[上海]工业厂房中英文对照施工组织设计(土建、水电安装

合集下载

工业厂房中英文对照施工组织设计方案说明书(土建、水电安装)

工业厂房中英文对照施工组织设计方案说明书(土建、水电安装)

[上海]工业厂房中文对照施工组织设计施工组织设计目录第1部分施工组织设计总说明 .......错误!未定义书签。

1.1工程概况 (268)1.1.1项目情况 (268)1.1.2建筑结构概况 ................................................................. 错误!未定义书签。

1.1.3地质情况 ......................................................................... 错误!未定义书签。

1.1.4水纹及周围道路情况 ..................................................... 错误!未定义书签。

1.1.5安全文明施工目标 ......................................................... 错误!未定义书签。

1.1.6工程特点、难点及对策 ................................................. 错误!未定义书签。

1.2工程目标 (268)1.2.1质量目标 (268)1.2.2工期目标 (268)1.2.3安全、文明施工目标 (268)1.3施工大型机械的配备 (268)1.4工程施工设想 (268)1.5编制依据 (269)第2部分施工进度计划 (270)2.1进度计划编制说明 (270)2.2施工流水段划分 (270)2.2.1施工流水段划分的原则2.2.2流水段划分 (270)2.3施工总进度计划 (270)2.3.1总工期安排 (270)2.3.2主要节点工期 (270)2.5工期保证措施 (271)2.5.1进度目标体系的要求 (271)2.5.2成立工期保证领导班子 (272)2.5.3设备的保障 (272)第3部分施工机械配备 .............错误!未定义书签。

