四年级下册英语教学进度表和学期计划
黄田农场学校集体备课电子教案模板
组别:英语
姓名:柴小娟
2019-2020 学年第一学期
四年级英语下册学期教学计划
一、班级学生情况分析
四年级有3个班, 从学习情况来看,其中一个班学生的英语基础知识差,没有养成认真仔细的学习习惯,特别有几个学生作业不能自觉、认真、按时完成;在课外良好的学习习惯,独立认识单词及阅读能力差,两级分化较严重。
本学期将继续以培养学生学习习惯,缩小两极分化为重点。
在掌握教材所学知识的基础上进一步转化后进生,所以在教学中要特别注意改进教学方法,提高课堂效率,争取使每个学生在原有的基础上都有所进步。
二、教材分析
1.教材结构分析
本学期使用教材是义务教育小学教科书英语(第四册)(精通)(三年级起点),本册教材分为六个单元,两个复习单元。
2.教学内容分析
单元题目话题
Unit 1 Welcome to my new home! home things
Unit 2 There are forty students in our class? numbers
Unit 3 What subject do you like best? School subjects
Fun Time 1
Unit 4 There are seven days in a week. Weeks
Unit 5 What will you do this weekend? hobbies
Unit 6 Would you like to take a trip? Some animals
Fun Time 2
3.教学重难点分析
进行简单的交流关于家庭物品、数字、科目、星期、爱好、动物等几个话题,能用英语书写句子。
三、教学目标
1.知识技能目标
能听懂、会说12组会话,并能进行简单的交流;能听、说、认读60个单词和词组并能听、说、读、写61个单词和24个句子。
2.操作应用目标
能用英语进行关于学校、时间、衣服、天气、购物、农场动物、数字、颜色等几个话题的讨论,并简单运用。
3.情感态度价值观目标
强调语言的运用,注重能力的培养,突出了兴趣的激发,重视双向交流,融合学科内容,重视灵活扩展,实现整体设计。
四、主要教学措施
1.认真备课,钻研教材,抓紧课堂教学,做到当堂内容当堂掌握。
2.运用各种不同的肢体语言来辅助教学,巧用实物、头饰、卡片、chant 等来帮助进行单词教学。
3.在课堂上多开展一些有趣的活动、游戏让学生在活动中学习英语,在生活中学习英语。
4.多为学生营造一些学习氛围,如:创设英语角等等。
5.要求学生在课余时间尽量的运用已经学习的英语进行对话。
6.多看英语画报,多读英语故事,多看英语书籍。
7.多与学生交流,进行口语交际训练,融会话教学与情景表演之中。
四年级(下)英语教学进度计划表模板
6.8:点评练习,Unit 6 Part C, 复习Unit 2 let's spell 6.9-10: 单元检测
6.11-12: 剑桥Unit 4 , 复习Unit 2 Part B Let's play
学科: 英语 任教班级: 401、
402 日期
2019-2020学年第二学期教学进度计划表
周次
课时
备课内容
5月11日—5月17日 第1周
7
5.11:Unit 5 Let's spell 5.12:评讲练习
5.13: Unit 5Part B let's talk & let's act, 5.14:评讲练习
6月15日—6月21日 第6周
7
复习Unit 3, 单元综合测试
6月22日—6月28日 第7周
7
复习Unit 4, 单元综合测试
6月29日—7月5日 第8周
7
复习Unit 5, 单元综合测试
7月6日—7月12日 第9周
7
复习Unit 6, 单元综合测试
7月13日—7月19日 第10周
7
复习Unit 1, 单元综合测试
6月1日—6月7日 第4周
7
6月8日—6月14日 第5周
7
6.1Unit 6 Part B let's talk and let's act 6.2 点评练习, 复习Unit 2 Part A let's do 6.3 Unit 6 Part B let's learn and let's play
小学四年级英语老师2024下半年教学计划
小学四年级英语老师2024下半年教学计划教学计划:小学四年级英语目标:掌握四年级英语基础词汇、语法和语音,能够运用所学知识进行简单的交流和阅读。
时间:2024下半年课程安排:第一周:Unit 1 My School Life- 学习并熟悉课本中的基本词汇和句型- 学习并练习介绍自己和家人的表达方式- 进行角色扮演,模拟日常生活中的校园场景第二周:Unit 2 My Daily Routine- 学习并练习描述日常活动的动词短语- 学习并练习一般现在时的用法- 完成有关日常活动的练习和问答第三周:Unit 3 My Hobbies- 学习并练习描述爱好的形容词和名词- 学习并练习表示频率的副词- 分组展示自己的爱好,并描述自己的爱好的原因第四周:Unit 4 My Family- 学习并练习家庭成员的称呼和描述- 学习并练习描述人物外貌和个性特点的形容词- 完成有关家庭成员的问答和简短作文第五周:Unit 5 My Friends- 学习并练习描述朋友和同学的词汇和句型- 学习并练习询问和回答关于朋友和同学的问题- 完成有关朋友和同学的练习和小组讨论第六周:Unit 6 My Community- 学习并练习描述社区和地理位置的词汇和句型- 学习并练习方位介词的用法- 小组分工合作,描述自己所在社区的特点和活动第七周:复习和测试- 综合复习所学知识点- 进行小测验和口语测试,检验学生的掌握程度第八周:总结和展示- 总结本学期所学知识- 小组展示自编英语短剧或故事,展示学生英语交流能力以上仅为初步的教学计划,具体内容和细节还需根据学生的实际情况和掌握程度进行适当调整。
老师还可根据需要添加更多的语言游戏、口语练习和阅读材料,以提高学生的学习兴趣和语言能力。
小学四年级下册英语学期计划进度表
小学四年级下册英语学期计划进度表全文共10篇示例,供读者参考篇1Hello everyone! I'm so excited to share with you all my semester plan for the second half of my fourth grade English class. I have everything planned out, so let's get started!Week 1:- Review and practice vocabulary words- Learn new sight words- Practice reading short stories aloudWeek 2:- Introduce grammar concepts (nouns, verbs, adjectives)- Practice using these parts of speech in sentences- Complete a grammar worksheetWeek 3:- Read a new book or story as a class- Discuss the main idea and key details- Answer comprehension questions about the storyWeek 4:- Practice spelling words with different spelling patterns- Complete a spelling test- Review tricky spelling rulesWeek 5:- Introduce writing prompts- Write a short story or paragraph using the writing prompt - Share our stories with the classWeek 6:- Work on a group project- Present our project to the class- Reflect on what we learned from the projectWeek 7:- Practice listening comprehension with audio recordings - Answer questions about what we heard- Discuss any misunderstandings or questions we may haveWeek 8:- Review all the materials we've covered this semester- Prepare for a semester exam- Take the exam and celebrate all our hard work!I can't wait to dive into all of these fun and educational activities with my classmates. I know we'll all learn a lot and have a great time together. Let's make this semester one to remember!