中考英语中考词汇表对照表资料

合集下载

2024最新中考英语总复习必考1600个词汇对照表(精华版)

2024最新中考英语总复习必考1600个词汇对照表(精华版)
apple [ɔæp(ɔ)l] April [ɔeɔpr(ɔ)l] area [ɔeɔrɔɔ]
arm [ɑɔm] army [ɔɑɔmɔ] around [ɔɔraɔnd]
arrive [ɔɔraɔv]
词性
词意
a. 再一;另一
pron. ;别的;不
同的
另一个
n. 回答,答复
v. ;答案
回答,答复
;回信(作
action [ɔækɔ(ɔ)n] active[ɔæktɔv] activity[ækɔtɔ
词性
词意
art. 一(个、件
……)
n. 能力;才能
a. 能够;有能 力的
ad. 大约;到处 prep. ;四处
关于;在各 处;四处 prep. 在……上面 ad. 到(在)国 外 a. 缺席;不在
n. 口音;音调
n. 澳洲;澳大 利亚
a. 澳洲的;澳 n. 大利亚的
澳大利亚人 n. 秋天,秋季
a. 有用的;有 The swimming pool is
效的
available onlyin summer.
这个游泳池只在夏天开放。
v. 避免;躲开 She should avoid eating
baseball[ɔbeɔsb ɔɔl] basic[ɔbeɔsɔk] basket [ɔbɑɔskɔt; (US) ɔbæskɔt] basketball[ɔbɑɔ skɔtbɔɔl] bathroom[ɔbɑɔθ ruɔm] be [biɔ]
vt. 接受
n. 事故,意外 的事
vi. & 痛;疼痛 n. vt. 达到;取得
prep 横过;穿过 n. 法令;条例 v. 表演,扮演

中考必备3500词汇表

中考必备3500词汇表

中考必备3500词汇表一、A开头的词汇。

1. able [ˈeɪbl] adj. 能够;有能力的。

- be able to do sth. 能够做某事。

2. about [əˈbaʊt] prep. 关于;大约 adv. 大约;到处;四处。

- talk about 谈论。

- be about to do sth. 即将做某事。

3. above [əˈbʌv] prep. 在……上面 adj. 上面的 adv. 在上面。

- above all 首先;首要。

4. abroad [əˈbrɔːd] adv. 到(在)国外。

- go abroad 出国。

二、B开头的词汇。

1. back [bæk] n. 后面;背部;靠背 adv. 回(原处);向后。

- come back 回来。

- at the back of 在……的后面。

2. bad [bæd] adj. 坏的;有害的;不利的;严重的。

- be bad for 对……有害。

- bad luck 运气不好。

3. bag [bæɡ] n. 书包;提包;袋子。

4. ball [bɔːl] n. 球;舞会。

- football 足球。

- basketball 篮球。

三、C开头的词汇。

1. cake [keɪk] n. 蛋糕;糕点;饼状食物。

- a piece of cake 小菜一碟(容易的事)2. call [kɔːl] v. 称呼;呼唤;喊;叫 n. 电话;通话。

- call sb. (up) 给某人打电话。

- call for 要求;需要。

3. car [kɑː(r)] n. 汽车;轿车。

4. care [keə(r)] n. 照料;保护;小心 v. 介意;在乎;关心。

- take care of 照顾;照料。

- care about 关心;在乎。

中考英语1700词汇对照表—听写版

中考英语1700词汇对照表—听写版
到达(具体位置)
[ɑːt]
n.
艺术,美术
画家,艺术家
[ˈɑːtɪk(ə)l]
n.
文章;东西
[əz, æz]
ad&conj
prep.
像……一样;如同;因为
作为,当作
[ˈeɪʃə]
n.
亚洲
[ˈeɪʃ(ə)nn]
a.
n.
亚洲的
亚洲人
[ɑːsk]
v.
问,询问;请求,要求;邀请
[əˈsliːp]
a.
睡着的,熟睡
vi.
出现
消失
[ˈæp(ə)l]
n.
苹果
[ˈeɪpr(ə)l]
n.
四月
[ˈeərɪə]
n.
面积;地域;区域;范围;领域
[ˈɑ:gjumənt]
n.
争论
[ˈɑːm]
n.
臂,支架
[ˈɑːmɪ]
n.
军队
[əˈraʊnd]
ad.
prep.
在周围;在附近
在……周围;大约
[əˈraɪv]
vi.
到达;达到
到达(广泛地点)
[əˈɡriː]
v.
同意;应允
同意某人
[əˈɡriːmənt]
n.
同意;一致;
不同意(n)
[eɪm]
n.
目的,目标
[eə(r)]
n.
空气;大气
[eid]
n.v.
援助
急救
[ ˈeəlain]
n.
航空公司
[ˈeəpleɪn]
n.
(美)飞机
[ˈeəpɔːt]
n.
航空站,飞机场
[əˈlaɪv]

