竣工验收工作总结
竣工工作总结7篇

竣工工作总结7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、报告大全、合同协议、演讲致辞、规章制度、应急预案、心得体会、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work summaries, report summaries, contract agreements, speeches, rules and regulations, emergency plans, experiences, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!竣工工作总结7篇通过工作总结,可以发现自己工作中的不足和改进的空间,我们可以在工作总结里面回忆自己这段时间以来的工作收获和成长,本店铺今天就为您带来了竣工工作总结7篇,相信一定会对你有所帮助。
竣工验收工作总结8篇

竣工验收工作总结8篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作计划、工作总结、述职报告、合同协议、演讲致辞、条据文书、心得体会、策划方案、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work plans, work summaries, job reports, contract agreements, speeches, documents, insights, planning plans, teaching materials, other sample essays, and more. If you want to learn about different sample formats and writing methods, please stay tuned!竣工验收工作总结8篇通过工作总结,我们可以更好地评估工作中的进展和挑战,通过工作总结的写作可以提升我们的工作能力哦,因此要认真对待才行,以下是本店铺精心为您推荐的竣工验收工作总结8篇,供大家参考。
工程竣工验收工作总结7篇

工程竣工验收工作总结7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、汇报材料、自我鉴定、条据文书、合同协议、心得体会、方案大全、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, presentation materials, self-evaluation, documentary evidence, contract agreements, reflections, comprehensive plans, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!工程竣工验收工作总结7篇态度的端正是我们在写工作总结的时候要注意的一点,工作总结是我们对自己工作的一种自我评估,可以帮助我们发现自己的不足之处,进而改进和提升,以下是本店铺精心为您推荐的工程竣工验收工作总结7篇,供大家参考。
建筑工程竣工验收监理工作总结(通用10篇)

建筑工程竣工验收监理工作总结(通用10篇)建筑工程竣工验收监理工作总结篇1一、工程概况:本工程位于重庆xx大竹林组团0标准分区010-7、010-8和010-9号地块,为xx工程,工程总用地面积5825.14平方米,总建筑面积82635.49平方米;其中包含37#、38#栋高层住宅,地下一层,地上吊七层;建筑抗震设防类别为丙类,场地类别为二类;建筑结构形式:剪力墙、框架核心筒框架结构;建筑使用年限50年,抗震设防烈度6度,建筑耐火等级为一级,屋面防水等级一级,基础采用独立基础和条形基础。
二、施工情况:加强施工过程控制,严把原材料复试和半成品、成品质量关,严格控制工序质量,每个分部、分项工程的关键工序设立质量管理点,要求施工单位进行自检、互检、交接检制度。
工程实施过程中的质量要求进行控制,按先交底、后实施、先样板、后大面的原则,达到合格标准后,才进入下步工序施工。
对重庆市勘测院移交的测量控制点进行了复核及控制点加密,对基础的基槽分别进行了放样及复核测量。
认真进行技术交底,重要工序交验、重要部位均经过参建各方的检查及重庆两江新区建设工程质量监督站的监督验收,方可进行下道工序施工。
