品管中英文名词对照表(doc 20)
中英文单词对照表

一、品质专业词汇Quality Professional GlossaryQC Quality Control (品质管控)IQC Incoming Quality Control (进料品质管控)IPQC In process Quality Control (制程品质管控)FQC Final Quality Control (终点品质管控)OQC Output Quality Control (最终出货品质管控)QA Quality Assurance (质量保证)TQC Total Quality Control (全面质量管理)FAA First Article Assurance (首件确认)POC Passage Quality Control (段检)OQA Output Quality Assurance (出货质量保证)QE Quality engineering (品质工程)QI Quality Improvement (品质改善)ACC Accept (允收) REE Reject (拒收)AOD Accept On Deviation (特采)CR Critical (极严重的)MAJ Major (主要的)MIN Minor (轻微的)AQL Acceptable Quality Level (品质允收水准)S/S Sample size (抽样检验样本大小)CAR Corrective Action Request (矫正措施要求)C/R Corrective Action (矫正措施)ECN Engineering Change Notes (工程变更通知)(供应商)ECO Engineering Change Order (工程改动要求)(客户)PCN Process Change Notice (工序改动通知)PMP Product Management Plan (生产管制计划)SIP Specification In Process (制程检验规格)SOP Standard Operation Procedure (制造作业规范)IS Inspection Specification (成品检验规范)BOM Bill Of Material (物料清单)PS Package Specification (包装规范)SPEC Specification (规格)CCC China Compulsory Certificate(中国强制认证)QCC Quality Control Circle (品管圈)QIT Quality Improvement Team (品质改善小组)QP Quality Policy (质量方针)QT Quality Target (质量目标)OK OK (好,合格)NG Not Good (不行,不合格)Lot (批) Lot Size (批量)Sample(样本) Sampling(抽样)Defect (缺陷)Inspection(检验)PDCA Plan Do Check Action (计划执行检查总结)5W1H When Where Who What Why How (何时何地何人何事为何怎么做)4M1E Man Machine Material Method Environment (人机器物料方法环境)二、产品词汇Production GlossaryUPS Uninterruptible Power Supply (不间断电源)EPS Emergency Power supply (应急电源)Low Frequency Online UPS (低频在线UPS\工频在线UPS)High Frequency Online UPS (高频在线UPS)On-line UPS (在线UPS)Off ine UPS(离线UPS)Back-up UPS (后备UPS)Line Interactive UPS (在线互动UPS)Electric Power UPS(电力UPS)Home UPS(家用UPS)Inverter (逆变器)Frequency Converter(变频器)AC Stabilized Power Supply (交流稳压电源)DC Power Supply (直流电源)三、电气专用词汇Electric Professional GlossaryInput Voltage (输入电压) Output Voltage (输出电压) Rated Voltage (额定电压) Input Current (输入电流) Output Current (输出电流) Rated Current (额定电流) Input Frequency (输入频率) Output Frequency (输出频率) Rated Frequency (额定功率) Input Power (输入功率) Output Power (输出功率) Rated Power (额定功率) Manual Bypass (手动旁路) Maintenance Bypass (维修旁路)Transform Time (转换时间) Waveform Distortion (波形失真)Phase (相数) Phase Sequence (相序)Single Phase (单相) Three Phase (三相)Efficiency (效率) Load (负载)Temperature (温度) Humidity (湿度)Normal (正常) Abnormal (不正常)Waveform (波形) Sine Wave (正弦波)Square Waveform (方波) Modified Sine Wave (修正正弦波)MIN Minimum (最小值)MAX Maximum (最大值)MIN Power (最小功率) MAX Power (最大功率)Protection (保护) Fault/Failure (故障)Reset (复位) Test (测试)Startup (启动) Shutdown (关闭)Alarm (报警) Silence (静音)Overload Protection (过载保护)Short Circuit Protection (短路保护)Over Temperature Protection (过温保护)Battery Low Voltage Protection (电池低压保护)Rated Battery Voltage (额定电池电压)Charge Voltage (充电电压)Float Voltage (浮充电压)Cycle Voltage (均充电压)Charge Current (充电电流)Isolation Resistance (绝缘电阻)Isolation Intensity (绝缘强度)Grounding Resistance (接地电阻)Leakage current to ground (对地泄漏电流)PF Power Factor (功率因数)CF Crest Factor (峰值因数)AVR Automatic Voltage regulate (自动稳压)EPO Emergency Process Operation (紧急操作程序)REC Rectifier (整流器) BYP Bypass (旁路) BAT Battery (电池)L line (火线) N neutral (零线/中线) G Ground (地 )SNMP Simple Network Management Protocol (简单网络管理协议)USB Universal Serial Bus (通用串行总线架构)SMT surface mount technology (贴片技术)AI Auto-Insertion (自动插件)四、产品包装箱和丝印词汇 Production Packaging-Box And Silk-Screen Glossary Model (型号) Specification (规格)Series (系列)Dimension (尺寸)Quantity (数量) Capacity (容量)Weight (重量) Shipping Weight (运输重量)Net Weight (净重) Gross Weight (毛重)L Length (长度) W Width (宽度)H High (高度) D Depth (深度)Color<英> Colour<美> (颜色)Grey (灰色) Red (红色)Black (黑色) White (白色)Yellow (黄色) Silver (银色)Blue (蓝色) Green (绿色)S/N Serial Number (序列号)TEL Telephone (电话)Modem (调制解调器) FAX (传真)Caution/Warning (警告) Notice (注意)Port (端口) Slot (槽)Parallel Port (并机端口)Communication Port (通讯端口)Intelligent Port (智能端口)Single Mode (单机模式)Parallel Mode (并机模式)五、电子物料词汇 Electron Materiel GlossaryTransformer (变压器) Relay (继电器)Transistor (晶体管) Resistance (电阻)Capacitance (电容) Inductance (电感)Diode (二极管) Audion (三极管)Fuse (保险丝) Buzzer (蜂鸣器)Socket (插座) Plug (插头)Filter (滤波器) Fan (风扇)Circuit Breaker (断路器)Crystal Oscillator (晶振)Touch Screen (触摸屏)LCD Liquid crystal Display (液晶显示屏)LED Light-emitting Diode (发光二极管)MOSFET Metallic Oxide Semiconductor Field Effect Transistor(金属氧化物半导体场效应晶体管)IGBT Isolated Gate Bipolar Transistor (绝缘双极性晶体管)SCR Silicon Control Rectifier (可控硅)STS Static Transform Switch (静态转换开关)六、其他语言词汇 Other Language Glossary中文英文法文德文西班牙文灰色 gray gris grau gris白色white blanc weiß blanco红色 red rouge rot rojo蓝色 blue bleu blau azul绿色green vert grün verde黑色 black noir Schwarz negro橙色 orange orange orange naranja黄色yellow jaune gelb amarillo。
品质管理术语中英文对照表

产品提交检验时的质量接受界限,可答应的质量水平。
19
CAR
Corrective Action Requirement
纠正措施要求
质量产生问题,所进行的纠正措施。
20
CPK
Complex Process Capability index
制程能力指数表
指工序在一定时间里,处于稳固状态下的实际加工能力,它是工序保证质量的能力的统计表。
出货检验
依照客户的标准,进行出货品质管制,附出货报告,包括对包装、标识等要求的检验。
7
QA
Quality assurance
品质保证工程师
负责管理,分析和测试,在全部产品链中,站在顾客和生产的立场上,保证制程可靠质量稳固。
8
QE
Quality engineer
品质工程师
负责从样品至量产的质量控制,跟进质量问题,处理回复客诉,制定文件标准,主导品质会议等。
Productindustrialengineer
产品工艺工程师