2020年中考英语1700词汇对照表-(默写版)

2020年中考英语1700词汇对照表-(默写版)
[ˈɔːtəm]
n.
秋天,秋季
[əˈwɔ:d]
n.
奖品,奖金
[əˈvɔɪd]
v.
避免;逃避
You’d better avoid(make) mistakes when you do exercise.
[əˈweɪk]
(awoke;awoken)
v.
唤醒;醒着的
[əˈweɪ]
ad.
离开;原离
[ˈɔ:fl]
[ˈkæptɪn]
n.
(海军)上校;船长;舰长
[kɑː(r)]
n.
汽车;小卧车
[kɑːd]
n.
卡片;纸牌
[ˈkæri]
v.
携带,搬运
执行
[keə(r)]
n.
v.
照料;小心
在乎;关心
=照顾
[ˈkeəfʊl]
a.
小心的;谨慎的
[ˈkeəlɪs]
a.
粗心的;漫不经心的
[kɑ:ˈtu:n]
n.
卡通,漫画
[kæt]
n.
照相机;摄象机
[kæmp]
n.
(夏令)营
去露营
[kæn]
modal v.
能够;可以;会;
[ˈkænədə]
n.
加拿大
加拿大人
[ˈkæns(ə)l]
v.
取消
[ˈkænd(ə)l]
n.
蜡烛
[ˈkænsə]
n.

[ˈkændɪ]
n.
糖果
[kæp]
n.
(无檐的)帽子
[ˈkæpɪt(ə)l]
n.
首都;省会;
prep.
靠近;在…旁边;在…时间;不迟于;被;用;由;乘(车)

2023年中考英语必背词汇表(1842个)

2023年中考英语必背词汇表(1842个)

169 biology* n. 生物
140
bean n. 豆子
170
bird n. 鸟,鸟类
141
bear n. 熊 v. 承受,忍耐 171
birth n. 出生,起源
142
beat v. 打败
172 birthday n. 生日
143 beautiful adj. 美丽的
173 biscuit n. 饼干
64 among prep. 在…中间
94
Asia n. 亚洲
65 ancient adj. 古老的,古代的 95 Asian n. 亚洲人 adj. 亚洲的
66
and conj. 和,而且
96
ask v. 询问
67
angry adj. 生气的
97 asleep adj. 睡着的
68 animal n. 动物
127 banana n. 香蕉
128 band* n. 乐队
129
bank n. 银行
157 below prep. 在......下面
158
belt*
n. 腰带, 皮带, 传送 带
159 benefit n. 利益 v. 获益
130 baseball n. 棒球
160 beside prep. 在......旁边
182
blow v. 吹
212
brother
n. 兄弟,哥哥,弟 弟
183
blue n. 蓝色 adj. 蓝色的 213 brown n. 棕色 adj. 棕色的
184 board n. 木板
214 brush v. 刷 n. 刷子
185
boat n. 小船

