常用造价英语词汇

合集下载

常用的造价英文

常用的造价英文

常用造价英语词汇估算/费用估算:estimate/cost estimate;估算类型:types of estimate;详细估算:是偏差幅度最小的估算,defined estimate;设备估算:equipment estimate;分析估算:analysis estimate;报价估算:proposal estimate;控制估算:control estimate;初期控制估算:interim control estimate/initial control estimate批准的控制估算:initial approved cost核定估算:check estimate首次核定估算:first check estimate二次核定估算:production check estimate人工时估算:man hour estimate材料费用/直接材料费用:material cost/direct material cost设备费用/设备购买费用:equipment cost/purchased cost of equipment散装材料费用/散装材料购买费用:bulk material cost/purchased cost of bulk material 施工费用:construction cost施工人工费用:labor cost/construction force cost设备安装人工费用:labor cost associated with equipment散装材料施工安装人工费用:labor cost associated with bulk materials人工时估算定额:standard manhours施工人工时估算定额:standard labor manhours标准工时定额:standard hours劳动生产率:labor productivity/productivity factor/productivity ratio修正的人工时估算值:adjusted manhours人工时单价:manhours rate施工监督费用:cost of construction supervision施工间接费用:cost of contruction indirects分包合同费用/现场施工分包合同费用:subcontract cost/field subcontract cost公司本部费用:home office cost公司管理费用:overhead非工资费用:non payroll开车服务费用:cost of start-up services其他费用:other cost利润/预期利润:profit/expected profit服务酬金:service gains风险:risk风险分析:risk analysis风险备忘录:risk memorandum未可预见费:contingency基本未可预见费:average contingency最大风险未可预见费:maximum risk contingency用户变更/合同变更:cilent change/contract change认可的用户变更:approved client change待定的用户变更:pending client change项目变更:project change内部变更:internalchange批准的变更:authoried change强制性变更:mandatory change选择性变更:optional change内部费用转换:internal transfer认可的预计费用:anticipated approved cost涨价值:escalation项目费用汇总报告:project cost summary report项目实施费用状态报告:project operation cost status report总价合同:lump sum contract偿付合同:reimbursible contract预算:budget环境设计( Environmental design )以物质环境的质量为基本点,以优良环境是人的基本权利与需要为前提的土地利用规划。

工程造价 英语 短语翻译

工程造价 英语 短语翻译

⏹(一)1.政府机构governmental agency2.承包商contractor3.分包商subcontractor4.建筑师architect5.保险公司insurance company6.担保公司surety company7.材料商material dealer/supplier8.施工现场construction site⏹(二)项目规划设计和施工project planning, design and construction临时设施temporary job facilities项目预算project budget投资和合同授予过程bidding and contract award process质量控制quality control项目的监督project supervision7.进度款progress payment合同变更contract change满足业主要求suit the individual owner's requirements以业主的名义in the name of the owner◆(三)卷入诉讼------ be involved in litigation公共工程------ public work承包商的注册-- contractors’ register某此因素------ certain factors合同工期------ duration of contract相对重要性---- relative importance担保能力------ bonding capacity现有工作任务-- current workload⏹(四)投标公告notice to bidders招标邀请函invitation to bidders标书格式bid forms标书分析bid analysis主要供应商major supplier投标保函bid bonds未预见情况unforeseen circumstances质量保证期quality guarantee period标书接收的地点和时间the time and place for the receipt of bids警察,消防和街道代表police, fire, and street department representatives●(五)材料价格material price分包商的报价subcontractor's quotation机具设备租赁费equipment hire rates向供应商询价enquire supplier工程量清单bill of quantitie s墙砖wall tiles / brick防潮层damp-proof courses水泥cement粗骨料coarse aggregates回扣discount◆(刘)平面布置图和立面图schematic layouts and elevations规划许可planning permission建筑业管理许可building regulations approval工程质量project quality装修工程的造价the cost of decoration projects合同文本contract documents合同图纸contract drawings承包人义务contractor's obligations指定供应商和分包商specified suppliers and subcontractors 开工和竣工时期the start and completion dates中期付款interim payments缺陷责任期the defects liability period⏹(七)法律框架legal framework相关各方parties concerned标准文本standard forms标准条款standard clauses特殊条款special clauses业主姓名the name of the employer工料测量师quantity surveyor公共机构public bodys签名和印章signature and seal印花税stamp duty●(八)投标明细或价值明细表bid breakdown or schedule of values污水处理厂wastewater treatment plant地下管线underground utility lines道路改建roads improvements开挖与回填excavation and backfill筑堤embankment延长英尺linear feet平方英尺square feet延期罚款条款liquidated damages clauses for delay工程造价construction pricing /cost of construction管理费和利润overhead and profit合同管理contract administration(九)造价师/工料测量师quantity surveyor建筑设计阶段building design stage 可行性分析阶段feasible analysis stage概算approximate estimate施工图设计阶段construction drawing design stage建筑面积floor spac e成本效益分析cost and profit analysis养护费maintenance cost◆(十一)项目经理project manager现场管理Management of construction field项目成本和时间控制project cost and time control技术复杂性technical complexity施工方法construction methods设计阶段design stage材料替代material substitute/alternatives管理机构regulatory agency材料和设备供应商material and equipment suppliers材料和设备的运输时间the delivery times of materials and project equipment●Twelve总承包商the general contractor业主the owner影响费用impact costs间接损失consequential damages项目总进度计划overall project schedule项目网络图project network变更条款change clauses备忘录memoranda延迟提交索赔defer claims submission提出索赔file a claim。

