目 录目录 (Ⅰ)摘要 (Ⅳ)英文摘要 (Ⅴ)1 绪论 (1)1.1 贵州岩溶地区特点及遵义地区特点 (1)1.1.1 贵州岩溶地区特点 (1)1.1.2 遵义地区特点 (1)1.2 边坡稳定性评价综述 (1)1.2.1 定性评价方法 (2)1.2.2 定量评价方法 (2)1.3 边坡治理技术综述 (5)2 工程与场区地质概况 (7)2.1 工程概况 (7)2.1.1 场地地理位置与交通 (7)2.1.2 拟建建筑物特征 (7)2.2 场区工程地质概况 (7)2.2.1 地形地貌 (7)2.2.2 地质构造 (7)2.2.3 岩土构造 (7)2.2.4 水文地质条件与岩溶 (8)3 边坡稳定性评价 (9)3.1 概述 (9)3.1.1 边坡稳定性概念 (9)3.1.2 边坡破坏的类型和特征 (9)3.1.3 影响边坡稳定性的因素 (9)3.2 场地边坡稳定性分析 (11)3.2.1 基坑边坡稳定性影响因素 (11)3.2.2 计算指标的确定 (11)3.2.3 边坡稳定分析 (12)4 边坡治理方案 (19)4.1 边坡设计方案选择 (19)4.2 边坡设计计算 (20)4.2.1 抗滑桩—锚索设计计算 (20)4.2.2 土钉墙设计计算 (26)4.2.3 锚杆格构墙设计计算 (30)4.2.4 喷面设计计算 (31)5 施工策划 (33)5.1 施工方法 (33)5.1.1 施工要点 (33)5.1.2 土钉墙施工 (33)5.1.3 锚杆施工 (33)5.1.4 挂网喷浆护面施工 (34)5.1.5 支护桩及锚索施工 (34)5.2 基坑支护过程中的监测 (34)5.3 施工注意事项 (35)5.4 质量检查和验收 (35)5.4.1 质量检查 (35)5.4.2 工程验收 (35)5.5 其他说明 (35)6 结论与建议 (37)6.1 结论 (37)6.2 建议 (37)7 参考文献 (38)8 致谢 (39)附录 (40)计算示意图 (44)基坑支护平面图 (45)基坑支护设计图 (51)工程地质剖面图 (53)遵义航天大厦基坑边坡稳定性评价及治理方案摘 要随着城市建设的发展,高层建筑越来越多,出现了大量的深基坑工程。

毕业论文基坑支护

毕业论文基坑支护

毕业论文基坑支护毕业论文基坑支护一、引言基坑支护是土木工程中一个重要的环节,它涉及到建筑物的稳定性和安全性。

在建筑物的施工过程中,基坑的挖掘和支护是必不可少的步骤。

本文将探讨基坑支护的方法和技术,以及其在工程实践中的应用。

二、基坑支护的意义基坑支护是为了保证基坑的稳定和安全。

在施工过程中,基坑的挖掘会导致周围土体的失稳,从而对建筑物和地下管线造成威胁。

因此,基坑支护的目的是通过采取一系列措施来防止土体塌方和基坑塌陷,以确保施工的顺利进行。

三、基坑支护的方法1. 土钉墙土钉墙是一种常见的基坑支护方法。

它通过在基坑周围的土体中安装钢筋混凝土土钉,并与钢筋混凝土挡土墙连接,形成一个整体结构。

土钉墙具有施工简便、成本低廉、适用范围广等优点,因此在基坑支护中得到了广泛应用。

2. 桩墙桩墙是另一种常见的基坑支护方法。

它通过在基坑周围驱动或挖孔灌注钢筋混凝土桩,并与钢筋混凝土挡土墙连接,形成一个整体结构。

桩墙具有承载能力强、稳定性好等优点,适用于较深的基坑支护。

3. 挡土墙挡土墙是一种常用的基坑支护结构。

它通过使用钢筋混凝土、砖石、钢板等材料构建,用于抵抗土体的侧压力。

挡土墙具有结构稳定、抗震性好等优点,适用于各种类型的基坑支护。

四、基坑支护的工程实践基坑支护在工程实践中有着广泛的应用。

以某大型商业综合体的地下停车场基坑支护为例,该工程采用了土钉墙和桩墙的组合支护方式。

首先,在基坑周围安装了土钉墙,以增加土体的抗剪强度;然后,在土钉墙内部挖孔灌注了钢筋混凝土桩,以增加整体结构的稳定性。

通过这种组合支护方式,成功地实现了基坑的稳定和安全。

五、基坑支护的挑战和发展趋势基坑支护面临着一些挑战,如复杂地质条件、施工难度大等。

为了应对这些挑战,需要不断改进和创新基坑支护技术。

未来,基坑支护的发展趋势可能包括以下几个方面:1. 新型材料的应用:如高强度钢筋、纤维增强材料等,可以提高基坑支护结构的承载能力和抗震性能。

2. 数字化技术的应用:如计算机模拟、数据采集和监测等,可以提高基坑支护的设计和施工效率,减少工程风险。

基坑开挖支护方案设计毕业论文(优质借鉴)

基坑开挖支护方案设计毕业论文(优质借鉴)

摘要本论文首先对昆明理工大学津桥学院空港校区场地的工程地质、水文地质条件进行了详细论述和评价,通过对各种基坑围护结构形式的对比分析,选择放坡、混凝土挡土墙为学生会堂、行政办公楼基坑的支护方案,法学、经管系科楼进行放坡支护方案。

然后进行详尽的设计,包括对土压力、水压力、支护结构内力的计算,并进行稳定性验算(围护桩底地基承载力验算、抗渗验算、抗倾覆验算、整体圆弧滑动验算、板式围护桩强度验算)。

并含基坑开挖及支护的施工方案。

关键词:工程地质,水文地质,围护结构,土压力,水压力,围护桩,施工组织AbstractThe thesis firstly evaluates and concentrates on the hydrogeology and engineering geology conditions in detail for Wuxiandian in Pingyang. Comparing with various retaining and protection structure form of foundation pit,single strut system is chosen as the retaining and protection of foundation pit program.Then,the design is done in the thesis ,including soil pressure,water pressure and calculation of internal force of retaining andprotection,verifies the stability of foundation pit(check compatations of foundation bearing capacity at the bottom of surrounding pile,percolation and overturning resistance;check compatations of integral arc slip and the flat-slab type surrounding)Key words: hydrogeology and engineering geology;surrounding and protection structure;earth pressure;water pressure ;protection pile目录摘要 (Ⅰ)第一章绪论 (3)1.1基坑工程的现状和特点 (4)1.2基坑开挖的支护结构 (3)1.3拟建场地工程概况 (5)第二章场地工程地质条件 (7)2.1地形地貌特征 (7)2.2场地地层岩性构成及相关物理力学参数 (10)2.3场地水文地质条件 (11)2.4特殊性土及不良地质作用 (11)2.4.1特殊性土 (11)2.4.2 不良地质作用 (12)2.4.3对特殊土及不良地质作用的处理建议 (14)2.5岩土工程分析评价 (15)2.5.1地基土工程性质评价 (15)2.5.2地基土均匀性评价 (15)2.5.3地震效应评价 (16)2.5.4土对建筑材料及金属的腐蚀性评价 (17)第三章基坑工程评价及结论 (18)3.1基坑安全等级划分 (18)3.2基坑侧壁稳定性评价 (19)3.3结论与建议 (19)第四章基坑开挖支护方案设计 (21)4.1支护方案对比分析 (21)4.2支护方案选型 (22)4.2.1支护方案 (22)4.2.2方案的比较及确定 (25)4.2.3支护方案的选择 (25)4.3支护方案总结 (26)4.4支护方案分析与计算 (27)4.4.1重力式挡土墙计算 (27)4.4.1.1基本参数选取 (27)4.4.1.2土压力计算 (31)4.4.1.3各组合最不利结果 (40)4.4.2施工监测 (44)第五章施工组织设计 (45)5.1整体布局 (45)5.2开挖方案 (47)5.2.1施工准备工作 (47)5.2.2场地平整 (48)5.2.3土方开挖 (49)5.4边坡施工注意事项 (52)结论 (53)结束语 (55)参考文献 (56)致谢 (57)第一章绪论1.1基坑工程的现状和特点我国城市化的不断发展,导致城市人口膨胀,建筑空间日趋拥挤,可利用土地资源日益紧张。

