施组封面ser_secret
PCB工程中常见的英文缩写汇总

PCB工程中常见的英文缩写汇总工程圖檔資料中常見的英文縮寫匯總AOI : Automatic Optical Inspection 自動光學檢測SMD : Surface Mount Devices 表面安裝設備SMB : Surface Mount Board 表面安裝板SMT : Surface Mount Technology 表面安裝技術MIL : Military Standard 美國軍用標准LPI : Liquid Photo Imageable Solder Mask 液態感光阻焊油SMOBC : Solder Mask On Bare Copper 裸銅覆蓋阻焊工藝OSP : Organic Solderability Preservative 焊錫性有機保護劑PTI : Proof Tracking Index 耐電壓起痕指數CTI : Comparative Tracking Index 相對漏電起痕指數HASL : Hot Air Solder Leveling 噴錫HAL : Hot Air Leveling 噴錫?PCB : Printed Circuit Board 印制電路板PWB : Printed Wiring Board 印制線路板CCL : Copper-clud laminat 覆銅箔層壓板FPC: Flexible printed board 柔性线路板简称,又称软板CAD : Computer Aided Design 計算機輔助設計CAM : Computer Aided Manufacturing 計算機輔助制造CAT : Computer Aided Testing 計算機輔助測試PTH : Plated Through Hole 鍍通孔IC : Integrated Circuit 集成線路UL : Under Writers Laboratories 美國保險商實驗室CNS : Chinese National Standards 中國國家標准BGA : Ball Grid Array 球柵陣列BUM : Build-up Multilayer 積層法多層板CFR : Code of Federal Regularations 聯邦法規全書AQL : Acceptable Quality Level 允收品質水准LDI : Laser Direct Imaging 鐳射直接成像HDI : High Density Interconnection –-Build-up Multilayer 高密度互連積層多層板1.依照標准(in according with related standards):IPC : The Institute for International and Packaging Electronic Circuit美國電路互連與安裝學NEMA : National Electronic Manufacturing Association 國家電子制造協會/美國電氣制造協會2.基本材料 ( base material):natural color 自然色 external copper weight 外層銅厚copper clad覆銅箔prepreg 預浸材料(指半固化膠片)Tg rating 玻璃化溫度laminate 基板cross-section切片cutout 切口Metal core 金屬芯type of board 板類(single sided 單面double sided 雙面multilayer 多層)epoxy glass fiber 環氧玻璃纖維flammability rating/class 防火等級dielectric material 介質材料temperature 溫度Resin Content 膠含量Glass Transition T emperature (由”玻璃态”转化为”橡皮态”简称为TG!)base copper (基銅)3.偏差及公差(deviation & tolerance) :registration 對位(重合度) dimension (長/寬/高)尺寸大小 radius &diameter半徑/直徑hole size/aperture孔徑 width 寬度length 長度depth深度height 高度thickness 厚度spacing間距axis軸coordinate坐標parameter參數copper foil 銅箔board outline/contour 板輪廓圖 edge to edge 邊到邊heat sink plane 散熱層stack up 疊層$ 疊放finish(ed) thickness 完成厚度trace = track = line = pattern = conductor =rail = circuit 線路top layer 上層& bottom layer 下層 layer to layer registration 層與層對位inter layer & external layer 內層&外層clearance 空隙、間空、間隔 & gap 間隙guide hole = pilot hole導引孔tangency 切線、相接觸&diagonal對角線、對頂線signal plane 信號層voltageplane電源層 ground plane 接地層C/S=component side 元件面 S/S=solder side 焊接面Primary side 主層secondary side 輔層 supporting plane 支撐面Film 底片/菲林master film 主稿片artwork 底稿片master drawing布設總圖4. 