造价工程术语大全--中英文对照

造价工程术语大全--中英文对照

工程术语1、建筑工程施工质量验收统一标准GB50300-20011建筑工程building engineering为新建、改建或扩建房屋建筑物和附属构筑物设施所进行的规划、勘察、设计和施工、竣工等各项技术工作和完成的工程实体。

2建筑工程质量quality of building engineering反映建筑工程满足相关标准规定或合同约定的要求,包括其在安全、使用功能及其在耐久性能、环境保护等方面所有明显的隐含能力的特性总和。

3验收acceptance建筑工程在施工单位自行质量检查评定的基础上,参与建设活动的有关单位共同对检验批、分项、分部、单位工程的质量进行抽样复验,根据相关标准以书面形式对工程质量达到合格与否做出确认。

4进场验收site acceptance对进入施工现场的材料、构配件、设备等按相关标准规定要求进行检验,对产品达到合格与否做出确认。

5检验批inspection lot按同一的生产条件或按规定的方式汇总起来供检验用的,由一定数量样本组成的检验体。

6检验inspection对检验项目中的性能进行量测、检查、试验等,并将结果与标准规定要求进行比较,以确定每项性能是否合格所进行的活动。

7见证取样检测evidential testing在监理单位或建设单位监督下,由施工单位有关人员现场取样,并送至具备相应资质的检测单位所进行的检测。

8交接检验handing over inspection由施工的承接方与完成方经双方检查并对可否继续施工做出确认的活动。

9主控项目dominant item建筑工程中的对安全、卫生、环境保护和公众利益起决定性作用的检验项目。

10一般项目general item除主控项目以外的检验项目。

11抽样检验sampling inspection按照规定的抽样方案,随机地从进场的材料、构配件、设备或建筑工程检验项目中,按检验批抽取一定数量的样本所进行的检验。

12抽样方案sampling scheme根据检验项目的特性所确定的抽样数量和方法。

(完整word版)建设工程造价与管理 英文单词缩写

(完整word版)建设工程造价与管理 英文单词缩写

(完整word版)建设工程造价与管理英文单词缩写1.ICEC 国际造价工程师联合会International Cost Engineering Council2.SMM 英国建筑工程量计算规则 Standard Method of Measurement3.ENR 造价指数 Engineering News Records4.FIDIC 国际咨询工程师联合会Fédération lnternationale Des lngénieurs Conseils5.NPV 项目净现值 Net Present Value6.IRR 项目内部收益率 Internal Rate of Return7.AIQS 澳大利亚工料测量师协会8.AACE 美国造价工程师协会9.CIQS 加拿大工料测量师协会10.C/SCSC 造价与工期控制系统的规范 Cost/Schedule Control System Criterion11.EVM 项目挣值管理 Earned Value Management12.LCCM 全生命周期造价管理 Life Cycle Cost Management13.WPCM 全过程造价管理 Whole Process Cost Management14.TCM 全面造价管理 Total Cost Management15.ABC 基于活动造价确定方法 Activity Based Costing16.ABM基于活动造价管理方法 Activity Based Management17.FOB 离岸价装运港船上交货价进货价18.CIF 到岸价运费、保险在内价关税完税价格19.CFR 运费在内价20.FOS 目的地港船边交货价21.IBRD 世界复兴开发银行 International Bank for Reconstruction and Development22.EPC 设计采购施工23.R 投资收益率24.ROI 总投资收益率25.ROE 项目资本金净利润率26.i c折现率27.NAV 净年值 Net Annual Value28.UNIDO 联合国工业发展组织29.BCWS 拟完工程计划投资 Budgeted Cost of Work Scheduled30.ACWP 已完工程实际投资 Actual Cost of Work Performed31.BCWP 已完工程计划投资 Budgeted Cost of Work Performed32.OHSAS 职业安全卫生评价标准 Occupational Health and Safety Assessment Series。