土木工程专业毕业论文--地铁深基坑支护设计[管理资料]

土木工程专业毕业论文--地铁深基坑支护设计[管理资料]

摘要基坑工程是指在地表以下开挖的一个地下空间及其配套的支护体系。

而基坑支护就是为保证基坑开挖,基础施工的顺利进行及基坑周边环境的安全,对基坑侧壁以及周边环境采用的支挡,加固与保护措施。

基坑支护体系是临时结构,安全储备较小,具有较大风险,基坑工程具有很强的区域性。

不同水文,工程地质环境条件下基坑工程的差异很大。

基坑工程环境效应复杂,基坑开挖不仅要保证基坑本身的安全稳定,而且要有效的控制基坑周边地层移动以及保护周围环境。

本文在第1章中介绍了深基坑的发展状况、人们对其设计理论的研究状况及重点研究方向;第2章主要介绍了基坑支护的一些常用方法及各自的特点;在第3章中,从排桩的计算、止水、降水以及钢支撑稳定性分析方面对深基坑计算理论进行了阐述,最后还介绍了施工监测方面的内容;第4章通过对深圳地铁工点的具体分析,运用前面讲到的理论方法,对基坑支护进行了设计;第5章对施工组织设计做了一个简单的设计,着重介绍了土方的开挖顺序、挖孔桩和钢支撑的施工工艺。

关键词:基坑支护结构人工挖孔桩钢支撑施工组织设计The Design of Deep Foundation Pit Bracing ofShenzhen MetroAbstractFoundation Pit is the excavation of an underground space below the surface and a coordinated support system. Bracing of foundation pit is to ensure that excavation and foundation construction for the smooth and safe environment Foundation Pit and used the pit retaining wall reinforcement and protection. Bracing of Foundation Pit structure is the structural safety of temporary reserves are smaller, more risk. Foundation pit structure has a strong regional. Excavation works under different hydrological environmental and geological conditions are vastly. Effects complex excavation, excavation pit is not only necessary to ensure their own safety,but also to effectively control the pit surrounding strata.In chapter 1, it introduces the development of deep foundation pit, and the study of the design theory, and the major research direction; In chapter 2, it primarily introduces some methods of the foundation bracing and respective characteristic; In chapter 3, it gives readers a presentation to the theory of computation of deep foundation pit, through calculation of piling, water-stop, dewatering and the stability analysis of steel bracing. In the end, it introduces some content about supervisory survey of construction; In chapter 4, through detailed analysis of construction site and the application of the theory method mentioned above, it finishes the design of the deep foundation bracing; In chapter 5, it designs the construction management plan simply, among which earth excavation sequence and the construction techniques of dug pile and steel timbering are recommend highlighted.key words:Bracing of Foundation Pit Structure, Artificial digged-hole pile, Steel Timbering, Construction Management Plan目录第1章绪论 (1)深基坑工程的发展状况 (1)深基坑支护设计理论及计算方法研究现状 (2)深基坑工程中存在的主要问题及重点研究方向 (4)第2章基坑支护的主要内容和方法 (7)基坑支护的内容和特点 (7)基坑支护的主要内容和功能 (7)基坑支护的主要特点 (8)基坑支护方法概述 (9)护壁桩支护结构 (9)地下连续墙支护 (10)土钉支护 (11)内支撑支护 (12)第3章深基坑设计计算理论 (13)土压力计算 (13)静止土压力 (13)填土面水平时的朗肯土压力 (14)地下连续墙止水帷幕 (16)地下连续墙的分类 (16)地下连续墙的优点 (16)地下连续墙止水帷幕的应用 (17)降水设计 (17)管井降水一般计算方法 (17)按经验数据计算管井降水 (19)辅助降水 (19)排桩设计 (19)钢支撑稳定性验算 (21)施工监测 (22)监测量测组织与程序 (22)施工监测主要内容 (23)第4章深圳地铁太安站工点设计 (26)太安站工程概况及设计资料 (26)概述 (26)本区地质情况概要及不良地层概况 (26)太安车站周边建造物基础调查 (28)52轴至67轴周边房屋照片 (28)施工降水 (30) (30) (31)按经验数据降水计算 (32)桩配筋计算和钢支撑稳定性验算 (32)桩配筋计算 (33)钢支撑稳定性验算 (43)第5章深基坑支护施工组织设计 (45)工程概况 (45)工程简介 (45)既有建筑物 (45)工程特点 (45)工程重点 (46)技术难点及采取措施 (48)总体施工方案及施工顺序 (48)总体施工方案 (48)施工步骤 (50)施工组织 (51)挖孔桩及护壁施工 (52)挖孔桩施工 (52)护壁施工 (54)钢支撑施工 (55)施工工艺 (56)施工方法 (56)结论 (60)致谢 (61)参考文献 (62)附录 (63)第1章 绪论深基坑工程的发展状况自80年代以来,我国城市建设进入了一个新的发展时期,高层、超高层的建筑越来越多,仅从1990年到2000年的十年间,2。

基坑支护技术论文

基坑支护技术论文

基坑支护技术论文基坑支护是现代建筑施工的重要环节,在建筑工程施工的过程中,场地整平工程完成之后需要进行的工作就是基坑的开挖。

下面是店铺整理了基坑支护技术论文,有兴趣的亲可以来阅读一下!基坑支护技术论文篇一基坑支护技术浅析摘要:基坑开挖期间,地下水控制也属于基坑支护的一部分,地下水控制方法可分为集水明排、降水、截水和回灌等型式单独或组合使用。

当基坑开挖采用放坡无法保证施工安全或场地无放坡条件时,一般采用支护结构临时支撑,以保证基坑施工安全。

本文现就基坑支护技术做客观分析。

关键词:基坑支护技术土壁灌注桩基坑支护是现代建筑施工的重要环节,在建筑工程施工的过程中,场地整平工程完成之后需要进行的工作就是基坑的开挖。

在开挖周一前首先应当根据相关的规定和规程以及施工现场的具体地质水文情况进行分析和探讨,去顶其开挖的尺寸和边坡的稳定措施,进而计算土方工程量,然后现场放线、实施开挖最后验槽。