工藝(process):surface finishing = surface treatment = finish 表面處理hard gold 重金Entek / Flux 防氧化Immersion Ag 化银gold plating 鍍金immersion gold 沉金flash gold 閃金tin / lead plating 鍍鉛錫electroless gold (plating)(無電)鍍金nickel /gold plating 鍍鎳金HASL : Hot Air Solder Leveling 噴錫 HAL : Hot Air Leveling 噴錫NPTH : Not Plated Through Hole 非鍍通孔(非電鍍孔)Flat package type平裝型SMOBC : Solder Mask On Bare Copper 裸銅覆阻焊工藝plug through hole 塞孔Void 空洞slot 開槽/ 槽孔tented vias掩孔 / 導通孔 annular ring 孔環mounting hole安裝孔tooling hole 管位孔(定位孔)wet solder mask濕膜dry film /dry solder mask干膜preflux & postflux 預塗助焊劑&後塗助焊劑carbon ink 碳油silkscreen legend 絲印字符non-conductive 非導電的Permanent 耐久的Solder resist阻焊劑 & solder mask 阻焊油(膜)Flow soldering 流焊Reflow soldering 再流焊 Wave soldering 波焊Dip soldering 浸焊Drag soldering 曳焊Float soldering 浮焊withdrawal lacquer = peelable solder mask 藍膠2. 25mm window around fiducial without solder resistOverall diameter of solder resist free area = 6.0mm5. 標識(marking ):vender’s identification (賣主身份) = m anufacture’s identification (制造商名)= company name (公司名稱)date code 生產周期 UL logo (denotation) UL標識trademark 商標type designation 型號標志revision letter 版本字母dustbin symbol 垃圾箱標志stamp 蓋印、壓印short /open test 短/斷路測試liable to read易於辯认6.彎曲與扭曲(bow and twist or twist and warp ):not exceed 不超過7. 外形(profiling):mechnical outline 外形圖 countersink 鑽孔route bit 鑼鑽頭score 劃痕、刻痕、劃線score line分割線slot 開槽/ 槽孔& cutouts 切口panelization detail 拼板圖cosmetic =appearance外觀keepout area 保留區域breakaway rails 沖破導線array size 拼板尺寸punch 沖床drill 鑽孔route 鑼板V-cut 切割、分割8. 清潔度(clealiness):Finished circuit board shall be free of dirt ,oil ,ionic contaminates or other foreign matter which could affect solderability circuit performance ,lift or appearance 。
锂离子电池英文

锂离子电池技术英文词句2.3 assembly line process(5/15)流水线工艺film loading-vacuum on-film folding-sliding jig backward-top cutting-sliding jig forward-vacuum off-film unloading放上包装膜—抽真空—包装膜折叠-分切夹心的后端-剪掉顶部-分切夹心的前段-释放真空-拿下包装膜station 岗位two station 两个岗位folding 折叠guide type 指导方式top cutting 顶部剪切knife 刀片2.3 assembly line process(6/15)流水线工艺j/r loading-vacuum on-j/r jig backward-bottom former up-upper former down-放极组-抽真空-极组夹具放在后端-模板末端在上面-顶端在下面-heating forming-former up,down-j/r jig forward-vacuum off-j/r unloading加热模板-模板上下翻转-极组夹具朝前-释放真空-取下极组station two station岗位两个岗位heating forming pressing time,preset timer加热模板施压时间施压次数temperature thermocouple温度热电耦time:mmin,2~max.3sec时间:press force :40~50kg压力temperature:150℃温度2.3 assembly line process(7/15)流水线工艺film loading-fim clamp-sliding jig backward-edge pushing-tab clamp-tab unclamp-放上包装膜-包装夹具-分切极组末端-整边-放极耳夹具-卸下极耳夹具sliding jig forward-cell unloading分切极耳前端station two stationheat sealing top热封sealing thickness control(micrometer)热封厚度控制(毫米)sealing control pressing time,preset timer热封控制施压时间施压次数precision regulator精度校准temperature, thermocouple温度热电耦time :min.2~max.3sec时间press force:250kg压力temperature:180~250℃温度2.3 assembly line process(9/15)流水线工艺cell loading-vacuum on-sliding jig backward-side cutting-feeding-tab cutting-放上电芯-抽真空-滑动夹心后端-裁边-流入下工序-剪极耳sliding jig forward-cacuum off-cell unloaing滑动夹心前端-释放真空-取下电芯station two stationside cutting knifeside cutting force 100kgtab cutting knifetab cutting force 100kg2.3 assembly line process(10/15)流水线工艺cell loading-sliding jig backward-vacuum