常用工程造价专业英语词汇

常用工程造价专业英语词汇

常用工程造价专业英语词汇估算/费用估算:estimate/cost estimate;估算类型:types of estimate;详细估算:是偏差幅度最小的估算,defined estimate;设备估算:equipment estimate;分析估算:analysis estimate;报价估算:proposal estimate;控制估算:control estimate;估算/费用估算:estimate/cost estimate;估算类型:types of estimate;详细估算:是偏差幅度最小的估算,defined estimate;设备估算:equipment estimate;分析估算:analysis estimate;报价估算:proposal estimate;控制估算:control estimate;初期控制估算:interim control estimate/initial control estimate批准的控制估算:initial approved cost核定估算:check estimate首次核定估算:first check estimate二次核定估算:production check estimate人工时估算:man hour estimate材料费用/直接材料费用:material cost/direct material cost设备费用/设备购买费用:equipment cost/purchased cost of equipment散装材料费用/散装材料购买费用:bulk material cost/purchased cost of bulk material施工费用:construction cost施工人工费用:labor cost/construction force cost设备安装人工费用:labor cost associated with equipment散装材料施工安装人工费用:labor cost associated with bulk materials人工时估算定额:standard manhours施工人工时估算定额:standard labor manhours标准工时定额:standard hours劳动生产率:labor productivity/productivity factor/productivity ratio 修正的人工时估算值:adjusted manhours人工时单价:manhours rate施工监督费用:cost of construction supervision施工间接费用:cost of contruction indirects分包合同费用/现场施工分包合同费用:subcontract cost/field subcontract cost公司本部费用:home office cost公司管理费用:overhead非工资费用:non payroll开车服务费用:cost of start-up services其他费用:other cost利润/预期利润:profit/expected profit服务酬金:service gains风险:risk风险分析:risk analysis风险备忘录:risk memorandum未可预见费:contingency基本未可预见费:average contingency最大风险未可预见费:maximum risk contingency用户变更/合同变更:cilent change/contract change认可的用户变更:approved client change待定的用户变更:pending client change项目变更:project change内部变更:internalchange批准的变更:authoried change强制性变更:mandatory change选择性变更:optional change内部费用转换:internal transfer认可的预计费用:anticipated approved cost涨价值:escalation项目费用汇总报告:project cost summary report项目实施费用状态报告:project operation cost status report 总价合同:lump sum contract偿付合同:reimbursible contract预算:budgetFinancial:财务completion:竣工final:决算accounts:审计and:和project:工程construction cost:造价audit:审计Financial completion final accounts audit财务竣工决算审计project construction cost audit工程造价审计.。

