文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的实用资料,如实习报告、述职报告、工作总结、工作计划、心得体会、演讲稿、作文大全、申请书、自我鉴定、其他资料等等,想了解不同资料格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor.I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of practical materials for everyone, such as internship reports, job reports, work summaries, work plans, reflections, speeches, essay summaries, application forms,self-evaluation, and other materials. If you want to learn about different data formats and writing methods, please stay tuned!年度项目工作总结报告6篇有效的工作总结能够激发大家提升工作动力,工作中存在问题是难免的,在工作总结中做好分析记录才能帮助自己成长,下面是本店铺为您分享的年度项目工作总结报告6篇,感谢您的参阅。
项目工作总结报告范文1500字通用10篇

项目工作总结报告范文1500字通用10篇项目工作总结报告范文【篇1】今年上半年,市委、市政府继续坚定不移地强化重点项目建设在拉动投资增长和带动经济发展的重中之重地位,不断健全管理制度,完善工作机制,落实目标责任,强化工作协调,以重点项目的持续建设实现全市经济的稳定健康发展,全市重点项目保持平稳较快推进态势,成为全市固定资产投资较快增长的重要支撑力量。
现将工作情况总结如下:一、全市重点项目进展情况上半年以来,全市共实施第一批重点项目共45个,总投资259.57亿元,年度计划投资134.18亿元。
其中,开工建设39个,完成投资56.54亿元,占年度计划的42.14%,低于时间进度7.86个百分点。
1、工业项目,完成投资34.74亿元,占年度计划的53.2%,高于时间进度3.2个百分点。
其中21个项目开工在建,万洋免维护蓄电池项目、天昱太阳能玻璃项目、天利太阳能光伏玻璃项目、贝迪空调高效热泵换热器项目、矿用电器井下救生舱项目、科灵电器开关及煤矿监控系统、台翔化工纳米氧化锌项目、金利稀贵金属回收项目等13个项目超时间进度,豫光多金属综合回收、中联新型干法水泥熟料生产线、金马苯加氢项目等9个项目开工后,迟迟形不成施工高潮,进度较慢。
中原特钢高洁净重型机械装备项目、恒通集团PVC深加工产业园、金马焦化年产12万吨炭黑项目、卡朱米时装年产100万套羽绒服项目等项目因规划设计等问题开工时间未定。
2、交通电力项目,完成投资13.83亿元,占年度计划的31.71%,低于时间进度18.29个百分点。
其中,济源大道拓宽改建项目、东、西二环路项目完成投资快于时间进度,方山至坡头道路改建工程、220千伏南岭输变电站项目、沁北电厂三期项目等进度较慢。
3、城建项目,完成投资4.37亿元,占年度计划的45.56%,低于时间进度4.44个百分点。
其中玉川集聚区基础设施建设项目、贰仟家汽车产业园项目完成投资快于时间进度。
黄河路绿化工程,电信公司通信枢纽楼工程等进展较慢。
项目总结报告(精选11篇)

项目总结报告(精选11篇)项目总结报告报告格式一般包括:①标题②主送机关③正文④结尾等四个部分组成。
具体如下:一、标题,包括事由和公文名称。
二、主送机关,发文单位的直属上级领导机关。
三、正文,结构与一般公文相同。
从内容方面看,报情况的,应有情况、说明、结论三部分,其中情况不能省略。
四、结尾,可展望、预测,亦可省略,但结语不能省。
项目总结报告(精选11篇)在现实生活中,报告的适用范围越来越广泛,我们在写报告的时候要注意逻辑的合理性。
那么报告应该怎么写才合适呢?下面是小编帮大家整理的项目总结报告(精选11篇),欢迎大家借鉴与参考,希望对大家有所帮助。
项目总结报告1xxx工程总建筑面积为5174.88㎡,计划投资450万元。