一、基槽的支撑方法基坑属于临时性工程,其作用是提供一个空间,使基础的砌筑作业得以按照设计所指定的位置进行。

开挖较窄的基槽时,常采用横撑式钢木支撑。

贴附于土壁上的挡土板,可水平铺设或垂直铺设,可断续铺设或连续铺设。

1、断续式水平支撑。

挡土板水平放置,中间留出间隔,并在两侧同时对称立竖枋木,再用工具式或木横撑上下顶紧。

适用于能保持立壁的干土或天然湿度的黏土类土,地下水很少,深度在3m以内。

2、连续式水平支撑。

挡土板水平连续放置,不留间隙,然后两侧同时对称竖枋木,上下各顶一根撑木,端头加木楔顶紧。

适用于较松散的干土或天然湿度的黏土类土,地下水很少,深度为3~5m。

3、连续或间断式垂直支撑。

挡土板垂直放置,连续或留适当间隙,然后每侧上下各水平顶一根枋木,再用横撑顶紧。

适用于土质较松散或湿度汉高的土,地下水较少,深度不限。

二、浅基坑的支撑方法开挖浅基坑时,采用的支撑方法有斜撑支撑和锚拉支撑。

1、斜撑支撑。

水平挡土板钉在柱桩内侧,柱桩外侧用斜撑支顶,斜撑底端支在木桩上,在挡土板内侧回填土。

深基坑支护论文(3篇)

深基坑支护论文(3篇)

深基坑支护论文(3篇)第一篇:论复杂条件深基坑支护综合施工技术【摘要】深圳某停车库综合楼项目场地狭窄,地下水丰富、地质条件复杂。

基础地下3层,基坑深14.2m。

该项目基坑施工周期长,基坑支护综合使用了旋挖咬合桩、旋挖灌注桩、三管旋喷桩、预应力锚索、钢管混凝土桩及内支撑等施工方式,使基坑支护与止水帷幕形成有机结合,通过优化基坑设计方案及施工措施,实现了基坑稳定及安全的目标。

【关键词】深基坑;地下水;基坑支护;施工1工程概况深圳某项目位于深圳南山区新中心商务区,项目包括地下室3层,楼高20层,高80m,基坑南侧为一加油站;西侧为学校运动场;北侧为市政道路;东侧为市政道路;基坑深14.2m(局部17.8m),施工现场场地狭窄。

2场地工程地质与水文地质条件项目场地地下水位较高,场地常年水位埋深3.75~4.20m,丰水期水位上升0.5~1.0m。

根据现场勘探,揭露地层自上而下为第四系人工素填土、人工素填砂、第四系海陆交互相淤泥质黏土、淤泥质砾砂、第四系冲洪积砾砂、第四系残积砾质黏土,支护桩施工均进入残积砾质黏土层。

3基坑支护设计方案1)根据地下水分布浅的特点,本工程基坑外地下水采用咬合桩﹑旋挖桩与三管旋喷桩作为止水帷幕封堵,基坑内部地下水采用疏干井与排水井明排。

2)本工程项目红线东、北侧紧邻道路红线,南侧红线与加油站红线重合,西侧红线与学校围墙红线重合,因此,基坑采用支护桩进行边坡支护:南侧采用准1200mm咬合桩(AB桩:A为素混凝土桩;B为钢筋混凝土桩)+双排内支撑;西侧、北侧、东侧采用准1200mm旋挖灌注桩+准1000mm三管旋喷桩+双排内支撑,灌注桩间距为1.8m;东南角采用准1200mm旋挖灌注桩+准1000mm三管旋喷桩+三排锚索张拉,整个支撑采用混合型;深基坑边坡支护工程安全等级为一级。

4方案优化设计及施工措施4.1支护桩优化设计本工程原设计为支护桩133根,其中南侧咬合桩42根(21根钢筋混凝土桩+21根素混凝土桩),其余向均为准*********支护桩,东侧、西侧与北侧为一道内支撑+二排锚索;东北角为三排锚索,无内支撑。

基坑支护设计(毕业论文)

基坑支护设计(毕业论文)

