建筑工程英语试题
建筑工程专业英语-吴承霞版考试资料

1.Construction engineering is a specialized branch of civil engineering concerned with thepianning ,execution,andcontrol of construction operations for various projects.planning consists of scheduling the work to be done and selecting the most suitable construction methods and equipment for the project .execution requires the timely mobilization of all drawings,layouts,and materials on the job to prevent delays to the work.control consists analyzing progress and cost to ensure that the project will be done on schedules and within the estimated cost.(一单)建筑工程是土木工程的一个分支,涉及项目的计划、实施和施工控制。
计划包括安排项目工程进度,选择适当的施工方法和设备。
实施则是要求及时筹备所有的图纸、布置和施工原料以防止工作延期。
控制包括进度和成本分析,以保证项目能按计划进行,并控制成本消耗在预期范围内。
2.Construction operations are generally classified according to specialized fields. These include preparation of the projectsite, earthmoving, foundation treatment, construction of load-carrying frame and electrical and mechanical installations.However, the relative importance of each field is not the same in all cases[5施工程序通常根据工种不同来分类,包括现场准备、挖运土方、地基处理、主体结构施工以及电器和机械安装,但是每个工种的相对重要性在各种情况下并不总是相同的。
建筑工程专业英语试题三及答案

建筑工程专业英语试题三及答案I Match the English in Column A with their Chinese equivalents in Column B(每题2分,共20分)Column A Column B( ) 1.reinforced concrete a. 工程造价( ) 2. frame structure b. 建筑布线( ) 3.construction cost c. 招标文件( ) 4.cost estimate d. 施工图纸( ) 5. building materials e. 钢筋混凝土( ) 6. project quality and safety f. 施工承包商( ) 7.construction drawings g. 成本估算( ) 8. tendering documents h. 工程质量和安全( ) 9.construction contractor i. 框架结构( ) 10. building wiring j. 建筑材料II Translate the following sentences.(每题5分,共50分)(1)Specialists are often called on to valuate real estate and facilitate transactions.(2)Concrete is used more than any other man-made material and over 5 billion tons are used worldwide each year,the reason for this is that it is really the ultimate construction material.(3)Glass“curtain walls” can be used to cover the entire facade of abuilding,or it can be used to span over a wide roof structure in a “space frame”.(4)New alloys have further increased the strength of steel and eliminated some of its problems,such as metal fatigue,which is a tendency for it to weaken as a result of continual changes in stress.(5)In addition to cost amounts,information on material quantities and labor inputs within each job account is also typically retained in the project budget.(6)The i—Home Enabler is a multi-functional controller that transforms your private life from a busy unorganized style into a technology-driven, automated, and relaxing one.(7)To enable wires to be easily and safely identified, all common wiring safety codes mandate a colour scheme for the insulation on power conductors. In a typical electrical code, some colour-coding is mandatory, while some may be optional.(8)The design, detailing, and choice of materials of the furnishings are important not only for design continuity but also for both durability and ease of maintenance.(9)Designing and choosing exterior furnishings for a building should be approached in the context of both the comprehensive urban environment of the building and the specific streets where the furnishings are to be used.(10)Progress schedule is a supply plan that, according to the progress schedule and the engineering quantity of the construction project, proposes labor, material, machinery and equipment, component and so on.III Translate the following paragraphs into Chinese.(每小题15分,共30分)1. Civil construction technology’s range is wide and content is very rich.For example,earth and rock works,foundation works,masonry works,reinforced concrete works,prestressed concrete engineering,main structure construction of buildings and structures,formwork and scaffold works,installation engineering,waterproofing works and decoration projects,etc. . It must be prepared well in organizational design and pay attention to safe production during the construction.2. Green building materials are composed of renewable, rather thannonrenewable resources. Green materials are environmentally responsible because impacts are considered over the life of the product. Depending upon project-specific goals, an assessment of green materials may involve an evaluation of one or more of the criteria.答案I Match the English in Column A with their Chinese equivalents in Column B1. e2. i3. a4. g5. j6. h7. d8. c9. f 10 b II. Translate the following sentences(1) 在房地产评估和交易时相应造就出了一些相关专业人员。