从20xx年9月开工以来,施工单位对基础工程、主体工程、电气安装、给排水工程、消防工程工程进行施工,过程中分部分项工程的质量经过检查达到合格要求后,进行了分部分项工程的验收,验收符合建筑工程施工质量验收统一标准,均全部合格。
三、监理工作情况:我监理部根据项目特点设置了合理的项目监理部,配备了经验丰富的监理工程师,严格按设计图纸和相关施工验收规范进行监理,编制了本工程监理规划、监理实施细则等,用以指导现场监理工作。
为确保该工程合同规定的质量目标,我监理部在主体给排水及消防安装整个施工过程中,按照“监理规划”、“监理实施细则”、强制性标准和质量通病防治等进行严格监理,从施工技术准备到施工技术、管理活动运行全过程,对各分项工程质量进行了检查验收。
2024年建设单位竣工验收工作总结

2024年建设单位竣工验收工作总结2024年是建设单位竣工验收工作的重要一年,全年共完成了XX个项目的竣工验收任务。
在经过全体验收人员的共同努力下,圆满完成了各项任务,取得了一系列的重要成果。
下面对2024年建设单位竣工验收工作进行总结和回顾。
一、工作目标和任务2024年的建设单位竣工验收工作目标是按照政府要求和相关标准,确保工程质量安全,保障群众的生命财产安全。
主要任务包括对各项工程项目进行全面、细致的验收工作,确保工程达到设计要求和验收标准,并及时整改存在的问题,以提高建设单位的工程质量水平。
二、工作组织和领导在2024年的竣工验收工作中,我们成立了专门的工作组织和领导机构,确立了明确的任务分工和工作流程。
工作组织由主要负责人和相关部门代表组成,并设立项目验收组,负责具体的项目验收工作。
工作领导机构在验收过程中始终保持高度的工作热情和责任心,制定了科学合理的工作计划,并通过定期召开工作会议,及时解决工作中遇到的问题和难题。
三、工作方法和措施在2024年的竣工验收工作中,我们采取了一系列的工作方法和措施,确保工作的顺利进行。
主要包括:1. 制定详细的审核计划和验收标准,确保验收工作的透明和公正。
2. 加强对验收人员的培训和学习,提高他们的专业水平和业务能力。
3. 强化对建设单位的监督和管理,确保他们按照规定的标准和要求进行工程建设。
4. 加强与相关部门的沟通和联系,共同推进工作的顺利进行。
四、工作成果和亮点在2024年的竣工验收工作中,我们取得了一系列的工作成果和亮点,主要体现在以下几个方面:1. 完成了全部的竣工验收任务,所有工程项目均按时完成验收工作,没有出现工程质量和安全问题。
2. 在验收过程中,我们坚持公正、公平、公开的原则,严格按照相关标准和要求进行验收,确保了验收结果的客观和公正。
3. 在处理问题和整改方面,我们采取了及时、有效的措施,对于工程存在的问题进行了全面的整改和改进,确保工程质量的稳步提升。
竣工验收业主单位工作总结

竣工验收业主单位工作总结
近期,我们业主单位在竣工验收工作中取得了一定的成绩,现在我对这段时间
的工作进行总结,以便更好地指导今后的工作。
首先,我们在竣工验收工作中注重了团队合作。
在整个过程中,各部门之间密
切配合,相互协助,共同推动工作的顺利进行。
特别是在面对问题和挑战时,大家能够积极沟通,共同寻求解决方案,确保工作能够顺利完成。
其次,我们高度重视了质量管理。
在竣工验收工作中,我们始终把质量放在首位,严格按照相关标准和规定进行验收,确保项目的质量达到了预期的要求。
同时,我们也不断加强对施工过程中的质量控制,及时发现和解决问题,以保证项目的质量和安全。
另外,我们还积极开展了与相关部门的合作。
在竣工验收过程中,我们与监理
单位、设计单位、施工单位等各方保持了密切的联系和沟通,及时解决了各种问题,确保了竣工验收工作的顺利进行。
最后,我们也不断加强了自身的学习和提升。
在竣工验收工作中,我们不断总
结经验,吸取教训,不断提高自身的业务水平和管理能力,以更好地适应和应对各种复杂的工作情况。
总的来说,我们在竣工验收工作中取得了一定的成绩,但也存在一些不足之处。
希望在今后的工作中,我们能够进一步加强团队合作,提高质量管理水平,加强与相关部门的合作,不断提升自身的能力和素质,为业主单位的发展贡献更大的力量。
验收工作总结(精选5篇)

验收工作总结(精选5篇)验收篇1在分公司领导的信任和培养下,我于20__年月被任命为项目经理至今已有十个月的时间,在分公司的大力支持和关心下,项目部各项工作进展顺利,现就近一年来的工作总结如下:一、积极采取的措施,精心组织、精心管理1.进一步完善各项安全质量、完善管理体制通过多年来的施工生产实际,进一步完善安全、质量等管理体系,建立安全质量月检、旬检、日检制度及整改制度。
