某城市污水处理厂毕业设计-完整版含图纸

合集下载

某城市污水处理厂工艺设计(6万m3)

某城市污水处理厂工艺设计(6万m3)

摘要城市污水处理厂是现代城市发展和水资源保护不可缺少的组成部分。

本课题是设计一座日处理量为 6万m3的城市生活污水处理厂。

其核心处理工艺选用的是卡鲁塞尔氧化沟工艺流程。

污水在氧化沟中经曝气设备的搅动与活性污泥充分接触后,大部分的污染物被除去。

最后出水达到国家的有关排放标准。

本文设计介绍了该工艺的特点,并有相关的城市污水处理厂的工艺设计过程。

关键词:污水处理厂工艺设计氧化沟工艺污泥处理AbstractThe city sewage treatment plant is essential constituent of the modern urban development and the water resources conservation. This topic designs a city life sewage treatment plant which can treat 60,000 m3 sewage one day. Its core processing craft selects the Carrousel oxidation ditch technicalprocess. Sewage in oxidation ditch after aerator mixing and active sludgefull contact, most of pollutants of which are removed. Last, the water leakage achieved the country related discharges standard. This article introduceds the characteristic of this craft and supplies the correlated process of the city sewage treatment plant.Key words:Sewage treatment plant Technological design Oxidation ditch craft Sludge processing目录第一章设计概述............................................. - 4 -1.1城市生活污水处理现状及发展.................................................................... - 4 -1.1.1 目前存在的问题................................................................................ - 4 -1.1.2 今后的发展趋势................................................................................ - 5 -1.2 毕业设计任务的主要内容(含主要技术参)..................... - 5 -1.2.1 污水处理厂服务范围及建设规模.................................................. - 5 -1.2.2 污水处理厂进水水质...................................................................... - 5 -1.2.3 污水处理厂出水水质...................................................................... - 6 -1.2.4 污水处理厂厂区概况...................................................................... - 6 -1.3 毕业设计应完成的工作(含图纸数量)................................................. - 7 -1.3.1 毕业设计最终成果.......................................................................... - 7 -1.3.2 要求.................................................................................................. - 7 -1.3 设计目的..................................................................................................... - 7 -第二章工艺流程确定............................................ - 9 -2.1 设计原则....................................................................................................... - 9 -2.1.1 设计原则............................................................................................ - 9 -2.1.2 设计依据............................................................................................ - 9 -2.2 适合中小型污水处理厂的脱氮除磷工艺............................................... - 10 -2.2.1 处理工艺大方案的比选................................................................ - 10 -2.2.2 处理工艺小方案的比选................................................................ - 16 -2.2.3 处理工艺流程................................................................................ - 19 -第三章处理系统构筑物计算..................................... - 25 -3.1 进水井....................................................................................................... - 25 -3.2 粗格栅....................................................................................................... - 25 -3.3 提升泵房................................................................................................... - 29 -3.4 细格栅....................................................................................................... - 30 -3.5 曝气沉砂池............................................................................................... - 34 -3.6 厌氧池......................................................................................................... - 38 -3.7 卡鲁塞尔氧化沟......................................................................................... - 39 -3.8 二沉池....................................................................................................... - 49 -3.9 接触池....................................................................................................... - 56 -3.10 计量槽..................................................................................................... - 58 -3.11 污泥泵房................................................................................................... - 58 -3.12 污泥浓缩池............................................................................................. - 60 -3.13 储泥池..................................................................................................... - 62 -3.14 污泥脱水间............................................................................................. - 63 -第四章水头损失确定........................................... - 65 -4.1 废水处理水的高程布置计算..................................................................... - 65 -4.1.1 管段选择及沿程损失的计算.......................................................... - 65 -4.1.2 污水管的弯头处局部损失的计算.................................................. - 67 -4.1.3 流过构筑物时水头损失的确定...................................................... - 68 -4.1.4 总水头损失...................................................................................... - 68 -4.2 污泥高程的计算......................................................................................... - 68 -第五章污水处理厂总体布置...................................... - 69 -5.1 污水厂厂址选择......................................................................................... - 69 -5.1.1 遵循原则.......................................................................................... - 69 -5.2 污水厂平面布置......................................................................................... - 70 -5.2.1 污水处理厂平面布置原则.............................................................. - 70 -5.3 污水厂的高程布置..................................................................................... - 71 -第六章劳动定员............................................... - 72 -6.1 生产组织..................................................................................................... - 72 -6.2 劳动定员..................................................................................................... - 72 -6.3 人员培训..................................................................................................... - 72 -第七章工程技术经济分析........................................ - 73 -7.1 土建费用及主要设备材料费用................................................................. - 73 -7.1.1 土建费用造价列表.......................................................................... - 73 -7.1.2 主要设备清单.................................................................................. - 73 -7.1.3 直接投资费用.................................................................................. - 74 -7.2 运行费用计算............................................................................................. - 74 -7.2.1 成本估算.......................................................................................... - 74 -7.2.2 运行费用.......................................................................................... - 75 -7.2.3 工资福利开支.................................................................................. - 75 -7.2.4 生产用水水费开支.......................................................................... - 75 -7.2.5 运费.................................................................................................. - 76 -7.2.6 维护维修费...................................................................................... - 76 -7.2.7 管理费用.......................................................................................... - 76 -7.2.8 运行成本核算.................................................................................. - 76 -第八章环境保护、建筑防火和职业安全防护....................... - 77 -8.1 环境保护..................................................................................................... - 77 -8.1. 污水............................................................................................................ - 77 -8.2 厂区绿化..................................................................................................... - 77 -8.3 建筑防火..................................................................................................... - 77 -8.4 职业安全防护............................................................................................. - 78 -参考文献(References)......................................... - 78 -致谢- 80 -第一章设计概述1.1城市生活污水处理现状及发展世界任何国家的经济发展,都会推进社会进步、促进工农业生产能力得到提高,使人民生活得到进一步改善,但是也随之带来不同程序的环境污染。

