IEC 61400-11 噪声测量技术
风力机气动噪声测量分析

风力机气动噪声测量分析岳巍澎;薛宇;刘燕【摘要】A new method was proposed for measurement and analysis the wind turbine aerodynamic noise .To measure the acoustic pressure in time domain at specified location , which is about 45 degree in front of wind turbine at operation, different from IEC microphone location .First, the measured signal was run through high-pass filter with cutoff frequency to capture AM noise .Then dBC calculation was run to obtain instantaneous sound pressure level.Finally AM noise amplitude and blade passing frequency by FFT were got .This method was used to measure and analysis of 1.5 MW wind turbine noise .It is found that wind turbine aeroacoustics AM noise has strong cou-pling wit in coming unsteady wind with atmospheric turbulence .The new method may help to establish the standard measurement of wind turbine aerodynamic noise for industry , to better control the amplitude noise of the wind tur-bine.%针对风力机气动调幅噪声,提出了一种新的测量和分析方法。
4_Acoustic%20noise%20measurements

2008-01-08Acoustic noise measurements噪声测量Training of test stations in Beijing风电机组检测技术培训北京Outline概要1. International Rules for Noise Measurementson Wind Turbines -Example: IEC 61400-11风机噪声测量国际规范-参考: IEC 61400-11 2. The WINDTEST procedure as one possibilityto carry out noise measurements on wind turbines –Breaks in between with time for discussionsWINDTEST的测试流程可以完成风机噪声测量——讲解过程中如有疑问可以随时打断以便讨论Topic 1: International Rules for Noise Measurements on Wind Turbines -Example: IEC 61400-11主题1:风机声学测量国际规范-参考: IEC 61400-11•How to use noise measurement results-development and sales steps –如何使用声学测量结果——开发与销售•History of the main international guidelines主要国际规范的发展历史•IEC 61400-11 as a measurements guideline测试规范之一IEC 61400-11•Conclusions and future topics结论和将来的主题How to use Noise Measurement Results -Development and Sales Steps –如何使用噪声测量结果——开发与销售•Prototype testing and optimization (emission measurements)样机测试与优化(声发射测量)•Certification (emission measurements)认证(声发射测量)•Noise impact calculations (based on measurement results)噪声影响计算(基于测量结果)•Noise impact verification (immission measurements) 噪声影响证明(声注入测量)Prototype Testing and Optimization (Emission Measurements)•Testing of interacting components=> check the turbine regarding resonances •Optimization of interacting components=> minimize noise level by choosing the optimal components combination•Optimization of turbine control system=> get the best combination of maximum power output / optimal turbine behaviour and lowest noise样机测试与优化(声发射测量)•测试连接部件=> 检查风机的共振•优化连接部件=> 通过优化组件连接方式最大限度地降低声级•优化风机控制系统=> 在输出最大功率/优化风机动作和最低的噪声之间寻求最完美的结合Certification认证(Emission