施工常用英语
公路工程施工专业英语词汇

公路桥梁Ganger 工长Skilled labour 技工Operator for heavy...重型设备操作工Welder 焊工Propel 推进驱动Concrete mixer 混凝土搅拌机Stone crushing plant 破碎系统Asphalt plant 沥青系统Grader 平地机In figures 小写In words 大写Bitumen 沥青柏油Bitumen distributor 沥青撒布工Portable pump 手提式泵Diameter 直径semi diameter Excavator/backhoe 反铲Welding machine 焊机Cement 水泥Aggregate 骨料Earth works 土石方工程Clearing and grubbing 清理Cutting and removal of tree 移植Unsuitable material 不合格料Disposal 处置Stockpile 储备堆放Back fill 回填Cladding layer 覆盖层Girth 周长围长Borrow pit in arranged land 借土Swamp 沼泽湿地Sub-grade works 路基工程improved sub-grade 路基改善Fine aggregate 细骨料1st class bricks 1级砖Dismantle portions 拆除部分Brick Masonry 砖砌结构Pavement works 路面工程Repair of Pothole 坑洼坑洞修补Milling of exiting pavement 刨除现有路面Sub-base 底基层Bituminous Prime Coat 沥青透层Bituminous Tack Coat 沥青粘结层Wearing Course 磨耗层Base Course 基层Sole agent 独家代理Bored piles 钻孔灌注桩Plug 插头塞住Carry out 执行Load test 荷载测试Pilot 飞行员试点的Strain 张力拉紧Dynamic 应变力lateral load 侧向荷载Grade beam 地基梁Flyover 天桥立交桥Culvert 涵洞Pier 桥墩码头Pedestal 底座基座Superstructure 上部结构Sub structure 下部结构Box girder 箱梁Crane girder 吊车梁Pres tress 预应力Strand 线串prestressing strands Expansion joint 伸缩缝Seal 封闭strip sealElastic 弹性的松紧带Bearing of bridge 支座Friction 摩擦Slab 板Incidental 附带的杂项Catch pit 积水坑Bedding 垫层mortar bedding 砂浆垫层Kerb 路缘石Gutter 排水沟Fiber 纤维Filter 过滤Crash barrier 防撞栏Triangle traffic signs 三角交通标志round Aluminum 铝铝的Plaster 石膏Hook 挂钩钩住Tile 瓷砖瓦片White washing 刷白Polish 抛光Lime 石灰Panel (仪表/控制)面板小组Stainless steel 不锈钢Rusty 生锈的Copper 铜Sensor device 感言装置Sanitary 卫生的Oriental 东方的Commode 马桶洗脸台wash basinFuse 融合熔断保险丝Arrester 避雷器lightning protectionCircuit breaker 断路器Blade 叶片Exhaust 排出排气使精疲力尽Split 分开分离劈开Slot 插槽Laboratory 试验室Road base 路基Gravel 碎石Bank guarantee 银行保函unlimited competitive open biding 公开招标security company 担保公司payment guarantee 支付保函cost plan 成本计划client´s requirements业主要求offer 报价quotationbid evaluation 评标Audit 审核review commentDefect 缺陷preventive action 预防措施Bearing platform 承台Bench mark 水准点Bending strength 抗弯强度Bent cap 盖梁Annual average daily traffic 年平均日交通量Aerial photogrammetry 航空摄影测量Admixture 外加剂Abutment 桥台Bituminous surface treatment 沥青表处Toll system 收费系统Traffic flow 交通流量traffic volumeCumulative toll revenue 累计收费Toll station 收费站Toll rate 收费标准Adjustment for toll rate 收费调整Preference 优先偏爱GDP growth forecast 经济增长预测Historic economic statistic(record)历史经济数据Daily record 日报表Traffic survey 交通调查Traffic composition 交通组成Traffic density 交通密度Peak(design) hourly volume 高峰(设计)小时交通量Base year 基年Planned road network 规划路网Parallel road 平行路网Base/optimistic/conservative case 基本/乐观/保守方案。
(完整版)工程英语词汇