pad down-open-needle down-e/l filling(e/l-needle up-needle up-vacuum pad up-sliding jig forward-cell unloadingstation two statione/l supply 3kuter sub-tank on equipmentmetering pump hi -bar pump,hbd-2bc-17accuracy; under 3.0;±0.1gocer 3.0; ±3.5g2.3 assembly line process(11/15)流水线工艺cell loading-sliding jig backward-jig backward-jig up-vacuum(vacuum chamber)-放上电芯-滑动夹心后端-夹心向后-再向上-抽真空-sealing block forward-sealing热封前端- 密封--sealing block backward-jig down-silding jig forward-cell loading-formation热封后端- 夹心翻转向下-滑动夹心前端-取下电芯-成型station two stationvacuum source 740mmhg max.vacuum pumpsealing control pressing time preset tiomerpressing force, precision regulatortemperature, thermocouple热电偶time:min.3~max4secpress force:250kgtemperatrure:180~250℃2.3 assembly line process(12/15)流水线工艺cell loading-conveyor drive-numbering-numbering-head down-vacuum on-放上电芯- 启动传送带- 编号码-编号码-电芯朝下-抽真空head up-head forwward-head down-vacuum purge-head up-cell unloading电芯朝上- 电芯朝前- 电芯朝下-真空净化- 电芯朝上-取下电芯speed controller motor 25Wnumbering ink jet printercell unloading magacine2.3 assembly line process(13/15)流水线工艺piercing-cell loading-sliding jig backward-jig up-vacuum°assing-穿透??- 放电芯-滑动夹心后端-夹心向上- 抽真空&脱气sealing block forward-sealing-sealing block backward-jig down-sliding jig forward-cell loading 热封前端- 热封–热封后端-滑动夹心前端–取电芯station two stationpiercing ∮6holevacuum source 750mmhg max.vacuum pumpsealing comtrol pressing time ,preset timerpressing force,preision regulator调整压力temperature,thermocouple(温度热电偶)time: min.3~max.4sec时间press force:250kg(压力)temperature:180~250℃(温度)2.3 assembly line process(14/15)流水线工艺cell loading-vacuum on-sliding jig backward-cutter down-cutting-cutter up-放电芯-抽真空-滑动夹心后端-切割刀具向下-切割-切割刀具向上sliding jig forward-vacuum off-cell loading滑动夹心前端- 释放真空-取下电芯电池封口--cutting(切断) knife(刀)2.3 assembly line process(15/15)流水线工艺cell loading-ist folding-2nd folding-heat pressing-3nd folding-4th folding(sicing)放电芯- 第一次折叠-第二次折叠-热压-第三次折叠-第四次折叠cell unloading取下电芯manual-loading-2st foliding-heat pressing-3nd folding-4th folding手工–放上- 第二次折叠- 热压- 第三次折叠- 第四次折叠cell transfer linear transferfolding actuator pneumatic actuatorheat pressing pressing time,preset timerpressing forceprecision regulatortemperature, thermocoupletime:min.2~max.3 secpress force:40kgtemperatrure:80~100℃2.3 assembly line process(1/6)流水线工艺jelly roll supply-jelly roll loading-cell alignment-tab straightening-提供极组-放上极组-电芯排列好-将极耳伸直sealant sealing(sealant film supply)-sealant sealing(sealant film supply)-final sealing-密封胶密封(密封膜供给)-密封胶密封(密封膜供给)-最终的密封sealant film check-tab forming-jelly roll unloading(ng unloading)检验密封膜-极耳成型-取下极组2.3 assembly line process(2/6)流水线工艺al-foil supply-pre heating(contact)-pouch forming---pouch punch out-??—供应箔(铝塑膜???)