Measurements)(声发射测量)•Measurements have to be carried out according to a guideline accepted by certification authorities测量必须根据权威认证认可的规范执行•Measurement results will be acepted if they have been carried out by an accredited institute如果测试是由公认的测试机构完成的,那么测量结果也会获得认可•Results of certification measurements can be used nearly all over the world认证测量的结果几乎可以在全世界使用Noise Impact Calculations (Based on Measurement Results)•Estimation of impacting noise at the dwellings around a wind turbine or wind farm•For noise impact calculations the certification measurement results have to be used•Given reference values on the houses around depend on the guideline used in each country •Precondition to get a building permission for a wind turbine in many countries噪声影响计算(基于测量结果)•在风机或风场周围的住所的噪声影响评估•对于噪声的影响计算,需要使用认证测量结果•房屋周围的噪声参考值根据各个国家标准确定•前提是获得国家对安装风机的建筑施工许可Noise Impact Verification(Immission Measurements)噪声影响证明(声注入测量)•Measurements very close to dwellings around the wind farm shows the acoustic far distance behaviour在风电场周围的住所附近测量表明声音的远距离特性•Other noise sources around the dwellings may have an important influence in the measurement results住所周围的其他声源对测量结果影响非常大•Manufacturers possibilities: Even in case of a higher sound power level an impact compliance is possible制造商的可能性:即使出现了更高的声功率级,但使冲击变弱也是可能的Topic 1: International Rules for Noise Measurements on Wind Turbines -Example: IEC 61400-11•How to use noise measurement results-development and sales steps -•History of the main international guidelines •IEC 61400-11 as a measurements guideline •Conclusions and future topics主题1:风机声学测量国际规范-参考: IEC 61400-11•如何使用声学测量结果——开发与销售•主要国际规范的发展历史•测试规范IEC 61400-11•结论和将来的主题History of the MainInternational Guidelines •1988: IEA recommendation ed. 2•1994: IEA recommendation ed. 3•1996: IEC 61400-11 ed. 1•1997: MEASNET ed. 1•2002: IEC 61400-11 ed. 2•2005:MEASNET ed. 2•(2009: IEC 61400-11 ed. 3 ?)主要国际规范的发展历史•1988: IEA推荐ed. 2•1994: IEA推荐ed. 3•1996: IEC 61400-11 ed. 1•1997: MEASNET ed. 1•2002: IEC 61400-11 ed. 2•2005:MEASNET ed. 2•(2009: IEC 61400-11 ed. 3 ?)History of International Guidelines-some Steps until Present Guidelines -•1988:-Wind speed measured exclusively anddirectly in 10 m height-Reference wind speed 8 m/s (10 m height)•1994: -Second wind screen was introduced-Wind speed calculated from measuredpower output parallel to met mast meas.