Project Cost Control

Material Source: Managing benefits plans Author: Thinker Introduction

Project is corporate image window and benefit of the source. With increasingly fierce market competition, the quality of work and the rising material prices fluctuations. Uncertainties and other factors, make the project operational in a relatively tough environment. So the cost of control is through the building of the project since the bidding phase of acceptance until the completion of the entire process, It is a comprehensive enterprise cost management an important part, we must organize and control measures in height to the attention with a view to improving the economic efficiency of enterprises to achieve the purpose.

Outlining the Construction Project Cost Control

The cost of the project refers to the cost and process of formation occurred, on the production and operation of the amount of human resources, material resources and expenses, guidance, supervision, regulation and restrictions, in a timely manner to prevent, detect and correct errors in order to control costs in all project costs within the intended target, to guarantee the production and operation of enterprises benefits.

Construction Enterprise Cost Control Principle

Construction enterprises control the cost of control is based on cost control of construction project for the center, construction of the project cost control principle is the enterprise cost management infrastructure and the core, construction Project Manager in the Ministry of Construction of the project cost control process, we must adhere to the following basic principles.

(a) Principles lowest cost. Construction of the project cost control, the basic purpose is to cost management through various means, promote construction projects continue to reduce costs, to achieve the lowest possible cost of the objective requirements. The implementation of the principle of minimum cost, attention should be given to the possibility of reducing costs and reasonable cost of the

minimum. While various mining capacity to reduce costs so that possibility into reality; the other must proceed from actual conditions, enacted subjective efforts could achieve a reasonable level of the minimum cost.

(b) Overall cost control principles. Cost Management is a comprehensive enterprise-wide and full management of the entire process. The full project cost control is a system of substantive content, including the departments, the responsibility for the network and team economic accounting, and so on; to prevent the cost control is everybody's responsibility, regardless of everyone. Project cost of the entire process control requirements to control its costs with the progress of construction projects in various stages of continuous, neither overlooked nor time when, should enable construction projects throughout costs under effective control.

(c) Dynamic Control principle. Construction of the project is a one-time, cost control should emphasize control of the project in the middle, that is, dynamic control. Construction preparation stage because the cost is under the control of construction design to determine the specific content of the cost, prepare cost plans, the development of a cost-control program for the future cost control ready. And the completion of phase cost control, as a result of cost financing has been basically a foregone conclusion, even if the deviation has been too late to rectify.

(d) Responsibility, authority, in light of the profit principle. Construction of the project, project manager of the department, the team shouldering the responsibility for cost control at the same time, enjoy the power of cost control, project manager for the department, Teams cost control in the performance of regular examination and appraisal. Only to do a good job duty, rights, and interests combining cost control, in order to achieve the desired results.

The Construction Cost Control Measures

Project Manager of the project cost management responsibility for the first, comprehensive organization of the project cost management, timely understand and analyze profit and loss situation and take prompt and effective measures; engineering technology department should ensure the quality, Regular tasks to complete as much as possible under the premise adopt advanced technology in order to reduce costs; Ministry of Economic Affairs should strengthen budget management contract, the project to create the budget revenue; Finance Ministry in charge of the project's financial, Analysis of the project should keep the financial accounts of reasonable scheduling of funds. Develop advanced economies reasonable construction program, which can shorten the period, and improve quality,