产品显现问题时,负责与其他部分一起合作找出问题,协同解决并跟进。
12
QCC
Quality control circle
品管圈
品管圈又名质量控制圈、品管圈、质量小组、QC小组,利用小组情势共同解决质量问题。
13
SOP
Standardoperatingprocedure
9
PQE
Process quality engineer
制程品质工程师
主要是分析和解决产品制造进程中显现的质量问题,提升客户对产品的中意度。
10
SQE
Supplier quality engineer
品管中英文名词对照表

品管中英文名词对照表SNAKEAccuracy 准确度Active 主动Action 评价.处理Activity 活动Add 加Addition rule 加法运算规则Analysis Covariance 协方差分析Analysis of Variance 方差分析Appraisal Variation 评价变差Approved 承认ASQC 美国质量学会Attribute 计数值Audit 审核Automatic database recovery 数据库错误自动回复Average 平均数balance 平衡Balance sheet 资产负债对照表Binomial 二项分配Body 机构Brainstorming Techniques 脑力风暴法Business Systems Planning 企业系统规划Cable 电缆Capability 能力Cause and Effect matrix 因果图.鱼骨图Center line 中心线check 检查Check Sheets 检查表Chi-square Distribution 卡方分布Clutch spring 离合器弹簧Coining 压印加工Common cause 共同原因Complaint 投诉Compound factor 调合因素Concept 新概念Condenser 聚光镜Conformity 合格Connection 关联Control 控制Consumer’s risk 消费者之风险Control characteristic 管制特性Control chart管制图Control plan 管制计划Correction 纠正Correlation Methods 相关分析法Cost down 降低成本CPI: continuouse Process Improvement 连续工序改善Creep 渐变Cross Tabulation Tables 交*表CS: customer Sevice 客户中心Cushion 缓冲Customer 顾客DSA: Defects Analysis System 缺陷分析系统Data 数据Data Collection 数据收集Data concentrator 资料集中缓存器DCC: Document Control Center 文控中心Decision 决策.判定Defects per unit 单位缺点数Description 描述Detection 难检度Device 装置Digital 数字Do 执行DOE: Design of Experiments 实验设计Element 元素Else 否则Engineering technology 工程技术Entropy 函数Environmental 环境Equipment 设备Estimated accumulative frequency 计算估计累计数Equipment Variation 设备变异Event 事件External Failure 外部失效,外部缺陷FA: Failure Analysis 坏品分析Fact control 事实管理Fatigue 疲劳FMEA: Failure Mode and Effect analysis 失效模式与效果分析FPY 合格率FQA: Final Quality Assurance 最终品质保证FQC: Final Quality control 最终品质控制Full-steer 完全转向function 职能Gauge system 量测系统Grade 等级Gum-roll 橡皮滚筒Health meter 体重计Heat press 冲压粘着Histogram 直方图Hi-tech 高科技hypergeometric 超几何分配hysteresis 磁滞现象Improvement 改善Inductance 电感Information 信息Initial review 先期审查Inspection 检验Internal Failure 内部失效,内部缺陷IPQC: In Process Quality Control 制程品质控制IQC: Incomming Quality Control 来料品质控制IS International Organization for Standardization 国际标准组织Law of large number 大数法则Link 连接LCL: Lower Control limit 管制下限LQC: Line Quality Control 生产线品质控制LSL: Lower Size Limit 规格下限Machine 机械Manage 管理Materials 物料Measurement 量测Median 中位数Miss feed 漏送Module,sub-system,sub-unit 单位Momentum 原动力Monte garlo method 原子核分裂热运动法MSA: Measurement System Analysis 量测系统分析Multiplication rule 乘法运算规则NIST 美国:标准技术院Normal 常态分布Occurrence 发生率On.off system 开,关系统Operation Instruction 作业指导书Organization 组织Parameter 参数Parto 柏拉图Parts 零件Parts per million 不良率Passive 消极的,被动的Plan 计划Pulse 脉冲Policy 方针Population 群体Power 力量,能源PQA: Process Quality Assurance 制程品质保证Practice 实务Precision 精密度preemptive 先占式多任务Pressure 压缩Prevention 预防Probability 机率Probability density function 机率密度函数Procedure 流程Process 过程Process capability analysis 制程能力分析图Process control and process capability 制程管制与制程能力Producer’s risk 生产者之风险Product 产品Production 生产Program 方案Projects 项目QA: Quality Assurance 品质保证QC: Quality Control 品质控制QE: Quality Engineering 品质工程QFD: Quality Function Desgin 品质机能展开Quality 质量Quality manual 品质手册Quality policy 品质政策Random experiment 随机试验Random numbers 随机数Range 全距Record 记录Reflow 回流Reject 拒收Repair 返修Repeatusility 再现性Reproducibility 再生性Requirement 要求Residual 误差Response 响应Responsibilities 职责Review 评审Reword 返工Robustness 稳健性Rolled yield 直通率RPN: Risk Priority Number 风险系数sample 抽样,样本Sample space 样本空间Sampling with replacement 放回抽样Sampling without peplacement 不放回抽样Scatter diagram 散布图分析Scrap 报废Screw 螺旋Severity 严重度Shot-peening 微粒冲击平面法Simple random sampling 简单随机取样Size 规格SL: Size Line 规格中心线Slip 滑动Stratified random sampling 分层随机抽样SOP: Standard Operation Procedure 标准作业书SPC: Statistical Process Control 统计制程管制Special cause 特殊原因Specification 规范SQA: Source(Supplier) Quality Assurance 供货商品质保证Stage sampling 分段随机抽样Standard Deviation 标准差Sum of squares 统计表supplier 平方和System 供方systematic sampling 系统,体系Statistical tables 系统抽样Taguchi-method 田口方法Technical committees 技术委员会Test piece 测试片Theory 原理Time stamp 时间戳印Time-lag 延迟Title 标题Torque 转矩Total 求和TQC: Total Quality Control 全面品质控制TQM: Total Quality Management 全面品质管理Traceablity 追溯Training 培训Transaction processing and logging 交易处理Trouble 困扰Up and down 上和下UCL: Upper Control Limit 管制上限USL: Upper Size Limit 规格上限Validation 确认Variable 计量值Variance 变异和Vector 向量Verification 验证Version 版本VOC: voice of Customer 客户需求VOE: Voice of Engineer 工程需求GRR Gauge Repeatability Reproducibility 量测的再现性与再生性FPI First Piece Inspection 首件检查Sampling without replacement 不放回抽样SQA: Source(Supplier) Quality Audit 供货商品质审核1. QC : quality control 质量管理2. IQC : incoming quality control 进料质量管理3. OQC : output quality control 出货质量管理4.PQC : process quality control 制程质量管理也称IPQC : in process quality control .5. AQL : acceptable quality level 允收标准6.CQA: customer quality assurance 客户品质保证7. MA : major defeat 主要缺点 8. MI : minor defeat 次要缺点9. CR :critical defeat 关键缺点 10. SMT : surface mounting technology表面粘贴技术11. SMD :surface mounting device 表面粘贴程序SMC : surface mounting component 表面粘贴组件12.ECN : engineering change notice 工程变更通知 13.DCN : design change notice 设计变更通知14.PCB : printed circuit board 印刷电路板15.PCBA : printed circuit board assembly装配印刷电路板16. BOM : bill of material 材料清单 17. BIOS : basically input and output system基本输入输出系统18. MIL-STD-105E : 美国陆军标准,也称单次抽样计划. 