-预热(连接)-成型成袋状- 袋状膜冲压打孔pouch loading(pouch pin hole check)-pouch loading-ist folding-lst folding-2nd folding-放上袋状膜(检验针孔)-放上袋状膜- 第一次折叠-第二次折叠top cutting(ng unloading)-jelly roll insertion(jelly roll alignment-jelly roll loading)—剪掉顶部—插入极组(调整极组-放上极组)3nd folding-pre heat sealing-package unloading第三次折叠-预热密封—取下包好的电芯2.3 assembly line process(3/6)流水线工艺cell loading-lst top sealing--2nd top sealing-top cooling-side sealing-side cooling-放上电芯-第一次顶部密封-第二次顶部密封-顶部冷却—封边—两边冷却side cutting-short check-cell unloading-ng unloading裁边- 测短路—取下电芯—ng是什么啊???package loading-pre weighing-package opening-e/l filling(e/l dispensing e/l supply tank) 放上包装好的电芯—预称重—打开电芯--- 注液(分配电解液电解液供给罐)--lst vacuum-2nd vacuum --lst sealing-2nd sealing-plst-weighing-package unloading-第一次抽真空---第二次真空---第一次密封---第二次密封---???---称重---取下电芯package loading-package aging--formation放上电芯---电芯老化-----化成cell loader-cell-loading-piercing-vacuum°assing heat sealing-2nd sealing-装电芯设备-电芯-装上电芯—穿透(??)-抽真空& 脱气热封—第二次密封side trimming-cell unloading修边--- 取下电芯cell loading-lst folding-2nd folding-3rd folding-4th folding-5th folding(sizing)-放电芯---第一次折叠---第二次折叠---第三次折叠---第四次折叠---第五次折叠(量尺寸)5th folding(sizing)-tab cutting-height&vision check-final weighging-final weighting-第五次折叠(量尺寸)---剪极耳---检验高度&视觉---最后称重ng rejection-cell unloading-cell unloading-cell palleticing挑选,排除---取下电芯--- (用托盘)搬运电芯???1.1 assembly line specification –products流水线特殊产品can type(壳体类型) aluminum can(A3003) 铝壳(材质A3003)conventional prismatic type ,not oval type 传统的方型,不是椭圆型model of cell电池型号basic design model:xx-yy—zz基本设计型号:XX-YY-ZZ range 范围w:30~34mm t:4.0 ~10mm h:40~67mm宽:厚:高:cathode tab正极耳AL,t0.08~0.12mm,w3/4mm铝带,厚度0.08~0.12mm宽度3/4mm welding to top cap with ultrasonic welder 用超声波焊接机超焊在极片头部anode tab负极耳ni,t0.08~0.12mm,w3/4mm镍带,厚度0.08~0.12mm宽度3/4mm welding to top cap with resistance spot welder用阻抗点焊机焊在极片头部can seam welding壳盖的缝隙焊接side welding侧面焊接top insulator 顶部绝缘片injection molded注液模具bottom tape wrapping底部贴胶纸pp-tape,same as j/r wrapping tape, roll,w:28~32mmt:0.05~0.10mm o.d:200mm core id:3inchesfor xx30zz width 28mm,for xx34zz width 32mmfill port welding 补焊砂眼AL Ball (Al050,∮1.37±0.03mm),laser seam welding 激光焊接e/l filling accuracy 精确注液量under 3.0g; ±0.1gover 3.0g ±3.5g r/l filling volume:1~7g 注液量范围1~7gmodel change exchange tool,jig, carrier&tray搬运工具,夹具,搬运盒&托盘option:only carrier&tray (others:sutomatically adiusted其它:适当调整)tray托盘jr极组(256pcs),can壳(300pcs),cap盖帽(100pcs),(rivet)all trays are prepared user1.2 assembly line specification –equipment流水线特殊设备line tact time 流水线标准工时 2.0(30ppm)Drive mechanism 发动装置cam,ac servo drive&air actuatorelectrical power 电源286kva,3p-380v±10%,50hz±1hzpneumatic source 气源13300l/min,0.6mpa (include welding jig cooling包括焊接模具冷却)nitrogen gas 氮气285 l/min, 0.6mpa(for laser welding shield gas激光焊接防护气)laser cooling water激光焊冷却水320 l/min,below25℃fume collector 烟、气收集罐400cfm,explosion-proof type for al-fume,outdoor typefume suction main piping 抽气主管道系统 4 inchexhaust piping排气管道系统5inchdry air piping干燥气管道系统5inchdry chamber(total) 干燥室20.78m3total weight总重量14.8ton(approx大概),(not include laser welder不包括激光焊接机)floor load 场地负荷1500kg/m2dry room height干燥室高度2500mm(min)can seam welding壳盖的缝隙焊接side welding侧面焊接,welding speed 焊接速率10~15mm/sec.