绿化施工方案
绿化工程 绿化工程施工方案(优秀5篇)

绿化工程绿化工程施工方案(优秀5篇)(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如总结报告、演讲发言、规章制度、员工手册、创业计划、企划方案、心得体会、法律文书、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample texts, such as summary reports, speeches, rules and regulations, employee manuals, entrepreneurial plans, planning plans, insights, legal documents, teaching materials, other sample texts, etc. If you want to learn about different sample formats and writing methods, please pay attention!绿化工程绿化工程施工方案(优秀5篇)为了确保工作或事情顺利进行,就常常需要事先准备方案,方案是书面计划,是具体行动实施办法细则,步骤等。
道路绿化工程施工方案(3篇)

第1篇一、工程概况1. 工程名称:XX道路绿化工程2. 工程地点:XX市XX道路3. 工程规模:全长XX公里,绿化带宽度XX米4. 工程内容:道路绿化带建设、植物配置、灌溉系统、园林小品等5. 工程期限:XX个月二、施工组织设计1. 施工队伍(1)项目经理部:负责整个工程的全面管理,包括施工组织、进度控制、质量控制、安全管理等。
(2)工程技术部:负责工程的技术指导和施工方案编制。
(3)施工班组:负责具体的施工任务。
2. 施工进度计划(1)施工准备阶段:1个月(2)基础施工阶段:1个月(3)绿化施工阶段:2个月(4)养护阶段:1个月三、施工方案1. 施工准备(1)现场调查:对施工现场进行实地考察,了解地形、地貌、土壤、水文等条件。
(2)施工图纸会审:组织施工、设计、监理等相关人员对施工图纸进行会审,明确施工要求。
(3)材料设备准备:根据施工图纸和工程量清单,采购所需的苗木、材料、设备等。
(4)人员培训:对施工人员进行技术培训和安全教育。
2. 基础施工(1)绿化带整理:按照设计要求,对绿化带进行平整、修整,确保绿化带整齐、美观。
(2)排水设施施工:设置排水沟、雨水口等,确保绿化带排水畅通。
(3)灌溉系统施工:安装灌溉管道、喷头等,确保绿化带灌溉系统正常运行。
3. 绿化施工(1)植物配置:根据设计要求,选择适宜的植物种类,合理配置植物,确保绿化效果。
(2)苗木种植:按照设计要求,栽植苗木,注意栽植深度、间距等。
(3)园林小品施工:按照设计要求,施工园林小品,如座椅、花架、景墙等。
4. 灌溉系统施工(1)管道安装:按照设计要求,安装灌溉管道,确保管道连接牢固、畅通。
(2)喷头安装:按照设计要求,安装喷头,确保喷头分布均匀、喷洒效果良好。
(3)控制系统安装:安装灌溉控制系统,实现自动化灌溉。
5. 养护阶段(1)植物养护:定期对植物进行浇水、施肥、修剪、病虫害防治等养护工作。
(2)绿化带养护:对绿化带进行修剪、清理杂草、修剪绿化带边缘等养护工作。
绿化种植工程施工方案三篇

绿化种植工程施工方案三篇篇一:绿化种植工程施工方案(一)土壤改良对现有的无锡的土壤,因它粘性强、透气性差以及机械施工后的土方地形,对松土层达不到要求的地块应普遍深翻两次。
深翻前还应浇一次水,使其达到一定的疏松程度。
(二)苗木种植1、选苗选择苗木,要求乔木达到树杆较直,长势旺盛,无病虫害的标准。