篇2Hello everyone! I'm so excited to share with you my plan for the second half of the fourth grade English semester.Week 1-2:- Review and practice vocabulary words from the first half of the semester- Start learning new vocabulary related to animals and nature- Work on improving reading comprehension skills with short stories and passagesWeek 3-4:- Continue learning about animals and nature vocabulary- Practice speaking skills by describing animals and their habitats- Start working on a group project about our favorite animalsWeek 5-6:- Focus on grammar and sentence structure with exercises and worksheets- Practice writing short paragraphs about our daily routines and favorite activities- Continue with the group project by researching and presenting information about our chosen animalsWeek 7-8:- Review all the topics covered so far in the semester- Prepare for a fun English language game day with quizzes and activities- Present our group projects to the class and learn from each other's researchI am looking forward to all the fun activities we have planned for the rest of the semester. Let's work hard and have a great time learning English together!篇3Hey guys! Today I want to share with you my semester plan for the second half of my fourth grade English class. So, here's what I have planned out for the next few months!First things first, I'm going to continue working on my vocabulary. I want to learn at least 10 new words every week and make flashcards to help me remember them. I'm also going to practice using these words in sentences so I can get better at writing and speaking in English.Next, I'm going to focus on my grammar skills. I want to improve my understanding of tenses, articles, and prepositions. I'm going to do some exercises in my workbook and ask my teacher for help if I get stuck.I also want to work on my reading and comprehension. I'm going to choose one book a month to read and do a book report on. This will help me improve my reading skills and learn new vocabulary at the same time.Finally, I want to practice speaking English with my classmates. We can have conversations in English during our breaks or work on English projects together. This will help me feel more confident speaking in English and improve my pronunciation.Overall, I'm really excited to work on my English skills this semester and I hope to see a lot of improvement by the end of the year. Wish me luck!篇4Hey guys! It's me again, your friend from fourth grade. I want to tell you all about our semester plan for English class. It's super exciting and we're going to learn so much together!First off, let me tell you about the topics we'll be learning this semester. We'll start with learning about different countries and their cultures. We'll talk about famous landmarks, traditional foods, and even learn a few words in different languages. It's going to be so cool!After that, we'll move on to learning about animals. We'll learn about different habitats, animal behaviors, and even do some fun projects like making animal masks or creating a mini zoo in class. I can't wait to learn all about my favorite animals!Next up, we'll dive into the world of science and technology. We'll learn about inventions, famous scientists, and even do some cool experiments in class. I hope we get to make slime or volcano eruptions – those are always the best!Towards the end of the semester, we'll focus on storytelling and writing. We'll learn how to create our own stories, write poetry, and even put on a mini play for the class. I'm so excited to show off my creative side and see what my friends come up with too.So, that's our plan for the semester. I hope you guys are as excited as I am to learn and have fun in English class. Let's work hard, help each other out, and make this semester the best one yet! Let's do this, fourth graders!