摘要近年来随着经济的发展,社会的进步,城市化进程的加快,高层建筑和市政工程大量涌现。

高层建筑的建造、大型市政设施的施工及大量地下空间的开发,必然会有大量的深基坑工程产生。

建筑物高度越高,其埋置深度也越深,相应的对基坑工程的要求也就越高。

深基坑支护结构的设计、施工、监测等是近年来经常遇到的技术难题。

深基坑支护不仅要求确保边坡的稳定,而且要满足变形控制要求,保证基坑内正常作业安全,而且要防止基坑及坑外土体移动,保证基坑附近建筑物、道路、管线的正常运行。

为了满足如今建筑物的支护,基坑工程也在朝更大、更深的要求迈进。

本设计主要是对某科技楼工程基坑支护结构进行设计,首先要确保周围建筑物、道路、管线等的正常安全使用,同时要求围护结构的稳定性好,沉降位移小。

设计主要采用的支护方式是钻孔灌注桩和土钉墙两种,同时,钻孔灌注桩采用的内支撑形成支护体系。

基坑降水主要在基坑周围设置降水井,采用集水明排法降水方案。

设计最后针对支护和降水方案,对基坑施工工艺及基坑监测进行了大致说明。

关键词:深基坑;钻孔灌注桩;土钉墙;降水;施工;监测AbstractIn recent years, with economic development , social progress , urbanization , and high-rise buildings and public works in large numbers . Construction , construction of large municipal facilities to develop high-rise buildings and a large underground space , there must be a lot of deep excavation produced . The higher the building height , the depth of its buried deeper , corresponding to the requirements of the higher excavation . Deep excavation structural design, construction , monitoring and other technical problems are often encountered in recent years . Deep excavation requires not only ensure the stability of the slope, but also to meet the requirements of distortion control , to ensure the normal operation of the pit safety , but also to prevent the soil pit and pit outside move to ensure pit near buildings, roads, pipelines normal operation. In order to meet today shoring, excavation of the building is also moving in a larger , deeper demands forward. This design is a science and technology building project excavation structure design, first make sure that the surrounding buildings , roads, pipelines and other normally safe to use , while retaining structure requires good stability , a small settlement displacement . Supporting manner designed primarily uses two bored and soil nail wall , while using the support form Bored supporting system . The main setting precipitation pit dewatering wells around the pit , using the method of precipitation scheme catchment next row . Finally, supporting the design and precipitation scheme of excavation pit monitor the construction process and were generally described.Keywords: deep excavation ; bored ; soil nail wall ; precipitation ; construction ; monitoring第1章前言 (3)1.1 基本技术要求 (4)1.1.1设计的基本技术要求 (4)1.1.2 施工的基本技术要求 (5)1.2基坑工程设计 (5)1.2.1设计依据 (5)1.2.2设计内容 (5)1.2.3计算理论 (6)1.3 本设计内容 (6)第2章设计方案的综合说明 (7)2.1概述 (7)2.1.1工程概况 (7)2.1.2环境条件概况 (7)2.1.3工程地质条件 (7)2.1.4地下水情况 (8)2.1.5基坑侧壁支护结构安全等级及重要性系数 (8)2.2 基坑支护方案 (8)2.2.1基坑支护方案选择的依据 (8)2.2.2基坑支护方案选择 (9)2.2.3 基坑支护方案说明 (10)2.3 地下水控制方案 (12)第3章基坑支护结构设计计算书 (13)3.1地质设计参数 (13)3.1.2 计算区段划分 (13)3.1.3计算方法 (14)3.1.4土压力系数计算 (14)3.2 ABCD段支护结构设计 (14)3.2.1土层分布 (14)3.2.2 土层侧向土压力计算主动土压力 (15)3.2.3土压力合力及作用点 (16)3.2.4嵌固深度的确定 (17) (18)3.2.5最大弯矩计算3.2.6稳定性验算 (20)3.2.7配筋计算 (21)3.2.8支撑结构设计计算 (23)3.3 BCFE段支护结构设计 (26)3.3.1土钉设计 (26)3.3.2稳定性验算 (32)3.3.3面层设计 (34)第4章地下水控制方案 (34)4.1 基坑降排水作用及方法 (34)4.2降水方法的依据 (34)4.3降水设计 (35)4.4基坑突涌稳定性验算 (37)第5章施工 (39)5.1基坑土方施工工艺及要求 (39)5.2钻孔灌注桩的施工工艺 (40)5.3冠梁施工工艺 (42)5.4内支撑施工工艺 (43)5.5土钉墙施工工艺 (45)第6章基坑施工监测 (48)6.1监测目的 (48)6.2监测要求 (49)6.3监测原则 (49)6.4基坑监测项目选择依据及监测内容 (49)6.5监测实施 (50)6.5.1周围环境的监测 (50)6.5.2支护桩位移与沉降监测 (50)6.5.3测量精度 (52)6.5.4仪器设备 (53)6.5.5测量周期 (53)6.5.6预警报告 (53)6.5.7信息反馈 (54)第7章电算 (55)7.1 AB段内支撑电算 (55)7.1.1 支护方案 (55)7.1.2 支护信息 (55)7.1.3设计结果 (58)7.1.4稳定性验算 (62)7.1.5 隆起量的计算 (65)7.1.6嵌固深度计算 (66)7.2土钉墙电算 (67)7.2.1设计项目: (67)7.2.2 设计结果 (69)7.2.3 喷射混凝土面层计算 (71)第8章翻译 (73)Reinforced Concrete (73)2.2 Earthwork (75)2.3 Safety of Structures (77)8.1钢筋混凝土 (80)8.2土方工程 (81)8.3结构的安全度 (82)致谢 (85)参考文献 (86)第1章前言随着经济的发展,人们生活水平的提高,人类对生活环境的要求越来越高,尤其在中国这样人口大国,人口基数比较大,增长的比较快。

基坑支护毕业设计-基坑支护技术

基坑支护毕业设计-基坑支护技术

本科毕业设计(论文)郑州地铁碧沙岗站基坑支护设计专业名称:土木工程年级班级:学生姓名:指导教师:土木工程学院二○一三年六月十日摘要基坑支护工程是我国当前工程领域一个重要的研究方向,随着我国建设事业的发展,城市的高层建筑大量涌现,极大的推动了深基坑工程设计理论和施工技术的不断发展,同时也产生了大量的深基坑支护设计与施工问题。

如何根据场地工程性质、水文地质、环境条件制定合理的设计方案;如何在保证稳定性的前提条件下,设计最经济的方案,也是基坑比较重要的问题。

因此在基坑工程设计与施工中,需要严谨、周密的分析与计算。

本基坑根据工程概况及其特点,在考虑基坑的安全性和经济性的前提下,通过方案比选采用地下连续墙加钢支撑支护方案,采用朗肯土压力理论计算土压力,通过等值梁法计算墙体内力及各支点反力。

本设计主要内容有:工程概况的论述;支护方案的比选;土压力计算;围护结构内力的计算;钢支撑设计;基坑的稳定性分析;基坑变形估算及控制;施工组织设计。

关键词:基坑支护;地下连续墙;钢支撑;等值梁法AbstractFoundation pit supporting project is currently an important research direction in the field of engineering in China, with the development of construction cause in our country, the city's high-rise buildings springing up, the deep foundation pit engineering has been heavily promoted by the development of design theory and construction technology, at the same time also produced a large number of deep foundation pit supporting design and construction problems. How to according to the nature of site engineering, hydrogeology, environmental conditions, formulate reasonable design scheme; How to ensure the stability of the premise condition, design the most economical solution, also is foundation of the more important question. Therefore in design and construction of foundation pit engineering, the need to rigorous, careful analysis and calculation.According to the engineering general situation and characteristics of the foundation pit, and on the premise of the safety of foundation pit and economy, through schemes comparison using underground continuous wall with steel support support scheme, earth pressure is obtained by using the Rankine's earth pressure theory, through the equivalent beam method to calculate internal force and the pivot reaction force of wall. This design main content includes: project overview is discussed; Support scheme comparison; Earth pressure calculation; Retaining structure internal force calculation; Steel support design; Stability analysis of foundation pit; Deformation calculations and control; Construction organization design.Key words:Foundation pit supporting; The underground continuous wall; Steel support;Equivalent beam method目录第一章绪论 (1)1.1 毕业设计目的及意义 (1)1.2 国内外研究现状简述 (1)1.3 毕业设计主要内容及方法 (1)第二章工程概况 (2)2.1 工程简介 (2)2.1.1 设计依据 (2)2.1.2 设计原则 (2)2.2 工程地质与水文地质条件 (2)2.2.1 工程地质条件 (2)2.2.2 地震烈度 (5)2.2.3 水文地质条件 (5)2.2.4 工程地质评价 (6)2.3 车站基坑周边情况 (6)2.3.1 车站基坑周边管线情况 (6)2.3.2 车站基坑周边建筑物情况 (7)2.3.3 车站基坑周边交通疏解情况 (7)第三章支护方案的选择与比较 (9)3.1 基坑支护的类型及其特点和适用范围 (9)3.1.1 深层搅拌水泥土围护墙 (9)3.1.2 土钉墙 (9)3.1.3 排桩支护 (9)3.1.4 槽钢钢板桩 (10)3.1.5 SMW工法 (10)3.1.6 地下连续墙 (10)3.2 方案的比较及确定 (11)3.2.1 基坑的特点 (11)3.2.2 支护方案的选择 (11)第四章支护结构设计 (13)4.1 土压力计算参数确定 (13)4.1.1 地面荷载的确定 (13)4.1.2 计算参数的确定 (13)4.2 结构内力计算 (15)4.2.1 计算理论的确定 (15)4.2.2 初步选定各支撑点位置 (15)4.2.3 土压力计算 (15)4.2.4 用等值梁法计算弯矩 (17)4.3 地下连续墙的配筋计算 (24)4.3.1 纵筋配置 (24)4.3.2 水平筋配置 (27)4.4 支撑设计 (27)4.4.1 方案比较 (27)4.4.2 内支撑系统的材料及结构布置 (27)4.4.3 支撑设计 (27)4.4.4 立柱设计 (29)4.5基坑的稳定性验算 (29)4.5.1 概述 (29)4.5.2 基坑的整体稳定性验算 (29)4.5.3 基坑的抗隆起稳定验算 (30)4.5.4 基坑支护结构踢脚稳定性验算 (31)4.6 基坑变形估算及控制 (32)4.6.1 概述 (32)4.6.2 水平位移估算 (32)4.6.3 基坑隆起估算 (32)4.6.4 地表沉降估算 (33)第五章支护结构施工 (34)5.1 地下连续墙的施工 (34)5.1.1 导墙施工 (34)5.1.2 槽段开挖施工 (35)5.1.3 钢筋笼吊装施工 (37)5.1.4 接头形式 (39)5.1.5 泥浆系统施工 (39)5.2 钢支撑施工 (40)5.3 地下连续墙施工难点 (42)5.3.1 导墙施工的难点及对策 (42)5.3.2 成槽的难点及对策 (43)5.3.3 钢筋笼安装难点及对策 (44)5.3.4 导管装配、浇筑混凝土的难点及对策 (44)5.4 工程质量的保证 (44)5.5 文明施工措施 (45)5.6 环境保护措施 (45)第六章结论 (47)参考文献 (48)致谢 (49)第一章绪论1.1毕业设计目的及意义基坑支护工程造价高,开工数量多,是各施工单位争夺的重点,由于其技术复杂,涉及范围广,变化因素多,也是工程中最具有挑战性的技术难点,同时也是降低工程造价,确保工程质量的重点。