特别是本工程骨架树种如常绿大乔木等是体现景观效果的主要树种,选购时一定要高标准。
特别是在选苗的同时,要给每一棵大乔木编号,并将其树冠、树高仔细地记录在案,以利用于种植时合理定位。
2、挖掘树苗的挖掘质量是确保种植成活率的重要环节,树木泥球的大小一般是胸径的8倍,挖掘工具应锋利,挖前必须消除表面浮土至须根。
开挖时,要求断根切口与泥球壁齐平。
土球用草绳以腰箍及网络的形式扎紧,保证土球牢固性。
3、运输首先,树苗在装卸过程中,必须轻装轻卸,不能扔摔拖拉,保证泥球的完好。
其次,运输距离较长,应对树苗叶面喷洒清水。
并油布盖好,预防日晒,风燥。
4、种植保证树苗的种植质量是提高成活率的关键。
严格按照种植步骤规范操作。
(1)乔灌木种植程序:(3)栽植前的准备工作凡列为工程栽植工作应将设计图与现场核对平面及标高。
如有不符时,应由设计单位变更设计。
(4)栽植材料的质量要求栽植前应检查材料的质量,符合设计要求的规格。
花苗应茁壮、发育匀齐、根系良好、无病虫害。
一、二年生长的花卉,叶簇茁壮。
宿根花卉,根系须有三至四个芽块茎。
球根花卉须完整在块茎上至少应有两个幼芽。
观叶用的材料必须叶色鲜艳、叶簇丰满。
草块厚度不小于2cm,无病虫害,杂草不得超过5%。
(5)栽植土壤栽植和播种前应根据土层有效厚度,土壤质地,酸碱度和盐份,采取相应的消毒,施肥和改换土壤等措施。
园林植物种植必须的最低土层深度(树坑的直茎(或正方形树穴的边长)应较裸根或土球为大。
裸根植物,其比例为1.3:1以上。
带球植物,其比例为1.5:1以上。
树坑的深度为根子或土球直径0.8倍以上。
景观绿化施工方案(3篇)

第1篇一、项目概述项目名称:XX景观绿化工程项目地点:XX市XX区XX街道项目规模:占地面积XX平方米项目类型:城市公园绿化工程设计单位:XX设计院施工单位:XX园林绿化有限公司施工期限:XX个月二、施工原则1. 生态优先原则:在施工过程中,充分尊重自然规律,保护和恢复原有植被,实现人与自然的和谐共生。
2. 美观实用原则:注重景观效果,同时兼顾功能性和实用性,满足人民群众休闲、娱乐、健身的需求。
3. 经济合理原则:在保证工程质量的前提下,合理控制成本,提高施工效益。
4. 安全文明施工原则:确保施工安全,做到文明施工,减少对周边环境的影响。
三、施工准备1. 施工组织准备(1)成立项目施工组织机构,明确各部门职责,确保施工顺利进行。
(2)制定施工方案,明确施工流程、施工工艺和质量要求。
(3)组织施工人员培训,提高施工队伍的整体素质。
2. 技术准备(1)熟悉设计图纸,掌握设计意图,确保施工符合设计要求。
(2)了解施工规范、标准,确保施工质量。
(3)做好材料、设备采购计划,确保施工材料、设备的质量和供应。
3. 施工现场准备(1)做好施工现场的规划,确保施工场地整洁、有序。
(2)设置施工围挡,保护施工现场环境。
(3)配备必要的安全设施,确保施工安全。
四、施工工艺1. 土方工程(1)平整场地:根据设计要求,对场地进行平整,确保场地坡度符合设计要求。
(2)土方开挖:根据设计要求,进行土方开挖,确保土方量符合设计要求。
(3)土方回填:根据设计要求,进行土方回填,确保回填土的压实度符合设计要求。
2. 植物种植(1)苗木选择:根据设计要求,选择适宜的苗木品种,确保苗木生长良好。
(2)种植时间:根据苗木生长习性,选择适宜的种植时间。
(3)种植方法:采用穴植、坑植等方法进行种植,确保苗木根系舒展。
(4)浇水:种植后及时浇水,确保苗木成活。
3. 园路铺装(1)基础处理:对园路基础进行处理,确保基础稳定。
(2)面层铺设:根据设计要求,铺设园路面层,确保路面平整、美观。