篇5My English Semester Progress ReportHi everyone, my name is Lily and I'm in the fourth grade. Let me tell you about my English semester progress so far!In the beginning of the semester, we started off by reviewing all the things we learned in the previous grades. We refreshed our memory on vocabulary words, grammar rules, and basicsentence structures. It was a great way to ease back into the routine of learning English.As the weeks went by, we dove into more complex topics such as verb tenses, sentence expansion, and reading comprehension. I learned how to use present simple, past simple, and future tense verbs correctly in sentences. It was a bit tricky at first, but with lots of practice and help from my teacher, I finally got the hang of it!We also worked on expanding our sentences by adding adjectives, adverbs, and conjunctions. It was fun to play around with words and make my sentences more interesting and detailed. I even wrote a short story using all the new techniques I learned.One of the highlights of this semester was reading different types of texts and answering questions about them. I enjoyed reading short stories, poems, and informational texts. It helped me improve my reading comprehension skills and expand my vocabulary.Looking ahead, I'm excited to continue learning new things in English class. I can't wait to learn more about pronouns, prepositions, and different types of writing styles. I know it willbe challenging, but I'm ready to work hard and improve my English skills even more!Overall, I'm happy with my progress this semester and I'm proud of all the things I've learned so far. English class has been a lot of fun and I can't wait to see what the rest of the semester has in store for me!That's all for now, see you next time! Bye!篇6Hey guys! Today I'm gonna share with you my study plan for the second semester of Grade 4 English. I hope you guys can help me stick to it and make some progress together!Week 1:- Review of vocabulary from last semester- Learn new words related to animals and nature- Practice spelling and pronunciation- Listen to English songs and try to sing alongWeek 2:- Read a short story in English and summarize it- Learn some new grammar rules- Practice writing short sentences using the new grammar rules- Watch a English cartoon and try to understand the dialoguesWeek 3:- Practice speaking English with classmates during group activities- Learn about different cultures and countries where English is spoken- Write a short composition about my favorite animal- Have a mini English presentation in classWeek 4:- Review all the topics we learned so far- Take a mock test to assess my progress- Set goals for the next semester- Play English language games to make learning funI hope this plan can help me improve my English skills and become more confident in speaking and writing. Let's work hard together and make this semester a successful one! Go Grade 4 English students!篇7Hello everyone! I’m in the fourth grade and I’m here to share with you my semester plan for English class. I’m so excited to tell you about all the fun things we’ll be learning and doing!In the first month, we will focus on reviewing what we learned in the last semester. We will go over vocabulary words, grammar rules, and practice speaking and listening skills. I want to get really good at pronunciation and understanding English when people speak.In the second and third months, we will learn about different countries and cultures where English is spoken. I can’t wait to learn about the food, music, and traditions of countries like the United States, Canada, and Australia. It’s going to be so interesting!During the fourth and fifth months, we will dive deeper into grammar and writing. We’ll learn how to write a properparagraph with a topic sentence, supporting details, and a conclusion. I think it will be fun to practice writing stories and essays.In the sixth month, we will have a special project where we will work in groups to create a short play in English. I’m excited to perform in front of the class and show off my acting skills!I’m looking forward to a fun and challenging semester in English class. I hope I can improve my English skills and become more confident in speaking and writing. Let’s study hard and have a great time learning together!