19. ISO : international standard organization 国际标准化组织20. DRAM: 内存条21.Polarity : 电性 22. Icicles : 锡尖 23. Non-wetting : 空焊24. Short circuit : 短路 25. Missing component : 缺件26. Wrong component :错件 27 . Excess component :多件28. Insufficient solder : 锡少29 . Excessive solder :锡多30. Solder residue: 锡渣 31. Solder ball : 锡球32. Tombstone : 墓碑 33 . Sideward:侧立34. Component damage :零件破损35. Gold finger:金手指36. SOP : standard operation process 标准操作流程 37. SIP : standard inspection process 标准检验流程38 .The good and not good segregation :良品和不良品区分39. OBW : on board writer 熸录BIOS40 . Simple random sampling : 简单随机抽样41. Histogram : 直方图 42 . Standard deviation : 标准差43. CIP : Continuous improvement program 持续改善计划44. SPC : Statistical process control 制程统制45 . Sub-contractors : 分包商 46. SQE: Supplier quality engineering 47. Sampling sample :抽样计划48. Loader : 治具 49. QTS: Quality tracking system 质量追查系统50. Debug : 调试51. Spare parts: 备用品 52. Inventory report for : 库存表 53. Manpower/Tact estimation 工时预算54. Calibration : 校验55. S/N :serial number 序号56. Corrugated pad : 波纹垫 57.Takeout tray: 内包装盒58. Outer box : 外包装箱 59. Vericode : 检验码 60. Sum of square : 平方和61. Range : 全距62. Conductive bag : 保护袋63. Preventive maintenance :预防性维护 64. Base unit : 基体 65. Fixture : 制具66. Probe : 探针 67. Host probe : 主探针 68. Golden card : 样本卡 69. Diagnostics program : 诊断程序70. Frame : 屏面 71. Lint-free gloves : 静电手套 72 .Wrist wrap : 静电手环 73. Target value : 目标值74. Related department : 相关部门 75. lifted solder 浮焊 76.plug hole孔塞 77. Wrong direction 极性反ponent damage or broken 零件破损 79.Unmeleted solder熔锡不良80.flux residue松香未拭81.wrong label or upside down label贴反 82. mixed parts机种混装83. poor solder mask绿漆不良84. oxidize 零件氧化 85.stand off height浮高86. IC reverse IC反向 87.supervisor课长88. Forman组长89. WI=work instruction作业指导 90.B.P. 非擦除状态91. Internal notification: 内部联络单92. QP :Quality policy质量政策 93. QT: Quality target 品质目标 94. Trend:推移图 95.Paret柏拉图96. UCL: Upper control limit管制上限 97.LCL:Lower control limit管制下限98. CL: Center line中心线99.R.T. Rolled throughout yield直通率100. PPM: Parts per million 不良率 101.DPU: Defects per unit 单位不良率102.Resistor: 电阻 103.Capacitor:电容104. Resistor array : 排阻 105. Capacitor array: 排容106. DIODE: 二极管 107.SOT: 三极管108. Crystal:震荡器109.Fuse:保险丝 110.Bead: 电感111.Connector:联结器112.ADM: Administration Department行政单位 113. CE: Component Engineering零件工程114. CSD :Customer Service Department客户服务部 115. ID: Industrial Design工业设计116.IE: Industrial Engineering工业工程117. IR: Industrial Relationship工业关系118. ME: Mechanical Engineering机构工程 119. MIS :Management Information System信息部120. MM: Material Management资材 121. PCC: Project Coordination/Control专案协调控制122. PD: Production Department生产部 123. PE: Product Engineering产品工程124. PM: Product Manager产品经理 125. PMC: Production Material Control生产物料管理126. PSC: Project Support & Control产品协调127.Magnesium Alloy:镁合金128. Metal Shearing:裁剪129.CEM:Contract Electronics Manufacturing电子制造服务企业EMS: Electronics Manufacturing Services130. ERP: Enterprise Resource Planning 企业资源规划SCM+CRM+ERP+EAI=Network direct TM links procurement, production, Logistics and sales采购,生产,后勤管理及市场营销的融合EAI: Enterprise application Integration 企业应用系统整合CRM: Customer Relationship Planning 客户服务规划SCM : Supply chain management 供应链管理131. OJT: On job training 在职培训 132.Access Time: 光盘搜寻时间133. B2CEC:Business to consumer electronic commerce 企业对消费者的电子商务B2BEC:Business to business electronic Commerce 企业间的电子商务L:Copper Clad Laminate 铜箔基板 135. Intranet: 企业内部通讯网路136. ISP: Internet Service Provider网络服务提供者 ICP: Internet Content Provider网络内容提供者137. GSM: Global System for Mobile Communication 泛欧数字式行动电话系统GPS: 全球卫星定位系统138. Home Page: 网络首页 139.Video Clip:影像文件 140. HTML:超文标记语言141.Domainname: 网域名称142. IP: 网络网域通讯协议地址143.Notebook:笔记型计算机144. VR: Virtual Reality虚拟实境145. WAP: Wireless Application Protocol无线应用软件协议146. LAN : Local area network局域网络WW WWorld Wide Web世域网 WAN: Wide Area Network 广域网络147. 3C: Computer, Communication, Consumer electronic 计算机,通讯,消费性电子三大产品的整合rmation Supplier Highway:信息高速公路 149.UPS:Uninterrupted power system不断电系统150.Processed material: 流程性材料 151.Entity/Item:实体 152.Quality loop:质量环153.Quality losses: 质量损失154.Corrective action:纠正措施 155. Preventive action:预防措施156.PDCAlan/Do/Check/Action计划/实施/检查/处理157. Integrated circuits(IC):集成电路158.Application program: 应用程序 159.Utilities:实用程序160.Auxiliary storage/Second storage:;辅助存储器 161.Silicon chip:硅片162Diskette drive:软驱163.Display screen/Monitor:显示器164.Foreground:前面 165.Montherboard:母板 166.Mermory board: 内存板167.Slot:插槽 168.Busata-bus/address-bus/Control bus: 总线/数据总线/地址总线/控制总线169.Plotter:绘图170.MPC:Multimedia personal computer多媒体171.Oscillator:振荡器 172.Automatic teller terminal:自动终端(出纳)机173.Joystick port:控制端口 174.VGA: Video Graphics Array显示卡175.Resolution:分辨率176.Register:寄存器177.ISA: Industry Standard Architecture: 工业标准结构 178.EISA: Extended Industry Architecture179.Adapter: 适配器 180.Peripheral:外部设备 181.Faxmodem:调制解调器 181.NIC:Network interface card网络接口卡182. SCSI: Small computer system interface 183.VESA: Video Electronic