景观园林绿化工程施工方案(3篇)

第1篇一、工程概况1. 工程名称:XX景观园林绿化工程2. 工程地点:XX市XX区XX街道3. 工程规模:占地面积约XX平方米4. 工程内容:包括绿化种植、园林景观设计、园林小品制作安装、水景工程、道路铺装、照明工程等5. 工程工期:预计XX个月二、设计原则1. 符合国家相关法律法规和行业标准2. 注重生态保护,体现可持续发展理念3. 体现地方特色,满足当地居民需求4. 确保工程质量,保证工程安全5. 合理安排施工进度,确保工程按时完成三、施工准备1. 组织机构(1)项目经理部:负责整个工程的施工组织、协调和管理。
(2)施工班组:负责具体的施工任务。
2. 人员配置(1)项目经理:负责整个工程的施工管理工作。
(2)技术负责人:负责施工技术指导和工程质量控制。
(3)施工员:负责施工方案的编制、施工进度控制、现场管理等。
(4)质检员:负责工程质量检查和验收。
3. 材料设备(1)绿化植物:选择适合当地气候和土壤条件的植物种类,确保植物生长良好。
(2)园林小品:选择符合设计要求的园林小品,如座椅、垃圾桶、景观石等。
(3)水景工程:选用环保、耐用的水景设备。
(4)道路铺装:选用耐磨、美观的铺装材料。
(5)照明工程:选用节能、环保的照明设备。
4. 施工方案编制(1)根据设计图纸和现场实际情况,编制详细的施工方案。
(2)明确施工顺序、施工工艺、质量控制点等。
(3)编制施工进度计划,确保工程按时完成。
四、施工工艺1. 绿化种植(1)种植前,对土壤进行改良,确保土壤肥沃、排水良好。
(2)根据设计要求,选择合适的植物种类和种植位置。
(3)按照规定的种植密度和深度进行种植。
(4)及时浇水、施肥,确保植物生长良好。
2. 园林景观设计(1)按照设计图纸,进行园林景观布局。
(2)制作安装园林小品,如座椅、垃圾桶、景观石等。
(3)进行园林景观美化,如铺装、绿化等。
3. 水景工程(1)根据设计要求,进行水景布局。
(2)选用环保、耐用的水景设备。
绿化工程施工方案

绿化工程施工方案一一、清理场地:对施工场地内所有的垃圾、杂草杂物等进行全面清理。
二、场地平整:严格按设计标准和景观要求,土方回填平整至设计标高,对场地进行翻挖,乔木种植土层厚度不低于70cm,破碎表层整理成符合要求的平面或曲面,按图纸设计要求进行整势整坡工作。
标高符合设计要求,有特殊情况与业主共同商定处理。
三、放线定点:根据设计图比例,将设计图纸中各种树木的位置布局、反应到实际场地保证苗木布局符合实际要求。
实际情况与图纸发生冲突时,在征得监理同意的前提下,做适当调整。
四、挖种植穴和施基肥:乔木种植穴以圆形为主,种植穴比树木跟球直径大30cm左右。
施基肥按作业指导书进行。
五、苗木规格及运输:选苗时,苗木规格与设计规格误差不得超过5%,按设计规格选择苗木。
乔木土球用草绳、蒲包包装,并适当修剪枝叶,防止水分过度蒸发而影响成活率。
六、苗木种植:按《苗木种植作业指导书》要求进行,乔木须立保护桩固定。
七、种植浇灌:无论何种天气,何种苗木栽后均需浇足量的定根水。
并喷洒枝叶保湿。
八、施工后的清理:对施工后形成的垃圾及时清理外运,保证绿地及附近地面清洁。
不影响业主整体运作。
绿化工程施工方案二一、苗木准备:根据工程设计图纸,列出苗木的品种、数量、规格、落实苗木供应来源,以及运到栽植地的运输情况及运苗方法。
对符合规格、生长健壮无病虫害的苗木,应逐株做记号。
高质量的苗木应具备的条件:根系发达完整,主根短直,接近根茎范围内有较多的侧根和须根,起苗后根系无劈裂;苗木粗壮通直,不徒长;主侧枝分布均匀,能构成完美的树冠;无病虫害和机械损伤。