•1998: -New tonality evaluation procedure国际规范发展历史——现有规范的一些发展•1988:-风速在10m高处单独测试-标准风速8 m/s (10 m 高度处)•1994: -引入辅助挡风屏-风速通过测试的输出功率和与之平行的测风塔来计算•1998: -新的音调评估程序History of International Guidelines-some Steps until Present Guidelines -•2002:-Wind speed range not less than 6-10 m/s in 10 m height-2nd order Regression instead ofBIN analysis-New tonality evaluation procedure •Since 2005 (only MEASNET, not IEC):-10 s averages instead of 1 min allowed-Nacelle wind speed for better correlation-Optimized met mast position国际规范发展历史——现有规范的一些发展步伐•2002:-10 m高度处的风速范围不少于6-10 m/s -使用二阶回归代替分仓-新的音调评估程序•自2005 (只针对MEASNET,而不是IEC):-允许使用10s平均代替1 min-机舱风速具有更好的相关性-优化的测风塔位置Topic 1: International Rules for Noise Measurements on Wind Turbines -Example: IEC 61400-11•How to use noise measurement results-development and sales steps -•History of the main international guidelines •IEC 61400-11 as a measurements guideline •Conclusions and future topics主题1:风机声学测量国际规范-参考: IEC 61400-11•如何使用声学测量结果——开发与销售•主要国际规范的发展历史•测试规范IEC 61400-11•结论和将来的主题IEC 61400-11 ed. 2.1•Measurements测量方法•Evaluation and further calculations评估和深入计算•Reporting报告Measurements测量方法•Calibration periods校准周期•Measurement positions测量位置•Acoustic measurements声学测量•Non-acoustic measurements非声学测量Calibration Periods •Equipment shall be checked regularly and be calibrated with traceability to a national or primary standards laboratoryDevice Calibration intervalAcoustic calibrator12 monthMicrophone24 monthIntegrating sound level meter24 monthSpectrum analyzer36 monthData recording system24 monthAnemometer24 monthElectric power transducer24 monthTable 23.a: Calibration intervals校准周期•测试设备需要定期检查并由国家的或高级的标准实验室标定设备标定间隔声音校准器12 个月麦克风24个月一体化声级计24个月频谱分析仪36个月数据记录系统24个月风速仪24个月电功率传感器24个月表24.a: 标定间隔Measurement Positions测量位置Fig. 25.1: Point for noise measurements图25.1: 噪声测试的测点布置Fig. 26.1: Distances for noise and meteorological measurements 图26.1: 噪声测量和气象测量的距离Fig. 27.1: Noise measurement positions (obligatory [1] and optional [2, 3, 4])图27.1: 噪声测量位置(必选位置[1] ,可选位置[2, 3, 4])Fig. 28.1: Noise measurement position (not only) in hilly terrain 图28.1: 噪声测量位置(不单是)多坡的地形Fig. 29.1: Microphone mounting on acoustically hard board 图29.1: 麦克风安装的硬质板Fig. 30.1: Met mast positioning area 图30.1: 测风塔安装区域Acoustic Measurements-What is to be Measured -•Apparent sound power level (for propagation calculations and turbine characterization)•3rd octave band levels (for propagation calculations)•Tonality (necessary how bothering the noise consistence is)•All values at the integer wind speeds 6, 7, 8, 9 and 10 m/s relating to 10 m height•All further conspicuous noise characteristics声学测试——测试内容•视在声功率级(用于后续演算和机组特性描述)•1/3倍频程频带升级测量(用于后续演算)•音调(必要的,评估持续的噪音有多么令人厌烦)•所有数据需要转换到10 m高度处的整风速6, 7, 8, 9, 10 m/s•所有显著的噪音特性Acoustic Measurements•At the reference position at least 30 average values of noise measurements concurrent with wind speed for both operated and stopped turbine; if necessary several measurement series have to be taken•At least 3 average values per wind speed BIN( +/-0.5 m/s at each integer wind speed value)•Each mean value shall be averaged over not less than one minute声学测试•在基准位置处的风机噪声测试,对于运行和停机状态均至少需要与风速同步测试30组平均值;•必须要考虑几组测试序列:在每一个风速窗(即每一整风速处的±0.5m/s范围内)至少需要3组平均值。