(完整版)工程英语词汇一、基础工程词汇1. 工程:Engineering2. 项目:Project3. 设计:Design4. 施工:Construction5. 监理:Supervision6. 材料:Material7. 结构:Structure8. 质量:Quality9. 安全:Safety10. 进度:Schedule二、土木工程词汇1. 土壤:Soil2. 基础:Foundation3. 桥梁:Bridge4. 隧道:Tunnel5. 路面:Pavement6. 水利:Hydraulic Engineering7. 港口:Harbor8. 道路:Road9. 铁路:Railway10. 地铁:Subway三、建筑工程词汇1. 建筑物:Building2. 楼层:Floor3. 墙体:Wall4. 屋顶:Roof5. 窗户:Window6. 门:Door7. 楼梯:Stairs8. 幕墙: Curtain Wall9. 装修:Decoration10. 室内设计:Interior Design四、电气工程词汇1. 电路:Circuit2. 电线:Wire3. 开关:Switch4. 插座:Outlet5. 发电机:Generator6. 变压器:Transformer7. 电动机:Motor8. 电池:Battery9. 照明:Illumination10. 控制系统:Control System五、机械工程词汇1. 机械:Machine2. 零件:Part3. 轴承:Bearing4. 齿轮:Gear5. 润滑:Lubrication6. 紧固件:Fastener7. 焊接:Welding8. 冲压:Stamping9. 加工:Machining10. 装配:Assembly六、环境工程词汇1. 环境:Environment2. 污染:Pollution3. 废水:Wastewater4. 废气:Waste Gas5. 噪音:Noise6. 固体废物:Solid Waste7. 污染治理:Pollution Control8. 节能:Energy Saving9. 环保:Environmental Protection10. 可持续发展:Sustainable Development七、信息技术工程词汇1. 信息技术:Information Technology (IT)2. 网络:Network3. 服务器:Server4. 数据库:Database5. 编程:Programming6. 软件开发:Software Development7. 硬件:Hardware8. 云计算:Cloud Computing9. 大数据:Big Data八、化学工程词汇1. 化学反应:Chemical Reaction2. 流体力学:Fluid Mechanics3. 热力学:Thermodynamics4. 分离过程:Separation Process5. 反应器:Reactor6. 材料 science:Material Science7. 质量传递:Mass Transfer8. 能量传递:Energy Transfer9. 过程控制:Process Control10. 安全工程:Safety Engineering九、航空航天工程词汇1. 航空:Aeronautics2. 航天:Astronautics3. 飞行器:Aircraft4. 发射:Launch5. 航天器:Spacecraft6. 导航:Navigation7. 飞行控制系统:Flight Control System8. 火箭:Rocket9. 卫星:Satellite10. 航天站:Space Station十、生物医学工程词汇1. 生物医学:Biomedical2. 生物材料:Biomaterial3. 医疗设备:Medical Device4. 生物力学:Biomechanics5. 细胞工程:Cell Engineering6. 基因工程:Genetic Engineering7. 仿生学:Bionics8. 生物传感器:Biosensor9. 医学影像:Medical Imaging10. 组织工程:Tissue Engineering十一、项目管理词汇1. 项目管理:Project Management2. 项目经理:Project Manager3. 项目规划:Project Planning4. 项目预算:Project Budget5. 项目进度:Project Schedule6. 风险管理:Risk Management7. 质量管理:Quality Management8. 成本控制:Cost Control9. 团队协作:Team Collaboration10. 项目交付:Project Delivery十二、建筑信息模型(BIM)词汇1. 建筑信息模型:Building Information Modeling (BIM)2. 三维模型:3D Model3. 四维建模:4D Modeling(时间维度)4. 五维建模:5D Modeling(成本维度)5. BIM软件:BIM Software6. 模型协调:Model Coordination7. 数字化施工:Digital Construction8. BIM协作:BIM Collaboration9. 可视化:Visualization10. 仿真分析:Simulation Analysis十三、绿色建筑与可持续性词汇1. 绿色建筑:Green Building2. 可持续性:Sustainability3. 节能:Energy Efficiency4. 碳排放:Carbon Emission5. 绿色认证:Green Certification6. 生态设计:Esign7. 资源循环:Resource Recycling8. 生物多样性:Biodiversity9. 低影响开发:Low Impact Development (LID)10. 环境生命周期评估:Environmental Life Cycle Assessment十四、电子工程与自动化词汇1. 电子工程:Electronics Engineering2. 电路板:Circuit Board3. 集成电路:Integrated Circuit (IC)4. 传感器:Sensor5. 自动化:Automation6. 控制系统:Control System7. 技术:Robotics8. 伺服电机:Servo Motor9. 可编程逻辑控制器:Programmable Logic Controller (PLC)10. 工业互联网:Industrial Internet of Things (IIoT)十五、地质工程与矿业词汇1. 地质工程:Geological Engineering2. 地层:Stratum3. 岩土工程:Geotechnical Engineering4. 钻探:Drilling5. 矿业:Mining6. 采掘:Excavation7. 岩石力学:Rock Mechanics8. 地下水:Groundwater9. 防滑坡:Landslide Prevention10. 矿物加工:Mineral Processing。
铁塔基础施工中常见英语