《建筑工程专业英语》教学资源包 期末试卷及答案 试卷B答案

《建筑工程专业英语》期末试卷B答案I Match the English in Column A with their Chinese equivalents in Column B1. i2. g3. f4. a5. h6. c7. b8. j9. d 10 e II. Translate the following sentences(1) 建筑施工中的质量控制通常是用最少的材料和工艺,根据设计要求以保证设备的正常运行。
(2) 一些天然材料,如黏土、石头、淤泥、木材和树叶等都已用于房屋的建筑。
(3)绿色建材是由可再生的,而不是不可再生的资源构成的。
(4)一个大工程有很多不同的专业人员参加施工,因此,如何组织好施工是解决好第三个阶段的关键,这是一个十分重要的系统工程。
(5) 电气配线一般是指用于携带电和相关设备的绝缘导线。
(6) 此外,当智能家居系统与视频门禁电话及家用电话连接后,来访者的影像、来电号码、来电记录以及留言信息等都可即时传递到电视屏幕上,让您透过电视屏幕界面进行全方位操控。
(7)为了应付不可预见的事件和由此产生的成本,通常在工程项目成本估算中要安排一定数量的储备金。
(8)工程预算是公司某个特定项目的相关成本预测。
这些成本包括劳动力、材料和其他相关费用。
(9)早期的内部布线系统使用的是包裹着布胶带的裸露的导体,用U形钉钉在建筑物的框架上或者是可以移动的接线板上。
(10)招标投标是一种国际惯例,是商品经济高度发展的产物,是应用技术、经济的方法和市场经济竞争机制的作用,有组织地开展一种择优成交的方式。
III Translate the following paragraphs into Chinese 1. 在安全方面,施工承包商必须是该组织的领导,首先要提出安全规范:传达安全的理念是施工现场第一要务;有提供安全施工环境的权利与义务;需要遵守公司安全守则中所有的规定,然后通过行动表明其遵守了安全政策和程序。
建筑英语句型练习40题

建筑英语句型练习40题1. The walls of this building are made of _____.A. steelB. woodC. glassD. brick答案:D。
本题考查常见建筑材料的词汇。
选项A“steel”意为“钢铁”,常用于构建框架等;选项B“wood”意为“木材”,常用于制作家具等;选项C“glass”意为“玻璃”,常用于窗户等;选项D“brick”意为“砖”,常用于建造墙壁,符合题意。
2. This bridge is supported by _____.A. concreteB. plasticC. rubberD. leather答案:A。
本题考查建筑材料的相关词汇。
选项A“concrete”意为“混凝土”,常用于支撑桥梁等大型建筑结构;选项B“plastic”意为“塑料”,一般不用于桥梁支撑;选项C“rubber”意为“橡胶”,用途多为制造轮胎等;选项D“leather”意为“皮革”,与桥梁支撑无关。
3. The roof of that house is covered with _____.A. tileB. paperC. clothD. sand答案:A。
本题主要考查建筑屋顶材料的词汇。
选项A“tile”意为“瓦片”,常用于屋顶覆盖;选项B“paper”意为“纸”,不能用于屋顶覆盖;选项C“cloth”意为“布”,不适合做屋顶材料;选项D“sand”意为“沙子”,也不是屋顶的常见覆盖材料。
4. The floor in this room is made of _____.A. marbleB. cottonC. silkD. wool答案:A。
本题考查地板材料的词汇。
选项A“marble”意为“大理石”,常用于地板铺设;选项B“cotton”意为“棉花”,不是地板材料;选项C“silk”意为“丝绸”,一般不用于地板;选项D“wool”意为“羊毛”,也不是地板的常见材料。
建筑专业英语试题及答案

建筑专业英语试题及答案一、选择题(每题2分,共20分)1. What is the term for the main vertical structural element in a building?A. ColumnB. BeamC. SlabD. Foundation2. The process of applying plaster to walls is known as:A. TilingB. RenderingC. PlasteringD. Drywalling3. Which of the following is a type of roofing material?A. BrickB. ConcreteC. AsphaltD. Glass4. The term "architectural scale" refers to:A. A set of rules for building designB. A tool used for measuring distances on architectural drawingsC. A method of constructionD. A type of building material5. What is the function of a lintel in construction?A. To support a wallB. To support a door or window openingC. To provide insulationD. To prevent water infiltration6. The abbreviation "RC" in construction stands for:A. Reinforced CementB. Roof ConstructionC. Residential ConstructionD. Raw Concrete7. The term "load-bearing wall" is used to describe a wall that:A. Carries the weight of the roof and floorsB. Is used for decorationC. Is non-structuralD. Separates rooms8. What does "green building" refer to?A. A building covered in plantsB. A building made from recycled materialsC. A building designed to reduce environmental impactD. A building with a lot of windows for natural light9. The process of attaching a building to the ground is known as:A. AnchoringB. FoundationingC. GroundingD. Embedding10. What is the purpose of a "cantilever" in construction?A. To provide additional supportB. To allow a structure to extend beyond its supportC. To increase the height of a buildingD. To create a decorative effect二、填空题(每空1分,共10分)11. The structural system that uses a series of arches to distribute weight is known as a _______.12. The process of cutting and shaping stone is known as_______.13. A _______ is a type of joint that allows for some movement between connected parts.14. The term "facade" refers to the front of a building, which is often the _______ of the structure.15. The _______ is the part of a building that connects the roof to the walls.三、简答题(每题5分,共20分)16. Explain the difference between "load-bearing" and "non-load-bearing" walls.17. Describe the role of a "cantilever" in architectural design.18. What is the significance of "sustainability" in modern architecture?19. Discuss the importance of "thermal insulation" in building construction.四、翻译题(每题5分,共30分)20. Translate the following sentence into English:“悬挑结构能够创造出独特的建筑形态,但同时也需要精心的设计以确保结构的稳定性。