中考英语1600词汇_-_默写单词

中考英语1600词汇_-_默写单词

中考英语1600词汇_-_默写单词中考词汇表对照表词性词意一(个、件……) art.能力;才能 n.能够;有能力的 a.大约;到处;四处 ad.关于;在各处;四处 prep.在……上面 prep.到(在)国外 ad.缺席;不在 a.口音;音调 n.接受 vt.事故,意外的事 n.痛;疼痛 vi. & n.达到;取得 vt.横过;穿过 prep法令;条例 n.表演,扮演(角色);演出,行动 v.行动 n.积极的,主动的 a.活动 n.增添;增加 vt.地址 n.优点;好处 n.广告 n.忠告;劝告;建议 n.忠告;劝告;建议 vt.负担的起(……的费用);抽的出(时间); vt.提供害怕的;担心的 a.在后;后来 ad.在……之后;在……后面 prep.在……以后 conj.下午,午后 n.再一次;再,又 ad.对着,反对 prep.年龄;时代 n.以前 ad.同意;应允 v.同意;一致;协定 n.空气;大气 n.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heatdissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意航空公司 n.(美)飞机 n.航空站,飞机场 n.活着的,存在的 a.全部地 ad.全(部);所有的;总;整 a.全部;全体成员 pron.允许,准允 vt.几乎,差不多 ad.单独的,孤独的 a.向前;和…..在一起;一同 ad.沿着;顺着 prep.大声地 ad.已经 ad.也 ad.虽然;尽管 conj.总是;一直;永远 ad.美国;美洲 n.美国人;美国人的 a.美国人 n.在……中间;在(三个以上)之间 prep. 古代的;古老的 a.和;又;而 conj.生气的,愤怒的 a.动物 n.再一;另一;别的;不同的 a.另一个 pron.回答,答复;回信;答案 n.回答,答复;回信(作出)答案 v.蚂蚁 n.(无论)哪一个;那些 pron.任何的;(用于疑问句、否定句)一些;什a.么任何人,无论谁 pron.任何人,无论谁 pron.什么事(物);任何事(物) pron.不管怎样 ad.任何地方 ad.出现 vi.苹果 n.四月 n.面积;地域;区域;范围;领域 n.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat.Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意臂,支架 n.军队 n.在周围;在附近 ad.在……周围;大约 prep.到达;达到 vi.艺术,美术;技艺 n.文章;东西;冠词 n.像……一样;如同;因为 ad.&conj. 作为,当作 prep.亚洲 n.亚洲的;亚洲人的 a.亚洲人 n.问,询问;请求,要求;邀请 v.睡着的,熟睡 a.在(几点钟);在(某处) prep.大西洋(的) n. & a.关心;注意 n.八月 n.伯母;舅母;审;姑;姨 n.澳洲;澳大利亚 n.澳洲的;澳大利亚的 a.澳大利亚人 n.秋天,秋季 n.有用的;有效的 a.避免;躲开;逃避 v.唤醒;醒着的 v.离开;原离 ad.婴儿 n.回(原处);向后 ad.后面的 a.背后;后部;背 n.背景 n.坏的;有害的;不利的;严重的 a.书包;提包;袋子 n.球 n.气球 n.竹 n.香蕉 n.(河、海、湖的)岸,堤;银行 n.棒球 n.基本的 a.篮子 n.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning ofsupport and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意篮球 n.浴室 n.是(原形),其人称和时态形式有 v. am,is,are,was,were,being, been; 成为海滨,海滩 n.熊 n.敲打;跳动;打赢 v.(音乐)节拍 n.美的,美丽的,美观的 a.因为 conj.变得;成为 v.床 n.寝室,卧室 n.蜜蜂 n.牛肉 n.在……以前;在……前面 prep.以前 ad.在…..之前 conj.开始,着手 v.行为,举止 n.(表示位置)在……后面 prep.在后面;向后 ad.相信;认为 v.钟,铃;钟(铃)声;钟形物 n. 在……下面 prep.在…..旁边;靠近 prep.除……以外(还有) prep.还有,此外 ad.在(两者)之间,在……中间 prep.(表示位置)在……的那边 prep.大的 a.自行车 n.帐单;法案,议案;(美)钞票,纸币 n.鸟 n.出生;诞生 n.生日 n.饼干 n.一点,一些,少量 n.有苦味的;痛苦的;难过的;严酷的 a.黑色 n.黑色的 a.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion spaceand insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意黑板 n.瞎的 n.血,血液 n.吹;刮风;吹气 v.蓝色 a.木板;布告牌;委员会;(政府的)部 n. 小船,小舟 n.身体 n.书;本子 n.预定,定(房间、车票等) v.乏味的;无聊的 a.出生 a.(向别人)借用;借 v.领班;老板 n.两;双 a.两者;双方 pron.瓶子 n.底部;底 n.碗 n.盒子,箱子 n.男孩 n.脑子 n.勇敢的 a.面包;食物,粮食;生计 n.打破(断、碎);损坏,撕开 v早餐 n.气息;呼吸 n.呼吸 vi.桥 n..明亮的;聪明的 a.拿来,带来,取来 vt.兄;弟 n.褐色,棕色 n.褐色的,棕色的 a.刷;擦 v.刷子 n.建筑;造 v.建筑物;房屋;大楼 n.燃,烧;着火;使烧焦;使晒黑 v.公共汽车 n.(本分)工作;职业;生意;交易;事业 n.忙(碌)的 a.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservationplastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意但是;可是 conj.除了;除…之外 prep.黄油;奶油 n.