污水处理厂毕业设计(包含CAD大图)

污水处理厂毕业设计(包含CAD大图)

目录引言................................................. 错误!未定义书签。

1 设计任务及概况 (6)1.1设计任务及依据 (6)1.1.1 设计任务 (6)1.1.2 设计依据及原则 (6)1.1.3设计围 (7)1.2设计水量及水质 (7)1.2.1设计水量 (7)1.2.2设计水质 (7)1.3.3设计人口 (7)2 工艺设计方案的确定 (8)2.1方案确定的原则 (8)2.2污水处理工艺流程的确定 (8)2.2.1厂址及地形资料 (8)2.2.2气象及水文资料 (9)2.2.3可行性方案的确定 (9)2.2.4工艺流程方案的确定 (10)2.2.5污泥处理工艺流程 (12)2.3主要构筑物的选择 (12)2.3.1格栅 (12)2.3.2泵房 (13)2.3.3沉砂池 (13)2.3.4初沉池、二沉池 (14)2.3.5曝气池 (14)2.3.6接触池 (15)2.3.7计量槽 (16)2.3.8浓缩池 (16)2.3.9消化池 (16)2.3.10污泥脱水 (17)3污水处理系统工艺设计 (17)3.1格栅的计算 (17)3.1.1粗格栅 (17)3.1.2格栅的计算 (18)3.1.3选型 (21)3.2泵房 (21)3.2.1泵房的选择 (21)3.2.2泵的选择及集水池的计算 (21)3.2.3扬程估算 (22)3.3细格栅 (22)3.3.1细格栅的计算: (22)3.3.2格栅的计算 (23)3.3.3选型 (25)3.4沉砂池的计算 (26)3.4.1池体计算 (26)3.4.2沉砂室尺寸计算 (27)3.4.3排砂 (29)3.4.4出水水质 (30)3.5初沉池 (30)3.5.1池体尺寸计算 (30)3.5.2中心管计算 (33)3.5.3出水堰的计算 (34)3.5.4集配水井计算 (35)3.5.5出水水质 (35)3.5.6选型 (36)3.6曝气池 (36)3.6.1池体计算 (36)3.6.2曝气系统设计与计算 (39)3.6.3供气量 (40)3.6.4空气管道系统计算 (43)3.6.5空压机的选择 (46)3.6.6污泥回流系统 (46)3.7二沉池 (47)3.7.1池体尺寸计算 (47)3.7.2中心管计算 (50)3.7.3出水堰的计算 (51)3.7.4集配水井计算 (51)3.7.5出水水质 (53)3.7.6选型 (53)3.8接触池 (53)3.8.1接触池尺寸计算 (53)3.8.2加氯间 (54)3.9计量槽 (55)4 污泥的处理与处置 (55)4.1污泥浓缩池 (55)4.2污泥消化池 (59)4.2.1 一级消化池池体部分计算 (59)4.2.2 一级消化池池体各部分表面积计算 (61)4.2.3二级消化池 (62)4.3贮气柜 (62)4.4污泥控制室 (63)4.4.1污泥投配泵的选择 (63)4.4.2污泥循环泵 (64)4.4.3污泥控制室布局 (65)4.5脱水机房 (65)4.5.1采用带式压滤机除水 (65)4.5.2选型 (66)4.6事故干化场 (66)4.7压缩机房 (67)5 污水处理厂总体布置 (67)5.1平面布置 (67)5.1.1平面布置的一般原则 (67)5.1.2 平面布置 (67)5.2污水处理厂高程布置 (68)5.2.1高程布置原则 (68)5.2.2污水污泥处理系统高程布置 (69)总结 (70)参考文献 (72)致 ................................................... 错误!未定义书签。

20000m3d城市污水处理厂综合设计(含11个CAD作图图纸)--优秀毕业设计{修}

20000m3d城市污水处理厂综合设计(含11个CAD作图图纸)--优秀毕业设计{修}

本设计污水处理厂综合设计包括15个图纸,十分全面,具体详见报告后附图。

本报告附图全面详细。

图纸内容如下:A2O池,初沉池,幅流式二沉池,隔栅,工艺简单图,工艺流程图(高程图),回转耙式格栅除污机图,平面布置图,污泥浓缩池,厌氧消化池,钟式沉砂池等。

全为CAD制图。

下载后复制放大或打印可看清!题目20000m3/d城市污水处理厂综合设计专业: 环境工程年级: 2005级学号: 3105001286姓名: 莫笑伟指导教师:2008年12 月摘要我国水体污染主要来自两方面,一是工业发展超标排放工业废水,二是城市化中由于城市污水排放和集中处理设施严重缺乏,大量生活污水未经处理直接进入水体造成环境污染。

工业废水近年来经过治理虽有所减少,但城市生活污水有增无减,占水质污染的51%以上。

我国水体污染主要来自两方面,一是工业发展超标排放工业废水,二是城市化中由于城市污水排放和集中处理设施严重缺乏,大量生活污水未经处理直接进入水体造成环境污染。

工业废水近年来经过治理虽有所减少,但城市生活污水有增无减,占水质污染的51%以上。

本设计要求处理水量为20000m3/d的城市生活污水,设计方案针对已运行稳定有效的A2/O活性污泥法工艺处理城市生活污水。

A2O工艺由于不同环境条件,不同功能的微)能生物群落的有机配合,加之厌氧、缺氧条件下,部分不可生物降解的有机物(CODNB被开环或断链,使得N、P、有机碳被同时去除,并提高对COD的去除效果。