本工程为框架结构,建筑层数为7层。
本工程1#楼于20xx年11月7日正式开工建设,计划于20xx年5月7竣工验收并交付使用。
2#楼于20xx 年11月26日开工建设,计划于20xx年5月26日竣工验收并交付使用。
开工以来,在公司领导的关心和同事们支持帮忙下,我项目部全体员工坚持贯彻公司“质量第一,过程精品;安全第一,预防为主;礼貌施工,保护环境,以人为本,员工健康”的指导方针,精心组织,严密施工,经过项目部全体成员的共同努力,取得了必须的成绩,年度完成总投资约150万元。
现将开工以来的工作总结如下:一、20xx年工作回顾开工以来,我项目部严格按照公司的工作计划部署,认真抓好项目各项管理工作,已经完成的工程质量、安全均到达合格要求。
(一)抓好项目部建设管理工作1、项目部建设管理。
为了圆满完成施工任务,我们近公司项目管理规定要求,组建了xxx工程项目部,进取完善各项规章制度,落实工作职责,明确了“干优质工程、创一流业绩、让业主满意、为公司争光”的工作目标,组织精兵强将全力以赴投入工程的施工,确保工程能够按计划、有步骤地进行。
2、认真制定工作方案。
为了使施工管理工作顺利开展,项目部根据施工总进度计划的要求,认真制定好工作计划,将工作任务经过施工管理人员落实到班组,落实到个人。
公司项目总结报告(4篇)

公司项目总结报告(4篇)公司项目总结报告(通用4篇)公司项目总结报告篇1项目总结报告是项目管理过程中的最后一个重要文件,项目团队要找出项目和项目管理的成功、失败之处及其原因,研究项目使用过的方法和技术有哪些值得推广。
同时,写出项目总结报告,并召开总结会,总结经验教训。
项目总结报告中一般包括如下内容:1.项目绩效。
将项目的完成情况与计划要实现的目标进行比较,来评价项目的实施结果,并提出项目管理的一系列建议。
2.管理绩效。
记录项目管理过程中出现的问题及解决的方式,并总结管理经验。
3.项目组织结构。
在项目总结报告中,应对项目组织结构的优缺点进行评价,并指出其对项目进展的促进或制约作用。
4.项目团队。
对项目团队成员的表现、成员之间的沟通及相互合作精神进行评价.5.项目管理技术的运用。
项目总结报告要对项目中运用的项目管理技术,如预算技术、计划技术、资源分配技术和控制技术等,进行检查和总结。
如果这些管理技术运用得不够恰当,不能有效地推动项目的进展,也应在此提出改进建议。
项目总结报告的最后递交,即标志着项目的最终结束.公司项目总结报告篇2一、工作情况(一)年初,一场突如其来的凝冻灾害袭击了华夏大地,电站也出现大范围雨雪冰冻天气,对担负着电站引水发电系统尾水工程的九局项目部生活造成了严重影响。
不仅断水断电,而且各种物质出现严重短缺。
面对如此严峻的局面,在项目部领导班子的大力支持下,工会组织充分发挥其职能,在广大职工队伍和民工队伍中宣传公司的自救方针政策,号召全体职工以主人翁精神积极投入“抗凝冻、保生产”的战斗中去。
项目经理、副经理、党委书记以及工会主席模范带头,动用装载机、铁铲、锄头等工具,出动100多人次对场内2#公路、大桥、油库至变电站路段进行全面的除冰保电行动,经过从早上8点到中午12点近5个小时的奋战,场内的交通全部恢复,确保了生产生活的正常运行。
同时,由项目部党委喻书记、副经理、工会张主席组成的慰问小组,对项目部5个分包商队伍进行了慰问,给他们送去了猪肉、油、大米、蔬菜等物品。
项目工作总结报告6篇

项目工作总结报告6篇项目工作总结报告 1一、--年的工作情况总结(一)明确任务、开拓创新,有计划、有组织地抓好施工生产--年对我们广州工程处来说是极不平凡的一年,也是我历年来在生产组织上最为困难的一年。
由于受雨季时间长、施工作业面紧张、地方关系协调困难等诸多不利因素的影响,始终制约生产的全面展开。
面对困难,我一面分析生产形势,积极采取措施,协调好各方面的关系,充分挖掘和调动各方面潜力,千方百计保证了施工生产的顺利进行,较为圆满地完成了各项施工生产任务。
1、强化生产准备的充分性。
针对工程项目点多面广,战线较长、施工难度大的实际情况,重点抓了施工前的组织准备、材料准备以及设备、施工机具准备,体现施工准备的充分性,争取了主动。
及时的组织技术、材料、预算等部门对施工方案进行敲定,明确了工期、质量、安全目标,为完成生产任务奠定了基础。