  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

目录前言 (1)第一章工程概况 (2)第一节工程概述 (2)第二节工程地质条件 (3)一、气象概况 (3)二、地形地貌 (3)三、工程地质 (3)第三节水文地质条件 (4)一、地下水类型 (4)二、地下水的腐蚀性评价 (5)第四节抗震设计 (5)第五节护坡设计参数 (5)第二章基坑支护结构设计 (7)第一节施工方法的论证 (7)第二节围护结构型式的选择 (7)一、基坑等级及变形控制标准 (7)二、基坑围护结构方案比选 (7)三、钢支撑和锚索施工比较 (8)第三节基坑支护中荷载的计算 (9)一、荷载与组合 (9)二、水平荷载标准值 (9)三水平抗力标准值 (10)第四节护坡桩设计 (11)一、嵌固深度计算 (11)二、钢筋混凝土桩设计 (17)三、施工方案设计 (20)第五节锚杆设计 (20)一、计算锚杆承载力 (21)二、锚杆自由长度计算 (22)三、锚杆锚固段长度计算 (22)四、锚杆参数最终确定 (22)第三章钻孔灌注桩施工 (24)一、泥浆护壁施工法 (24)二、钻孔灌注桩常见施工问题 (25)第四章基坑稳定性验算 (27)第一节整稳定性验算 (27)第二节抗倾覆稳定性验算 (27)第三节抗滑移稳定性 (28)第四节坑底土隆起稳定性验算 (28)结论 (30)致谢 (31)参考文献 (32)中国地质大学(北京)本科毕业设计前言基坑工程是指建筑物和构筑物的地下结构部分施工时,所进行的基坑开挖、工程降水和基坑支护,同时,对周围的建筑物、构筑物、道路和地下管线进行监测和维护,以确保正常、安全施工的综合性工程.一般情况下,基坑支护是临时措施,地下室主体施工完成时支护体系即完成任务,与永久性结构相比临时结构的安全储备要求可小一些,由于其安全储备较小,因此具有较大的风险性.岩土工程区域性很强,岩土工程中的基坑工程区域性更强,如软粘土地基、软土地基、砂土地基、黄土地基等工程地质和水文地质条件不同的地基中基坑工程差异性很大,同一城市不同区域也有差异.基坑工程的支护体系设计施工和土方开挖都要因地制宜,根据本地情况进行.基坑工程的支护体系设计与施工和土方开挖不仅与工程地质和水文地质条件有关,还与基坑相邻建筑物、构筑物及市政地下管线的位置、抵御变形的能力、重要性以及周围场地条件等有关,这就决定了基坑工程具有很强的个性.正是由于基坑工程具有很强的区域性和个性,因此根据不同的区域和个性特征,研究相应的基坑稳定性、支护结构的内力及变形以及周围地层的位移对周围建筑物和地下管线等的影响及保护的计算分析,以便采取经济、实用的基坑支护方案,就具有重要的理论意义和实际效益.与分析、计算方法的进步相对应的是基坑开挖技术,特别是支护技术的日臻完善,并出现了许多新的支护结构形式与稳定边坡的方法.本文结合北京市地铁八号线01标段(西三旗车站)地下结构挖方工程,根据基坑地质条件和周围环境的特殊性,选择钢筋混凝土灌注桩加锚杆的基坑开挖围护方案,并对组合围护结构体系进行了设计计算.依据《建筑基坑支护技术规程》(JGJ120-99)等规范,采用整体等值梁法的计算方法计算桩长、支点内力、最大弯矩;对混凝土灌注桩进行结构设计与验算,确定桩径、桩身配筋;对冠梁与腰梁进行结构设计.最终编制了基坑开挖围护设计方案.本科毕业设计第一章工程概况第一节工程概述工程名称:北京市地铁八号线01标段(西三旗车站)基坑开挖支护工程.工程照片见下图:图1-1工程实际照片工程概况:西三旗站是北京地铁8号线二期工程第三座车站,位于西三旗路和西三旗东路十字路口处.在西三旗东路下南北向布置,为8号线首批开工车站.车站所处十字路口东北角有北新家园、新康园小区、建材城西里小区和新材医院;东南角为北新建材集团,规划为商业用地;西北角为中国石油天然气集团直属机关党校、新龙批发市场;西南角有育新花园小区、首师大附属育新学校.西三旗路交通繁忙,路下管线复杂,道路规划红线宽45米,主路宽16米,双向4车道,路口西侧局部段双向6车道,目前已经实现规划;西三旗东路规划红线宽40米,路口北段现状道路宽10米,路口南段现状道路宽4米,未实现规划.第二节工程地质条件一、气象概况北京地区属于温暖带大陆性半湿润—半干旱季风气候,受季风影响形成春季干旱多风、夏季炎热多雨、秋季秋高气爽、冬季寒冷干燥、四季分明的气候特点.近几年平均气温为12.5℃~13.7℃,极端最高气温42.2℃,极端最低气温-15℃.全市多年平均降水量为626米米,降水量的年变化大,年内分配也不均,汛期(6~8月)降水量约占全年降水量的80%以上.旱涝的周期性变化较明显.二、地形地貌本合同段线路位于永定河冲积扇的中下部,土层以新沉积层、第四纪冲洪积沉积土层为主.拟建工程所处地势基本平缓,地面以市政道路为主,路面平坦,地面标高为37~40米.三、工程地质施工场地范围内的土层主要有人工填土层、新近沉积层、一般第四纪冲洪积沉积层.车站主要位于粉土和粘土层,底板位于粉质粘土层.钻孔孔口地面高程介于3.40米~5.05米,平均3.71米.场地照片如下图1-2:图1-2场地照片根据野外钻探资料,拟建场地从上至下分布的地土层为:1、人工填土层:粉质粘土素填土①层:黄褐色,稍湿,稍密,以粉质粘土为主,含少量碎砖屑、植物根等,结构松散,无层理.粉土素填土①2层:黄褐色,稍湿,稍密,以粉土为主,含少量碎砖屑、植物根等,结构松散,无层理.建筑垃圾杂填土①6层:杂色,稍湿,稍密~中密,以碎石块、水泥块为主,砂、石及粘性土充填.新近沉积层:粉质粘土②层:黄褐色,软塑~可塑,含氧化铁、氧化锰,土质结构差,无层理.粉土②2层:黄褐色,稍湿~湿,稍密,含氧化铁、氧化锰,土质结构差,无层理.2、一般第四纪冲洪积沉积层:粉质粘土③层:黄褐~褐黄色,可塑,含氧化铁、云母.粉土③2层:黄褐~褐黄色,稍湿~湿,稍密~中密,含氧化铁、氧化锰等、云母、钙质结核等.