它可以同NB--时完成有机物的去除,硝化脱氮、磷的过量摄取而被去除等功能,脱氮的前提是NH3N应完全硝化,好氧池能完成这一功能,缺氧池则完成脱氮功能。

厌氧池和好氧池联合完成除磷功能。

关键词:城市生活污水,活性污泥,A2/O目录摘要 (III)目录 (IV)第一章设计概述 ······································································- 7 -1设计任务 ······································································- 7 - 2设计原则 ······································································- 7 - 3设计依据 ······································································- 8 - 第二章工艺流程及说明 ·····························································- 8 -1工艺方案分析 ································································- 8 - 2工艺流程 ······································································- 9 - 3流程各结构介绍 ·····························································- 9 -3.1格栅······························································································· - 9 -3.2沉砂池··························································································- 10 -3.3初沉池··························································································- 10 -3.4生物化反应池··············································································- 10 -3.5二沉池··························································································- 12 -3.6浓缩池··························································································- 12 - 第三章构筑物设计计算 ··························································· - 12 -1格栅 ·········································································· - 12 -1.1设计说明······················································································- 12 -1.2设计计算······················································································- 13 -2沉砂池 ······································································· - 16 -2.1设计说明······················································································- 16 - 3初沉池 ······································································· - 17 -3.1设计说明······················································································- 17 -3.2设计计算······················································································- 17 - 4生化池 ······································································· - 19 -4.1设计说明······················································································- 19 -4.2设计计算······················································································- 19 - 5二沉池 ······································································· - 26 -5.1设计说明······················································································- 26 -5.2设计计算······················································································- 26 - 6液氯消毒 ···································································· - 29 -6.1设计说明······················································································- 29 -6.2设计计算······················································································- 29 - 7污泥浓缩池 ································································· - 30 -7.1设计说明······················································································- 30 -7.2设计计算······················································································- 30 -8 污泥消化池 ································································· - 31 -8.1设计说明······················································································- 31 -8.2设计计算······················································································- 32 - 9浓缩污泥提升泵房 ························································ - 38 -9.1设计选型······················································································- 38 -9.2提升泵房······················································································- 38 -9.3污泥回流泵站··············································································- 38 -10污泥脱水间 ······························································· - 39 -10.1设计说明······················································································- 39 -11鼓风机房 ·································································· - 39 - 12恶臭处理系统 ···························································· - 39 -12.1设计说明······················································································- 39 -12.2设计计算······················································································- 39 -12.3风机选型······················································································- 40 - 第四章污水处理厂总体布置 ····················································· - 41 -1总平面布置 ································································· - 41 -1.1总平面布置原则··········································································- 41 -1.2总平面布置结果··········································································- 41 -2高程布置································································································- 42 -2.1高程布置原则··············································································- 42 - 第五章参考文献 ···································································· - 42 -第一章设计概述1设计任务本次课程设计的主要任务是完成某城市污水厂的A2/O工艺设计处理生活污水,处理水量为20000m3/d,按近期规划人口10万人计算(自定)。

(完整版)城镇污水处理厂毕业课程设计

(完整版)城镇污水处理厂毕业课程设计

目录1. 前言 (1)1.1 设计概述 (1)1.1.1 设计目的 (1)1.1.2 设计背景 (1)1.2 设计内容 (1)1.2.1 基本资料 (1)1.2.2 主要内容 (2)1.2.3 水质去除率计算 (2)2. 城镇污水处理厂设计方案的确定 (3)2.1 污水处理方式的设计原则与设计依据 (3)2.1.1 设计原则 . (3)2.2 污水处理 AB工艺的简介 (4)2.2.1 A B 法的由来 . (4)2.2.2 A B 法工艺的主要特征 (4)2.2.3 A B 法工艺的处理机理和适用范围 (4)2.2.4 AB 法的除磷脱氮 (5)2.2.5 AB 法的优缺点 (6)2.3 AB 处理工艺流程示意图 ` (7)2.4 主要构筑物的选择 (8)2.4.1 污水处理构筑物的选择 (8)2.4.2 污泥处理构筑物的选择 (9)3. 设计计算及说明 (10)3.2 格栅的设计计算 . (11)3.2.1 泵前中格栅 . (11)3.2.2 泵后细格栅 . (13)3.3 污水提升泵房 (16)3.3.1 选泵 (16)3.3.2 集水池 (17)3.3.3 潜污泵的布置 (18)3.3.4 泵房高度的确定 (18)3.3.5 泵房附属设施 (18)3.3.6 单管出水井的设计 (19)3.3.7 污水提升泵房设计草图 (19)3.4 曝气沉砂池的设计计算 (19)3.4.1 池子的有效容积( V) (20)3.4.2 水流断面积( A) (20)3.4.3 池总宽度( B) (20)3.4.4 每格池子宽度( b) (20)3.4.5 池长( L) (20)3.4.6 每小时的需空气量 (q) (20)3.4.7 沉砂室所需容积( Vm3) (20)3.4.8 每个沉砂斗容积( V0) (21)3.4.9 沉砂斗各部分尺寸 (21)3.4.10 曝气沉砂池设计草图 (22)3.5 A 段曝气池和 B 段曝气池的设计计算 (22)3.5.1 A 段曝气池的设计计算 (22)3.5.2 B 段曝气池的设计计算 (26)3.6 沉淀池的设计计算 (29)3.6.1 中间沉淀池的设计计算 (29)3.6.2 二次沉淀池的设计计算 (31)3.6.3 沉淀池设计图 (32)3.7 平流式消毒池与加氯间 (32)3.7.1 设计计算 (33)3.8 巴氏计量槽 (35)3.8.1 设计参数 . (35)3.9 鼓风机房 (36)3.9.1 鼓风机的选型 (36)3.9.2 鼓风机房的设计 (37)3.9.3 鼓风机房设计图 (39)4. 污泥处理系统的设计 (39)4.1 回流污泥泵房 . (39)4.1.1 设计说明 . (39)4.1.2 回流污泥泵设计选型 (40)4.2 剩余污泥泵房 . (40)4.2.1 设计说明 . (40)4.2.2 设计选型 . (40)4.3 浓缩池 (41)4.3.1 设计参数及设计要求 (41)4.3.2 浓缩池的尺寸设计计算 (41)4.3.3 污泥浓缩池设计图 (45)4.4 污泥脱水机房 . (45)4.4.2 设计参数 (46)4.4.3 设计计算 . (46)4.4.4 污泥脱水机房设计图 (47)5. 污水处理厂的布置 (48)5.1 污水处理厂平面布置 (48)5.1.1 平面布置原则 (48)5.1.2 平面布置 . (48)5.1.3 污水处理厂平面布置尺寸 (48)5.2 污水处理厂的高程布置 (48)5.2.1 高程布置原则 (48)5.2.2 污水处理构筑物高程计算 (48)5.2.3 污泥处理构筑物高程计算 (48)6. 参考文献 (48)7. 心得体会 (49)8. 致谢 (49)9. 附图 (50)9.1 污水处理厂的平面布置图 (50)9.2 污水处理厂的高程分布图 (50)1.前言1.1 设计概述1.1.1 设计目的通过课程设计,加深理解所学专业知识,培养学生运用所学专业知识的能力,在设计、计算、绘图方面得到锻炼,初步学会针对污水处理设计任务如何选择处理工艺方法,如何组织工艺流程,如何计算和确定主要的构筑物、如何选择设备。