篇8Hello everyone! I'm so excited to share with you my schedule for the second half of the fourth grade English semester. Here's a look at what I have planned:Week 1: We will start off by reviewing our vocabulary words from last semester. I want to make sure we remember all those tricky words!Week 2: We will dive into our new unit on animals. We'll learn all about different types of animals and their habitats.Week 3: Time for some grammar practice! We'll be focusing on using the correct verb tense in sentences.Week 4: It's time for our first writing assignment. We will write a short paragraph about our favorite animal using the vocabulary words we've learned.Week 5: This week we will have a mini spelling bee to review our spelling words. I hope I can spell all the words correctly!Week 6: We will work on our reading comprehension skills by reading a short story and answering questions about it.Week 7: We are going to have a fun group project where we create a poster about an animal of our choice. I can't wait to show off my artistic skills!Week 8: It's time for our final exam. I will study hard so I can do my best on the test.I can't wait to learn and grow in English class this semester. I hope you all have a great semester too! Let's work hard and have fun together. Let's go, fourth grade English!篇9Hello everyone, I'm a fourth-grade student and today I want to share with you my semester plan for English class.First of all, I plan to review all the lessons we have learned in the first semester. I will go over the vocabulary words, grammar rules, and reading passages we studied. This will help me refresh my memory and reinforce what I have already learned.Next, I will focus on improving my speaking and listening skills. I will try to speak in English as much as possible, whether it's with my classmates or my teacher. I will also listen to English songs, watch English videos, and practice speaking on my own.In addition, I will work on my writing skills by writing short essays, letters, and stories in English. I will pay attention to my spelling, grammar, and organization of ideas. I want to become a better writer and express myself more clearly in English.Finally, I will continue to read English books and articles to expand my vocabulary and improve my comprehension skills. I will set a goal to finish a certain number of books by the end of the semester and keep track of my progress.Overall, I am excited to learn more about English and I am determined to make the most of this semester. I know that with hard work and dedication, I will be able to achieve my goals and become more confident in my English skills. Thank you for listening to my semester plan! Let's all work hard together and have a great semester!篇10Hello everyone! I'm a fourth grader and I want to share with you my plan for the second semester of the school year. Here is my schedule for English class:Week 1-2: Review and practice the past tensesIn these two weeks, we will review the past tenses such as simple past, past continuous, and past perfect. We will do exercises and play games to practice using these tenses correctly.Week 3-4: Learn about adjectives and adverbsDuring these two weeks, we will learn about adjectives and adverbs. We will learn how to use them to describe people, places, and things. We will do fun activities like describing our favorite things and places.Week 5-6: Focus on reading comprehensionIn these two weeks, we will focus on reading comprehension. We will practice reading passages and answering questions about them. We will also work on improving our reading speed and accuracy.Week 7-8: Work on speaking and listening skillsDuring these two weeks, we will work on improving our speaking and listening skills. We will have conversations with our classmates and practice listening to and understanding spoken English. We will also watch short videos and listen to English songs to improve our listening skills.Week 9-10: Review and prepare for the end-of-semester examIn the last two weeks of the semester, we will review everything we have learned so far and prepare for theend-of-semester exam. We will do practice tests and review our notes to make sure we are ready for the exam.I am really excited to learn all these new things in English class! I hope to improve my English skills and become more confident in speaking and writing in English. Thank you for reading my English semester plan!。
人教版小学四年级下册英语学科教学计划含进度表
学情分析 学生基本情况 学习情况
对于四年级的学生来说,通过半年多的学习,已有具备了一定的的英语语言基础。有着正确标准的语音语调,具备了基础的语感。绝大多数学生对英语学习有着浓厚的兴趣。课堂上学生学习积极,态度认真,能较好的完成课后作业。新的学期,他们也渴望学习获得更多的知识,以丰富自己的语言积累,提高使用英语会话和交际的能力
Unit2
What time is it ?