最全工厂英文对照

最全工厂英文对照

最全工厂英文对照一、工厂基本设施及部门名称对照1. 工厂:Factory2. 车间:Workshop3. 办公室:Office4. 生产线:Production Line5. 库房:Warehouse6. 物料部:Material Department7. 质量部:Quality Department8. 生产部:Production Department9. 技术部:Technical Department10. 人力资源部:Human Resources Department二、工厂常用设备名称对照1. 冲压机:Stamping Machine2. 注塑机:Injection Molding Machine3. 车床:Lathe4. 铣床:Milling Machine5. 磨床:Grinding Machine6. 钻床:Drilling Machine7. 线切割机:Wire Cutting Machine8. 激光切割机:Laser Cutting Machine9. 折弯机:Bending Machine10. 剪板机:Shearing Machine三、工厂常用原材料名称对照1. 钢铁:Steel2. 铝:Aluminum3. 铜:Copper4. 塑料:Plastic5. 橡胶:Rubber6. 纸张:Paper7. 玻璃:Glass8. 木材:Wood9. 纱线:Yarn10. 纤维:Fiber四、工厂生产流程及工艺名称对照1. 设计:Design2. 打样:Sampling3. 下料:Cutting4. 成型:Shaping5. 焊接:Welding6. 抛光:Polishing7. 喷涂:Spraying8. 组装:Assembly9. 调试:Testing10. 包装:Packing五、工厂质量管理术语对照1. 质量控制:Quality Control2. 抽样检验:Sample Inspection3. 全检:Full Inspection4. 不良品:Defective Product5. 合格率:Pass Rate6. 质量改进:Quality Improvement7. 质量管理体系:Quality Management System8. 认证:Certification9. 检测报告:Test Report10. 客户满意度:Customer Satisfaction六、工厂安全与环保术语对照1. 安全生产:Safe Production2. 安全培训:Safety Training3. 安全检查:Safety Inspection4. 防护用品:Protective Equipment5. 环境保护:Environmental Protection6. 废气处理:Exhaust Gas Treatment7. 废水处理:Wastewater Treatment8. 噪音治理:Noise Control9. 危险品:Hazardous Materials10. 应急预案:Emergency Plan七、工厂人力资源管理术语对照1. 招聘:Recruitment2. 面试:Interview3. 培训:Training4. 考核:Assessment5. 薪酬:Salary6. 福利:Benefits7. 劳动合同:Labor Contract8. 休假:Leave9. 晋升:Promotion10. 离职:Resignation八、工厂物流与供应链管理术语对照1. 供应链:Supply Chain2. 供应商:Supplier3. 采购:Procurement4. 库存管理:Inventory Management5. 物流配送:Logistics Distribution6. 运输:Transportation7. 仓储:Warehousing8. 订单处理:Order Processing9. 货物跟踪:Cargo Tracking10. 供应链优化:Supply Chain Optimization九、工厂市场营销与客户服务术语对照1. 市场调研:Market Research2. 产品定位:Product Positioning3. 营销策略:Marketing Strategy4. 广告宣传:Advertising5. 展会推广:Exhibition Promotion6. 客户关系管理:Customer Relationship Management7. 客户满意度调查:Customer Satisfaction Survey8. 售后服务:Aftersales Service9. 客户投诉:Customer Complaint10. 持续改进:Continuous Improvement十、工厂财务管理术语对照1. 财务报表:Financial Statements2. 成本核算:Cost Accounting3. 预算管理:Budget Management4. 税务筹划:Tax Planning5. 应收账款:Accounts Receivable6. 应付账款:Accounts Payable7. 资金周转:Capital Turnover8. 投资分析:Investment Analysis9. 融资:Financing10. 内部审计:Internal Audit十一、工厂信息技术与数据分析术语对照1. 企业资源规划(ERP):Enterprise Resource Planning2. 制造执行系统(MES):Manufacturing Execution System3. 计算机辅助设计(CAD):ComputerAided Design4. 计算机辅助制造(CAM):ComputerAided Manufacturing5. 数据分析:Data Analysis6. 大数据:Big Data7. 互联网物联网(IoT):Internet of Things8. 云计算:Cloud Computing9. 信息技术支持:IT Support10. 网络安全:Cybersecurity十二、工厂项目管理术语对照1. 项目启动:Project Initiation2. 项目规划:Project Planning3. 项目执行:Project Execution4. 项目监控:Project Monitoring5. 项目收尾:Project Closure6. 项目团队:Project Team7. 项目风险管理:Project Risk Management8. 项目进度:Project Schedule9. 项目预算:Project Budget10. 项目目标:Project Objectives十三、工厂技术创新与研发术语对照1. 研发(R&D):Research and Development2. 技术创新:Technological Innovation3. 新产品开发:New Product Development4. 专利:Patent5. 技术转移:Technology Transfer6. 知识产权:Intellectual Property7. 样品:Prototype8. 实验室:Laboratory9. 技术标准:Technical Standard10. 创新能力:Innovation Capability十四、工厂国际化与外贸术语对照1. 进口:Import2. 出口:Export3. 贸易壁垒:Trade Barrier4. 国际市场:International Market5. 外贸合同:Foreign Trade Contract6. 海关申报:Customs Declaration7. 贸易术语(如FOB、CIF):Trade Terms8. 国际支付:International Payment9. 跨国公司:Multinational Corporation10. 全球供应链:Global Supply Chain通过这份最全工厂英文对照文档,我们希望能够为您的日常工作提供便利,帮助您在国际化的大背景下,更好地融入全球工业体系,提升个人和企业的竞争力。

施工组织设计(英文)

施工组织设计(英文)

1.3.3
The third step: Sub-structure. According to the settlement joint between Embassy and Ambassador’s Residence, the foundation slab will be divided into two sections. Bedding Course, Water Proofing Work and Waterproof Protection Work will be carried out in flow process. Reinforcement, Formwork and Concrete will be carried out parallelly. The wall of basement and columns will be divided into three sections: Ambassador’s Residence- the first section, Embassy - the second section, Air Raid Shelter- the third section. The concrete wall of paking ramp will be completed during construction of super-structure. The formwork of the first section is 1580M2,by adding about 400m2, it will then be re-used for the top slab of the basement (the total sum is 1950m2). 288 pieces of modular plastic forms will be prepared for the waffle slab. The formwork of the second section will be re-uesed for the third section. Bamboo plywood will be used as the formwork. For details, please refer to Chapter 5.