某城市污水处理厂毕业设计 完整版含图纸25页

某城市污水处理厂毕业设计 完整版含图纸25页

水污染控制工程课程设计题目:某城镇二级污水处理厂设计指导老师:设计人:班级:时间:设计任务书一、课程设计的目的本课程设计是水污染控制工程教学中的一个重要实践环节,要求综合运用所学的有关知识,掌握解决实际工程问题的能力,并进一步巩固和提高理论知识。

1复习和消化所学课程内容,初步理论联系实际,培养分析问题和解决问题的能力。

2了解并掌握污水处理工程设计的基本方法、步骤和技术资料的运用;3训练和培养污水处理的基本计算方法及绘图的基本技能;4提高综合运用所学理论知识独立分析和解决问题的能力;5了解国家环境保护和基本建设等方面的政策措施。

二、课程设计的任务根据已知资料,确定城市污水处理厂的工艺流程,计算各处理构筑物的尺寸,绘制污水处理厂的总平面布置图和高程布置图,并附详细的设计说明书和计算书。

三、设计内容及要求1 设计说明书:说明城市概况、设计任务、工程规模、水质水量、工艺流程、设计参数、主要构筑物的尺寸和个数、主要设备和辅助设备的型号和数量、处理构筑物平面布置及高程计算、参考资料;说明书应简明扼要,力求多用草图、表格说明,要求文字通顺、段落分明、字迹工整。

2 设计计算书:各构筑物的计算、主要设备(如水泵、鼓风机等)的选取、污水处理厂的高程计算等(各构筑物内部的水头损失查阅课本或手册,构筑物之间的水头损失按管道长度计算);3 设计图纸:污水处理厂总平面布置图和高程布置图各一张。

总平面布置图中应表示各构筑物的确切位置、外形尺寸、相互距离;各构筑物之间的连接管道及场区内各种管道的平面位置、管径、长度、坡度;其它辅助建筑物的位置、厂区道路、绿化布置等;污水污泥处理高程中标出各种构筑物的顶、底、水面以及重要构件的设计标高、地面标高等。

四、设计资料1 城市概况——江南某城镇位于长江冲击平原,占地约6.3 km2,呈椭圆形状,最宽处为2.4 km ,最长处为2.9 km 。

2 自然特征——该镇地形由南向北略有坡度,平均坡度为0.5 ‰,地面平整,海拔高度为黄海绝对标高3.9~5 .0 m,地坪平均绝对标高为4.80 m。

毕业设计---某城市污水处理厂工艺设计(含外文翻译)

毕业设计---某城市污水处理厂工艺设计(含外文翻译)

摘要本次设计的题目某城市污水处理厂工艺设计,设计流量为15万m3/d,进水水质为BOD5=200mg/L,CODc r=450mg/L,SS=370mg/L,氨氮=15。

出水水质:CODcr≤63mg/L;BOD5≤14 mg/L;SS≤30 mg/L;氨氮≤3 mg/L。

设计要求出水水质满足《中华人民共和国污水综合排放标准》(GB8978-1996)二级标准。

采用氧化钩法处理该城市污水,氧化沟处理技术70年代末就在国内开始应用,在污水处理中取得了良好的效果。

氧化沟是活性污泥法的一种改型,其曝气池呈封闭的沟渠型,污水和活性污泥的混合液在其中进行不断的循环流动,氧化沟通常在延时曝气条件下进行污水处理,这时水力停留时间长(10~40h),有机负/(kg VSS•d)]。

与其他生物处理工与艺相比,有以下一些荷低[0.05~0.15kg BOD5技术、经济方面的特点:工艺流程简单,构筑物少,运行管理方便;曝气设备和构造形式的多样化、运行灵活;处理效果稳定、出水水质好并可以实现脱氮除磷。