蝴蝶 n.买 vt.靠近;在…旁边;在…时间;不迟于;被; prep. 用;由;乘(车)再见 int.卷心菜;洋白菜 n.蛋糕;糕点;饼 n.喊;叫;电话,通话 n.称呼;呼唤;喊;叫 v.骆驼 n.照相机;摄象机 n.(夏令)营 n.能够;可以;会;(不能) modal v.加拿大 n.取消 v.蜡烛 n.癌 n.糖果 n.(无檐的或仅在前面有檐的)帽子;(瓶子的)盖; n. (钢笔的)笔套首都;省会;大写;资本 n.(海军)上校;船长;舰长;队长 n.汽车;小卧车 n.卡片;名片;纸牌 n.照料;保护;小心 n.介意…;在乎;关心 v.小心的;仔细的;谨慎的 a.粗心的;漫不经心的 a.拿;搬;带;提;抬;背;抱;运等 vt.猫 n.接住;捉住;赶上;染上(疾病) v.原因;起因 n.促使;引起;使发生 vt.光盘 n.信息储存光盘 n.天花板;顶棚 n.庆祝 v.美分(100 cents=1 dollar) n.中心,中央 n.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface,high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意世纪,百年 n.确定的,无疑的;一定会…… a.椅子 n.主席;会长;议长 n.粉笔 n.机会,可能性、 n.零钱;找头(改变,变化; n.更换;兑换 v.咏唱;歌颂; vt.颂歌;曲子 n.便宜的,贱 a.骗取,哄骗;作弊 v.检查;批改; n.校对,核对;检查;批改 vt.欢呼;喝彩 n.&vi.奶酪 n.化学 n.棋 n.箱子;盒子;胸部 n.鸡;鸡肉 n.孩子,儿童 n.中国 n.中国的;中国人的;中国话的,汉语的; a. 中国人;中国话,汉语,中文n.巧克力 n.选择;抉择 n.选择 vt.筷子 n.圣诞节(12月25) n.教堂;教会 n.电影院;电影 n.圆圈; n.将……圈起来 vt.市,城市,都市 n.拍手;鼓掌 vi.&n.(学校里的)班;年级;课 n.同班同学 n.教室 n.弄干净,擦干净; vt.清洁的,干净的 a.清晰的;明亮的;清楚的 a.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings forelectric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意聪明的,伶俐的 a.爬,攀登 v.钟 n.克隆(无性繁殖出来的有机体群) v.关,关闭 vt.衣服;各种衣物 n.云;云状物;阴影 n.多云的,阴天的 a.俱乐部 n.教练;马车;长途车 n.煤;煤块 n.海岸;海滨 n.外套;涂层;表皮;皮毛 n.咖啡 n.硬币 n.可口可乐 n.冷的,寒的; a.寒冷;感冒,伤风 n.收集,搜集 vt.学院;专科学校 n.颜色; n.给……着色,涂色 vt.来,来到 vi.舒服的;安逸的;舒服自在的 a. 普通的,一般的;共有的 a.交际;传达(感情,信息等) v. 交际;交往;通讯 n.公司 n.比较;对比 vt.比赛;竞赛 n.完成;结束a(完成的 vt.作文;作曲 n.电子计算机 n.音乐会;演奏会 n.条件;状况 n.(正式的)会议 n.vt. 连接;把…联系起来考虑 vt.继续 vi.控制 vt.& n.谈话,交谈 n.炊事员,厨师z,(烹调,做饭 n.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, whenordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意炊具(锅、炉灶、烤炉等) n.凉的,凉爽的;酷 a.抄本,副本;一本(份,册……) n.抄写;复印;(计算机用语)拷(备份盘) v.角;角落;拐角 n.改正;纠正; v.正确的,对的;恰当的 a.值(多少钱);花费; v.价格 n.棉花; n.棉花的 a.咳嗽 n.&vi.(can的过去式)可以;(表示许可或请求)可 modal v. 以…,行数,点数 vt.国家;农村,乡下 n.乡下,农村 n.夫妇;一对 n.勇气;胆略 n.过程;经过;课程 n.堂(表)兄弟,堂(表)姐妹 n.盖子;罩( n.覆盖,遮盖;掩盖 v.母牛,奶牛 n.蜡笔;蜡笔画 n.疯狂的 a.创造;造成 vt.十字形的东西; n.越过;穿过 vt.残酷的;无情的 a.叫喊;哭声; n.喊叫;哭 v.文化 n.茶杯 n.切,剪,削,割 v.(口语)爸爸,爹爹 n.每日的;日常的 a.每天 ad.日报 n.跳舞 n.&vi.危险 n.危险的 a.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specificationspublishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意敢;敢于 v.&aux.v黑暗;暗处;日暮;黑暗的;暗淡的;深色 a.的日期;约会 n.女儿 n.天; 日;白天 n.死的;无生命的 a.聋的 a.量,数额;交易 v.亲爱的 a.死 n.十二月 n.决定;下决心 v.决定;决心 n.深的; a.深;深厚 ad.程度;度数;学位 n.美味的,可口的 a.牙科医生 n.依靠;依赖;指望;取决于 vi.描写,叙述 vt.书桌,写字台 n.(使)发展;(使)发达;(使)发育;并发嘶( v. 冲洗(照片)vt.发展;发达;发育;开发 n.对话 n.日记;日记簿 n.词典,字典 n.死 v.不同 n.不同的,有差异的 a.难的;艰难的;不易相处的 a.困难;费力 n.挖(洞、沟等);掘 v.正餐,宴会 n.直接的;直达的;直截了当的 a.指挥;指导;监督;管理;指挥(演奏);vt.导演(电影)方向;方位 n.脏的 a.发现 vt.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniformappearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly词性词意发现 n.讨论,议论 vt.讨论,辩论 n.病,疾病 n.盘,碟;盘装菜;盘形物 n.解散;解雇;遣散 vt.扰乱;打扰 vt.分;划分 vt.做,干(用以构成疑问句及否定句。

