工程量清单计算书--
_桥梁工程量计算书_(计算稿)

圆木桩围堰
4米
打木桩
13*2 0.693*2.6
打桩架次
2.00
排水 五 搭板
574.20
桥头搭板C30
36.5+18.7+21.3+18.8
枕梁C25
10+5.2+5.6+5.8
钢筋
HRB335
6845.6+7389.5+3197.1-400
钢筋
R235
152.1+163.5+84.4
定额工程量 #NAME? kg kg m kg #NAME? m³ #NAME? kg #NAME? kg #NAME? m² #NAME? m³ #NAME? m² #NAME? m³ #NAME? m² #NAME? m³ #NAME? m² #NAME? kg #NAME? kg #NAME? m³ #NAME? m #NAME? m³ #NAME? #NAME? m³
大应变
1.00
#NAME? 根
二 承台、台帽、盖梁
1 承台M5浆砌块石垫层 30cm厚
4*14.64*3*0.3+4*16.14*1*0.3
#NAME? m³
挖土方
(18.04*32.78+22.46*31.28)
#NAME? m³
挖淤泥
其中
1.74*32.78
#NAME? m³
回填塘渣
8.73*31.28+4.07*32.78
18*2*42 3.1416*.4*.4*(43.4+1.65)*18
#NAME? m #NAME? m³
回旋钻机钻孔1.0m 水上
3.1416*.4*.4*(43.4+1.65/2)*18
结算工程项目工程量计算书范例(含多个专业)

10.3+1.5 6.50 8.00
2*0.15+0.7 2*0.15+0.7 (0.7+0.1*2+ 0.2*2+0.5)
(10.3+1.5)*(2*0.15+0.7) 6.5*(2*0.15+0.7) (0.7+0.1*2+0.2*2+0.5)*8
11.80 6.50 14.40 32.70
合计: 15 16 17 18 19 20204001001 10302006001 50304006001 50304005001 其他项目清单
0.50
0.2*0.2*7*0.5
(0.8*0.15+0.25*0.6)*6.8+0.7*0.15*(6.0+8.86) 0.7*6.0+(0.9*0.1+0.2*0.6)*(5.2+2.3) 1*0.1*2+1.2*0.15*4+0.6*0.1*4
3.40 5.78 1.16 10.33
10
10407001001
19.15
4
20102001003
休闲空间灰麻石石条 (80厚)楼地面及基层
m2
43.31
BJ-07/BJ08
组团甲右边 组团乙
0.40 0.40
8.80 15.36 43.31
工程量清单工程量计算书
工程名称: 第2页/共4页 项目名称 单位 结算数量 图号 BJ-09 上区 BJ-09 中间横向 5 20102001004 休闲空间枣红色石材 楼地面及基层(20厚) m2 13.65 BJ-09 中间纵向 BJ-09 下区四边 合计: 6 20109003001 说明 长 (6.8+10.45)82 1.40 5.00 (3+1.8+2.7+2.3 +2.55+0.8) 宽 0.20 0.20 0.20 0.20 8.00 2.00 高 (厚) 计算式 (6.5+10.45)*2*0.2 1.40*0.20*8 5*0.20*2 (3+1.8+2.7+2.3+2.55+0.8 )*0.2 小计 6.78 2.24 2.00 2.63 13.65
工程量计算书清单、定额分类

土建工程工程量计算规则公式汇总平整场地: 建筑物场地厚度在±30cm以内的挖、填、运、找平.1、平整场地计算规则(1)清单规则:按设计图示尺寸以建筑物首层面积计算。
(2)定额规则:按设计图示尺寸以建筑物首层面积计算。
2、平整场地计算方法(1)清单规则的平整场地面积:清单规则的平整场地面积=首层建筑面积(2)定额规则的平整场地面积:定额规则的平整场地面积=首层建筑面积3、注意事项(1)、有的地区定额规则的平整场地面积:按外墙外皮线外放2米计算。
计算时按外墙外边线外放2米的图形分块计算,然后与底层建筑面积合并计算;或者按“外放2米的中心线×2=外放2米面积” 与底层建筑面积合并计算。
这样的话计算时会出现如下难点:①、划分块比较麻烦,弧线部分不好处理,容易出现误差。
②、2米的中心线计算起来较麻烦,不好计算。
③、外放2米后可能出现重叠部分,到底应该扣除多少不好计算。
(2)、清单环境下投标人报价时候可能需要根据现场的实际情况计算平整场地的工程量,每边外放的长度不一样。
大开挖土方1、开挖土方计算规则(1)、清单规则:挖基础土方按设计图示尺寸以基础垫层底面积乘挖土深度计算。
(2)、定额规则:人工或机械挖土方的体积应按槽底面积乘以挖土深度计算。
槽底面积应以槽底的长乘以槽底的宽,槽底长和宽是指混凝土垫层外边线加工作面,如有排水沟者应算至排水沟外边线。
排水沟的体积应纳入总土方量内。
当需要放坡时,应将放坡的土方量合并于总土方量中。
2、开挖土方计算方法(1)、清单规则:①、计算挖土方底面积:方法一、利用底层的建筑面积+外墙外皮到垫层外皮的面积。
外墙外边线到垫层外边线的面积计算(按外墙外边线外放图形分块计算或者按“外放图形的中心线×外放长度”计算。
)方法二、分块计算垫层外边线的面积(同分块计算建筑面积)。
②、计算挖土方的体积:土方体积=挖土方的底面积*挖土深度。
(2)、定额规则:①、利用棱台体积公式计算挖土方的上下底面积。
工程量计算书

工程量计算书某砖混二层办公楼建筑面积:①一层:S1=12.24×8.24=100.858m2②二层:S2=12.24×8.24=100.858m2③一层底檐廊:S1=12.24×1.2/2=7.344m2(走廊、檐廊)④二层走廊:S2=12.24×1.2/2=7.344m2(挑廊、走廊)[注:P59页第4.2.11条:有永久性顶盖无围护结构的应按其结构底板水平面积的1/2计算。
仅指顶盖〈挑檐〉]⑤室外楼梯:S=0〈无永久性顶盖的室外楼梯不计算建筑面积。