Standards Association184. SIMM: Single in-line memory module 单排座存储器模块(内存条) 185.Casing:外箱186.Aluminum:铝质 187.Ceramic: 陶瓷的 188.Platter:圆盘片 189.Actuator:调节器190.Spindle:轴心 191.Actuation arm: 存取臂 192.Default code: 缺省代码 193.Auxiliary port:辅助端口194.Carriage return : 回车 195.Linefeed:换行 196.ASCII: American Standard Code for Information Interchange 197.Video analog: 视频模拟 198.TTL: Transistor- Transistor logic晶体管-晶体管逻辑电路199.Three-prong plug:三芯电插头 200.Female connector:连接插座201.Floppy disk:软盘202.Output level: 输出电平203.Vertical/Horizontal synchronization: 场/行同步204.H(Horizontal)-Phase:行相位 patible:兼容机 206.Hardware Expansion Card: 硬件扩充卡207.Buffer:缓冲 208.CRM:Customer relationship Management 客户关系管理 209.WIP: Work in process半成品210.Waiver:特别采用211.CXO系列—CEO Chief Executive Office首COO :Chief Operating OfficeCFO Chief Finance Officer CBO Chief Business Officer CTO Chief Technology OfficerCIO Chief Information Officer CGO Chief Government Officer212. NASDAQ: 纳斯达克证券市场NASDAQ Automated Quotation system 213.VC: Venture Capital 风险投资214. PDA: Personal Date Assistant个人数字助理 PLA: Personal Information Assistant个人信息助理215. PPAP: Advanced Product Quality Planning and Control Plan 生产性零组件核准程序216. FMEA: Potential Failure Mode and Effects Analysis 失效模式与效应分析217. MSA: Measurement Systems Analysis 量测系统分析218. QSA: Quality System Assessment 质量系统评鉴219. Cusum: 累计总合图 220. Overall Equipment Effectiveness设备移动率221. Benchmarking: 竞争标杆Analysis of motion/Ergonomics动作分析/人体工程学222. Poka Yoke 防错法 MCR: machine capability ratio 机器利用率223. Mistake Proofing 防呆法 Taguchi methods田口式方法224, Vertical integration垂直整合 Surveillance定期追踪审查225. EMS: Electronics Manufacturing Supply-chain 226. Cause & Effects charts特性要因图227. Scatter: 散布图 Fool-Proof System 防呆系统228. VE: Value Engineering 价值工程 QFD: Quality Function Development 质量机能展开229. Arrow Chart 箭头图法 Affiliate Chart亲和图法230. PDPC: Process Decision Program Chart System Chart系统图法231. Relation Chart 关边图法 Matrix Chart矩阵图法232. Matrix Data Analysis 矩阵数据分析法234. Brain-storm 脑风暴法JIT: Just In Time:及时性生产模拟235. Deming Prize: 戴明奖 Prototype技术试作236. BPM: Business Process Management .业务流程管 MBO目标管理237. MBP:方针管理 FTA:故障树分析 QSC服务质量238. IPPB: Information 情况 planning策划 Programming规划Budget预算239. EQ: Emotion Quotient:情商IQ: Intelligence Quotient:智商240. Implied Needs:隐含要求 Specified Requirement:规定要求241. Probation:观察期Incoming Product released for urgent production 紧急放行242.Advanced quality planning 先进的质量策划 243. AOQ: Average Outgoing Quality 平均检出质量AOQL: Average Outgoing Quality Limit 平均检出质量界限244.Approved Supplier List 经核准认可的供应商名单245.Attribute date 特征 Benchmarking 基准点 Calibration 校准246.Capable process 工序能力 Capability Index 工序能力指数 Capability ratio 工序能力率247.CHANGE CYCLE TIME 修改的时间周期 Continuous improvement 持续改进248. Control plans 控制策划 Cost of quality 质量成本249. Cycle time reduction 减少周期时间250. Design of experiments 实验设计 Deviation / Substitution 偏差/ 置换251. ESD: Electrostatic discharge 静电释放252. EH&S: Environmental, Health, and Safely 环境,健康.安全253. ESS: Environmental Stress Screening 环境应力筛选254. FMEA: Failure Mode Effect Analysis 失误模式效应分析255. First Article approval 产品的首次论证 256. First pass yield 一次性通过的成品率257. First sample inspection 第一次样品检验258. FMECA: Failure mode effect and critically analysis 失误模式,效应及后果分析259. Gauge control 测量仪器控制260. GR&R: Gauge repeatability and reproducibility 测量仪器重复性和再现性261. HALT: Highly Accelerated Life Test 高加速寿命试验262. HAST: Highly Accelerated Stress Test 高加速应力试验263. IN-CONTROL PROCESS 受控制工序 264. INDUSTRIAL AVERAGE 工业平均数265. JIT (just in time) manufacturing (实时)制程266. Key characteristic 关健特征 267. Key component 关健构件268. Life Testing 寿命试验 269. Lot traceability 批量可追溯性270. Material review board 原材料审查部门MCR: machine capability ratio 机械能力率271. NONCONFORMANCE 不符合272. OUT-OF-CONTROL PROCESS 失控工序273. Pilot Application 试产(试用)274. PPM: Parts per million 百万分之一275. Preventive VS detection 预防与探测 Preventive maintenance 预防维护276. Process capability index 工序能力指数 277. Process control 工序控制278. Process improvement 工序改进279. Process simplification 过程简化280. Quality Clinic Process Chart (QCPC) 质量诊断过程图281. Quality information system 质量资料体系282. Quality manual 质量手册 283. Quality plan 质量计划284. Quality planning 质量策划285. Quality policy 质量方针 286. Quality system 质量体系287. Reliability 可*性 RUN Chart 趋势表 288. Skill Matrix 技能表289. Statistical quality control (SQC) 统计质量控制290. Teamwork 团队工作291. Total quality management 全面质量管理292. Variable data 变量数据 293. Variation 影响变量294. Value Analysis 价值分析 295. Visual Factory 形象化工厂296. Survey Instructions 调查指引297. Profile 概况298. Improvement Plan 改进计划 299. Evaluation 评估 300. implementation 实施301. Compliance 符合302. Supplier Audit Report 供方审核报告 303. Site Audit 现场审核304. Typical agenda 典型的议事日程305. Internal and external failure costs 内部和外部的失误成本306. Failure rate percentage 失误百分率307. Productivity (output / input) 生产率(产出/投入)308. Customer complaints 客户投诉 309. Customer satisfaction indices 客户满意度指数310. Root cause analysis of failures 失误根原分析。
品管常见英语词汇总