14219_常用建筑专业英语单词

14219_常用建筑专业英语单词

常用建筑专业英语单词工程指挥部:construction headquarters 工程造价:construction cost工程预算:construction budget工程管理:engineering management工程监督:supervision of works工程量:quantities方案设计:schematic design最终验收:final acceptance包干合同:lump sum contract保用期:warranty period概算:approximate estimate地价:land cost报价:quoted price工人:worker工具:tool测量:survey地方规范:local regulation最小日照间距:minimum sunlighting spacing最小净空:minimum clearance混凝土:concrete钢筋:reinforcing bar rebar钢筋混凝土reinforced concrete钢筋混凝土工程reinforced concrete work钢筋混凝土基础reinforced concrete foundation 钢筋混凝土柱:reinforced concrete column钢筋混凝土桩:reinforced concrete pile钢筋混凝土过梁:reinforced concrete lintel钢筋笼:reinforcing cage混凝土保护层:concrete cover混凝土标号:grade of concrete剪力墙shear wall模板:formwork半地下室:semibasement变形缝:movement joint标准层:standard floor防潮层:damp-proof course不收缩混凝土:non-shrinking concrete拆除:dismantle沉降:settlement建筑专业词汇a. DESIGN BASIS 设计依据b. DESIGN STAGE 设计阶段c. CLIMATE CONDITION 气象条件d. GENERAL ROOM NAME 常用房间名称e. ROOFING & CEILING 屋面及天棚f. WALL(CLADDING) 墙体(外墙板)g. FLOOR & TRENCH 地面及地沟h. DOORS 、GLASS、WINDOWS & IRONMONGERY(HARDWARE)门、玻璃、窗及五金件I. STAIRCASE、LANDING & LIFT(ELEVATOR)楼梯、休息平台及电梯j. BUILDING MATERIAL WORDS AND PHRASES 建筑材料词汇及短语【 Bricks and Tiles 砖和瓦】【Lime, Sand and Stone 灰、砂和石】【Cement, Mortar and Concrete 水泥、砂浆和混凝土】【Facing And Plastering Materials 饰面及粉刷材料】【Asphalt (Bitumen) and Asbestos 沥青和石棉】【Timber 木材】【Metallic Materials 金属材料】【Non-Ferrous Metal 有色金属】【Anti-Corrosion Materials 防腐蚀材料】【Building Hardware 建筑五金】【Paint 油漆】k. OTHER ARCHITECTURAL TERMS 其它建筑术语【Discipline 专业】【Conventional Terms 一般通用名词】【Architectural Physics 建筑物理】【Name Of Professional role 职务名称】【Drafting 制图】a. DESIGN BASIS 设计依据计划建议书 planning proposals设计任务书 design order标准规范standards and codes条件图 information drawing设计基础资料 basic data for design工艺流程图 process flowchart工程地质资料 engineering geological data原始资料 original data设计进度 schedule of designb. STAGE OF DESIGN 设计阶段方案 scheme, draft草图 sketch会谈纪要summary of discussion谈判 negotiation可行性研究 feasibility study初步设计 preliminary design基础设计 basic design详细设计 detail design询价图 enquiry drawing施工图 working drawing, construction drawing项目管理英文词汇ABC Activity Based Costing 基于活动的成本核算ABM Activity Based Management 基于活动的管理ACWP Actual Cost of Work Performed 已完成工作实际成本ADM Arrow Diagram Method 箭线图方法ADP Automated Data Processing 自动化数据处理ADR Alternative Dispute Resolution 替代争议解决方案AF Actual Finish Date 实际完成日期AFE Application for Expenditure 支出申请AFE Authority for Expenditure 开支权ALAP As-Late-As-Possible 尽可能晚AMR Advanced Material Release 材料提前发布AOA Activity on Arc 弧线表示活动双代号网络AOA Activity on Arrow 箭线表示活动双代号网络AON Activity on Node 节点表示活动单代号网络AOQ Average Outgoing Quality 平均出厂质量AOQL Average Outgoing Quality Limit 平均出厂质量限度APMA Area of Project Management Application 项目管理的应用领域APR Acquisition Plan Review 采购计划评审AQL Acceptable Quality Level 可接受质量水平AS Actual Start Date 实际开始日期ASAP As-Soon-As-Possible 尽快ATP Acceptance Test Procedure 验收测试过程AUW Authorized Unpriced Work 批准的未定价工作BAC Budget at Completion 完工预算BAC Baseline at