九年级英语建筑设计单选题50题

九年级英语建筑设计单选题50题1.In the architecture studio, there are many ____ on the table.A.designB.designsC.designingD.designer答案:B。
本题考查名词的单复数形式。
“design”作为“设计图”讲时是可数名词,many 后面接可数名词复数形式,所以选designs。
2.The architect is looking at the ____ of the building.A.planB.plansC.planningD.planner答案:A。
“plan”作为“平面图”讲时是可数名词,但这里the 后面接单数名词特指这个建筑的平面图,所以选plan。
3.There are several ____ in the architecture book.A.pictureB.picturesC.picturingD.pictured答案:B。
“picture”作为“图片”讲时是可数名词,several 后面接可数名词复数形式,所以选pictures。
4.The architecture team is discussing the new ____.A.projectB.projectsC.projectingD.projected答案:A。
“project”作为“项目”讲时是可数名词,但这里new 后面接单数名词特指新的项目,所以选project。
5.In the corner of the studio, there is a stack of ____.A.blueprintB.blueprintsC.blueprintingD.blueprinted答案:B。
“blueprint”作为“蓝图”讲时是可数名词,a stack of 后面接可数名词复数形式,所以选blueprints。
6.The architect is trying to ______ a unique design for the new building.e up withB.put up withC.catch up withD.keep up with答案:A。
九年级英语建筑设计单选题50题

九年级英语建筑设计单选题50题1.The walls of this building are made of _____.A.steelB.waterC.airD.snow答案:A。
本题考查建筑材料相关词汇。
选项B“water”水、选项C“air”空气、选项D“snow”雪都不是建筑常用材料,而选项A“steel”钢材是常见的建筑材料。
2.This bridge is mainly constructed with _____.A.woodB.sandC.cloudD.ice答案:A。
选项B“sand”沙子一般不用来建造桥梁,选项C“cloud”云、选项D“ice”冰也不是桥梁的主要建造材料,只有选项A“wood”木材可以用来建造一些桥梁。
3.The roof of that house is covered with _____.A.grassB.stoneC.fireD.light答案:B。
选项A“grass”草一般不用于覆盖屋顶,选项C“fire”火、选项D“light”光明显错误,而选项B“stone”石头可以用来覆盖屋顶。
4.In ancient times, people often built houses with _____.A.plasticB.clayC.glassD.rubber答案:B。
在古代,人们常用“clay”粘土建造房屋。
选项A“plastic”塑料、选项C“glass”玻璃、选项D“rubber”橡胶在古代不是建筑材料。
5.The floor of this hall is laid with _____.A.paperB.marbleC.leafD.flower答案:B。
选项A“paper”纸、选项C“leaf”树叶、选项D“flower”花不能用来铺设大厅地面,而“marble”大理石可以。
6.The building is designed in a ______ style, with many arches and columns.A.modernB.classicalC.contemporaryD.minimalist答案:B。
初三英语建筑单选题50题

初三英语建筑单选题50题1. We need some ________ to build the house.A. woodsB. woodC. woodenD. woodens答案:B。
本题考查wood 的用法。
wood 作“木材”讲时,是不可数名词;woods 表示“树林”;wooden 是形容词,“木制的”;woodens 这种形式不存在。
这里需要“木材”,且不可数,所以选B。
2. The workers used many ________ to build the bridge.A. toolsB. toolC. toolesD. tooles答案:A。
tool 是可数名词,“工具”,many 修饰可数名词复数,tool 的复数形式是tools,所以选A。
3. This building is made of ________.A. stonesB. stoneC. stonyD. stoned答案:A。
stone 作“石头”讲时,是可数名词,这里指用很多石头建造,要用复数stones,所以选A。
4. Which ________ do you need to repair the roof?A. toolB. toolsC. a toolD. the tool答案:B。
根据语境,修屋顶需要不止一种工具,要用复数tools,所以选B。
5. The ________ is very heavy. We need a machine to move it.A. steelB. steelsC. a steelD. the steel答案:A。
steel 作“钢铁”讲时,是不可数名词,没有复数形式,也不能用不定冠词或定冠词修饰,所以选A。
6. The architecture of the Taj Mahal is known for its ________ beauty.A. amazingB. boringC. commonD. simple答案:A。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
页眉一、选择填空a secondary school. ) B 1. Between the buildings (D. standing C. to stand A. stand B. stands fond of music. B )2. Neither I nor he (D. wereC. are A. am B. ishow the buildings maybe made are )A 3.The laws that (building codes.D. telling C. told A. tell B. ellsfuture cities on the sea. C )4.It is expensive (D. buildsC. to build B. built A buildcements are widely used on the construction site. )(A5.TheB.above-mentioning A.above-mentionedD.above-mentionsC.above-mention70%. )B6.The production of steel has been increased (D.on C.at A.in B.byconcern everyone of )7.Let's discuss only such questions (C us.D.those C.as A.which B.thatstrong the materials are. D )8.He has to know(D. howC.which B.what A. thatman has )A (9.The Great Wall of China is the biggest structureever built.