2、强化生产组织的严密性。
针对工程施工任务量较大,始终坚持生产例会制度,定措施,抓落实,提要求,解决实际问题,及时确定各机组每个阶段的生产组织重点环节。
多次组织召开现场协调会和专业办公会,帮助机组科学合理地安排施工顺序,研究和确定了施工方案和施工计划,确保了各机组今年生产任务的完成。
3、强化生产计划的严肃性。
我主要抓了生产计划的执行和考核,对生产会议确定的各项目阶段性工期,加大了督查力度,并采取超常规措施,及时纠正偏差,确定整体目标和阶段目标,明确主攻方向,突出重点,各个击破,取得了明显效果。
4、强化施工管理文明的有序性。
在施工管理中主要狠抓了现场文明施工管理,要求按高起点、高标准、高水平运行,做到规范、整洁,对现场文明施工、样板起步一抓到底。
实践证明:抓而不紧等于没抓,抓而不实等于白抓。
通过对现场管理的常抓不懈,各机组的施工现场均达到了文明施工标准,树立了公司好的品牌与形象,受到了业主的普遍好评。
5、靠前指挥,及时解决问题。
在施工季节,为了及时掌握各项目生产的第一手材料,并与项目部同事一起深入工地,靠前指挥、靠前指导、靠前协调、靠前服务,进一步加强监督和检查的力度。
项目工作总结报告8篇

项目工作总结报告 8 篇-随着时间的流逝,我们要认真写一份总结报告来分析自己的工作情况,记录总结报告的时候,用词是非常严谨的,需要结合自身情况,以下是大学生范文网小编精心为您推荐的项目工作总结报告精选 8 篇,供大家参考。
项目工作总结报告篇 1光阴似箭,时间如梭。
转眼间上班已经一年多了,回首过去的一年,内心不禁万千。
我于 201*年9 月14 日进入 xx 集团置业公司,并于 9 月23 日进驻百货大楼项目工地担任项目经理,至今已三个月有余。
在这 3 个月的工作中,项目部在集团置业公司的大力支持、指导下,克服了诸多困难,走到今天,极为不易。
目前工地正处于打桩阶段,现已完成桩基施工任务的 46%,下一步的施工任务虽然异常艰巨,但还是有信心有能力完成各阶段工期目标。
下面我将 201* 年 3 个月以来的工作情况及下一年的工作计划做以下汇报:一、前期施工准备阶段百货大楼工程作为 xx 县的招商引资项目,只要有利于工程施工进度,基本上都能得到政府的支持与帮助,但开工之前还必须完成以下工作,才能顺利开工。
1、地下室控制边线放样。
2、建筑物放线。
3、规划部门进行验线工作。
4、将测绘部门提供的水准点、坐标控制点提交总包单位。
两次组织基坑支护施工图设计交底及图纸会审。
6、桩基施工图设计交底及图纸会审。
7、规划部门提供本项目周边市政管线图纸。
8、协助完成工地临时用电量不足扩容工作。
9、开工前去质安站办理质量监督手续事宜。
二、施工阶段打桩施工前,场地内基坑土方已开挖约两米五深,由于当时没有施工图纸,大部分地方均未开挖到位。
考虑到四周靠边一排桩施工有足够的工作面,需要土方开挖单位的配合将余土挖除。
土方开挖单位很长一段时间都不配合我司的工作安排,与我方保持对立情绪,甚至发展到来工地闹事,工地工作一度无法开展。
经过我方耐心细致、不厌其烦地努力去沟通,同时了解到当地其他工地的土方开挖单价,zui 终通过奖励的方式才与土方开挖单位达成协议。
工程项目工作总结报告(14篇)
工程项目工作总结报告(14篇)(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如合同协议、演讲致辞、述职报告、心得体会、工作总结、工作计划、自我鉴定、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as contract agreements, speeches, job reports, insights, work summaries, work plans, self-evaluation, teaching materials, complete essays, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!工程项目工作总结报告(14篇)总结是对一段时间内取得的成绩、存在的问题、经验教训进行全面系统的总结。
项目部总结报告8篇