人教版英语中考必背词汇表

人教版英语中考必背词汇表

日常生活常用词汇人教版英语中考必背词汇表一、人称代词1.主格:I 我,you 你,he 他,she 她,it 它,we 我们,you 你们,they 他们。

2.宾格:me 我,you 你,him 他,her 她,it 它,us 我们,you 你们,them他们。

二、家庭成员1.father 父亲2.mother 母亲3.brother 兄弟4.sister 姐妹5.grandpa 爷爷/外公6.grandma 奶奶/外婆7.uncle 叔叔8.aunt 阿姨9.cousin 堂兄弟/姐妹三、数字和计量单位1.one 一2.two 二3.three 三4.four 四5.five 五6.six 六7.seven 七8.eight 八9.nine 九10.ten 十11.twenty 二十12.thirty 三十13.forty 四十14.fifty 五十15.sixty 六十16.seventy 七十17.eighty 八十18.ninety 九十19.one hundred 一百20.kilometer 千米/公里21.centimeter 厘米liliter 毫升23.liter 公升24.gram 克25.kilogram 千克/公斤26.inch 英寸27.foot 英尺28.meter 米29.yard 码30.ton 吨31.gallon 加仑(美)32.liter(欧)升33.quart夸脱(美)品脱(英)34.peck蒲式耳(美)配克(英)35.bushel蒲式耳(美)配克(英)36.hectare公顷亩(英)公亩(中)37.square hectare公顷亩平方米(中)平方公亩(英)公顷(英)公亩(中)平方米(中)平方英亩(美)平方英亩(英)平方米(美)平方码(美)平方英尺(美)平方英寸(美)square meter平方米(中)平方公尺(中)square decimeter平方分米square centimeter平方厘米square inch平方英寸square foot平方英尺square yard平方码square mile平方英里cubic meter立方米cubic decimeter立方分米cubic centimeter立方厘米cubic inch立方英寸cubic foot立方英尺cubic yard立方码cubic mile立方英里quart夸脱pint品脱peck蒲式耳bushel蒲式耳gallon加仑pound磅ounce 盎斯pence便士shilling先令guilder荷兰盾mark马克krone克朗escudo 埃斯库多peso比索ducat杜卡特franc法郎liard里阿尔pfennig芬尼maravedi马拉维第斯pataca帕塔卡rappen雷普gensterek伦斯特egret特雷特escudo埃斯库多escudo de venezuela委内瑞拉埃斯库多guilder荷兰盾mark马克marka马卡obol阿波勒ruble卢布kopek38.pen 钢笔39.pencil 铅笔40.book 书41.ruler 尺子42.bag 包43.desk 书桌44.chair 椅子puter 电脑46.cup 杯子47.bottle 瓶子48.box 盒子49.fork 叉子50.knife 刀子51.spoon 勺子52.clock 时钟53.watch 表54.telephone 电话55.phone 手机puter 电脑 电视58.fan 风扇59.light 灯60.train 火车61.bus 公交车62.car 小汽车63.jeep 吉普车64.ship 船65.plane 飞机66.cake 蛋糕67.bread 面包68.hot dog 热狗69.hamburger 汉堡包70.French fries 法式薯条/炸薯条71.apple 苹果72.banana 香蕉73.orange 橙子74.watermelon 西瓜75.tomato 西红柿76.potato 马铃薯/土豆77.chicken 鸡肉/鸡78.fish 鱼肉/鱼k 牛奶80.juice 果汁81.tea 茶水82.coffee 咖啡83.bread 面包。