风电相关国家标准整理

国家相关标准风力发电机组功率特性测试主要依照IEC61400-12-1:2005风电机组功率特性测试是目前唯一一个正式版本电流互感器级别应满足IEC 60044-1电压互感器级别应满足IEC 60186功率变送器准确度应满足GB/T 13850-1998要求,级别为0.5级或更高IEC 61400-12-1 功率曲线IEC 61400-12-1 带有场地标定的功率曲线IEC 61400-12-2 机舱功率曲线IEC 61400-12 新旧版本区别对于垂直轴风电机组,气象桅杆的位置不同改变了周围区域的环境要求改变了障碍物和临近风电机组影响的估算方法使用具有余弦相应的风速计根据场地条件将风速计分为A、B、S三个等级根据高风速切入和并网信号可以得到两条功率曲线风速计校准要符合MEASNET规定风速计需要分级电网频率偏差不超过2HZ场地标定只能通过测量,不能用数值模拟场地标定的每一扇区分段至少为10°可以同步校准风速计改进了对风速计安装的描述通过计算确定横杆长度增加针对小型风机的额外章节MEASNET标准和旧版IEC61400-12标准区别使用全部可用的测量扇区,否则在报告中说明不允许使用数值场地标定场地标定更详细的描述,包括不确定度分析只允许将风速计置于顶部风速计的校准必须符合MEASNET准则不使用AEP不完整标准轮毂高度、风轮直径、桨角只能通过测量来判定,不能按照制造商提供的判定报告中必须提供全方位的照片IEC61400-12-1:Power performance measurement for electricity producing wind turbine(2005)风电机组功率特性测试可选择:场地标定IEC61400-12-2:Power curve verification of individual wind turbine,单台风电机组功率曲线验证(未完成)焦点:机舱功率曲线和数值场地标定IEC61400-12-3:Wind farm power performance testing,风电场功率特性测试(未完成)概念:多个气象桅杆(3D模型)IEC-61400-12-1 功率曲线严格的地形要求无尾流影响扇区每个风机使用一个气象桅杆测试时间大约3个月风场中少数风机的功率曲线IEC-61400-12-1 带有场地标定的功率曲线没有地形要求无尾流影响扇区每个风机使用两个气象桅杆测试时间大约6个月风场中少数风机的功率曲线风力发电机组载荷测试载荷测试标准参考IEC61400-12wind turbinesPart 12-1:Power performance measurements of electricity producing wind turbinesIEC61400-13wind turbine generator systemsPart 13:Measurement of mechanical loads风速,风向,温度气压等传感器的安装按照IEC61400-12进行风电机组噪声测试风电机组噪声测试结果风电机组型式认证:按照IEC61400-11标准进行测试风电机组噪声测试标准发展过程1988:IEA recommendation ed.2-风速只能在10m高度测试得到;-参考风速为8m/s1994:IEA recommendation ed.3-引入次风罩;-通过测量功率输出得到风速1996:IEC 61400-11 ed.1 (第一版)-使用新的音值计算方法1997:MEASNET ed.12002:IEC 61400-11 ed.2-测量风速范围扩展到6-10m/s;-用2阶拟合的方法取代分组分析的方法2005:MEASNET ed.2-用10s平均值代替1分钟平均值;-优化气象桅杆的位置2006:IEC 61400-11 ed.2.1-用4阶拟合的方法代替2阶拟合IEC 61400-11:2006 Ed.2.1 是目前风电机组噪声测量的IEC最新标准风电并网检测技术介绍风电机组电能质量测试标准GB/T 20320-2006等同采用IEC61400-21:2001随着我国风电产业的迅速增长,GB/T 20320-2006已经无法满足风电机组测试的要求2008年8月,IEC(国际电工委员会)颁布了新版的风电机组电能质量测试标准IEC61400-21:2008GB/T 20320-2006有效期为五年,新版风电机组电能质量测试标准正在升级过程中新版国家标准等同采用IEC61400-21:2008标准IEC61400-21:2008与GB/T 20320-2006《风力发电机组电能质量测量和评估方法》标准的主要变化:取消了风电机组电能质量特性参数中的“最大允许功率”和额定值中的“额定无功功率”项目;取消了测试条件中关于“中压电网接入点处的短路视在功率”和“湍流强度”的要求;测试条件中“机组输出端10min测量平均电压值”范围由额定值的±5%修改为±10%;增加了“对电压跌落的响应”测试内容和测试方法;增加了电流间谐波和高频分量的测试内容和测试、评估方法;增加了有功功率升速率限值和设定值控制的测试内容和测试方法;增加了无功功率能力和无功功率设定值控制的测试内容和测试方法;增加了电网保护和重并网时间的测试内容和测试方法测试标准:GB/T 20320《风力发电机组电能质量测量和评估方法》IEC61400-21:2008:Measurement and assessment of power quality characteristics of grid connected wind turbines风电机组电网适应性测试相关国标GB/T 15945-2008 《电能质量电力系统频率偏差》GB/T 15543-2008 《电能质量三相电压不平衡》GB/T 14549-1993 《电能质量公用电网谐波》GB/T 24337-2009 《电能质量公用电网间谐波》GB/T 12325-2008 《电能质量供电电压偏差》GB/T 12326-2008 《电能质量电压波动和闪变》GB/T 18481-2001 《电能质量暂时过电压和瞬态过电压》风电机组电气模型验证暂未出台,目前以德国TR4标准为基础,下半年作为国标推出。