〉∴∑S总建筑面积=100.858×2+7.344×2=216.40m2工程量清单编制A.1 土方工程项目编码 项目名称 项目特征 计量单位 工程量 010********* 平整场地m 2 108.20 (A 1-26)010*********挖沟槽V=L ·B ·H=[(12+8)×2+(8-1.2)×2]=53.6×1.2×1.7=109.344 m 3 010********* 土方回填 m 3 95.33 (A1-29)分析:⑪室内回填:100mm 厚C10砼垫层,20mm 1:2水泥砂浆抹面h 回填高度=0.3-(0.1+0.02)=0.18mV=S 净×h 净=(12-0.24×3)×(8-0.24)×0.18=15.756 m 3⑫台阶回填 V=12.24×(1.2-0.3)×(0.3-0.1-0.02)=1.983m 3100mm 厚C10砼现浇台阶,20mm1:2水泥砂浆抹面⑬基础土方回填:V 回填=V 挖-V 室外地面0.3以下的建筑物=109.344-(6.432+25.32)=77.592 m 395.330 m3V C10垫层=1.2×0.1×[(12+8)×2+(8-1.2)×2=6.432m3V砖基础-0.3~-1.9m=[(0.12×0.06+0.06×0.12+0.18×0.12)×2放脚面积+(2.0-0.1-0.3)×0.24基础墙面积]×[(12+8)×2+(8-0.24)×2]长度=0.456×55.52=25.32 m3A.3 砌筑工程010********* 砖基础m326.09分析:V JQL=0.24×0.24×[(12+8)×2+(8-0.24)×2-0.24×8]=3.09m3备注:0.24*8=梁长算至柱侧面,扣除柱长度砖基础:S1-1断面=(0.12×0.06+0.06×0.12+0.18×0.12)×2+0.24×(2.0-0.1-0.24)净高=标高-减垫层和JQL高度= 0.4704 m2∴V=0.4704×[(12+8)×2+(8-0.24)×2]=26.12 m3另扣GZ在砖基础里所占的体积h=0.3-0.24=0.06mV GZ(从JQL上表面至±0.00)=0.24×0.24×0.06×8个=0.03m3∴V净砖基础=26.12-0.03=26.09m3S墙基防潮层=[(12+8)×2+(8-0.24)×2]×0.24长*宽=13.325 m2010********* 实心砖墙m348.59(A3-9)240外墙:S =(12+8)××2)×(0.9-0.06)=244.522 m2另扣外墙门、窗、洞、QL、GL、GZ①:S外门窗洞:M10.9×2.4×6=12.96 m2 M1:900×2400共6樘C1 1.5×1.5×2=4.5 m2C1:1500×1500共2樘C2 1.2×1.2×6=8.64 m2C2:1200×1200共6樘无空洞026.1 m2②:QL、TL1、TL4 (240×240)两处高度240已扣过(6-0.24×2)③:GL 分析看其高度是否顶在上一个楼层下的梁底。
工程量计算书

工程量清单计算书建筑工程序号清单编号项目名称单位数量计算式1 010********* 平整场地 m2 882.5334 (14.99+0.24)*(48.34+0.24)+2*(14.99+48.34+0.48)+162 010********* 挖土方m3 518.369 土方体积:JK-3:(2.4*2.4*1.6-7.3161)*15 *9= 280.5m3JK-4:((6*0.35)*0.4)-0.026 *6*12= 68.814m3JK-8:(13.2*0.35*0.4-0.016 )*4*10= 70.21m3JK-9:((47.95*0.35)*0.4)-0.028*17 = 109.685m3JK-11:(7.1*0.35*0.4-0.0385)*4*11 = 46.82m3JK-12: (7.4*0.35*0.4-0.08)*8 *12=79.64m3JK-14:(7.6*0.35*0.4-0.106)*2*6 = 12.91m33 010********* 回填2:8灰土m3 280.599 JK1:素土回填体积 = (1.2475-0.3685)*37 = 31.91m3JK2:素土回填体积 =( 1.9-0.576) *15*6= 102.86m3JK12:(0.956-0.076+0.003+0.4598+0.2261)*8 *7= 13.53m3JK16:0.7735-((0.048+0.3835+0.184)) *12= 19.158m3JK17:(0.2294-0.0173+0.0874+0.091)*4*10 = 10.14m3JK18:(1.162-0.066+0.5785+0.2793)*2 *17= 11.48m3JK24:(0.273-0.1145+0.1178)*4 = 0.16m3工程量清单计算书序号清单编号项目名称单位数量计算式JK25:素土回填体积 = (4.2763-0.287+2.1232)*37 = 66.23m3JK26:素土回填体积 =( 6.693-0.2855+3.4425)*16 =44.46m3m3 6.55 KZ1:体积 = (0.5*0.5*1.75-0.1875-0.1031-0.021)*2 = 0.2518m3 4 010********* C30现浇混凝土基础矩形柱(周长1.8m外)(0.5*0.5)*1.75-0.1875-0.1031-0.021 = 0.1259m3KZ2:体积 = (0.5*0.5*1.75-0.1875-0.1031-0.021)*4 = 0.5036m3KZ3:体积 =( 0.5*0.5*1.75-0.1875-0.1031-0.021)*2 = 0.2518m3体积 = (0.5*0.5)*1.75-0.1875-0.1031-0.021 = 0.1259m3KZ4:体积 = (0.5*0.5*1.75-0.1875-0.1031-0.022)*2 = 0.4996m3KZ5:体积 = (0.5*0.5*1.75-0.1875-0.0963-0.0209)*4 = 0.536m3体积 = (0.5*0.5*1.75-0.1875-0.1031-0.0228)*3 = 0.3723m3KZ12:体积 = (0.5*0.5*1.75-0.1875-0.1031-0.021)*4 = 0.5036m3体积 = 0.5*0.5*1.75-0.1875-0.1031-0.022 = 0.1249m3KZ13:体积 = (0.5*0.5*1.75-0.1875-0.1031-0.0211)*2 = 