项目部总结报告8篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如致辞演讲、工作计划、心得体会、条据文书、汇报材料、规章制度、合同协议、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, work plans, reflections, written documents, reporting materials, rules and regulations, contract agreements, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!项目部总结报告8篇实用的总结报告是能够帮助我们不断进步的,具体地认识这段时间的工作情况,写总结报告的同时要理清以后的工作思路,本店铺今天就为您带来了项目部总结报告8篇,相信一定会对你有所帮助。
项目总结报告书(通用5篇)
项目总结报告书项目总结报告书(通用5篇)在不断进步的时代,报告的适用范围越来越广泛,不同的报告内容同样也是不同的。
相信许多人会觉得报告很难写吧,下面是小编收集整理的项目总结报告书,欢迎阅读,希望大家能够喜欢。
项目总结报告书篇1高等职业学校提升专业服务产业发展能力项目总结报告在中央财政的大力支持下,在省教育厅的正确领导下,运城护理职业学院全体教职工经过近一年的共同努力,使我院护理专业实训基地在原有的基础上又跃进了一大步,为本地及周边地区护理职业教育的发展做出更大贡献。
根据教育厅关于报送“高等职业学校提升专业服务产业发展能力项目”执行情况的说明要求,下面就我院建设项目的执行情况报告如下:一、项目概况(一)项目简介 20xx年8月,我院护理专业被教育部、财政部确定为“中央财政支持高等职业学校提升专业服务产业发展能力”项目,在这一年中,为实现项目建设的总体目标,按照我院提出的把护理专业建成骨干专业、品牌专业的发展规划,根据《建设方案》的具体要求,我院创新人才培养模式、加强师资队伍建设、有序推进项目建设,努力培养适合现代化社会需要的、具有护理技术和现代服务理念的高素质技能型护理人才。
在中央财政的大力支持下,我院全面实行院校对接,强化实践育人,推行“一贯穿、两一体,三融合”一体化培养模式。
20xx年将迎来我院第一届毕业生步入社会,通过建立初步完善的第三方人才培养质量评价体系,力求使我院毕业生能够获得高的就业率和用人单位的欢迎。
近期,按照《建设方案》要求,学院对建设项目的总体任务、各子项目完成情况、建设效益、专项经费决算等进行了全面自查。
自查结果表明,建设经费方面,配套资金及时到位,财政资金使用严格按规定执行,无违规行为。
资金效益明显。
基本实现了预期建设目标,与建设之前相比,特色鲜明,成效凸显,学院办学实力和社会影响力明显提升。
(二)进展与管理建设之初,我院升格不满一年,正处于转型跨越发展之关键时期,虽然朝气蓬勃,但也存在诸多矛盾与问题,例如,人才培养模式及其课程体系与岗位素质和技能需求不相适应,护生数量多与教师人数寡、实训设备数量少之间的矛盾,护理专业教师职业能力的滞后问题,校企合作、岗位对接的差距问题等,学院正是在发展机遇与严峻挑战同在、办学优势与困难问题并存的基础上开始启动中央财政支持建设项目。
项目部优秀的工作总结报告6篇
项目部优秀的工作总结报告6篇项目部优秀的工作总结报告 (1) 自从今年6月份到__弘阳三万顷工程部,半年来,在同事的帮助和领导的关怀下,完成了各项工作,也学到了很多新的知识。
参与了弘阳三万顷29栋改造工程建设,本人严格遵守公司制定的工程部部门规章制度及土建专业工程师岗位职责指导自己的行为,自律遵守工作流程及工作程序,接受工程部经理的领导与安排,积极努力工作,兢兢业业,在相关领导的指导下,较为圆满地完成了工程中所承担的职责。
总结以往工作,具体如下:1、现场管理1技术、质量方面:以施工图纸、施工验收规范、相关图集及标准为依据,严格规范总包单位的日常技术管理及质量验收工作,注重过程控制。
因工程特殊性,在工程技术、质量方面存在较多问题,但是通过与本工程负责人及领导保持联系,及时反馈现场存在的质量问题,处理并解决工程中相关的技术、质量问题,保证本工程的顺利进行。
2进度控制:严格要求总包单位结合工程情况及时制定施工进度计划,并监督其执行。