日常English一、词组QC: Quality control;(品质管理)QS: Quality system; (品质系统)IQC: Incoming quality control;(进料检验)PQC: Process quality control;(制程检验)FQC: Final quality control;(最终检验)OQC: Outgoing quality control;(出货检验)QA: Quality assurance;(品质保证)QE: Quality engineer;(品质工程师)PQE: Process quality engineer;(制程品质工程师)SQE: Supplier quality engineer;(供应商品质工程师)PIE: Product industrial engineer;(产品工业工程师) IEERP: Enterprise resource planning;(企业资源规划)QCC: Quality control circle;(品管圈)SOP: Standard operating procedure;( 标准作业规定)WI﹕Working Instructions. (作业指导书)SIP: Standard inspection procedure;(標准检验规范)QIP: Quality inspection procedure;(品质检验计划)ECN: Engineering change notice;(工程变更通知)ECR: Engineering change requirement;(工程变更申请)PDCA管理循环(又称戴明循环): Plan(计划) Do(执行) Check(检查) Action(行动)5M1E:Materials(物料) Machines(机器) Method(方法) Man(人) Measure(量测) Environment(环境);5W2H:Why(为什幺做) What(做什幺) When(何时) Who(何人) Where(何处) How to do(如何做) How much(成本如何) ISO: international organization for standardization;(国际标准化组织)SQC: Statistical quality control;(统计品质管制)SQC: Standard quality control;(标准质量控制)TQC: Total quality control;(全面品质管制)TQM: Total quality management;(全面质量经营)QSR: Quality system requirements;(品质系统要求)QSA: Quality system assessment;(品质系统评鉴)APQP: Advanced product quality planning and control plan;(先期产品品质规划及管理计划) FMEA: Failure mode and effects analysis;(失效模式与效应分析)MSA: Measurement systems analysis;(量测系统分析)SPC: Statistical process control;(统计制程管制)PPAP: Production part approval process;( 产性零组件核准程序)MRB: Material review board;(物料监管委员会)AVL: Approved vendor list;(合格供应商名单)BOM: Bill of material;(物料清单)FAI: First article inspection;(首件报告)AQL: Acceptable quality level;(允收品质水准)QC Flow Chart: Quality control flow chart;(制程品质流程图)Sample size code letter;(样本大小代字)Lot or batch size;(批量)Instruction book;(说明书)Made in China;(中国制造)二、常用单词Defective percent:不良率 Quantity cost:质量成本 product:产品Defect:缺陷 major defect:严重缺陷 sample:样本critical defect:致命缺陷 minor defect:轻微缺陷 Accept:允收Service:服务 Quality:品质 hardware:硬件software:软件REJ: reject 拒收,判退 pass:通过OK:好,可以 NG(no go):(不可允收)不合格 check:检查Use:使用 require:要求一月:January 二月:February 三月:March 四月:April 五月:May 六月:June 七月:July 八月:August 九月:September 十月:October 十一月:November 十二月:December星期天:Sunday 星期一:Monday 星期二:Tuesday 星期三:Wednesday星期四:Thursday 星期五:Friday 星期六:Saturdaycolor :颜色 red:红色 pink:粉红 orange:橙色yellow:黄色 green:绿色 white:白色 gray:灰色purple:紫色 blue:兰蓝 silver:银色 gold:金色black:黑色 cream:米色乳白色Country:国家 China:中国 USA:美国 France:法国Japan:日本 English:英国 Canada:加拿大 Germany:德国Sweden:瑞典 Italy:意大利 Mexico:黑西哥 Switzerland:瑞士Hong Kong :香港 Malaysia:马来西亚Taiwan:台湾 Australia:澳大利亚Date:日期 brand name:品名 page:页,页数 delivery:交货日期Model:型号 quantity(Q’TY):数量 job:工作 number(NO):号码Cosmetics:外观 instruction:说明 approve:批准 without(W/O):没有With(W):有 job sheet:工作指令单 gloves:手套 brand:商标front:前部 Transformer:变压器 back:后部 bottom:底部Top:顶部 description:说明 side:侧面 prepare:准备Improve:改善 require:要求 prevent:预防 issue:问题Maximum:最大值 minimum:最小值 wrong:错误 correctly:正确Judge:判定tester:测试器 market:市场 units:主机﹑單位Function:功能 open:打开 close:关闭 input:输入Output:输出 sensitivity:灵敏度 signal:信号 short circuit:短路switch:开关 Button:按钮 auto function:自动功能mechanical function:机械功能 volume:音量Surround function:环境功能 wake up:喚醒reliability:可靠 Separation:分离ending:结束 customer:客户三、外箱标示Label:标签 set:套 rev:版本 P/N(part NO):料号PO/N:订单号码 Q’TY:数量 N/W(NET Weight):净重G/W(Gross Weight):毛重 D/T:隆腾PCS:(多少)个 K:等于1000pcs 四、工程图纸专业用语Customer drawing:客户图纸 assembly drawing:组立图纸housing:塑胶外套,外壳 finish:拋光(表面处理)Plating:镀层 electrical:电气性能voltage rating:导通电压 Insulation resistance:绝缘电阻contact resistance:接触电阻 current ration:导通电流Withstanding voltage:承受阻抗 Force:保持力 note:注释Min:最小 material:物料 RD:开发Meg-ohm:兆 spec:标准,规格 Environmental:环境design:设计 check:检查 Review:复审approved:核准 sheet:书页 max:最大Scale:比例 section:部分﹑區 tolerance:公差nylon:尼龙 phosphor:磷 brass:黄铜Gold:金 nickel:镍 ref:参考Tin-leady:锡铅 U":膜厚单位 PLC:两边Retention force:保持力 TYP:重复,所有 TOL:公差物料简称H:塑胶 T:端子 M:公/盖子 F:母B:摇杆 EAR:耳扣 W:塞 L:长N:新 O:旧 P:针五、SPC内容Center line:中心线 SU and SL:规格上限与规格下限KM:移动全数upper and lower control limits:上.下管制线P chart:不良率管制图 X (X)5:样本D:不良数 N:样本数K:组数 C chart:缺点数管制图X:样本之平均值 X:样本平均值之平均U chart:单位缺点数管制图 R:全距u:规格中心值δ:标准差CPK:制程能力指数 A2 D3D4:管制系数UCL: 上限LCL: 下限。
品管常用术语英文翻译

MIR:Method Improvement Report (提案改善報告) ICT:In-Circuit Test(在線測試) ATE:Auto-Test Equipment (全自動測試設備) IC:Integrated Circuit (集成電路) Capacitor(電容器) Resistor(電阻器) Inductor(電感器) Core(鐵芯) Diode(二極真空管) Switch(開關) Resistor Network(排阻) PDCA:Plan,Do,Check,Action(計劃,做,查核,行動) 5W1H:Who,When,Where,What,Why,&How(誰,時間,地點,事件,為什麼&怎麼樣 10M:Market,Money,Maerial,Machine,Method,Management,Men,Morale, Motivation,Miscellaneous (市場,貨幣,材料,設備,方式,管理,人力,士氣,動機,多方面的) 整理,整頓,清理,清掃,教養,-----日語, 安全(Safety), 節約(Save)
品管常用朮語 英文譯解
SMT品管部 2003.6.18
COMMON word in out working; 1.IQC:Incoming Quality Control(進料品管) Incoming Inspection item:appearance(外觀),dimension(尺寸),marking(標記),function(solder-abi Material status(物料狀況):accept(合格),reject(拒收),waive(特采),hold(待判) 2.IPQC:In Process Quality Control(制程品管) Inspection item:producparameter check(設備參數點檢)materi 3.FQC:Final Quality Control(最終檢驗) Inspection item:component assmbly(元件安裝),solder status(焊錫狀況),cleaning(清潔度),markin 4.OQC:Outgoing Quality Control(出貨查核) Inspection item:quantity(數量),package(包裝)…etc. 5.QE:Quality Engineering (品質工程)
品管常用专业术语中英对照