0.2516m3KZ14:体积 =( 0.5*0.5*1.75-0.1875-0.1031-0.022)*3 = 0.3747m3KZ15:体积 = (0.5*0.5*1.75-0.1875-0.1031-0.0211)*2 = 0.2516m3体积 = (0.5*0.5*1.75-0.1875-0.1031-0.0211)*2 = 0.2516m3工程量清单计算书序号清单编号项目名称单位数量计算式5 010********* C30现浇混凝土基础梁m3 46.962KL1(3):体积 = 0.3*0.6*(2.5+6.7*2)KL2(3):体积 = 0.3*0.6*(2.5+6.7*2)*2KL4(3):体积 = 0.3*0.6*(2.5+6.7*2)*4KL5(3):体积 = 0.3*0.6*(2.5+6.7*2)*2KL6(3):体积 = 0.3*0.6*(2.5+6.7*2)KL7(3):体积 = 0.3*0.6*(2.5+6.7*2)KL8(3):体积 = 0.3*0.6*(48-0.5*10)*26 010********* C10现浇混凝土基础垫层 m3 50.457 CD-1=3.4*3.4*0.1*11CD-2=3.4*3.4*0.1*11CD-5=6.5*3.5*0.1*117 010********* C30现浇混凝土桩承台基础m3 274.1255J-1:体积=((3.2*3.2*0.45)+1.612)*11J-2:体积 =((3.2*3.2*0.45)+1.612)*11J-5:体积 =(( 6.3*3.3*0.45)+3.125)*118 010********* C30现浇混凝土有梁板(板厚100以内)m3 61.193B100:体积 = ((48*13.2)*0.1)-0.217-0.808-0.16-1.3398 = 60.8352m3 体积 = ((2.825*1.3*0.1)-0.0657)*4 = 1.2064m3工程量清单计算书建筑工程(首层)序号清单编号项目名称单位数量计算式9 010********* 加气混凝土砌块墙m3 819.192QTQ-200:体积= (13*3.2*0.2-1.4068-0.1012-0.0312-0.0572-0.1716)*3*6 = 58.64m3体积 = (2.8*3.2*0.2-0.222-0.2052-0.0652-0.0114-0.0342)*4*6 = 16.512m3体积=(5.1501*3.2-1.89)*0.2-0.3-0.0228-0.0353-0.0683)*4*6 = 29.7872m3体积 = (6.9*3.2*0.2-0.448-0.744-0.0156-0.0309-0.0926)*4*6 = 49.36m3体积 = (3.5*3.2)*0.2-0.2558-0.3098-0.0155-0.0466)*2*6 = 12.8984m3体积 = (4.7*3.2*0.2-0.256-0.43-0.108-0.0324-0.0202-0.0606)*2*6= 16.81m3体积 = (3.5*3.2*0.2-0.3198-0.2998-0.015-0.0451)*2*6 = 12.48m3体积 = (3.8975*3.2*0.2-0.2795-0.054-0.032-0.0187-0.0561)*4*6 =32.796m3体积(18.2*3.2-7.56)*0.2-0.896-1.68-0.0788-0.1305-0.2364*6 = 26.0222m3体积 = (3*3.2-3.6)*0.2-0.2134-0.0315-0.0147-0.056-0.0442)*2 *6= 6.7216m3体积 = (1.2*3.2*0.2-0.064-0.2068-0.0136-0.0053 )*8*4=14.32m310 010********* C30现浇混凝土矩形柱(周长1.8m内) m3 166.51 KZ-1:体积 = 0.4*0.5*3.17*2*6*5 = 24.965m3KZ-2:体积 = 0.4*0.5*3.17*4*6 *3= 32.495m3KZ-3:体积 = 0.4*0.5*3.17*2*6 *10= 50.072m3KZ-4:体积 = 0.4*0.5*3.17*4*6 *4= 44.144m3工程量清单计算书序号清单编号项目名称单位数量计算式KZ-14:体积 = 0.4*0.5*3.17*3*6= 7.698m3KZ-15:体积 = 0.4*0.4*3.17*6 = 8.698m311 010********* C20现浇混凝土矩形构造柱36.99 GZ200*200:体积 = (0.2*0.2*3.2+0.0314-0.02)*2*6*5= 4.99858m3体积 = (0.2*0.2*3.2+0.0315-0.024)*8*6 =4.2365m3体积 = (0.2*0.2*3.2+0.0315-0.024)*8*6 = 4.032m3体积 = (0.2*0.2)*3.2+0.0461-0.0228 )*4*6*9=20.5987m3体积 = (0.2*0.2*3.2+0.0453-0.024)*4*6*5 = 13.0659m3GZ100*100:体积 = (0.1*0.1*3.2+0.0152-0.0035)*12*6 =2.2m312 010********* C30现浇混凝土有梁板(板厚100以内)m3 109.832B-100:体积 = ((3.95*2.375*0.1)-0.0206-0.1295)*4*6*4 =52.658m3KL1:体积 = (0.25*0.57*13.15-0.2351 )*2*6= 12.9632m3KL2:体积 = (0.25*0.6*5.45-0.135 )*2*6*2= 14.223m3KL7:体积 = (0.25*0.6*11.2)-0.195-0.0265 *6= 5.889m3KL11:体积 = (0.25*0.57*5.975)-0.1104 *6*9= 20.885m3KL13:体积 = (0.25*0.57*6.4)-0.1425*6 *6= 12.885m3L1:体积 = (0.2*0.35*3.975-0.0193)*4 *6*3=14.16m3L3:体积 = (0.2*0.35*4.7-0.063)*6 = 4.16m3。
招标文件清单工程量计算书