施工中常见英语1、施工工具挖掘机Grab:[græb]搅拌机Mix Machine:[miks][mə'ʃin]振动棒Vibrating Spear:['vaibreit][spiə]打夯机Tamping Machine:['tæmpiŋ] [mə'ʃin]铁锹Shovel:['ʃʌvl]料斗Hopper:['hɔpə]尺Meter:['mi:tə]水管Water pipe(透明软管,测平整度用):['wɔ:tə][paip]2、施工材料混凝土配合比Concrete Mixing Ratio:['kɔnkri:t]['miksiŋ]['reiʃəu]水泥Cement:[si'ment]石子Carpolite 、Gravel:['grævəl]砂子Sand:[sænd]水Water钢筋Reinforcing Steel bar:[,ri:in'fɔ:s] [sti:l][bɑ:]地脚螺栓Anchor bolt:['æŋkə][bəult]螺母Nut:[nʌt]定位模板Template:['templit]接地材料Grounding Material:['graundiŋ][mə'tiəriəl]角钢Angle Steel:['æŋgl] [sti:l]扁铁Flat Iron:[flæt]['aiən]3、施工过程定位放线Orientation and measurement:[,ɔ:rien'teiʃən] ['meʒəmənt]基坑Foundation Ditch:[faun'deiʃən][ditʃ]基坑开挖Excavate Pit:['ekskəveit][pit]基坑检查back-check of pit:['bæk,tʃek][pit]坑底平整level off of pit bottom:['levl][ɔ:f] [pit]['bɔtəm]垫层(浇筑)lean concrete (Cast in situ):[li:n]['kɔnkri:t]钢筋绑扎Colligation for steel bar:[kɔli'geiʃən] [sti:l][bɑ:]地脚螺栓固定Anchor bolts of Fixing ['æŋkə][bəult]['fiksiŋ]模板支设和拆除Formwork of Fixing and backout:[fɔ:m\wə:k] [ɔv] ['fiksiŋ混凝土浇筑Cast in situ concrete:[kɑ:st][in][situ] ['kɔnkri:t]混凝土搅拌Concrete of Mixing ['kɔnkri:t] ['miksiŋ]图纸Layout 、Drawing、Design:['leiaut]、['drɔ:iŋ]、[di'zain]开工Start working:[stɑ:t]['wə:kiŋ]完成Complete:[kəm'pli:t]工程Project:[prə'dʒekt]宽、长、深、高度width、length、depth、height:[widθ]、[leŋθ]、[depθ]、[hait]标高Elevation:[,eli'veiʃən]基础Foundation:[faun'deiʃən]焊接Welding:[weldiŋ]防锈的Antirust:[,ænti'rʌst]保护层Cover layer:['kʌvə]['leiə]回填土Backfill:['bækfil]夯实Tamp:[tæmp]征地land acquisition:[lænd][,ækwi'ziʃən]检查check:[tʃek]。
工程施工常用英语

工程施工常用英语1. Construction Site1.1 Construction site: a piece of ground where construction work is taking place.1.2 Site layout: The arrangement of structures, utilities, and equipment on a construction site.1.3 Temporary facilities: Temporary structures set up on a construction site to facilitate the construction process, such as temporary offices, restrooms, and storage areas.1.4 Safety signs: Signs placed around a construction site to warn workers and visitors of potential hazards.1.5 Site amenities: Facilities provided on a construction site for the comfort and convenience of workers, such as break areas, water coolers, and restrooms.2. Construction Equipment2.1 Excavator: A large machine used for digging and moving earth and rocks.2.2 Bulldozer: A heavy-duty machine equipped with a wide metal blade used for pushing earth and rocks.2.3 Crane: A tall, long-armed machine used for lifting heavy materials and equipment on a construction site.2.4 Concrete mixer: A machine used to mix and transport concrete on a construction site.2.5 Forklift: A small vehicle equipped with a lifting mechanism used for moving heavy materials and equipment.3. Construction Materials3.1 Concrete: A mixture of cement, water, and aggregate used as a building material.3.2 Steel: A strong and durable metal commonly used in construction for structural elements.3.3 Wood: A versatile material used for framing, finishing, and other construction purposes.3.4 Bricks: Small rectangular blocks made of clay or concrete used for building walls, pavements, and other structures.3.5 Asphalt: A black, sticky substance used for surfacing roads and