二、植前整地及放线:根据设计图纸要求,种植地土质应基本满足植物生长需要,如发现土质太差,应栽植前换填种植土,以保植株成活。
根据图纸,在现场找出苗木实际栽植位置,用白灰撒灰点,进行定点放线。
一般采用行列式放线法及等距弧线放线法。
三、树穴的开挖:树穴开挖一般在运取苗木前1—2天进行。
种植穴的大小依土球及根系情况而定,带土球的应比土球大16—20cm,穴的深度一般比球高度稍深10—20cm,栽植裸根苗木应保护根系充分舒展,树穴必须保证上下口径一致,避免出现上大下小的“锅底坑”,挖出的表土、心土应分别堆放。
绿化提升施工方案范文(三篇)

绿化提升施工方案范文(三篇)【篇1】绿化提升施工方案1、施工准备(1)踏勘现场,了解、熟悉现场情况。
(2)仔细阅读施工图,充分理解设计意图,使施工充分体现设计意图。
(3)作好苗木的准备工作,落实好土方来源。
(4)落实苗木种植所需的营养土、介质土、绑扎材料、遮荫材料。
(5)组织好施工队伍,落实机具设备等。
(6)搭设好施工和管理人员的生活设施。
(7)制定质量目标、施工进度;落实监督、检查制度。
(8)测试土壤肥力及PH值,复核土方标高。
2、主要施工方法A、清理场地,清除建筑垃圾,集中堆放于甲方指定区域。
同时抓紧时间将表层混凝土地坪、房屋基础进行破碎,同表层三合土一起集中深埋到甲方指定区。
在深埋过程中,对建筑垃圾进行分层夯实,避免土方沉降不均匀。
B、进土、深翻、粗平整及土壤改良清场后按计划进度作好进土、深翻、粗平整及土壤改良相结合的办法。
外进绿化种植土优质沙性山泥,不含杂质,同时翻除现场石块垃圾及各种废弃物料,并集中堆置,随时运出至指定弃料场。
对20CM以下的土层用人工进行深翻,剔除垃圾,保证土壤质量并使土壤疏松、平整、平整之后的绿地地势饱满,自然坡度达到3%左右,做到无积水现象,为下一步工序打好基础。
土壤改良:在种植土内掺和有机肥。
栽植大乔木处用黄沙掺和,有利于改善土壤的渗水性,减少土壤粘性。
另外可增施过磷到钙,按100公斤每过磷钙施入土层内,确保樾手长时所需的养分。
有机肥组成:由堆肥、醋渣、珍珠岩、草木灰、鸡粪、共籽饼等成份。
其优点一是重量轻,有机肥含氮、磷、钾等多种营养成分,偏酸,PH值6---6.5,且营养释放缓慢,极利于树木的吸收;有机肥通气性好,渗水率高,有利根系发育;有机肥内含有大量微生物,能吸收原土壤中的碱性物质,将其转化成有机物或进行分解,提高原土壤的理化性状。
除此之外,对于乔木和喜酸植物种植区域(香樟、杜鹃等)增设隔水层,防止盐碱随毛细水上升而对植物根系的侵蚀,并进行部分换土,采用山泥做种植的顺填土壤,加快植物的恢复生长,提高植物的成活率。
绿化施工方案

绿化施工方案(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如管理制度、管理办法、管理规定、规程规范、条例细则、程序标准、岗位职责、管理守则、试题大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample texts for everyone, such as management systems, management methods, management regulations, rules and regulations, detailed rules and regulations, procedural standards, job responsibilities, management rules, complete test questions, and other sample texts. If you want to learn about different sample formats and writing methods, please pay attention!绿化施工方案绿化,施工,方案相关资讯是工作经常遇到及需要使用的,也许您正为撰写绿化,施工,方案而苦恼,下面是整理的绿化施工方案,希望能够帮助到大家。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