工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日工程名称:名筑新东城2号楼共 26 页第 127工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日工程名称:名筑新东城2号楼共 26页第 227工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日工程名称:名筑新东城2号楼共 26页第 3 页27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日2727工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日工程名称:名筑新东城2号楼共 26页第 9 页2727工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表27建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表27建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日工程名称:名筑新东城共 26 页第 17 页27工程量计算表27建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表27建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日27工程量计算表建设单位名称:陕西省周至县城建局 2011年 5 月 4 日2727。
工程量清单计算书
工程量清单计算书
工程量清单计算书是一种用于记录和计算工程项目中各项工作量和材料的清单。
它通常包括工程项目的各项工程量、单位工程量、工程量计算公式、计算结果等内容。
在编制工程量清单计算书时,一般按照以下步骤进行:
1. 根据项目设计文件和施工图纸,确定需要计算的各项工程量,如土方、砼、钢筋、砖瓦、油漆等。
2. 查阅相关工程量计算规范和标准,了解各项工程量的计算方法和计算公式。
3. 根据计算规范和标准,按照项目实际情况,计算出各项工程量的数值。
4. 将计算结果填入工程量清单计算书中,包括工程量、单位工程量、计算公式和计算结果等。
5. 检查计算书的正确性和完整性,确保计算结果准确无误。
工程量清单计算书的编制是工程项目管理的重要环节,对于项目的预算、施工进度和质量控制等方面具有重要意义。
同时,在实际施工过程中,也可以根据工程量清单计算书对工程进展情况进行监控和调整。
工程量清单计算书格式
工程量清单计算书格式工程量清单计算书格式是工程建设过程中非常重要的一项工作,它是对各种工程项目的材料、设备、工艺和人工等进行详细计量和计算的文件。
正确编制和使用工程量清单计算书格式,不仅可以确保工程项目的质量和进度,还可以有效控制成本和资源的使用。
首先,工程量清单计算书格式应该包含基本信息,如工程项目的名称、地点、建设单位、设计单位等。
这些信息对于后续的施工和管理都非常重要,因此需要在工程量清单计算书中详细列出。
其次,工程量清单计算书格式应该包含具体的工程项目清单。
这些清单应该按照工程项目的不同部分进行分类,比如结构工程、土方工程、装饰工程等。
每个清单包含的内容应该非常详细,包括材料的名称、规格、数量、单位、单价等。
在计算总量时,需要对每个清单的数量进行累加,并计算出总量和总价。
同时,在工程量清单计算书格式中,还应该包含工程项目的工作量计算和费用计算。
工作量计算需要根据具体的工程项目要求,确定每个清单的工作量和工时,并进行累加。
费用计算则需要将每个清单的总价进行累加,并加上其他相关费用,如税费、利润等,计算出工程项目的总费用。
此外,工程量清单计算书格式还应该包含相关的附件和图纸。
附件可以是一些工程项目的技术要求、施工方案等,这些文件对于工程项目的实施和管理都非常重要。
图纸则是工程项目的设计图纸,包括平面图、立面图、剖面图等,这些图纸对于工程项目的施工和验收都非常关键。
最后,工程量清单计算书格式还应该包含一些相关的说明和备注。
这些说明和备注可以对工程项目的特殊要求、施工需要注意的事项、工程量清单计算的方法等进行说明,以确保工程项目的顺利进行。
综上所述,工程量清单计算书格式是工程建设过程中必不可少的一项工作。
正确编制和使用工程量清单计算书格式,可以确保工程项目的质量和进度,有效控制成本和资源的使用。
因此,工程项目相关的人员应该重视工程量清单计算书格式的编制和使用,并不断完善和改进。
只有这样,才能保证工程项目的顺利进行,实现预期的效果和目标。
工程量计算书
工程量计算书一、土石方工程1.平整场地清单量S=49.2*(16.2-1.8-1.8+0.2)+(3.7+0.2)*0.8*2+(3.8*2+0.2)*0.8*2+(3.1+2.6+3.1+0.2)*1*3+(2.6+0.2)*0.8*3=682.2m²计价量S′=682.2+(49.2+2*2)*2+(16.2-1.8-1+0.2+2)*2*2+3.7*2*2+3.1*2*6+2.6*2*3+(1.2*2+1.6*2+2)*3=963.8m²2.挖一般土方:挖土深度6.6-0.7=5.9mV=[(49+1.4*2)*(16.2-1-1.8+0.5*2)+(3.1*2+2.6+1.7+1)*(0.5+1.25)*2+(3.1*2+2.6+1.1*2)*(0.5+1.25)]*5.9+(3.3*3.6*3+5.95*2.6+2.6*4.4*2)*0.2=5526.453m³计价量:考虑工作面,地下室做防水,基础外边外扩1m,放坡系数:机械开挖,坑内作业,选择0.33V′=(A+2C+KH)*(B+2C+KH)*H+1/3*K²H³=(49+1.4*2+2*0.7+0.33*5.53)*(15.2+0.5+0.45+2*0.7+0.33*5.53)*5.53+1/3*0.33²*5.53³=5901.68m³3.挖基坑土方V=(2.2+0.7*2)*(2.6+0.7*2)*3*(8.18-5.53-0.7)=84.24m³4.