页脚页眉D.when C.where B.which A.thatyou go, you can see many buildings.B )10. (D.Whatever C.Whenever B.Wherever A.Whoever from you soon. C)11.We are looking forward to (D. hears C.hearing A.hear B.heardtoo cheap for the dictionary. )A 12.Five yuan (D.has beenC.were A.is B.area )C 13.We should aim at combining beauty and comfort (welcoming friendliness.D.forC.with A.to B.ina device in the picture. A )14.We can see an engineer (D.adjust C.adjusted B.adjusts A.adjusting.)(B 15.You are studying at college,D.we do so C.we are so A.so do we B.so are weof the English films are familiar to me. I've never seen )C 16. (them before.D.AnyC.None A.Both B.Nothing)(17.If the garden is big, some floodlights can be AD.fixture C.required A.installed B.produced rebar ? B)18.Dose your shop (D.make C.settle B.supply A.developthe specification . A (19.It's our duty to )页脚页眉D.make C.know ply with plete20.The bigger quantity you order, ( A ).A. the lower price you will be offeredB. the low price you will be offeredC. you will be offered lower priceD. you will be offer low二、词组互译(reinforced 2.钢筋混凝土( zoning codes)1.小区规范concrete)(labor cost) 人工费3.供热设备(the heating system) 4. (cast iron pipe) 6.铸铁管 5.工艺(workmanship) (the civil 8.土木工程承包商(contractor) 7. engineering)(architect) 建筑师9.工程量清单(the bill of quantities) 10.照12.lighting system ( 11.tripod (三脚架)) 明系统质量) 14.quality assurance (13.site safety program (工地安全方案保证)) 16.material cost (材料费银行担保15.bank guarantees () 18.the layout of the rooms ) 技术人员17.technical staff ( 房屋布局()) 20.office automation system城市规划19.town planning rules (页脚页眉) (办公自动系统三、选词填空\ \ vary \ serve \ insurance \ as well ( minimumfrom ) \ protect…\ foundation \ spread support \ apply)a tool. serveas 1. Foreign language can (2. We have to ( support ) the roof with pillars.in shape from place to place. ) 3. Roofs( vary4. They are trying to achieve the maximum of efficiency with the ( minimum ) of labor.5. He has found a suitable piece of land and an experienced ( as well ). builder6. As he bought the fire( insurance ), he didn't suffer severely from the great fire.7. As indicated the ( foundation )are bases of the building, which play an important part in construction.theory to practice. 8. We should ( apply ))flies. 9. The disease( is spreadbyWe should ( protect )our plants ( from ) the cold.四.翻译句子1. Materials used for doors and window frames are timber, iron用于门、窗框的材料可以是木材、铁、( and aluminum alloys. )铝合金。
页脚页眉2. Steel and concrete are the most widely used structural)钢和混凝土是当前广泛使用的结构材料。
materials today. (3. The Letter of Agreement is a promise of the Contractor tothe) Employer.( 协议书是承包商对业主的承诺。
4. Each unit price should include material cost, labour cost and)每个单价应包括材料费、人工费、机械费。
machine cost.(5. Now the popular interest in investment is infrastructure and 现在的投资热点是基础设施工程housing development projects. ()和住宅开发工程。
灯的样式应与6. Style of lamps should match other decoration. ()其他装饰相一致。
灯7. The light fixtures should be functional as well as decorative.() 具应既体观功能又具有装饰性。
8. We cannot expect a stable superstructure without a solid )没有牢固的基础,难以想象会有稳定的上部结构。
foundation.( 施工就是9. Construction is the translation of a design to reality.()把设计变为现实。
) 我们销售不同的直径和强度的钢筋。
10. We supply rebar with various diameters and strength.(我看到工人们在工地干11.I saw some workers working in the site.()活。
把这一想12. To translate this idea into reality needs hard work.() 法变为现实需要艰苦的劳动。
页脚页眉将房13. It is the individual touch that makes a house a home.( ) 屋布置成个家,各人有各人的做法。
14. The manager found the project much behind the)schedule.( 经理发现工程进度落后于计划进度。
15. All kinds of electric equipment are installed in modern) 现代住宅中装有各种电器设备。