2021年中考英语总复习必考1600个词汇对照表(精华版)

2021年中考英语总复习必考1600个词汇对照表(精华版)
航空站,飞机场
alive [əˈlaɪv]
a.
活着的,存在的
all [ɔːl]
ad.
a.
pron.
全部地
全(部);所有的;总;整
全部;全体成员
allow [əˈlaʊ]
vt.
允许,准允
almost [ˈɔːlməʊst]
ad.
几乎,差不多
alone [əˈləʊn]
a.
单独的,孤独的
along [əˈlɔŋ; (US) əˈlɔŋ]
anybody[ˈenɪbɔdɪ]
pron.
任何人,无论谁
anyone [ˈenɪwʌn]
pron.
任何人,无论谁
anything [ˈenɪθɪŋ]
pron.
什么事(物);任何事(物)
anyway[ˈenɪweɪ]
ad.
不管怎样
anywhere [ˈenɪweə®]
ad.
任何地方
appear[əˈpɪə®]
vi.
到达;达到
art [ɑːt]
n.
艺术,美术;技艺
article [ˈɑːtɪk(ə)l]
n.
文章;东西;冠词
artist [ˈɑːtɪst]
n.
艺术家
as[əz, æz]
ad.&conj.
Prep.
像……一样;如同;因为
作为,当作
Asia [ˈeɪʃə]
n.
亚洲
Asian [ˈeɪʃ(ə)n, ˈeɪʒ(ə)n]
afraid[əˈfreɪd]
a.
害怕的;担心的
Africa
n.
非洲
African
a.
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
n.
蜜蜂
beef
n.
牛肉
before
prep.
ad.
Hale Waihona Puke conj.在……以前;在……前面
以前
在…..之前
begin(began, begun)
v.
开始,着手
behaviour
n.
行为,举止
behind
prep.
ad.
(表示位置)在……后面
在后面;向后
believe
v.
相信;认为
bell
n.
钟,铃;钟(铃)声;钟形物
below
prep.
在……下面
beside
prep.
在…..旁边;靠近
besides
prep.
ad.
除……以外(还有)
还有,此外
between
prep.
在(两者)之间,在……中间
beyond
prep.
(表示位置)在……的那边
big
a.
大的
bike=bicycle
n.
自行车
bill
n.
帐单;法案,议案;(美)钞票,纸币
avoid
v.
避免;躲开;逃避
awake(awoke;awoken)
v.
唤醒;醒着的
away
ad.
离开;原离
baby
n.
婴儿
back
ad.
a.
n.
回(原处);向后
后面的
背后;后部;背
background
n.
背景
bad (worse, worst)
a.
坏的;有害的;不利的;严重的
bag
n.
书包;提包;袋子
conj.
在后;后来
在……之后;在……后面
在……以后
afternoon
n.
下午,午后
again
ad.
再一次;再,又
against
prep.
对着,反对
age
n.
年龄;时代
ago
ad.
以前
agree
v.
同意;应允
agreement
n.
同意;一致;协定
air
n.
空气;大气
airline
n.
航空公司
airplane
在周围;在附近
在……周围;大约
arrive
vi.
到达;达到
art
n.
艺术,美术;技艺
article
n.
文章;东西;冠词
as
ad.&conj.
prep.
像……一样;如同;因为
作为,当作
Asia
n.
亚洲
Asian
a.
n.
亚洲的;亚洲人的
亚洲人
ask
v.
问,询问;请求,要求;邀请
asleep
a.
睡着的,熟睡
angry
a.
生气的,愤怒的
animal
n.
动物
another
a.
pron.
再一;另一;别的;不同的
另一个
answer
n.
v.
回答,答复;回信;答案
回答,答复;回信(作出)答案
ant
n.
蚂蚁
any
pron.
a.
(无论)哪一个;那些
任何的;(用于疑问句、否定句)一些;什么
anybody
pron.
任何人,无论谁
at
prep.
在(几点钟);在(某处)
n. & a.
大西洋(的)
attention
n.
关心;注意
August
n.
八月
aunt
n.
伯母;舅母;审;姑;姨
Australia
n.
澳洲;澳大利亚
Australian
a.
n.
澳洲的;澳大利亚的
澳大利亚人
autumn
n.
秋天,秋季
available
a.
有用的;有效的
n.
(美)飞机
airport
n.
航空站,飞机场
alive
a.
活着的,存在的
all
ad.
a.
pron.
全部地
全(部);所有的;总;整
全部;全体成员
allow
vt.
允许,准允
almost
ad.
几乎,差不多
alone
a.
单独的,孤独的
along
ad.
prep.
向前;和…..在一起;一同
沿着;顺着
aloud
n.
活动
add
vt.
增添;增加
address
n.
地址
advangtage
n.
优点;好处
advertisement
n.
广告
advice
n.
忠告;劝告;建议
advise
vt.
忠告;劝告;建议
afford
vt.
负担的起(……的费用);抽的出(时间);提供
afraid
a.
害怕的;担心的
after
ad.
prep.
ad.
大声地
already
ad.
已经
also
ad.