项目部除设立一名专职安全员外,各工区也层层设立专职安全员。
将安全工作提高到了前所未有的高度。
质量方面,绝不放松,强化强施工过程控制,坚持施工质量检查制度,严格执行“自检、互检、交接检”的三检制度,使质量问题在每道工序作业中都能得以有效控制。
2.完善激励机制,调动员工生产积极性通过完善内部承包机制、制定循环奖励措施及月目标任务考核奖等手段,极大的提高了员工的劳动积极性,部分的缓解了因资金紧张带来的消极影响。
3.提高生产效率,降低生产成本通过不断完善施工工艺,合理安排人员,精心组织,精心施工,在全体员工的努力下,施工产量不断提高,效率不断提升。
4.加强成本控制,强化数据管理,确保数据真实性项目部每月日定期召开成本分析会,认真分析上月存在的问题,找出不足,层层落实,下月改进,要求各项对比实现数据化,数据必须真实可靠,施工现场的每一个环节,层层控制,每道工序都做到有据可查,为了确保数据的准确性,做到每班质检工程师和领工员进行现场收方互相复核签认,确保了数据的真实性。
进场所有材料无论多晚,都由材料员签收,保证足额入库。
5.文明工地建设继续加现场文明施工管理,根据实际成立了第一文明施工班和第二文明施工班,总人数8人。
专门进行文明工地建设相关工作,保持工地卫生清洁,使道路干净畅通,尽量减少对周围居民和环境的影响。
各种设备物资标识齐全,堆放有序。
6.认真搞环保、水保工作积极与业主和地方水务、水保主管部门联系,主动邀请其进场检查,征求意见,逐步完善排污、水保方案、措施。
工程竣工工作总结

工程竣工工作总结(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、工作计划、演讲致辞、策划方案、合同协议、规章制度、条据文书、诗词鉴赏、教学资料、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as work summaries, work plans, speeches, planning plans, contract agreements, rules and regulations, doctrinal documents, poetry appreciation, teaching materials, other sample essays, etc. If you want to learn about different sample formats and writing methods, please stay tuned!工程竣工工作总结工程竣工工作总结(通用17篇)工程竣工工作总结篇1______年______月______日内蒙古德克斯有限公司10kV输配电工程随着变压器”嗡”的一声,标志着这个项目送电成功,所有的付出得到了回报,作为此工程的工程负责人,我的心情是很激动的。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
某住宅小区项目竣工验收工作总结(高级工程师薛增玉)一、基本概况# # #工程项目位于----,共计---栋住宅单体建筑,其中五层24栋、四层13栋、三层4栋,层高均为2.9米,总建筑面积95000平方米,--年--月份以后相继开工,--年--月全部竣工。
该期所包括楼号为:4#、5#、6#、9#、10#、11#、12#、17#、18#、19#、20#、21#、25#、26#、27#、28#、29#、37#、38#、39#、40#、41#、42#、43#、45#、46#、47#、48#、49#、54#、55#、56#、57#、58#、59#、60#、61#、62#、63#、64#、65#共41栋楼。
项目各参建单位有:●建设单位:开封市# # #开发有限公司●主体施工单位:开封市# # #建筑工程有限公司●节能施工单位:1、开封市# # #节能有限公司(承建4#、5#、6#、9#、10#、11#、12#、17#、18#、19#、20#、21#、25#、26#、27#、28#、29#、37#、38#、48#、49#、63#、64#、65#)2、河南# # #发展有限公司(承建39#、40#、41#、42#、43#、45#、46#、47#、54#、55#、56#、57#、58#、59#、60#、61#、62#)●设计单位:开封市# # #设计有限责任公司●勘察单位:开封市# # #设计院●监理单位:开封市# # #工程监理有限公司在各参建单位全体参建人员的共同努力下,较好的完成了本期工程施工任务,经开封市质量管理部门的验收评定,有15栋楼较为突出,获07年度“开封市优质结构奖”。