粉质粘土④层:灰黄~褐灰色,可塑,含氧化铁、云母,少量有机质等.粉土④2层:灰黄~褐灰色,稍湿~饱和,含氧化铁、云母,少量有机质等.细砂④4层:灰黄~褐灰色,湿~饱和,主要矿物成分是石英、长石、云母.粉质粘土⑤层:褐黄色,可塑,含氧化铁、云母等.粉土⑤2层:褐黄色,湿~饱和,中密~密实,含氧化铁、云母等.粉砂⑤3层:褐黄色,湿~饱和,中密,主要矿物成分是石英、长石、云母.细砂⑤4层:褐黄色,湿~饱和,密实,主要矿物成分是石英、长石、云母.粉质粘土⑦层:黄灰~褐灰色,可塑,含氧化铁、氧化锰等.粉砂⑧3层:灰褐~黄褐色,饱和,密实,主要矿物成分是石英、长石、云母.粉质粘土⑨层:灰黄~褐黄色,可塑,含氧化铁、云母等.粘土⑨1层:灰黄~褐黄色,可塑,含氧化铁、云母等.粉土⑨2层:灰黄~褐黄色,湿~饱和,密实,含氧化铁、云母等.细砂⑨4层:灰黄~褐黄色,密实,主要矿物成分是石英、长石、云母.粉质粘土⑩层:褐灰色,可塑,含氧化铁、云母,少量有机质等.粘土⑩1层:灰褐~褐灰色,可塑,含氧化铁、云母,少量有机质等.粉土⑾2层:褐黄色,饱和,密实,含氧化铁、云母.粉砂⑾3层:褐黄色,饱和,密实,主要矿物成分为石英、长石、云母.中砂⑾5层:褐黄色,饱和,密实,主要矿物成分为石英、长石、云母,含少量圆砾.粗砂⑾6层:褐黄色,饱和,密实,主要矿物成分为石英、长石、云母.圆砾⑾8层:杂色,饱和,密实,一般粒径2~3米米,最大粒径2厘米,圆砾含量约60%,含少量卵石,主要母岩成分为岩砂、砾岩,中粗砂充填.卵石⑾9层:杂色,饱和,密实,一般粒径2~3厘米,最大粒径5厘米,卵石含量约60%,主要母岩成分为砂岩、砾岩,中粗砂充填.粉质粘土⑿层:褐黄色,可塑,含氧化铁、云母、钙质结核.粘土⑿1层:褐黄色,可塑~硬塑,含氧化铁、云母、钙质结核.粉土⑿2层:褐黄色,湿~饱和,密实,含氧化铁、云母等.细砂⑿4层:褐黄色,湿~饱和,密实,主要矿物成分为石英、长石、云母.粉砂⒀3层:褐黄色,饱和,密实,主要矿物成分为石英、长石、云母.粉质粘土⒁层:褐灰~褐黄色,可塑,含氧化铁、钙质结核.粘土⒁1层:褐灰~褐黄色,可塑~硬塑,含氧化铁、钙质结核.粉土⒁2层:褐灰~褐黄色,饱和,密实,含氧化铁、云母、钙质结核.中砂⒂5层:褐黄色,饱和,密实,主要矿物成分为石英、长石、云母.粉质粘土⒃层:褐灰~褐黄色,可塑,含氧化铁、云母、钙质结核,见少量螺壳.粘土⒃1层:褐灰~褐黄色,可塑~硬塑,含氧化铁、云母、钙质结核,少量有机质.粉土⒃2层:黄褐~褐灰色,饱和,密实,含氧化铁、云母、少量有机质.细砂⒄4层:褐黄色,饱和,密实,主要矿物成分为石英、长石、云母.中砂⒄5层:褐黄色,饱和,密实,主要矿物成分为石英、长石、云母.卵石⒄9层:杂色,饱和,密实,亚圆形,最大粒径5厘米,一般粒径2~3厘米,主要母岩成分为岩砂、砾岩,中粗砂充填.粘土⒅1层:褐黄色,可塑~硬塑,含氧化铁、云母.第四节抗震设计1、抗震设防烈度根据《中国地震动参数区划图》(GB16306-2001)和《建筑抗震设计规范》(GB50011-2001)附录D及《铁路工程抗震设计规范》(GB50111-2006)综合考虑,拟建场区的抗震设防烈度为8度,设计地震分组为第一组,设计基本地震加速度值为0.20g.2、建筑场地分类本次勘察在XSQC02#、Z3-XSQ-003#、Z3-XSQ-009#和Z3-XSQ-015#钻孔中分别进行了全孔波速测试,经实测其25米深度范围内土层等效剪切波速值分别为236 米/s、231.86米/s、233.27米/s和228.26米/s,根据《铁路工程抗震设计规范》(GB50111-2006)第4.0.1条判定,场地土类型为中软土,场地类别为Ⅲ类.3、液化判别根据《铁路工程抗震设计规范》(GB50111-2006)附录B进行判别,拟建场地地面下20米深度范围内的饱和粉土及砂土不液化.第五节护坡设计参数地面超载按q=30kPa考虑.基坑支护后剖面变形按1级控制.车站深度范围内土层主要参数如下表:第二章基坑支护结构设计第一节施工方法的论证目前国内地铁车站施工主要方法有明挖法、盖挖法、暗挖法,每种方法都有其适用条件及优缺点,结合本车站现场选定站位实际情况,对以下三种方法进行多方面比较,具体优缺点详见下表.及附属皆采用明挖法施工.第二节围护结构型式的选择一、基坑等级及变形控制标准本车站标准段基坑宽度22.3米,基坑深度约18.3米,基坑附近无特殊建构筑物需要防护,根据基坑规模与周边环境条件及《北京地铁8号线二期工程技术要求》,本明挖基坑变形控制等级为一级,基坑变形控制标准为:地面最大沉降量≤0.15%H;围护结构最大水平位移≤0.2%H,且≤30米米.二、基坑围护结构方案比选基坑围护结构形式和地下水的治理措施不仅是地下结构施工的需要,也是保证地面建筑物和地下管线安全的关键环节,必须综合治理,统筹考虑方可达到预期目的.明挖法施工中围护结构的主要型式见下表(1) 施工时基本无噪音、无振动、无地面隆起或侧移,因此对环境和周边建筑物危害小;(2)大直径钻孔灌注桩直径大、入土深;(3) 对于桩穿透的图层可以在空中作原位测试,以检测土层的性质;(4)扩底钻孔灌注桩能更好地发挥桩端承载力;(5) 经常设计成一柱一桩,无需桩顶承台,简化了基础结构形式;(6)钻孔灌注桩通常布桩间距大,群桩效应小;(7)施工设备简单轻便,能在较低的净空条件下设桩;(8)钻孔灌注桩在施工中,影响成桩质量的因素较多,质量不够稳定,有时候会发生缩径、桩身局部夹泥等现象,桩侧阻力和桩端阻力的发挥会随着工艺而变化,且又在较大程度上受施工操作影响;三、钢支撑和锚索施工比较(一)施工工艺支撑和锚索的施工工艺都比较成熟,在深基坑支护中,挖掘机操作需避让支撑,而锚索不需要.但锚索需要一定的地下空间,这对于市政工程是一的非常的局限条件,并不在任何地方都可以用锚索支护.待基坑施工至基底开始施工结构时,需要向基坑内运输工程材料,在调装的过程中,支撑有着很大的限制与不便.