although
conj.
虽然;尽管
always
ad.
总是;一直;永远
America
n.
美国;美洲
American
a.
n.
美国人;美国人的
美国人
among
prep.
在……中间;在(三个以上)之间
ancient
a.
古代的;古老的
and
conj.
和;又;而
缺席;不在
accent
n.
口音;音调
accept
vt.
接受
accident
n.
事故,意外的事
ache
vi. & n.
痛;疼痛
achieve
vt.
达到;取得
across
prep
横过;穿过
act
n.
v.
法令;条例
表演,扮演(角色);演出,行动
action
n.
行动
active
a.
积极的,主动的
activity
been; 成为
beach
n.
海滨,海滩
bear
n.

beat(beat, beaten)
v.
n.
敲打;跳动;打赢
(音乐)节拍
beautiful
a.
美的,美丽的,美观的
because
conj.
因为
become(became, became)
v.
变得;成为
bed
n.

bedroom
n.
寝室,卧室
bee
中考英语中考词汇表对照表资料
中考1600词汇表对照表
考试大纲词汇表
词性
词意
备注
a(an)
art.
一(个、件……)
ability
n.
能力;才能
able
a.
能够;有能力的
about
ad.
prep.
大约;到处;四处
关于;在各处;四处
above
prep.
在……上面
abroad
ad.
到(在)国外
absent
a.
bird
n.

birth
n.
出生;诞生
birthday
n.
生日
biscuit
n.
饼干
bit
n.
一点,一些,少量
bitter
a.
有苦味的;痛苦的;难过的;严酷的
black
n.
a.
黑色
黑色的
blackboard
n.
黑板
blind
n.
瞎的
blood
n.
血,血液
blow(blew, blown)
v.
吹;刮风;吹气
ball
n.

balloon
n.
气球
bamboo
n.

banana
n.
香蕉
bank
n.
(河、海、湖的)岸,堤;银行
baseball
n.
棒球
basic
a.
基本的
basket
n.
篮子
basketball
n.
篮球
bathroom
n.
浴室
be
v.
是(原形),其人称和时态形式有am,is,are,was,were,being,
blue
a.
蓝色
board
n.
木板;布告牌;委员会;(政府的)部
boat
n.
小船,小舟
body
n.
身体
anyone
pron.
任何人,无论谁
anything
pron.
什么事(物);任何事(物)
anyway
ad.
不管怎样
anywhere
ad.
任何地方
appear
vi.
出现
apple
n.
苹果
April
相关文档
最新文档