有关施工组织设计 英文译文与原文

有关施工组织设计 英文译文与原文

英文译文与原文学院工程技术学院专业、班级土木工程1011 姓名杜军斌学号 ********** 指导老师刘强职称教授第一篇Civil engineering introduction papersAbstract: the civil engineering is a huge discipline, but the main one is building, building whether in China or abroad, has a long history, long-term development process. The world is changing every day, but the building also along with the progress of science and development. Mechanics findings, material of update, ever more scientific technology into the building. But before a room with a tile to cover the top of the house, now for comfort, different ideas, different scientific, promoted the development of civil engineering, making it more perfect.[key words] : civil engineering; Architecture; Mechanics, Materials.Civil engineering is build various projects collectively. It was meant to be and "military project" corresponding. In English the history of Civil Engineering, mechanical Engineering, electrical Engineering, chemical Engineering belong to to Engineering, because they all have MinYongXing. Later, as the project development of science and technology, mechanical, electrical, chemical has gradually formed independent scientific, to Engineering became Civil Engineering of specialized nouns. So far, in English, to Engineering include water conservancy project, port Engineering, While in our country, water conservancy projects and port projects also become very close and civil engineering relatively independent branch. Civil engineering construction of object, both refers to that built on the ground, underground water engineering facilities, also refers to applied materials equipment and conduct of the investigation, design and construction, maintenance, repair and other professional technology.Civil engineering is a kind of with people's food, clothing, shelter and transportation has close relation of the project. Among them with "live" relationship is directly. Because, to solve the "live" problem must build various types of buildings. To solve the "line, food and clothes" problem both direct side, but also a indirect side. "Line", must build railways, roads, Bridges, "Feed", must be well drilling water, water conservancy, farm irrigation, drainage water supply for the city, that is direct relation. Indirectly relationship is no matter what you do, manufacturing cars, ships, or spinning and weaving, clothing, or even production steel, launch satellites, conducting scientific research activities areinseparable from build various buildings, structures and build all kinds of project facilities.Civil engineering with the progress of human society and development, yet has evolved into large-scale comprehensive discipline, it has out many branch, such as: architectural engineering, the railway engineering, road engineering, bridge engineering, special engineering structure, water and wastewater engineering, port engineering, hydraulic engineering, environment engineering disciplines. [1]Civil engineering as an important basic disciplines, and has its important attributes of: integrated, sociality, practicality, unity. Civil engineering for the development of national economy and the improvement of people's life provides an important material and technical basis, for many industrial invigoration played a role in promoting, engineering construction is the formation of a fixed asset basic production process, therefore, construction and real estate become in many countries and regions, economic powerhouses.Construction project is housing planning, survey, design, construction of the floorboard. Purpose is for human life and production provide places.Houses will be like a man, it's like a man's life planning environment is responsible by the planners, Its layout and artistic processing, corresponding to the body shape looks and temperament, is responsible by the architect, Its structure is like a person's bones and life expectancy, the structural engineer is responsible, Its water, heating ventilation and electrical facilities such as the human organ and the nerve, is by the equipment engineer is responsible for. Also like nature intact shaped like people, in the city I district planning based on build houses, and is the construction unit, reconnaissance unit, design unit of various design engineers and construction units comprehensive coordination and cooperation process.After all, but is structural stress body reaction force and the internal stress and how external force balance. Building to tackle, also must solve the problem is mechanical problems. We have to solve the problem of discipline called architectural mechanics. Architectural mechanics have can be divided into: statics, material mechanics and structural mechanics three mechanical system. Architectural mechanics is discussion and research building structure and component in load and other factors affecting the working condition of, also is the building of intensity, stiffness and stability. In load, bear load and load of structure and component can cause the surrounding objects in their function, and the object itself by the load effect and deformation, and there is the possibility of damage, but the structure itself has certain resistance to deformation and destruction of competence, and the bearing capacity of the structure size is and component of materials, cross section, andthe structural properties of geometry size, working conditions and structure circumstance relevant. While these relationships can be improved by mechanics formula solved through calculation.Building materials in building and has a pivotal role. Building material is with human society productivity and science and technology improves gradually developed. In ancient times, the human lives, the line USES is the rocks andTrees. The 4th century BC, 12 ~ has created a tile and brick, humans are only useful synthetic materials made of housing. The 17th century had cast iron and ShouTie later, until the eighteenth century had Portland cement, just make later reinforced concrete engineering get vigorous development. Now all sorts of high-strength structural materials, new decoration materials and waterproof material development, criterion and 20th century since mid organic polymer materials in civil engineering are closely related to the widely application. In all materials, the most main and most popular is steel, concrete, lumber, masonry. In recent years, by using two kinds of material advantage, will make them together, the combination of structure was developed. Now, architecture, engineering quality fit and unfit quality usually adopted materials quality, performance and using reasonable or not have direct connection, in meet the same technical indicators and quality requirements, under