIR direction 定向45. AZM azimuth ⽅位46. DEV deviation 井斜47. ROP rate of penetration 机械转速48. ID inside-diameter 内径49. OD outside diameter 外径50. FTG footage 进尺51. PPG pounds per gallon (密度)每加仑磅52. PSI pounds per square inch 磅每平⽅英尺53. SGL single 单根54. LP low pressure 低压55. HP high pressure ⾼压56. H P horsepower 马⼒57. HHP hydraulic horsepower ⽔马⼒58. HTHP high temperature high pressure ⾼温⾼压59. AD assistant driller 副司钻60. LCM lost circulation material 堵漏剂61. API American petroleum institute美国⽯油协会62. IADC international association of drilling contractors 国际钻井承包商协会63. CNPC China national petroleum 中国⽯油天然⽓总公司64. P/N part number 零件型号65. S/N serial number 系列号66. N/W net weight 净重67. G/W gross weight ⽑重68. P/U pick up 吊起69. M/U make up 接上70. L/D lay down 甩开71. N/U nipple up 接上72. N/D nipple down 卸开73. R/U rig up 安装74. R/D rig down 拆卸75. WOC wait on cement 候凝76. WOW wait on water 等⽔77. WOW wait on weather 等天⽓78. WOO wait on order 等指令79. RIH run in hole 下钻80. POOH pull out of hole 起钻81. DR drilling 钻进82. DDR daily drilling report 钻井⽇报表83. RM reaming 扩眼(划眼)84. BR back ream 倒划眼85. TOF top of fish 鱼顶86. SX sacks 袋87. MW mud weight 泥浆密度88. CBU circulate bottom up 循环⼀周89. TOH trip out of hole 起钻90. MWD measurement while drilling 随钻测量91. LWD logging while drilling 随钻测井92. POB personnel on board 井场⼈员93. SG specific gravity ⽐重94. NDT non-destructive test ⽆损探伤95. S/I shut in 关井96. PTW permit to work ⼯作许可97. BPV back pressure valve 回压凡尔98. DIBPV drop in back pressure valve投⼊式单流阀99. NP neutral point 中和点100.U PS uninterrupted power supply 不间断供电101.R BP retrievable bridge plug 可取回桥塞102.S ICP shut in casing pressure 关井套压103.S IDPP shut in drill pipe pressure 关井⽴压104.MAASP maximum allowable annular surface pressure 最⼤允许环空压⼒105.BHT bottom hole temperature 井底温度106.BHP bottom hole pressure 井底压⼒107.HP hydrostatic pressure 液柱压⼒108. FP friction pressure 摩擦压⼒109. SP surface pressure 地⾯压⼒110. CP choke pressure 节流压⼒111.CF capacity factor 容积系数112.DSA drilling spool adaptor 四通转换法兰113. DSA double studded adaptor 双头载丝法兰114. CBHP constant bottom hole pressure 恒定井底压⼒115. ICP initial circulating pressure 初始循环压⼒116. FCP.final circulating pressure 终了循环压⼒117. BUR. build up rate 造斜率118. SS string stabilizer 钻具扶正器119. EMKL emergency kill line 应急压井管线120. RMR reamer 扩眼器121. NBRR near-bit roller reamer 近钻头⽛轮扩眼器122. SR string roller reamer 钻具⽛轮扩眼器123.RCJBreverse circulation junk basket 反循环打捞蓝124. FPI free point indicator 测卡仪125. PIC person in charge 负责⼈126. PJSM pre-job safety meeting 作业前安全会127. STK stroke 泵冲128. ACS automatic crown saver 电⼦防碰天车129. PVT pit volume totalizer 泥浆体积计量器130. IWCF international well control forum 国际井控论坛131. RH rat hole / right hand ⼤⿏洞 / 井底⼝袋132. LOT leak off test 地破试验133. PIT pressure integrity test 地破试验134. FIT formation integrity test 地层完整性试验135. BTC buttress thread connection 梯形扣136. LTC long thread connection 长圆扣137. STC small thread connection 短圆扣138. CHC circulate hole clean 循环清洗井底139. ODF original drill floor 原始钻台⾯⾼度140. FAT first aid treatment 急救处理141. PPF pound per foot 段重142. TOC top of cement ⽔泥返⾼143. WBM water base mud ⽔基泥浆144. OBM oil base mud 油基泥浆145. LOTO lock out tag out 挂牌上锁146. TFA total flow area 总流到⾯积147. MCC motor control center 马达控制中⼼148.SABAsupplied air breathing apparatus 空⽓呼吸器149.SCBA self-contained breathing apparatus ⾃给式呼吸器150.EPC external pipe coating 钻杆外涂层151.W&W wait and weight 等待加重法152.MSDS material safety data sheet 材料安全数据表153.WBS weld blade stabilizer 焊接式翼⽚扶正器154.MPI magnetic particle inspection 磁粉探伤155.ESP electric submersible pump 电潜泵156.CP casing pressure/conductor pipe 套压/导管157.TCA tubing and casing annulus 油管与套管环空/doc/20c6f23de43a580216fc700abb68a98270feacc9.html A casing and casing annulus 套管与套管环空159.LPM liter per minute 升/分钟160.MUT make up torque 上扣扭矩161.MWDP maximum well design pressure 最⼤井眼设计压⼒162.NBS near bit stabilizer 近钻头扶正器163.P&A plug and abandon 填井、弃井164.SCR silicon control rectifier/slow circulating rate 可控硅房/低泵冲165.JSA job safety analysis 作业安全分析166.SO slack off 下放167.SWL safe working load 安全⼯作载荷168.TDS top drive system 顶驱169.VM volumetric method 体积压井法170.DD directional driller 定向司钻171.UPR upper pipe ram 上半封闸板172.LPR lower pipe ram 下半封闸板173.N/A not applicable 不适⽤的/doc/20c6f23de43a580216fc700abb68a98270feacc9.html tank 罐175.DEG degree 度176.bbl barrel 桶177.sec second 秒178.Min minute 分钟179.Hr hour ⼩时180.FC float collar 浮箍181.FS float shoe 浮鞋182.DVT 分级箍183.CMT cement ⽔泥,固井184.ft foot 英尺184.in inch 英⼨186.lb libra=pound 磅187.L liter 升188.klb kilo-pound 千磅189.WT weight 重量190.