土方回填V(垫层)=[(49+1.4*2+0.1*2)*(13.4+0.5*2+0.1*2)+(1+1.25-0.5)*(1.2+3.1*2+ 2.6+0.5+1+0.1*2)*2+(1.25+1+0.5)*(10+1.1*+0.1*2)]*0.1=84.89m³V(防水找平层)=848.9*0.07=59.423m³V(褥垫层)=850.75*0.2=170.15m³V(满堂基础)=[(49+1.4*2)*(13.4+1)+11.5*1.75*2+12.2*1.75]*0.7+(3.3*3.6*3+5.95*2.6+2.6*4.4*2)*0.9+43.2*1.95=736.095m³V(地下室)=[49.2*13.6+(3.1*2+2.6+0.2)*1.2*3]*(5.53-0.7)=3388.35m³V(回填)=5526.45+84.24-84.89-59.423-170.15-736.095-3388.35=1171.78m³5.余方弃置V=5526.45+84.24-1171.78=4438.91m³二、砌筑工程:标准层第四层1.砌体墙 200厚外墙1轴:V=[5.6(长度)*2.9(墙高)*0.2(墙厚)-0.72(扣窗)-0.532(扣梁)]*2(根数)=3.992m³V=(3.8*2.9*0.2-0.3-0.366)*2=2.076m³J轴:V=(1.9*2.9*0.2-0.54-0.19)*3=1.116m³V=(2.4*2.9*0.2-0.285-0.24)*3=2.601m³V=(1.9*2.9*0.2-0.54-0.19)*3=1.116m³H轴:V=(3*2.9*0.2-0.54-0.3)*2=1.8m³V=(2.1*2.9*0.2-0.45-0.21)*4=2.232m³V=(3.4*2.9*0.2-0.27-0.258)*4=5.776m³V=(1.4*2.9*0.2-0.126)*2=1.372m³F轴:V=(2*2.9*0.2-0.21-0.16)*4=3.16m³A轴:V=(8.8*2.9*0.2-2.312-0.688)*3=6.312m³V=(0.9*2.9*0.2-0.238-0.072)*6=1.272m³B轴:V=(2.2*2.9*0.2-0.68-0.22)*2=0.752m³V=(6.1*2.9*0.2-1.36-0.61)*2=3.136m³2.砌体墙 200厚内墙G轴:V=[6.6(长度)*2.9(墙高)*0.2(墙厚)-0.756(扣门)-0.462(扣梁)]*2=5.22m ³V=(5.7*2.9*0.2-0.756-0.387)*4=8.652m³F轴:V=(2*2.9*0.2-0.484-0.16)*3=1.548m³V=0.9*2.9*0.2*4=2.088m³E轴:V=(3.2*2.9*0.2-0.212)*4=6.576m³C轴:V=(7.4*2.9*0.2-2.76-0.868)*3=9.444m³3轴:V=(6.6*2.9*0.2-0.588(扣洞)-0.504-0.632)*6=12.624m³V=(4.2*2.9*0.2-0.378(扣门)-0.406(扣梁))*6=9.912m³4轴:V=(3.05*2.9*0.2-0.216(扣门)-0.291(扣梁))*6=7.572m³V=(1.4*2.9*0.2-0.42(扣门))*6=2.352m³V=0.7*2.9*0.2*6=2.436m³5轴:V=(6.8*2.9*0.2-0.51(扣梁))*3=10.302m³V=(1*2.9*0.2-0.08)*3=1.5m³10轴:V=(5.8*2.9*0.2-0,566)*2=5.596m³3.砌体墙 100厚内墙F轴:V=(3.5*2.9*0.1-0.1225(扣梁))*2=0.785m³2轴:V=(2.1*2.9*0.1-0.168(扣门)-0.06(扣梁))*6=2.286m³4轴:V=1.2*2.9*0.1*6=2,088m³V=(1.75*2.9*0.1-0.147(扣门)-0.0525(扣梁))6=1.848m³D轴:V=(2.45*2.9*0.0.0813(扣梁))*6=3.7752m³三、混凝土及钢筋混凝土工程:标准层第四层1.矩形梁:L8:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L4:V=0.2*0.35*3.9=0.273m³模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L10:V=0.2*0.35*15.5=1.085m³模板:S=0.2*15.5+0.35*15.5*2=11.63㎡L1:V=0.2*0.3*2.2*2=0.264m³模板:S=(0.2*2.2+0.3*2.2*2)*2=3.52㎡XL2:V=0.2*0.4*0.9*6=0.432m³模板:S=(0.2*0.9+0.4*0.9*2)*6=5.4㎡L3:V=0.2*0.4*8.8*3=2.112m³模板:S=(0.2*8.8+0.4*8.8*2)*3=26.4㎡L2:V=0.2*0.5*7.2*3=2.16m³模板:S=(0.2*7.2+0.5*7.2*2)*3=25.92㎡L5:V=0.2*0.35*7.8=0.546m³模板:S=0.2*7.8+0.35*7.8*2=7.02㎡XL4:V=0.2*0.45*1.6*2=0.288m³模板:S=(0.2*1.6+0.45*1.6*2)*2=3.52㎡L9:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L12:V=0.2*0.35*15.5=1.085m³模板:S=0.2*15.5+0.35*15.5*2=11.63㎡L7:V=0.2*0.35*3.9=0.273m 