8D Process 8D过程D0 - Emergency Response Action快速反应行动D1 - Establish the Team建立团队D2 - Describe the Problem描述问题D3 - Develop the Interim Containment Action (ICA)开发临时性围堵方案或临时性纠正方案D4 - Define and Verify Root Causes and Escape Point确定和验证问题的根源和逃逸点D5 - Choose Permanent Corrective Actions (PCA)选择永久性纠正方案D6 - Implement and Validate Permanent Corrective Actions 实施和验证永久性方案D7 - Prevent Recurrence防止再发生D8 - Recognize Team and Individual Contributions认可团队和个人的贡献MRB运作流程指导一、目的为合理有效的对来料不合格品进行处置和对重大品质问题进行处理,保证公司产品的品质和交期,特成立MRB委员会。
二、定义MRB:Material Review Board三、适用范围对来料和外协加工过程的不合格品及重大品质问题的处理均可提交MRB委员会处理。
四、组织结构MRB委员会主席:质量总监MRB委员会成员:IQC负责人,QA负责人,工艺负责人,电路设计工程师,结构设计工程师,采购部门相关人员,其他部门相关人员(需要时)五、职责MRB委员会主席:对不合格品或者重大品质问题的最终处理决定;MRB委员会成员:品质部门负责不合格品之品质判定及评审;采购负责来件不合格品之评审及处理(退货,换货等);结构设计工程师负责对结构类来料不合格品之评审;电路设计工程师负责对电子类来料不合格品之评审;工艺负责人负责对于生产工艺方面的评审;其他部门相关人员负责来料不合格品之评审。
品质管理名词及英文缩写
品质管理名词及英文缩写..品质管理名词(中英文对照)QE=品质工程师(Quality Engineer )MSA: Measurement System Analysis 量测系统分析LCL: Lower Control limit 管制下限Control plan 管制计划Correction 纠正Cost down 降低成本CS: customer Sevice 客户中心 Data 数据Data Collection 数据收集 Description 描述 Device 装置 Digital 数字 Do 执行DOE: Design of Experiments 实验设计Environmental 环境Equipment 设备FMEA: Failure Mode and Effect analysis 失效模式与效果分析FA: Failure Analysis 坏品分析FQA: Final Quality Assurance 最终品质保证 FQC: Final Quality control 最终品质控制 Gauge system 量测系统 Grade 等级Inductance 电感 Improvement 改善 Inspection 检验IPQC: In Process Quality Control 制程品质控制 IQC: Incoming Quality Control 来料品质控制 ISO: International Organization for Standardization 国际标准组织LQC: Line Quality Control 生产线品质控制LSL: Lower Size Limit 规格下限 Materials 物料Measurement 量测 Occurrence 发生率Operation Instruction 作业指导书Organization 组织Parameter 参数 Parts 零件 Pulse 脉冲 Policy 方针 Procedure 流程Process 过程Product 产品 Production 生产 Program 方案 Projects 项目QA: Quality Assurance 品质保证 QC: Quality Control 品质控制QE: Quality Engineering 品质工程QFD: Quality Function Design 品质机能展开 Quality 质量Quality manual 品质手册 Quality policy 品质政策 Range 全距Record 记录 Reflow 回流 Reject 拒收 Repair 返修Repeatability 再现性 Reproducibility 再生性 Requirement 要求Residual 误差 Response 响应Responsibilities 职责 Review 评审 Rework 返工Rolled yield 直通率 sample 抽样,样本 Scrap 报废SOP: Standard Operation Procedure 标准作业书SPC: Statistical Process Control 统计制程管制 Specification 规格SQA: Source(Supplier) Quality Assurance 供应商品质保证Taguchi-method 田口方法TQC: Total Quality Control 全面品质控制TQM: Total Quality Management 全面品质管理 Traceability 追溯UCL: Upper Control Limit 管制上限 USL: Upper Size Limit 规格上限 Validation 确认 Variable 计量值 Verification 验证 Version 版本QCC Quality Control Circle 品质圈/QC 小组PDCA Plan Do Check Action 计划执行检查总结..Consumer electronics 消费性电子产品 Communication 通讯类产品 Core value (核心价值) Love 爱心Confidence 信心 Decision 决心Corporate culture (公司文化) Integration 融合 Responsibility 责任 Progress 进步QC quality control 品质管理人员FQC final quality control 终点品质管制人员IPQC in processquality control 制程中的品质管制人员OQC output quality control 最终出货品质管制人员IQC incoming quality control 进料品质管制人员TQC total quality control 全面质量管理 POC passage quality control 段检人员 QA quality assurance 质量保证人员OQA output quality assurance 出货质量保证人员QE quality engineering 品质工程人员FAI first article inspection 新品首件检查FAA first article assurance 首件确认CP capability index 能力指数SSQA standardized supplier quality audit 合格供应商品质评估FMEA failure model effectiveness analysis 失效模式分析AQL Acceptable Quality Level 运作类允收品质水准S/S Sample size 抽样检验样本大小 ACC Accept 允收 REE Reject 拒收 CR Critical 极严重的 MAJ Major 主要的 MIN Minor 轻微的Q/R/S Quality/Reliability/Service 品质/可靠度/服务P/N Part Number 料号 L/N Lot Number 批号AOD Accept On Deviation 特采 UAI Use As It 特采FPIR First Piece Inspection Report 首件检查报告PPM Percent Per Million 百万分之一SPC Statistical Process Control 统计制程管制SQC Statistical Quality Control 统计品质管制GRR Gauge Reproducibility & Repeatability 量具之再制性及重测性判断量可靠与否DIM Dimension 尺寸 DIA Diameter 直径QIT Quality Improvement Team 品质改善小组 ZD Zero Defect 零缺点QI Quality Improvement 品质改善 QP Quality Policy 目标方针TQM Total Quality Management 全面品质管理RMA Return Material Audit 退料认可7QCT ools 7 Quality Control T ools 品管七大手法通用之件类ECN Engineering Change Notice 工程变更通知(供应商)ECO Engineering Change Order 工程改动要求(客户)PCN Process Change Notice 工序改动通知PMP Product Management Plan 生产管制计划SIP Standard Inspection Procedure 制程检验标准程序SOP Standard Operation Procedure 制造作业规范IS Inspection Specification 成品检验规范 BOM Bill Of Material 物料清单PS Package Specification 包装规范SPEC Specification 规格DWG Drawing 图面系统文件类ES Engineering Standard 工程标准IWS International Workman Standard 工艺标准ISO International Standardization Organization 国际标准化组织GS General Specification 一般规格部类PMC Production & Material Control 生产和物料控制PCC Product control center 生产管制中心PPC Production Plan Control 生产计划控制 MC Material Control 物料控制DCC Document Control Center 资料控制中心QE Quality Engineering 品质工程(部) QA Quality Assurance 品质保证处QC Quality Control 品质管制(课)..PD Product Department 生产部 LAB Laboratory 实验室IE Industrial Engineering 工业工程 R&D Research & Design 设计开发部品质部相关职位的工作职责: 1 职位名称(IPQC )、OQC 、FQC 、 IQC 直属上级 QC 组长工作内容: 每日工作:1) 参与维护、监督质量体系的运行、组织和管理内部质量审核工作;2) 根据检验计划完成当日首件、巡检、综检出货检工作任务;3) 确认生产单位的自检记录;4) 按SIP 及相应流程对待检产品进行检验,检验前以及检验过程中认真核对产品代码、名称,填写检验记录,并提交QC 组长;5) 汇总、存档各项质检记录及相关资料;6) 为纠正质量问题,有权暂时停止现场生产,并立即向上级报告;7) 中晚班人员如遇一般外观不良,有权停止现场生产,如遇紧急生产或修模,可电话联络上级作决定;8) 现场不合格产品的确认,初步处理;9) 不合格品处理单和纠正预防措施表的开出,追踪和验证;10) 不合格品处理单和纠正预防措施表做好登录,以便追踪;11) 及时上报批量质量问题,不合格信息的及时传递;12) 向下一班交接检验用具和生产注意点; 13) 协助质量主管完成其它质量管理体系方面的工作。
品管中英文名词对照表