(IEC)标准系列09

标 准 号 中 文 名 英 文 名
IEC 62255-3-2006
1 , 75
宽带数字通信用对绞/星绞多芯对称电缆(高位率数 Multicore and symmetrical pair/quad cables for broadband digital communications (high bit rate 字存取通信网络).外部设备电缆.第3部分:填充电 digital access telecommunication networks) - Outside plant cables - Part 3: Filled cables - Sectional 缆.分规范 specification 低压电气装置.第4-41部分:安全防护.电击防护 Low-voltage electrical installations - Part 4-41: Protection for safety - Protection against electric shock
IEC 62255-2-2006
IEC 62255-2-1-2006
IEC 62132-1-2006
IEC 62129-2006
国际电工委员会(IEC)标准系列09
标 准 号 中 文 名 英 文 名
IEC 62115 Edition 1.1-2006 电动玩具.安全 Electric toys - Safety
IEC 60704-2-13 AMD 1-2005
IEC 60601-2-51-2005
医用电气设备.第2-51部分:单道和多道心电描记器 Medical electrical equipment - Part 2-51: Particular requirements for the safety, including essential 记录和分析的安全(包括基本特性)的特殊要求 performance, of recording and analysing single channel and multichannel electrocardiographs 低压电气设施.第7-753部分:特殊装置或位置要求. 地板和天花板供暖系统 家用和类似用途电器.安全.第1部分:一般要求.勘 误1 家用或类似用途的电熨斗性能测量方法.修改件1 Low-voltage electrical installations - Part 7-753: Requirements for special installations or locations - Floor and ceiling heating systems Household and similar electrical appliances - Safety - Part 1: General requirements; Corrigendum 1
风电整机噪声测试

产品认证型式试验作业指导书风电机组噪声测试编写:实施日期:版本号:编制:目录1.目的和适用范围6.测试数据处理2.引用文件3.现场测试的安全规程4.测试准备工作5.噪声现场测试1.目的和适用范围1.1.目的为确保实验设备和检验人员的安全,促进测试工作的规范化和程序化,保障测试数据的准确性、可靠性,特制定本试验指导书。
本试验指导书提供了统一的方法进行风力发电机组噪声测试,以确保测试过程中实验设备和检验人员的安全:促进测试工作的规范化、程序化和自动化,保证测试和分析的准确性、一致性和可重复性。
1.2.适用范围本试验指导书适用于各种容量和类型的风电机组噪声测试。
2.引用文件:-GBT 22516-2008《风力发电机组噪声测试方法》-IEC 61400-11:2002 Aoustic noise measurement techniques3.现场测试的安全规程3.1.人员试验工作人员至少为2人,其中1人为操作员,完成实验的操作;另l人为监督员,对操作进行监督和检查。
厂方应配备专门的工作人员对测试工作积极配合。
3.2.标志试验时应悬挂明显的工作标识。
3.3.试验开始前1)认真听取现场工作人员的有关注意事项的说明;2)停电,放置作业标志;3)检查风力发电机组是否带电;4)安装试验设备,并按照测试系统的接线图正确接线,并由试验监督员进行检查。
核实无误后方可通电。
特别需要注意设备的接地和互感器的二次侧接线情况,保证设备接地良好,电压互感器二次侧不短路,电流互感器二次侧不开路。
3.4.试验过程中1)进行必要的电气操作时要戴好安全帽和绝缘手套、穿好绝缘靴;2)试验过程中不要乱动与试验设备无关的其他设备。
3.5.试验结束后1)风力发电机组停电;2)检查设备是否带电;3)确认停电后,关闭测试系统电源;4)将测试设备正确拆除,并整理好按要求放回测试系统工具箱中;5)清除作业标志,恢复试验前的现场工况。
3.6.紧急情况处理整个测试过程应严格按照试验指导书和现场安全规程进行操作,遇到紧急情况应迅速断电,保证人身和设备的安全。
《环境噪声监测技术规范--噪声测量值修正》培训教材

通常测量的是噪声声压级:
由以上两式,声压级的运算为:
L合 10 lg(100.1L1 100.1L2 )
噪声测量值修正原理