Time ; subjects ; meals
Unit3
Weather
Weather ;place
Recycle 1
Unit4
At a farm
Animas; number ; vegetables
Unit5
My clothes
Clothes ; colour
2、操作应用目标
能用英语进行关于学校、时间、衣服、天气、购物、农场动物、数字、颜色等几个话题的讨论,并简单运用。
3、情感态度价值观目标
强调语言的运用,注重能力的培养,突出了兴趣的激发,重视双向交流,融合学科内容,重视灵活扩展,实现整,抓紧课堂教学,做到当堂内容当堂掌握。
17
Shopping
6
Weather
18
Recycle 2
7
Recycle 1
19
Recycle 2
8
Recycle 1
20
期末复习
9
期中复习
21
期末复习
10
期中复习
22
期末考试
11
期中考试
12
At a farm
Unit6
Shopping
Clothes; number
四年级英语教学计划及进度表
四年级英语教学计划及进度表教学目标
- 培养学生的英语听、说、读、写基本技能。
- 提高学生的英语口语表达能力。
- 培养学生对英语研究的兴趣和积极性。
- 引导学生研究英语的正确方法和惯。
教学内容
1. 英语基础知识与语法规则。
2. 日常生活和交际用语。
3. 儿童文学及相关英语故事、歌曲和诗歌。
教学进度表
教学方法
- 教师讲授与学生互动结合,提高学生的参与度。
- 利用多媒体技术辅助教学,激发学生的研究兴趣。
- 运用游戏、竞赛等活动形式进行英语研究,增加趣味性。
- 运用小组合作研究和角色扮演的教学方式,培养学生的沟通能力。
教学评估方式
- 日常口头表现评估。
- 课堂练与作业评估。
- 期末考试评估。
- 学生互评与自评。
以上是四年级英语教学计划及进度表的内容,希望对您有所帮助!。
2020【新人教版】四年级英语(下册) 教学计划与教学进度表
小学20 -20 学年度第二学期学科教学计划四年级英语(下册)任教班级:任课教师:四年级下学期英语教学计划及教学进度一、指导思想全面贯彻党的教育方针,以立德树人铸就教育之魂。
倡导社会主义核心价值观,遵守教师职业道德,实施素质教育,真正关爱学生,认真研读《英语课程标准》,吃透教材,创设有利于英语学习的良好环境。
培养学生良好的英语学习兴趣,联系课堂内外教育资源,开展丰富多彩的英语学习活动,使学生在听说读写,各方面都能够得到有力的发展,使学生的基础知识和基本技能能够得到巩固,拓宽学生的视野,真正做到将英语学习转化为学生们的语言表达能力。
二、学情分析四年级学生正处于学习英语的最佳时期,也是培养学习习惯的关键时期。
从学生的状态来看,许多学生能够积极准备英语预习,认真完成教师布置的任务和作业,但对英语单词的发音不够准确,不能够很好掌握英语发音规则,部分同学因为基础较为薄弱,失去信心,没有了学习的兴趣,针对这种情况,我会在教学当中注意,增加趣味性,以此来提高学生对英语的学习兴趣,给学生进行适当减压,针对学生现状,在课堂上尽量以鼓励表扬为主,注重培养学习英语的兴趣,营造学英语的氛围,鼓励学生开口说英语、特别是给差生创造机会,让他们尝试成功的喜悦。
三、教材分析本学期学习新目标人教版四年级(下册)英语课本,涉及到日常生活当中各种各样的语言情境和语言环境,旨在引导学生,积累丰富的英语单词和英语句型,在听说读写各方面,能够有进一步的提高,教材编写融入了生活当中真实的场景,活学活用,使得学生更好地锻炼自己的口语表达能力。
Unit 1 My School.本单元的任务是掌握本单元的重点单词、重点短语及重点句型,了解字母组合er在单词中的发音规律。
能够简单地介绍学校设施的分布情况,学会使用感叹句。
Unit 2 What time is it? 本单元的任务是掌握本单元的重点单词、重点短语及功能句型。
能够正确运用功能句型和重点词汇描述自己的日常活动;能够掌握字母组合ir和ur的发音规则。
下学期四年级英语教学工作计划
下学期四年级英语教学工作计划一、教学目标1. 知识与技能:使学生掌握英语字母表,增加词汇量,能够听、说、读、写简单的英语句子,并能够进行简单的日常交流。
2. 过程与方法:通过情景教学、互动式学习等方法,激发学生的学习兴趣,培养学生的听说读写技能和跨文化交流能力。
3. 情感态度与价值观:培养学生对英语学习的兴趣和自信心,培养学生的合作精神和积极向上的学习态度。
二、教学内容1. 教材:人教版《PEP小学英语》四年级下册。
2. 教学主题:本学期共八个主题,分别为:家庭成员、动物、食物、季节、节日、身体部位、服装和交通工具。
3. 教学重点:字母表、单词、日常用语和简单句型的学习。
三、教学方法1. 情景教学法:通过设定各种真实的生活场景,让学生在实际语境中学习英语,提高学生的语言运用能力。
2. 互动式学习法:鼓励学生积极参与课堂活动,进行小组讨论和角色扮演,提高学生的口语表达能力和团队协作能力。
3. 任务型教学法:通过完成各种实际任务,让学生在实践中学习英语,提高学生的综合语言运用能力。
四、教学安排1. 每周三节英语课,共计16周。
2. 每节课40分钟,其中:20分钟为新知识的学习和练习,20分钟为课堂互动和作业布置。
3. 每周进行一次小测验,每月进行一次单元测试。