(approx) cartesian robot stageelectrolyte filling process注电解液工序40station-80 jig index unit,vacuum真空&pressurize加压elctrolyte filling range注液范围depend on internal dead space of cell design根据电池设计内部的绝对空间hbd-2bc series of hibar pum, japan hibarleak check 测漏differential pressure check system,100pa max.不同压力测试系统,最大为100pa accuracy:+/-0.5%精确度need test actual work 需要通过实际操作测量2.1 assembly parts name&compositionball-top cap assembly盖板流水线(t/c)--top insulator顶部绝缘片(t/l)-cathode正极耳(al-tab铝带)-anode负极耳(ni-tab镍带)-bottom tape底部胶纸(b/t)-jelly roll极芯(j/r)-aluminum can铝壳2.2 assembly process basic specification装配过程概述3.1 prismatic lib assembly processbottom tape底部胶纸-jelly roll insertion极芯入壳-top insulator顶部绝缘片-tab forming极耳修整-top-cap welding顶部极耳焊接-top cap folding极耳折叠-top cap setting卡极耳-seam welding焊缝焊接-leak check测漏-electrolyte filling注液-ball insertion压钢珠-fill port welding补焊砂眼(???)3.2 assembly line process(1/8)can supply供应壳non dust paper tray无尘的纸盘can tray size装壳的盘子尺寸270*212*22/32htray capacity盘子容量423048-450can/tray343450-496can/tray(suppiled by user)stack volume堆叠范围48/50h:8tray65/67h:6traycan supply供应壳体-can loading放上壳体-can check检验壳体-jelly roll loading放上极芯(ng reject-bottom tape check检验底部胶纸-bottom tape wrapping贴底部胶纸-jelly roll supply供应极芯-from winder从卷绕机)-jelly roll centering极芯放在正中央-jelly roll insertion插入极芯-insertion height check检验极芯入壳高度-ng rejectj/r supply 极芯供应tray from winder来自卷绕机的盘子j/r tray size放极芯盘子的尺寸540*540*50hj/r capacity 容纳极芯的数量48/50h:40*8=320/tray65/67h:40*6=240/tray supplied by userstack volume堆叠范围8 traytray handling盘子搬运using manual cart用手推车bottom tape底部胶纸pp tape,rollcore size标准尺寸 3 inch paper coreb/t color 底部胶纸颜色blue or green兰色或绿色b/t check 检验底部胶纸color sensor颜色传感器3.2 assembly line process(2/8)tab straightening拉直极耳—tab position check检查极耳位置—top insulator insertion插入绝缘片(t/I escapement镊子??—top insulator supply供应绝缘片)—T/I presence check检查绝缘片—tab forming极耳修整—j/r final insertion极芯入壳—t/c welding盖板焊接(ni tab镍带)—(t/c direction check检查盖板方向—top cap supply盖板供应)—al tab welding铝带超焊—cap/tab welding check检验焊接是否牢固—tab folding极耳折叠—t/csetting&check固定、检验盖板—ng rejecttop cap supply盖板供应tray from cap ass’y m/ccap tray size 装盖板盘子的尺寸340*240*18hcap capacity能装盖板的数量18*6=108 cap/traystack volume 堆叠范围24 tray(2592 cap)j/r final insertion极芯入壳include j/r insertion height check包括检验极芯入壳高度ni-tab welding焊接镍带resistance spot welding,2points阻抗点焊机,2点include welding current monitor包括焊接电流监控器al-tab welding铝带超焊ultrasonic welding超声波焊接40khx/800w/branson brandtop insulator顶部绝缘片pull check拉力测试cap height check盖板高度检验t/c setting check 检验盖板牢固性setting height check检验固定的高度3.2 assembly line process(3/8)height check#1高度检验1#—pre spot welding预点焊—height check#2高度检验2#—ng reject排除不合格品??