供配电10kv变配电所设计中英文翻译

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

Substation Design

Power system is the system of production and consumption of electricity generation, transmission, transformation, distribution and electricity and other aspects of the composition. Its primary function is the energy conversion means through natural generation power into electrical energy, and then by transmission and distribution substation and supplies power to each user. The main structure of the power system has power (hydropower, thermal power plants, nuclear power plants, etc.), substations (boost substation, load center substation, etc.), transmission and distribution lines and load centers. Each power point is also interconnected to achieve energy exchange between different regions and regulation to improve security of supply and economy. Substation transmission line network consisting of the electricity network and is usually called.

Substation is from the main terminal , the main transformers, high and low voltage power distribution equipment , relay protection and control systems, the power and DC systems , remote and communication systems , the necessary reactive power compensation device and the main control room and other components . Among them, the main terminal , the main transformers, high and low voltage power distribution equipment , such as belonging to a system ; protection and control systems, the DC system , remote and communication systems are secondary system . Main connection is the most important part of the substation . It determines the function of the substation , construction, investment , operation quality , maintenance conditions and supply reliability. Generally divided into several basic forms single busbar , double busbar , a half breaker and ring wiring and so on. Substation main transformer is the most important equipment , which directly affects the performance and configuration of the advanced nature of the substation , economy and reliability . General need to install substation main transformer 2 to 3 sets ; 330 kV and below , the main transformer is usually a three-phase transformer , its capacity by 5 to 10 years into the expected load selection . In addition, substations and other equipment selection and the overall layout of the site selection also have specific requirements. Substation

relay protection subsystem (including transmission lines and bus protection ) and component protection ( including transformers , reactors and reactive power compensation device protection ) categories. Substation control mode is generally divided into the direct control and optional control two categories.

Transformer substation is the main equipment is divided into two-winding transformer, three-winding transformers and autotransformers that high and low voltage windings for each phase of a shared, taking a header from the middle of the high voltage winding qualify as a low-voltage winding of the transformer. V oltage is proportional to the level of the winding turns, the current is inversely proportional to the number of turns. Transformers can be classified according to their role and step-down transformer step-up transformer. The former is used to send end substation power system, which is used by the end of the substation. V oltage transformer and voltage of the power system needs to adapt. In order to maintain acceptable voltage under different load conditions may need to switch the transformer tap. By way of transformer tap switch with load-load and no-load regulating transformer no-load tap changer. OLTC is mainly used by the end of the substation.

V oltage and current transformers. Their operating principle is similar to the transformer, which the operating voltage of high voltage equipment and busbar, high current that the device and the bus load or short-circuit current measurement instruments according to a predetermined ratio becomes low voltage relay protection and control equipment and a small current . Operation at rated voltage transformer secondary voltage l00V, current transformer secondary current is 5A or 1A. Current transformer secondary winding is often connected with the load close to a short circuit, please note: never let it open, otherwise it will endanger due to high voltage equipment and personal safety or to the current transformer burned.

Switchgear includes circuit breakers, isolating switches, load switches, high voltage fuses are disconnected and close the circuit devices. Breakers are generally composed of a contact system, arc system, operation mechanism, release, housing and so on. The role of the circuit breaker is turned off and the load circuit, and cut off the fault circuit

相关文档
最新文档