品管中英文名词对照表5S活动的对象原本是针对现场的环境,它对生产现场环境全局进行综合考虑,并制订切实可行的计划与措施,从而达到规范化管理,有许多公司扩展到办公室的管理以增进办公效率,常见的手法为红牌作战,看板及衍生的目视管理。
ASP应用程式服务供应商(ApplicationServiceProvider)对企业提供IT业务应用服务和管理服务,主要透过软体与硬体租用或租赁形式来实施,服务商的收入和利润来自客户的租金。
AVL认可的供应商(ApprovedVendorList)对提供企业产品或服务的众多供应商中,某些符合公司的策略、对产品服务的要求,而成为合格或认可的供应商。
BOM物料清单(BillOfMaterial)一般亦可称为产品结构表或用料结构表,它乃用来表示一产品〔成品或半成品〕是由那些零组件或素材原料所结合而成之组成元素明细,其该元素构成单一产品所需之数量称之为基量,BOM是所有MRP系统的基础,如果BOM表有误,则所有物料需求都会不正确。
天瀚定义90阶为PCBA95阶为Driver或Bundle的程式97阶为Engine或组合好的主机98阶为连包装盒的产品(不连外箱)BPR企业流程再造(BusinessProcessReengineering)关心客户的需求,对现有的经营过程进行思考和再设计,利用新的制造、资讯技术及现代化的管理手段,打破传统的职能型组织结构(Function-Organization),建立全新的过程型组织结构(Process-OrientedOrganization)。
以作业流程为中心,打破金字塔状的组织结构,使企业能适应新经济的高效率和快节奏,让企业员工参与企业管理,实现企业内部上下左右的有效沟通,具有较强的应变能力和较大的灵活性。
BPR的主要原则有三:1.以顾客为中心:全体员工建立以顾客服务中心的原则。
顾客可以是外部的,如在零售商业企业,柜台营业员直接面对的是真正的顾客;也可以是内部的,如商场内的理货员,他的顾客是卖场的柜台小组。
品质管理名词中英文对照
常用品质管理名词中英文对照1、Brainstorming Techniques 脑力风暴法2、Complaint 投诉3、Conformity 合格(符合)4、Correction 纠正5、External Failure 外部失效,外部缺陷6、FPY: First-Pass Yield (第一次通过)合格率7、FQA: Final Quality Assurance 最终品质保证8、Internal Failure 内部失效、内部缺陷9、LQC: Line Quality Control 生产线品质控制10、Manage 管理11、PPM:Parts per Million (百万分之)不良率12、PQA: Process Quality Assurance 制程品质保证13、Prevention 预防14、Product 产品15、Production 生产16、QA: Quality Assurance 品质保证17、QC: Quality Control 品质控制18、QE: Quality Engineering 品质工程19、Quality 质量20、Repair 返修21、Review 评审22、Reword 返工23、Scrap 报废24、SOP: Standard Operation Procedur 标准作业书25、SPC: Statistical Process Control 统计制程管制26、SQA: Source(Supplier) Quality Assurance 供货商品质保证27、TQC: Total Quality Control 全面品质控制28、TQM: Total Quality Management 全面品质管理。
品管中英文单词对照表
品管中英文单词对照表accuracyactiveactivityaddaddition ruleAnalysis CovarianceAnalysis of varianceAppraisal VariationapprovedASQCattributeAuditautomatic database recovery averagebalancebalance sheetbinomialbodyBrainstorming TechniquesBusiness Systems PlanningcablecapabilityCause and Effect Matrixcenter linecheckCheck SheetsChi-square Distributionclutch springcoiningcommon causeComplaintcompound factorconceptCondensercontomityconsumer's riskcontrolcontrol characteristicControl Chartcontrol plancorrectionCorrlatio Methodscost downCPI:Continuouse Process Improvement creepCross Tabulation TablesCS:Customer SevicecushioncustomerDAS:Defects Analysis SystemdataData Collectiondata concen tratorDCC:Document Control Centerdecisiondefects per unitdescriptiondevicedigitaldoDOE:Design Of Experimentselementelseengineering recbnologyentropyEnvironmentalequipmentestimated accumulative frequency EV:Equipment VariationeventExternal FailureFA:Failure Analysisfact controlfatiqueFMEA:Failure Mode and Effect Analysis FPYFQA:Final Quality AssuranceFQC:Final Quality ControlFull-steerfunctiongauge systemgradegum-rollhealth meterheat presshistogramHi-techhypergeometrichysteresisimprovementinductanceimformationinitial reviewInternal FailureIPQC:In Process Quality Control IQC:Incomming Quality Control ISO:International Organization for Standardizationlaw of large numberlinkLCL:Lower Control LimitLQC:Lin Quality ControlLSL:Lower Size LimitmachinemanagematerialsMeasurementmedianmiss feedmodule,sub-system,sub-unit momentumMonte Garlo MethodMSA:Measurement System Analysis multiplication ruleNISTnormaloccurrenceon,off systemOperation Instructionorganizationparameterpartopartsparts per millionpassiveplanpulsepolicypopulationpowerPQA:Process Quality Assurance practiceprecisionpreemptivepressurepreventionprobabilityprobability density function procedureprocess capability analysisprocess control and process capability producer's riskproductproductionprogramprojectsQA:Quality AssuranceQC:Qualiry ControlQFD:Quality Function Desginqualityquality manualquality policyrandom experimentrandom numbersrangerecordreflowrejectrepairrepeatusilityreproducibilityrequirementresidualresponsereponsibilitiesreviewrewordrobustnessrolled yieldRPN:Risk Priorty Numbersamplesample spacesampling with replacementsampling without peplacementscatter diagramscrapscrewseverityshot-peeningsimple random samplingsizeSL:Size Lineslipstratified random samplingSOP:Stantistical Process Controlspecial causespecificationSQA:Source(supplier)Quality Assurance stage samplingStandard Deviationstatistical tablessum of squaressuppliersystemsystematic samplingtaguchi-methodtechnical committeesTest piecetheorytime stamptime-lagtitletorquetotalTQC:Total Quality ControlTQM:Total Quality Managementtr。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