Completion 完成/完工基线BATNA Best Alternative to Negotiated Agreement 协议外最佳方案BCM Business Change Manager 商业变更经理BCWP Budgeted Cost of Work Performed 已完工作预算成本BCWS Budgeted Cost of Work Scheduled 计划工作的预算成本BEC Elapsed Cost 计划工作的预算成本BOOT Build, Own, Operate, Transfer 建造拥有经营转让BPA Blanket Purchase Agreement 一揽子采购协议BSA Balanced Scorecard Approach 平衡记分卡方法C/SCSC Cost/Schedule Control System Criteria 成本控制系统标准?C/SSR Cost/Schedule Status Report 成本/进度状态报告CA Control Account 控制帐目CAD Computer Aided Drafting/Design 计算机辅助制图/设计CAM Cost Account Manager 成本帐目经理CAM Computer Aided Manufacturing 计算机辅助制造CAM Control Account Manager 控制帐目经理CAP Cost Account Plan 成本帐目计划CAP Control Account Plan 控制帐目计划CAR Capital Appropriation Request 资本划拨请求CBD Component-Based Development 基于构件的开发CBS Cost Breakdown Structure 成本分解结构CCB Change Control Board 变更管理委员会CCDR Contractor Cost Data Report 承包商成本数据报告CDR Critical Design Review 关键设计评审CI Configuration Item 配置项CM Configuration Management/Construction Management 配置管理/施工管理CPFFC Cost Plus Fixed Fee Contract 成本加固定费用合同CPI Cost Performance Index 成本绩效指数CPI Cost Performance Indicator 成本绩效指数CPIFC Cost Plus Incentive Fee Contract 成本加奖励费用合同CPM Critical Path Method 关键路径法CPN Critical Path Network 关键路径网络图CPPC Cost Plus Percentage of Cost Contract 成本加成本百分比合同CPR Cost Performance Ratio 成本绩效比率CPR Cost Performance Report 成本绩效报告CPU Central Processing Unit 中央处理单元CR Change Request 变更请求CSCI Computer Software Configuration Item 计算机软件配置CSF Critical Success Factors 关键的成功因素CTC Contract Target Cost 合同目标成本CTP Contract Target Price 合同目标价格CTR Cost-Time Resource Sheet 成本时间资源表CV Cost Variance 成本偏差CWBS Contract Work Breakdown Structure 合同工作分解结构DBA Database Administrator 数据库管理员DBM Dynamic Baseline Model 动态基线模型DBMS Database Management System 数据库管理系统DCE Distributed Computing Environment 分布式计算环境DCF Discounted Cash Flow 折现现金流DD Data Date 数据日期DID Data Item Description 工作项描述DRD documentation Requirements Description 文档要求说明DU Duration 工期持续时间EAC Estimated Actual at Completion 实际完工估算ECC Estimated Cost to Complete 尚未完成的成本估算ECP Engineering Change Proposal 工程变更建议书EF Early Finish Date 最早完成日期EFC Estimated Final Cost 估算的最终成本EMR Expenditure Management Report 支出管理报告EPS Enterprise Project Structure 企业项目结构ERP Enterprise Resource Planning 企业资源规划ERPS Enterprise Resource Planning Systems 企业资源规划系统ES Early Start Date 最早开始日期ESAR Extended Subsequent Applications Review 扩展后续应用评审ETC Estimate To Complete 尚未完成/完工的估算EV Expected value 期望值EVMS Earned value Management System 挣值管理系统FAC Forecast At Completion 完工预测FF Free Float 自由浮动时间FFP Firm Fixed Price Contract 严格固定价格合同FIFO First In, First Out 先进先出FM Functional Manager 职能经理FP Fixed Price Contract 固定价格合同FPPIF Fixed Price Plus Incentive Fee Contract 固定价格加激励酬FTC Forecast to Completion 完工尚需预测FTP File Transfer Protocol 文件传输协议G&A General and Administrative Costs 综合行政管理成本G&A General and Administrative 综合行政管理费GAAP Generally Accepted Accounting Principles 公认会计原则GERT Graphical Evaluation and Review Technique 图形评审技术GUI Graphical User Interface 图形用户界面。