噪声测量值 L测 、环境背景声值 L背 和噪声源排放声值 L源
之间满足公式:
L 10 lg(10 10 ) 0.1L L测 10lg(100.1L源 100.1L背 ) 源
相同。
不能
测量时间:与噪 声测量值的测量 时间相近或相同。 测量地点:背景
噪声对照点。
案例一
某发电厂厂区呈半岛型,南面靠山,三面环水,最近的村庄有二个, 南面为A村,东南为B村。
20XX年X月,受企业委托对该厂二期扩建工程进行竣工环境保护验 收监测。
案例一
表1 厂界噪声监测结果统计表
单位:dB(A)
GB 22337-2008《社会生活环境噪声排放标准》 GB 12348-2008《工业企业厂界环境噪声排放标准》 GB 12523-2011《建筑施工场界环境噪声排放标准》
相关标准及规范
相关标准及规范
新规 范中 补充 内容
1
补充了噪声测量值与背景噪声值相差3dB(A) 以下时的修正方法。
2 规范了背景噪声测量的技术细节。
❖ 4.4 若被测噪声源短时间内不能够停止排放,且噪声源停止前后 的时间段内周围声环境已发生变化,则应另行选择与测量噪声 源时声环境一致的时间测量背景噪声。测点位置同4.3。
背景噪声测量方法
背景噪声对照点测量
❖ 4.5 若被测噪声源不能够停止排放,且存在背景噪声对照 点,背景噪声可选择在背景噪声对照点测量。应详细记录 背景噪声对照点的周边声源情况、测点布设及其他影响因 素(如:绿化带、地形、声屏障等),并与被测噪声源处 相应信息进行比较。此方法仅用在背景噪声与噪声测量值 相差4.0 dB以上时,相差4.0 dB以内时不得采用。
IEC61400

您现在的位置:首页 > 技术文库 > 技术服务 > 管理咨询/认证 > 文章内容:“IEC61400“IEC61400“IEC61400-22风力发电机组符合性检测及认证”解读作者:TüV莱茵技术公司吴强来源:Ringer世界风能行业自上世纪70年代末出现, 至今已经走过了超过30年的发展历程。
中国风能行业发展也是伴随着一条国家重视、引进、试验、消化、吸收、研发和贸易化的道路。
风能行业发展过程中,相关的国家、国际标准同样遵循实践、总结、编写,再实践、再更新的轨迹不断建立、健全和完善。
IEC(国际电工委员会)协调风能行业标准的分委会称为TC88(Technical Committee —技术委员会88),本世纪初,该委员会为协调欧洲诸国风电机组认证,出版了2001版“IEC WT01风电机组符合性测试及认证的IEC体系”标准。
该标准总结了当时风能行业的发展经验,规范了有关风电机组检测、认证的范围、规则、程序、报告形式,以及证书颁发的种类。
与风电机组认证标准紧密“配套”的是IEC61400系列技术标准,它涵盖了设计要求、小型风电机组(SWT)、海上(offshore)风电机组,以及风电机组的主要零部件,如主齿轮箱、叶片等;对整个风电机组的运行测试也颁布了相关的测试标准,包括功率、电质量、噪音等。
IEC61400系列技术标准之间是相互关联并交叉参考的。
例如IEC61400-1固然是针对风电机组设计要求而制订,其中对于主齿轮箱的具体执行标准必须参考“IEC61400-3齿轮箱”。
不仅如此,IEC61400系列技术标准还与其他更多的IEC标准关联,例如发电机部分参考“IEC60034转动型电气设备”,电气安全参考“IEC60204-1电气设备安全通则”等。
从“IEC WT01”到“IEC61400-22”标准的制订既是对制订时间点前的实践总结,规范出相应的条例,又必须应用于制订之日后的实践,因此,其作用之一是承前启后,而且,随着时间的进一步推移,行业的发展向前,碰到很多新情况、新题目,就有必要对已制订的标准重新审核、更新、改版,以适合实践需要。
小型风力机测试标准综述

小型风力机测试标准综述包道日娜;姚明【摘要】小型风力发电机能有效解决电网不能覆盖偏远地区农牧民的用电问题.但目前市场上的小风机质量参差不齐,加之农牧民缺乏对小风机技术的了解,因此保证小风机产品质量和农牧民利益问题亟待解决.风力发电机组测试认证标准为保证风力发电行业的健康发展发挥了重要作用,世界各国都在建立和完善本国的测试认证标准.本文介绍了现有关于小型风力机的测试标准,包括IEC 61400-2《小型风力发电机组设计要求》、IEC 61400-11:2006《噪声测试》、IEC 61400-12-1《功率性能测试》、《AWEA9.1小型风力发电机组性能与安全标准》、《BWEA小型风力发电机组性能与安全标准》,并在此基础上分析各标准在测试方法和数据处理上的差别.【期刊名称】《太阳能》【年(卷),期】2015(000)007【总页数】5页(P11-15)【关键词】小型风力发电机;测试标准【作者】包道日娜;姚明【作者单位】内蒙古工业大学能源与动力工程学院;内蒙古工业大学能源与动力工程学院【正文语种】中文0 引言根据中国农业机械工业协会风能设备分会对行业内22 家主要生产制造企业上报的统计资料显示,2013 年这22家中小型风电企业全年总生产量7.79 万台,总销售量达到7.19 万台,总产值8.79 亿元,总销售额8亿元,生产机组容量6.72万kW,销售机组容量6.1 万kW,利税总额1.96亿元。
其中有15 家企业上报的出口量1.97 万台,出口机组容量2.75 万kW,出口额4100 多万美元;另有3家永磁发电机生产企业产销永磁发电机约9500 kW,销售额达到2000 多万元。
2013年全国中小型风力发电机组出口到全球6大洲113个国家或地区,出口数量约13400多台,出口额达到2395万美元,平均每台1700多美元,比2012 年的出口额减少9.5%[1]。
随着国内中小型风力发电行业的不断发展,中小型风力发电设备生产厂商持续增加,其产品大量涌入市场。
- 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
- 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