绿化工程施工方案、种植前土壤处理1、种植土层的厚度:小灌木,乔木。
2、栽植前应对土壤施有机肥,有机肥应充分腐熟,并与有机肥种植土充分搅拌均匀,保证绿地内种植土表层覆盖15腐殖土,绿地外观不应有明显坑洼现象,雨季不积水。
3、对回填土的要求:回填种植土应满足含盐量不超过0.3%。
PH值应为 6.5-8.5 之间。
二、栽植穴(槽)的挖掘种植穴的规格:乔木栽植穴直径>。
三、苗木修剪1、栽植前应进行苗木修剪,将劈裂根、病虫根、过长根剪除,并对树冠进行修剪,保持树体地上地下平衡。
2、生长季节移植的落叶树木,根据不同的树种在保持树形的前提下应重剪,以保成活。
四、树木栽植1、施工要求⑴、栽植时根系舒展,带土球苗不散台,不易降解包装物应拆除、高度搭配合理。
⑵、树形丰满面应朝向主要观赏面;苗木中心线应垂直水平面;回填土应分层夯实;栽植的深度应和原根径土线持平。
⑶、规则式栽植应保持平衡对称,行道树或行列栽植树木应在一条线上,相邻植株规格、高度搭配近似。
⑷、绿篱的株行距应均匀,高度一致。
(5)、落叶乔木非栽植季节植树,应选用容器苗或提前疏枝、断根、多次移植过的树苗,应用强刨吗,苗要选择适宜树种,可采用根部喷布生根激素,保水剂,抗蒸腾剂等措施。
⑹、行列栽植或群植时,株行距现有树木规格调整,丛植时可紧密栽植或按图示。
2、苗木种植前的准备⑴、种植前的植物材料选择及选定非常关键,既要满足建设单位的条件,又要符合设计要求,部分苗木可以从我公司自己的苗圃地提供,其它苗木必须是天津市及周边地区定植三年以上符合设计要求的苗木,对景观树在购苗前须与发包单位一起号苗,征得发包人同意后方可调入苗木。
⑵、调苗时对苗木的来源地,立地条件、检疫情况、交通状况、林业部门制度等进行全面调查摸底,根据情况制定调苗方案、运输方案、种植方案及相应的保证措施,以做到知己知底,打有准备之仗。
⑶、根据公司的人员储备情况,选派有丰富经验的管理人员、有较高实践经历的技术工人,这样的队伍才能够打硬仗。
⑷、为保证给项目提供高质量的合格苗木,加强对号苗、掘苗、运输、种植、养护等方面的质量控制。
⑸、本工程景观赏效果的好坏,与种植季节和质量有直接关系,为了达到一个高效果,我们还要与建设单位、监理单位、设计单位做更好的配合,服从三方的管理要求,同时搜集本地区以往几年的气象信息,以做好最佳应对措施。
3、苗木的挖掘、包扎、运输⑴、苗木移植在适宜季节,种植采用先里后外,先乔木后灌木,最后地被草坪的原则。
总之,要求总体上控制分段工期,又要在具体过程中视具体气象情况,灵活有度。
做到既保证工期,又保证苗木质量成活率。
⑵、移植开挖前,要对工具、设备、人力、运输做充分准备,特别是大树移植。
首先对苗木出圃通道,环境仔细踏勘,并跟踪气象变化情况,要求做到工序紧凑合理,苗木随挖随运随种。
所有苗木起挖与栽植保持同步协调,避免起挖和种植滞缓,另外,要求整个移植过程前吸足水分,这样可加强根系与土壤的粘结力,同时,方便挖掘,且土球也不易碎裂。
⑶、在苗木挖掘前,还需做好如下工作:护干:将乔木主干、大型主枝用草绳密绕,这样在挖运时可避免树皮擦伤主枝撕断。
束冠:用草绳将树冠适度捆拢,以防止挖运过程中损坏。
束冠后做好主观赏面标记。
苗木挖掘时须特别注意对土球和切过根苗木新发须根的保护,即切根处外面扩展10的范围。