the precondition of choice of different material is different, use method of engineering cost has direct impact.In construction process, building construction is and architectural mechanics, building materials also important links. Construction is to the mind of the designer, intention and idea into realistic process, from the ancient hole JuChao place to now skyscrapers, from rural to urban country road elevated road all need through "construction" means. A construction project, including many jobs such as dredging engineering, deep foundation pit bracing engineering, foundation engineering, reinforced concrete structure engineering, structural lifting project, waterproofing, decorate projects, each type of project has its own rules, all need according to different construction object and construction environment conditions using relevant construction technology, in work-site.whenever while, need and the relevant hydropower and other equipment composition of a whole, each project between reasonable organizing and coordination, better play investment benefit. Civil engineering construction in the benefit, while also issued by the state in strict accordance with the relevant construction technology standard, thus further enhance China's construction level to ensure construction quality, reduce the cost for the project.Any building built on the surface of the earth all strata, building weight eventually to stratum, have to bear. Formation Support building the rocks were referred to as foundation, and the buildings on the ground and underthe upper structure of self-respect and liable to load transfer to the foundation of components or component called foundation. Foundation, and the foundation and the superstructure is a building of three inseparable part. According to the function is different, but in load, under the action of them are related to each other, is the interaction of the whole. Foundation can be divided into natural foundation and artificial foundation, basic according to the buried depth is divided into deep foundation and shallow foundation. , foundation and foundation is the guarantee of the quality of the buildings and normal use close button, where buildings foundation in building under loads of both must maintain overall stability and if the settlement of foundation produce in building scope permitted inside, and foundation itself should have sufficient strength, stiffness and durability, also consider repair methods and the necessary foundation soil retaining retaining water and relevant measures.[3]As people living standard rise ceaselessly, the people to their place of building space has become not only from the number, and put forward higher requirement from quality are put car higher demands that the environment is beautiful, have certain comfort. This needs to decorate a building to be necessary. If architecture major engineering constitutes the skeleton of the building, then after adornment building has become theflesh-and-blood organism, final with rich, perfect appearance in people's in front, the best architecture should fully embody all sorts of adornment material related properties, with existing construction technology, the most effective gimmick, to achieve conception must express effect. Building outfit fix to consider the architectural space use requirement, protect the subject institutions from damage, give a person with beautifulenjoying, satisfy the requirements of fire evacuation, decorative materials and scheme of rationality, construction technology and economic feasibility, etc. Housing construction development and at the same time, like housing construction as affecting people life of roads, Bridges, tunnels has made great progress.In general civil engineering is one of the oldest subjects, it has made great achievements, the future of the civil engineering will occupy in people's life more important position. The environment worsening population increase, people to fight for survival, to strive for a more comfortable living environment, and will pay more attention to civil engineering. In the near future, some major projects extimated to build, insert roller skyscrapers, across the oceanBridges, more convenient traffic would not dream. The development of science and technology, and the earth is deteriorating environment will be prompted civil engineering to aerospace and Marine development, provide mankind broader space of living. In recent years, engineering materials mainly is reinforced concrete, lumber and brick materials, inthe future, the traditional materials will be improved, more suitable for some new building materials market, especially the chemistry materials will promote the construction of towards a higher point. Meanwhile, design method of precision, design work of automation, information and intelligent technology of introducing, will be people have a more comfortable living environment. The word, and the development of the theory and new materials, the emergence of the application of computer, high-tech introduction to wait to will make civil engineering have a new leap.This is a door needs calm and a great deal of patience and attentive professional. Because hundreds of thousands, even hundreds of thousands of lines to building each place structure clearly reflected. Without a gentle state of mind, do what thing just floating on the surface, to any a building structure, to be engaged in business and could not have had a clear, accurate and profound understanding of, the nature is no good. In this business, probably not burn the midnight oil of courage, not to reach the goal of spirit not to give up, will only be companies eliminated. This is a responsible and caring industry. Should have a single responsible heart - I one's life in my hand, thousands of life in my hand. Since the civil, should choose dependably shoulder the responsibility. Finally, this is a constant pursuit of perfect industry. Pyramid, spectacular now: The Great Wall, the majestic... But if no generations of the pursuit of today, we may also use the sort of the oldest way to build this same architecture. Design a building structure is numerous, but this is all experienced centuries of clarification, through continuous accumulation, keep improving, innovation obtained. And such pursuit, not confined in the past. Just think, if the design of a building can be like calculation one plus one equals two as simple and easy to grasp, that was not for what? Therefore, a civil engineer is in constant of in formation. One of the most simple structure, the least cost, the biggest function. Choose civil, choosing a steadfast diligence, innovation, pursuit of perfect path.译文:土木工程概论摘要:土木工程是个庞大的学科,但最主要的是建筑,建筑无论是在中国还是在国外,都有着悠久的历史,长期的发展历程。