具体楼号如下:12#、26#、27#、37#、38#、42#、45#、46#、54#、57#、58#、58#、64#、65#及商务综合楼。
# # #工程部也被公司评为“年度优秀工程项目管理部门”。
二、工程检查验收工作的回顾检查验收工作贯穿于工程的整个施工过程中,回顾该项工作的开展,主要包括以下几项内容:1.进场材料的检查验收。
严扒进场材料关,是保证工程质量的前提,对所有进场的工程材料、设备、构配件除监理单位认真检查验收外,工程部主管人员同时进行检查验收,对一些关键材料如:电气配件、电缆电线、防水材料、给排水管材、屋面瓦、门窗等,指定厂家和品牌,或进行甩项专业承包,有效的规范了施工单位对合格材料的使用,为保证工程的质量奠定了基础。
2.隐蔽工程的验收。
隐蔽工程验收,是在施工过程中工程质量控制的重要环节。
主要包括:基础工程、钢筋混凝土工程、防水工程(屋面、卫生间)以及一些关键部位的预留预埋等均要进行隐蔽验收。
为加强该项工作的实施,首先由监理单位按照有关程序进行检查,若不符合要求,责令施工单位进行整改,若监理单位通过重新检验认为符合要求,再由工程部主管工程师进行复验,确认符合要求,均在隐蔽验收记录上签字,施工单位方可进行下道工序施工。
这样,加强了隐蔽工程的监督控制,有利于保证工程的内在质量。
3、检验批的检查验收。
该项工作主要由现场监理工程师完成,工程部管理人员进行监督。
严格按照验收规范的规定进行。
4、分项、分部工程的验收。
该工作是施工过程控制的关键环节,按照规定程序进行,分项工程由专业监理工程师负责组织进行,重要的分部工程监理单位组织,施工单位质量、技术负责人及设计单位项目负责人及工程部有关人员参加,共同验收,并形成验收资料文件,市质监站进行实体检测和验收,从而杜绝或减少了漏洞和隐患,保证了工程质量。
5、分户验收工作。
分户验收是近年来国家为加强住宅工程质量,减少客户投诉所采取的一项措施,开封市首批在一期工程进行试点。
因此,我们积累了一定的经验,在二期工程验收实践中,我们计划周全,认真分工,提前着手,分为两个时间段进行。
一是主体完成进行主体工程验收前进行,主要是对室内空间尺寸、轴线位置及墙体、砼观感质量等进行检测检查,发现问题进行及时整改和处理,避免了质量问题的进一步扩大;二是在工程竣工验收前进行分户验收,该阶段工作由工程部组织,分为四个小组:1.公共部分、外墙保温小组。
2.室内实测实量小组。
3.门窗工程小组。
4.水电验收小组。
每个小组均由甲方人员任组长,参加单位有:监理公司、施工单位、物业公司及外保温、塑钢窗、防盗门等各专业施工单位人员组成,每栋楼每一户均要进行验收。
是验收工作中集中人员最多,工程量最大,涉及面最宽、时间最长的检查验收。
每栋楼都经过了:初验——整改——复验——整改——再验——再整改——市质监站抽验——整改——物业公司再验收——再整改——分户验收完成。
在实际工作中,我们加强组织、每户必查、不走过场、仔细认真、不留死角,取得了较好的效果。
6、竣工预验收。
竣工预验收是单位工程竣工验收前,监理单位按程序应组织完成的验收工作,安排在分户验收之后,竣工验收之前完成。
按照规范要求的程序和标准进行,工程部配合及监督。
每栋楼均进行,验收整改合格后,监理单位总监理工程师签字及向甲方提供质量评估报告。
该项工作已按规定较好的完成。
7、单位工程竣工验收。
工程竣工验收是工程交付使用的最后一次验收,验收合格标志着工程施工过程的结束,质量保修期的开始。
在此阶段是在分户验收的基础上进行,由建设单位组织,其中分两次进行。
一次是--年--月--日,共29栋楼::12#、19#、21#、26#、27#、28#、29#、37#、38#、39#、40#、41#、42#、43#、45#、46#、47#、48#、49#、54#、55#、56#、57#、58#、59#、62#、63#、64#、65#。
第二次是07年--12月--日进行,共12栋楼,楼号为:4#、5#、6#、9#、10#、11#、17#、18#、20#、25#、60#、61#。
首先工程部编制了竣工验收方案,共分为三个验收组,分别是土建工程组、安装工程组、工程资料组。
建设单位、勘察单位、设计单位、监理单位、各施工单位及市质监站有关单位和人员参加。