关键词:城市污水,氧化沟,活性污泥法AbstractThe design for the title of the city sewage treatment plant process design, design flow for the 150 ,000 m3 / d, water quality for BOD5 is200mg / L, COD cr is 450mg / L, SS is 370mg / L, Ammonia is15. Effluent quality for BOD5is less than 14mg / L, COD is less than 63mg / L, SS is less than 30 mg / L, Ammonia is less than 3mg / L. The drainage water should meet the two criteria water requirements of GB8978-1996《wastewater discharge standards》.By the oxidation ditch treatment of urban sewage,oxidation ditch technology was applied in our country about 70s, and had good effect in treating waste water. Oxidation ditch is a remodel of active mud method, its plug flow aeration assuming obturate ditch type, the mixed liquid of waste water and active mud flowing in circle. Oxidation ditch usually treats waste water in delay plug flow condition, the waterpower has long settle time (10~40h), low organic loading [0.05~0.15kg BOD5/(kg VSS•d)]. comparing with other biology treat technology, such as: simple process, little building, convenient to administering, its equipment and structure diversification, stabilization effect, and has good water quality, can pull off the nitrogen.Keywords : Urban Sewage,Oxidation ditch,Live and dirty mire method目录摘要 (I)ABSTRACT (II)目录 (1)第一章绪论 (4)1.1设计任务 (4)1.1.1设计题目 (4)1.1.2设计任务与内容 (4)1.1.3基本要求 (4)1.1.4设计计算说明书的具体要求 (5)1.2设计原始资料及处理目标 (5)1.2.1进水水质资料 (5)1.2.2气候资料 (5)1.2.3处理目标 (6)1.2.4处理效果的估算 (6)1.3处理工艺比较与选定 (6)1.3.1水质特征 (6)1.3.2目前国内外的研究现状 (7)1.3.3活性污泥法的新发展 (8)1.3.4工艺流程的确定 (9)1.3.5设计依据 (12)第二章污水处理构筑物设计计算 (14)2.1中格栅 (14)2.1.1设计说明 (14)2.1.2设计参数 (14)2.1.3设计计算 (14)2.2污水提升泵房 (17)2.2.1泵房设计计算 (17)2.3曝气沉砂池 (18)2.3.1.设计说明 (18)2.3.2池体设计计算 (18)2.4.1氧化沟的由来 (21)2.4.2氧化沟的结构 (21)2.4.3 Carrousel氧化沟处理污水的原理 (21)2.4.4设计参数 (22)2.4.5池体设计计算 (22)2.4.6曝气机设计选型 (23)2.4.7剩余污泥计算 (24)2.4.8计算校核 (25)2.5二沉池 (25)2.5.1设计说明 (25)2.5.2设计参数 (27)2.5.3池体设计计算 (27)2.6接触消毒池 (29)2.6.1设计说明 (29)2.6.2设计参数 (30)2.6.3设计计算 (30)第三章污泥处理构筑物设计计算 (33)3.1回流污泥泵房 (33)3.1.1设计说明 (33)3.1.2回流污泥泵房设计选型 (33)3.2剩余污泥泵房 (33)3.2.1设计说明 (33)3.2.2设计选型 (33)3.3污泥浓缩池 (34)3.3.1设计说明 (34)3.3.2设计参数 (34)3.3.3设计计算 (34)3.4污泥脱水间 (36)第四章污水处理厂平面与高程布置 (38)4.1平面布置 (38)4.1.1各处理单元构筑物的平面布置 (38)4.1.3辅助建筑物 (38)4.2高程布置 (38)4.2.1输送方式 (39)4.2.2污水管材料选取 (39)4.2.3设计充满度 (39)4.2.4设计流速 (39)4.2.5管径设计 (39)4.2.6最小设计坡度 (39)4.2.7污水管道的埋深深度 (40)4.3水力损失计算 (40)4.3.1水头损失计算 (40)4.3.2构筑物水力损失 (41)4.3.3总水力损失 (41)4.4高程计算 (42)4.4.1设计说明 (42)4.4.2设计计算 (42)第五章工程概预算 (43)5.1.基本建设投资 (43)5.2运行费用 (44)5.2.1运行成本估算 (44)第六章设计结论 (45)参考文献 (46)附录A 英文文献及译文 (48)附录B 设计图纸...................................... 错误!未定义书签。

某城镇污水处理厂毕业设计(DOC)

某城镇污水处理厂毕业设计(DOC)

灵宝市污水处理厂初步设计摘要水是人类的生命之源,它孕育和滋养了地球上的一切生物,并从各个方面为人类服务。

但是,水环境中的淡水资源却很少,仅占总量的2.53%,而目前能供人类直接取用的淡水资源仅占0.22%。

加之自然水源的季节变化和地区差异,以及自然水体遭到的普遍污染,致使可能直接取用的优质水量日益短缺,难以满足人们生活和工农业生产日益增长的需求,因此保护和珍惜水资源,是整个社会的共同职责。

所以说水资源是基础性自然资源、战略性经济资源,水资源安全属于资源和经济安全。

80年代以来,废水生物处理新工艺的研究、开发和应用,已在全世界范围内得到了长足的进展,并出现了许多新型的废水生物处理技术。

这些新工艺有的已在国内外实际工程中得到了良好的应用,有的已显示出其良好的应用发展前景、得到广大的研究者和工程技术人员的关注并正在得到不断深入的研究,他们的共同特点是高效、稳定、节能,并具有对污染物去除的多功能性,大多具有脱氮除磷等深度处理的良好效能,并正朝自动化控制的方向发展。

近年来,随着灵宝市经济不断发展,人口和工业产值也随之增加,生活用水和工业用水的需求也急剧扩大,如此必然引起污水量的增加,一系列水环境问题将日益突出。

如不及时对产生的污水进行治理,那么灵宝市的水环境污染将严重下去,整个市区的生活环境和生态平衡都将受到更为严重的破坏,而这一切的恢复将是十分缓慢的,要为之付出的代价也十分昂贵。