pavements.4. Construction Processes4.1 Excavation: The process of digging and removing earth and rocks from a construction site.4.2 Foundation: The base of a building that supports the structure and distributes its weight to the ground.4.3 Framing: The process of constructing the basic structure of a building using wood or steel beams.4.4 Roofing: The process of installing a protective covering over a building to prevent water infiltration.4.5 Finishing: The final stage of construction that involves painting, flooring, and other cosmetic touches.5. Construction Safety5.1 Personal protective equipment (PPE): Clothing and equipment worn by workers to protect them from workplace hazards.5.2 Fall protection: Measures taken to prevent workers from falling from elevated surfaces, such as guardrails and safety harnesses.5.3 Hazard communication: The process of informing workers about potential hazards in the workplace and how to avoid them.5.4 Emergency response: Procedures put in place to respond to accidents, injuries, and other emergencies on a construction site.5.5 OSHA regulations: Safety guidelines set by the Occupational Safety and Health Administration to protect workers on construction sites.6. Construction Management6.1 Project manager: The person responsible for overseeing a construction project from start to finish.6.2 Scheduling: The process of creating a timeline for a construction project and assigning tasks to workers to ensure it is completed on time.6.3 Budgeting: The process of estimating and tracking the costs of a construction project to ensure it stays within budget.6.4 Quality control: Measures taken to ensure that construction work meets industry standards and client expectations.6.5 Subcontractors: Workers hired by the main contractor to perform specific tasks on a construction project.7. Construction Communication7.1 Daily reports: Written reports submitted by workers at the end of each workday detailing progress, issues, and other relevant information.7.2 Meetings: Scheduled gatherings of project stakeholders to discuss progress, address issues, and make decisions about a construction project.7.3 Email: Electronic messages sent between project stakeholders to communicate important information about a construction project.7.4 Phone calls: Conversations held between project stakeholders over the phone to discuss urgent matters related to a construction project.7.5 Documentation: Written records of important information related to a construction project, such as contracts, permits, and plans.8. Construction Challenges8.1 Weather: Adverse weather conditions, such as rain, snow, and extreme temperatures, can delay construction work and impact worker safety.8.2 Supply chain disruptions: Issues with the timely delivery of construction materials and equipment can cause delays and increase costs.8.3 Regulatory compliance: Meeting government regulations and building codes can be