支撑安装工人需要经过专业的培训才可以上岗,危险系数较大.(二)施工工期支撑施工时土方将不能同时进行开挖,而锚索在到达设计标高以后,可以多台同时作业,这期间土方还可以继续施工,不影响工程进度.但浆液龄期需要大概4天的时间,土方开挖需要给张拉留出工作面.(三)体系效果从监控量测的数值反映和对比,两种支护体系效果均比较理想,桩体的侧向位移都在3厘米以内.经过比较并根据已对该工程地质条件、基坑开挖深度及周边环境的特点的分析,选择基坑支护方案时充分考虑影响边坡稳定性安全的不利因素,同时兼顾经济、高效的原则,该工程基坑支护方案拟采用钻孔灌注桩加锚杆结合支护.第三节基坑支护中荷载的计算一、荷载与组合结构自重:钢筋混凝土自重按25kN/米3计.水土侧压力:砂、卵石层水土分算,粘性土层水土合算,施工期间按朗肯公式计算其主动土压力.施工荷载:按0=30kPaσ计.(8)、插入深度计算桩身最大弯矩计算kN/mBCDEFA 1图2-8 力学计算简图剪力为零处弯矩最大,故先求剪力为零点: 桩所受土体均布荷载斜率142.88.14617.53k ==所以取max 下面进行钢筋混凝土桩的 设计.截面弯矩设计值为max 0j 25.1M M γ=(2-11)式中0γ为基坑侧壁安全等级重要性系数,查表取1.0. 代入数据,有j 1.25 1.0456.1627.1kN m M =⨯⨯=⋅依据《地下建筑结构设计》P155周边均匀配置纵向钢筋挡土灌注桩一般按钢筋混凝土正截面受弯构件计算配筋.对于沿周边均匀配置纵向钢筋的 圆形截面钢筋混凝土受弯构件,当截面内纵向钢筋数量不少于6根时,截面抗弯承载力可按下式计算:33sin sin 2sin 3t c y s s M f r f A r παπααππ+=+为简化计算取10.75y sc f A f A α=+-αα225.1-=t (2-13)式中 M ——单桩抗弯承载力(kN m)⋅;cf ——混凝土轴心抗压强度设计值2(N/mm );A ——土灌注桩横截面积2(mm ); r ——圆形截面半径(mm); y f ——钢筋抗拉强度设计值2(N/mm ); s A ——全部纵向钢筋的 截面积2(mm );sr ——纵向钢筋所在圆周的 半径(mm);α——对应于受压区混凝土截面面积的 圆心角与2π的 比值; tα——纵向受拉钢筋截面积与全部纵向钢筋截面积的 比值;挡根据钻孔机械,桩身直径为D 800mm =, 采用C30混凝土,HRB335级钢筋,则 混凝土轴心抗压强度2c mm N 3.14=f钢筋抗拉强度设计值2y y mm N 300='=f f ,2t mm N 43.1=f代入公式得0.334α=,0.58tα=;再将α值代入式(2-21)求出单桩抗弯承载力M :max =627.14 1.6=1003.4 kN m M ⨯⋅ 1078>1003.4kN m M =⋅故配筋成功.最终配筋参数见表2-11:图2-9 围护桩身配筋断面图注:①——桩主筋,②——箍筋,③——加强筋根据基坑开挖尺寸,护坡桩应该为:32.72211.727.42 2.8222.32346.11.6n ⨯+⨯+⨯+⨯+⨯==根.取为347根.考虑四周边角以及中段拐角处加密,增加14根.故总共护坡桩为361根.支护桩平面布置见附图一.第三章钻孔灌注桩施工钻孔灌注桩的施工,因其所选护壁形成的不同,有泥浆护壁方式法和全套管施工法两种,本基坑选用泥浆护壁的方法.一、泥浆护壁施工法冲击钻孔,冲抓钻孔和回转钻削成孔等均可采用泥浆护壁施工法.该施工法的过程是:平整场地→泥浆制备→埋设护筒→铺设工作平台→安装钻机并定位→钻进成孔→清孔并检查成孔质量→下放钢筋笼→灌注水下混凝土→拔出护筒→检查质量.施工顺序:(1)施工准备施工准备包括:选择钻机、钻具、场地布置等.钻机是钻孔灌注桩施工的主要设备,可根据地质情况和各种钻孔机的应用条件来选择.(2)钻孔机的安装与定位安装钻孔机的基础如果不稳定,施工中易产生钻孔机倾斜、桩倾斜和桩偏心等不良影响,因此要求安装地基稳固.对地层较软和有坡度的地基,可用推土机推平,在垫上钢板或枕木加固.为防止桩位不准,施工中很重要的是定好中心位置和正确的安装钻孔机,对有钻塔的钻孔机,先利用钻机的动力与附近的地笼配合,将钻杆移动大致定位,再用千斤顶将机架顶起,准确定位,使起重滑轮、钻头或固定钻杆的卡孔与护筒中心在一垂线上,以保证钻机的垂直度.钻机位置的偏差不大于2厘米.对准桩位后,用枕木垫平钻机横梁,并在塔顶对称于钻机轴线上拉上缆风绳.(3)埋设护筒钻孔成败的关键是防止孔壁坍塌.当钻孔较深时,在地下水位以下的孔壁土在静水压力下会向孔内坍塌、甚至发生流砂现象.钻孔内若能保持壁地下水位高的水头,增加孔内静水压力,能为孔壁、防止坍孔.护筒除起到这个作用外,同时好有隔离地表水、保护孔口地面、固定桩孔位置和钻头导向作用等.制作护筒的材料有木、钢、钢筋混凝土三种.护筒要求坚固耐用,不漏水,其内径应比钻孔直径大(旋转钻约大20厘米,潜水钻、冲击或冲抓锥约大40厘米),每节长度约2~3米.一般常用钢护筒.(4)泥浆制备钻孔泥浆由水、粘土(膨润土)和添加剂组成.具有浮悬钻渣、冷却钻头、润滑钻具,增大静水压力,并在孔壁形成泥皮,隔断孔内外渗流,防止坍孔的作用.调制的钻孔泥浆及经过循环净化的泥浆,应根据钻孔方法和地层情况来确定泥浆稠度,泥浆稠度应视地层变化或操作要求机动掌握,泥浆太稀,排渣能力小、护壁效果差;泥浆太稠会削弱钻头冲击功能,降低钻进速度.(5)钻孔钻孔是一道关键工序,在施工中必须严格按照操作要求进行,才能保证成孔质量,首先要注意开孔质量,为此必须对好中线及垂直度,并压好护筒.在施工中要注意不断添加泥浆和抽渣(冲击式用),还要随时检查成孔是否有偏斜现象.采用冲击式或冲抓式钻机施工时,附近土层因受到震动而影响邻孔的稳固.所以钻好的孔应及时清孔,下放钢筋笼和灌注水下混凝土.