因此,必须建立一座生活污水处理厂。

污水通过治理可以缓解和减轻水环境污染,缓解水资源的供需矛盾,为灵宝市的经济文化的发展创造有利条件。

工程的兴建,一方面为人们提供优质的生活污水,提高人们的生活质量和健康水平;另一方面是工业用水水质得到保障。

本设计是针对灵宝市的实际情况而设计的。

由于灵宝市生活用水的流量较大、SS含量高、氮磷等也都需要有一定的去除。

A2/O在同时脱氮除磷去除有机物的的工艺中,该工艺流程最为简单,总水力停留时间也少于同类其他工艺,在厌氧—缺氧—好氧交替运行下,丝菌不会大量繁殖,SVI一般小于100,不会发生污泥膨胀等优点。

(完整版)污水处理厂毕业课程设计

(完整版)污水处理厂毕业课程设计

1总论1.1 设计任务和内容1.1.1 设计任务为某城市设计一座日处理为12万的二级污水处理厂1.1.2 设计内容①工艺构筑物选型作说明②主要处理设施(格栅、沉砂池、初沉池、曝气池、二沉池)的工艺计算③污水处理厂的平面和高程布置1.2任务的提出目的及要求1.2.1 任务的提出及目的随着经济飞速发展,人民生活水平的提高,对生态环境的要求日益提高,要求越来越多的污水处理后达标排放。

在全国乃至世界范围内,正在兴建及待建的污水厂也日益增多。

有学者曾根据日处理污水量将污水处理厂分为大、中、小三种规模:日处理量大于10万m3为大型处理厂,1---10m3万为中型污水处理厂,小于1万m3的为小型污水处理厂。

根据所确定的工艺和计算结果,绘制污水处理厂总平面布置图,高程图,工艺流程图。

1.2.2 要求①方案选择合理,确保污水经处理后的排放水质达到国家排放标准。

②所选厂址必须符合当地的规划要求,参数选取与计算准确。

③全图布置分区合理,功能明确;厂前区,污水处理区污泥处理区条块分割清楚。

延流程方向依次布置处理构筑物,水流创通。

厂前区布置在上风向并用绿化隔离带与生产区隔离,以尽量减少对厂前区的影响,改善厂前区的工作环境。

④构筑物的布置应给厂区工艺管线和其他管线设有余地,一般情况下,构筑物外墙距道路边不小于6米。

⑤厂区设置地坪标高尽量考虑土方平衡,减少工程造价,满足防洪排涝要求。

⑥水力高程设计一般考虑一次提升,利用重力依次流经各个构筑物,配水管的设计需优化,以尽量减少水头损失,节约运行费用。

⑦设计中应该避免磷的再次产生,一般不主张采用重力浓缩池,而是采用机械浓缩脱水的方式,随时将排出的污泥进行处理。

⑧所选设备质优、可靠、易于操作。

并且设计必须考虑到方便以后厂区的改造。

⑨附有平面图,高程图各一份。

1.3 基本资料1.3.1 设计基本要求污水处理量:12万,污水处理厂设计进出水质:(如下表)1.3.2 处理要求污水经二级处理后应符合以下具体要求:≦70mgL;≦20 mgL;≦30 mgL1.3.3 处理工艺流程污水采用传统活性污泥法工艺处理,具体流程如下:污水→分流闸井→格栅间→污水泵房→出水井→计量槽→沉砂池→初沉池→曝气池→二沉池→消毒池→出水1.3.4 气象与水文资料(1)气象风向:多年主导风向为北北东风气温:最冷月平均为5℃最热月平均为32.5℃极端气温,最高为41.9℃;最低为-1℃;最大冻土深度为0.05m(2)水文降水量:多年平均为每年728mm蒸发量:多年平均为每年1210mm地下水水位:地面下5~6m1.3.5 厂区地形污水厂选址在64-66m之间,平均地面标高为64.5m。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

设计说明书环境条件见设计任务书的设计资料一栏。

二、处理工艺的选择该城镇污水处理厂主要是用于处理城区生活污水和部分工业废水,且对氮磷的去除有一定要求。

按《城市污水处理和污染防治技术政策》要求推荐,对脱磷脱氮有要求的城市,应采用二级强化处理,如AIO工艺,A/0工艺,SBR及其改良工艺,氧化沟工艺,以及水解好氧工艺,生物滤池工艺等。

故该设计应选取二级强化处理。

鉴于SBR工艺具有以下特点:(1) 工艺流程简单、管理方便、造价低。

SBR工艺只有一个反应器,不需要二沉池,不需要污泥回流设备,一般情况下也不需要调节池,因此要比传统活性污泥工艺节省基建投资30%以上,而且布置紧凑,节省用地。

由于科技进步,目前自动控制已相当成熟、配套。

这就使得运行管理变得十分方便、灵活,很适合小城市采用。

(2) 处理效果好。

SBR工艺反应过程是不连续的,是典型的非稳态过程,但在曝气阶段其底物和微生物浓度变化是连续的( 尽管是处于完全混合状态中),随时间的延续而逐渐降低。

反应器内活性污泥处于一种交替的吸附、吸收及生物降解和活化的变化过程之中,因此处理效果好。

(3) 有较好的除磷脱氮效果。

SBR工艺可以很容易地交替实现好氧、缺氧、厌氧的环境,并可以通过改变曝气量、反应时间等方面来创造条件提高除磷脱氮效率。

(4) 污泥沉降性能好。

SBR工艺具有的特殊运行环境抑制了污泥中丝状菌的生长,减少了污泥膨胀的可能。

同时由于SBR工艺的沉淀阶段是在静止的状态下进行的,因此沉淀效果更好。

(5) SBR工艺独特的运行工况决定了它能很好的适应进水水量、水质波动。

均适用于本设计,故选取SB工艺作为本设计的水处理工艺。

三、污水厂的主要工艺流程四、设计说明1、格栅和提升泵房设置方式:粗格栅T泵房T细格栅格栅的主要作用是将污水中的大块污物拦截,以免其对后续处理单元的机泵或工艺管线造成损害。