challenging and time-consuming for construction projects.8.4 Labor shortages: Shortages of skilled workers in the construction industry can make it difficult to complete projects on time and within budget.8.5 Design changes: Changes to the original plans and specifications of a construction project can lead to delays, cost overruns, and conflicts among stakeholders.In conclusion, construction projects involve a wide range of processes, materials, equipment, and challenges that require effective management, communication, and safety measures to ensure successful completion. By understanding and addressing these common aspects of engineering construction, project stakeholders can work together to achieve their goals and deliver high-quality, safe, and cost-effective projects.。
英语日常用语——施工现场

英语日常用语——施工现场ON CONSTRUCTION SITE1、Welcome to our construction site.2、Glad to have you here.3、Our job site(施工现场)is over there/here.4、It is very simple and crude here. Do not mind, please.这里很简陋,别介意。
5、Come in, please. Be quick. Just a minute, please. Take care.6、I am a site engineer (director, workshop head, chief of section, foreman, worker, staff member).工地工程师(厂长、车间主任、班组长、领工、工人、职员)7、May I introduce our chief engineer to you. (总工程师)8、Mr.Wang is responsible for this task.. 负责这项工作任务9、I am in charge of this section. 我负责这个工段。
10、Here is our engineering office (drawing office, control room, laboratory, meeting room, common room, rest room).这是我们的工程技术办公室(绘图室、调度室、实验室、会议室、座谈室、休息室)11、Sit down, please. Let us have a rest.12、Have some tea (cold drink, ice-sucker 冰棒).13、I have some thing(question) to ask of you.14、Would you please tell us something about this?15、Thanks for your kindness. 感谢费心!Thanks for your help.16、The shift will start at half past seven a.m.早班从7点半开始。
工程常用词汇(英语)

工程常用词汇(英语)一、基础建筑结构类。
1. beam [biːm] (n.) 梁;横梁。
- 例句:The beam supports the weight of the upper floors.(这根梁支撑着上面楼层的重量。
)2. column ['kɒləm] (n.) 柱;圆柱。
- 例句:There are several columns in the hall.(大厅里有几根柱子。
)3. foundation [faʊn'deɪʃ(ə)n] (n.) 基础;地基。
- 例句:A good foundation is essential for the stability of the building.(良好的地基对建筑物的稳定性至关重要。
)4. slab [slæb] (n.) 平板;厚板。
- 例句:The concrete slab forms the floor of the building.(混凝土板构成了建筑物的地面。
)5. wall [wɔːl] (n.) 墙;墙壁。
- 例句:The wall divides the two rooms.(这面墙把两个房间隔开。
)二、建筑材料类。
1. concrete ['kɒŋkriːt] (n.) 混凝土;(adj.) 混凝土的;实在的;具体的。
- 例句:The building is made of concrete.(这座建筑物是由混凝土建造的。
)- 例句:We need a concrete plan.(我们需要一个具体的计划。
)2. steel [stiːl] (n.) 钢;钢铁。
- 例句:The bridge is made of steel.(这座桥是由钢铁制成的。
)3. brick [brɪk] (n.) 砖;砖块。
- 例句:The old house was built with bricks.(这座老房子是用砖砌成的。
工程施工常见英语单词