中英文对照施工方案

中英文对照施工方案

中英文对照施工方案Construction Proposal施工方案1. Introduction介绍本施工方案概述了施工项目的计划,包括工作范围、进度、预算和安全措施。

本项目涉及新建一座商业建筑,将用作零售空间。

预计项目持续时间为六个月。

2. Scope of Work工作范围The scope of work includes the following tasks:- Site preparation: Clearing the construction site, setting up temporary facilities, and ensuring proper access to the site.- Foundation construction: Excavating, pouring concrete, and installing the foundation.- Structural construction: Erecting the framework,installing walls, floors, and roof.- Electrical and plumbing installation: Wiring the building for electricity, installing plumbing fixtures.- Interior finishing: Installing doors, windows, flooring, and finishing the walls.- Exterior finishing: Applying the exterior siding, painting, and landscaping.工作范围包括以下任务:-场地准备:清理施工现场,建立临时设施,确保适当的进入施工现场。

-基础施工:挖掘、浇筑混凝土和安装基础。

施工组织设计统一规定_中英文版

施工组织设计统一规定_中英文版

General Stipulations Regarding to Construction Organization Design施工组织设计统一规定Examination and Approval Schedule审批表Cover封面1.Preparation Note编制说明1.1.Project Description工程概述1.1.1.Natures of Project (Newly built)项目的性质(新建) 1.1.2.Purposes and Significance of Project Construction项目建设的目的、意义。

1.2.Preparation Basis编制依据1.2.1.Name and code of data and documents based on which the organization design is prepared组织设计编制所依据的资料、文件的名称和编号;1.2.2.Name and code of standards and specification based on which the organization design is prepared组织设计编制所依据的标准、规范的名称及编号。

1.3.Parties Involved in the Project参建单位Project Client: xxxxxxxxxxxxxxxxx.项目建设的建设单位:xxxxxxxxxxxxxxxxxxxx;Supervision contractor, design contractor, material procurement contractor and construction contractor etc.监理、设计、物资采购、施工等单位;Support companies and subcontractors for construction.施工协作、分包单位。

工业园厂房水电安装施工组织设计方案

工业园厂房水电安装施工组织设计方案

工业园厂房水电安装施工组织设计方案
一、项目概述
该项目为某工业园区内的一栋厂房的水电安装施工,施工总面
积为4000平方米,包括一层生产车间、二层为办公区和员工休息区。