—seam welding#1焊缝焊接1#—seam welding#2焊缝焊接2#—seam welding#3焊缝焊接3#—seam welding#4焊缝焊接4# (jig cooling模具冷却)—short check测短路—ng reject排除不合格品pre spot welding预点焊laser spot welder激光点焊机,3-points 50w/2-fiber,1system(supplied by user)height check#1 高度检验1# check the top cap setting height检查盖板固定的高度height check#2 高度检验2# check the top cap welded height检查盖板焊接高度seam welding缝隙焊接laser welder激光焊接机,10~15mm/sec,700w/2-fiber,4systemsrequire speed down for 34xxyy 对于34xxyy需减速models (prevent against overheat预防过热)supplied by userjig cooling 模具冷却vortex tube,using compressed air热交换管道,采用压缩气体air pressure 0.65mpa (minimum)气压shield gas supply保护气供应nitrogen gas,0.65mpa18/min氮气with digital flow meter数显流动仪表fume collector烟气收集罐400 cfm,1.5kw,amanl/japanexplosion proof,outdoor type户外气体排放装置short check测短路lcr meter3.2 assembly line process(4/8)vacuum out释放真空—equilibrium平衡状态—leak detection测漏—vent排除气体—ng reject排除不合格品leak check procedure测漏程序atmosphere气体—vacuum抽真空—equilibrium平衡状态—detection测漏—leaked cell漏气电芯—normal cell 正常电芯leak check测漏differential pressure,100pa max.. 不同压力测试系统,最大为100pavacuum out-100kpa max.释放真空leak detection timeusing master cell采用好的电芯accuracy:+-0.5%精确度cell handling搬运电芯8 cells,simultaneously check 8只电芯,同时检查3.2 assembly line process(5/8)pre weighing预称重—cell loading放上电芯—e/l dispensing电解液分配—vacuum/vent抽真空/排气—vacuum 抽真空—pressurize加压—vent排气—cell unloading取下电芯—post weighting快速称重—ng rejectelectrolyte supply供应电解液drum桶,200 literusing nitrogen gas使用氮气, 0.02~0.04mpasub-tank in equipment装置内的储槽,3 litermetering pump 抽吸仪表hibar pump,japan hibarhbd-2bc series*2vacuum抽真空-700mmhg,(max.-740mmhg)suction capacity抽吸泵容量310/min.r5c 0040e*02,busch/germany德国??Pressurize加压nitrogen gas氮气,0.15~0.2mpaWeighing称重load-cell,6digits,nmb/japan日本Display显示;000.00gnozzle cleaning 清洗喷嘴nitrogen gas blow out用氮气吹,0.15~0.2mpafor blow out the remained e/l 把剩余的电解液吹出来process time 工序工时128sec (max)filling accuracy 注液精确度under 3.0g;±0.1g 小于3.0g,±0.1gover 3.0g; ±3.5% 大于3.0g; ±3.5%3.2 assembly line process(8/8),al ball typecleaning paper supply供应纸巾-cap face cleaning清洁盖帽表面-cleaning paper supply供应纸巾-cap face wet cleaning盖帽表面除湿-solvent dispenser溶剂给料器-fill port cleaning清洁注液孔-cleaning paper supply供应纸巾-ball insertion钢珠插入-ball supply钢珠供应-ball press压钢珠-ball height check检验压钢珠的高度--ball seam welding钢珠缝隙焊接-welding check焊接检验-uv glue dispensing UV胶水给料-ng reject-uv curing紫外光固化????-cell unloading取下电芯cleaning paper清洁纸巾non-dust paper,roll,width 14mm无尘纸巾,卷,14mm宽3 inch paper coreballsupply钢珠供应bowl feeder钢珠进料器requies testing by the actual sample目前测试样版ball press force压力35~40kgfseam welding定位焊接方法laser seam welder,6.5mm/sec激光焊接工作350w/-fiber,1 system焊接系统(supplied by user)适当调整6.1 model change time 型号变化时间manual conversion type 46-30-48 vs 46-30-xx:6 hours approx.(only different'heieght)xx-xx-xx vs yy-yy-yy:3days6.2 delivery交货manual conversion type 7months to shipping,after l/c open6.3 customer scope 客户范围primary main power wiring to control panel of the each equipment,with main power panel.