五、评价方法1. 课堂表现评价:对学生在课堂上的参与度、听说读写技能和团队协作能力进行评价。
2. 测验成绩评价:通过定期的小测验和单元测试,对学生的学习成绩进行评价。
3. 学生互评:鼓励学生互相评价,促进学生的自我提高和共同进步。
六、教学保障1. 加强教师培训:提高教师的专业水平和教学能力,确保教学质量。
2. 优化教学资源:整合各种教学资源,为学生提供丰富的学习材料。
3. 加强家校沟通:及时与家长沟通学生的学习情况,共同关注学生的成长。
4. 创设良好的学习氛围:营造轻松、愉快的学习环境,使学生能够在愉悦的情感状态下学习英语。
四年级下册英语教学计划及进度表
四年级下册英语教学计划及进度表教学计划:1. Unit 1: My School Life- Vocabulary: school subjects, school facilities, school uniforms- Grammar: present simple tense (affirmative and negative), time adverbs- Skills: listening, speaking, reading, writing- Activities: classroom discussion, role play, reading comprehension, writing a school diary entry2. Unit 2: Sports and Hobbies- Vocabulary: sports and hobbies, equipment and accessories, action verbs- Grammar: present continuous tense (affirmative and negative), frequency adverbs- Skills: listening, speaking, reading, writing- Activities: group discussion, action game, reading comprehension, writing a short paragraph about a favorite hobby or sport3. Unit 3: Family and Friends- Vocabulary: family members, personal pronouns, possessive adjectives, descriptive adjectives- Grammar: there is/are, possessive 's- Skills: listening, speaking, reading, writing- Activities: family photo sharing, describing friends and relatives, reading comprehension, writing a family tree4. Unit 4: Food and Nutrition- Vocabulary: food items, meals, food groups, cooking verbs- Grammar: countable and uncountable nouns, modal verb should - Skills: listening, speaking, reading, writing- Activities: food tasting, meal planning, reading comprehension, writing a healthy eating guide5. Unit 5: Animals and Nature- Vocabulary: animals, habitats, nature, environmental issues- Grammar: present simple tense (questions and negatives), prepositions of place- Skills: listening, speaking, reading, writing- Activities: animal and habitat matching game, nature walk and journaling, reading comprehension, writing a letter to a local environmental organization进度表:Week 1-2: Unit 1 - My School Life- Discuss school subjects and facilities- Learn present simple tense (affirmative and negative)- Learn time adverbs- Practice reading and writing school-related vocabulary- Write a school diary entryWeek 3-4: Unit 2 - Sports and Hobbies- Play