1. Construction - 施工2. Project - 项目3. Engineer - 工程师4. Contractor - 承包商5. Architect - 建筑师6. Supervisor - 监理7. Blueprint - 建筑图纸8. Foundation - 基础9. Column - 柱子10. Beam - 梁11. Slab - 楼板12. Wall - 墙体13. Roof - 屋顶14. Floor - 地板15. Ceiling - 天花板16. Flooring - 地板材料17. Partition - 墙隔断18. Stairs - 楼梯19. Elevator - 电梯20. Door - 门21. Window - 窗户22. HVAC - 供暖、通风和空调系统23. Electrical - 电气24. Plumbing - 给排水25. Concrete - 混凝土26. Steel - 钢筋27. Reinforcement - 砼加固28. Grout - 填缝料29. Trench - 挖沟30. Excavation - 挖掘31. Backfill - 回填32. Foundation excavation - 基础挖掘33. Foundation trench - 基础沟槽34. Footing - 承台35. Piling - 桩基36. Soil - 土壤37. Grading - 土方平整38. Compaction - 压实39. Drainage - 排水40. Drainage system - 排水系统41. Pipeline - 管道42. Pipe - 管子43. Valve - 阀门44. Faucet - 水龙头45. Faucet installation - 水龙头安装46. Pump - 泵47. Electrical installation - 电气安装48. Lighting - 照明49. Socket - 插座50. Cable - 电缆51. Transformer - 变压器52. Generator - 发电机53. Welding - 焊接54. Cutting - 切割55. Drilling - 钻孔56. Grinding - 磨削57. Sawing - 锯切58. Painting - 涂装59. Waterproofing - 防水60. Insulation - 隔热以上单词只是工程施工中常见的一部分,实际应用中还会遇到更多专业术语。
施工现场英语

施工现场英语常用单词1、土建部分场平施工:Field flat construction推土机:bulldozer挖掘机:excavator基础开挖:Foundation excavation基础浇筑:Foundation casting钢筋:reinforced steel混凝土:concrete模板:template水泥:cement砂:sand骨料:aggregate振捣器:vibrator搅拌机:mixer梁:beam柱:column联系梁:Connecting grider水泥砂浆地面:Cement mortar floors地砖:Floor tile防火门:Fire doors独立基础:Independent foundation电焊机:welding machine钢筋弯曲机:Reinforced bending machine切割机:Cutting machine铁锹:shovels钢钎:Steel chisel空压机:air compressor镐:pickaxe散水:apron放坡:Put slope檩条:purline屋面:roofing装修:fitment;Decoration2、线路部分铁塔:Tower导线:wire; conductor绝缘子:insulator耐张线夹:tension clamp悬垂线夹:suspension clamp横担:cross arm; pole arm架空地线:Overhead ground架空导线:Overhead conductor接地线:Earth wire接地极:Grounding wire; earth electrode; earthing pole接地电阻:Earth resistance线路通道:Transmission line passage way分坑复测:retest in separate pits全站仪:total station经纬仪:theodolite塔尺:sliding staff钢卷尺:steel measure tape3、电气安装部分高压开关柜:High-voltage switchgear低压开关柜:Low-voltage switchgear断路器:Breaker; Disconnector熔断器:Fuse plug隔离开关:Isolating switch一次接线:Once circuit二次接线:Secondary circuit接线端子:Wire connecting terminal号牌机:Paddle before machine槽钢:Channel steelCT、PT:Current Transformer; Potential Transformer避雷器:Lighting arrester额定电流:Rated current额定电压:Rated voltage。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
施工常用英语一.问候和介绍greetings and introductions1.Welcome to China. 欢迎你到中国来!2.Welcome to our job site. 欢迎你到我们工地来!3.Allow me to introduce myself,my name is Li Han. 请允许我自我介绍,我的名字叫李汉.•4.What is your specialty?你的专业是什么?•5.My technical specialty is civil engineering. 我的技术专业是土建工程.• chemical engineering 化工工程process 工艺• mechanical equipment 机械设备electrical 电气• instrumentation 仪表piping 管道• welding 焊接furnace building 筑炉• corrosion prevention 防腐thermal-insulation 保温• heating-ventilation 采暖通风quality control 质量控制6.I am a mechanist.• 我是一名机械工. electrician 电工pipe layer 管工welder 焊工carpenter 木工turner 车工blacksmith 煅工builder 建筑工人erector 安装工人riveter 铆工rigger 起重工concrete worker 混凝土工engine-driver 司机repair worker 修理工 7.I am a manager. 我是经理.project manager 项目经理resident construction manager 驻工地总代表construction superintendent 工地主任controller 管理员staff member 职员engineer 工程师technician 技术员economist 经济员supervisor 检查员foreman 工长worker 工人8.I wish we shall have a friendly cooperation in coming days.