- 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。
IEC 61400-11 噪声测量技术IEC 61400-11风力发电机组,第11部分:噪声测量技术1 范围这个程序介绍的方法能够以一致的和正确的方式确定单个风力机噪声发散的特性。
这个程序包括以下部分:, 特定的声学测量位置;, 获得声学、气象学和相关风力机运行数据的必要条件;, 分析获得的数据和数据报告的内容;, 分析特殊声学发散参数和环境评估中的相关描述。
2 方法大纲应用这个国际表标准描述的方法提供视在有利声功率级、频率和在整数风速6到10m/s时单独风力机的声值。
可选的,方向性也可能被决定。
为了受到地形影响、大气条件或风力产生的噪声的最小影响测量在靠近涡轮的特定位置进行。
在试验、参考距离R基于风力机使用的尺寸的情况下说明风0 力机的尺寸。
通过放置在地面上的甲板上的麦克风进行测量能减少麦克风产生的风力噪声和最小化不同地面类型产生的影响。
在短时间周期和大范围风速中同时测量声压级和风速。
标准风速被修改成相应的参考高度10m和参考在粗糙长度0.05m的风速。
声音级在标准风速6、7、8、9和10m/s时被决定和用于计算视在有利声功率级。
通过比较在参考位置测量到的涡轮周围其它三个方向的声级确定方向性。
附件情报包括:, 风力机噪声发散和它们的量的其它可能特性(附件 A); Details of greento introduce "the art of bonsai" concept, plant morphology, leaf color, aromas to create different moods and charms. (B) improving air pollution prevention and control. …… Air p ollution sources in the four areas, a dust pollution and industrial enterprises of coal-burning pollution. A significant proportion of gypsum, stone processing enterprises and use of glass furnace standards of environmental protection facilities. Second, poor dust control, wide range of construction dust, road dust capacity. Three is to build coal-fired boilers in the region,particularly within the city's outdoor barbecue gas discharge seriously. Four motor vehicle exhaust is not inIn particular the greening of urban areas, it is necessary to carefully select the species suited to local soils, reflecting ... ... Features also allow for the evergreen trees, so that people walking in the shade. On one handTo expand green areas, improve planting quality fuss; but also to focus on simplicity and generosity of the green on the other hand, to enhance the Visual effect of green scale. Big green landscape according to the terrain the moderate, plant communities in natural, varied colors, flowers and clear principles, reflect the level, color and seasonal change., 录音/重放设备标准(附件 B);, 湍流强度评估(附件 C);, 测量不确定性评估(附件 D)。
3 使用仪器声学工具确定等价连续声级的设备确定三分之一倍频程波段范围的设备确定窄波段范围有测量甲板和挡风玻璃的麦克风声学口径测量器数据录音/重放系统非声学工具风速计电能传感器风向传感器其它使用仪器可追踪的刻度以下设备将被有规律的选定和由一个国家或首要标准实验室进行校准。
最后刻度的最大时间将被规定为各个项目中设备的要求:, 声学口径测量器(12月), 麦克风(24月), 整体声级表(24月), 频谱分析器(36月), 数据录音/重放系统(24月), 风速计(24月), 电能传感器(24月)4 测量和测量程序Details of green to introduce "the art of bonsai" concept, plant morphology, leaf color, aromas to create different moods and charms. (B)improving air pollution prevention and control. …… Air pollution sources in the four areas, a dust pollution and industrial enterprises of coal-burning pollution. A significant proportion of gypsum, stone processing enterprises and use of glass furnace standards of environmental protection