模板:S=0.2*3.9+0.35*3.9*2=3.51㎡L6:V=0.2*0.35*7.8=0.546m³模板:S=0.2*7.8+0.35*7.8*2=7.02㎡L13:V=0.2*0.3*1.9*4=0.456m³模板:S=(0.2*1.9+0.3*1.9*2)*4=6.08㎡L11:V=0.2*0.35*14.6=1.022m³模板:S=0.2*14.6+0.35*14.6*2=13.14㎡KL1:V=0.2*0.3*2.2*4=0.528m³模板:S=(0.2*2.2+0.3*2.2*2)*4=7.04㎡KL2:V=0.2*0.3*1.8*2=0.216m³模板:S=(0.2*1.8+0.3*1.8*2)*2=2.88㎡LLK26:V=0.2*0.5*3=0.3m³模板:S=0.2*3+0.5*3*2=3.6㎡LLK2:V=0.2*0.5*5.6*2=1.12m³模板:S=(0.2*5.6+0.5*5.6*2)*2=13.44㎡LLK3:V=0.2*0.5*11*2=2.2m³模板:S=(0.2*11+0.5*11*2)*2=26.4㎡LLK1:V=0.2*0.5*3.8=0.38m³模板:S=0.2*3.8+0.5*3.8*2=4.56㎡LLK12:V=0.2*0.5*2.5=0.25m³模板:S=0.2*2.5+0.5*2.5*2=3㎡LLK19:V=0.2*0.4*3.1=0.248m³模板:S=0.2*3.1+0.4*3.1*2=3.1㎡LLK4:V=0.2*0.5*4.5*2=0.9m³模板:S=(0.2*4.5+0.5*4.5*2)*2=10.8㎡LLK24:V=0.2*0.4*2*3=0.48m³模板:S=(0.2*2+0.4*2*2)*3=6㎡LLK5:V=0.2*0.5*4.5*4=1.8m³模板:S=(0.2*4.5+0.5*4.5*2)*4=21.6㎡LLK7:V=0.2*0.5*4.4*4=1.76m³模板:S=(0.2*4.4+0.5*4.4*2)*4=21.12㎡LLK20:V=0.2*0.5*2.1*4=0.84m³模板:S=(0.2*2.1+0.5*2.1*2)*4=10.08㎡LL1:V=0.2*0.5*1.9*4=0.76m³模板:S=(0.2*1.9+0.5*1.9*2)*4=9.12㎡LLK31:V=0.2*0.5*2.4*3=0.72m³模板:S=(0.2*2.4+0.5*2.4*2)*3=8.64㎡LLK25:V=0.2*0.4*4.2*2=0.84m³模板:S=(0.2*4.2+0.4*4.2*2)*2=8.4㎡LLK8:V=0.2*0.4*3.5*4=1.12m³模板:S=(0.2*3.5+0.4*3.5*2)*4=14㎡LL2:V=0.2*0.5*1*3=0.3m³模板:S=(0.2+0.5*2)*3=3.6㎡LLK16:V=0.2*0.6*7.4=0.888m³模板:S=0.2*7.4+0.6*7.4*2=10.36㎡LLK21:V=0.2*0.35*6.5*2=0.91m³模板:S=(0.2*6.5+0.35*6.5*2)*2=11.7㎡LLK6:V=0.2*0.5*5.7*4=2.28m³模板:S=(0.2*5.7+0.5*5.7*2)*4=27.36㎡LLK13:V=0.2*0.5*6.4=0.64m³模板:S=0.2*6.4+0.5*6.4*2=7.68㎡LLK9:V=0.2*0.5*5.9*2=1.18m³模板:S=(0.2*5.9+0.5*5.9*2)*2=14.16㎡LLK22:V=0.2*0.4*6.5*2=1.04m³模板:S=(0.2*6.5+0.4*6.5*2)*2=13㎡LL3:V=0.2*0.5*1.9*2=0.38m³模板:S=(0.2*1.9+0.5*1.9*2)*2=4.56㎡LLK29:V=0.2*0.5*3=0.3m³模板:S=0.2*3+0.5*3*2=3.6㎡LLK23:V=0.2*0.4*3.1=0.248m³模板:S=0.2*3.1+0.4*3.1*2=3.1㎡LLK11:V=0.2*0.5*3.8=0.38m³模板:S=0.2*3.8+0.5*3.8*2=4.56㎡LLK15:V=0.2*0.5*2.5=0.25m³模板:S=0.2*2.5+0.5*2.5*2=3㎡LLK14:V=0.2*0.5*6.4=0.64m³模板:S=0.2*6.4+0.5*6.4*2=7.68㎡LLK17:V=0.2*0.6*7.4=0.888m³模板:S=0.2*7.4+0.6*7.4*2=10.36㎡2.直形墙Q-1 V1=1.7(长度)*2.9(墙高)*0.2(墙厚)*16(个数)=15.776m³模板:V=1.7*(2.9-0.1)*2*16=152.32㎡V2=0.6*2.9*0.2*16=5.568m³模板:S=0.6*(2.9-0.12)*2*16=53.376㎡ V3=3.8*2.9*0.2*2=4.408m³模板:S=3.8*(2.9-0.1)*2*2=42.56㎡ V4=0.5*2.9*0.2*2=0.58m³模板:S=0.5*(2.9-0.1)*2*2=5.6㎡V5=0.3*2.9*0.2*6=1.044m³模板:S=0.3*(2.9-0.12)*2*6=10.01㎡ V6=2.2*2.9*0.2*8=10.208m³模板:S=2.2*(2.9-0.12)*2*8=97.856㎡ V7=0.8*2.9*0.2*4=1.856m³模板:S=0.8*(2.9-0.1)*2*4=17.92㎡ V8=1*2.9*0.2*2=1.16m³模板:S=1*(2.9-0.1)*2*2=11.2㎡Q-2 V1=1.7*2.9*0.2*16=15.776m³模板:S=1.7*(2.9-0.1)2*16=152.32㎡ V2=0.6*2.9*0.2*16=5.568m³模板:S=0.6*(2.9-0.1)*2*16=53.76㎡4.板现浇板 100厚V1=3.5*2.8*0.1*2=1.96m³模板:S=(3.5-0.2)*(2.8-0.2)*2=17.16㎡V2=2.3*2*0.1*2=0.92m³模板:S=(2.3-0.2)*(2-0.2)*2=7.56㎡V3=3.5*2*0.1*2=1.4m³模板:S=(3.5-0.2)*(2-0.2)*2=11.88㎡V4=2.3*1.6*0.1*2=0.736m³模板:S=(2.3-0.2)*(1.6-0.2)*2=5.88㎡V5=3.5*4*0.1*2=2.8m³模板:S=(3.5-0.2)*(4-0.2)*2=25.08㎡V6=1*2*0.1*6=1.2m³模板:S=(1-0.2)*(2-0.2)*2=2.88㎡V7=1*1.6*0.1*6=0.96m³模板:S=(1-0.2)*(1.6-0.2)*6=6.72㎡V8=2.9*3.8*0.1*6=6.612m³模板:S=(2.9-0.2)*(3.8-0.2)*6=58.32㎡V9=4.2*1.6*0.1*6=4.032m³模板:S=(4.2-0.2)*(1.6-0.2)*6=33.6㎡V10=2.4*2*0.1*3=1.44m³模板:S=(2.4-0.2)*(2-0.2)*3=11.88㎡V11=2.6*2.8*0.1*4=2.912m³模板:S=(2.6-0.2)*(2.8-0.2)*4=24.96㎡V12=1.4*2*0.1*4=1.12m³模板:S=(1.4-0.2)*(2-0.2)*4=8.64㎡V13=3.6*2*0.1*4=2.88m³模板:S=(3.6-0.2)*(2-0.2)*4=24.48㎡V14=2.4*1.6*0.1*4=1.536m³模板:S=(2.4-0.2)*(1.6-0.2)*4=12.32㎡V15=3.6*4*0.1*4=5.76m³模板:S=(3.6-0.2)*(4-0.2)*4=51.68㎡现浇板 