希望我们合作愉快!二.天气和环境weather and environment1.It is very fine today,the weather is suitable for our work.今天天气很好,适合我们工作.2.It is not at all a nice day. It will be getting colder.天气一点也不好,要变冷了.3. We can not continue the outdoor work, because it is raining now.因为正在下雨,我们不能继续在室外工作.4.It is going to snow tomorrow, some measures must be taken to prevent freezing. 明天将下雪,为预防冰冻必须采取一些措施.5.The lifting work on site will be compelled to stop,owing to the strong wind(dense fog). 由于强风(浓雾),现场起重吊装工作将被迫停止.6.If it should rain tomorrow,the work would be postponed for some days. 如果明天下雨,工作就要延期几天.7.we have a nap after lunch in hot season.热天午餐后,我们有一个午睡时间.8.What is the weather forecast for today?今天天气预报怎样?9.The weatherman says: the highest temperature during the day will be twenty one degrees centigrade.天气预报员说:今天白天最高气温为摄氏二十一度.10.The temperature will drop to five above (below) zero tonight.今晚温度将降至零上(下)五度.11.There is an equipment in front of the building.在建筑物前面有一台设备.behind the water tower 在水塔后面under the pipe rack 在管廊下面on the floor 在地面上inside the steel structure 在钢结构里面in the workshop 在车间内12.Our construction site is north of Nanjing, near the Changjiang River.我们的工地在南京以北,靠近长江.三.在会议上at the meeting1.Our meeting will be next Tuesday at eight o’ clock.我们的会议将在下星期二八点举行.2.We want to change our meeting from Monday to Wednesday.我们想把会议由星期一改为星期三.3.Sit down, please. Have a cigarette and a cup of tea.请坐,请抽烟、喝茶.4.Which issues shall we discuss today?我们今天讨论哪些问题?5.Today we shall discuss the question of hydraulic test.今天我们将讨论水压试验问题.6.Please give us your opinion.请把你的意见告诉我们.7.We must know your opinion.我们必须知道你的意见.8.Do you agree with me?你同意我的意见吗?----I agree.----I disagree.----I agree with you,but with some reservations.9.Your suggestion suits us.We agree.你的建议适合我们,我们同意.10.We are willing to accept your suggestion.我们乐于采纳你的建议.11.Please forgive me.We have different views on this.Our opinion is…请原谅.我们对此有不同的看法.我们的意见是…12.I am very sorry,but I disagree with you.我很抱歉,我不同意你说的.13.Thanks for the advice,but this is something we have to figure out ourselves.感谢你的建议,但此事我们要自己考虑一下.14.We must act according to the contract.我们应该按照合同办事.15.Let us discuss these problems one by one (step by step).让我们一个一个地(一步一步地)讨论这些问题.16.I do not see any point in discussing the question any further.我认为进一步讨论此事没有必要.17.Shall we have a break?我们休息一下好吗?18.We hold the opinion of our own.我们坚持我们的意见.19.We have not got fully determined.我们尚未完全决定.20.This problem must be reported to the higher level, they have the final say to make decisions. 这个问题应该呈报上级,由他们作最后决定.21.Your side will be held responsible for all the consequences arising from that. 由此产生的一切后果由你方负责.22.Let us draft a resolution about it.让我们为此起草一项协议.23.Please sign your name to the minutes of the meeting.请在会议记录上签字.24.We shall meet again tomorrow morning.我们明天早上接着开会.四.工程项目engineering project1.A project execution is usually divided into some elementary phases,such as: engineering,procurement and transportation and field construction.