an action game to reinforce vocabulary- Learn present continuous tense (affirmative and negative)- Practice frequency adverbs- Discuss favorite hobbies and sports- Write a paragraph about a favorite hobby or sportWeek 5-6: Unit 3 - Family and Friends- Share family photos and describe family members- Learn possessive adjectives and personal pronouns- Discuss possessive 's- Write a family treeWeek 7-8: Unit 4 - Food and Nutrition- Plan and prepare healthy meals- Learn countable and uncountable nouns- Practice using the modal verb should- Write a healthy eating guideWeek 9-10: Unit 5 - Animals and Nature- Explore local habitats and identify animals- Learn present simple tense (questions and negatives)- Discuss prepositions of place- Write a letter to a local environmental organizationNote: This is just a sample schedule and may vary depending on the pace and needs of the class.。
最新PEP小学英语四年级下册教学计划及进度表
教学任务及
大学生个性化消费增多是一种趋势。当前社会、经济飞速发展,各种新的消费品不断增多,流行文化时尚飞速变化,处于校园与社会两者之间的大学生肯定会受影响。目前在大学校园,电脑、手机、CD、MP3、录音笔被称为大学生的“五件武器”。除了实用,这也是一种表明自己生活优越的炫耀性的东西。现下很大一部分大学生中的“负债消费”表现的典型的超前享乐和及时行乐——其消费项目多半是用于奢侈浪费的非必要生活消耗。如举办生日宴会、打网球、保龄球、上舞厅跳舞、进夜总会唱“卡拉OK”等。“负债消费”使很多学生耽于物欲,发展严重者轻则引起经济纠纷,动武斗殴,影响同窗友谊,重则引发犯罪事件,于社会治安不利。要求
8课时
3周
Unit 2
What time is it?
8课时
3周
Unit 3
Is this your skirt?
8课时
3周
Recycle One
3课时
1周
Unit 4
It’s warm today
8课时
3周
Unit5
最新人教PEP版小学英语四年级下册教学计划及教学进度安排表(3)
最新人教PEP版小学英语四年级下册教学计划XXXX—XXXX学年度第二学期一、学生情况分析1、学生基本情况四年级3班共有43名学生,其中男生26人,女生17人。
本学期转进0人。
四年级4班共有44名学生,其中男生26人,女生18人。
本学期转进0人。
2、原有成绩分析大部分学生能掌握所学基本的语言知识,能够听懂会说所学单词及一些简短的对话,阅读一些较简单的对话和小故事。
能够规范书写26个字母,认读相关单词。
通过上学期的学习,学生对英语产生了浓厚的兴趣,但部分学生的学习习惯有待于进一步规范。
3、学困生情况分析四年级学生正处在儿童向少年过渡的时期,这个年龄段的孩子具有好奇、好活动、爱表现、善模仿等特点。
他们喜欢新鲜事物,对陌生语言的好奇心能激起他们对外语的兴趣。
他们喜欢引起别人的注意,重视老师的表扬,不怕犯错,很少有羞怯感。
他们处在发育阶段,尚未定性,发音器官较成人的灵活,因此模仿外语的语音语调远比成年人容易。
他们的记忆力好,形象思维好,但缺乏理性思维,逻辑思维不强。
部分学生还未形成良好的学习习惯,课堂上时常出现不专心听讲,交头接耳,做小动作等现象。
因此,应把培养学生良好的学习习惯作为提升学业成绩的前提来抓。
二、教学内容本册教材共有6个新授单元,2个复习单元,内容涉及学校、时间、衣服、天气、购物、农场动物、数字、颜色等几个话题。
其中每个新授单元均分为三大块,A部分包括Let’s learn,用来巩固单词的Let’s do,以Let’s learn所学词汇为主题的对话Let’s talk,以掌握单词、句子为主要目标的Read and write。
B部分是对A部分内容的深化和拓展,二者一脉相承。
C部分为选学内容,包括语音训练,歌曲教学、趣味故事教学等。
2个复习单元是对前面三个单元知识的重组、整合和升华。
1.能听懂、会说12组会话,并能进行简单的交流。
2.能听、说、认读60个单词和词组并能听、说、读、写61个单词和24个句子(包括学校、时间、衣服、天气、购物、农场动物、数字、颜色等几个话题),并简单运用。