品管中英文名词对照表(doc 20)品管中英文名词对照表Accuracy准确度Active主动Action评价.处理Activity活动Add加Addition rule加法运算规则Analysis Covariance协方差分析Analysis of Variance方差分析Appraisal Variation评价变差Approved承认ASQC美国质量学会Attribute计数值Audit审核Automatic database re covery数据库错误自动回复Average平均数balance平衡Balance sheet资产负债对照表Binomial二项分配Body机构Brainstorming Techniques脑力风暴法Business Systems Pla nning企业系统规划Cable电缆Capability能力Cause and Effect matrix因果图.鱼骨图Ce nter line中心线check检查Check Sheets检查表Chi-square Distribution卡方分布Clutch spring离合器弹簧Coining压印加工Common cause共同原因Complaint投诉Compound fa ctor调合因素Concept新概念Condenser聚光镜Conformity合格Connection关联Consumer’s risk消费者之风险Control控制Control characteristic管制特性Control chart管制图Con trol plan管制计划Correction纠正Correlation Methods相关分析法Cost down降低成本C PI: continuouse Process Improvement连续工序改善Creep渐变Cross Tabulation Tables交叉表CS: customer Sevice客户中心Cushion缓冲Customer顾客DSA: Defects Analysis Sy stem缺陷分析系统Data数据Data Collection数据收集Data concentrator资料集中缓存器DCC: Document Control Center文控中心Decision决策.判定Defects per unit单位缺点数Description描述Detection难检度Device装置Digital数字Do执行DOE: Design of Expe riments实验设计Element元素Else否则Engineering recbnology工程技术Entropy函数E nvironmental环境Equipment设备Estimated accumulative frequency计算估计累计数EV: Equipment Variation设备变异Event事件External Failure外部失效,外部缺陷FA: Failure Analysis坏品分析Fact control事实管理Fatique疲劳FMEA: Failure Mode and Effect ana lysis失效模式与效果分析FPY合格率FQA: Final Quality Assurance最终品质保证FQC:Final Quality control最终品质控制Full-steer完全转向f unction职能Gauge system量测系统Grade等级Gum-roll橡皮滚筒Health meter体重计Heat press冲压粘着Histogra m直方图Hi-tech高科技hypergeometric超几何分配hysteresis磁滞现象Improvement改善Inductance电感Information信息Initial review先期审查Inspection检验Internal Failure内部失效,内部缺陷IPQC: In Process Quality Control制程品质控制IQC: Incomming Quality Control来料品质控制ISO: International Organization for Standardization国际标准组织La w of large number大数法则Link连接LCL: Lower Control limit管制下限LQC: Line Qu ality Control生产线品质控制LSL: Lower Size Limit规格下限Machine机械Manage管理Materials物料Measurement量测Median中位数Miss feed漏送Module,sub-system,sub-unit单位Momentum原动力Monte garlo method原子核分裂热运动法MSA: Measurement System Analysis量测系统分析Multiplication rule乘法运算规则NIST美国标准技术院N ormal常态分布Occurrence发生率On.off system开,关系统Operation Instruction作业指导书Organization组织Parameter参数Parto柏拉图Parts零件Parts per million不良率Pass ive消极的,被动的Plan计划Pulse脉冲Policy方针Population群体Power力量,能源PQA: Process Quality Assurance制程品质保证Practice实务Precision精密度preemptive先占式多任务Pressure压缩Prevention预Total求和TQC: Total Quality Control全面品质控制TQM: Total Quality Management全面品质管理Traceablity追溯Training培训Transaction processing and logging交易处理Tr ouble困扰Up and down上和下UCL: Upper Control Limit管制上限USL: Upper Size Li mit规格上限Validation确认Variable计量值Variance变异和Vector向量Verification验证Version版本VOC: voice of Customer客户需求VOE: Voice of Engineer工程需求企业常用缩写作者:Christian5S : 5S管理ABC : 作业制成本制度(Activity-Based Costing)ABB : 实施作业制预算制度(Activity-Based Budgeting)ABM : 作业制成本管理(Activity-Base Management)APS : 先进规画与排程系统(Advanced Planning and Scheduling)ASP : 应用程式服务供应商(Application Service Provider)ATP : 可承诺量(Available To Promise)A VL : 认可的供应商清单(Approved Vendor List)BOM : 物料清单(Bill Of Material)BPR : 企业流程再造(Business Process Reengineering)BSC : 平衡记分卡(Balanced ScoreCard)BTF : 计划生产(Build To Forecast)BTO : 订单生产(Build To Order)CPM : 要径法(Critical Path Method)CPM : 每一百万个使用者会有几次抱怨(Complaint per Million)CRM : 客户关系管理(Customer Relationship Management)CRP : 产能需求规划(Capacity Requirements Planning)CTO : 客制化生产(Configuration To Order)DBR : 限制驱导式排程法(Drum-Buffer-Rope)DMT : 成熟度验证(Design Maturing Testing)DVT : 设计验证(Design Verification Testing)DRP : 运销资源计划(Distribution Resource Planning)DSS : 决策支援系统(Decision Support System)EC : 设计变更/工程变更(Engineer Change)EC : 电子商务(Electronic Commerce)ECRN : 原件规格更改通知(Engineer Change Request Notice)EDI : 电子资料交换(Electronic Data Interchange)EIS : 主管决策系统(Executive Information System)EMC : 电磁相容(Electric Magnetic Capability)EOQ : 基本经济订购量(Economic Order Quantity)ERP : 企业资源规划(Enterprise Resource Planning)FAE : 应用工程师(Field Application Engineer)FCST : 预估(Forecast)FMS : 弹性制造系统(Flexible Manufacture System)FQC : 成品品质管制(Finish or Final Quality Control)IPQC : 制程品质管制(In-Process Quality Control)IQC : 进料品质管制(Incoming Quality Control)ISO : 国际标准组织(International Organization for Standardization) ISAR : 首批样品认可(Initial Sample Approval Request)JIT : 即时管理(Just In Time)KM : 知识管理(Knowledge Management)L4L : 逐批订购法(Lot-for-Lot)LTC : 最小总成本法(Least Total Cost)LUC : 最小单位成本(Least Unit Cost)MES : 制造执行系统(Manufacturing Execution System)MO : 制令(Manufacture Order)MPS : 主生产排程(Master Production Schedule)MRO : 请修(购)单(Maintenance Repair Operation)MRP : 物料需求规划(Material Requirement Planning)MRPII : 制造资源计划(Manufacturing Resource Planning) NFCF : 更改预估量的通知Notice for Changing ForecastOEM : 委托代工(Original Equipment Manufacture)ODM : 委托设计与制造(Original Design & Manufacture)OLAP : 线上分析处理(On-Line Analytical Processing)OLTP : 线上交易处理(On-Line Transaction Processing)OPT : 最佳生产技术(Optimized Production Technology)OQC : 出货品质管制(Out-going Quality Control)PDCA : PDCA管理循环(Plan-Do-Check-Action)PDM : 产品资料管理系统(Product Data Management)PERT : 计画评核术(Program Evaluation and Review Technique) PO : 订单(Purchase Order)POH : 预估在手量(Product on Hand)PR : 采购申请Purchase RequestQA : 品质保证(Quality Assurance)QC : 品质管制(Quality Control)QCC : 品管圈(Quality Control Circle)QE : 品质工程(Quality Engineering)RCCP : 粗略产能规划(Rough Cut Capacity Planning)RMA : 退货验收Returned Material ApprovalROP : 再订购点(Re-Order Point)SCM : 供应链管理(Supply Chain Management)SFC : 现场控制(Shop Floor Control)SIS : 策略资讯系统(Strategic Information System)SO : 订单(Sales Order)SOR : 特殊订单需求(Special Order Request)SPC : 统计制程管制(Statistic Process Control)TOC : 限制理论(Theory of Constraints)TPM : 全面生产管理Total Production ManagementTQC : 全面品质管制(Total Quality Control)TQM : 全面品质管理(Total Quality Management)WIP : 在制品(Work In Process)5S管理5S是由日本企业研究出来的一种环境塑造方案,其目的在藉由整理(SEIRI)、整顿(SEIT ON)、清扫(SEISO)、清洁(SEIKETSU)及身美(SHITSUKE)五种行为来创造清洁、明朗、活泼化之环境,以提高效率、品质及顾客满意度。