工程造价英语

工程造价英语

工程造价英语工程造价英语是指相关于工程造价方面的英语词汇和句子,主要涉及到工程项目的估算、预算、投标、合同、支付等方面。

在工程造价领域中,英语是必不可少的语言工具,因为许多国际工程项目都需要使用英语进行沟通和交流。

以下是一些常见的工程造价英语词汇和句子:1. Estimate - 估算2. Budget - 预算3. Bid - 投标4. Contract - 合同5. Payment - 支付6. Cost breakdown - 成本分析7. Quantity surveyor - 工料测量师8. Bill of quantities - 工程量清单9. Variation order - 变更单10. Cost control - 成本控制例句:1. We need to estimate the cost of this project before we can proceed.我们需要在继续进行之前估算一下这个项目的成本。

2. The budget for this project has been approved by the board.这个项目的预算已经被董事会批准了。

3. Several companies have submitted bids for the project.几家公司已经为这个项目提交了投标书。

4. The contract for the project has been signed and is now in effect.这个项目的合同已经签署并已生效。

5. Payment for the completed work will be made within 30 days.完成的工作的支付将在30天内完成。

6. We need to do a cost breakdown to see where we can save money.我们需要进行成本分析,看看哪里可以节省费用。

中英文对照造价工程术语大全

中英文对照造价工程术语大全

«中英文对照造价工程术语大全(一)工程术语建筑工程施工质量验收统一标准1建筑工程building engineering为新建、改建或扩建房屋建筑物和附属构筑物设施所进行的规划、勘察、设计和施工、竣工等各项技术工作和完成的工程实体。

2建筑工程质量quality of building engineering反映建筑工程满足相关标准规定或合同约定的要求,包括其在安全、使用功能及其在耐久性能、环境保护等方面所有明显的隐含能力的特性总和。

3验收acceptanee建筑工程在施工单位自行质量检查评定的基础上,参与建设活动的有关单位共同对检验批、分项、分部、单位工程的质量进行抽样复验,根据相关标准以书面形式对工程质量达到合格与否做出确认。

4进场验收site acceptanee对进入施工现场的材料、构配件、设备等按相关标准规定要求进行检验,对产品达到合格与否做出确认。

5检验批inspection lot按同一的生产条件或按规定的方式汇总起来供检验用的,由一定数量样本组成的检验体。

6检验inspection对检验项目中的性能进行量测、检查、试验等,并将结果与标准规定要求进行比较,以确定每项性能是否合格所进行的活动。

7见证取样检测evidential testing在监理单位或建设单位监督下,由施工单位有关人员现场取样,并送至具备相应资质的检测单位所进行的检测。

8交接检验handing over inspection由施工的承接方与完成方经双方检查并对可否继续施工做出确认的活动。

9主控项目dominant item建筑工程中的对安全、卫生、环境保护和公众利益起决定性作用的检验项目。

10一般项目gen eral item除主控项目以外的检验项目。

11扌由样检验sampling inspection按照规定的抽样方案,随机地从进场的材料、构配件、设备或建筑工程检验项目中,按检验批抽取一定数量的样本所进行的检验。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

常用造价英语词汇
估算/费用估算:estimate/cost estimate;
估算类型:types of estimate;
详细估算:是偏差幅度最小的估算,defined estimate;
设备估算:equipment estimate;
分析估算:analysis estimate;
报价估算:proposal estimate;
控制估算:control estimate;
初期控制估算:interim control estimate/initial control estimate
批准的控制估算:initial approved cost
核定估算:check estimate
首次核定估算:first check estimate
二次核定估算:production check estimate
人工时估算:man hour estimate
材料费用/直接材料费用:material cost/direct material cost
设备费用/设备购买费用:equipment cost/purchased cost of equipment
散装材料费用/散装材料购买费用:bulk material cost/purchased cost of bulk material 施工费用:construction cost
施工人工费用:labor cost/construction force cost
设备安装人工费用:labor cost associated with equipment
散装材料施工安装人工费用:labor cost associated with bulk materials
人工时估算定额:standard man-hours
施工人工时估算定额:standard labor man-hours
标准工时定额:standard hours
劳动生产率:labor productivity/productivity factor/productivity ratio
修正的人工时估算值:adjusted man-hours
人工时单价:man-hours rate
施工监督费用:cost of construction supervision
施工间接费用:cost of construction indirects
分包合同费用/现场施工分包合同费用:subcontract cost/field subcontract cost
公司本部费用:home office cost
公司管理费用:overhead
非工资费用:non payroll
开车服务费用:cost of start-up services
其他费用:other cost
利润/预期利润:profit/expected profit
服务酬金:service gains
风险:risk
风险分析:risk analysis
风险备忘录:risk memorandum
未可预见费:contingency
基本未可预见费:average contingency
最大风险未可预见费:maximum risk contingency
用户变更/合同变更:cilent change/contract change
认可的用户变更:approved client change
待定的用户变更:pending client change
项目变更:project change
内部变更:internal change
批准的变更:authorized change
强制性变更:mandatory change
选择性变更:optional change
内部费用转换:internal transfer
认可的预计费用:anticipated approved cost
涨价值:escalation
项目费用汇总报告:project cost summary report
项目实施费用状态报告:project operation cost status report 总价合同:lump sum contract
偿付合同:reimbursable contract
预算:budget。