水电安装施工的目的是为厂房提供稳定的电力和水源,满足生产和
办公的需要。

二、工程内容
1、电气设备:安装高压变配电室、变压器、低压配电室、开关柜、电缆桥架、电缆缆线。

2、照明设备:安装室内外照明灯具、紧急照明灯具等。

3、弱电设备:安装局域网、电话、防盗报警、监控摄像等。

4、水系统设备:安装生产用水、生活用水系统,包括水箱、水泵、水管等。

5、通风系统设备:安装新风机、排风机、管道等。

三、组织设计
1、成立项目组:由总工程师、电气工程师、水力工程师、监理师、安全员等组成工程项目组,确定施工计划、技术方案、安全预
警等。

2、确定施工队伍:由合格的专业施工队伍负责施工,工人持有
相应的职业资格证书,了解施工安全和质量要求。

中英文对照施工方案

中英文对照施工方案

中英文对照施工方案Construction Plan施工方案I. Introduction引言施工方案旨在概述建设项目的逐步过程,确保工程的高效、安全和质量。

本方案提供了详细的时间表、资源分配和风险管理策略,以确保项目的成功完成。

II. Project Scope项目范围项目范围包括建设一座三层的新商业楼。

该楼将在底层设有零售空间,上层设有办公空间。

范围还包括场地准备、地基工作、结构施工和装饰工作。

III. Timeline时间表1. Site preparation: 2 weeks场地准备:2周2. Foundation work: 4 weeks地基工作:4周3. Structural construction: 12 weeks结构施工:12周4. Finishing work: 6 weeks装饰工作:6周5. Final inspection and handover: 1 week最后验收和交付:1周IV. Resource Allocation资源分配1. Labor:a. Skilled construction workers: 20 workers for the entire project duration熟练工人:整个项目期间共20名工人b. Site supervisor: 1 supervisor for the entire project duration现场监督员:整个项目期间1名监督员c. Electricians: 4 electricians for the electrical installations电工:4名电工用于电气安装2. Machinery and equipment:a. Excavator: 1 unit for site preparation挖掘机:1台用于场地准备b. Crane: 1 unit for lifting and moving heavy materials起重机:1台用于吊装和搬运重物c. Concrete mixer: 1 unit for mixing and pouring concrete搅拌机:1台用于混凝土的搅拌和浇筑V. Risk Management风险管理1. Safety precautions:a. Proper safety gear for all workers所有工人都必须佩戴适当的安全装备b. Regular safety training and toolbox talks定期进行安全培训和工具讨论c. Safety inspections conducted by the site supervisor现场监督员进行安全检查2. Material quality management:a. Regular checks on the quality of materials delivered to the site定期检查送到现场的材料质量b. Strict adherence to material specifications and standards严格遵守材料规格和标准c. Proper storage and handling of materials to prevent damage妥善存放和处理材料,以防止损坏3. Schedule management:a. Regular progress meetings to ensure project stays on schedule定期进展会议,确保项目按计划进行b. Contingency plans in place for potential delays针对潜在延误制定应急计划高效配置资源,将停工时间降至最低VI. Conclusion结论。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

[上海]工业厂房中英文对照施工组织设计施工组织设计中建四局第五建筑工程有限公司China Construction Fourth Bureau Fifth Engineering Division Co.,Ltd目录Index第1部分施工组织设计总说明 .......错误!未定义书签。

1.1工程概况Generals (268)1.1.1项目情况Condition (268)1.1.2建筑结构概况General of Building Structure ................ 错误!未定义书签。

1.1.3地质情况Geological Condition ................................... 错误!未定义书签。

1.1.4水纹及周围道路情况Water wave and peripheral road and undergroundpipelines ........................................................................... 错误!未定义书签。