120厚V1=(2.9*2.2+3.1*2)*0.12*6=9.058m³模板:S=[(2.9-0.2)*(2.2-0.2)+(3.1-0.2)*(2-0.2)]*6=63.72㎡V2=4.2*5*0.12*6=15.12m³模板:S=(4.2-0.2)*(5-0.2)*6=115.2㎡钢筋工程量:剪力墙:1.Q-1 ①水平筋 L=1800-2*15+10d*2=1930mm=1.93mN=[(2900-50)/200+1]*2=16*2=32根(向上取整+1)质量=0.00617*8*8*1.93*32=24.39kg②纵筋L=2900+1.2Lae=2900+1.2*35*10=3320mm=3.32mN=[(900-200*2+15*2+6*2)/200+1]*2=8根(向上取整+1)质量=0.00617*10*10*3.32*8=16.39kg③拉筋L=200-2*15+2*(5d+1,9d)=253mm质量=0.00617*6*6*0.253*18=1.02kgGBZ-1 ①纵筋L=2900+Lle=2900+49*12=3488mm=3.488mL=2900-(Lle+0.3Lle)+0.3Lle+Lle+Lle=3.488mm质量=0.00617*12*12*3.49*7*2=43.4kg②箍筋L=(700+200)*2-8*20+11.9d*2=1830.4mm=1.83mN=2900/200+1=16根质量=0.00617*8*8*1.83*16=11.56kgL=(500+200)*2-8*20+11.9d*2=1382.8mm=1.38m质量=0.00617*6*6*1.38*16=4.9kgL=200-2*20+[1.9d+max(10d,75)]*2=333mm=0.333m质量=0.00617*6*6*0.333*32=2.42kgGBZ-3 ①纵筋L=2900+Lle=2900+49*12=3488mm=3.488mL=2900-(Lle+0.3Lle)+0.3Lle+Lle+Lle=3.488mm质量=0.00617*12*12*3.49*6=18.6kg②箍筋L=(400+200)*2-8*20+11.9d*2=1182.8mm=1.183mN=2900/200+1=16根质量=0.00617*8*8*1.183*16=4.2kgL=200-2*20+[1.9d+max(10d,75)]*2=333mm=0.333m 质量=0.00617*6*6*0.333*16=1.21kgD=6 理论质量小计 (1.02+4.9+2.42+4.2+1.21)*10=137.5kgD=8 理论质量小计 (11.56+24.39)*10=359.5kgD=10 理论质量小计 16.39*10=163.9kgD=12 理论质量小计 (43.4+18.6)*10=620kg。
工程量计算书
工程量计算书摘要:一、工程量计算书的概念与作用1.工程量计算书的定义2.工程量计算书的重要性3.工程量计算书的作用二、工程量计算书的内容1.工程量计算书的基本内容2.工程量计算书的具体项目3.工程量计算书的数据来源三、工程量计算书的使用1.工程量计算书的阅读2.工程量计算书的应用3.工程量计算书与工程造价的关系四、工程量计算书的管理1.工程量计算书的归档2.工程量计算书的更新3.工程量计算书的管理流程正文:工程量计算书是工程建设中必不可少的一个环节,它对于工程的顺利进行和造价控制具有重要的意义。
本文将围绕工程量计算书的概念、内容、使用和管理四个方面进行详细阐述。
一、工程量计算书的概念与作用工程量计算书是一个记录工程项目的工程量、工程造价及工程项目的其他相关数据的文件。
它是工程造价的基础,对于工程项目的投资决策、招投标、合同签订、工程款支付等环节具有重要的参考价值。
1.工程量计算书的定义工程量计算书是根据工程图纸、工程量清单和其他相关资料,采用一定的计算方法和规则,对建筑、安装、市政等工程项目的工程量进行计算的书面文件。
2.工程量计算书的重要性工程量计算书是工程造价管理的重要组成部分,对于工程的成本控制、投资决策、招投标等环节具有重要的参考价值。
3.工程量计算书的作用工程量计算书的主要作用有:为工程造价提供依据;为招投标提供参考;为工程款支付提供依据;为工程项目的成本控制提供数据支持。
二、工程量计算书的内容工程量计算书的内容主要包括以下几个方面:1.工程量计算书的基本内容工程量计算书的基本内容主要包括:工程项目名称、工程量、单位、综合单价、合价等。
2.工程量计算书的具体项目工程量计算书的具体项目主要包括:建筑安装工程、市政工程、园林绿化工程、装饰装修工程等。
3.工程量计算书的数据来源工程量计算书的数据来源主要有:工程图纸、工程量清单、施工方案、材料清单等。
三、工程量计算书的使用工程量计算书的使用主要涉及以下几个方面:1.工程量计算书的阅读阅读工程量计算书时,应关注工程项目名称、工程量、单位、综合单价等关键信息。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
个 成品腻子(防水性N)三遍,涂刷乳胶漆底漆
一遍,面漆三遍。
砌筑宝顶、1:2水泥砂浆零星抹灰、刮外墙成
件 品腻子(防水性N)三遍,涂刷乳胶漆底漆一
遍,面漆三遍。
施工单位
注册造价师(项目技术负责人):
现场代表:
现场监理工程师(注册方章):
注册造价师(项目技术负责人):
3 木门窗套 木龙骨 117.99*0.1
4
实木防腐门窗套刷防腐 桐油
117.99*0.28
5 实木防腐门窗套油漆 117.99*0.18
224.9
117.99
11.8 33.04 21.24
6
实木防腐装饰板吊檐宽 200mm 厚25mm
11.56*2+0.5*2*2+3.5+3.67
7