由于直棒式格栅运行可靠,布局简洁,易于安装维护,本工艺选用选择Gf型回转格栅。

粗格栅运行参数:栅前流速0.5m/s ,过栅流速0.8m/s,栅条宽度0.02m,格栅间隙数27,水头损失0.07m,每日栅渣量0.823m3/d ;细格栅运行参数:栅前流速0.5m/s,过栅流速0.8m/s,栅条宽度0.01m,栅前渠道水深0.4m,格栅倾角60°,栅间隙数66,水头损失0.2m ,每日栅渣量1.18m3/d 。

对于新建污水处理厂, 工艺管线可以充分优化, 故污水只考虑一次提升。

污水经提升后入曝气沉砂池。

然后自流进入各工艺池,提升泵房采用2 台(1 用1 备)型号为YC300LXL-780-11 的水泵,其主要性能参数为:流量545-900m3/h,扬程9-12m,转速980r/min,效率78%配套电机及功率为Y250M-37叶轮名义直径335mm其中细格栅计算草图如下:2、沉砂池沉砂池主要用于去除污水中粒径大于0.2mn,密度2.65t/m3的砂粒,以保护管道、阀门等设施免受磨损和阻塞。

平流式沉砂池具有构造简单、处理效果好的优点。

故本设计采用平流式沉砂池。

污水经立式污水污物泵提升后经细格栅,进入钟式沉砂池,共两组对称与提升泵房中轴线布置,每组分为两格。

设计参数为:沉砂池长度9m池总宽1.2m,有效水深0.96m,贮砂斗容积0.178m3(每个沉砂斗),斗壁与水平面倾角为600,斗高0.68m,斗部上口宽1.23m。

草图如下:3、SB反应池本设计中为进水时间1 h ;曝气时间h ;有效反应时间4 h ; 沉淀时间1 h ;滗水时间0.5 h ;除磷厌氧时间0.5 h ,一个周期T N=6 h,经过预处理的污水由配水井连续不断地进入反应池,反应区内安照“进水、闲置、曝气、沉淀、滗水”程序运行。

本设计米用SBR反应池4座,并联运行,运行周期为6h。

单座尺寸为55m*15m*5.5m反应池内最小水深2.9m,滗水高度1.1m,内设微孔曝气头。

采用膜片式微孔曝气器,每个服务面积A=0.5m2,曝气头个3数为1000个;滗水高度1.56m,滗水速度为0.694 m /s4、污泥泵房污泥泵选三台(两用一备),单泵流量Q>2Q2 = 13.07m3/h。

选用1PN污泥泵Q 7.2 —16nVh , H: 14-12m,功率为3kW4、污泥浓缩池污泥浓缩的目的是使污泥初步脱水、缩小污泥体积。

为后续处理创造条件。

浓缩脱水方法有重力沉降浓缩、上浮浓缩以及其他浓缩方法。

这里使用重力浓缩—辅流式污泥浓缩池。

浓缩后的污泥采用带式压滤机处理污泥,最后产生的干泥运往垃圾焚烧厂处理。

设计参数:设计流量:每座1344.4kg/d ,采用2 座,进泥浓度10g/L,污泥浓缩时间13h,进泥含水率99.0%,出泥含水率96.0%, 池底坡度0.08,坡降0.28m,贮泥时间4h,上部直径9.5m,浓缩池总高4.68m,泥斗容积5.86m3。

5、贮泥池设贮泥池1座,贮泥时间12h,选用1PN污泥泵两台,一用一备,单台流量Q7.2〜16nVh,扬程H14〜12mHO,功率3kW五、处理构筑物平面布置处理构筑物是污水处理厂的主体建筑物, 应根据各构筑物的功能和水力要求结合当地地形地质条件,确定它们在厂区内的平面布置。

污水处理厂的辅助建筑物有泵房,鼓风机房,办公室等,其建筑面积按具体情况而定,在污水厂内主干道应尽量成环,方便运输,保证30%以上的绿化。

为保证污水处理厂二期扩建工程的实施, 在厂区留有一定面积的扩建空间。

六、高程计算为了降低运行费用和使维护管理,污水在处理构筑物之间的流动以按重力流考虑为宜,厂内高程布置的主要特点是先确定最大构筑物的地面标高,然后根据水头损失,通过水力计算,递推出前后构筑物的各项控制标高。