1.1.5安全文明施工目标Safety and civilized construction objectives错误!未定义书签。

1.1.6工程特点、难点及对策Project difficulty and countermeasure错误!未定义书签。

1.2工程目标Project Objective (268)1.2.1质量目标Quality Objective (268)1.2.2工期目标Schedule Objective (268)1.2.3安全、文明施工目标Safety, Civilized Construction Goal (269)1.3施工大型机械的配备 (269)Preparation of large equipment for construction (269)1.4工程施工设想Construction Consideration (270)1.5编制依据Reference (270)第2部分施工进度计划 (272)2.1进度计划编制说明Description of Schedule Preparation (272)2.2施工流水段划分 (272)Division of Streamlined Construction Section (272)2.2.1施工流水段划分的原则Principle of the Division of StreamlinedConstruction Section (272)2.2.2 流水段划分 Division of Streamlined Section (273)2.3 施工总进度计划 General Construction Schedule (273)2.3.1 总工期安排 General Schedule Arrangement (273)2.3.2主要节点工期 Key Milestone Dates ............................................................ 273 2.4施工进度计划表 Construction Schedule ................................................. 274 2.5 工期保证措施 Measures to Guarantee Schedule Time .. (274)2.5.1 进度目标体系的要求 Requirement of Progress Objective System (274)2.5.2成立工期保证领导班子 Establishment of Leading Team to GuaranteeScheduled Time ............................................................................................. 275 2.5.3 设备的保障 Equipment Guarantee .............................................................. 276 第3部分施工机械配备 ............. 错误!未定义书签。

3.1 施工机械的选择及布置 Option and Arrangement of ConstructionEquipment ...................................................................... 错误!未定义书签。

3.2 主要施工机械设备一览表 Schedule List of Main ConstructionEquipment ...................................................................... 错误!未定义书签。

3.3 施工机械配备明细表 Deployment Breakdown of ConstructionEquipment ...................................................................... 错误!未定义书签。

第4部分施工平面布置 ............. 错误!未定义书签。

4.1 施工总平面布置 General Construction Layout Plan 错误!未定义书签。

4.1.1 材料堆场及加工场布置 Arrangement of Material Laydown Area andWorking Shed .................................................................. 错误!未定义书签。

4.2 施工用水、用电方案 Construction Water and Electricity Plan 错误!未定义书签。

4.2.1临时用电布置 Temporary Electrical Consumption ....... 错误!未定义书签。

4.2.2 临时用水布置 Temporary Water Consumption ............. 错误!未定义书签。

4.3 施工现场平面布置图(见附图)Construction Site Layout Plan (See attacheddiagram) ............................................................................ 错误!未定义书签。

4.4 施工现场临时用水、用电布置图。

见附图Temporary Water andElectrical Distribution on Jobsite, see attached diagram 错误!未定义书签。

第5部分施工方案 ............................... 277 5.1 施工流程 Construction Flow .................................... 错误!未定义书签。

5.1.1钢筋混凝土工程施工流程 Construction Process of Reinforced ConcreteEngineering ...................................................................... 错误!未定义书签。

5.1.2 钢结构工程施工流程 Construction Process of Steel Structure Work 错误!未定义书签。

5.2 施工总体设想方案 General Construction Consideration Plan (277)5.2.1工程总体施工组织设想 Consideration for Organization of OverallConstruction ................................................................................................... 277 5.2.2 基础结构工程施工设想 Consideration for Foundation Structure Construction (278)5.2.3 主体结构工程施工设想 Consideration for Main Structure Construction (279)5.3 工程测量及测量复核方案 Engineering Survey and Review CheckPlan (280)5.3.1施工测量方案 Construction Survey Plan .................................................... 280 5.3.2建立固定的观测路线 Establishment of Fixed Observing Route ................ 283 5.3.3沉降观测 Settlement Observation ................................................................ 284 5.3.4 测量复核 Review Check of Measurement (284)5.4 基础及主体工程 Foundation and Main Work (286)5.4.1 施工准备 Construction Preparation (286)5.4.2 桩基础施工 Pile Foundation Construction (286)5.4.3 土方开挖工程 Earth Excavation Work .......................... 错误!未定义书签。

5.4.4 桩头连接施工 Pile Head Splicing Construction ............ 错误!未定义书签。

5.4.5 钢筋工程 Reinforcement Work ...................................... 错误!未定义书签。

相关文档
最新文档