实木防腐装饰板吊檐手 刷防腐桐油
工程量清单计算书
工程名称:
所在地址:
户主:
序号 定额名称
计算式说明/计算式
数量
1 外墙双排脚手架
11.56*4.94+11.56*2.9+4.36*5.06+4.79*(6.96+7.34+6.9 6)/3+11.56*6.77
2
实木防腐门窗套 宽 100mm 厚20mm
(1.78*2+1.78+2.68+1.78+1.78*2+1.78+2.08+1.79+1.61+ 1.56*2+1.62+1.58*2+1.28+0.77*2+0.7+0.9*2+1.77+1.48 *2+1.49+1.18*2+2.01+0.9+1.18+0.88*2+0.73+0.78*2)*2 +(1.79+1.78+0.9)+0.1*2*13+0.1*4*10+0.1*2*3+0.2*2*1 3
工程名称: 所在地址: 序号 定额名称
工程量清单计算书
计算式说明/计算式
户主: 数量
单位
备注
18 砖砌瓦屋面山花屋脊 3.5*2+3.67*2
19
实木防腐装饰板吊顶 板厚20mm
20
实木防腐装饰板吊顶 木龙骨
21
实木防腐装饰板吊顶 刷桐油
22
实木防腐装饰板吊顶 油漆
23 GRC装饰羊头安装
24 GRC装饰线条100宽
1.78*1.5-1.78*1.78-1.62*1.58-1.28*0.77-0.7*0.91.77*1.48-1.49*1.18-0.9*0.93-1.18*0.88-0.78*0.73-
13 墙面乳胶漆及腻子
1.56*1.611.79*2.08+11.56*2.9+(1.78*4+1.78+2.68*2+1.78*4+1.7
叠瓦屋脊、砌筑砖屋脊250*240、1:2水泥砂
m 浆零星抹灰、刮外墙成品腻子(防水性N)三
遍,涂刷乳胶漆底漆一遍,面漆三遍。
m2 实木防腐装饰板吊顶制作、安装 板厚20mm
m3 木龙骨制作、安装、手刷桐油两遍
m4 双面手刷桐油两遍
m5
瓦屋面封檐板下口吊顶刮油性腻子,刷聚氨 酯底漆2遍,面漆二遍、上色一遍
32.29*0.45
8
实木防腐装饰板吊檐油 漆
32.29*0.25
实木防腐装饰板 装饰
9 框制作、安装
宽 4.79+0.8*4+0.85*2+1.19*2+1.38=13.45
250mm 厚20mm
10
实木防腐装饰板 装饰 框木龙骨
13.45*0.25
32.29 16.15 8.07 13.45 4.82
建设单位
监理单位
现场代表:
现场监理工程师(注册方章):
单位
备注
m2 搭设双排脚手架 高度15米以内
m
外墙木门窗套所用材料加工成型后,均手刷 桐油两遍,然后安装,
㎡ 木门窗套木龙骨 手刷桐油两遍,然后安装 ㎡ 木门窗套双面手刷桐油两遍 ㎡ 刮油性腻子,调和漆3遍。 m 瓦屋面吊檐板制作、安装 ㎡ 吊檐板双面手刷桐油两遍
㎡ 外墙木装饰框刮油性腻子,调和漆3遍。
原墙面抹灰粗糙,直接在粗糙墙面刮外墙成
m2 品腻子(防水性N)三遍,涂刷乳胶漆底漆一
遍,面漆三遍。
㎡
原墙面凿毛,挂钢丝网,1:2水泥砂浆打底, 粘贴青石片
叠瓦屋脊、砌筑砖屋脊250*240、1:2水泥砂
m 浆零星抹灰、刮外墙成品腻子(防水性N)三
遍,涂刷乳胶漆底漆一遍,面漆三遍。
9+2.08*2+1.61*2+1.56*2+1.58*2+1.62*2+1.77*2+1.48*2 +1.18*2+1.49*2+2.1*2+0.9+1.28*2+0.77*2+0.7*2+0.9*2
+0.88*2+1.18*2+0.78*2+0.73*2)*0.19
7.26 3.9
205.12
14 墙柱面粘贴青石片
㎡ 刮油性腻子,调和漆3遍。
m
外墙木装饰框所用材料制作、安装 宽250mm 厚20mm
㎡
外墙木装饰框 木龙骨 手刷桐油两遍,然后 安装
施工单位
注册造价师(项目技术负责人):
现场代表:
现场监理工程师(注册方章):
注册造价师(项目技术负责人):
工程量清单计算书
工程名称: 所在地址:
户主:
序号 定额名称
个 GRC成品装饰羊头安装,刷漆
m GRC成品装饰线条安装,刷漆
25 PVC万字格安装
11.56
26 墙柱包角砖粘贴文化石 3.76*2*0.3+5.6*0.45
27 拆除瓦屋面
12.56*2.7+(3.60+3.67-1)*2*1.35
ቤተ መጻሕፍቲ ባይዱ
现场代表:
建设单位
监理单位 现场监理工程师(注册方章):
11.56 4.78 50.84
计算式说明/计算式
数量
11
实木防腐装饰板 装饰 框刷桐油
13.45*0.54
12
实木防腐装饰板 装饰 框刷漆
13.45*0.29
11.56*3.76+0.8*2.45+4.36*3.76+4.79*5.6+0.5*4.79*1.
38+11.56*5.6+(11.56+4.36*2)*(1+0.36)-1.78*1.78-
12.56*2.7+(3.60+3.67-1)*2*1.35 11.56
户主: 50.84
11.80
m2 人工盖上屋面屋脊人工操作通道瓦屋面
m
刮外墙成品腻子(防水性N)、刷乳胶漆底漆 一遍、刷乳胶漆面漆三遍。
现场代表:
建设单位
监理单位 现场监理工程师(注册方章):
施工单位 注册造价师(项目技术负责人):
(3.55+3.67)*0.5+12.56*0.57 (3.55+3.67)*0.5+12.1*0.57 (3.55+3.67)*0.5*2+12.56*0.57*2 (3.55+3.67)*0.5+12.1*0.57 3 11.56
14.34
10.77 10.77 21.54 10.77
3 11.56
m 成品PVC万字格安装
m2
原墙面凿毛,挂钢丝网,1:2水泥砂浆打底, 零星粘贴青石文化石
m2 人工拆除做屋面屋脊人工操作通道瓦屋面
施工单位 注册造价师(项目技术负责人):
现场代表:
现场监理工程师(注册方章):
注册造价师(项目技术负责人):
工程名称: 所在地址:
28 盖瓦屋面
29 抹灰线条油漆
工程量清单计算书
11.56*1.18+0.8*0.94+9.15*1.3+11.54*1.17-1.78*1.180.9*1.17
36.64
15 砖砌屋脊
11.56+0.5+0.1
12.16
16 砖砌白石塔
6
4.00
17 砖砌宝顶
1
现场代表:
建设单位
监理单位 现场监理工程师(注册方章):
1.00
单位
备注
㎡ 外墙木装饰框双面手刷桐油两遍