个人年终总结英文自我评价精选范文

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

个人年终总结英文自我评价

个人能力英文自我评价篇一

In the past five months, under the leadership of the Department of Engineering Services, and colleagues through the common struggle, after their own positive efforts to do the following work.

one. Work attitude, ideological work.

I am very passionate about my job, I am able to follow the disciplines of the Engineering Department, maintain a responsible work attitude, humble learning, proactive, and constantly improve their technical

level, and strive to lead the allocation of each task to do the most it is good.

two. Guide the installation work.

In Jinli permanent magnet installation combat work, through the equipment of the pipeline interface, rectifier cabinets and control cabinet wiring to

pay-line installation, deepened my understanding of the equipment process and line power supply and distribution. But also trained me to understand the electrical wiring schematic, the ability to connect pipe installation drawings. But also to learn the skills of cognitive equipment spare parts. Every step of the installation process is done carefully. Found that the installation of lye filter timely and correct installation. Although the smooth completion of the guidance, but through the work found in the control cabinet in the PLC model configuration and accessories detailed name, the role of functional understanding is

not deep enough. The future focus on some technical drawings, working hours to the material security department cognitive accessories. Do not understand the issue of timely advice to colleagues and leaders.

Third, equipment testing and debugging work.

In the workshop on the Saudi equipment debugging test, the power plant CNDQ-10 hydrogen production equipment startup sequence, PID parameter settings, have a certain understanding. But also on the working principle of rectification from shallow to deep understanding.Before the test to determine

through-cylinder is 90 degrees, tee 180 degrees. Through ball valve modulation off. Jordan's pneumatic film regulating valve should do its initial adjustment, debugging process, such as equipment can not reach the system pressure, the actual level does not match with the host computer, pump damage has occurred, should be based on the actual situation of

correct investigation.

Fourth, the future direction of work.

Next month focused on the debugging phase of learning. Develop their own ability to find fault. The scene found the problem back to the leadership, more advice. In the future work to make up for deficiencies, work hard to do better.

个人能力英文自我评价篇二

Time rush, I feel between 2018 has quietly waved to us. Looking back a year of work and life, sentiment. Usually busy, there is not much time and opportunity to sit down and sum up their work done, all year round, Jing Xiaxin to sum up the work of one year gains and losses, find their own deficiencies, for the coming year to do the work arrangements and plans, is Very

相关文档
最新文档