homes.(五.阅读理解(一).Shelter from the natural elements is a basic need. Early peoplemet this need by dwelling in caves and then their descendantsbegan to construct buildings. An ancient building material, timber, is still being used in house building. Improved techniquesnow overcome many of its weaknesses. The strength of timber isdifferent along and across the grain. Multiple layers are bondedby adhesives to make the grain run in various directions. Durability is improved by better methods of preservation and improved timber does not burn easily. Devices for joining timberstructures have also been improved and they spread the applied load over a wide area. More extensively it is used for joists, rafters, window frames, doors and floors. Timber also has appeal for conservationists because it is renewable.We can plant more trees and manufacture the timber into a usable 页脚页眉form. It involves no pollution of the environment.Clay is used in the form of bricks and tiles. The great advantageof brick construction is its low cost. Clay is cheap and plentiful,and bricks are small enough to be laid easily by hand.Stone is strong and durable. In many respects, it is an ideal building material. However, it is difficult to handle. Stones must be cut from the solid rock in a quarry for use in a large building. All thislabor makes stone very expensive and difficult to work with.Stone is used today mainly as a thin outside covering for large buildings and for the decorative walls and floors of entrance lobbies.Many other kinds of materials besides the basic structural materials are needed for a building. Concrete, steel,glass, alloys, plastics, adhesives and pitch are among them. 判断对错1. There is little room for improvement in the building material. F2. Trees can not pollute the environment. T3. Bricks are made of clay. T4. Stone is as cheap as bricks. F5. There are many kinds of building materials. T(二)To cure concrete properly, the exposed surfaces must be keptcontinually moist form the moment the concrete first begins to页脚页眉set. The concrete must thereafter be kept continually moist for aminimum of 14 days and longer if at all possible.The simplest method of keeping concrete moist is to spray the ). Sand or burlapsurface with water at frequent intervals (频繁地can be spread over the surface to help retain (麻袋片)moisture. A covering is necessary, in any case, for the first 3 days(光线)after placing to protect the concrete from the direct rays of the sun.can also be sprayed on the 养护剂)Special curing compounds (concrete. The spraying should take place as soon as thesurface of the concrete has lost its watery appearance. Properly applied, a curing compound will allow the concrete tocontinue curing even after the concrete has been placed in service, as with a concrete highway, for example. Spraying ona curing compound is often the only practical method of curingconcrete that has been poured into an unusual shape.A third method of curing concrete is to spread a sheet of polyethylene film or building paper over the surface of the concrete. The polyethylene or building paper should overlapthe sides of the exposed concrete. This covering must remain on top of the concrete for the entire curing period.页脚页眉1. According to the passage, all the exposed surfaces of the concrete must be kept moist, ( B ).A. after the concrete has setB. as soon as the concrete begins to setC. whenever the concrete is placedD. before the concrete is placed2. The concrete must thereafter be kept continually moist for ( A ).A. at least 14 daysB. only 14 daysC. about 14 daysD. less than 14 days3. To keep concrete moist, ( C ).A. we can only spread some sand or burlap over the surface. )?some water over the surface. 喷B. we spray (C. we should spray water on the surface frequently.D. we should spray water mixed with sand over the surface.4. After the concrete is placed, ( B )A. it should be covered for a long time.B. it must be covered to avoid the strong sun light.C. it should be covered for 3 days.D. it may be covered for the first 3 days if possible.页脚页眉5. Special curing compounds ( B )A. can only be used from the moment to concrete first begins to set.B. can be used even after the concrete has been placed in service.C. can always be used on the concrete highway.D. can be sprayed on anything.页脚。