主要的电源线控制每一个设备的主电路板????Primary main pneumatic piping to beside the each equipment, with main air-filter unit.主要的气管道系统装在每个设备的旁边,主要的气体过滤器????Primary main nitrogen gas piping to beside the each equipment, with main gas -line filter unit.主要的氮气管道系统装在每个设备的旁边,主要的气体过滤器???/All duct piping for suction &exhaust from equipment's inlet/outlet to main duct.所以用于从设备上的进口/出口抽气或排气的输送管道Installation &piping/wiring/wiring for fume collector(outdoor type)给烟气收集器(户外类型)安装管道系统/配线系统Inlet/drain water piping of the washing machine,with water strainer.清洗设备的进水/排水管道,水过滤器Laser welding system &laser welder welder import/export fee激光焊接系统&激光输入/输出Cooling water piping for each laser system,below 25℃.(it requires a water filter (strainer)用于激光系统的冷却水,25℃以下(需要一个水过滤器)Cooler or chiller for laser cooling water.激光冷却水的冷却器Dry pneumatic piping for laser shutter operation to each laser system.用于每一个激光系统的激光开关操作的干燥气管道Installation&wiring/cabling for laser fiber and laser control cable.给激光光纤和激光控制电缆安装配线/电缆Installation &wiring/cabling for laser control pendant.给激光控制的悬吊物安装配线/电缆????6.4 laser system location outdoor of the dry room. It requires air-conditioning or sufficient ventilation.激光系统位于干燥间的外面。
巨人通力调试手册

目录升级CPU和DRV指导手册(最终版)机房控制柜打上紧急电动, 上电.6—16= 7 断电上电6—1= 11 断电上电1—99= 2 断电上电5—7—2 断电上电1—1 与锁梯层一致(1—72)1—2 6(该参数设置后外呼盒上会有运行箭头)1—12 有提前开门时设 4 无提前开门时设 01—13 01—18 单开门时设 1 双开门时设为 31—24 单开门时设 0 双开门时设为 1 1—42 11—71 31—72 锁梯返回层1—79锁梯时照明关闭=0锁梯时照明不关闭=11—83 11—92 11—930 双开门时设 11—9471—98 17—907—8007—8107—84显示当前位置 1显示下一位置 17—97 1 (锁梯时电梯返回锁梯层关门后外召显示关闭)6—1 116—2 16—26 1.56—28 1.76—34 1.7 (短层时可以小一些)6—60 01—30 基站层锁梯返回层1—32 反基站延时1—33 反基站功能选择1—44 司机功能1—60消防反回曾层1—6111 区域码1—62 1 消防功能选择1—50 为电梯号一号梯为1二号梯为2一类推1—56 为电梯台数1—41 Submenu 1为放到乱功能设为1Submenu2为消号功能设为11用户界面的操作手册 21.1 CPU用户界面的按钮 21.1.1用户界面的按钮 21.1.2 LCE™用户界面的LEDs和按钮71.2变频器用户界面141.2.1面板操作说明142. 慢车运行前需做步骤162.1 修改CPU参数162.2 设置变频器162.2.1同步曳引机162.2.2异步曳引机203.快车调试243.1 DRV抱闸延时调整243.2轿顶检修箱内CCBS拨码开关位置调整243.3 井道自学习243.4 减速距离学习253.5 显示程序设置253.6 减速距离学习25 附录1:参数表28 附录2:OPT拨码开关位置表60 附录3:选项功能缩写62 1用户界面的操作手册1.1 CPU用户界面的按钮1.1.1用户界面的按钮按钮和显示屏1.功能模式2.功能模式的显示3.楼层(轿厢位置)4.新楼层(目标楼层)5.增加数值/楼层6.选择数值/接受7.上召8.内召9.限速器测试10.子菜单11.数值(调整值)12.减小数值/楼层13.下召14.缓冲测试用户界面的功能模式如下表所示下例描述了召梯的步骤。
otometrics MADSEN 兹达 (Xeta) 说明书

3.2.1 前面板布局 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 3.2.2 刺激声按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 3.2.3 “ 掩蔽 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 3.2.4 “ 测试 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 3.2.5 信号指示灯 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 3.2.6 “ 扩展范围 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 3.2.7 “ 更换耳 ” 按钮 (左 <--> 右). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 3.2.8 “ 清除 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 3.2.9 “ 新建患者 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 3.2.10 “ 预览 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 3.2.11 滚动患者列表按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 3.2.12 “ 设置 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 3.2.13 设置 1 和设置 2 — 对测试进行自定义 . . . . . . . . . . . . . . . . . . . . . . . . . . 27 3.2.14 “ 开始 / 暂停 ” 按钮 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