挖掘工具要锋利,土球四周外表根系可涂波尔多液消毒除菌;挖掘时间连续紧凑,绝不隔夜;主根未断时及时打好腰箍,以免铲切主根时土球掉土松裂。
所有乔灌木土球草绳包裹后,需对草绳喷水保湿。
⑷、苗木装卸:关键是不损伤树冠、树干及土球,苗木尽可能不直接外露以减少蒸发。
大规格乔木起苗卸苗须用吊车,注意吊车吨位应有所宽余,利用12吨以上吊车可在场地紧凑情况下,远臂起吊,加快作业效率。
吊绳系扎时,在土球和树杆包扎草绳间垫以厚麻袋片或软物,以增加摩擦力防止系绳移位并保护树身。
另外,需在树冠处另系牵引绳2根以方便调整冠梢方位。
土球系绳用粗麻绳以“字节”兜底,底圈圆环大小应合适,过大易松脱土球,过小起吊时稳定性不好,树干系绳,结扎部位在主杆上部1/4 —1/3处。
土球及树干系绳应根据球体及树冠大小份量确定长度,由此一般将起吊时主干与地平夹角控制在45-60度之间,以使重心落稳。
乔木树体吊装上车时可用废旧大轮胎垫于土球底部,可避免受力不均匀或路途颠簸损裂土球。
大乔木装车后结扎牢固,以防颠簸移动。
大中型乔灌木尽量安排夜间运输,如系白天运输,树冠部应遮以蓬布,可直接避开日照风吹。
大乔木装运时其树干靠车身拦板处垫缓冲料,另外禁止超载叠压损裂土球,装卸过程轻放缓落。
4、苗木种植穴的挖掘根据施工种植的要求,我们将安排施工小队在铺设好的表土上按绿化工程布置的图纸进行实地放样,位置明确,标记明显。
标出种植树坑的具体位置,并得到监理工程师的检查认可。
在挖树坑时表土和底土分开,遇到有土块、石块、硬土及其它杂物和不适于种植的材料运到附近的垃圾场,以保护环境,提高成活率。
5、苗木种植流程定点放线T种植穴挖掘T种植土改良T种植T支撑T做堰T浇水T种植养护⑴、定点放线依据方格网放出定点放线,放线时对各种植点做出标记,并根据苗木规格要求划出种植穴范围。
花灌木及攀援植物群植时根据方格网先放出林缘线,再于林缘线范围内确定种植点。
地被花卉、色带花卉植物根据方格网放出边线,用土做堰标出明显种植范围。
挖种植穴之前了解地下管网和隐蔽物埋设情况。
种植穴挖掘时将表土与底土分开堆放,不散乱,以便于好土回填,渣土外弃。
并参照规范要求进行。
种植穴大小参照苗木规格及土球或根幅大小,种植穴必须垂直下挖,上口下底相等,不出现锅底穴。
⑵、种植土改良依据本工程现状土壤质地需要对种植土进行改良。
客土:河沙:熟牛粪:草炭=2: 2: 1: 1 (体积比),其优点含N、P、K等多种营养成分,且营养释放缓慢,拌和时保证三种原料均匀,利于树木生长,通气性好,渗水率高,有利于根系发育。
⑶、苗木种植①、种植的质量应符合下列规定:a、按设计图纸要求核对苗木品种、规格及种植位置。
b、规则式种植应保持对称平衡,行道树或行列种植树木应在一条线上,相邻植株规格应合理搭配,高度、干径、树形相近,种植的树木应保持直立,不得倾斜,应注意观赏面的合理朝向。
c、树形丰满的一面应向外,按苗木高度、树干大小搭配均匀。
在苗圃修剪成型的绿篱,种植时应按造型拼栽,深浅一致。
d、种植带土球树木时,不易腐烂的包装物必须拆除。
e、高大、易倒的乔灌木栽植后均应进行支撑。
攀援植物根据生长需要进行绑扎和牵引。
f、种植时,根系必须舒展,填土应分层踏实,种植深度应与原种植线一致。
②、树木种植方法应符合下列规定:a、树木置入种植穴前,应先检查种植穴大小及深度,不符合根系要求时,应修整种植穴。
b、种植裸根树木时,应将种植穴底填土层呈半圆土堆,置入树木填土至1/3时,应轻提树干使根系舒展,并充分接触土壤,随填水分层踏实。
c、带土球树木必须踏实穴底土层,而后置入种植穴,填土踏实。
d、成块种植或群植时应由中心向外顺序退植。
坡式种植时应由上向下种植。