facilities. Second, poor dust control, wide range of construction dust, road dust capacity. Three is to build coal-fired boilers in the region, particularly within the city's outdoor barbecue gas discharge seriously. Four motor vehicle exhaust is not inIn particular the greening of urban areas, it is necessary to carefully select the species suited to local soils, reflecting ... ... Features also allow for the evergreen trees, so that people walking in the shade. On one handTo expand green areas, improve planting quality fuss; but also to focus on simplicity and generosity of the green on the other hand, to enhance the Visual effect of green scale. Big green landscape according to the terrain the moderate, plant communities in natural, varied colors, flowers and clear principles, reflect the level, color and seasonal change.测量位置声学测量位置风速和方向测量位置声学测量声学测量要求, 完整的测量链将包括测量前和测量后至少在一个频率,或如果麦克风在重新配置期间时不连贯的。
, 所有声学信号必须被记录和贮存用于随后的分析。
, 闯入间歇性后台噪声的周期(例如航行器)将被忽略。
, 在风力机停止的时候,使用相同的测量结构,后台噪声将被立即测量在风力机噪声测量系列之前或之后和相似的风力条件。
在测量后台噪声时,所有的影响将被确定后台声音测量是典型的后台噪声在风力机噪声发散测量期间。
, 测量将包括实际可能的风速的范围。
在几个连续测量的测量中获得充足的风速范围将是必须的。
在参考位置1的声学测量声级三分之一倍频程波段测量窄波段测量在2、3和4位置的可选声学测量其它可选测量非声学测量风速测量方法1:从电力输出和功率曲线确定风速方法2:由风速计确定风速风向Details of green to introduce "the art of bonsai" concept, plant morphology, leaf color, aromas to create different moods and charms. (B) improving air pollution prevention and control. …… Air pollution sources in the four areas, a dust pollution and industrial enterprises of coal-burning pollution. A significant proportion of gypsum, stoneprocessing enterprises and use of glass furnace standards of environmental protection facilities. Second, poor dust control, wide range of construction dust, road dust capacity. Three is to build coal-fired boilers in the region, particularly within the city's outdoor barbecue gas discharge seriously. Four motor vehicle exhaust is not inIn particular the greening of urban areas, it is necessary to carefully select the species suited to local soils, reflecting ... ... Features also allow for the evergreen trees, so that people walking in the shade. On one handTo expand green areas, improve planting quality fuss; but also to focus on simplicity and generosity of the green on the other hand, to enhance the Visual effect of green scale. Big green landscape according to the terrain the moderate, plant communities in natural, varied colors, flowers and clear principles, reflect the level, color and seasonal change.其它大气条件5 数据压缩程序风速后台噪声修正视在声功率级三分之一倍频程波段级音值普通方法鉴别可能音值临界波段内的频谱线分类确定音值水平修正后台噪声确定掩饰噪声级确定音值可听度方向性(可选)6 报告信息风力机特性风力机详细资料:, 制造商;, 模型编号;, 序列号。