根据SBR反应池的设计水面标高,推求各污水处理构筑物的水面标高,根据和处理构筑物结构稳定性,确定处理构筑物的设计地面标七、参考资料《水污染控制工程实践教程》彭党聪主编化学工业出版社;《水污染控制工程》下册高廷耀、顾国维主编高等教育出版社;《给水排水工程专业工艺设计》南国英张志刚主编化学工业出版社《环保设备设计与应用》罗辉主编高等教育出版社《给水排水设计手册(第九册)专用机械》第三版上海市政工程设计研究院主编中国建筑工业出版社设计计算书设计流量生活污水量:近期30000*200*10 -3*1.7 =10200 (m3/d );远期60000*200*10 -3 *1.7=20400 (m3/d )工业污水量:近期5000*1.3 =7500 (m3/d );远期10000*1.3 =13000 (m3/d )总污水量:近期17700 (m3/d );远期33400 (m3/d )取设计污水量Q =20000(m3/d )粗格栅1、主要设计参数栅条宽度:S = 10 mm栅条间隙宽度:b = 20 mm过栅流速:v二0.8 m/s栅前渠道流速:0.5 m/s栅前渠道水深:h = 0.5 m格栅倾角:a = 60 °数量:1座单位栅渣量:W=0.07m3/10 3m2、工艺尺寸(1) 格栅尺寸过栅流量:Q= Q = 20000 m3/d = 0.2314 m 3/s栅条间隙数:n Q sin02314辽26.02 取n=27 bhv 0.02 0.5 0.8有效栅宽:B= S (n+1) + bn = 0.01* (27+1) + 0.02*27 =0.8 m进水渠道宽度B:要求B1*h*v > Qmax取B= 0.6 m(2) 格栅选择选择GH型回转格栅;* fQ.sin 0.2314 sin 60 3 头际过流速度:v 0.77 m/sbhn 0.02 0.5 27(3) 栅渠尺寸栅渠过水断面S : S Q 0.23140463m 2v 0.5栅槽总长度:i= h +h 2= 0.5+0.3 = 0.8 ma1指进水渐宽部分的展开角,一般取20°3、 水头损失格栅断面为锐边矩形断面(B =2.42 ) 格栅水头损失:2 2, ,S 、0.75 V … ,0.01、0.750.77 . “ ccr hi( )sin k 2.42 () sin 60 3 0.07m b 2g0.022 9.8栅后槽总高度:H= h+ h 1+ h 2 =0.5+0.07+0.3 = 0.87 mh 2 —栅前渠超高,一般取0.3 m4、 栅渣量对于栅条间距b=20.0mm 的中格栅,城市污水中取每单位体积污水拦截污物为W=0.07m 3/103m ,每日栅渣量为l il 2 1.0 1.5H i tg0.0577 0.029 1.0 0.5tg203.78m其中l iB 10.8 2 tg2 tg600.0577ml 2 匕吗0.029m286400QW i 1000K z86400 0.2314 0.071000 1.70.823—生活污水流量的总变化系数拦截污物量大于0.3m3/d,宜采用机械清栅。

三、细格栅污水由进水泵房提升至细格栅沉砂池,细格栅用于进一步去除污水中较小的颗粒悬浮、漂浮物。

1、主要设计参数3Q= 20000 m/s ,S= 10 mm,b= 10 mm过栅速率:v= 0.8 m/s栅前渠道流速:0.5 m/s栅前渠道水深:0.4 m倾角:a = 60 °数量:1座单位栅渣量:W1=0.07m3/10 3m2、工艺尺寸(1)格栅尺寸栅条间隙数:n 2也°.2314 sin6065.04 取n=66 bhv 0.01 0.4 0.8有效栅宽:B= S (n+1) + bn = 0.01* (66+1) + 0.01*66 = 1.31 m进水渠道宽度B:要求B*h*v > Qmax取Bi= 0.8 m(2)格栅选择选择GH 型回转格栅;H1= h +h 2= 0.4+0.3 = 0.7 ma 1—进水渐宽部分的展开角,一般取20°3、水头损失格栅断面为锐边矩形断面(B =2.42 ) 格栅水头损失:2 2h (S)0.75— sin k 2.42 (0.01)0.75sin60 3 0.2mb 2g 0.01 2 9.8栅后槽总高度:H= h+ h 1+ h 2 =0.4+0.2+0.3 = 0.9 mh 2—为栅前渠超高,一般取0.3 m4、栅渣量实际过流速度:Q^sin\/ 0.2314 .sin 600.79 m3/sVbhn0.010.4 66(3)栅渠尺寸栅渠过水断面 S : SQ0.23140463mv0.5栅槽总长度:L l 1 l 2 1.0 1.5 H10.14 0.07 1.0 0.5 0.73.63mtgtg20B B 1 2 tg1.31 0.8 2 tg 600.14m其中hl l0.1420.07m对于栅条间距b=10.0mm的中格栅,城市污水中取每单位体积污水拦截污物为W=0.01m3/103m,每日栅渣量为86400QW i 1000K z 86400°.2314 o.1 1.18 m3/d 1000 1.7污物的排出采用机械装置:?300螺旋输送机,选用长度l=6.0m 的一台四、平流式沉砂池1、设计参数污水在池内的流速:v= 0.3 m/s ;最大流量时,污水在池内的停留时间t= 45 s ;有效水深:0.25-1.0 m,池宽>0.6 m ;池底坡度:0.022、计算公式(1) 长度:L= vt= 0.2*45 =9 m(2) 水流断面面积:A Q 0.2314 1.157m2v 0.2(3) 池总宽B:设格数n= 2,每格宽0.6 m,贝S B= 1.2 m(4) 有效水深:h2 - 1157 0.96mB 1.2(5) 贮砂斗所需容积86400 QXT K z10686400 0.2314 30 261.7 1030.71m3X—城市污水的沉砂量,一般采用30m/106m (污水);0.2314 1.15720.134m3/s 3、沉砂量Q W K z 1060.2314 30630.35m /dT —排砂时间间隔,这里T= 2 d ;设每一个有两个沉砂斗:V 0714 ~~40.178m3(6) 贮砂斗各部分尺寸设斗的截面为正方形,取贮砂斗高h3‘ = 0.5 m,底宽b i= 0.5 m,斗壁与水平面的倾角为60°,则贮砂斗上口宽b2为b2b1 J05 0.5 1.23mtg 60 tg 60贮砂斗的容积V i为1 I--------------- 1 2M —h3(S S2 .,S S2) —0.5 (0.25 1.51 0.78) 0.42m23 3S 1、S2—分别为贮砂斗上口和下口的面积(7) 贮砂室的高度h3:设采用重力排砂,池底坡度i= 6%,坡向砂斗,则I *h3 h3 0.06 I2 h3 0.06 ---------------29 2 1.23 0.50.5 0.06 0.68m2(8) 池总高hh= h 1+h2+h3 = 0.3+0.96+0.68 =1.94 m(9) 核算最小流速V min五、SBR 反应池1硝化所需要的最低好氧污泥龄66,N (d)S,N 1 1.013(15 T) f s -2.0 4.26d0.47卩一 硝化细菌比生长速率(d-1 ),= 15 C 时,尸0.47 d-1f s —安全系数,取f s 二2.0。