《世界传说换装迷宫3》全流程通关教程

1 / 57
スタン:斯坦 ルーテイ:鲁蒂 リオン:里昂
人员姓名
3.近五年派出参加国家级继续医学教育项目情况
培训内容
培训时间
主要方向
商店买够 15 个スペクタクルズ,便于收集怪物图鉴
3:本次装饰品恢复了传说的传统设置可以装备两个了, 但是前作的服装特殊能力做了另外的改变,所以对战斗显得 比较不利。
4:接上面提到,服装特殊能力变化了,变成了队伍能力,类 似于机战 R 的支援度系统,只要将认识的人组在一个队伍里 就会有不同效果,例如凯依鲁+利亚那有 TP 回复的效果.利 德+法拉有 HP 回复的效果(可在右下方查看)
唐劲松 英国剑桥大学:遗传认知神经科学 2010.3~2010.4
李卫晖 美国杜克大学:精神病学
2009.2~2010.2
向小军 美国贝勒医学院:精神病学
2009.5~2010.5
王绪轶 美国耶鲁大学:精神科住院医师培训 2009.5
谌红献 日本千叶大学:成瘾医学
2010.4~2011.4
廖艳辉 美国芝加哥大学:精神病学
精神病学与精神卫生
李乐华 澳大利亚墨尔本大学:精神病学
2006.9
生物精神病学
陈琼妮 香港葵涌医院:护理管理
2008.9~2008.10
精神病护理学
黎艳华 香港葵涌医院:护理管理
2008.9~2008.10
罗 薇 香港葵涌医院:护理管理
2008.9~2008.10
join in 3各单元知识点

。员行飞为成想梦孩男多许 .stolip gnim oceb fo maerd sy ob ynaM 友朋的我见梦候时有我 .sdneirf ym fo maerd semitemos I�如 望渴�想梦② …见梦① hts�gniod�+fo maerd )2( 谈交物动和能我见梦常经我 .slamina ot klat nac I taht maerd netfo I�如 ”…见梦“ 句从+taht maerd )1( �型句点重 .41
片通卡看 nootrac hctaw .9 调烹 gnikooc emos od .8 语英习学 hsilgnE nrael .7 样怎 tuoba tahw .6 机音录 redrocer ettessac .5 倒绊 revo pirt .4 糕蛋块一 ekac fo eceip a .3 会聚加参 ytrap a ot og .2 会聚行举 ytrap a evah .1 �sesarhP 递传 ssap .51 诉告 llet .41 丛树矮 hsub.31 藏 edih.21 会将 llahs .11 次再 niaga.01 想 kniht .9 意主 aedi .8 要需 deen .7 红脸 hsulb .6 笑 hgual .5 搬 yrrac .4 块 eceip .3 的亮漂 ytterp .2 会聚 ytrap .1 �sdroW ) 。写、认、读、说、听会求要子句和词单类二第( )。糕蛋带我 �么什带能你 ( .sekac em os gnirb nac I ? gnirb uoy nac tahW .51 �。来包面些带以可我� .daerb eht gnirb nac I .41 �。糕蛋些要需也们我想我。的好�B �吗来汁橙些带以可你�A� .sekac deen osla ew kniht I .KO ,seY :B ?eciuj egnaro emos gnirb uoy naC :A .31 �。意主好:B �吗子李些要还 :A� .aedi taerG :B ?smulp tuoba tahW :A .21 �。果苹和狗热要需们我��。乐可和包面要需们我�B �呢么什要需们我 :A� �.selppa dna sgod toh deen eW� .aloc dna daerb deen eW :B ?deen ew od tahW :A .11 �。会聚个一加参去备准你� .ytrap a ot gniog era uoY .01 �。舞跳去备准们他� .ecnad ot gniog era yehT .9 �。球足踢去备准们我� .llabtoof yalp ot gniog era eW .8 �。泳游去备准 ammE� .miws ot gni og si ammE .7 �。琴钢弹去备准她� .onaip eht yalp ot gniog si ehS .6 �。车行自骑去备准 m oT� .ekib a edir ot gni og si moT .5 �。马骑去算打我�B �么什干算打天明你�A� .esroh a edir ot gni og ma I :B ?worromot od ot gniog uoy era tahW :A .4 �。会聚加参去备准我�B �么什干备准六期星你�A� .ytrap a ot gniog ma I :B ?yadrutaS no od ot gniog uoy era tahW :A .3 �。子李和梨、果苹买去备准我� .smulp dna sraep ,selppa yub ot gni og ma I .2 �。糖香口买去备准我� .mug gniwehc yub ot gni og ma I .1 .secnetneS 待等 tiaw .91 要需 deen .81 买 y ub .71 末周 dnekeew .61 来带 gnirb .51 乐可 aloc .41 汁果 eciuj .31 狗热 god toh .21 糕蛋 ekac .11 子橙 egnaro .01 包面 daerb .9 糖香口 mug gniwehc .8 果苹 elppa .7 蕉香 ananab .6 力克巧 etalocohc .5 梨雪 raep .4 糕雪 maerc eci.3 条面 eldoon .2 子李 mulp .1 �sdroW ) 。写、背、读、说、听会求要子句和词单类一第(