@ at 在……位置191.FOSV full opening safety valve 全开式安全阀192.HV high viscosity ⾼粘193.LV low viscosity 低粘194.BPH barrel per hour 桶每⼩时195.PG pressure gradient 压⼒梯度196.CPLG coupling 接箍197.BU balled up 泥包198.ASAP as soon as possible 尽早199.HSE health ,safety and environment 健康,安全和环保201.PA public announcement202.SWP safety work permit 安全⼯作许可203.LWP life work permit204.CWP cold work permit 冷作业许可205.SD shut down 关闭206.CSE confined space entry207.HWP hot work permit 热作业许可208.EWP electrical work permit ⽤电许可。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

钻井英语缩写补充
List of Abbreviations
ACS Anti-Collision System
API American Petroleum Institute
APL Annulus Pressure Loss
AR Automated Roughneck
BHA Bottom Hole Assembly
BHCT Bottom-Hole Circulating Temperature BHP Bottom-Hole Pressure
BHST Bottom-Hole Static Temperature BOP Blow Out Preventer
CBBL Core Barrels
CDPP Circulating Drill Pipe Pressure
CP Conductor Pipe, Casing Pressure CSO Complete Shut Off
CSES Cable Sidedoor Entry Sub
CSG Casing
DC Drill Collar
DD Directional Driller
DLS Dogleg Severity
DM Driller's Method
DP Drill Pipe
DPP, Pdp Drill-Pipe Pressure
DSA Double Studded Adapter
DST Drill Stem Test
DTU Double-Tilt Units
DWCH Docking Head
ECD Equivalent Circulating Density
EMW Equivalent Mud Weight
EOR Enhanced Oil Recovery
ERD Extended Reach Drilling
EZSV Easydrill Plug
FCP Final Circulating Pressure
FIT Formation Integrity Test
FPI Free Point Indicator
Q Flow rate
GWDC Great Wall Drilling Contractor
HCR Hydraulic Controlled Remote Operated HDHO Heavy Duty Hole Opener
HP High Pressure
HPHT High Pressure High Temperature
HSE Health, Safety And Environment
HWDP Heavy Weight Drill Pipe
IADC International Association Of Drilling Contractor IBOP Inside BOP, Gray Valves
ICP Initial Circulating Pressure
ID Inside Diameter
IPS Improved Plow Steel
IWCF International Well Control Forum
IWRC Independent Wire Rope Core
KOP Kick Off Point
L/D Lay Down
LTA Lost Time Accident
LCM Low Choke Method, Lost Circulation Material LOT Leak-Off Test
LPM Liters Per Minute
LPR Lower Pipe Ram
MAASP Maximum Allowable Annular Surface Pressure MD Measured Depth
MEMW Maximum Equivalent Mud Weight
MPHS Max. Expected Pressure in Next Hole Section MSDS Material Safety Data Sheets
MUT Make-Up Torque
MWD Measurement While Drilling
MWDP Max. Well Design Pressure
NBS Near Bit Stabilizer
NMDC Non Magnetic Drill Collars
NSTK Number Of Pump Strokes
OBM Oil Based Mud
OD Outside Diameter
OE Open Ended
OH Openhole
P&A Plug and Abandon
P/U,PU Pick Up
PBR Polished Bore Receptacle
PDC Polycrystalline Diamond Compact
PDM Positive Displacement Motor
PM Preventive Maintenance
POAF Pack-Off Adapter Flange
POOH Pull Out Of Hole
PPE Personal Protective Equipment
PV Plastic Viscosity
PVT Pit Volume Totalizer
R/D Rig Down
R/U Rig Up
RCD Residual Current Device
RFT Repeated Formation Tester
RIH Run In Hole
RKB Rotary Kelly Bushings
ROP Rate Of Penetration
RPM Rotation Per Minute
RPSP Reduced Pump Strokes Pressure S.G. Specific Gravity
SCBA Self Contained Breathing Apparatus SCR Slow Circulating Pump Pressure
SD Specific Density
SHUT-IN Wellhead Or Shut-In Pressure SICP Shut-In Casing Pressure
SIDPP Shut-In Drill Pipe Pressure
SJ Single Joint
SJA Safe Job Analysis
SO Slack-Off
SPM Stroke Per Minute
SPP Stand Pipe Pressure
SRG Surface Recording Gyro
SSSV Sub Surface Safety Valve
SWL Safe Working Load
TCP Tubing Convoyed Perforation
TD Total Depth
TDS Top Drive System
TIP Tie In Point
TOC Top Of Cement
TVD Total Vertical Depth
UPR Upper Pipe Ram
UTM Universal Transverse Mercator
VM Volumetric Method
VSIDPP Virtual Shut-In Drill Pipe Pressure W&W Wait And Weight Method
WBM Water Based Mud
WL Wireline
WLL Working Load Limit
WOB Weight On Bit
WOC Wait On Cementing
WOM Weight On Mill
WP Working Pressure
X/O Cross Over Sub
YP Yield Point。