及时跟进现场人员出勤情况,反馈给各专业工程师,督促总包单位合理调配人员完成进度计划,从效果上看,除了样板石材因大板、线条的样品确认滞后致使工程进度不很理想外,其他分项工程基本上处于进度受控的状态。
3安全施工方面:安全管理是管理工作的重中之重,工作中,重点要求总包单位对脚手架搭设、现场安全用电、临边防护等重点环节加强管理,并在现场巡视中,将发现的问题及时与相关单位沟通指正并监督其整改落实。
过程中,与工程部领导多次对工地现场安全文明大检查,汇总存在的安全问题及时跟踪整改,并下发了几份安全生产方面的工作联系单。
从现状看,安全方面总体较好,未出现较为严重的安全事故。
4文明施工方面,因为项目本身为改造工程,建筑不定期的拆除老结构,现场经常存在大量建筑垃圾,管理的难度较大。
在施工进行中,与施工总包及分包单位及时沟通、协调,取得了一定的效果,但也还存在着不足。
文明施工关系着安全工作的顺利进行以及整个项目的对外形象,所以,在今后工作中要加大管理力度,力争在此方面有所突破。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
立项代码:
科技型中小企业技术创新基金项目
验收材料
项目名称:
项目承担单位:
项目性质:地方立项无偿资助类
项目的执行期:年月至年月
项目联系人:
联系电话:
申请验收时间:年月
***有限责任公司
二○一年月日
***项目工作总结报告
自20 年月起,至20 年月止,公司承担的科技型中小企业技术创新基金无偿资助项目——(以下简称本项目),历时年,现已顺利完成。
现将项目实施情况总结如下:
一、项目资金落实与支出情况
(一)项目资金落实情况
表1-1 项目资金计划与落实情况对照表(单位:万元)
截止20 年月,项目实际完成投资万元,其中:创新基金资助万元,自筹资金万元,地方科技经费支持万元。
(二)资金支出情况
在项目资金的管理上,我公司严格按照《科技型中小企业技术创新基金项目管理暂行办法》、《科技型中小企业技术创新基金财务管理暂行办法》及现代企业财务制度的有关规定,对项目所有资金实行单独核算,将公司自筹资金和科技部创新基金管理中心拨付的资金,作为专项应付款处理。
其中:消耗部分予以核销,形成资产部分转入资本公积。
项目资金用于本项目研究开发及中试阶段的必要开支,收支清晰。
主要包括人工费、仪器设备购置和安装费、商业软件购置费、租赁费、试制费、材料费、燃料及动力费、鉴定验收费、培训费等与本项目直接相关的支出。
表1-2 项目资金支出明细表
(单位:万元)
二、项目产品开发进度与取得成果情况
本项目执行期为20 年月至20 年月,共分三个阶段实施。
截止20 年月,各阶段实际完成内容和已达到的目标如下:
(一)第一阶段:中试前期(20 年月-20 年月)
进度指标:完成项目后期技术开发,购置设备。
技术开发指标:验证关键技术的工艺性、可靠性、稳定性。
资金落实额:。
生产建设情况:完成设备购置和安装。
实现销售收入:0万元。
(二)第二阶段:中试后期(20 年月至)
进度指标:试生产阶段
技术开发指标:
资金落实额:
生产建设情况:
实现销售收入:
(三)第三阶段:中试生产(20 年月至)
进度指标:进行产品中试生产,实现项目经济指标
技术开发指标:
资金落实额:
生产建设情况:
实现销售收入:
三、项目产品市场开拓与销售情况
四、合同技术、经济、质量、资产指标完成情况
截止201 年月,本项目已全部完成合同规定的各项指标任务。
见表。
表4-1 合同技术、经济、质量、资产指标规定与完成情况对照表
说明:
五、项目执行过程中存在问题
(一)项目执行过程中存在的问题:流动资金紧缺。
原因:
1、产品供不应求,本项目急需迅速扩大生产能力,才能迅速占领新开发的市场并巩固原有市场。
2、产品品种规格繁多,企业必须保持大量库存的行业特性决定库存占用大量流动资金。
(二)解决措施:
1、请求本项目未到位资金及时到位。
2、通过各种渠道,多方面筹集资金,解决流动资金紧缺困难。
六、其他相关说明:无。
七、相关附件
(一)《创新基金项目专项审计报告》。
(二)基金项目合同执行期内本项目取得的各类成果证明材料复印件
专利证书
产品鉴定证书
权威机构测试报告
产品照片
(三)资产负债表和损益表原件
*****有限责任公司
二○一年月日。