一个工程项目的实施通常可分为几个基本阶段:工程设计、采购和运输、以及现场施工.2.We are building an ethylene plant with an annual capacity of 300,000 metric tons. 我们正在建设一座年产30万吨的乙烯工厂.3.The contract number of this project is CJC78-8.这个项目的合同号是CJC78-8.4. We can contract to build turn-key plant,undertake single items of projects as a subcontractor or provide labor services.我们可以承建成套工厂或分包单项工程或提供劳务.5.Are you the Seller’s Representative on the job site?你是卖方的现场代表吗?6.I am the Buyer’s General Representative.我是买方的总代表.7.The project team normally consists of project engineer, design engineer, schedule engineer and various specialists.项目工作组通常包括项目工程师、设计工程师、计划工程师、以及各类专家.8.It is an inquiry about this project.这是这个项目的询价书.commercial and technical proposal 商务和技术报价书approval 批准书agreement 协议protocol 会议记录annex 附加条件technical appendix 技术附件9.There are many information in the technical proposal,including: process flow, process description, capacity of the plant, performance of the product.技术报价书中有很多资料,包括:工艺流程、工艺说明、生产能力、产品特性等.10.We can evaluate the results of field construction by four criteria, which are quality,time,cost and safety.我们可以通过四个指标来评价现场施工的完成情况,即质量、进度、费用和安全.五.计划与进度planning and scheduling1.We should work according to the overall schedule chart of the project.我们应该按照工程项目的总进度表工作.2.The effective date of this contract will begin from June first,nineteen ninety-eight. 这个合同的有效期将从一九九八年六月一日开始.3.Our major planning items contain estimating of cost and construction schedule. 我们主要的计划工作项目包括费用预算和施工进度.4.This contract plant will start-up on November thirtieth this year.这座合同工厂将于今年十一月三十日开车.5.The date of acceptance of this plant will be August twenty-eight,nineteen ninety-eight. 这座工厂的交工验收期定在一九九八年八月二十八日.6.Every month we shall establish construction schedule.每个月我们都要制定建设进度计划.7.We shall also make the project schedule report every day.我们也将每天提出项目进度报告.8.The Seller will provide preliminary (final) technical documents for Buyerin May. 卖方将于五月份向买方提供初步(最终)技术文件.9.On our most projects Critical Path Method (CPM) is used for schedule. 在我们的大多数工程项目中都采用“统筹法”(简称CPM)安排计划.10.We have to change our plan for lack of materials.因缺少材料,我们只能改变计划.11.What is your suggestion about this schedule?你对这个计划进度有何建议?六.技术资料和图纸technical documents and drawings1.This is a plot plan drawing. 这是一张平面布置图.general layout drawing 总平面图general arrangement drawing 总布置图detail drawing 细部图section drawing 剖面图erection drawing 安装图flow sheet drawing 流程图assembly drawing 装配图civil drawing 土建图electrical drawing 电气图control and instrumentation drawing 自控和仪表图projection drawing 投影图piping drawing 配管图2.How many drawings are there in the set?这套图纸有几张?3.Is this a copy for reproduction?这是一份底图吗?4.Is this a revised edition?这是修订版吗?5.There are various types of lines on the drawing such as: border lines, visible lines, invisible lines, section lines, center lines, extension lines, dimension lines, break lines, phantom lines.图上有各种形式的线条,诸如:过框线、实线、虚线、剖面线、中心线、引出线、尺寸线、断裂线、假想线。