在验收过程中,根据有关规定,重点做了以下要求:1、各分项工程的质量验收合格;2、分户验收合格;3、各控制资料完整、齐全,并装订成册;4、各种专项检测(例如:安全、消防、环境、保温、门窗等)符合要求并资料完整;5、观感质量符合要求;三、主体工程小结主体工程总承包单位为开封市# # #建筑工程有限公司,下设有17个项目经理部,具体为4#、10#、11#、20#楼项目部;5#、6#楼项目部;9#、17#楼项目部;12#、64#、65#楼项目部;18#、19#、25#楼项目部;26#、27#、37#、38#楼项目部;28#、29#、39#、40#楼项目部;41#62#楼项目部;21#63#楼项目部,42#、54#楼项目部;43#、55#楼项目部;56#、57#楼项目部;58#、59#楼项目部;60#、61#楼项目部;45#楼项目部;46#、47#楼项目部;48#、49#楼项目部。
总建筑面积约9.5万平方米,层高2.9米,设计抗震裂度7级。
在施工过程中严格按照有关程序和规范进行,其主要依据有:各专业施工图纸、标准规范、施工统一做法、变更单等文件。
工程测量定位由开封市规划部门及建设单位认定,地基采用C30砼,基础开挖后,经施工、监理、勘察、设计及建设单位检查,进行基槽验收,对地基不符合要求的,进行了相应的处理。
基础及钢筋砼施工中,监理单位对钢筋、水泥、砂、石和粘土砖等材料均进行见证取样、送样,并具有合格证及试验报告。
砼浇注前,施工单位自检合格后报验,监理工程师及建设单位工程管理人员,对现场施工人员、机械、材料等准备情况进行检查,并对钢筋工程、模板工程进行验收,全部符合要求后,签署浇注令,施工单位进行浇注。
浇注过程中监理人员进行旁站监督,发现问题及时整改。
该分部完成后,经有关单位验收合格,方可进入下道工序施工。
在砌体施工过程中,对砌体砂浆饱满度、拉结筋放置、轴线尺寸、砌体灰缝、垂直度、空心板搁置长度等,随机进行抽检,发现问题及时要求施工单位整改。
在主体施工过程中,采用了硬架支模技术。
硬架支模就是采用先安装空心板再浇注圈梁混凝土的新工艺。
可使楼板、板缝和圈梁形成整体,底面较平,观感佳,受力均匀。
并减少顺板裂缝,防止质量通病,提高建筑强度,降低房屋维修费用。
装饰装修工程施工质量,是保证工程观感质量合格,顺利交付使用的关键一环。
工程部对此非常重视,在施工前向各主体施工单位下发了“# # #工程装饰装修要求”。
在施工过程中对空鼓、裂纹、起皮、阴阳角顺直、防水及砂浆面层等进行严格检查,尽可能减少质量通病的发生。
在水电安装工程中,从基础开始即进行预留预埋管工作,严格按照图纸规定要求进行。
对一些关键水电材料指定厂家或品牌,对产品的材质、规格、安装坡度、垂直度、管卡设置等均进行认真检查。
特别是防雷接地的设置,管道的试压,通过试验,避水试验、绝缘遥测等都要严加控制和监督。
从而保证了安装工程的质量。
为了保证工程的顺利进行,我们十分重视工程施工资料的收集、整理和监督检查工作,每一个月就要对各楼号进行一次工程资料检查,发现有遗漏、不齐全,甚至错误的,由施工单位及时补充和整改,基本做到了质量与工程进度的同步,保证了整个工程的顺利进行。
四、建筑节能工程小结为了积极响应国家提出的大力发展节能型住宅要求,落实科学发展观,建设节约型社会,落实我省建筑节能工作的重要部署。
根据河南省建设厅实施建筑示范工程的指导意见,河南省建筑科学研究院受我公司委托,依据国家行业标准《外墙外保温工程技术规程》、《河南省居住建筑节能设计标准(寒冷地区)》进行了单体建筑结构节能设计,节能指标65%。
工程完成后,委托了河南省建筑节能测试中心进行了现场节能检测,结果显示,该项目能耗指标符合节能65%的设计标准。
同时,在#楼实施了节能70%指标的项目试点,目前项目已完成。
取得了较好的节能效果。
在项目实施中,我们重点采取了以下几方面技术和措施:1、墙体围护结构:除基础外,所有内、外墙体材料均为用黄河淤泥制备的KP1型烧结多孔砖,既降低了黄河河床高度,又减少了土地开挖量,节约了宝贵的土地资源。
这种由烧结多孔砖组成的内外墙围护结构,保温节能效果好。
2、外墙外保温技术:底层外墙(包括一层住宅板底)采用50㎜挤压聚苯乙烯泡沫塑料板(XPS)薄抹灰外墙外保温系统;一层以上外墙及阁楼层外墙采用聚苯乙烯泡沫塑料板(EPS)薄抹灰外墙外保温系统,根据不同的单体建筑的窗墙比及体型系数,外墙聚苯板厚度在40㎜-60㎜之间。
对于节能70%指标的#楼,全部采用80㎜厚EPS 板及抹灰系统。
3、节能门窗:外墙立面上的所有外门窗(含南、北阳台)均采用中空双层玻璃优质塑钢门窗。
因其空气夹层、框扇材料的传热系数小以及良好的密封性能,从而具有保温、隔热、隔声等多重功能。