钻孔的顺序也应实事先规划好,既要保证下一个桩孔的施工不影响上一个桩孔,又要使钻机的移动距离不要过远和相互干扰.(6)清孔钻孔的深度、直径、位置和孔形直接关系到成装置量与桩身曲直.为此,除了钻孔过程中密切观测监督外,在钻孔达到设计要求深度后,应对孔深、孔位、孔形、孔径等进行检查.在终孔检查完全符合设计要求时,应立即进行孔底清理,避免隔时过长以致泥浆沉淀,引起钻孔坍塌.对于摩擦桩当孔壁容易坍塌时,要求在灌注水下混凝土前沉渣厚度不大于30厘米;当孔壁不易坍塌时,不大于20厘米.对于柱桩,要求在射水或射风前,沉渣厚度不大于5厘米.清孔方法是使用的钻机不同而灵活应用.通常可采用正循环旋转钻机、反循环旋转机真空吸泥机以及抽渣筒等清孔.其中用吸泥机清孔,所需设备不多,操作方便,清孔也较彻底,但在不稳定土层中应慎重使用.其原理就是用压缩机产生的高压空气吹入吸泥机管道内将泥渣吹出.(7)灌注水下混凝土清完孔之后,就可将预制的钢筋笼垂直吊放到孔内,定位后要加以固定,然后用导管灌注混凝土,灌注时混凝土不要中断,否则易出现断桩现象.二、钻孔灌注桩常见施工问题1、缩径产生的原因:(1)清孔不彻底,泥浆中含泥块较多,再加上终灌拔管过快,引起桩顶周边夹泥,导致保护层厚度不足.(2)孔中水头下降,对孔壁的静水压力减小,导致局部孔壁土层失稳坍落,造成砼桩身夹泥或缩颈.孔壁坍落部分留下的窟窿,成桩后形成护颈.防治措施 :预防缩径的关键是控制泥浆比重,确保泥浆能保持孔壁平衡.(1)使用直径合适的钻头成孔,根据地层变化配以不同的泥浆.(2)成孔施工时应重视清孔,在清孔时要做到清渣而不清泥,预防清孔后的在浇砼的过程中局部坍塌,导致缩径的产生.2、断桩产生的原因:(1)砼拌和物发生离析使桩身中断.(2)灌注中,发生堵塞导管又未能处理好;或灌注中发生导管卡挂钢筋笼,埋导管,严重坍孔,而处理不良时,都会演变为桩身严重夹泥,砼桩身中断的严重事故.(3)灌注时间过长,首批砼已初凝,而后灌注的砼冲破顶层与泥浆相混;或导管进水,未及时作良好处理,均会在两层砼中产生部分夹有泥浆渣土的截面.防治措施:(1)导管要有足够的抗拉强度,能承受其自重和盛满砼的重量;内径应一致,其误差应小于±2毫米,内壁须光滑无阻,组拼后须用球塞、检查锤作通过试验;导管最下端一节导管长度要长一些,一般为4米,其底端不得带法兰盘.(2)导管在浇灌前要进行试拼,并做好水密性试验.(3)严格控制导管埋深与拔管速度,导管不宜埋入砼过深,也不可过浅.及时测量砼浇灌深度,严防导管拔空.(4)经常检测砼拌和物,确保其符合要求.3、桩顶局部冒水、桩身孔洞产生的原因:(1)水下砼灌注过程中,导管埋深过大,导管内外砼新鲜程度不同,再加上灌注过程中上下活动导管过于频繁,致使导管活动部位的砼离析,保水性能差而泌出大量的水,这些水沿着导管部位最后灌入的、最为新鲜的砼往上冒,形成通道(即桩身孔洞) .(2)水下砼灌注过程中,砼倾倒入导管速度过快过猛,把空气闷在导管中,在桩内形成高压气包.高压气包在其自身浮力或导管起拔等外力的作用下,在砼内不断上升,当上升到桩顶附近时,气包浮力与上升阻力接近,在没有外力的作用下,气包便滞留在桩身内,最终形成桩身孔洞.另外,有一些桩在余桩截后,桩身内残余的高压气体,因通道打开而顺桩身的细小缝隙释放出来.这时,常会携带部分遗留在气包内的水往上冒,出现“桩顶冒气泡”的怪现象.(3)水下砼灌注时间过长,最早灌入孔内的砼坍落度损失过大,流动性变差,终灌导管起拔后会留下难以愈合的孔洞.防治措施:(1) 控制导管的埋深,灌注过程中做到导管勤提勤拔.(2) 砼倾入导管的速度应根据砼在管内的深度控制,管内深度越深,砼倾入速度越应放慢.在可能的情况下,应始终保持导管内满管砼,以防止桩身形成高压气包.实际施工中,往往因为导管每次起拔后管内都会形成空管,再次灌注时,桩身形成高压气包就很难避免.因此,应在灌注过程中适当上下活动导管,把已形成的高压气包引出桩身.(3)加适当缓凝剂,确保砼在初凝前完成水下灌注.4、钢筋笼上浮产生的原因: 砼由漏斗顺导管向下灌注时,产生一种顶托力,使钢筋笼上浮防治措施:(1)钢筋骨架上端在孔口处与护筒相接固定.(2)灌注中,当砼表面接近钢筋笼底时,应放慢砼灌注速度,并应使导管保持较大埋深,使导管底口与钢筋笼底端间保持较大距离,以便减小对钢筋笼的冲击.(3)砼液面进入钢筋笼一定深度后,应适当提导管,使钢筋笼在导管下口有一定埋深.但注意导管埋入砼表面应不小于2 米,不大于10米.如果钢筋笼因为导管埋深过大而上浮时,现场操作人员应及时补救,补救的办法是马上起拔拆除部分导管;导管拆除一部分后, 可适当上下活动导管;这时可以看到,每上提一次导管,钢筋笼在导管的抽吸作用下,会自然回落一点;坚持多上下活动几次导管,直到上浮的钢筋笼全部回落为止.当然,如果钢筋笼严重上浮,那么这一补救措施也不一定会十分奏效.5 、“烂桩头”产生的原因:(1)清孔不彻底,桩顶浮浆过浓过厚,影响水下砼灌注时测量桩顶位置的精度.(2)导管起拔速度过快,尤其是桩头直径过大时,如未经插捣,直接起拔导管,桩头很容易出现砼中间高、四周低的“烂桩头”.(3)浇筑速度过快,导致孔壁局部坍塌,影响测量结果.防治措施:(1)认真做好清孔工作,确保清孔完成后孔口没有泥块返出;在空孔较长的桩内测量砼上升面时,应控制好测量重锤的质量.通常认为使用5~40米米碎石砼时,重锤的质量可以控制在1.5千克左右;使用5~25米米碎石砼时,重锤的质量可以控制在1千克左右.在设计桩顶与地面距离<4 米时,通常认为使用竹竿通过手感测量砼面更直观,精度更高.(2)砼终灌拔管前,应使用导管适当地插捣砼,把桩身可能存在的气包尽量排出桩外后,以便精确测量砼面.也可通过导管插捣使桩顶砼摊平.6 、灌注砼时桩孔坍孔灌注水下砼过程中, 发现护筒内泥浆水位忽然上升溢出护筒, 随即骤降并冒出气泡,为坍孔征兆.如用测深锤探测砼面与原深度相差很多时,可确定为坍孔.。

相关文档
最新文档