大型块植或不同彩色丛植时,宜分区分块种植。
⑷、修剪苗木移植后,根系大量损伤,打破了原来地上部分和地下部分的平衡,使水分和有机物质大量消耗,如果这种平衡不能迅速恢复,树木就可能死亡。
因此,我们通过修剪使地上部分和地下部分水分和养分相对平衡,并且在保证树木成活的前提下保证效果。
①、常绿树修剪:常绿针叶树,只剪除病虫枝、干枯枝、过密的轮生枝和下垂枝。
②、落叶乔木修剪:树木以原树冠形状为基础进行修剪,以疏为主,轻短截为辅。
在保证设计高度、冠幅的基础上,先剪去干枯枝、病虫枝、细弱枝、内膛枝,再剪除交叉枝、平行枝及其它影响树形美观的枝条,使枝条分布均匀,保持自然、完整、优美的树形,如龙爪槐等具有明显树干的树种,在保证主枝顶芽不受损伤的前提下,重点以疏枝为主,侧枝可适当进行短截,修剪后对枝条直径大于的剪口涂抹保护剂,起到杀菌、促使伤口愈合的目的。
③、花灌木修剪:先剪去干枯枝、病虫枝,然后根据树形及生长特性进行修剪。
圆形树冠的品种剪除细弱枝、内膛枝,短截过长枝,保持树冠端正;垂枝拱形树冠的品种剪除细弱枝、过密枝,培养粗壮主枝,保留长枝,保持树体的拱形特点;自然形树冠的品种以疏枝为主,短截为辅,剪除内膛枝、徒长枝、过密枝,短截过长枝,使枝条分布均匀,树形自然美观;开心形树冠的品种疏枝和短截并重,使其主枝分布均匀,通风透光;紫叶李修剪时,对中心主枝和其它主侧枝均短截,疏除内膛细弱枝、徒长枝,对其它枝条亦短截,所有剪口芽均留外侧,保证圆满树形和生长期内彩色树种的观赏效果,榆叶梅则花后短截,保证来年开花。
④、苗木根系修剪:剪去过长根、折断根、劈裂根、枯死根,把伤口修剪整齐,用利刀削平不留毛茬,有利于愈合。
⑤、修剪后的苗木规格不得小于设计规格。
⑥、种植前对苗木进行修剪的目的,有以下三条:a、起苗后苗木根系受到严重损伤,为了保持地上和地下平衡,必须适当对树冠进行疏剪,使根系吸收的水分,养分能充分供给地上部分的需要。
b、修剪有保持树冠均匀分布、造型美观,促进生长的作用。
c、修剪树冠具有特殊造型。
所作的修剪只提出原则要求,不可能包括所有树种,有的树种受地区立地条件影响,修剪方式可能与规定略有不同,均可参照本地区习惯修剪。
灌木种植一般带土球者较多,根系损伤较轻,加以灌木要求发挥现场种植效果(特别春季开花的花灌木),一般不应做修剪。
修剪苗木的质量要求目的是使修剪的苗木栽植后能尽快愈合,以免感染病害,合理形成树冠,促进生长。
⑸、树木支撑在苗木回填完土踏实后,第一次浇水之前做支撑。
一般采用三根无虫蛀木杆三角支撑法,若用松木杆支撑必须刮除树皮,防止皮内存在天牛等蛀虫,而引发苗木虫害。
支撑杆与树干绑扎结合处用草片或麻布垫衬,以防损伤树皮。
各支脚埋入土中至少,使支撑稳固,防止倒伏或倾斜。
对于较矮苗木可采用“n”字支撑,在树干两侧各埋一根长度的直立木桩,两木桩间距,再用长的横杆与树干、立木桩连接固定,干与横木杆做垫衬。
因本工程多地形,并且地形较陡,所以在树的上坡用较短木杆,下坡用较长木杆,支撑方法同三角支撑。
⑹、做堰种植后在略大于种植穴直径的周围,筑成的灌木围堰,堰筑实不得漏水。
⑺、浇水新植树木在当日浇透第一遍水,3日内浇透第二遍水,10日内浇透第三遍水,浇水渗下后,土球稍干时及时用围堰土封树穴。
再筑堰时,不得损伤根系。
⑻、种植后养护管理①、设专人随时检查树盘土壤水分状况,发现缺水情况立即浇水,保证充足的水分供应。
②、设专人随时检查树木的支撑情况,发现松动立即加固,保证支撑稳固。
③、植保技术员认真观察苗木的病虫害情况,做好虫情病情预测预报,提出合理的防治措施,特别要考虑生物防治。
6、地被花卉、色带种植⑴、整理种植区域土地:清除土壤内石块、瓦片、残根、断茎及杂草等有碍于植物生长的杂物。